Loading...
10090053 CITY OF CUPERTIN O BUILDING PERMIT BUILDING ADDRESS: 7927 BELKNAP DR CONTRACTOR:R A CONSTRUCTION PERMIT NO: 10090053 OWNER'S NAME: TAITI CHENG 3851 R CHARTER PARK DR DATE ISSUED:09/08/2010 f NER'S PHONE: 4084643775 SAN JOSE,CA 95136 PHONE NO:(408)559-1877 ❑ LICENSED CONTRACTOR'S DECLARrATION BUILDING PERMIT INFO: BLDG F ELECT r PLUMB F License Class � [! Lic.# 6 -5y,7 MECH r RESIDENTIAL COMMERCIAL r. Contractor m1f� Date f �d JOB DESCRIPTION:RE-ROOF TEAR OFF OLD ROOF&INSTALL OSB I hereby affirm that I am licensed under the provisions of Chapter 9 PLYWOOD (commencing with Section 7000)of Division 3 of the Business&Professions INSTALL A NEW ASPHALT SHINGLE(ELK)CLASS A 29SQ Code and that my license is in full force and effect. I hereby affirm under penalty of perjury one of the following two declarations: I have and will maintain a certificate of consent to self-insure for Worker's Compensation,as provided for by Section 3700 of the Labor Code,for the performance of the work for which this permit is issued. I have and will maintain Worker's Compensation Insurance,as provided for by Section 3700 of the Labor Code,for the performance of the work for which this Sq.Ft Floor Area: Valuation:$9950 permit is issued. APPLICANT CERTIFICATION P/(?— APN Number:36208042.00 Occupancy Type: I certify that I have read this application and state that the above information is correct.I agree to comply with all city and county ordinances and state laws relating to building construction,and hereby authorize representatives of this city to enter upon the above mentioned property for inspection purposes. (We)agree to save PERMIT EXPIRES IF WORK IS NOT STARTED indemnify and keep harmless the City of Cupertino against liabilities,judgments, WITHIN 180 DAYS OF PERMIT ISSUANCE OR costs,and expenses which may accrue against said City in consequence of the granting of this permit. Additionally,the applicant understands and will comply 180 DAYS FROM LAST CALLED INSPECTION. with all non-point source regulations per the Cupertino Municipal Code,Section 9.18. f Signature Date �� Issued by: Date: i V OWNER-BUILDER DECLARATION RE-ROOFS: I hereby affirm that I am exempt from the Contractor's License Law for one of All roofs shall be inspected prior to any roofing material being installed.If a roof is the following two reasons: installed without first obtaining an inspection,I agree to remove all new materials for 1,as owner of the property,or my employees with wages as their sole compensation, inspection. will do the work,and the structure is not intended or offered for sale(Sec.7044, Business&Professions Code) Signature of Applicant: �— Date: 1,as owner of the property,am exclusively contracting with licensed contractors to construct the project(Sec.7044,Business&Professions Code). ALL ROOF COVERINGS TO BE CLASS"A"OR BETTER I hereby affirm under penalty of perjury one of the following three declarations: HAZARDOUS MATERIALS DISCLOSURE I have and will maintain a Certificate of Consent to self-insure for Worker's Compensation,as provided for by Section 3700 of the Labor Code,for the I have read the hazardous in requirements under Chapter 6.95 of the performance of the work for which this permit is issued. California Health&Safety Code,Sections 25505,25533,and 25534. I will maintain I have and will maintain Worker's Compensation Insurance,as provided for by compliance with the Cupertino Municipal Code,Chapter 9.12 and the Health& Safety Code,Section 25532(a)should I store or handle hazardous material. Section 3700 of the Labor Code,for the performance of the work for which this Additionally,should I use equipment or devices which emit hazardous air permit is issued. contaminants as defined by the Bay Area Air Quality Management District I will I certify that in the performance of the work for which this permit is issued,I shall maintain compliance with the Cupertino Municipal Code,Chapter 9.12 and the not employ any person in any manner so as to become subject to the Worker's Health&Safety Code,Sections 25505,25533,and 25534. Compensation laws of California. If,after making this certificate of exemption,I Owner suth d agent: / become subject to the Worker's Compensation provisions of the Labor Code,I muse Date: forthwith comply with such provisions or this permit shall be deemed revoked. CONSTRUCTION LENDING AGENCY APPLICANT CERTIFICATION I certify that I have read this application and state that the above information is I hereby affirm that there is a construction lending agency for the performance of work's correct.I agree to comply with all city and county ordinances and state laws relatinl; for which this permit is issued(Sec.3097,Civ C.) to building construction,and hereby authorize representatives of this city to enter Lender's Name upon the above mentioned property for inspection purposes.(We)agree to save -reify and keep harmless the City of Cupertino against liabilities,judgments, Lender's Address and expenses which may accrue against said City in consequence of the granting of this permit.Additionally,the applicant understands and will comply ARCHITECT'S DECLARATION with all non-point source regulations per the Cupertino Municipal Code,Section I understand my plans shall be used as public records. 9.18. Signature Date Licensed Professional CITY OF CUPERTINO 3 ITEMS OF 3 PERMIT RECEIPT OPERATOR: patg COPY # : 1 Sec: Twp: Rng: Sub: Blk: Lot: APN . . . . . . . . : 36208042 .00 DATE ISSUED. . . . . . . : 09/08/2010 RECEIPT #. • • • • • • . • : BS000011410 REFERENCE ID # . . . : 1OC90053 SITE ADDRESS . . . . . : 7927 BELKNAP DR SUBDIVISION . . . . . . CITY CUPERTINO IMPACT AREA . . . . . . OWNER TAITI CHENG ADDRESS . 7927 BELKNAP DR CITY/STATE/ZIP . . . : CUPERTINO, CA 95014 RECEIVED FROM R A CONSTRUCTION CONTRACTOR ANDREWS, RON LIC # 21382 COMPANY R A CONSTRUCTION ADDRESS 38'31 R CHARTER PARK DR CITY/STATE/ZIP SAN JOSE, CA 95136 TELEPHONE (4 )8) 559-1877 FEE ID UNIT QUANTITY AMOUNT PD-TO-DT THIS REC NEW BAL ---------- ------------- ---------- ---------- ---------- -- 1BCBSC VALUATION 9, 950 . 00 1 .00 0 .00 1.00 0 .0 1BSEISMICR VALUATION 9, 950 . 00 1 .00 0 .00 1. 00 0 .00 1REROOFRES SQ FEET 29. 00 377 .00 0 .00 377 . 00 0 .00 ---------- ---------- ---------- ---- TOTAL PERMIT 379 .00 0 . 00 379 .00 0 .00 METHOD OF PAYMENT AMOUNT --REFERENCE NUMBER ----------------- --------------- CHECK 379. 00 #17157 --------------- TOTAL RECEIPT 379. 00 VOICE ID DESCRIPTION VOICE ID --------DESCRIPTION ------- ------ ----------- __ _ -- -- ---------- _ 601 ROOF TEAR OFF 602 ROOF PLYWOOD NAIL 604 ROOF IN-PROGRESS 605 FINAL REROOF CITY OF CUPERTINO FEE ESTIMATOR--BUILDING DIVISION ADDRESS: DATE: REVIEWED BY: APN: BP#: *VALUATION: 1$9,950 xPERMIT TYPE: Minor Building Permit PL�,N CHECK TYPE: Re-roof PRIMARY 7C?T,2L PENTAMATION 1SFDWLROOF USE: SFD or Duplexl_C)<)t .� �l -�- PERMIT TYPE: WORK SCOPE FEE ID ROO]z AREA s.f. 1 REROOFFRES 2.900 _7 l Il_ i'i t Ch i ED(:I<c _L_ :Ife Yi. � 0"P('r P z mb hi'�l, Lj -I_ Ot/W kl(i h np tl zh, law, 1"v: I"z,�itt�_ lo'/". FLIC l:ier iny, /�"" NOTE: These fims are based on the preliminary in ormation available and are only an estimate. Contact the De t or addn'l info, FEE ITEMS(Fee Resolution 09-051 Ef. 7%1%10) FEE QTY/FEE MISC ITEMS P/an Check 1"(w: ,Step/. PC l;cC Pfrzml�.%_11�c�h.il:f�c;Plazz C.7zec:k: Permit Fee: $377.00 Sil1,14. 111'1p Fce Pl;rrrzlt.;':tlifc Tz.:Z:lcc; !,'rzir 1�t�c: Plzznztr.%;��ltrt•l�.,'1<lc�t 1't����tzrt 1-'c°�: C'�,zzstt•rrcrr{qtr 1'cz:� �tc�r,tzslic:cr1 t:ek�i���� f�'c°c�: Work Without Permit? 0 Yes E) No 11;0.00 Platirting, '11'w ci Strong Motion Fee: IBSEISMICR `;1.00 Select an Administrative Item BI�Stds Commission Fee: IBCBSC .51.00 SUBTOTALS: $379.00 $0.00 TOTAL FEE:` $379.00 Revised: 9/01/2010 M.Indoor Air Ouality and Finishes 1 IAQ/Health pts y=yes 0 2.Use Low VOC,Water-Based Wood Finishes 2 IAQ/Health pts y=yes D 31AQ/Heahh pts y=yes 0 4.Use Salvaged Materials for Interior Finishes 3 Resource pts y=yes 0 5.Use Engineered Sheet Goods with no added Urea Formaldehyde 61AQIHealth pts y=yes D 6.Use Exterior Grade Plywood.for Interior Uses 1 IAQ/Health pts y=yes 0 - 4IAQ/Health pts y=yes D 8.Use FSC Certified Materials for Interior Finish 4 Resource pts y=yes 0 9.Use Finger-Jointed or Recycled-Content Trim 1 Resource pts y=yes 0 10.Install Whole House vacuum System 3 IAQ/Health pts y=yes 0 1 i 1 N.Flooring 1.Select FSC Certified Wood Flooring 8 Resource pts y=yes 0 2.i/ae s .le�rr�s 4 Resource pts y=yes D 3.Use Recycled Content Ceramic Tiles 4 Resource pts yJyes 0 4.Install Natural linoleum in Place of Vinyl -5 IAQ/Haath pts y=yes 0 5.Use Exposed Concrete as Finished Floor 4 Resource pts y=yes 0 6.Install Recycled Content Carpet with Low VOCs 4 Resource pts y=yes 0 Total Points Available: I 140T.-1301 57 Total Points Project Received: 1 01 01 0 G:data1pmgs/gnsnbuildngguiderines/rem ale reenpant nmM12D4protectedxis REROOF TEAR-OFF POLICY COMMUNITY DEVELOPMENT DEPARTMENT•BUILDING DIVISION ALBERT SALVADOR, P.E.,C.B.O.,BUILDING OFFICIAL 10300 TORRE AVENUE•CUPERTINO,CA 95014-3255 CUPERTINO (408)777-3228•FAX(408)777-3333•buildinga(Dcupertino.org �� APN# FPROJECTADDRESSff PHONI / ���� E-MAIL�/,w/�/ — v7 T _ ,�+ _ FAX STREET ADDRESS (`�j� LICENSE NU BU;p, LICENSE TYPE 7X " CONTRACTOR NAM ^ , E-MAIL COMPANY NAME CITY,STA"E.ZIP PHONE 3F /yam STREET ADDRESS �/�� / (f� I UNDERSTAND AND AGREE TO THE FOLLOWING: 1. The re-roof project shall comply with all applicable provisions of the 2007 California Building Code. 2. You must schedule all needed inspections a minimum of one day before the requested inspection date. Please schedule inspections online or call (408)777-3228 between 7:30-3:30 (Mon-Fri). 3. Tear-off roof inspection is required. Please ca 1 for tear-off inspection after the roof is torn off and all the nails/fasteners have been removed. Any alLd all dry-rotted wood shall be replaced prior to this inspection. A building inspector will be availabl:within one hour. There are special hours for this service: 7:30 - 10:30am and 1:00- 3:30pm (Mon-Thurs); 7:30 - 10:30am and 1:00-2:30pm (Friday). 4. If plywood is installed, a plywood nailing inspection is required. 5. In Prop-ress roof inspection is required. Call fbr an in-progress roof inspection to verify building is weather tight after installation of approximately 25% of the roofing material. 6. New roof coverings shall not be applied without first obtaining all inspections and written approvals from the building inspector. Any roofing which is applied without first obtaining an approved inspection will require the removal of all new material down to the sheathing so a proper inspection can be performed. 7. A final inspection and approval shall be obtained from the building inspector when the re-roofing is complete. To receive a final sign-off, the following items will be verified: a. Flat roofs shall have a minimum of per -oot of slope and must demonstrate there is no ponding. b. Listings from approved testing agencies for all pre-manufactured products used shall be available on-site to review at the time of the inspection. c. Proper spark arrestor installation. 8. NOTE: If you call for a tear-off or plywood nailing inspection and the work is not complete, you will be charged a re-inspection fee of$126.00. The re-inspection fee shall be paid before another inspection can be scheduled. By my signing below, I certify each of the following is true: I am the property owner or authorized agent to act on the property owner's behalf. I a d and agrce t� o comply with the re-roof policy stated above I Date: � — 12, Signature of Applicant/Agent: Reroofpolicy_2010.doc revised 05/17110 CITY OF CITY OF CUPERTINO IsREROOF MI CUPERTINO PERT APPLICATION APN # Date: Building Address: 7 c 2 7- Owner's Name: 1� �01_3�v��,y Phone #: �"� HOA: Yes ❑ No If yes, provide lett ar from HOA Contractor: Phone #: C /1977Z Fax#: Cupertino Business License #: Contractor License #: Type of R,)of Covering: Existing: Proposed: ❑ Built-Up Roof ❑ Built-Up roof ❑ Asphalt Shingles X Asphalt Shingles Wood Shakes ❑ Wood Shakes ❑ Wood Shingles ❑ Wood Shingles ❑ Other (Specify) ❑ Other (Specify) Number of existing coverings ❑ Provide I.C.C.E.S. Report# ❑ To be Removed ❑ Provide Mfgr. Installation Specs. Job Description: r"'`� /� 0115 pf- r C c ss Residential Commercial ❑ Green Building: Please complete relevant portion of the Con.frmed Awth Planning Dept. if Green Building Checklist & attach it to the application or if there are any restrictions: ❑ applicable, i clude in plan set & the sheet index. Valuation: ���� I Have Read, Unde tand and Will Comply with Cupertino's Tear-Off Policy: Sign e Revised 02/05/09