10070140CITY OF CUPERTI VO BUILDING PERMIT
BUILDING ADDRESS: 20111 JOHN DR
CONTRACTOR: WESTERN ROOFING
PERMIT NO: 10070140
SYSTEMS
'NER'S NAME: CARY CAMPBELL
1328 WHITE OAKS RD
DATE ISSUED: 07/20/2010
OWNER'S PHONE: 4084465143
CAMPBELL, CA 95008
PHONE NO: (831)278-1837
Ld LICENSED CONTRACTOR'S DECLARATION
F F f—
BUILDING PERMIT INFO: BLDG ELECT PLUMB
License Class 3 Lic. # G 7 g 7 2
I— F r
Contrac r Date? ZcJ / J
MECH RESIDENTIAL COMMERCIAL
I her y a ►rm th t I am livens der the provisions of Chapter 9
JOB DESCRIPTION: RE -ROOF TEAR OFF WOOD SHAKE, FILL SHEATING AS
(commencing with Section 700 ivision 3 of the Business & Professions
NEEDED, SYNTHETIC U, INSTALL METAL
SHAKE PER [CC 5626 CLAASSSS A A 26SMENT6SQ
Code and that my license is in full force and effect.
I hereby affirm under penalty of perjury one of the following two declarations:
I have and will maintain a certificate of consent to self -insure for Worker's
Compensation, as provided for by Section 3700 of the Labor Code, for the
performance of the work for which this permit is issued.
I have and will maintain Worker's Compensation Insurance, as provided for by
Sq: Ft Floor Area:
Valuation: $16000
Section 3700 of the Labor Code, for the performance of the work for which this
permit is issued. I" v,
APN Number: 36933036.00
Occupancy Type:
APPLICANT CERTIFICATION
I certify that I have read this application and state that the above information is
correct. I agree to comply with all city and county ordinances and state laws relating
to building construction, and hereby authorize representatives of this city to enter
upon the above mentioned property for inspection purposes. (We) agree to save
PERMIT EXPIRES IF WORK IS NOT STARTED
indemnify and keep harmless the City of Cupertino against liabilities, judgments,
costs, and expenses which may accrue against said City in consequence of the
WITHIN 180 DAYS OF PERMIT ISSUANCE OR
granting of this permit. Additionally, the applicant understands and will comply
180 DAYS FROM LAST CALLED INSPECTION.
with all non -point source regulations per the Cupertino Municipal Code, Section
9.18.
re Date—7— Zy / J
Issued b Date:
❑ OWNER -BUILDER DECLARATION
RE -ROOFS:
I hereby affirm that I am exempt from the Contractor's License Law for one of
All roofs shall be inspected prior to any roofing material being installed. If a roof is
the following two reasons:
installed without first obtaining an inspection, I agree to remove all new materials for
I, as owner of the property, or my employees with wages as their sole compensation,
inspection.
will do the work, and the stricture is not intended or offered for sale (Sec.7044,
Business & Professions Code)
Signature of Applic Date:
I, as owner of the property, am exclusively contracting with licensed contractors to
construct the project (Sec.7044, Business & Professions Code).
ALC ROOF COVERINGS T BE ASS "A" OR BETTER
I hereby affirm under penalty of perjury one of the following three
declarations:
I have and will maintain a Certificate of Consent to self -insure for Worker's
HAZARDOUS MATERIALS DISCLOSURE
Compensation, as provided for by Section 3700 of the Labor Code, for the
I have read the hazardous materials requirements under Chapter 6.95 of the
performance of the work for which this permit is issued.
California Health & Safety Code, Sections 25505, 25533, and 25534. I will maintain
I have and will maintain Worker's Compensation Insurance, as provided for by
compliance with the Cupertino Municipal Code, Chapter 9.12 and the Health &
Section 3700 of the Labor Code, for the performance of the work for which this
Safety Code, Section 25532(a) should I store or handle hazardous material.
Additionally, should I use equipment or devices which emit hazardous air
permit is issued.
contaminants as defined by the Bay Area Air Quality Management District I will
I certify that in the performance of the work for which this permit is issued, I shall
maintain compliance with the Cupertino Municipal Code, Chapter 9.12 and the
not employ any person in any manner so as to become subject to the Worker's
Health & Safety Code, Sections 25505, 25533, and 25534.
Compensation laws of California. If, after making this certificate of exemption, I
become subject to the Worker's Compensation provisions of the Labor Code, I mustcaner
o utho ' agent:
Date: — �✓ �c/
forthwith comply with such provisions or this permit shall be deemed revoked.
APPLICANT CERTIFICATION
CONSTRUCTION LENDING AGENCY
I certify that I have read this application and state that the above information is
I hereb affirm tha there is a construction lending agency for the performance of work's
correct. I agree to comply with all city and county ordinances and state laws relating
for which Q ermit is issued (Sec. 3097, Civ C.)
to building construction, and hereby authorize representatives of this city to enter
Lender's Name
the above mentioned property for inspection purposes. (We) agree to save
.nnify and keep harmless the City of Cupertino against liabilities, judgments,
Lender's Address
costs, and expenses which may accrue against said City in consequence of the
granting of this permit. Additionally, the applicant understands and will comply
ARCHITECT'S DECLARATION
with all non -point source regulations per the Cupertino Municipal Code, Section
9.18.
I understand my plans shall be used as public records.
Signature Date
Licensed Professional
2 ITEMS OF 4
CITY OF CUPERTINO
PERMIT RECEIPT
Sec: Twp: Rng: Sub: Blk.: Lot:
APN ........: 36S33036.00
DATE ISSUED.......: 07/20/2010
RECEIPT #......... BS(,00010912
REFERENCE ID # ...: 10(70140
SITE ADDRESS .....: 20_.11 JOHN DR
SUBDIVISION ......
CITY CUPERTINO
IMPACT AREA ......
OWNER CARY CAMPBELL
ADDRESS 20:.11 JOHN DR
CITY/STATE/ZIP ...: CUPERTINO, CA 95014
OPERATOR: patg
COPY # : 1
RECEIVED FROM MICHAEL D LUNNEBORG
CONTRACTOR MICHAEL LUNNEBORG LIC # 25896
COMPANY ..........: WESTERN ROOFING SYSTEMS
ADDRESS 13:28 WHITE OAKS RD
CITY/STATE/ZIP ...: CAMPBELL, CA 95008
TELEPHONE (831)278-1837
FEE ID UNIT
QUANTITY
AMOUNT
PD -TO -DT
----------
THIS REC
----------
NEW BAL
---
-----------------------
1BCBSC VALUATION
----------
16,000.00
----------
1.00
0.00
1.00
0.00
1REROOFRES SQ FEET
26.00
338.00
0.00
338.00
----------
0.00
----------
TOTAL PERMIT
----------
339.00
----------
0.00
339.00
0.00
METHOD OF PAYMENT
-----------------
CREDIT CARD
TOTAL RECEIPT
AMOUNT
---------------
756.00
---------------
756.00
VOICE ID DESCRIPTION
-------- ----------------------------
601 ROOF TEAR OFF
REFERENCE NUMBER
--------------------
VISA
VOICE ID DESCRIPTION
-------- ----------------------------
602 ROOF PLYWOOD NAIL
604 ROOF IN -PROGRESS 605 FINAL REROOF
CITY OF CUPERTINO
FEE ESTIMATOR - BUILDING DIVISION
lalADDRESS:
FEE
DATE:
MISC ITEMS
REVIEWED BY:
APN:
BP#:
-VALUATION: 1$16,000
PERMIT TYPE: Minor Building Permit
PLAN CHECK TYPE:
Re -roof
PRIMARY
USE: SFD or Duplex
TOTAL
ROOF AREA:
2,600
S f
APPLICATION
TYPE: 1 R3SFDADD/REM
xW
as
cc
3U
]VnTF- Thoco fops aro hosed on the preliminary information available and are only an estimate. Contact the Dept for addn'1 info.
FEE ITEMS (Fee Resohrtion 09-051 F/1' %;'1i09)
FEE
QTY/FEE
MISC ITEMS
Permit Fee:
$338.00
Work Without Permit? Q Yes No
$0.00
Strom Motion Fee: 1BSE CR
$1.60
Select an Administrative Item
Bldg Stds Commission Fee: IBCBSC
$1.00
SUBTOTALS:
$340.60
$0.00 TOTAL FEE:
$340.60
Revised: 6/30/2010
CITY OF
CITY OF CUPERTINO
REROOF
c u P N o PERMIT APPLICATION
i o� 7 u I q J
APN #L-� 5� 0 � �
Date:
Building Address: Z& I I
Owner's Name:Ai
Phone #:
AOA: Yes ❑ No [�If yes, provide letter from HOA
Contractor:40�� 7 S s ,� f
Phone
Fax #: 33
Cupertino Business License #:
Contractor License #:
Type of Roof Covering:
Existing:
Proposed:
❑ Built -Up Roof
❑ Built -Up roof
❑ Asphalt Shingles
❑ Asphalt Shingles
Shakes
❑ Wood Shakes
roWood
Wood Shingles
❑ Wood Shingles
❑ Other (Specify)
Other (Specify) -e7l—
Number of existing coverings
❑ Provide I.C.C.E.S. Report # �G z
❑ To be Removed
❑ Provide Mfgr. Installation Specs.
Job Description: / 71ft
sit'A41_: ar NP&We. C � s>.v 7Y4
�✓� � � li �h�� ��, �<<
r� z � L Lis .�- � G'
Residential -
Commercial
Green Building: Please complete relevant porton of the Cor£rmed AthTIanning Dept. if
Green Building Checklist & attach it to the application or if there are any restrictions: ❑
applicable, include in plan set & the sheet index.
Valuation:
QcJJ___
I Have Read, Understand and Will Comply with Cupertino's Tear -Off Policy:
Si tore
Revised 02/05/09
CUPERTINO
REROOF TEAR -OFF POLICY
COMMUNITY DEVELOPMENT DEPARTMENT - BUILDING DIVISION
ALBERT SALVADOR, P.E., C.B.O., BUILDING OFFICIAL
10300 TORRE AVENUE • CUPERTINO, -A 95014-3255
(408) 777-3228 • FAX (408) 777-3333 • b jilding(aDcupertino.org
PROJECT ADDRESS �J 1 l ` J()k1,J �>
G
APN#
OWNER NAME
CP Cp �
PH41
��& -�`I`r3
E-MAIL
STREET ADDRESS
Zo/ / Ji• ,a b �
CITY, STA FE, ZIP
6L t\
FAX
CONTRACTOR NAME h ,' J4L '
��tJ /^ 4gh
LICENSE NUMBEP
(f 2-, -
LICENSE TYPE
3 4
BUS. LIC. #
COMPANY NAME
E-MAIL
FAX . / -,L -5 3
STREET ADDRESS
/.?Z4- Gv� � r �-c
CITY, STA" �, ZIP
_ k Soy
PHONE
3 s
I UNDERSTAND AND AGREE TO THE FOLLOWING:
1- The re -roof project shall comply with all applicable provisions of the 2007 California Building Code.
2. You must schedule all needed inspections a minirlum of one day before the requested inspection date.
Please schedule inspections online or call (408)717-3228 between 7:30-3:30 (Mon -Fri).
3. Tear -off roof inspection is required. Please cal for tear -off inspection after the roof is torn off and all
the nails/fasteners have been removed. Any and all dry -rotted wood shall be replaced prior to this
inspection. A building inspector will be available within one hour.
There are special hours for this service: 7:30 — 10:30am and 1:00 — 3:30pm (Mon — Thurs);
7:30 — 10:30am and 1:00 — 2:30pm (Friday).
4. If plywood is installed, a plywood nailing inspection is required.
5. In -Progress roof inspection is required. Call fclr an in -progress roof inspection to verify building is
weather tight after installation of approximately 25% of the roofing material.
6. New roof coverings shall not be applied without first obtaining all inspections and written approvals
from the building inspector. Any roofing which is applied without first obtaining an approved inspection
will require the removal of all new material dowr to the sheathing so a proper inspection can be
performed.
7. A final inspection and approval shall be obtained from the building inspector when the re -roofing is
complete. To receive a final sign -off, the followi ng items will be verified:
a. Flat roofs shall have a minimum of 1/4" per foot of slope and must demonstrate there is no ponding.
b. Listings from approved testing agencies for x.11 pre -manufactured products used shall be available
on-site to review at the time of the inspectiot-
c. Proper spark arrestor installation.
8. NOTE: If you call for a tear -off or plywood nailing inspection and the work is not complete, you will
be charged a re -inspection fee of $126.00. The rc-inspection fee shall be paid before another
insaection can be scheduled.
By my signing below, I certify each of the following is true: I am the property owner or authorized agent to act
on the property owner's beal£ I underst nd and agree to comply with the re -roof policy stated above.
Signature of Applicant/Agent: Date: 7-7v'I0
ReroofPo(icy_2010.doc revised 05/17/10
1. Use LoWND-VOC PWM
1 IAQ/Health pts
y --yes
2. Use Low VOC, Water -Based Wood Finishes
2 IAQ/Health pts
y=yes'
3. Use Lowlilo VOC Adhesives
3 IAQ/Health pts
Y --yes;
4. Use Salvaged Materials for Interior Finishes
3 Resource pts
y --yes;
5. Use Engineered Sheet Goods with no added Urea
5 IAQ/Health pts
y=yes
Formaldehyde
61AQMealth pts
y --yes
S. Use Exterior Grade Plywood for Interior Uses
1 IAQ/Health pts
y=yes
7.$9W all Exposed Particleboard or MDF
4 IAQMealth pts
y=yes
8. Use FSC Certified Materials for Interior Finish
4 Resource pts
y --yes
9. Use Finger -Jointed or Recycled -Content Trim
1 Resource pts
y --yes
10. Install Whole House Vacuum System
3 IAQMealth pts
y --yes
N. Flooring
1. Select FSC Certified Wood Flooring
8 Resource pts
y --yes
2. Use Rapidly Renewable Flooring Materials
4 Resource pts
y --yes
3. Use Recycled Content Ceramic Tiles
4 Resource pts
y --yes
4. Install Natural Linoleum in Place of Vinyl
5 IAQ/Health pts
y=yes
5. Use Exposed Concrete as Finished Floor
4 Resource pts
yeses
6. Install Recycled Content Carpet with Low VOCs
4 Resource pts
y=yes
Total Points Available:
Total Points Project Received:
G:datalprogslgr,
140 130 57
01 01 0
eeted.xls
CUPERTINO
CONTRACTOR / SL BCONTRACTOR LIST
Building Department
City Of Cupertino
10300 Torre Avenue
Cupertino, CA 95014-3255
Telephone: 408-777-3228
Fax: 408-777-3333
JOB ADDRESS: Z (91 t k
PERMIT # 4120-70 -0
OWNER'S NAME: C- C.b
PHONE # 1+4' S/"3
GENERAL CONTRACTOR:
BUSINESS LICENSE #
ADDRESS: 04S R-
CITY/ZIPCODE: C l.. l q��v
*Our municipal code requires all businesses working in the city to have a city of uupertmo uusiness ncense.
NO BUILDING FINAL OR FINAL OCCUPANCY INSPECTION(S) WILL BE SCHEDULED UNTIL THE
GENERAL CONTRACTOR AND ALL SUBCONTRACTORS HAVE OBTAINED A CITY OF CUPERTINO
BUSINESS LICENSE. -7_
I am not using any subcontractors: / Zvi
Si€;natur Date
Please check applicable subcontractors and complete t all ng information:
ner ontractor Signature
Date
SUBCONTRACTOR
BUSINESS NAME
BUSINESS LICENSE #
Cabinets & Millwork
Cement Finishing
Electrical
Excavation
Fencing
Flooring / Carpeting
Linoleum / Wood
Glass / Glazing
Heating
Insulation
Landscaping
Lathing
Masonry
Painting / Wallpaper
Paving
Plastering
Plumbing
Roofing
Septic Tank
Sheet Metal
Sheet Rock
Tile
ner ontractor Signature
Date