Loading...
Exhibit CC 04-16-2013 Item #6 Annual Report on Pavement Management Item 6 Figure 3 (to replace current figure 3 on page 3 of Annual Report on Pavement Management Program dated April 16, 2013) FY 2008/09 FY 2009/10 FY 2010/11 FY 2011/12 FY 2012/13 Gas Tax Footnote#1 Footnote#2 Footnote#3 $355,063 $1,543,000 Footnote#4 Vehicle $329,000 Registration Fees Surface $330,000 $500,000 Transportation Program General Fund $750,000 $710,207 $510,469 $1,229,324 $1,122,000 Proposition 1B $890,000 $708,107 Proposition 42 $470,611 $332,188 ARRA $509,858 Adjustment due $1,859,345 $90,530 to carryover/ ending balance TOTAL $3,829,345 $1,690,676 $1,550,764 $1,584,387 $3,584,530 Footnotes: #1: $912k received and used for operations #2: $920k received and used for operations and annual concrete project #3: $1,427,000 received and used for operations and annual concrete project #4: $1,645,000 received; $355,063 to pavement program i / 0e, 1 2013 PAVEMENT MANAGEMENT PROGRAM CITY COUNCIL April 16, 2013 NETWORK STATISTICS Total Miles 139 Miles (2,914,740 SY) Residential 103 Miles (2,047,450 SY) Collector Streets 21 Miles (509,610 SY) Arterial Streets 15 Miles (357,680 SY) Distribution by Area (SY): Arterial,12.3% Residential, 70.2% 1 Street Types CN ''N----7-7'c-- ! rI l "1i.t,-� �— ...W J 1 J- r t4i , , . , _ i ,,,_ 1 =1+11� _ Y j _A ` _I I { Y lam 4 r-i I r. i - r « 1 Arterial(15 mi) Collector(21 mi) Residential(103 mi) NETWORK CONDITION PCI (2005-2012) 100 90 80 ; 69 69 70 70 69 71 71 64 1111I111i 0 0 ' 10 ._ 2005 2006 2007 2008 2009 2010 2011 2012 PCI - 2012 1 76 77 59 64 Residential Collector Arterial Average - 2 Pavement Condition Index(as of February 2013) , - 44 „ Mr tlit 4iiie' ' ' MI ri ill 110.16 ran irt 1111111.„caR 11111,0,,-- 3 .4 j lir iirjui 11)1 - 4-41141Libe Ltgillillat A, .. u„,...,, ._ , _ ., ii. ,,.... . ^.j u ..,.. ..., ,,.. . . • MTC PCI Breakpoints: t IL Very Good 80-89 PCI:(76-100) Good- 70-79 (51-75) Fair- 60-69 (26-50) At Risk 50-59 (0-25) Poor 25-54 4 ", , 4 t .' '� , 3 ` j { ii ! _ . - sm . .�.� „t. • • • _ WIMP. OVU y .. .,..,.,.. 4 I :a 5 PAVEMENT MANAGEMENT OUTLOOK Available budget: ■Gas Tax • $2.31 million ■Vehicle • PCI will decline to 58 by 2018 ' license Fees • Deferred maintenance will grow �rOne Bay ss2s,000 from $35 million to $75 million Area Grant Needed budget to increase PCI and slow growth of deferred maintenance: • $6.5 million • PCI will increase to 67 by 2018 • Deferred maintenance will grow to $60 million Benefit of Timely Preventative Maintenance PCI 00 Excellent 40%Drop in Quality Spending$1 on Good t�+t��9 preservation here._ 75%of Life Fair .,.eliminates or delays spending$6 to$10 Poor on rehabilitation or 40%Drop in Quality f reconstruction here. Z0 Very Poor 12%of Life Failed 0 5 10 15 20 6 QUESTIONS 7