Loading...
10110171CITY OF CUPERTINO BUILDING PERMIT BUILDING ADDRESS: 20902 HANFORD DR CONTRACTOR: CLEAN SOLAR PERMIT NO: 10 110 171 OWNER'S NAME: HARISH AGASTYA 1445 KOLL CIR STE 109 DATE ISSUED: 12/07/2010 OWNER'S PHONE: SAN JOSE, CA 95112 PHONE NO: (408) 217-8876 ❑ LICENSED CONTRACTOR'S DECLARATION r r r &\O L) 10-6 Liq BUILDING PERMIT INFO: BLDG ELECT PLUMB License Class Lic. it r r r C -� 1� Contractor �1(� d-At� Date (? 11 1 10 MECH RESIDENTIAL COMMERCIAL 1 hereby affirm that I am licensed under the provisions of Chapter 9 JOB DESCRIPTION: PHOTOVOLTAIC ROOF MOUNTS-16 SUNTECH (commencing with Section 7000) of Division 3 of the Business & Professions PANELS/UNITS Code and that my license is in full force and effect. I hereby affirm under penalty of perjury one of the following two declarations: I have and will maintain a certificate of consent to self-insure for Worker's Compensation, as provided for by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued. Sq. Ft Floor Area: Valuation: $21236 I have and will maintain Worker's Compensation Insurance, as provided for by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued. APN Number: 32630057.00 Occupancy Type: APPLICANT CERTIFICATION I certify that I have read this application and state that the above information is correct. I agree to comply with all city and county ordinances and state laws relating to building construction, and hereby authorize representatives of this city to enter PERMIT EXPIRES IF WORK IS NOT STARTED upon the above mentioned property for inspection purposes. (We) agree to save indemnify and keep harmless the City of Cupertino against liabilities, judgments, WITHIN 180 DAYS OF PERMIT ISSUANCE OR costs, and expenses which may accrue against said City in consequence of the 180 DAYS FROM LAST CALLED INSPECTION. granting of this permit. Additionally, the applicant understands and will comply with all non-point source regulations per the Cupertino Municipal Code, Section 9.18. Issued by: Date: 12-7-10 Signature Date ❑ OWNER-BUILDER DECLARATION RE-ROOFS: All roofs shall be inspected prior to any roofing material being installed. If a roof is I hereby affirm that 1 am exempt from the Contractor's License Law for one of installed without first obtaining an inspection, I agree to remove all new materials for the following two reasons: inspection. 1, as owner of the property, or my employees with wages as their sole compensation, will do the work, and the structure is not intended or offered for sale (Sec.7044, Signature of Applicant: Date: Business & Professions Code) 1, as owner of the property, am exclusively contracting with licensed contractors to construct the project (Sec.7044, Business & Professions Code). ALL ROOF COVERINGS TO BE CLASS "A" OR BETTER I hereby affirm under penalty of perjury one of the following three declarations: HAZARDOUS MATERIALS DISCLOSURE 1 have and will maintain a Certificate of Consent to self-insure for Worker's 1 have read the hazardous materials requirements under Chapter 6.95 of the Compensation, as provided for by Section 3700 of the Labor Code, for the California Health & Safety Code, Sections 25505, 25533, and 25534. I will maintain performance of the work for which this permit is issued. compliance with the Cupertino Municipal Code, Chapter 9.12 and the Health & I have and will maintain Worker's Compensation Insurance, as provided for by Safety Code, Section 25532(a) should I store or handle hazardous material. Section 3700 of the Labor Code, for the performance of the work for which this Additionally, should I use equipment or devices which emit hazardous air permit is issued. contaminants as defined by the Bay Area Air Quality Management District I will maintain compliance with the Cupertino Municipal Code, Chapter 9.12 and the [ certify that in the performance of the work for which this permit is issued, l shall Health & Safety Code, Sections 25505, 25533, and 25534. not employ any person in any manner so as to become subject to the Worker's Compensation laws of California. If, after making this certificate of exemption, 1 O e I r J become subject to the Worker's Compensation provisions of the Labor Code, I must 1 fi Date: l I forthwith comply with such provisions or this permit shall be deemed revoked. CONSTRUCTION LENDING AGENCY APPLICANT CERTIFICATION I hereby affirm that there is a construction lending agency for the performance of work's I certify that I have read this application and state that the above information is for which this permit is issued (Sec. 3097, Civ C.) correct. 1 agree to comply with all city and county ordinances and state laws relating Lender's Name to building construction, and hereby authorize representatives of this city to enter upon the above mentioned property for inspection purposes. (We) agree to save Lender's Address indemnify and keep harmless the City of Cupertino against liabilities, judgments, costs, and expenses which may accrue against said City in consequence of the ARCHITECT'S DECLARATION granting of this permit. Additionally, the applicant understands and will comply with all non-point source regulations per the Cupertino Municipal Code, Section 1 understand my plans shall be used as public records. 9.18. j Signature Date t �i 4 Licensed Professional CITY Of CUPERTINO CITY OF CUPERTINO / 0// 0/ 71 SOLAR PANEL PERMIT APPLICATION FORM APN # ---) - f)l �e �D 0 5`7 Fee Description Date:� Building Address: C)a �4 n Owner's Name: S�cwa— j—� j AAf �, / f� Phon Contracn,,,, Photovoltaic System Commercial/Multi-family Phone #:I 0 �)'7 -��rl� Contractor Lic se #: gr1 Fax #: 0F" Contact: ! Phone #: "a(�l `b �d Cupertino Business License #: Kn_ l (� ( Fax #: Number of Panels/Un'ts: S fi Kilowatts (Commercial Only): SI,i�� S Job Description: y /C v,] PhofD Vol (0 -le -c r��moc�ti� Project Size: Express WStandard Large Major Fj Residential [ Commercial E]Valuation (cosX-,o f proie'� Green Points: 1.2 KW — 6 Points El 2.4 KW —12 Points 3.6 KW —18 Points ❑ Quantity Fee ID Fee Description Fee Group Permit Type 1 SOLARPANL Commercial Solar Panel E SOLAR -COMM 1PHOTOVCOM Photovoltaic System Commercial/Multi-family E 1BSEISMICO Seismic Commercial E IELCPLNCK Plan Check Fee E 1BCBSC Cal Bldg Standards Commission Fee B ALL PERMIT TYPES COMM & RESID 1 SOLARRES Residential Solar Panel E SOLAR -RES Revised 07/06/09 IM -1 CITY OF CUPERTINO FEE ESTIMATOR - BUILDING DIVISION NOTE: These fees are based on the nreliminary information available and are onlv an estimate. Contact the Dent for addn'l info. FEE ITEMS (Fee Resolution 09-051 E, K. 7//// 0) ADDRESS: 20902 hanford dr. DATE: 11/29/2010 REVIEWED BY: bobs. Lfec:A. l'c>�'111i1 Fc: APN: BP#: `VALUATION: 1$21,236 PERMIT TYPE: Building Permit PLAN CHECK TYPE: Alteration / Repair PRIMARY USE: SFD or Duplex 7-07-,4I, PLOOR •thf.r4. PENTAMATION PERMIT TYPE: SOLAR -RES WORK install solar panels at existing sfd rooftop SCOPE NOTE: These fees are based on the nreliminary information available and are onlv an estimate. Contact the Dent for addn'l info. FEE ITEMS (Fee Resolution 09-051 E, K. 7//// 0) fo h, Plan Check tPfrtmi" Non (';I, CJ� c'k Lfec:A. l'c>�'111i1 Fc: Plan Check Fee: � /ho..11 i ,17. /asp, 1 F -1F' I'IfJ l7Tt; 1: (JIt7L'r' El"(Ll I IMJ/). Ftce- i'; irll; il. lil q), !': /:lr.r Irtq,. 1, . NOTE: These fees are based on the nreliminary information available and are onlv an estimate. Contact the Dent for addn'l info. FEE ITEMS (Fee Resolution 09-051 E, K. 7//// 0) FEE QTY/FEE MISC ITEMS Plan Check Fee: $0.00 1 # $207.00 Photovoltaic System ISOLARRES Suppl. PC Fee: 0 Reg. 0 OT 0.0 1 hrs $0.00 PME Plan Check: $0.00 Permit Fee: $0.00 Suppl. Insp. Fee{' Reg. 0 OT 0.0 1 hrs $0.00 PME Unit Fee: $0.00 PME Permit Fee:. $0.00 _T_T Construction Tnx Acoustical Fee: 0 Yes 0 No $0.00 0 O Work Without Permit? 0 Yes 0 No $0.00 Planning Fee: $0.00 Select a Non -Residential Building or Structure 0 0 Travel Doc%U1?C!?1ati()n l��ccs': Strong Motion Fee: IBSEISMICR $2.12 Select an Administrative Item Bldg; Stds Commission Fee: IBCBSC $1.00 SUBTOT:kLS: $3.121 $207.00 TOTAL FEE: $210.12 Revised: 11/08/2010 CUPERTINO CONTRACTOR / SUBCONTRACTOR LIST Building Department City Of Cupertino 10300 Torre Avenue Cupertino, CA 95014-3255 Telephone: 408-777-3228 Fax: 408-777-3333 JOB ADDRESS: Q PERMIT # L © l � OWNER'S NAME: C(S PHONE # GENERAL CONTRACTOR.j C�2 BUSINESS LICENSE # ADDRESS:S , ,, SaC *Our municipal code requires all businesses working in the city to have a City of Cupertino business license. NO BUILDING FINAL OR FINAL OCCUPANCY INSPECTION(S) WILL BE SCHEDULED UNTIL THE GENERAL CONTRACTOR AND ALL SUBCONTRACTORS HAVE OBTAINED A CITY OF UPERTINO BUSINESS LICENSE. I am not using any subcontractors: Signature Dat Please check applicable subcontractors and complete the following information: G/ SUBCONTRACTOR BUSINESS NAME BUSINESS LICENSE # Cabinets & Millwork Cement Finishing Electrical Excavation Fencing Flooring / Carpeting Linoleum / Wood Glass / Glazing Heating Insulation Landscaping Lathing Masonry Painting / Wallpaper Paving Plastering Plumbing Roofing Septic Tank Sheet Metal Sheet Rock Tile Owner / Contractor Signature Date 185 Watt MONOCRYSTALLINE SOLAR MODULE Suntech Black Label" modules are exclusively designed and engineered for homeowners who seek a rooftop solar solution that combines visual aesthetics with excellent efficiency. Features High module conversion efficiency (up to 14.5%), through superior manufacturing technology = Guaranteed 0-5W positive power output tolerance ensures high reliability .� Proprietary Gallium -F22 doping process -a• dramatically reduces initial light -induced degradation to <1%, thus delivering better power and performance overtime Entire module certified to withstand high wind loads (240WMIROuW0 snow loads (5400 Pascal) ;; •. IN ACCORDANCE WITH THE CITY Of CUPERTINO CODES AND ORDINANCE$ DATE 2—1—/ - �V I_JL I V I SIGNEDt�_� This set of plans and specifications MUST be kept onthe job at a1 tines and it is Trust Su` tiance Over Time the Building DWartment, C of Cupertino. • World' Bi�I-RNVT E+llfrFll?11I tphotovoltaic modules • Unrival&WdW lR?." WoWdVISA technology • Rigorouic��v��hr�i'ainational standards W. ISO 9001: 2008 aO 004 • Certification and standards: IEC 61215, IEC 61730, conformity to CE .SSUNTECH Solar powering a green future" Industry-leading warranty � n M. »ti 7w 25 year transferrable power output warranty: 5 year/95%, 12 year/90%,18 year/85%, 25 year/80% *" Based on nominal power Warrants 6.7% more power than the market standard over 25 years 5 year material and workmanship warranty • Please refer to Suntech Standard Module Installation Manual for details. '• Please refer to Suntech Product warranty for details. ®Copyright 2010 Suntech Power too 5 a 0 90 % 6 M0 nay t r,Aodute �(�cime a Some& s others 3 "f v o 11 % Patented surface pyramids enhance sunlight absorption by redirecting reflected light to other areas on the cell surface to be reabsorbed Suntech cells feature a breakthrough process that replaces traditional boron doping with gallium doping. The effect of initial light -Induced degradation is dramatically reduced, leading to greater power output over the entire module lifetime. Graph Is for Illustration only and does not Imply arty guarantee of module performance. Please check warranty for details. Sect) Note: mm (inch) Current -Voltage & Power -Voltage Curve (1855-24) e s CZ L, S 0 2 0 Vdtage M 1000 W/nJ - BOO_ __ __ = __ Temperature Characteristics Nominal Operating Cell Temperature (NOCT) 45±2°C Temperature Coefficient of Pmax -0.48 %/°C Temperature Coefficient of Voc -0.34 %/°C Temperature Coefficient of Isc 0.037 %/°C Dealer information box Specifications are subject to change without further notification Electrical Characteristics STC STPI8SS-24/Ad+ STP180S-24/Ad+ Optimum Operating Voltage (Vmp) 36.4 V 36.0 V Optimum Operating Current (Imp) 5.09 A 5.00 A Open - Circuit Voltage (Voc) 45.0 V 443V Short - Circuit Current (Isc) 5.43 A 5.29 A Maximum Power at STC (Pmax) 185 W 180 W Module Efficiency 145 % 14.1% Operating Temperature -40 °C to +85 °C -40°C to +85°C Maximum System Voltage 600 V DC 600 V DC Maximum Series Fuse Rating 15A 15 A Power Tolerance 0/+5W 0/+5 W STC Irradiance 1000 w/m2, module temperature 25'C, AM -1 S NOCT STPI8SS-24/Ad+ STPISOS-24/Ad+ Maximum Power (W) 137W 133 W Maximum Power Voltage (V) 332 V 32.9 V Maximum Power Current (A) 4.11 A 4.05 A Open Circuit Voltage (Voc) 41.3 V 40.9 V Short Circuit Current (Isc) 4.39 A 4.30 A Efficiency Reduction (from 1000 W/m'to 200 W/m') <4.5% <4.5% NOCT.'Irradlance 800 W/m2, ambient temperature 20 °C, wind speed 1 m/s Mechanical Characteristics Solar Cell Monocrystalline 125 x 125 mm (5 Inches) No. of Cells 72 (6 x 12) Dimensions 1580 x 808 x 35mm (62.2 x 31.8 x 1.4 inches) Weight 155 kgs (34.1 lbs.) Front Glass 32 mm (0.13 inches) tempered glass Frame Anodized aluminium alloy Junction Box IP67 rated H+S RADOX• SMART cable 4.0 mm2 (0.006 Inches?), Output Cables symmetrical lengths (-)1000 mm (39.4 Inches) and (+) 1000 mm (39.4 inches), H4 connectors (MC4 compatible) Packing Configuration Container 20 GP j 40'GP Pieces per pallet 26 26 Pallets per container 12 28 Pieces per container 312 728 [e] ENPHASE MICROINVERTER MAOXiJ The Enphase Energy Microinverter System improves energy harvest, increases reliability, and dramatically simplifies design, installation and management of solar power systems. The Enphase System includes the microinverter, the Envoy Communications Gateway, and the web -based Enlighten monitoring and analysis website. - Maximum energy production PROD u CT IV E - Resilient to dust, debris and shading - Performance monitoring per module - MTBF of 331 years R E L I A R L E - System availability greater than 99.8% - No single point of system failure S 1`.0 A R T - Quick & simple design, installation and management - 24/7 monitoring and analysis S A r E - Low voltage DC s�® - Reduced fire risk c us MICROINVERTER TECHNICAL DATA In ut Data DC M190-72-208-612/3 M190-72-240-612/3 p ( M190 -72 -208 -612/3 -NA (Ontario) M190 -72 -240 -612/3 -NA (Ontario) Recommended input power (STC) 230W Maximum input DC voltage 56V Peak power tracking voltage 22V — 40V Min./Max. start voltage 28V/54V Max. DC short circuit current 12A Max. input current 10A Output Data (AQ 230W 56V 22V — 40V 28V/54V 12A 10A Maximum output power 190W 190W Nominal output current 920mA 800mA Nominal voltage/range 208V/183V-229V 240V/211V-264V Extended voltage/range 208V/179V-232V 240V/206V-269V Nominal frequency/range 60.0/59.3-60.5 60.0/59.3-60.5 Extended frequency/range 60.0/59.2-60.6 60.0/59.2-60.6 Power factor >0.95 >0.95 Maximum units per branch 21 15 Efficiency Peak inverter efficiency 95.5% CEC weighted efficiency 95.0% Nominal MPP tracking 99.6% Mechanical Data Operating temperature range Night time power consumption Dimensions (WxHxD) Weight Cooling Enclosure environmental rating Features Communication Warranty Compliance 95.5% 95.0% 99.6% -40°C to +65°C -40°C to +65°C 30mW 30mW 8" x 5.25" x 1.25" 4.4 1 bs Natural Convection — No Fans Outdoor — NEMA 6 Enphase Energy, Inc. 201 1St Street, Suite 300, Petaluma, CA 94952 877 797 4743 enphaseenergy,com 17M Powerl ine 15 Years UL1741/IEEE1547 FCC Part 15 Class B 142-00005 REV 05 9 Printed on 100 percent recycled paper. Quick Mount PVa Your 501 ►f10►1 in Mounting Solar . H2O • Conduit • HVAC Products • Custom Curved Tile Mount Specifications All Patents Pending Racking of Choice (Not Induded) (E) 18"x 18" Curved -Tile EPDM Rubber Counter Flashing Flexible Aluminum Flashing Cut Tile I(E) Batton (E) Plywood Sheathing (E) Tar Paper 6" Lip of ile to Center of Post Douglas Fir, Larch Douglas Fir, South .Engelmann Spruce (MSR 1650 f & higher) Hem, Fir Hem, Fir. (North) Southern Pine Spruce, Pine, Fir Spruce, Pine, Fir (E of 2 million psi and higher grades of MSR and MEL) 2 each 5/16'x 3' Lag Bolts Lag Bolt Specifications Specific 5116" shaft 5116" shaft gravity 3" thread depth 1" thread depth .50 798 266 .46 705 235 .46 705 235 .43 636 212 .46 705 235 .55 921 307 .42 615 205 .50 798 266 Sources: Uniform Building Code; American Wood Council Notes: 1) Thread must be embedded in a rafter or other structural roof member. 2) Pull-out values incorporate a 1.6 safety factor recommended by the American Wood Council. 3) See UBC for required edge distances. "Note: To maintain waterproofing of substrate it is important to make sure the Peel and Stitt Flashing is property placed over the Mount Base, and under the course of paper above. If the paper above does not reach due to layout, place an additional piece of roofing paper over the Peel and Stick and under the next course of paper above. (See instructions page 4) 1 5/16"x 1"Machine Bolt (Stainless Steel ) For Rack Attachment 5/16' ID Fender Washer (Stainless Steel) 5/16"x 1 1/4" Sealing Washer (Stainless Steel) ' Field Applied Appropriate Sealant 1 1/4'x 5 1/2"Aluminum Post / 5/16"-18 x 3/4" Grade 8 Bolt uminum Base Plate 12"x 11" Installation Tools Required: Tape Measure Drill with 1/4"wood bit Ratchet w/ 1/2' Socket J� Caulking Gun 1 Tube of Appropriate Sealant 30 Ib felt paper (E) 2 x Rafters Wisk Broom /Vacuum Roofers Bar / Shingle Ripper Know Your Roof It is a good idea to do a thorough roof evaluation prior to your project installation. At this time you should do a layout on the roof confirming everything on the drawing will fit as it is intended. Any irregularities should be noted now, so that you can deal with them simply on install day. The quality of the roofing should be determined, so that any repairs or replacement can happen before or in conjunction with the installation. Remove a tile and see what is underneath. On a file roof it is important to know as much as possible about: the manufacturer of the tile, the size of the tile, age of tile, type of substrate (plywood or oriented strand board [OSB]) the rafter size and spacing, age of roof structure, who roofed it, who built it, etc. Photos should be taken of all of the roof variables and associated with the job file for any future reference either short term or long. If the roof- ing manufacturer is known, it is then easy to obtain the written manufacturer's installation instructions for the roofing materials you are dealing with. Typically the the roof manufacturer puts a stamp of some sort on the back of each tile. This stamp can be defined by the roofing yard, or by a little on-line surfing. The manufacturer's instructions will spell out exactly what does and does not void the warranty of their roofing product. Officially, the roofing manufacturer's instructions supersede our instructions, as our product is weaving into theirs. It is also important to have their instructions in the job file, for any future reference. Product Selection The Quick Mount Curved Tile Mount is intended to fit within most curved tile roof systems, as well as most flat file systems. Specifically it is sized to fit within a standard 12" wide x 17" tall concrete tile roof system of either standard weight or light weight, and flat or curved. It is used on Flat Tile roofs when the engineer or building department requires rafter mounting. It is used on most any Curved Tile roof and rafter mounted as a standard. Height extensions are not for use with this product. Custom lengths can be ordered. (Coming Soon: Curved Tile Instructional Video at www.quickmountpv.com/tech.php) Waterproofing On a the roof it is actually the building paper below the tiles that is waterproof. The tiles are considered water resistant. It is assumed that water will travel under the tiles. The tiles are therefor aesthetics, thermal absorbtion, and to protect the building paper from U.V. and the elements. It is imperative to follow standard roofing practices with the paper. The Peel and Stick Flashing that we provide needs to go over our Mounting Base Plate with 1" minimum sticking to the roof paper below the mount On the top side of the mount, the Peel and Stick must extend under the existing lap in the paper course directly above the mount In the common occurrence that the paper is too far up the roof to reach, you must supply and install another piece of building paper (usually 30 Ib.) under the row of paper above, and over the top 2 inches of Peel and Stick Flashing. This paper should be wider than the Peel and Stick Flashing, and either stapled down or nailed. If a baton board is in the way, pry it up and slip the paper under the baton. How Many Mounts Per Module? There are two questions that must be asked when adding anything to a roof. 1. Can the roof / building / foundation handle the additional load? 2. What is to keep the new load from blowing away? It is assumed that a licensed solar installer can answer these questions. If he / she can't, he / she will need to find somebody that can. Alicensed engineer is the easiest solution. Some of the racking manufacturers have guides to calculating a code compliant install as well. Many vari- ables must be considered and determined to complete the calculation. The spacing between mounts has the variables of strength of rail, dis- tance between parallel rails, cantilever of modules over rails, pull out strength of mount, slope of roof, height of roof, wind zone, roof type, structural integrety of roof framing, etc. The only values in the variables above that we can provide is pull out strength and shear of mount. We provide structural test reports on all of our mounts as needed. You will need to do the calculation of variables as you are the only one who knows them all. Product Includes The units are sold in 12 packs. Each 12 pack includes the mounting hardware, the mount, the substrate waterproofing, and the flashing to install 12 mounts, with written instructions. Q� IBC T_**1_X ���` International 12/� National Building \ Roofing Code State Contractors Building �Assoclation Code Asphalt \ Roofing Manufacturers Association Further Resources Sheet Metal& In the process of all the research we have done, we came up with what %P Air Conditioning we call the "Wheel of Accountability". It is a graphical look at the many 7 Contractors' official entities that govern how waterproofing should be done. At our National Association web site you can click on any wedge of the wheel and get the code snip- National pets that pertain to that entity's focus on roof penetrations. Fire Please don't hesitate to use it to your advantage. And of course if you 41 9 q p have any feed back pro or con, let us have ft. Take photo's of your jobs tiG�O�, submit them to us,we'll pu using Mount them up tSubject 2 nor webkgallery. Submitthemto n - Gallery Photo � 1 International Residential Code National n Fire Protection Q Association (L nL 2 International Code Council s Ls 5/16"-18 x 1" SS Machine Bolt Racking of Choice 5/16" ID SS Fender Washer 6.625" o'(Not Included) 0 " 00 9 - . 18.00" EPDM Rubber ID 5/16" ID x 1 1/4" OD Counter Flashing Sealing Washer -„ 18.00" Flexible Peel and Stick Flashing Aluminum 12" x 11" Flashing j 5/16" x 3" Lag Bolts Example of a QMCTM cover molded as if on two roof tiles Cast Aluminum %� Base Plate / 1 5"x3.5"x0.5" 1 5/16"-18 x 3/4" Grade 8 Bolt PROPERTY OF QUICK MOUNT PV . ALL RIGHTS OF DESIGN OR INVENTION ARE RESERVED D\ (U Mount °V' CURVED TILE MOUNTING INSTRUCTIONS RAFTER INSTALLATION Remove Tile at selected location of Mount. Im-:7 Locate center of rafter and Mark with a felt pen. F Use a straight edge and measure up 6 5/8" from bottom of tiles to center of the Mount, over the center of Rafter. Drill 1/4" pilot hole. Place Machine Bolt under Carefully clean the building paper then install Peel Base Plate in hex slot, threads pointing up. Lag and Stick Flashing over stud and up roof to lap Base Plate into Rafter on Marks. under the next row of base paper flashing. Install Post onto stud. Make sure Peel and Stick Place Aluminum Flashing into position over Post slides under existing building paper. & bend to contour of tiles. Apply Sealant around cone to Post. Slide on EPDM Counter Flashing. Seal top of Post with 1 1/4" Sealing Washer. For Questions Call 925-687-6686 www.quickmountpv.com 4 Take pre to do a quality installation — see im- portant notes *(below) and **(pgl). Firmly press Peel and Stick Flashing to Base and paper; work from center out removing any air pockets. You are now ready for the rack of your choice. Follow all the directions of the rack manufacturer as well as the module manufacturer. All roofing manufacturers' written instructions must also be followed by anyone modifying a roof system. Please consult the roof manufacturers' specs and instructions prior to touching the roof. * Make sure the Peel and Stick is firmly adhered and that all the air bubbles are pushed out. -7 Quick Mount R 2 info@quickmountpv.com SoIarMount® TOP MOUNTING CLAMPS Select top mounting clamps if you prefer to install modules after securing the footings and the rails. This sequence is especially well suited for flush mounting. Top mounting clamps do not use module mounting holes, thus allowing flexibility in rail placement. See the installation manual for details. Top mounting requires 1 inch between modules. Rails must extend 1V2 inches beyond the last module on each end. End clomp Light Rail, Flush Mount; Clamps: Checklist Mid damp • Sizing: Rails and damps, pp. 4-5. • Kit pricing: Light rail kits, p.8; clamp kits, pp. 11-14. • Pro -Pak pricing: Light rails, p. 9; L -feet, p. 9; clamps, pp. 11-14. • Light rail splices, grounding clips, and grounding lugs, p. 10. • Standoffs and flashings, p. 15. • Accessories: hanger bolts, table ties, shims, security hardware, p. 18. Standard Rail, Flush, Clamps: Checklist Master Price List umoRme BOTTOM MOUNTING CLIPS Select bottom mounting clips if you plan to attach modules to rails prior to final installation, a sequence well suited for pre -wired rows of modules. No space between modules is required, and rails e need not extend past the end modules. Cautions: (1) Module mounting holes determine spacing of the rails. If rails are parallel to rafters, stringers will likely be necessary under the roof since footings must attach to structural members, not decking alone. (2) Flush arrays are significantly more Bottom difficult to install when using bottom mounting clips mounting because of access problems when securing footings. dip Use bottom mounting clips with flush mounts only if the PV modules you are installing have mounting holes near the ends. Flush Mount; Clips: Checklist • Siting: Rails and damps, pp. 4-5. • Sizing: Rails and clamps, pp. 6-7. • Kit pricing: Standard rail kits, p.8; damp kits, pp. 11-14. • Kit pricing: Standard rail kits, p.8; dips, p. 14. • Pra-Pak pricing: Standard rails, p. 9, L -feet, p. 9; clamps, pp. 11-14. • Pro -Pak pricing: Standard rails, p. 9; L -feet, p. 9; dips, p.14. • Light rail splices, grounding clips, and grounding lugs, p. 10. • Light rail splices, grounding clips, and grounding lugs, p. 10. • Standoffs and (lashings, p. 15. • Standoffs and flashings, p. 15. • Accessories: hanger bolts, cable ties, shims, security hardware, p. 18. • Accessories: Cable ties, shims, and security hardware, p. 18. Ste Cautions I and 2 above. Consult UniRac before ushW aluminum standoffs or hanger bolts in this configuration. Low Profile Tilt Legs, Clamps: Checklist Same as "Standard Rail, Flush, Clamps", plus: • Sizing: Tilt angles, p. 16, and L -feet required, p. 17. • Pricing: Low profile tilt legs, p 17. Consult Uaftc before using aluminum standoffs or hanger bolts in this configuration. High Profile Tilt Legs, Clamps. Checklist Same as "Standard Rail, Flush, Clamps", plus: • Sizing: Tilt angles, p. 17. • Pricing: High profile tilt legs, p. 17. Do not use splices with this configuration. Consult UniRac before using aluminum standoffs or hanger bolts. So1arMount®/S-5!TMt: Checklist ' Siting: Clamp sets, pp. 19-20 • Pricing: Clamp sets, pp. 19-20. • Clamp sets with L -feet for use with rails (p. 20). Low ProfileTih Legs, Gips: Checklist Same as 'Standard Rail, Flush, Clips", plus: • Sizing: Tilt angles, p. 16, and L -feet required, p. 17. • Pricing: Low profile tilt leg, p 17. Requires mounting holes at ends of modules. Consult fhtiRac before using aluminum standoffs or hanger bolts in this configuration. High Profile Tflt Legs, Clips: Checklist Same as "Standard Rail, Flush, Clamps", plus: • Sizing: Tilt angles, p. 17. • Pricing: High profile tilt legs, p. 17. Do not use rail spliceswith this configuration. Consult UniRac before using aluminum standoffs or hanger bolts. PQM See www.unirac.com for your nearest UniRac distributor. 3 SolarMounto Master Price List VNIRAC° Pro -Pak Rails and L- feet Use Pro -Pak component pricing when regularly using SolarMount on multiple installations. Standard rail PRO-PAK: Standard rail bundles consist of 8 rails. Bundles listed here do not include L -feet or hardware. See the sizing chart (pp. 4-5 or 6-7) to deterimine rail length appropriate to your installation. If desired rail length exceeds 240 inches, order a splice and two segments. Spliced segments should be as close to equal in length as possible. Rail Bundle o(8 rails and two segments. Spliced segments should be length Nominal ship Nominal ship (inches) size (inches) weight (Ibs) Item no. List price 48 51 x 5 x 3 30 300101 $246.00 60 63 x 5 x 3 36 300102 288.00 72 75 x 5 x 3 44 300103 331.00 84 87 x 5 x 3 50 300104 374.00 96 99 x 5 x 3 55 300105 417.00 106 109 x 5 x 3 61 300106 460.00 120 123 x 5 x 3 67 300107 508.00 132 135 x 5 x 3 72 300108 556.00 144 147 x 5 x 3 78 300109 604.00 156 159 x 5 x 3 92 300110 652.00 168 171 x 5 x 3 100 300111 700.00 180 183 x 5 x 3 108 300112 749.00 192 195 x 5 x 3 114 300113 797.00 204 207 x 5 x 3 120 300114 845.00 216 219 x 5 x 3 128 300115 893.00 228 229 x 5 x 3 135 300116 930.00 240 243 x 5 x 3 142 300117 979.00 Light rail PRO -PAW Light rail bundles consist of 10 rails. Bundles listed here do not Include L -feet or hardware. See the top mounting siring chart in (pp. 6-7) to deterimine rail length appropriate to your installation. If desired rail length exceeds 216 inches, order a splice and two segments. Spliced segments should be as close to equal in length as possible. Rail Bundle of 10 rails length Nominal ship Nominal ship (inches) size (inches) weight (Ibs) Item no. List price 48 5l x 5 x 3 25 303101 ;199.00 60 63 x 5 x 3 30 303102 239.00 72 75 x 5 x 3 36 303103 279.00 84 87 x 5 x 3 41 303104 319.00 96 99 x 5 x 3 45 303105 359.00 106 109 x 5 x 3 50 303106 399.00 120 123 x 5 x 3 55 303107 439.00 132 135 x 5 x 3 59 303108 479.00 144 147 x 5 x 3 64 303109 519.00 156 159 x 5 x 3 75 303110 559.00 168 171 x 5 x 3 82 303111 599.00 180 183 x 5 x 3 88 303112 639.00 192 195 x 5 x 3 93 303113 679.00 204 207 x 5 x 3 98 303114 719.00 216 219 x 5 x 3 104 303115 759.00 See www. unirac com for your nearest UniRac distributor. Serrated L -feet t PRO-PAK: Each L -foot includes a stainless steel bolt and flange nut to attach the foot to a SolarMount rail. Lag bolts are not included. Rail set pricing (p. 8) lists the appropriate number of L -feet per pair of rails. Nominal Quantity ship wt (Ibs) Part no. List price 1 310068 $ 4.70 20 5 310067 81.00 Project Description 1) Panels: 16 Suntech STP185S - 24/Adb+ 2) INVERTER: 16 Enphase Energy: M190 -72-240-S12 3) Monitoring system with Inverter 4) Standard components include; racking and mounting components, wiring, conduit, and over -current protections, roofing sealant or flashing, as needed 5) No battery back-up systems 6) Main electrical panel, inverter and controller panels will be labeled with warning labels 7) All Metal parts of module frames, equipment and conductor enclosures will be grounded 8) All outdoor wiring will be weather rated PROJECT VALUATION Total Value of Project: $21,236 SYSTEM SIZE RATING STC rated: 2.96 kW CEC rated: 2.54 kW MSP Main Service Panel ® Junction Box All mounting are 48"-60" apart Vents ELEVATION SYSTEM TOTALS: 545.6 lbs. Panels POINT LOADING: 80 lbs. Racking 718.0 lbs. Total Array Weight 26 lbs. Standoffs 26 Loading Points 64 lbs. Inverters 27.6 lbs/load Point 718.0lbs Total Weight Panel Dimensions 61.39"x31.42"x1.81" 2.48 Sq Ft. Array Panel Weight 34.1 lbs 3.35 lbs/sq. ft. STRUCTURAL CALCULATIONS GENERAL NOTES 1. This drawing is diagramatic in some respects, field verify exact conditions prior to beginning any work. 2. Some roof details omitted for drawing clarity. INSTALLATION Notes: 1. No setback required by the City of CUPERTINO 2. No additional/separate AC disconnect(s) required by the City of CUPERTINO 3. Conduit run across roof, penetrate and run under eave into garage to connect into existing service panel Clean Solar Inc. 1445 Koll Circle Suite 109 San Jose, CA. 95113 888-551-7652 Cont. Lic. # 910849 www.cleansolar.com 4P CLEANSOLAR 37 W r Ln U Z o� O F- W f— a t~t) SCALE: 1/16" = 1'-0" DRAWN BY Nav Singh REVISIONS: SHEET: 1 of 3 z r- C) ti 61 L0 0¢ � i I n (n W I-- N L-11.1 Cp._ U ao d� =Z000 - 05_ ?Q-Qz <XIt W W d)n00 �NUD=.� Q SCALE: 1/16" = 1'-0" DRAWN BY Nav Singh REVISIONS: SHEET: 1 of 3 PANEL LAYOUT & ROOF DETAIL PLAN Roof type - Flat S -Tile =0 I 1.) 16 Suntech STP185S - 24/Adb+ 2.) Rafters 2"X10 13 x 24" 3.) Roof tilted at 21 ° slope 4.) Roof decking - plywood 5.) 48"-60" max.spacing between roof mounts 6.) Flat Tile S 7.) Continuous Unirac Rails 8.) Micro -Inverters 9.) QMCT 85S - 24A QMCT ,king is 3 & Length Flat- - Ti I e -S Clean Solar Inc. 1445 Koll Circle Suite 109 San Jose, CA. 95113 888-551-7652 Cont. Lic. # 910849 www.cleansolar.com CLEANSOLAR 57 W �Q tJ) W UD h ~w 057 OU r aQ W zoC)r�' r) AL6 {5 1,, 64 wp,Uoo'r �z000 Qz�r �- <-r <� W O O U� N = Q U r2 � SCALE: 1/16" = V-0" DRAWN BY Nav Singh REVISIONS: SHEET: 2 of 3 Array A & S Pv Modules 16 Suntech STP185S - 24/Adb+ (16 Panels) STP185S - 24/Adb+ ❑ Enphase Micro -Inverter INVERTER: 16 Enphase M190 -72-240-S12 (16 microinverters) EXISTING MAIN PANEL 200 A TO PG&E Main Service Panel ETE W 15A Al w A8 131 LLJ B8 0 U) #8 Solid copper ground #14 XHHW-2 AC BUS (under arr iv) #14 XHHW-2 AC BUS (under array) General Notes: 1. 240V AC wires run from array to main panel breaker 2. Individual panels inverted from DC to AC with micro -inverter located under each panel 3. The Voltage Drop as above described was completed for 240 Volts @50 feet to be .49 percent for branch of 8 %" EMT Conduit 6 - #10 THWN-2 Wires 1 - #8 THWN-2 Ground JUNCTION BOX %" EMT Conduit 6 - #10 THWN-2 Wires 1 - #8 THWN-2 Ground Amperage Calculation l For: STP185S - 241Adb+ Individual Panel (DC) Vmp - 36.4 Imp - 5.09 Voc - 45.0 Ise - 5.43 Individual Inverter (AC) Vop - 240 lop - 0.80 (2) 8 Inverter branch Vop - 240 lop - 6.40 lop - 8.00 @125% Clean Solar Inc. 1445 Koll Circle Suite 109 San Jose, CA. 95113 888-551-7652 Cont. Lic. # 910849 www.cleansolar.com w U) J H JUNCTIONU w BOX 4 0 J Q OU >� O °C E- f U o aw SCALE: 1/16" = V-0" DRAWN BY Nav Singh REVISIONS: SHEET: 3 of 3 w z�or�'.(D LLJ Cq 0 U) th 0U°~°IT ocz0C)C a<z�-�- C/) N W W ZZ �-MCL00 �N(,)a-CL SCALE: 1/16" = V-0" DRAWN BY Nav Singh REVISIONS: SHEET: 3 of 3