Loading...
10080152 CITY OF CUPERTINO BUILDING PERMIT BUILDING ADDRESS: 10408 DENISON AVE CONTI:ACTOR:KEITH ROOFING CO INC PERMIT NO: 10080152 OWNER'S NAME: YEA-IIWANG UANG 920 LINCOLN AVE DATE ISSUED:08/23/2010 'VER'S PHONE: 4082578849 SAN JOSE,CA 95126 PHONE NO:(408)295-8616 CJ LICENSED CONTRACTOR'S DECLARATION BUILDING PERMIT INFO: BLDG r— ELECT r— PLUMB License Class � Lie.# -� MECH[_ RESIDENTIAL I- COMMERCIAL� Contractor G Date 0V,;2 D I hereby affirm that I am licensed under the provisions of Chapter 9 JOB DESCRIPTION:RE-ROOF REMOVE SHAKE ROOF,INSTALL 7/16 OSB,30LB (commencing with Section 7000)of Division 3 of the Business&Professions FELT CAMP ROOF CLASS A 33SQ Code and that my license is in full force and effect. I hereby affirm under penalty of perjury one of the following two declarations: I have and will maintain a certificate of consent to self-insure for Worker's Compensation,as provided for by Section 3700 of the Labor Code,for the performance of the work for which this permit is issued. I have and will maintain Worker's Compensation Insurance,as provided for by Sq.Ft 17oor Area: Valuation:$19630 Section 3700 of the Labor Code,for the performance of the work for which this permit is issued. APN N amber:31629071.00 Occupancy Type: APPLICANT CERTIFICATION I certify that I have read this application and state that the above information is correct.I agree to comply with all city and county ordinances and state laws relating to building construction,and hereby authorize representatives of this city to enter PERMIT EXPIRES IF WORK IS NOT STARTED upon the above mentioned property for inspection purposes. (We)agree to save indemnify and keep harmless the City of Cupertino against liabilities,judgments, WITHIN 180 DAYS OF PERMIT ISSUANCE OR costs,and expenses which may accrue against said City in consequence of the 1F0 YS FRO IXST CALLED INSPECTION. granting of this permit. Additionally,the applicant understands and will comply with all non- ce regulations per the Cupertino Municipal Code,Section Date: 9.18. Issued ti.... Sig ature Date .r' OWNER-BUILDER DECLARATION RE-ROOFS: All roo's shall be inspected prior to any roofing material being installed.If a roof is I hereby affirm that I am exempt from the Contractor's License Law for one of installe i without first obtainin spection,I agree to remove all new materials for the following two reasons: inspect on. I,as owner of the property,or my employees with wages as their sole compensation, will do the work,and the structure is not intended or offered for sale(Sec.7044, Signat.re of AppKiant: Da Business&Professions Code) 1,as owner of the property,am exclusively contracting with licensed contractors to construct the project(Sec.7044,Business&Professions Code). ALL ROOF COVERINGS TO BE CLASS"A"OR BETTER I hereby affirm under penalty of perjury one of the following three HAZARDOUS MATERIALS DISCLOSURE declarations: I have and will maintain a Certificate of Consent to self-insure for Worker's I have read the hazardous materials requirements under Chapter 6.95 of the Compensation,as provided for by Section 3700 of the Labor Code,for the Califon nia Health&Safety Code,Sections 25505,25533,and 25534. I will maintain performance of the work for which this permit is issued. compliance with the Cupertino Municipal Code,Chapter 9.12 and the Health& I have and will maintain Worker's Compensation Insurance,as provided for by Safety Code,Section 25532(a)should I store or handle hazardous material. Section 3700 of the Labor Code,for the performance of the work for which this Additi rnally,should I use equipment or devices which emit hazardous air contantinants as defined by the Bay Area Air Quality Management District I will permit is issued. maints in compliance with the Cupertino Municipal Code,Chapter 9.12 and the I certify that in the performance of the work for which this permit is issued,I shall Health&Safety Code,Sections 25505,25533,and 25534. not employ any person in any manner so as to become subject to the Worker's Compensation laws of California. If,after making this certificate of exemption,I Owner ized agent: become subject to the Worker's Compensation provisions of the Labor Code,I mustDate: forthwith comply with such provisions or this permit shall be deemed revoked. CONSTRUCTION LENDING AGENCY APPLICANT CERTIFICATION I beret y affirm that there is a construction lending agency for the performance of work's I certify that I have read this application and state that the above information is for wh ch this permit is issued(Sec.3097,Civ C.) correct.I agree to comply with all city and county ordinances and state laws relating Lender's Name to building construction,and hereby authorize representatives of this city to enter upon the above mentioned property for inspection purposes.(We)agree to save Lender's Address indemnify and keep harmless the City of Cupertino against liabilities,judgments, s,and expenses which may accrue against said City in consequence of the ARCHITECT'S DECLARATION ,ting of this permit.Additionally,the applicant understands and will comply wita all non-point source regulations per the Cupertino Municipal Code,Section I unde stand my plans shall be used as public records. 9.18. Licens ed Professional Signature Date CITY OF CUPER"INO PERMIT RECE::PT OPERATOR: patg 3 ITEMS OF 3 COPY # : 1 Sec: Twp: Rng: Sub: Blk: Lot: APN 31629071.00 DATE ISSUED. . . . . . . : 08/23/2010 RECEIPT #. . . . . . . . . BS000011242 REFERENCE ID # 10080152 SITE ADDRESS 10408 DENISON AVE SUBDIVISION . . . . . . . CITY CUPERTIrO IMPACT AREA . . . . . . . OWNER . . . . . . . . . . . . : YEA-HWANG UANG ADDRESS : 10408 DENISON AVE CITY/STATE/ZIP . . . : CUPERTINO, CA 95014 RECEIVED FROM • ' ROGER BRIGHT ROGER LIC # 21477 CONTRACTOR . . . . . . COMPANY . . . . . . . . . . : KEITH ROOFING CO INC ADDRESS : 920 LINCOLN AVE CITY/STATE/ZIP . . . : SAN JOSS, CA 95126 TELEPHONE . . . . . . . . : (408) 29 -8616 FEE ID UNIT QUANTITY AMOUNT PD-TO-DT THIS REC- --NEW-BAL- ---------- ------------- ---------- ---------- 0 .00 1. 00 0 • 00 1BCBSC VALUATION 19, 630 . 00 1 .00 0 .00 2 . 00 0 .00 1BSEISMICR VALUATION 19, 630 . 00 2 .00 1REROOFRES SQ FEET 33 . 00 429 . 00 0 .00 429. 00 ------ -- -- 4_2 .00 0 .00 432 .00 0 .00 TOTAL PERMIT METHOD OF PAYMENT AMOUNTF.EFERENCE NUMBER ------------ --------------- -- CREDIT CARD 432 .00 VISA --------------- TOTAL RECEIPT 432 .00 VOICE ID DESCRIPTION VOICE ID DESCRIPTION-- ---------- ____ 601 ROOF TEAR OFF 602 ROOF PLYWOOD NAIL 604 ROOF IN-PROGRESS 605 FINAL REROOF 2- CITY OF ( ?e CITY OF CUPE'RTINO REROO F CUPERTINO PERMIT APPLICATION APN # j Date: C�� i �3 10 Building Address: v� iel Owner's Name: Phone 25 7 VII ,J t �'� HOA: Yes ❑ No If es, rovide letter fro;n HOA Contractor: Phone #:�o�s: Fax#: o-;Lq /2 Cupertino Business License #: Contractor License #: Type of Roof Covering: Existing: Proposed: ❑ Built-Up Roof ❑ Built-Up roof ❑ Asphalt Shingles Asphalt Shingles --.Wood Shakes ❑ Wood Shakes ❑ Wood Shingles ❑ Wood Shingles ❑ Other (Specify) ❑ Other (Specify) Number of existing coverings ❑ Provide I.C.C.E.S. Report# ❑ To be Removed ❑ Provide Mfgr. Installation Specs. Job Description:- � � s I -7 'le, dS!3. ma Ib e �- �C►•�► ' dp-�- Residential - Commercial ❑ Green Building: Please complete relevant portion of the Confirmed with Planning Dept. if Green Building Checklist & attach it to the applica,:ion or if there are any restrictions: applicable, include in plan set & the sheet index. Valuation: n /31)"&V IL I Have Read, U tand and Will Comply with Cupertino's Tear-Off Policy: Si tore Revised 02/05/09 REROOF TEAR-OFF POLICY COMMUNITY DEVELOPMENT DEPARTMENT•BUILDING DIVISION ALBERT SALVADOR, P.E., C.B.O., BUILDING DFFICIAL 10300 TORRE AVENUE•CUPERTINO, CA 95014-3255 CUPERTINO (408)777-3228• FAX(408)777-3333•buildinc 1 @cupertino.orq PROJECT ADDRESS De P1 APN# 10 q06 OWNER NAME PHONE E-MAIL STREET ADDRESS CITY, STATE,ZIP FAX CONTRACTOR NAME LICENSE LICNSE T P BUS.LIG#,..�'�� r 1; COMPANY NAME E-MAIL FAX STREET ADDRESS CITY,STATE, h PHONE f I UNDERSTAND AND AGREE TO THE FOLLOWING: 1. The re-roof project shall comply with all applicable previsions of the 2007 California Building Code. 2. You must schedule all needed inspections a minimum of one day before the requested inspection date. Please schedule inspections online or call (408)777-3228 between 7:30-3:30 (Mon-Fri). 3. Tear-off roof inspection is required. Please call for tsar-off inspection after the roof is torn off and all the nails/fasteners have been removed. Any and all (try-rotted wood shall be replaced prior to this inspection. A building inspector will be available with in one hour. There are special hours for this service: 7:30 — 10:3Cam and 1:00—3:30pm (Mon—Thurs); 7:30 — 10:3C am and 1:00—2:30pm (Friday). 4. If plywood is installed, a plywood nailing inspection is required. 5. In-Progress roof inspection is required. Call for an in-progress roof inspection to verify building is weather tight after installation of approximately 25% of the roofing material. 6. New roof coverings shall not be applied without first o)taining all inspections and written approvals from the building inspector. Any roofing which is app ied without first obtaining an approved inspection will require the removal of all new material down to th,- sheathing so a proper inspection can be performed. 7. A final inspection and approval shall be obtained from the building inspector when the re-roofing is complete. To receive a final sign-off, the following items will be verified: a. Flat roofs shall have a minimum of 1/4"per foot of slope and must demonstrate there is no ponding. b. Listings from approved testing agencies for all pre-manufactured products used shall be available on-site to review at the time of the inspection. c. Proper spark arrestor installation. 8. NOTE: If you call for a tear-off or plywood nailing inspection and the work is not complete, you will be charged a re-inspection fee of$126.00. The re-insp,-ction fee shall be paid before another inspection can be scheduled. By my signing below, I certify e of the following is true: I am the property owner or authorized agent to act on the property owner's be understand and agree to comply with the re-roof policy stated a ove. Signature of Applicant/Ag Date: ReroofPo1icy_2010.doc revised 05/17/10