Loading...
10110015CITY OF CUPERTINO BUILDING PERMIT BUILDING ADDRESS: 10500 N DE ANZA BLVD CONTRACTOR: CUPERTINO ELECTRIC INC PERMIT NO: 10110015 OWNER'S NAME: APPLE INC 1132 N 7TH ST DATE ISSUED: 11/19/2010 OWNER'S PHONE: 4089744876 SAN JOSE, CA 95112 PHONE NO: (408)991-1000 ❑ LICENSED CONTRACTOR'S DECLARATION r r r BUILDING PERMIT INFO: BLDG ELECT PLUMB License Class Z — / e—> Lic. # D 7VG 3 7 MECH r RESIDENTIAL r COMMERCIAL r Contractor L Ud.[,tTixJO EL tf Date / / —/'�, — /D I hereby affirm that 1 am licensed under the provisions of Chapter 9 JOB DESCRIPTION: OUTSIDE @EXISTING TRUCK LOADING AREA - INSTALL (commencing with Section 7000) of Division 3 of the Business & Professions 1-300 KW TEMP STAND-BY GENERATOR Code and that my license is in full force and effect. I hereby affirm under penalty of perjury one of the following two declarations: I have and will maintain a certificate of consent to self -insure for Worker's Compensation, as provided for by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued. Sq. Ft Floor Area: Valuation: $10000 I have and will maintain Worker's Compensation Insurance, as provided for by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued. K APN Number: 31622017.00 Occupancy Type: APPLICANT CERTIFICATION I certify that 1 have read this application and state that the above information is correct. I agree to comply with all city and county ordinances and state laws relating to building construction, and hereby authorize representatives of this city to enter PERMIT EXPIRES IF WORK IS NOT STARTED upon the above mentioned property for inspection purposes. (We) agree to save indemnify and keep harmless the City of Cupertino against liabilities, judgments, WITHIN 180 DAYS OF PERMIT ISSUANCE OR costs, and expenses which may accrue against said City in consequence of the 180 DAYS FROM LAST CALLED INSPECTION. granting of this permit. Additionally, the applicant understands and will comply with all non -point source regulations per the Cupertino Municipal Code, Section 9.18. Issued by- Signature l_ Date / / / — ze�) / ❑ OWNER -BUILDER DECLARATION RE -ROOFS: All roofs shall be inspected prior to any roofing material being installed. If a roof is I hereby affirm that I am exempt from the Contractor's License Law for one of installed without first obtaining an inspection, 1 agree to remove all new materials for the following two reasons: inspection. 1, as owner of the property, or my employees with wages as their sole compensation, will do the work, and the structure is not intended or offered for sale (Sec.7044, Signature of Applicant: Date: Business & Professions Code) 1, as owner of the property, am exclusively contracting with licensed contractors to construct the project (Sec.7044, Business & Professions Code). ALL ROOF COVERINGS TO BE CLASS "A" OR BETTER HAZARDOUS MATERIALS DISCLOSURE 1 hereby affirm under penalty of perjury one of the following three declarations: I have and will maintain a Certificate of Consent to self -insure for Worker's I have read the hazardous materials requirements under Chapter 6.95 of the Compensation, as provided for by Section 3700 of the Labor Code, for the California Health & Safety Code, Sections 25505, 25533, and 25534. 1 will maintain performance of the work for which this permit is issued. compliance with the Cupertino Municipal Code, Chapter 9.12 and the Health & I have and will maintain Worker's Compensation Insurance, as provided for by Safety Code, Section 25532(a) should 1 store or handle hazardous material. Section 3700 of the Labor Code, for the performance of the work for which this Additionally, should 1 use equipment or devices which emit hazardous air contaminants as defined by the Bay Area Air Quality Management District I will permit is issued. maintain compliance with the Cupertino Municipal Code, Chapter 9.12 and the I certify that in the performance of the work for which this permit is issued, I shall Health & Safety Code, Sections 25505, 25533, and 25534. not employ any person in any manner so as to become subject to the Worker's Compensation laws of California. If, after making this certificate of exemption, 1 Owner or authorized!%%� ent: become subject to the Worker's Compensation provisions of the Labor Code,1 must L Date: forthwith comply with such provisions or this permit shall be deemed revoked. CONSTRUCTION LENDING AGENCY APPLICANT CERTIFICATION I hereby affirm that there is a construction lending agency for the performance of work's I certify that 1 have read this application and state that the above information is for which this permit is issued (Sec. 3097, Civ C.) correct. 1 agree to comply with all city and county ordinances and state laws relating Lender's Name to building construction, and hereby authorize representatives of this city to enter upon the above mentioned property for inspection purposes. (We) agree to save Lender's Address indemnify and keep harmless the City of Cupertino against liabilities, judgments, costs, and expenses which may accrue against said City in consequence of the ARCHITECT'S DECLARATION granting of this permit. Additionally, the applicant understands and will comply with all non -point source regulations per the Cupertino Municipal Code, Section I understand my plans shall be used as public records. 9.18. Licensed Professional Signature Date CITY OF CUPERTINO FEE ESTIMATOR — BUILDING DIVISION ADDRESS: DATE: REVIEWED BY: APN: BP#: 'VALUATION: 1$10,000 %PERMIT TYPE: Electrical Permit PLAN CHECK TYPE: Alteration / Addition / Repair PRIMARY Commercial Building USE: TUT:11_ FLOOR .4Rl;. a: PENTAMATION PERMIT TYPE: 10EAP8 WORK install 1-300 kw temp stand by generator oeA, SCOPE APPLIANCE / EQUIP TYPE FEE ID QTY UNITS BP FEES Generators 1BREMPOWER 1 # $158 TOTALS: $158.00 MLY11. Ilan Check 1'Icrrr ( hcc:A, Elec. Plan Check 2.0 1 hrs $252.00 Mech. Permit Fee. Phwrr'. Permit l"(1e: IELCPLNC Elec. Permit Fee: IEPERMIT ;llech.Insp. L 01her Phernh Insir, IL Other Elee. Insp. 0.0 hrs L$42.00 . hisp. FCC: pit,,, h. h, yr. LI(L.1nsp. Fcc NOTE: These fees are based on the Dreliminary information available and are only an estimate. Contact the Dent for addn 7 info. FEE ITEMS (Fee Resolution 09-051 Eff. 7/1./10) FEE QTY/FEE MISC ITEMS Plan Check Fee: Suppl. PC Fee PME Plan Check: $252.00 Perrnit Fee- Suppl. Insp Fee PME Unit Fee: $158.00 PME Permit Fee: $42.00 Construction Tax Acoustictd RevicivT-ee: Work Without Permit? © Yes 0 No $0.00 Planning pores: i Travel Documentation Fee: ITRAVDOC $42.00 Strong Motion Fee: IBSEISWCO $2.10 Select an Administrative Item Bldg Stds Commission Fee: IBCBSC $1.00 SUBTOTALS: $497.10 $0.00-D7rAF"lE: $497.10 Revised: 10/17/2010