Loading...
10080159CITY OF CUPERTINO BUILDING PERMIT CONTRACTOR: FOUR SEASONS ROOFING BUILDING ADDRESS: 20073 NORTHCREST SQ PO BO`:1668 OWNER'S NAME: BERT FRESCURA SAN JC SE, CA 95109 1ER'S PHONE: 4082576052 LICENSED CONTRACTOR'S DECLARATION �T�z°9 r1hereby nse Class Lc.,t Date tractor affirm that I am licensed under the provisions of Chapter 9 mmencing with Section 7000) of Division 3 of the Business & Professions e and that my license is in full force and effect. I hereby affirm under penalty of perjury one of the following two declarations: I have and will maintain a certificate of consent to self -insure for Worker's Compensation, as provided for by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued. I have and will maintain Worker's Compensation Insurance, as provided for by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued. APPLICANT CERTIFICATION I certify that I have read this application and state that the above information is correct. 1 agree to comply with all city and county ordinances and state laws relating to building construction, and hereby authorize representatives of this city to enter upon the above mentioned property for inspection purposes. (We) agree to save indemnify and keep harmless the City of Cupertino against liabilities, judgments, costs, and expenses which may accrue against said City in consequence of the granting of this permit. Additionally, the applicant understands and will comply with all non -point source regulations per the Cupertino Municipal Code, Section 9.18. /' O Z3 CL f Date Signature BUILI►ING PERMIT INFO: BLDG r PERMIT NO: 10080159 DATE ISSUED: 08/23/2010 PHONE NO: (408)278-0330 ELECT r— PLUMB r MECH r RESIDENTIAL I— COMMERCIAL r JOB DESCRIPTION: RE -ROOF REMOVE EXISTING CEMWWOOD ROOF & INSTALL A NEW CLASS A COMPOSITION SHINGLE. GAF GRAND CANYON (COLO t) STONEWOOD 12 SQ Sq. Ft f Area: Valuation: 54400 Occupancy Type: APN qumber: 31638072.00 jJ OWNER -BUILDER DECLARATION I hereby affirm that I am exempt from the Contractor's License Law for one of the following two reasons: I, as owner of the property, or my employees with wages as their sole compensation, will do the work, and the structure is not intended or offered for sale (Sec.7044, Business & Professions Code) I, as owner of the property, am exclusively contracting with licensed contractors to construct the project (Sec.7044, Business & Professions Code). I hereby affirm under penalty of perjury one of the following three declarations: I have and will maintain a Certificate of Consent to self -insure for Worker's Compensation, as provided for by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued. 1 have and will maintain Worker's Compensation Insurance, as provided for by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued. I certify that in the performance of the work for which this permit is issued, I shall not employ any person in any manner so as to become subject to the Worker's Compensation laws of California. If, after making this certificate of exemption, I become subject to the Worker's Compensation provisions of the Labor Code, I must forthwith comply with such provisions or this permit shall be deemed revoked. PERMIT EXPIRES OF PERMIT IIFS DANCE OR T STARTED WITHIN 180 DAY 1.80 DAYS FROM LAST CALLED INSPECTION. Issu !d by: APPLICANT CERTIFICATION I certify that I have read this application and state that the above information is correct. I agree to comply with all city and county ordinances and state laws relating to building construction, and hereby authorize representatives of this city to enter upon the above mentioned property for inspection purposes. (We) agree to save mify and keep harmless the City of Cupertino against liabilities, judgments, , and expenses which may accrue against said City in consequence of the granting of this permit. Additionally, the applicant understands and will comply with all non -point source regulations per the Cupertino Municipal Code, Section 9.18. /' /7-J)P Com/ Date Signature Date: RE -ROOFS: All u oofs shall be inspected prior to any roofing material being installed. If a roof is inst-, lled without first obtaining an inspection, I agree to remove all new materials for insp potion. �Date: 23�d Sigi ature of Applicant: ALL ROOF COVERINGS TO BE CLASS "A" OR BETTER HAZARDOUS MATERIALS DISCLOSURE I h ive read the hazardous materials requirements under Chapter 6.95 of the California Health & Safety Code, Sections 25505, 25533, and 25534. I will maintain compliance with the Cupertino Municipal Code, Chapter 9.12 and the Health & Sa'ety Code, Section 25532(a) should I store or handle hazardous material. At ditionally, should I use equipment or devices which emit hazardous air co itaminants as defined by the Bay Area Air Quality Management District I will maintain compliance with the Cupertino Municipal Code, Chapter 9.12 and the Health & Safety Code, Sections 25505, 25533, and 25534. O Hner or authorized agent:/2; l6 Date: CONSTRUCTION LENDING AGENCY I uereby affirm that there is a construction lending agency for the performance of work's fir which this permit is issued (Sec. 3097, Civ C.) Lender's Name I ender's ARCHITECT'S DECLARATION I understand my plans shall be used as public records. Licensed Professional - 3 ITEMS OF 18 CITY OF CUPERTINO PERMIT RECEIPT Sec: Twp: Rng: Sub: Blk: -,ot: APN ........: 31638)72.00 DATE ISSUED.......: 08/23/2010 RECEIPT #......... BS000)11254 REFERENCE ID # 10080159 SITE ADDRESS 20073 NORTHCREST SQ SUBDIVISION ...... CITY CUPERTINO IMPACT AREA ...... OWNER ............: BERT FRESCURA ADDRESS 20073 NORTHCREST SQ CITY/STATE/ZIP CUPERTINO, CA 95014 OPERATOR: patg COPY # : 1 RECEIVED FROM ....: FOUR SEASONS ROOFIN CONTRACTOR .......: DIAZ, ALFRED LIC # 21323 COMPANY ..........: FOUR SEASONS ROOFING ADDRESS ..........: PO BCX 1668 CITY/STATE/ZIP ...: SAN DOSE, CA 95109 TELEPHONE ........: (408)278-0330 FEE ID UNIT QUANTITY AMOUNT PD -TO -DT --------- THIS REC NEW BAL ----------------------- 1BCBSC VALUATION ---------- 4,400.00 ---------- 1.00 0.00 1.00 0.00 0.00 1BSEISMICR VALUATION 4,400.00 0.50 0.00 0.50 156.00 1REROOFRES SQ FEET 12.00 156.00 0.00 ---------- ---------- ------0_00 TOTAL PERMIT ----------- 157.50 0.00 157.50 0.00 VOICE ID DESCRIPTION -------- ---------------------------- 601 ROOF TEAR OFF VOICE ID DESCRIPTION -------- ---------------------------- 602 ROOF PLYWOOD NAIL 604 ROOF IN -PROGRESS 605 FINAL REROOF CITY OF CUPERTINO FEE ESTIMATOR — BUILDING DIVISIOONIEWED BY: DATE: 7APN: ESS: *VALUATION: $4,400 BP#: PLAN CHECK TYPE: Re -roof kPERMIT TYPE: Minor Building Permit PENTAMATION 1 MFDWLROOF Buildina is Yes C) No PERMIT TYPE: PRIMARY Multi -Family Dwelling >3 Stories USE: WORK NOTE: These fees are based on the retimina to u— FEE ITEMS (Fee Resolution 09-051 Eft' 7/1/.10) /'kin C 'Irc 'k Vcc>: S�rl71�1. I't." f"Gt. Permit Fee: Soppl_ 1 lth 1""c 1 ail, /�IGftltit,.; IL's tx'i l:./cc 1'F'i't7Nl F"c Work Without Permit? Yes No Tt'rrt��'II . Stront; Motion Fee_ 1BSEISMICR Bld T Stds Conunission Fee: 1BCBsc SUBTOTALS: !ion avail o u FEE I QTY/FEE $156.00 $0.0 MISC ITEMS Select an Administrative Item $0.',0 $1.00 TOTAL FEE: $157.50 $157.50 $0.00 Revised: 8/17/2010 CITY OF CITY OF CUPERTINO [a REROOF CUPERTINO PERMIT APPLICATION APN # Building Address: `2 c o -7 3 Owner's Name: hA i_, HOA: Yes Contractor: ❑ No ❑ If yes, 6w" SCJ, sc,-57 vide letter frc)m HOA 62z,a�J ti3 -T_. C - Cupertino Business License #: 2% 3 23 Type of Roof Covering: Existing: o Built -Up Roof ❑ Asphalt Shingles ❑ Wood Shakes ❑ Wood Shingles 9r Other (Specify) Number of existing coverings / ir--To be Removed Date: F/2,3 //a Via. Phone #: Ctvo) ;2=� 7- Phone #: (ym)v33 0 Fax#: Contractor License #: y7�,2/61 F Proposed: ❑ Built -Up roof Asphalt Shingles ❑ Wood Shakes ❑ Wood Shingles ❑ Other (Specify) ❑ Provide I.C.C.E.S. Report # ❑ Provide Mfgr. Installation Specs. �'S�r c✓c��SL 1�'c�� Job Description: �� ve 4 '�j -e''," , e C,k,_, I( 0,A1 Residential - Commercial Green Building: Please complete relevant portion of the Green Building Checklist & attach it to the application or if applicable, include in plan set & the sheet index. Valuation: �/ Yo a S? Confirmed with Planning Dept. if there are any restrictions: I Have Read, Understand and Will Comply with Ct.pertino's Tear -Off Policy: Signature Revised 02/05/09 REROOF TEAR -OFF POLICY COMMUNITY DEVELOPMENT DEPARTMENT • 3UILDING DIVISION M ALBERT SALVADOR, P.E., C.B.O., BUILDING O =FICIAL 10300 TORRE AVENUE • CUPERTINO, CA 95014-3255 UPERTINO (408) 777-3228 •FAX (408) 777-3333 • buildin a cupertlno.orq :;UUKESS 206 -7 3 f� p PN H t 1 V 1 C>/L� 6_' 0%v -JFK NA.Ml. - i3 r O �J LIC 0%1?=.NY NAME C/9 PH�O;r�/��0� Z E-MAIQQQL CITY, STJJIATE IP SG <* E-MAIL LICE g ATE, Zl 9 I UNDERSTAND AND AGREE TO THE FOLLOWING: FAX("u'a) 0" — 6, GC-? / BUS. L. IC/a�ZZ� PHONE U33� 1. The re -roof project shall comply with all applicable previsions of the 2007 California Building Code. the day before the inspectiection is te. Please call (408)777 2. An inspection request shall be scheduled 3225 between 7:30 - 3:30pm (Mon -Fri) to schedule thy; next day'nsp ved and all the dry -rotted wood has 3. After the roof torn off and the nails/fasteners have been remo been replaced, you must call for a roof inspection. A building inspector will be available with one hour. rn (Mon There are special hours for the service: 7:30 — 10:30�tm and 1:000 _ 2'.30pm (Friday). hurs); 7:30 - 10:30;im and 1.0 P 4. If plywood is installed, a plywood nailing inspection :s required. nd written ;. New roof coverings shall not be applied without first obtaining all inspectson as a roved inspection n pectionprovals lwill 11-1c building inspector. Any roofing which is applied without first obtaining Pp rec vire the removal of all new material down to the s leathing so a proper inspection can -r performed. 1 6. :� sinal inspection and approval shall be obtained from the building inspector when the re completed. is completed. To receive a final sign -off, the following item will be a. Flat roofs shall have a minimum of 1/ per foot of slope and demonstrate there is no ponding. b. A listing from an approved testing agency shall be a-ailable on-site to review at the time of the inspection. c. Proper spark arrestor installation. 7 NOTE: If you call for a plywood nailing inspection and the job is not ready, you will be charged to a re - NOTE: fee sh<<ll be paid before another inspection can be inspection fee of $126.00. The re-in scheduled. P' my signature below, I certify to each of the following: I am the property policy stated ab authorized agent to act on property owner's behalf. I un er rid and agree to comply w _-- Date: — -- Signaiure of Applicant/Agent: ReroofP01icy_20I0.doc revised 04/14,'10