10060203 CITY OF CUPERTINO BUILDING PERMIT
BUILDING ADDRESS: 1144 STAFFORD DR CONTRACTOR:CASTO ROOFING PERMIT NO: 10060203
OWNER'S NAME: ROSEVEARE RONALD E AND DOLORES 1937 OLD MIDDLEFIELD WAY DATE ISSUED:06/30/2010
NER'S PHONE: 4082534516 MOUNTAIN VIEW,CA 94043 PHONE NO:(650)961-8922
19/ LICENSED CONTRACTOR'S DECLARATION
�d C� �, BU LDING PERMIT INFO: BLDG ELECT f- PLUMBr
License Class `� / Lic.# 3 72' 3
,�„ t MECH F RESIDENTIAL r COMMERCIAL
Contractor , F'^'`JT '`"�'�a1-e I's-AD
I hereby affirm that I am licensed under the provisions of Chapter 9 JOl I DESCRIPTION: REMOVE EXISTING ROOF AND INSTALL RADIANT
(commencing with Section 7000)of Division 3 of the Business&Professions BAF RIER
Code and that my license is in full force and effect. W/'3#FELTINSTALL LANDMARK TL,CLASS A 30 YR
I hereby affirm under penalty of perjury one of the following two declarations:
I have and will maintain a certificate of consent to self-insure for Worker's
Compensation,as provided for by Section 3700 of the Labor Code,for the
performance of the work for which this permit is issued.
I have and will maintain Worker's Compensation Insurance,as provided for by
Section 3700 of the Labor Code,for the performance of the work for which this Sq.Ft Floor Area: Valuation:$11250
permit is issued.
APPLICANT CERTIFICATION APr Number:36207008.00 Occupancy Type:
I certify that I have read this application and state that the above information is
correct.I agree to comply with all city and county ordinances and state laws relating
to building construction,and hereby authorize representatives of this city to enter
upon the above mentioned property for inspection purposes. (We)agree to save ?ERMIT EXPIRES IF WORK IS NOT STARTED
indemnify and keep harmless the City of Cupertino against liabilities,judgments,
costs,and expenses which may accrue against said City in consequence of the WITHIN 0 DAYS OF PERMIT ISSUANCE OR
granting of this permit. Additionally,the applicant understands and will comply 180 DAY OM LAST CALLED INSPECTION.
with all non-point source regulations per the Cupertino Municipal Code,Section
9.18.
l
Is4nature Date Issu-d by: —l Date:
❑ OWNER-BUILDER DECLARATION
RE-ROOFS:
I hereby affirm that I am exempt from the Contractor's License Law for one of All roofs shall be inspected prior to any roofing material being installed.If a roof is
the following two reasons: insta led without first obtaining an inspection,I agree to remove all new materials for
I,as owner of the property,or my employees with wages as their sole compensation, inspe ction.
will do the work,and the structure is not intended or offered for sale(Sec.7044,
Business&Professions Code) Signaure of Applicant: ( �C3 Date:
1,as owner of the property,am exclusively contracting with licensed contractors to
construct the project(Sec.7044,Business&Professions Code). ALL ROOF COVERINGS TO BE CLASS"A"OR BETTER
I hereby affirm under penalty of perjury one of the following three
declarations:
I have and will maintain a Certificate of Consent to self-insure for Worker's HAZARDOUS MATERIALS DISCLOSURE
Compensation,as provided for by Section 3700 of the Labor Code,for the I hay a read the hazardous materials requirements under Chapter 6.95 of the
performance of the work for which this permit is issued. Calif 3rnia Health&Safety Code,Sections 25505,25533,and 25534. I will maintain
I have and will maintain Worker's Compensation Insurance,as provided for by coml liance with the Cupertino Municipal Code,Chapter 9.12 and the Health&
Section 3700 of the Labor Code,for the performance of the work for which this Safety Code,Section 25532(a)should I store or handle hazardous material.
Additionally,should I use equipment or devices which emit hazardous air
permit is issued. conti minants as defined b the Ba Area Air
y y Quality Management District I will
1 certify that in the performance of the work for which this permit is issued,I shall main tain compliance with the Cupertino Municipal Code,Chapter 9.12 and the
not employ any person in any manner so as to become subject to the Worker's Heah h&Safety Code,Sections 25505,25533,and 25534.
Compensation laws of California. If,after making this certificate of exemption,I
become subject to the Worker's Compensation provisions of the Labor Code,I must Own,!r or (fzed agent:
forthwith comply with such provisions or this permit shall be deemed revoked. Date: /
10
APPLICANT CERTIFICATION CONSTRUCTION LENDING AGENCY
I certify that I have read this application and state that the above information is I hereby affirm that there is a construction lending agency for the performance of work's
correct.I agree to comply with all city and county ordinances and state laws relating for w rich this permit is issued(Sec.3097,Civ C.)
to building construction,and hereby authorize representatives of this city to enter Lend 3r's Name
upon the above mentioned property for inspection purposes.(We)agree to save
unify and keep harmless the City of Cupertino against liabilities,judgments, Lend!r's Address
L ,and expenses which may accrue against said City in consequence of the
granting of this permit.Additionally,the applicant understands and will comply ARCHITECT'S DECLARATION
with all non-point source regulations per the Cupertino Municipal Code,Section
9.18 1 undt rstand my plans shall be used as public records.
SignaDate f�
Licensed Professional
CITY OF CUFERTINO
3 ITEMS OF 3 PERMIT RECEIPT OPERATOR: patg
COPY # : 1
Sec: Twp: Rng: Sub: Blk: Iot:
APN 36207008 . 00
DATE ISSUED. . . . . . . : 06/30,2010
RECEIPT #. . . . . . . . . BS000()10738
REFERENCE ID # 10060203
SITE ADDRESS 1144 ;STAFFORD DR
SUBDIVISION . . . . . . .
CITY CUPERCINO
IMPACT AREA
OWNER ROSEVEARE RONALD E AND DOLORES
ADDRESS . 1144 STAFFORD DR
CITY/STATE/ZIP CUPERTINO CA, 95014-4912
RECEIVED FROM . . . . : CASTO ROOFING INC
CONTRACTOR . . . . . . . : CASTO, LINDSEY LIC # 21324
COMPANY . . . . . . . . . . : CASTC ROOFING
ADDRESS . . . . . . . . . . : 1938 OLD MIDDLEFIELD WAY
CITY/STATE/ZIP . . . : MOUNIAIN VIEW, CA 94043
TELEPHONE . . . . . . . . : (650) 961-8922
FEE ID UNIT QUANTITY AMCUNT PD-TO-DT THIS REC NEW BAL
---------- -------------
----------
---- ------
---------- ---
1BCBSC VALUATION 11, 250 . 00 1 .00 0 .00 1 . 00 0 .0
1BSEISMICR VALUATION 11, 250 . 00 1 .20 0 . 00 1 .20 0 . 00
1REROOFRES SQ FEET 30 . 00 390 .00 0 . 00 390 . 00 0 . 00
---- ------ ---------- ---------- ----
TOTAL PERMIT 392 .20 0 . 00 392 .20 0 . 00
METHOD OF PAYMENT AMOUNT REFERENCE NUMBER
-----------------
--------------- --------------------
CREDIT CARD 392 .20 054163
---------------
TOTAL RECEIPT 392 .20
VOICE ID DESCRIPTION VOICE ID DESCRIPTION
---------
------ -------------------
__ _
--
-- ----------
601 ROOF TEAR OFF 602 ROOF PLYWOOD NAIL
604 ROOF IN-PROGRESS 605 FINAL REROOF
CITY OF CUPERTINO 10(�Wos
_V
REROOF
CUPEkTINO PERMIT APPLICATION
APN # •�00q,90 p 00 Date:
:� Ur z �" 1u
Building Address: 14 T
a r
Owner's Name: Phone#: R).��_s-3 4 S_
1)U� oyu) se o-e-a
Contractor: Casto Roofing Inc. Phone #: (o SZ) % ( - 12'
1938 Old Middlefield Way ,
Mnilnta'n Vipw, CA )4043-9503
Fax
Cupertino Business License #: - Contractor License #:
-2, 1 Z�f :3 1)�
Type of Roo f Covering:
Existing: Proposed:
❑ Built=Up Roof ❑ Built-Up roof
❑ Asphalt Shingles 5( Asphalt Shingles
Wood Shakes ❑ Wood Shakes
❑ Wood Shingles ❑ Wood Shingles
❑ Other(Specify) ❑ Other (Specify)
Number of existing coverings ❑ Provide I.C.B.O. Report#
❑ To be Removed ❑ Provide Mfgr. Installation Specs.
Job Description: ��� tr� , /� ,��zA-�-� nC�Gf Cx .� tm/V� C;
7 %
Residential Commercial
Green Building: Please complete relevant portion of the Confirmed with Planning Dept. if
Green Building Checklist& athich it to the there are any restrictions: ❑
application or if applicable, include in plan
set & the sheet index.
Valuation:
I Have Read, Understand and Will Comply with Cupertino's Tear-Off Policy:
Signature
CITY OF
CITY OF CUP:ERTINO
REROOF
CUPERTINO FEE SCHEDULE
Number of Fee ID Fee Description Fee Permit Type
Squares Group
1REROOFCOM Re-roof Commercial B 1COMMLROOF
1BCBSC Cal Bldg Standards B ALL PERMIT TYPES
Commission Fee
1BSEISMICO Seismic Commercial B
1RER00FRES Re-roof Resideny:ial B 1SFDWLR00F
1BCBSC Cal Bldg Standa-ds B ALL PERMIT TYPES
Commission Fee
1BSEISMICRE Seismic Residential B
1RER00FMRES Re-roof Multi-Family B 1MFDWLROOF
1BCBSC Cal Bldg Standa-ds B ALL PERMIT TYPES
Commission Fee
1BSEISMICRE Seismic Residential B
1BUSLIC Business Licens(; B
INPUT ReSl)urres Energy IAWflealth
I.Windows
1.Install Energy-Efficient Windows
a.Double-Paned 1 Energy p y=yes 0
b.Low-Emissivity(Low-E) 2 Energy'p s y=yes 0
c.Low.Conductivity Erarnes 2 Energy p:s y=yes D
2.Install Low Heat Transmission Glazing 1 Energy p: y=yes 0
1 1 !
J.Heating Ventilation and Air Conditioning
1.Use Duct Mastic on All Du om
eTM is P
2.Install Ductwork within Conditioned Space 3 Energy F is y=yes 0
3.Vent Range Hood to the Outside 1 IAQJHea th pt y=yes 0
4.Clean all Ducts Before Occupancy 2 IAQ/Hea th pts y=yes 0
5.Install Solar Attic Fan 2 Energy Its y=yes D
6.Install Attic Ventilation Systems 1 Energy pt y=yes D
7.Install Whole House Fan 4 Energy pts y=yes 0
B.Install Sealed Combustion Units
a.Furnaces 3 IAQJHee Ith pts y--yess0
b.Water Heaters 3 IAQ/He,.lth pts y=yes 0
9.Replace Wall-Mounted Electric and Gas Heaters with
Through-the-Wall Heat Pumps 3 Energy its Y--yes 0
10.Install 13 SEER/11 EER or higher AC with a TXV 3 Energy )ts y=yes 0
11.Install AC with Non-HCFC Refrigerants 2 Resourc.-pts y=yes 0
12.Install 90%Annual Fuel Utilization Efficiency(AFUE)Furnace 2 Energy)ts y=yes 0
13.Retrofit Wood Burning Fireplaces
a.Install EPA certified wood stoves/inserts 1 IAQ/He filth pt y--yes 0
b. Install/Replace Dampers 1 Energy pt y=yes 0
c.Install Airtight Doors 1 Energy pt y=yes 0
14.Install Zoned,Hydronic Radiant Heating 3 Energy pts y=yes 0
15.Install High Efficiency Filter 41AQ/He31th pts y=yes 0
16.Install Heat Recovery Ventilation Unit(HRV) 5 IAQ/He31th pts y=yes 0
17.Install Separate Garage Exhaust Fan 3 IAQ/Health pts y=yes 0
K.Renewable Energy and Roofing
1.Pre-Plumb for Solar Water Heating 4 Energy pts y=yes 0
2.Install Solar Water Heating System 10 Energ} pts y=yes 0
3.Pre-Wire for Future Photovoltaic(PV)Installation 4 Energy pts y=yes 0
4.Install Photovoltaic(PV)System
(1.2 kw=6 points,2.4 kw=12 points,3.6 kw=1 B points) Up o 18 Energy pts 0
S.Select Safe and Durable Roofing liaterials 1 Resourc e pt y=yes 0
7.Install Radiant Barrier 3 Energy pts y=yes 0
1 ! 1
L.Natural Heating and Cooling
1.Incorporate Passive Solar Heating 5 Energy pts y=yes 0
2.Install Overhangs or Awnings over South Facing Windows 3 Energy pts y=yes 0
3,Plant Deciduous Trees on the West and South Sides 3 Energy pts y=yes D
! ! !
REROOF TEAR-OFF POLICY
COMMUNITY DEVELOPMENT DEPARTMENT•BUILDING DIVISION
ALBERT SALVADOR, P.E., C.B.O., BUILDINS OFFICIAL
10300 TORRE AVENUE•CUPERTINO,CA 95014-3255
CUPERTINO
(408)777-3228• FAX(408)777-3333• buildi lq a(D.cupertino.orq
PROJECT ADDRESS// 7/--e) Jor ��r� Dr APN#
OWNER NAME ,.� E-MAIL
!>,, tat�/ P� ���
STREET ADDRESS CITY, STATE,Z P FAX
CONTRACT NAME LICEN LICENSCPE5 BUS.LIC.#
COMPANY NAME E-MAIL FAX
STREET] /qy�J� - J C ZI' W, �is/^ /
gid. SISI,
I UNDERSTAND AND AGREE TO THE FOLLOWING:
1. The re-roof project shall comply with all applicable provisions of the 2007 California Building Code.
2. You must schedule all needed inspections a minimum of one day before the requested inspection date.
Please schedule inspections online or call (408)777-: 228 between 7:30-3:30 (Mon-Fri).
3. Tear-off roof inspection is required. Please call fcr tear-off inspection after the roof is torn off and all
the nails/fasteners have been removed. Any and all dry-rotted wood shall be replaced prior to this
inspection. A building inspector will be available w thin one hour.
There are special hours for this service: 7:30 — 10:30am and 1:00—3:30pm (Mon—Thurs);
7:30 — 10 30am and 1:00—2:30pm (Friday).
4. If plywood is installed, a plywood nailing inspection is required.
5. In-Progress roof inspection is required. Call for an in-progress roof inspection to verify building is
weather tight after installation of approximately 250/) of the roofing material.
6. New roof coverings shall not be applied without firs: obtaining all inspections and written approvals
from the building inspector. Any roofing which is aiplied without first obtaining an approved inspection
will require the removal of all new material down to the sheathing so a proper inspection can be
performed.
7. A final inspection and approval shall be obtained frc m the building inspector when the re-roofing is
complete. To receive a final sign-off, the following items will be verified:
a. Flat roofs shall have a minimum of/4"per foot of slope and must demonstrate there is no ponding.
b. Listings from approved testing agencies for all >>re-manufactured products used shall be available
on-site to review at the time of the inspection.
c. Proper spark arrestor installation.
8. NOTE: If you call for a tear-off or plywood nailing, inspection and the work is not complete, you will
be charged a re-inspection fee of$126.00. The re-inspection fee shall be paid before another
inspection can be scheduled.
[Bn
y my signing below, I certify each of the following is tru,-: I am the property owner or authorized agent to act
the property owner's behalf. I unders nd and agree to comply with the re-roof policystateedabove.
gnature of Applicant /7 Date:
ReroofPolicy_2010.doc revised 05/17/10
Building Department
City Of Cupertino
10300 Torre Avenue
Cupertino, CA 95014-3255
Telephone: 408-777-3228
C U P E RT I N O Fax: 408-777-3333
CONTRACTOR/ SUBC'ONTRACTOR LIST
JOB ADDRESS: i �-!�f u��d. PERMIT# Zo(�
OWNER'S NAME: �.)e V,,V1, PHONE # z,
GENERAL CONTRACTOR: BUSINESS LICENSE #
ADDRESS: jx'3`+5 c. 1a CITY/ZIPCODE: Vt' - 1V
*Our municipal code requires all businesses working in ibe city to have a City of Cupertino business license.
NO BUILDING FINAL OR FINAL OCCUPANCY IN'PECTION(S) WILL BE SCHEDULED UNTIL THE
GENERAL CONTRACTOR AND ALL SUBCON RACI'ORS HAVE OBTAINED A CITY OF CUPERTINO
BUSINESS LICENSE.
I am not using any subcontractors
Signal ure Date
Please check applicable subcontractors and complete she following information:
SUBCONTRACTOR BUSINESS '.NAME BUSINESS LICENSE #
Cabinets & Millwork
Cement Finishing
Electrical
Excavation
Fencing
Flooring/ Carpeting
Linoleum /Wood
Glass / Glazing
Heating
Insulation
Landscaping
Lathing
Masonry
Painting /Wallpaper
Paving
Plastering
Plumbing
Roofing
Septic Tank
Sheet Metal
Sheet Rock
Tile
Owner/Contractor Signature Date