Loading...
12110059 - SI - SIGN � Qualify.Assurance Services Materials Consulting � �'ES�'ING EN�I�T�E�S, �T�TC. Since 7954 Apri12�, 2Q13 City of Cupertina TEI Praject No. 57517 B�uilding Ins�ectian Department permit No. 1211�3059 1034Q Torre Avenue Cupertino, California 95014 Subject: FINAL REPORT Project: 1Q165 N. DeAnza &lvc� AlQ ft Hot�l—Sign�age Cupertino, Ccclifor-nia (�entlemen: Tn accordance with Section 1704 af the California L'�ilding Cade, we nave pravided special inspection of: - Installation of expansian anehors in existing concrete. These i�spections were perfc,rmed by persorizael under the general supervision af a Registered Civil Engineer in the State of California. Based upon our in�pectians performed and our substantiating reports, tlie inspected wor�C requiring specia� inspection was, to the best of our kno�,7vledge, in aonforsi�ance with the approved plans and specifications, the ap�lic�ble vtrorkmanshi�,provisions of this Code, and any changes by the Engineer of Record. Details of our wark on this project are contained r.n our testing and�nspection reports that were submitted during the progress of construction. ���1 TESTING ENGINEERS,IN � e y � . 34I�2' � �`er�y L. Eglar�d, F . r � CE#34132, Exp. 6/30/13 ��',j� ,�� �'F CA1.1 cc; Infinite Loop Hotel LLC f D Gupta Azul Hospitali�y Gro�ap/J. Durbin •� ��� Corporate Office—2811 Teagarden Street—San Leandro,California 94577—(514)835-3142—FAX(510)834-3777 www.Testing-Engineers.corn I1CCR�DITED � � TESTING ENGINEERS, Il`�TC. 2811 TeagardQn St. 5�4-835-3142 510-834-�777fax Sayt Leandro,CA 9�577 800-660-3142 San I.eandro • San Jose * Marbnez INSPECTi�hT REPORT Week Ending: 1/18/13 ** Revised Report clated 4/`l2,/13 PROJ�CT#575T7 TYPE OF IIVSI�EC'I'ION: Expansion Anchors PROJECT: PLACE OF INSPECTIQN: 101b5 N.De Anza Blvd. JobsiEe �'� Aloft Hotel-Signage Cupertir►o,CA Permit# '�'� 32110059 1�f1� bATE 1/14/13 HO�S 4 INSPECTOR �'.P�Te�.son Reporfed to Jos�at the jobsite as requestec�. Wifinessed the drilling of holes of propex diamefer and depti�. Qbserved the cleaning of hales and witrtessed the proper insertian of f�venty-two(22)3/e" diameter Hilti KB-TZ expai�sion anchors,4-1/z"in lez�g�kli.,embedded 4°for sign at front corner. The preceding work was,to the liest of my icnowiedge,in campliance with engineer approved plans and specifications, including revisions Uy engineer. � Reviewed by. � Dav' Chippero � Sp ial Inspec�ian Division Manager 1ec: I�ifuufe Loop Hotel LLC/ D.Gupta *`� Azul Hospitalit��Group/J.Drsr�rzn City of Cupertino/ Bldg.Inspection I�ept. T1us report can be r�produced only in its entirery unless written permission from T'EI is obtained. P�ge 1 of 1