09090067 CITY OF CUPERTINO BUILDING PERMIT
BUILDING ADDRESS: 1633 ASTER LN CONTRACTOR:BECKS ROOFING PERMIT NO:09090067
OWNER'S NAME: TOM T R AND ROSE TRUSTEE 6191 OCHO RIOS DR DATE ISSUED:09/10/2009
1ER'S PHONE: 6507120708 SAN JOSE,CA 95123 PHONE NO:(408)365-8979
❑ LICENSED CONTRACTOR'S DECLARATION f— f—
BUILDING PERMIT INFO: BLDG ELECT PLUMB
License ClassLic.# f— F_ f—
C 4j �/� -4MECH RESIDENTIAL COMMERCIAL
Contractor � Date
I hereby affirm that I am licensed under the provisions of Chapter 9 JOB DESCRIPTION:RE-ROOF;ORIG PERMIT#08080012
(commencing with Section 7000)of Division 3 of the Business&Professions EXPIRED-T/O,PLYWOODNAIL&IN PROGRESS PASSED ON
Code and that my license is in full force and effect. ORIG PERMIT;THIS PERMIT FOR FINAL RE-ROOF
I hereby affirm under penalty of perjury one of the following two declarations:
I have and will maintain a certificate of consent to self-insure for Worker's
Compensation,as provided for by Section 3700 of the Labor Code,for the
performance of the work for which this permit is issued.
I have and will maintain Worker's Compensation Insurance,as provided for by Sq.Ft Floor Area: Valuation:$12000
Section 3700 of the Labor Code,for the performance of the work for which this
permit is issued.
APN Number:36624015.00 Occupancy Type:
APPLICANT CERTIFICATION
1 certify that I have read this application and state that the above information is
correct.I agree to comply with all city and county ordinances and state laws relating
to building construction,and hereby authorize representatives of this city to enter PERMIT EXPIRES IF WORK IS NOT STARTED
upon the above mentioned property for inspection purposes. (We)agree to save
indemnify and keep harmless the City of Cupertino against liabilities,judgments, WITHIN 180 DAYS OF PERMIT ISSUANCE OR
costs,and expenses which may accrue against said City in consequence of the 180 DAYS FROM LAST CALLED INSPECTION.
granting of this permit. Additionally,the applicant understands and will comply
with all non-point so ce regu 'ons per the upertino Municipal Code,Section
9.18. / _0Issued Iiy� ���� Date:
Signature Date
LI OWNER-BUILDER DECLARATION RE-ROOFS:
All roofs shall be inspected prior to any roofing material being installed.If a roof is
1 hereby affirm that I am exempt from the Contractor's License Law for one of installed without first obtaining an inspection,I agree to remove all new materials for
the following two reasons: inspection.
1,as owner of the property,or my employees with wages as their sole compensation,
will do the work,and the structure is not intended or offered for sale(Sec.7044, Signature of Applicant: Date:
Business&Professions Code)
1,as owner of the property,am exclusively contracting with licensed contractors to
construct the project(Sec.7044,Business&Professions Code). ALL ROOF COVERINGS TO BE CLASS"A"OR BETTER
I hereby affirm under penalty of perjury one of the following three
HAZARDOUS MATERIALS DISCLOSURE
declarations:
I have and will maintain a Certificate of Consent to self-insure for Worker's I have read the hazardous materials requirements under Chapter 6.95 of the
Compensation,as provided for by Section 3700 of the Labor Code,for the California Health&Safety Code,Sections 25505,25533,and 25534. I will maintain
performance of the work for which this permit is issued. compliance with the Cupertino Municipal Code,Chapter 9.12 and the Health&
I have and will maintain Worker's Compensation Insurance,as provided for by Safety Code,Section 25532(a)should I store or handle hazardous material.
Section 3700 of the Labor Code,for the performance of the work for which this Additionally,should I use equipment or devices which emit hazardous air
permit is issued. contaminants as defined by the Bay Area Air Quality Management District I will
maintain compliance with the Cupertino Municipal Code,Chapter 9.12 and the
I certify that in the performance of the work for which this permit is issued,I shall Health&Safety Code,Sections 25505,25533,and 25534.
not employ any person in any manner so as to become subject to the Worker's
Compensation laws of California. If,after making this certificate of exemption,I Owner or aut orized gent: Irl i0
become subject to the Worker's Compensation provisions of the Labor Code,I must Date: �J
forthwith comply with such provisions or this permit shall be deemed revoked.
CONSTRUCTION LENDING AGENCY
APPLICANT CERTIFICATION I hereby affirm that there is a construction lending agency for the performance of work's
I certify that I have read this application and state that the above information is for which this permit is issued(Sec.3097,Civ C.)
correct.I agree to comply with all city and county ordinances and state laws relating Lender's Name
to building construction,and hereby authorize representatives of this city to enter
upon the above mentioned property for inspection purposes.(We)agree to save Lender's Address
nify and keep harmless the City of Cupertino against liabilities,judgments,
and expenses which may accrue against said City in consequence of the
granting of this pennit.Additionally,the applicant understands and will comply ARCHITECT'S DECLARATION
with all non-point so ce regul ' ns per the Cupertino Municipal Code,Section I understand my plans shall be used as public records.
9.18.
Licensed Professional
Signature Date �/
09 01 OU
CITY OF CUPERTINO
REROOF
CUPEkT1NO PERMIT APPLICATION
APN #
Date
-
-3
Building Address: Zb 2_�; c 7Z�
Owner's Name: as-E_ �-m Phone #:/�HOA: Yes ❑ No a If es provide letter from HOA v Sv 71-Z, e) 7D 6��
Contractor: Phone #: ; 14,1
ec �� ops ' C
Fax #:
Cupertino Business License #: Contractor License #:
2772
Type of Roof Covering:
Existing: Proposed:
❑ Built-Up Roof ❑ wilt-Up roof
❑ Asphalt Shingles , Asphalt Shingles
)D Wood Shakes ❑ Wood Shakes
❑ Wood Shingles ❑ Wood Shingles
❑ Other (Specify) ❑ Other (Specify)
Number of existing coverings _ ❑ Provide I.C.C.E.S. Report#
To be Removed ❑ Provide Mfgr. Installation Specs.
Job Description:
Al a
Residential Commercial d?*60"16
Green Building: Please complete relevant portion of the Confirmed with Planning Dept. if
Green Building Checklist & attach it to the application or if there are any restrictions: ❑
applicable, include in plan set & the sheet index.
Valuation:
I Have Read, Understand and Will Comply with Cupertino's Tear-Off Policy:
Signature
Revised 02/05/09
CITY OF CUPERTINO
3 ITEMS OF 3 PERMIT RECEIPT OPERATOR: patg
COPY # 1
Sec: Twp: Rng: Sub: Blk: Lot:
APN . . . . . . . . : 36624015 . 00
DATE ISSUED. . . . . . . : 09/10/2009
RECEIPT #. . . . . . . . . : BS000008643
REFERENCE ID # . . . : 09090067
SITE ADDRESS . . . . . : 1633 ASTER LN
SUBDIVISION . . . . . .
CITY CUPERTINO
IMPACT AREA . . . . . .
OWNER TOM T R AND ROSE TRUSTEE
ADDRESS 1633 ASTER LN
CITY/STATE/ZIP . . . : CUPERTINO CA, 95014-5214
RECEIVED FROM . . . . : CARL A BECKS
CONTRACTOR . . . . . . . : BECKS, CARL LIC # 21908
COMPANY BECKS ROOFING
ADDRESS . . . . . . . . . . : 6191 OCHO RIOS DR
CITY/STATE/ZIP . . . : SAN JOSE, CA 95123
TELEPHONE . . . . . . . . : (408) 365-8979
FEE ID UNIT QUANTITY AMOUNT PD-TO-DT THIS REC NEW BAL
---------- ------------- ---------- ---------- ---------- ---------- ----------
1BCBSC VALUATION 12, 000. 00 1 . 00 0 . 00 1 . 00 0 . 00
1BSEISMICR VALUATION 12, 000. 00 1 .20 0 .00 1.20 0 . 00
1REROOFRES SQ FEET 27 . 00 351 . 00 0 .00 351. 00 0 . 00
---------- ---------- ---------- ----------
TOTAL PERMIT 353 .20 0. 00 353 .20 0 . 00
METHOD OF PAYMENT AMOUNT REFERENCE NUMBER
----------------- --------------- --------------------
CREDIT CARD 353 .20 VISA
---------------
TOTAL RECEIPT 353 .20
VOICE ID DESCRIPTION VOICE ID DESCRIPTION
-------- ---------------------------- -------- ----------------------------
601 ROOF TEAR OFF 602 ROOF PLYWOOD NAIL
604 ROOF IN-PROGRESS 605 FINAL REROOF
Community Development Department
Building Division
City of Cupertino
10300 Torre Avenue
Telephone: (408)777-3228
Fax: (408)777-3333
Building Department
Subject: Re-roofing policy for the City of Cupertino
1. Prior to permit issuance,you must agree to comply with 2007 IBC Standards
and manufacturers specifications on re-roofing.All roofs are Class "A"per Cupertino
municipal code 16.04.080.
2. New roof coverings shall not be applied without first obtaining all inspection
and written approval from the building inspector. A final inspection and
approval shall be obtained from the building inspector when the re-roofing
is completed.
3. All roofs shall be inspected prior to any roofing installation.
4. To receive a final sign off from the City,the following steps are
required:
1) Pre-inspection and/or tear off approval.
2) In-progress inspection approval.
3) Final inspection approval.
a) Spark arrester installation.
5. If plywood is installed,a plywood nail inspection is required.
6. Any roofing which is applied without first obtaining an inspection,
will require the removal of all new material down to the sheathing,
so a proper City inspection can be performed.
7. NOTE: If you call for a plywood nail inspection and the job is not ready,
you will be charged a re-inspection fee of$176.18. The re-inspection fee must
be paid before another inspection can be scheduled.
IMPORTANT:
1. Flat roofs must have a minimum of 1/ "per foot slope and demonstrate
that there is no ponding.
2. An I.C.B.O. report is required to be on the job site at the time on inspection.
I understand and will comply with the above stated policy on re-roofing.
Homeowner's Name:
Job Site Address: llo2 �5
AZ
Roofing Company Name:
Applicant's Signature:
Greg Casteel
Building Official
Revised 07/30/08