Loading...
10090271 CITY OF CUPERTIN43 BUILDING PERMIT BUILDING ADDRESS: 22322 CUPERTINO RD CONTRACTOR:GATEWAY ROOFING& PERMIT NO: 10090271 WATERPROOFING dER'S NAME: PON LEE 191 VIENNA ST DATE ISSUED:09/29/2010 OWNER'S PHONE: 4153346008 SAN FRANCISCO,CA 94112 PHONE NO:(415)3346008 ❑ LICENSED CONTRACTOR'S DECLARATION BUILDING PERMIT INFO: BLDG F ELECT r PLUMB License Class Lic.# ��q(0`-(' MECH F RESIDENTIAL r COMMERCIAL r Contractor Date JOB DESCRIPTION:REMOVE OLD WATERPROOFING MATERIAL&APPLY 3 I hereby affirm that I am licensed under the provisions of Chapter 9 'LY OF (commencing with Section 7000)of Division 3 of the Business&Professions :LASTOMERIC WATERPROOFING COATING Code and that my license is in full force and effect. I hereby affirm under penalty of perjury one of the following two declarations: I have and will maintain a certificate of consent to self-insure for Worker's Compensation,as provided for by Section 3700 of the Labor Code,for the performance of the work for which this permit is issued. I have and will maintain Worker's Compensation Insurance,as provided for by Section 3700 of the Labor Code,for the performance of the work for which this Sq.Ft Floor Area: Valuation:$11000 permit is issued. APPLICANT CERTIFICATION APN Number:32650061.00 Occupancy Type: I certify that I have read this application and state that the above information is correct.I agree to comply with all city and county ordinances and state laws relating to building construction,and hereby authorize representatives of this city to enter upon the::'rove mentioned property for inspection purposes. (We)agree to save PERMIT EXPIRES IF WORK IS NOT STARTED indemnify and keep harmless the City of Cupertino against liabilities,judgments, WITHIN 180 DAYS OF PERMIT ISSUANCE OR costs,and expenses which may accrue against said City in consequence of the granting of this permit. Additionally,the applicant understands and will comply 180 DAYS FROM LAST CALLED INSPECTION. with all non-point source regulations per the Cupertino Municipal Code,Section 9.18. Date:� 2� e Date � Z � Issued b � atu ❑ OWNER-BUILDER DECLARATION RE-ROOFS: I hereby affirm that I am exempt from the Contractor's License Law for one of All roofs shall be inspected prior to any roofing material being installed.If a roof is the following two reasons: installed without first obtaining an inspection,I agree to remove all new materials for I,as owner of the property,or my employees with wages as their sole compensation, inspection. will do the work,and the structure is not intended or offered for sale(Sec.7044, Date: Business&Professions Code) Signature of Applicant: I,as owner of the property,am exclusively contracting with licensed contractors to construct the project(Sec.7044,Business&Professions Code). ALL ROOF COVERINGS TO BE CLASS"A"OR BETTER I hereby affirm under penalty of perjury one of the following three declarations: HAZARDOUS MATERIALS DISCLOSURE I have and will maintain a Certificate of Consent to self-insure for Worker's I have read the hazardous materials requirements under Chapter 6.95 of the Compensation,as provided for by Section 3700 of the Labor Code,for the performance of the work for which this permit is issued. California Health&Safety Code,Sections 25505,25533,and 25534. I will maintain I have and will maintain Worker's Compensation Insurance,as provided for by compliance with the Cupertino Municipal Code,Chapter 9.12 and the Health& Safety Code,Section 25532(a)should I store or handle hazardous material. Section 3700 of the Labor Code,for the performance of the work for which this Additionally,should I use equipment or devices which emit hazardous air permit is issued. contaminants as defined by the Bay Area Air Quality Management District I will I certify that in the performance of the work for which this permit is issued,I shall maintain compliance with the Cupertino Municipal Code,Chapter 9.12 and the not employ any person in any manner so as to become subject to the Worker's Health&Safety Code,Sections 25505,25533,and 25534. Compensation laws of California. If,after making this certificate of exemption,I ner or author d ut become subject to the Worker's Compensation provisions of the Labor Code,I must Date: Z�7 forthwith comply with such provisions or this permit shall be deemed revoked. CONSTRUCTION LENDING AGENCY APPLICANT CERTIFICATION I certify that I have read this application and state that the above information is I hereby affirm that there is a construction lending agency for the performance of work's correct.I agree to comply with all city and county ordinances and state laws relating for which this permit is issued(Sec.3097,Civ C.) to building construction,and hereby authorize representatives of this city to enter Lender's Name the above mentioned property for inspection purposes.(We)agree to save Lender's Address ..mnify and keep harmless the City of Cupertino against liabilities,judgments, costs,and expenses which may accrue against said City in consequence of the granting of this permit.Additionally,the applicant understands and will comply ARCHITECT'S DECLARATION with all non-point source regulations per the Cupertino Municipal Code,Section I understand my plans shall be used as public records. 9.18. Signature Date Licensed Professional Building Department City Of Cupertino Is 10300 Torre Avenue Cupertino, CA 95014-3255 Telephone: 408-777-3228 CUPERTINO Fax: 408-777-3333 CONTRACTOR / SUBCONTRACTOR LIST JOB ADDRESS: ?, 6"#40 PERMIT# Z OWNER'S NAME: 10014,44PHONE # GENERAL CONTRACTOR: jULSINESS LICENSE# ADDRESS: CITY/ZIPCODE: G4 /`L *Our municipal code requires all businesses working it the city to have a City of Cupertino business license. NO BUILDING FINAL OR FINAL OCCUPANCY INSPECTION(S) WILL BE SCHEDULED UNTIL THE GENERAL CONTRACTOR AND ALL SUBC FACTORS HAVE OBTAINED A CITY OF CUPERTINO BUSINESS LICENSE. q6ql I am not using any subcontractors: Signature Date Please check applicable subcontractors and complete the following information: SUBCONTRACTOR BUSINESS NAME BUSINESS LICENSE # Cabinets & Millwork Cement Finishing Electrical Excavation Fencing Flooring/Carpeting Linoleum /Wood Glass/ Glazing Heating Insulation Landscaping Lathing Masonry Painting/Wallpaper Paving Plastering Plumbing Roofing Septic Tank Sheet Metal Sheet Rock Tile caner/Contracto Signature Dat Nl.Indoor Air Quality an Finishes ;• I.Use LDVV/fdo-VpC Pairit 2.Use Low VOC,Water-Based Wood Finishes 1 IAD/Health pts y=yes es D 3.Use Low/t�o VOC Adhesives 21AQ/Health pts y=yes D 4.Use Salvaged Materials for Interior Finishes 3 IAD/Health pts y=yes D 5.Use Engineered Sheet Goods with no added Urea 3 Resource pts y=yes D Formaldehyde B.Use Exterior Grade Plywood for Interior Uses 6 IAQ/Health pts y=yes 11AQ/Health is D 7.Seala"Ex{iosed P�oleboard Dr MQF p y=yes p B.Use FSC Certified Materials for Interior Finish — 4 IAQ/Health s = es 4 Resource pts D 9.Use Finger-Jointed orRecycled-Cony=yes tent Trim D -- 1D.Install Whole House Vacuum System i Resource pts y=yes D 3 IAQ/Health pts y=yes D N.Flooring 1.Select FSC Certified Wood Flooring (I Resource pts y=yes 2.Use R D apidly Renewable Flooring Materials 3.Use Recycled Content Ceramic Tiles Resource pts y=yes D 4.Install Natural Linoleum in Place of Vinyl Resource pts y=yes D 5.Use Exposed Concrete as Finished Floor *IAQ/Health pts y=yes D 6.Install Recycled Content Carpet with Low VOCs 4 Resource pts y=yes D 4 Resource pts y=yes D E=�� Total Points Available: 140 130 57 Total Points Project Received: 0 0 0 G:datalpmgs/greenbu Idingguidelines/remodelers/greenpointdna1212D4prMecled rJs REROOF TEAR-OFF POLICY COMMUNITY DEVELOPMENT DEPART MENT•BUILDING DIVISION ALBERT SALVADOR, P.E.,C.B.O., BUILDING OFFICIAL CUPERTINO 10300 TORRE AVENUE•CUPERTINO, CA 95014-3255 (408)777-3228•FAX(408)777-3333•tuilding(a)cupertino.org PROJECT ADDRESS . J APN# OWNER NAME PHONE Y3 - F2_6 E-MAIL /' n' f #„J• ^O ft-Al- STREET ADDRESSA 21' h0 Z 1 CITY, STA TE,ZIP O� FAX CONTRA OR NA E a� LICENSE NUMBEI.� LICENSE TYPE BUS.LIC.# a*A qft C MPA Y NAME E-MAIL ,� FAX tea xwl STREET A D ESS i CITY, TA-E,ZIP �� A PHO E ' O CMa I UNDERSTAND AND AGREE TO THE FOLLOWING: 1. The re-roof project shall comply with all applicatle provisions of the 2007 California Building Code. 2. You must schedule all needed inspections a minitaum of one day before the requested inspection date. Please schedule inspections online or call (408)7 7-3228 between 7:30-3:30 (Mon-Fri). 3. Tear-off roof inspection is required. Please cal l for tear-off inspection after the roof is torn off and all the nails/fasteners have been removed. Any and all dry-rotted wood shall be replaced prior to this inspection. A building inspector will be available within one hour. There are special hours for this service: 7:30 — 10:30am and 1:00— 3:30pm (Mon—Thurs); 7:30 — 10:30am and 1:00—2:30pm (Friday). 4. If plywood is installed, a plywood nailing inspection is required. 5. In-Progress roof inspection is required. Call for an in-progress roof inspection to verify building is weather tight after installation of approximately 25% of the roofing material. 6. New roof coverings shall not be applied without first obtaining all inspections and written approvals from the building inspector. Any roofing which is applied without first obtaining an approved inspection will require the removal of all new material down to the sheathing so a proper inspection can be performed. 7. A final inspection and approval shall be obtained from the building inspector when the re-roofing is complete. To receive a final sign-off, the followi ig items will be verified: a. Flat roofs shall have a minimum of 1/4"per Rot of slope and must demonstrate there is no ponding. b. Listings from approved testing agencies for z 11 pre-manufactured products used shall be available on-site to review at the time of the inspection. c. Proper spark arrestor installation. 8. NOTE: If you call for a tear-off or plywood nail,ng inspection and the work is not complete, you will be charged a re-inspection fee of$126.00. The re-inspection fee shall be paid before another inspection can be scheduled. By my signing below, I certify each of the ing is rue: I am the property owner or authorized agent to act on the property owner's behalf. I unde and and a ee t ply with t e-roof policy stated above. Signature of Applicant/Agent: Date: !i12V ReroofPolicy_2010.doc revised 05/17/10 1001 (0 2-1 3 CITY OF CITY OF C'UPERTINO CUPEKTINO GENERA-, BUILDING PERINMT APPLICATION FORM APN# 0 o� ` Date: Z D Building Address: CLMailing Address (if different om building address): Are Hazardous Materials being used as part of this project? Yes No 25 HOA: (Exterior work only) Yes ❑ No If es, provide letter from HOA Owner's Name- Phone#: F0 n 4az Contractor: Phone: W roe Fax: (S-s-2Z-��6J Contractor License : 7 q IO�- t Cupertino Business License#: Contact: JJ// Phone: ,W?vlfit/l, Fax: Residential Commercial ❑ Job Description: oV Building Permit Info: ' Bldg ❑ Elect ❑ P!umb ❑ Mech ❑ Type of Construction (Usage Class): Occupancy Type: (2--- 1-A, 1-B ❑ U/=-A ❑ II/VI B, IV-HT, V-B ❑�— Valuation: y� Square Footage: 000 � 12- Project Size: Express 2�tandard ❑ Large ❑ Major ❑ Green Building: Please complete relevant portion of the Green Building/LEED Checklist& attach it to the application or if applicable, iiclude in plan set& the sheet index. pints Achieved: L For help, contact Build it Green at www.builditgreen.or ,( Revised 07/14/09 3