09090118 CITY OF CUPERTINO BUILDING PERMIT
BUILDING ADDRESS: 19861 PORTAL PL BLDG F CONTRACTOR:KRT INC. PERMIT NO:09090118
OWNER'S NAME: HOA PRESIDENT-BIFF GEISER 9110B ALCOSTA BLVD STE 115 DATE ISSUED:09/15/2009
'ER'S PHONE: 4082410023 SAN RAMON,CA 94583 PHONE NO:(925)556-0632
LICENSED CONTRACTOR'S DECLARATIONf—
BUILDING PERMIT INFO: BLDG ELECT PLUMB
License Class Lic.#
9 `� 4 MECH RESIDENTIAL COMMERCIAL
Contractor �� 1 1�'�-` Date
1 hereby affirm that I am licensed under the provisions of Chapter 9 JOB DESCRIPTION:WINDOW REPLACEMENT,SEE PERMIT
(commencing with Section 7000)of Division 3 of the Business&Professions #09090116 FOR FEES;
Code and that my license is in full force and effect. KRT INC PD TO RENW BUS LIC 9/15/9(RLD PERMITS
#09090116&09090117)
I hereby affirm under penalty of perjury one of the following two declarations:
I have and will maintain a certificate of consent to self-insure for Worker's
Compensation,as provided for by Section 3700 of the Labor Code,for the
performance of the work for which this permit is issued.
I have and will maintain Worker's Compensation Insurance,as provided for by
Section 3700 of the Labor.Code,for the performance of the work for which this Sq.Ft Floor Area: Valuation:$6900
permit is issued.
APPLICANT CERTIFICATION APN Number:36946026.BLDGF Occupancy Type:
1 certify that I have read this application and state that the above information is
correct.I agree to comply with all city and county ordinances and state laws relating
to building construction,and hereby authorize representatives of this city to enter
upon the above mentioned property for inspection purposes. (We)agree to save PERMIT EXPIRES IF WORK IS NOT STARTED
indemnify and keep harmless the City of Cupertino against liabilities,judgments,
costs,and expenses which may accrue against said City in consequence of the WITHIN 180 DAYS OF PERMIT ISSUANCE OR
granting of this permit. Additiona ,the applicant understands and will comply 180 DAYS FROM LAST CALLED INSPECTION.
with all non-point source regulations er the Cupertino Municipal Code,Section
9.18.
Date:
Signature Data -1 / Issued by;= ----' —y—
L OWNER-BUILDER DECLARATION
RE-ROOFS:
I hereby affirm that I am exempt from the Contractor's License Law for one of All roofs shall be inspected prior to any roofing material being installed.If a roof is
the following two reasons: installed without first obtaining an inspection,I agree to remove all new materials for
1,as owner of the property,or my employees with wages as their sole compensation, inspection.
will do the work,and the structure is not intended or offered for sale(Sec.7044,
Business&Professions Code) Signature of Applicant: Date:
1,as owner of the property,am exclusively contracting with licensed contractors to
construct the project(Sec.7044,Business&Professions Code).
ALL ROOF COVERINGS TO BE CLASS"A"OR BETTER
I hereby affirm under penalty of perjury one of the following three
declarations:
I have and will maintain a Certificate of Consent to self-insure for Worker's HAZARDOUS MATERIALS DISCLOSURE
Compensation,as provided for by Section 3700 of the Labor Code,for the I have read the hazardous materials requirements under Chapter 6.95 of the
performance of the work for which this permit is issued. California Health&Safety Code,Sections 25505,25533,and 25534. 1 will maintain
I have and will maintain Worker's Compensation Insurance,as provided for by compliance with the Cupertino Municipal Code,Chapter 9.12 and the Health&
Section 3700 of the Labor Code,for the performance of the work for which this Safety Code,Section 25532(a)should I store or handle hazardous material.
permit is issued. Additionally,should I use equipment or devices which emit hazardous air
I certify that in the performance of the work for which this permit is issued,I shall contaminants as defined by the Bay Area Air Quality Management District I will
maintain compliance with the Cupertino Municipal Code,Chapter 9.12 and the
not employ any person in any manner so as to become subject to the Worker's Health&Safety Code, ec ons 25505,25533,and 25534.
Compensation laws of California. If,after making this certificate of exemption,I
become subject to the Worker's Compensation provisions of the Labor Code,I must Owner auth ed
ent:
forthwith comply with such provisions or this permit shall be deemed revoked. ° Date:
APPLICANT CERTIFICATION CONN LENDING AGENCY
I certify that 1 have read this application and state that the above information is I hereby affirm that there is a construction lending agency for the performance of work's
correct.1 agree to comply with all city and county ordinances and state laws relating for which this permit is issued(Sec.3097,Civ C.)
to building constriction,and hereby authorize representatives of this city to enter Lender's Name
upon the above mentioned property for inspection purposes.(We)agree to save
i- nify and keep harmless the City of Cupertino against liabilities,judgments, Lender's Address
1. and expenses which may accrue against said City in consequence of the
ranting of this permit.Additionally,the applicant understands and will comply
with all non-point source regulations per the Cupertino Municipal Code,Section ARCHITECT'S DECLARATION
9.18. I understand my plans shall be used as public records.
Signature Date Licensed Professional
CP1
CITY OF CUPERTINO
CUPEI�TINO GENERAL BUILDING
PERMIT APPLICATION FORM
APN #Q_�)( _q q � <)o`=Wf _ h�&r � Date:Building Address:
L-66C
Mailing Address (if different from building address):
Are Hazardous Materials being used as part of this project? Yes ❑ No
HOA: (Exterior work only) Yes No ❑ If yes, provide letter from HOA OW.-A-
Owner's Name: Phone#:
40A PO 'G-1 40? - X-+1 - 00-Z3 Y, I � 6
Contractor: Phone: 4i 2S- ssl5 - oG
�(0 L Fax: 43 29--SSS -o Q 3 7---
Contractor License#: -75-4-4RO$"
Cupertino Business License#:
Contact: Phone: CJ a-5- 557� �--
��Z 77 o✓ T- Fax:
Residential Commercial
Job Description: Wz��olre� 7ZrL� L.Ej- L4t MSN
Building Permit Info:
Bldg Elect ❑ Plumb ❑ Mech ❑
Type of Construction (Usage Class): Occupancy Type:
1-A, 1-B ❑ II/III/V-A ❑ II/III B, IV-HT, V-B �2-
Valuation: Square Footage:
Project Size: Express [t---Standard ❑ Large ❑ Major ❑
Green Building: Please complete relevant portion of the Green Building/LEED Checklist& attach it
to the application or if applicable, include in plan set & the sheet index.
Points Achieved:
For help, contact Build it Green at www.builditgreen.org
Revised 07/14/09
RESIDENTIAL PROJECT COVER SKEET
1
Assessor's Parcel Number:
Name of owner. (`J0 Q'(D LA �LQ2 Q 1-4 C).A
Project address. q(12
r
Contact person. ��fF Phone. `� D y a Ll —0 D;)-3 Y- 106
Fax.
Net square footage of lot.
Existing Proposed
Square footage: First floor:
Second floor:
Garage: /
TOTAL:
re there at least two 10 foot by 20 foot clear spaces inside the garage? A' +�; _ Iv
Is privacy protection planting required for the project. 2009
On what floor(s) is work being done?
\ aR
Bri f descri � �.
tion of work. U-)�UTa s ��'�L PYC ��r��
tq®N r��.cTt-\a.-L-- ms s -
Code editions:2008 CBC -N)2008 CFC (Y -N)2008 CMC (Y-N)
2008 CPC (Y -N)2008 NEC (Y -N)
Effective 1/1/08
ASSESSOR COPY
Plan Review Process Work Book Page-B-Revised 1/1/08
R SHE
Assessor's Parcel Number:
Name of owner. (d 94-o L A Pt A ZA o A
Project address. SGL , G (•�$ "22
Contact person. 13( (ZF Phone. 160
Fax.
Net square footage of lot.
Existing Proposed
Square footage: First floor:
Second floor:
Garage:
TOTAL:
re there at least two 10 foot by 20 foot clear spaces inside the garage? ,�N
Is privacy protection planting required for the project? YN
On what floor(s) is work being done? z
Brief description of work.
�lON
Code editions:2008 CBC N)2008 CFC (Y -N)2008 CMC (Y-N)
2008 CPC (Y-N)2008 NEC (Y-N)
Effective 1/1/08
CC); ti
r C 0q
Plan Review Process Work Book Page-8-Revised 1/1/08
' 0VE
Assessor's Parcel Number: 1 f
Name of owner. C ofL'�CsL l�.- �LL�.2� �" a A
Project address. ' Gt J" ��� Z ���2 L �L-A-C-
Z (.��1 S�I� Phone. o� 01 1H aoa D(�
Contact person. �l � '' ''
Fax.
Net square footage of lot.
Existing Proposed
Square footage: First floor:
Second floor:
Garage:
TOTAL:
'`re there at least two 10 foot by 20 foot clear spaces inside the garage? N
Is privacy protection planting required for the project? N
On what floor(s) is work being done? lgcor-
Brief description of work. W �,u' 7 VC5 9 — U 6 6-- 66 a
Code editions:2008 CBC �-N)2008 CFC (Y-N)2008 CMC (Y-N)
2008 CPC (Y-N)2008 NEC (Y-N)
Effective 1/1/08 -Iss
ess
o/P 00 4VI,
Plan Review Process Work Book Page-8-Revised 1/1/08
Community Development
10300 Torre Avenue
:470 Cupertino CA 95014
Telephone(408)777-3228
CITY OF Fax(408)777-3333
.,UPEI�TINO
Building Department
JOB ADDRESS: PERMIT # 0'?0 f'0 i
OWNER'S NAME: PogTAI, PHONE # Geo 00a3 x
GENERAL CONTRACTOR: �<qzr ( FAX #
I am not using any subcontractors:
/' / Signature ate
Please check applicable subcontractors and complete the following information:
SUBCONTRACTOR BUSINESS NAME BUSINESS LICENSE #
Cabinets &Millwork
Cement Finishing
Electrical
Excavation
Fencing
Flooring: Carpeting
Linoleum/ Wood
Glass/ Glazing
Heating
Insulation
Landscaping
Lathing
Masonry
Ornamental Sheet Metal
Painting/ Wallpaper
Paving
Plastering
Plumbing
Roofing
Septic Tank
Sheet Metal
Sheet Rock
Tile
Owner/Contractor Signature Date