10030103 CITY OF CUPERTINO BUILDING PERMIT
BUILDING ADDRESS: 20232,20242,20252,20262,20272 NORTHCOVE SQ CONTRACTOR:FOUR SEASONS ROOFING PERMIT NO: 10030103
OWNER'S NAME: MS.LINDA STARNES NORTH POINT HOA PO BOX 1668 DATE ISSUED:03/17/2010
NER'S PHONE: 4082296000 SAN JOSE,CA 95109 PHONE NO:(408)278-0330
❑ LICENSED CONTRACTOR'S DECLARATION BUILDING PERMIT INFO: BLDG F ELECT r— PLUMB
License Class - 3 Lie.#
C
MECH RESIDENTIAL COMMERCIAL
Contractor Date 7 -/0
I hereby a m th amJicensed under the provisions of Chapter 9 JOB DESCRIPTION:RE-ROOF BLDGS 20232,20242,20252,20262,20272 RMV
EXISTING ROOF APPLY NEW GAF GRAND CANYON COMP
(commencing with Section 7000)of Division 3 of the Business&Professions SHINGLES CLASS A 43SQ
Code and that my license is in full force and effect.
I hereby affirm under penalty of perjury one of the following two declarations:
I have and will maintain a certificate of consent to self-insure for Worker's
Compensation,as provided for by Section 3700 of the Labor Code,for the
performance of the work for which this permit is issued.
I have and will maintain Worker's Compensation Insurance,as provided for by
Section 3700 of the Labor Code,for the performance of the work for which this Sq.Ft Floor Area: Valuation:$26633
permit is issued.
APPLICANT CERTIFICATION APN Number:31641079.20232/42/52/62/72 Occupancy Type:
I certify that I have read this application and state that the above information is
correct.I agree to comply with all city and county ordinances and state laws relating
to building construction,and hereby authorize representatives of this city to enter
upon the above mentioned property for inspection purposes. (We)agree to save PERMIT EXPIRES IF WORK IS NOT STARTED
indemnify and keep harmless the City of Cupertino against liabilities,judgments, WITHIN 180 DAYS OF PERMIT ISSUANCE OR
costs,and expenses which may accrue against said City in consequence of the
granting of this permit. Additionally,the applicant understands and will comply 180 DAYS FROM LAST CALLED INSPECTION.
with all non-point sours�nn �theupertinoMunicipal Code,Section �79.18. J-1
Signature Date
7
t -0 Issued by: �/� Date:
L-1 OWNER-BUILDER DECLARATION
RE-ROOFS:
I hereby affirm that I am exempt from the Contractor's License Law for one of All roofs shall be inspected prior to any roofing material being installed.If a roof is
the following two reasons: installed without first obtaining an inspection,I agree to remove all new materials for
I,as owner of the property,or my employees with wages as their sole compensation, inspection.
will do the work,and the structure is not intended or offered for sale(Sec.7044,
Business&Professions Code) Signature of Applicant: Date:
I,as owner of the property,am exclusively contracting with licensed contractors to
construct the project(Sec.7044,Business&Professions Code). ALL ROOF COVERINGS TO BE CLASS"A"OR BETTER
I hereby affirm under penalty of perjury one of the following three
declarations: HAZARDOUS MATERIALS DISCLOSURE
I have and will maintain a Certificate of Consent to self-insure for Worker's
Compensation,as provided for by Section 3700 of the Labor Code,for the I have read the hazardous materials requirements under Chapter 6.95 of the
performance of the work for which this permit is issued. California Health&Safety Code,Sections 25505,25533,and 25534. I will maintain
I have and will maintain Worker's Compensation Insurance,as provided for by compliance with the Cupertino Municipal Code,Chapter 9.12 and the Health&
Safety Code,Section 25532(a)should I store or handle hazardous material.
Section 3700 of the Labor Code,for the performance of the work for which this Additionally,should I use equipment or devices which emit hazardous air
permit is issued. contaminants as defined by the Bay Area Air Quality Management District I will
I certify that in the performance of the work for which this permit is issued,I shall maintain compliance with the Cupertino Municipal Code,Chapter 9.12 and the
not employ any person in any manner so as to become subject to the Worker's Health&Safe e,See4int s 25505,25533,and 25534.
Compensation laws of California. If,after making-this certificate of exemption,I
become subject to the Worker's Compensation provisions of the Labor Code,I must O er or authosi nt: / 3- 0—/o
forthwith comply with such provisions or this permit shall be deemed revoked. '� Date:
CONSTRUCTION LENDING AGENCY
APPLICANT CERTIFICATION
I certify that I have read this application and state that the above information is I hereby affirm that there is a construction lending agency for the performance of work's
correct.1 agree to comply with all city and county ordinances and state laws relating for which this permit is issued(Sec.3097,Civ C.)
to building construction,and hereby authorize representatives of this city to enter Lender's Name
upon the above mentioned property for inspection purposes.(We)agree to save
unify and keep harmless the City of Cupertino against liabilities,judgments, Lender's Address
,and expenses which may accrue against said City in consequence of the
granting of this permit.Additionally,the applicant understands and will comply ARCHITECT'S DECLARATION
with all non-point source regulations per ertino Municipal Code,Section
9.18. I understand my plans shall be used as public records.
Signature Date 7 '� Licensed Professional
CITY OF CUPERTINO
3 ITEMS OF 3 PERMIT RECEIPT OPERATOR: patg
COPY # 1
Sec : Twp: Rng: Sub: Blk: Lot:
APN 31641079.20232/42/52/62/72
DATE ISSUED. . . . . . . : 03/17/2010
RECEIPT #. . . . . . . . . : BS000009967
REFERENCE ID # . . . : 10030103
SITE ADDRESS 20232, 20242, 20252, 20262, 20272
SUBDIVISION . . . . . .
CITY CUPERTINO
IMPACT AREA . . . . . .
OWNER MS. LINDA STARNES NORTH POINT
ADDRESS 20232 20242 20252 20262 20272
CITY/STATE/ZIP . . . : CUPERTINO, CA 95014
RECEIVED FROM . . . . : FOUR SEASONS ROOFIN
CONTRACTOR DIAZ, ALFRED LIC # 21323
COMPANY FOUR SEASONS ROOFING
ADDRESS PO BOX 1668
CITY/STATE/ZIP . . . : SAN JOSE, CA 95109
TELEPHONE (408) 278-0330
FEE ID UNIT QUANTITY AMOUNT PD-TO-DT THIS REC NEW BAL
---------- ------------- ---------- ---------- ---------- ---
1BCBSC VALUATION 26, 633 . 00 2 . 00 0 . 00 2 . 00 0 . 00
1BSEISMICR VALUATION 26, 633 . 00 2 .70 0 . 00 2 . 70 0. 00
1REROOFRES SQ FEET 43 . 00 559 . 00 0 .00 559 . 00 0 . 00
---------- ---------- ---------- ----------
TOTAL PERMIT 563 . 70 0 .00 563 .70 0. 00
METHOD OF PAYMENT AMOUNT REFERENCE NUMBER
----------------- --------------- --------------------
CHECK 563 .70 #009530
---------------
TOTAL RECEIPT 563 .70
VOICE ID DESCRIPTION VOICE ID DESCRIPTION
-------- ---------------------------- -------- -------------------
601 ROOF TEAR OFF 602 ROOF PLYWOOD NAIL
604 ROOF IN-PROGRESS 605 FINAL REROOF
CITY OF -
CITY OF CUPERTINO y
REROOF
CUPERTINO PERMIT APPLICATION
APN# Date:
Building Address:
VX Ck/CC1 -0(D
Owner's Name: ms. L s �-excix s Phone #:
HOA: Yes No ❑ If yes, provide letter from HOA
Contractor: F C r Phone #: 1A1 713 C,
V �— L,X?ctSC�t�S
Fax#: u(?g
Cupertino Business License #: Contractor License #:
I US
Type of Roof Covering:
Existing: Proposed:
❑ Built-Up Roof ❑ Built-Up roof
❑ Asphalt Shingles ---A—sphalt Shingles 3. -7 s" i (�
❑ Wood Shakes ❑ Wood Shakes
❑ Wood Shingles ❑ Wood Shingles
qv`Other (Specify) b-tin, ❑ Other (Specify)
Number of existing coverings ❑ Provide I.C.C.E.S. Report#
v-- o be Removed ❑ Provide Mfgr. Installation Specs.
Job Description:
�l3 S Cess 14 ,
Residential Commercial ❑
Green Building: Please complete relevant portion of the Confirmed with-Planning Dept. if
Green Building Checklist & attach it to the application or if there are any restrictions: ❑
applicable, include in plan set & the sheet index.
Valuation:
I Have Read, Underst i om y with Cupertino's Tear-Off Policy:
Si tur
- Revised 02/05/09
CITY OF
CITY OF CUPERTINO
REROOF
CUPERTINO FEE SCHEDULE
Number of Fee ID Fee Description Fee Permit Type
Squares Group
1REROOFCOM Re-roof Commercial B 1COMMLROOF
1BCBSC Cal'Bldg Standards B ALL PERMIT TYPES
Commission Fee
1BSEISMICO Seismic Commercial B
1REROOFRES Re-roof Residential B 1SFDWLROOF
1BCBSC Cal Bldg Standards B ALL PERMIT TYPES
Commission Fee
1BSEISMICRE Seismic Residential B
1RER00FMRES Re-roof Multi-Family B 1MFDWLROOF
1BCBSC Cal Bldg Standards B ALL PERMIT TYPES
Commission Fee
1BSEISMICRE Seismic Residential B
1BUSLIC Business License B
Community Development Department
Building Division
City of Cupertino
10300 Torre Avenue
Telephone: (408)777-3228
Fax: (408)777-3333
Building Department
Subject: Re-roofing policy for the City of Cupertino
1. Prior to permit issuance,you must agree to comply with 2007 CBC Standards
and manufacturers specification's on re-roofing. All roofs are Class"A" per Cupertino
municipal code 16.04.080.
2. New roof coverings shall not be applied without first obtaining all inspection
and written approval from the building inspector. A final inspection and
approval shall be obtained from the building inspector when the re-roofing
is completed.
3. All roofs shall be inspected prior to any roofing installation.
4. To receive a final sign off from the City,the following steps are required:
Pre-inspection and/or tear off approval.
a) AT TEAR OFF PULL OUT ALL ROOF FASTENERS.
2) In-progress inspection approval.
3) Final inspection approval.
a) Spark arrester installation.
5. If plywood is installed,a plywood nail inspection is required.
6. Any roofing which is applied without first obtaining an inspection,
will require the removal of all new material down to the sheathing,
so a proper City inspection can be performed.
7. NOTE: If you call for a plywood nail inspection and the job is not ready,
you will be charged a re-inspection fee of$126.00. The re-inspection fee must
be paid before another inspection can be scheduled.
IMPORTANT:
1. Flat roofs must have a minimum of 1/4" per foot slope and demonstrate
that there is no ponding.
2. An I.C.B.O.report is required to be on the job site at the time on inspection.
I understand and will comply with the above stated policy on re-roofing.Homeowner's Name: auk
Job Site Address: a Ua 3 2 -2-0,2-Li 3- -a v a a- -2 0 2-4 - 3-1 YVo_rHcovt s ci
Roofing Company Name:
Applicant's Signature: Date: 7110
Albert Salvador
Building Official
Revised 3/09/10
INPUT ResDurcas Energy IADIHEalth
T Windows
1.Install Energy-Efficient Windows
a.Double-Paned 1 Energy pt y=yes 0
b.Low-Emissivity(Low-E) 2 Energy pts y=yes 0
c.Low.Conductivity Frames 2 Energy pts y=yes 0
2.Install Low Heat Transmission Glazing 1 Energy pt y=yes 0
1 t 1
J.Heating Ventilation and Air Conditioning
1.Use Duct Mastic on All Duct Joints 2 Energy pts y=yes 0
2.Install Ductwork within Conditioned Space 3 Energy pts y=yes 0
3.Vent Range Hood to the Outside 1 IAQ/Health pt y=yes 0
4.Clean all Ducts Before Occupancy 2 IAQ/Health pts y=yes 0
5.Install Solar Attic Fan 2 Energy pts y=yes 0
6.Install Attic Ventilation Systems 1 Energy pt y=yes 0
7.Install Whole House Fan 4 Energy pts y=yes 0
B.Install Sealed Combustion Units
a.Furnaces 3 IAQ/Health pts y=yes 0
b.Water Heaters 3 IAQ/Health pts y=yes 0
9.Replace Wall-Mounted Electric and Gas Heaters with
Through-the-Wall Heat Pumps 3 Energy pts y=yes 0
10.Install 13 SEER/11 EER or higher AC with a TXV 3 Energy pts y=yes 0
11.Install AC with Non-HCFC Refrigerants 2 Resource pts y=yes 0
12.Install 90%Annual Fuel Utilization Efficiency(AFUE)Furnace 2 Energy pts y=yes 0
13.Retrofit Wood Burning Fireplaces
a.Install EPA certified wood stoves/inserts 1 IAQ/Health pt y=yes 0
b. Install/Replace Dampers 1 Energy pt y=yes 0
c.Install Airtight Doors 1 Energy pt y=yes 0
14.Install Zoned,Hydronic Radiant Heating 3 Energy pts y=yes 0
15.Install High Efficiency Filter 4 IAQ/Health pts y=yes 0
16.Install Heat Recovery Ventilation Unit(HRV) 5 IAQ/Health pts y=yes 0
17.Install Separate Garage Exhaust Fan 3 IAQ/Health pts y=yes 0
1 1 1
K.Renewable Energy and Roofing
1.Pre-Plumb for Solar Water Heating 4 Energy pts y=yes 0
2.Install Solar Water Heating System 10 Energy pts y=yes 0
3.Pre-Wire for Future Photovoltaic(PV)Installation 4 Energy pts y=yes 0
4.Install Photovoltaic(PV)System
(1.2 kw=6 points,2.4 kw=12 points,3.6 kw=18 points) Up to 18 Energy pts 0
6.Select Safe and Durable Roofing Materials 1 Resource pt y=yes 0 _
7.Install Radiant Barrier 3 Energy pts y—yes 0
1 1 1
L.Natural Heating and Cooling
1.Incorporate Passive Solar Heating 5 Energy pts y=yes 0
2.Install Overhangs or Awnings over South Facing Windows 3 Energy pts y=yes 0
3.Plant Deciduous Trees on the West and South Sides 3 Energy pts y=yes 0
1 1 1
M.Indoor Air Quality and Finishes
1.Use Low/No-VOC Paint 1 IAO/Health pts y=yes 0
2.Use Low VOC,Water-Based Wood Finishes 2 IAQ/Health pts y=yes. 0
3.Use Low/No VOC Adhesives 3 IAQ/Health pts y=yes 0
4.Use Salvaged Materials for Interior Finishes 3 Resource pts y=yes 0
5.Use Engineered Sheet Goods with no added Urea
Formaldehyde 61AQ/Health pts y=yes 0
0
7.Seal all Exposed Particleboard or MDF 4 IAQ/Health. pts y=yes 0
6.Use Exterior Grade Plywood for Interior Uses 1 IAQ/Health pts y=yes
B.Use FSC Certified Materials for Interior Finish 4 Resource pts y=yes 0
9.Use Finger-Jointed or Recycled-Content Trim 1 Resource pts y=yesj 0
10.Install Whole House Vacuum System 3 IAQ/Health pts y=yesl I 1 0
1 1 1
N.Flooring
1.Select FSC Certified Wood Flooring B Resource pts y=yes 0
2.Use Rapidly Renewable Flooring Materials 4 Resource pts y=yes 0
3.Use Recycled Content Ceramic Tiles 4 Resource pts y=yes 0
4.Install Natural Linoleum in Place of Vinyl 5 IAQ/Health pts y=yes 0
5.Use Exposed Concrete as Finished Floor 4 Resource pts y=yes 0
6.Install Recycled Content Carpet with Low VOCs 4 Resource pts y=yes 0
1 i 1
Total Points Available: 1401 130 57
Total Points Project Received:1 1 01 01 0
l7, /
al gguidelines/n:modelerslgreenpointsfinal21204pmtected.zis
Building Department
City Of Cupertino
10300 Torre Avenue
Cupertino, CA 95014-3255
Telephone: 408-777-3228
C U P E RT I N O Fax: 408-777-3333
CONTRACTOR/ SUBCONTRACTOR LIST
JOB ADDRESS: a o 3;?- '0 - _ s� �. �� - _� _
1+cam -e- - ti -� � tv PERMIT# i c..__. <_� _ `,f Y
OWNER'S NAME: vfk N l'e,��l- lea� PHONE # �/� 7 , Q j 3 ��
GENERAL CONTRACTOR: }=�� SPt. svn ��o�� �L BUSINESS LICENSE# 3
ADDRESS: 5' ,��, r, 5 CITY/ZIPCODE: S " C-5
*Our municipal code requires ail businesses working in the city to have a City of Cupertino business license.
NO BUILDING FINAL OR FINAL OCCUPANCY INSPECTION(S) WILL BE SCHEDULED UNTIL THE
GENERAL CONTRACTOR AND ALL SUBCONTRACTORS HAVE OBTAINED A CITY OF CUPERTINO
BUSINESS LICENSE. /
I am not using any subcontractors: 1L�1
Sign Date
Please check applicable subcontractors formation:
SUBCONTRACTOR BUSINESS NAME BUSINESS LICENSE #
Cabinets & Millwork
Cement Finishing
Electrical
Excavation
Fencing
Flooring/Carpeting
Linoleum/Wood
Glass /Glazing
Heating
Insulation
Landscaping
Lathing
Masonry
Painting/Wallpaper
Paving
Plastering
Plumbing
Roofing
Septic Tank
Sheet Metal
Sheet Rock
Tile
Owner/Contractor Signature Date