Loading...
09120050 (2) CITY OF CUPERTINO BUILDING PERMIT BUILDING ADDRESS: 18825 PENDERGAST AVE CONTRACTOR:STONERIDGE ROOFING PERMIT NO:09120050 OWNER'S NAME: SHEILA&JIM HEYHURST 2798 GLENFIRTH DR DATE ISSUED: 12/08/2009 ER'S PHONE: 4082577092 SAN JOSE,CA 95133 PHONE NO:(408)729-5101 ❑ LICENSED CONTRACTOR'S DECLARATION BUILDING PERMIT INFO: BLDG f— ELECT� PLUMB� License Class `- q Lic.# 2JS"// " MECH RESIDENTIAL COMMERCIAL Contractor Date C(. 0O:Q' I hereby affirm that I am licensed under t e provisions of Chapter 9 INCH, JOB DESCRIPTION: RE-ROOF TEAR OFF TAR&GRAVEL,INSTALL 1 OSQ 1/2 (commencing with Section 7000)of Division 3 of the Business&Professions 0SQ OSB,TWO-PLY 15LBS FELT,30YRS COMP CLASS A 2 Code and that my license is in full force and effect. 0SQ**SEE NOTES** I hereby affirm under penalty of perjury one of the following two declarations: I have and will maintain a certificate of consent to self-insure for Worker's Compensation,as provided for by Section 3700 of the Labor Code,for the performance of the work for which this permit is issued. I have and will maintain Worker's Compensation Insurance,as provided for by Section 3700 of the Labor Code,for the performance of the work for which this Sq.Ft Floor Area: Valuation:$8000 permit is issued. APPLICANT CERTIFICATION APN Number:37533022.00 Occupancy Type: 1 certify that I have read this application and state that the above information is correct.I agree to comply with all city and county ordinances and state laws relating to building construction,and hereby authorize representatives of this city to enter upon the above mentioned property for inspection purposes. (We)agree to save PERMIT EXPIRES IF WORK IS NOT STARTED indemnify and keep harmless the City of Cupertino against liabilities,judgments, costs,and expenses which may accrue against said City in consequence of the WITHIN 180 DAYS OF PERMIT ISSUANCE OR granting of this permit. Additionally,the applicant understands and will comply 180 DAYS FROM LAST CALLED INSPECTION. with all non-point source regulations per the Cupertino Municipal Code,Section 9.18. / Signature � /�f Date],��G t7��—Ot7 Issued by: Dat9! Li OWNER-BUILDER DECLARATION RE-ROOFS: 1 hereby affirm that I am exempt from the Contractor's License Law for one of All roofs shall be inspected prior to any roofing material being installed.If a roof is the following two reasons: installed without first obtaining an inspection,1 agree to remove all new materials for 1,as owner of the property,or my employees with wages as their sole compensation, inspection. will do the work,and the structure is not intended or offered for sale(Sec.7044, Business&Professions Code) Signature of Applicant: �v !&42rye- Date:D_-=C,p c4'G 1,as owner of the property,am exclusively contracting with licensed contractors to construct the project(Sec.7044,Business&Professions Code). ALL ROOF COVERINGS TO BE CLASS"A"OR BETTER I hereby affirm under penalty of perjury one of the following three declarations: I have and will maintain a Certificate of Consent to self-insure for Worker's HAZARDOUS MATERIALS DISCLOSURE Compensation,as provided for by Section 3700 of the Labor Code,for the I have read the hazardous materials requirements under Chapter 6.95 of the performance of the work for which this permit is issued. California Health&Safety Code,Sections 25505,25533,and 25534. 1 will maintain I have and will maintain Worker's Compensation Insurance,as provided for by compliance with the Cupertino Municipal Code,Chapter 9.12 and the Health& Section 3700 of the Labor Code,for the performance of the work for which this Safety Code,Section 25532(a)should I store or handle hazardous material. Additionally,should I use equipment or devices which emit hazardous air permit is issued. contaminants as defined by the Bay Area Air Quality Management District I will I certify that in the performance of the work for which this permit is issued,I shall maintain compliance with the Cupertino Municipal Code,Chapter 9.12 and the not employ any person in any manner so as to become subject to the Worker's Health&Safety Code,Sections 25505,25533,and 25534. Compensation laws of California. If,after making this certificate of exemption,I become subject to the Worker's Compensation provisions of the Labor Code,I must Owner or authorized agent: forthwith comply with such provisions or this permit shall be deemed revoked. ,� Date: & CZ APPLICANT CERTIFICATION CONSTRUCTION LENDING AGENCY I certify that I have read this application and state that the above information is I hereby affirm that there is a constriction lending agency for the performance of work's correct.I agree to comply with all city and county ordinances and state laws relating for which this permit is issued(Sec.3097,Civ C.) to building constriction,and hereby authorize representatives of this city to enter Lender's Name upon the above mentioned property for inspection purposes.(We)agree to save in,' )ify and keep harmless the City of Cupertino against liabilities,judgments, Lender's Address c nd expenses which may accrue against said City in consequence of the granting of this permit.Additionally,the applicant understands and will comply ARCHITECT'S DECLARATION with all non-point source regulations per the Cupertino Municipal Code,Section 9.18• I understand my plans shall be used as public records. Signature Date Licensed Professional l/ a7` CITY OF CUPERTINO REROOF CUPEkT1NO PERMIT APPLICATION APN # Date: ✓ .� "� L . De o 0 Building Address: / cnZe,,rgast Av" Owner's Name: one #: HOA: Yes ❑ No �If yes, provide letter from HOA yoG) 25 7 - �o 72 Contractor: Phone o� D Fax #: Cupertino Bus ness License #: Contractor License #: 66Vi Type of hoof Covering: Existing: Proposed: Built-Up Roof ❑ Built-Up roof ❑ Asphalt Shingles &Asphalt Shingles ❑ Wood Shakes ❑ Wood Shakes ❑ Wood Shingles ❑ Wood Shingles ❑ Other (Specify) ❑ Other (Specify) Number of existing coverings ❑ Provide I.C.C.E.S. Report# ❑ To be Removed ❑ Provide Mfgr. Installation Specs. Job Description: 2® o I ten sivicres '/ two.-Ply ) r c0 P Residential Commercial Green Building: Please complete relevant portion of the Confirmed with Planning Dept. if Green Building Checklist & attach it to the application or if there are any restrictions: ❑ applicable, include in plan set & the sheet inclex. Valuation: , o I Have Read, Understand and Will Comply with Cupertino's Tear-Off Policy: Signa re Revised 02/05/09 CITY OF C'UPERTINO :a REROOF CUPEkTINO FEE SCIJEDULE Number of Fee ID Fee Descr:.ption Fee Permit Type Squares Group 1REROOFCOM Re-roof Co;nmercial B 1COMMLROOF 1BCBSC Cal Bldg Standards B ALL PERMIT TYPES Commission Fee 1BSEISMICO Seismic Commercial B 1RER00FRES Re-roofRe,,idential B 1SFDWLR00F 1BCBSC Cal Bldg Standards B ALL PERMIT TYPES Commission Fee 1BSEISMICRE Seismic Re3idential B 1 REROOFMRES Re-roof ML.lti-Family B 1MFDWLROOF 1BCBSC Cal Bldg Standards B ALL PERMIT TYPES Commissio a Fee 1BSEISMICRE Seismic Re3idential B 1BUSLIC Business License B Community Development Department Building Division City of Cupertino 10300 Torre Avenue Telephone: (408)777-3228 Fax: (408)777-3333 Building Department Subject: Re-roofing policy for the City of Cupertino 1. Prior to permit issuance,you must a€;ree to comply with 2007 IBC Standards and manufacturers specifications on re-roofing.All roofs are Class "A"per Cupertino municipal code 16.04.080. 2. New roof coverings shall not be applied without first obtaining all inspection and written approval from the building inspector. A final inspection and approval shall be obtained from the building inspector when the re-roofing is completed. 3. All roofs shall be inspected prior to any roofing installation. 4. To receive a final sign off from the City,the following steps are required: 1) Pre-inspection and/or tear off approval. 2) In-progress inspection approval. 3) Final inspection approval. a) Spark arrester installation. 5. If plywood is installed,a plywood nail inspection is required. 6. Any roofing which is applied without first obtaining an inspection, will require the removal of all new material down to the sheathing, so a proper City inspection can be performed. 7. NOTE: If you call for a plywood nail inspection and the job is not ready, you will be charged a re-inspection fee of$176.18. The re-inspection fee must be paid before another inspection cz n be scheduled. IMPORTANT: 1. Flat roofs must have a minimum of 1/ "per foot slope and demonstrate that there is no ponding. 2. An I.C.B.O.report is required to be on the job site at the time on inspection. I understand and will comply with the abo,re stated policy on re-roofing. Homeowner's Name: Job Site Address: /'00°o2 S P,,,, Roofing Company Name: J � 7"' r .17 Applicant's Signature: &221 Date: �C , 200 Greg Casteel Building Official Revi:;ed 07/30/08