Loading...
10080136 CITY OF CUPERTINO BUILDING PERMIT BUILDING ADDRESS: 10575 GLENVIEW AVE CON'T'RACTOR:R E ROOFING& PERMIT NO: 10080136 CONSTRUCTION INC OWNER'S NAME: EUGEN KIM 15230 CLYDELLE AVE DATE ISSUED:08/20/2010 ER'S PHONE: SAN JOSE,CA 95032 PHONE NO:(408)626-9320 LICENSED CONTRACTOR'S DECLARATION JOB I IESCRIPTION: RESIDENTIAL COMMERCIAL r RE-ROOF 25 SQUARES REMOVE EXISTING 1 LAYER OF License Class Lic.# WOOD ContractorDate u (J SHINGLES,INSTALL NEW 1/2" CDX 30#FELT I her, rrm that Lam 1 Tensed under the provisions of Chapter 9 *wmihencingwtth Section 7000)of Division 3 of the Business&Professions Code and that my license is in full force and effect. I hereby affirm under penalty of perjury one of the following two declarations: I have and will maintain a certificate of consent to self-insure for Worker's Compensation,as provided for by Section 3700 of the Labor Code,for the performance of the work for which this permit is issued. Sq.F Floor Area: Valuation:$12000 I have and will maintain Worker's Compensation Insurance,as provided for by Section 3700 of the Labor Code,for the performance of the work for which this APN Number:36926020.00 Occupancy Type: permit is issued. APPLICANT CERTIFICATION I certify that I have read this application and state that the above information is PERMIT EXPIRES IF WORK IS NOT STARTED correct.I agree to comply with all city and county ordinances and state laws relating WITHIN 180 DAYS OF PERMIT ISSUANCE OR to building construction,and hereby authorize representatives of this city to enter upon the above mentioned property for inspection purposes. (We)agree to save 180 DAYS FROM LAST CALLED INSPECTION. indemnify and keep harmless the City of Cupertino against liabilities,judgments, I costs,and expenses which may accrue against said City in consequence of the Issued b Date: granting of this permit. Additionally,the applicant understands and will comply 3' with all non-point source regulations per the Cupertino Municipal Code,Section 9.18. RE-ROOFS: Signaty Date All roofs shall be inspected prior to any roofing material being installed.If a roof is l �� ithout first obtaining an inspection,I agree to remove all new materials for inspection. _ Cy a OCVNER-BUILDER DECLARATION ' G� SigmAur4ofApp"c e: I hereby affirm that I am exempt from the Contractor's License La for one of the following two reasons: ,, AL1L, OOF COVERINGS TO BE CLASS"A"OR BETTER I,as owner of the property,or my employees with wages as their sole compeitsation, " will do the work,and the structure is not intended or offered for sale(Sec.7044, Business&Professions Code) 1,as owner of the property,am exclusively contracting with licensed contractors to HAZARDOUS MATERIALS DISCLOSURE construct the project(Sec.7044,Business&Professions Code). I ha,,e read the hazardous materials requirements under Chapter 6.95 of the Cali'ornia Health&Safety Code,Sections 25505,25533,and 25534. 1 will I hereby affirm under penalty of perjury one of the following three main twin compliance with the Cupertino Municipal Code,Chapter 9.12 and the declarations: Health&Safety Code,Section 25532(x)should I store or handle hazardous I have and will maintain a Certificate of Consent to self-insure for Worker's matt rial. Additionally,should I use equipment or devices which emit hazardous Compensation,as provided for by Section 3700 of the Labor Code,for the air tori6a s as defined by the Bay Area Air Quality Management District I performance of the work for which this permit is issued. will maintain co liance with�� upe o Municipal Code,Chapte 9.12 alnd I have and will maintain Worker's Compensation Insurance,as provided for by the health afe pns 5505, 533,and 25534. Section 3700 of the Labor Code,for the performance of the work for which this Ow�,er o authorize a t: J Date !v permit is issued. I certify that in the performance of the work for which this permit is issued,I shall not employ any person in any manner so as to become subject to the Worker's CONSTRUCTION LENDING AGENCY Compensation laws of California. If,after making this certificate of exemption,I become subject to the Worker's Compensation provisions of the Labor Code,I must I hei eby affirm that there is a construction lending agency for the performance of forthwith comply with such provisions or this permit shall be deemed revoked. wort's for which this permit is issued(Sec.3097,Civ C.) Len Ier's Name APPLICANT CERTIFICATION Len ier's Address I certify that I have read this application and state that the above information is correct.I agree to comply with all city and county ordinances and state laws relating to building construction,and hereby authorize representatives of this city to enter T upon the above mentioned property for inspection purposes.(We)agree to save ARCHITECT'S DECLARATION 'emnify and keep harmless the City of Cupertino against liabilities,judgments, .s,and expenses which may accrue against said City in consequence of the I un Jerstand my plans shall be used as public records. E,anting of this permit.Additionally,the applicant understands and will comply with all non-point source regulations per the Cupertino Municipal Code,Section Licc nsed Professional 9.18, Signature Date CITY OF CUPERTINO REROOF CUPEkTINO PERMIT APPLICATION APN # ✓z Date: (Q cf .2-(D 0�O . 6� S (Zv lu Building Address: / V 1 L1n/ Owner's Name: --e 11, HOA: Yes ❑ No If yes provide letter fr[)m HOA C(Yti) Contractor: �. � I\j '., C.L` Phone #: �\,JC Fax #: 40� Cupertino Business License #: � Contractor License #: — -Z Type of Roof Covering: Existing: Proposed: ❑ Built-Up Roof ❑ Built-Up roof ❑ Asphalt Shingles � sphalt Shingles ❑ Wood Shakes ❑ Wood Shakes Wood Shingles ❑ Wood Shingles ❑ Other (Specify) ❑ Other (Specify) Number of existing coverings I ❑ Provide I.C.C.E.S. Report# To be Removed ❑ Provide Mfgr. Installation Specs. Job Description: G/f v sl? S i ► i (V- 5 '12- Residential Commercial Green Building: Please complete relevant portion (of the Confirmed with Planning Dept. if Green Building Checklist & attach it to the application or if there are any restrictions: ❑ applicable, include in plan set & the sheet index. Valuation: ti 1 2, c) v v . I I HavZA,ead, Understand and Will Comply with Cupertino's Tear-Off Policy: Signature Revised 02/05/09 REROOF TEAR-OFF POLICY COMMUNITY DEVELOPMENT DEPARTMENT- BUILDING DIVISION ALBERT SALVADOR, P.E., C.B.O., BUILDING OFFICIAL 10300 TORRE AVENUE•CUPERTINO,CA 95014-3255 CUPERTINO (408)777-3228• FAX(408)777-3333•buildingc�cupertino.orq PROJECT ADDRESS L2, I T1 V,L/1„ 4PN# OWNERNAME �./Il./CJ��+ �/1'v �PH�O�NEE Ael E-MAIL �u -� �"- STREET ADDRESS�,� UI �` �,./S_I /kms.i ' CITY, 'S4T IP,� y I A,-) FAX CONTRACTOR NAM> ,/ �•, LICENSE NUMBER 'I 2� LICENS TY Fj•_ BUS.LIC.# C COMPANY NAME 5 / U�� 5n1LU"L��1J �iC ` E-MAIL _� FAX STREET ADDRESS ZI Z, 1 ''J��{ ( '1�` p CITY,STATE,ZIPS i PHONE �I UNDERSTAND AND AGREE TO THE FOLLOWING: 1. The re-roof project shall comply with all applicable provisions of the 2007 California Building Code. 2. You must schedule all needed inspections a minimum c one day before the requested inspection date. Please schedule inspections online or call (408)777-3228 between 7:30-3:30 (Mon-Fri). 3. Tear-off roof inspection is required. Please call for tear-off inspection after the roof is torn off and all the nails/fasteners have been removed. Any and all c ry-rotted wood shall be replaced prior to this inspection. A building inspector will be available within one hour. There are special hours for this service: 7:30 — 10:30 im and 1:00—3:30pm (Mon—Thurs); 7:30 — 10:30 im and 1:00—2:30pm (Friday). 4. If plywood is installed, a plywood nailing inspection Ii required. 5. In-Progress roof inspection is required. Call for an i i-progress roof inspection to verify building is weather tight after installation of approximately 25% of the roofing material. 6. New roof coverings shall not be applied without first obtaining all inspections and written approvals from the building inspector. Any roofing which is applied without first obtaining an approved inspection will require the removal of all new material down to the sheathing so a proper inspection can be performed. 7. A final inspection and approval shall be obtained from :he building inspector when the re-roofing is complete. To receive a final sign-off, the following items will be verified: a. Flat roofs shall have a minimum of per foot of ;lope and must demonstrate there is no ponding. b. Listings from approved testing agencies for all pre-manufactured products used shall be available on-site to review at the time of the inspection. c. Proper spark arrestor installation. 8. NOTE: If you call for a tear-off or plywood nailing in;pection and the work is not complete, you will be charged a re-inspection fee of$126.00. The re-inspection fee shall be paid before another inspection can be scheduled. By my signing below, I cert' each of the following is true: I am the property owner or authorized agent to act on the property owner's behalf unrrstand an agrpc� ly with the re-roof policy stat`d above. l , Signature of Applicit/Agent: �—/ Date: �� t Reroo olicy_2010.doc revised 05/17/10 A.In oar Air QuaI4 and Finishes wo 1 IAQ/He Oth pts yeses 0 2.Use Low VOC,Water-Based Wood Fnishes 2 IAQ/He in pts y--yes 0 _ 3 IAQ/He Oth pts y--yes 0 4.Use Salvaged Materials for Interior Finishes 3 Resour.-e pts y--yes 0 5.Use Engineered Sheet Goods with no added Urea Formaldehyde 61AQ/Health pts y=yes 0 B.Use Exterior Grade Plywood.for Interior Uses 1 IAQ/Health pts y--yes 0 - 41AQ/Health. pts y--yes 0 B.Use FSC Certified Materials for Hari or Finish 4 Resource pts y=yes 0 9.Use Finger-Jointed or Recycled-Content Trim 1 Resource pts y=yes 0 10.Install Whole House Vacuum System 3 IAQ/H,;alth pts y-yes 0 N.Flaoring 1.Select FSC Certified Wood Mooring_ _ - B Resourc a pts Y--yes 0-— --— —— 2 the. 1�er�e�l_e�]oortxg 4 Resourc a pts y=yes 0 ". 3.Use Recycled Content Ceramic Tiles 4 Resourc a pts y--yes 0 4.Install Natural Linoleum in Place of Vinyl 5 IAQ/He filth pts y=yes 0 5.Use Exposed Concrete as Finished Floor 4 Resource pts y=yes 0 S.Install Recycled Content Carpet with Low VOCs 4 Resource pts y=yes 0 1 i 1 Total Points Avails le: 1 140 1301 57 Total Points Project Received: 01 0 0 G:da#alprogslgreenbwldinggu derines/remodelereJgreenpointgna121204protectedx1s CITY OF CUPERTINO FEE ESTIMATOR- BUILDING DIVISION ADDRESS: DATE: REVIEWED BY: APN: BP#: `VALUATION: 1$12,000 R��PERMITTYPE: Minor Building Permit PLAN CHECK TYPE: Re-roof PRIMARY SFD or Duplex �t{11<tL PENTAMATION 1SFDWLR00F USE: 1 t C)t 11Z.t h f,t: PERMIT TYPE: WORK SCOPE FEE ID ROOF ARES► s.f. 1REROOFFRES 2,500 17, NOTE: Thesefees are based on the preliminary information available and are only an estimate. Contact the De t or addn'1 info. FEE ITEMS (1W Resolution 09-051 Eff. 7/1/'10) FEE QTY/FEE MISC ITEMS Phi)" C,11ec;1 /"ec: Supp,[ PC'f-c>c, 1/wnh. Flec 'lair C`hcc1: Permit Fee: $325.00 suppt, lash `(."c Phljnh. l lc� b. Ffc:t: t 17iz f t"C' Phfnih "Ilcr h 1�let' Pcrlm! F'cc: ,It r>td.5/tcxtl ict'/c1t. Work Without Permit? 0 Yes 0 No $0.00 I;W� Cf` FCC's'_ I Strong Motion Fee: IBSEISMICR $1.20 Select an Administrative Item Bldg Stds Commission Fee: IBCBSC 1 $1.001 1 SUBTOTALS $327.201 $0.00 TOTAL FEE: $327.20 Revised: 8/17/2010 Building Department City Of Cupertino 10300 Torre Avenue Cupertino, CA 95014-3255 Telephone: 408-777-3228 CUPERTINO Fax: 408-777-3333 CONTRACTOR/ SUBCONTRACTOR LIST JOB ADDRESS: 10 I V PERMIT# OWNER'S NAME: L i1J lM PHONE# LA(XJ- 2(0 - �2 GENERAL CONTRACTO G% Rojf, jh/ BUSINESS LICENSE# 2 ADDRESS: I X72-7c) IL�� CITY/ZIPCODE: U *Our municipal code requires all businesses working in the city to have a City of Cupertino business license. NO BUILDING FINAL OR FINAL OCCUPANCY INSP-CTION(S) WILL BE SCHEDULED UNTIL THE GENERAL CONTRACTOR AND ALL SUBCONTRACTORS HAVE OBTAINED A CI Y OF CUPERTINO BUSINESS LICENSE. I am not using any subcontgactors: �� t `� ,: Sigh tute Date Please check applicable subcontractocomplete th 2 following information: V SUBCONTRACTOR BUSINESS NE\ME BUSINESS LICENSE # Cabinets & Millwork Cement Finishing Electrical Excavation Fencing Flooring/Carpeting Linoleum /Wood Glass /Glazing Heating Insulation Landscaping Lathing Masonry Painting/Wallpaper Paving Plastering Plumbing Roofing Septic Tank Sheet Metal Sheet Rock Tile Owner/Contractor Signature Date