Loading...
10080113 CITY OF CUPERTINO BUILDING PERMIT CONTRI,CTOR: ,c •PERMIT NO:10080113 BUILDING ADDRESS: 18860 NEWSOM AVE —n�—.�r/ i DATE ISSUED:08/17/2010 OWNER'S NAME: DRAGOS LUNGEANU i`-ri l� / PHONE NO: 4ER'S PHONE: 6502106849 + ❑ LICENSED CONTRACTOR'SDECLARATION BUILDING PERMIT INFO: BLDG ELECT PLUMB r License Class c �-1 / /L? Lic.# MECH r RESIDENTIAL COMMERCIAL r p'l�w 07�'Z Y(J�ate �- /7 c)Contractor JOB D ESCRIPTION:RE-ROOF REMOVE ASPHALT SHINGLES,INSTALL NEW I hereby affirm lat I am licensed under the provisions of Chapter 9 ASPHALT SHINGLES CLASS A 21 SQ (commencing with Section 7000)of Division 3 of the Business&Professions Code and that my license is in full force and effect. I hereby affirm under penalty of perjury one of the following two declarations: I have and will maintain a certificate of consent to self-insure for Worker's Compensation,as provided for by Section 3700 of the Labor Code,for the performance of the work for which this permit is issued. I have and will maintain Worker's Compensation Insurance,as provided for by Valuation:$5900 Section 3700 of the Labor Code,for the performance of the work for which this Sq.Ft I i loor Area: permit is issued. APPLICANT CERTIFICATION APN Number:37530021.00 Occupancy Type: I certify that I have read this application and state that the above information is correct.I agree to comply with all city and county ordinances and state laws relating to building construction,and hereby authorize representatives of this city to enter upon the above mentioned property for inspection purposes. (We)agree to save PHRMIT EXPIRES IF WORK IS NOT STARTED indemnify and keep harmless the City of Cupertino against liabilities,judgments, WITHIN 180 DAYS OF PERMIT ISSUANCE OR costs,and expenses which may accrue against said City in consequence of the granting of this permit. Additionally,the applicant understands and will comply 1;30 DAYS FROM LAST CALLED INSPECTION. with all non-point source regulations per the Cupertino Municipal Code,Section T/ 9.18. Issued b Date: �� c Signature Date O OWNER-BUILDER DECLARATION RE-ROOFS: I hereby affirm that I am exempt from the Contractor's License Law for one of All ro As shall be inspected prior to any roofing material being installed.If a roof is the following two reasons: install A without first obtaining an inspection,I agree to remove all new materials for 1,as owner of the property,or my employees with wages as their sole compensation, inspection. will do the work,and the structure is not intended or offered for sale(Sec.7044, Signa:ure of Applicant: Date: Business&Professions Code) 1,as owner of the property,am exclusively contracting with licensed contractors to — construct the project(Sec.7044,Business&Professions Code). ALL ROOF COVERINGS TO BE CLASS"A"OR BETTER I hereby affirm under penalty of perjury one of the following three declarations: HAZARDOUS MATERIALS DISCLOSURE I have and will maintain a Certificate of Consent to self-insure for Worker's I ha-,a read the hazardous materials requirements under Chapter 6.95 of the Compensation,as provided for by Section 3700 of the Labor Code,for the Cali]ornia Health&Safety Code,Sections 25505,25533,and 25534. I will maintain performance of the work for which this permit is issued. compliance with the Cupertino Municipal Code,Chapter 9.12 and the Health& I have and will maintain Worker's Compensation Insurance,as provided for by Safe,y Code,Section 25532(a)should I store or handle hazardous material. Section 3700 of the Labor Code,for the performance of the work for which this Add tionally,should I use equipment or devices which emit hazardous air permit is issued. cont iminants as defined by the Bay Area Air Quality Management District I will I certify that in the performance of the work for which this permit is issued,I shall mail stain compliance with the Cupertino Municipal Code,Chapter 9.12 and the not employ any person in any manner so as to become subject to the Worker's Heath&Safety Code,Sections 25505,25533,and 25534. Compensation laws of California. If,after making this certificate of exemption,I Owt,er or authorized agent: �v become subject to the Worker's Compensation provisions of the Labor Code,I must - Date: forthwith comply with such provisions or this permit shall be deemed revoked. — CONSTRUCTION LENDING AGENCY APPLICANT CERTIFICATION I certify that I have read this application and state that the above information is I he eby affirm that there is a construction lending agency for the performance of work's state laws relating for vhich this permit is issued(Sec.3097,Civ C.) correct.I agree to comply with all city and county ordinances and to building construction,and hereby authorize representatives of this city to enter Lender's Name upon the above mentioned property for inspection purposes.(We)agree to save Ler der's Address ;ra-mnify and keep harmless the City of Cupertino against liabilities,judgments, and expenses which may accrue against said City in consequence of the b.—ting of this permit.Additionally,the applicant understands and will comply ARCHITECT'S DECLARATION with all non-point source regulations per the Cupertino Municipal Code,Section I ut derstand my plans shall be used as public records. 9.18. Date Licensed Professional Signature CITY OF CUPEPTINO PERMIT RECEIPT OPERATOR: patg 3 ITEMS OF 4 COPY # : 1 Sec: Twp: Rng: Sub: Blk: Lo--: APN . . . . . . . . : 37530021.00 DATE ISSUED. . . . . . . : 08/17/2010 RECEIPT #. • . • • • • . . : BS000011199 REFERENCE ID # . . . : 10080113 SITE ADDRESS . . . . . : 18860 rEWSOM AVE SUBDIVISION . . . . . . CITY CUPERTINO IMPACT AREA . . . . . . OWNER DRAGOS LUNGEANU ADDRESS . 18860 NEWSOM AVE CITY/STATE/ZIP CUPERT::NO, CA 95014 RECEIVED FROM CAL HOTQE IMPROVEMEN CONTRACTOR TBD - `CO BE DETERMINED LIC # 00096 COMPANY TBD - 'CO BE DETERMINED ADDRESS . . . . . . . . . . CITY/STATE/ZIP . . . : TELEPHONE . . . . . . . . . FEE ID UNIT QUANTITY AMOUNT PD-TO-DT THIS REC- --NEW-BAL- ---- ---------- ------------- ---------- ------ ---------- ------- 1.000 .00 1BCBSC VALUATION 5, 900 . 00 1 . 60 0 .00 0 .00 1BSEISMICR VALUATION 5, 900 . 00 0 .60 0 .00 0 .60 00 1REROOFRES SQ FEET 21. 00 273 .00 0 .00 273 . 00 ------0_ TOTAL PERMIT 274 .60 0. 00 274 .60 0 .00 VOICE ID DESCRIPTION VOICE ID DESCRIPTION -- ____ 601 ROOF TEAR OFF 602 ROOF PLYWOOD NAIL 604 ROOF IN-PROGRESS 605 FINAL REROOF CITY OF CITY OF CUPERTINO i, s REROOF , , , PERMIT APPLICATION CUPEDate- a �1 Buildin Address: ; . �l Phone #: Owner's Name: � c�.ti �s`� �to HOA: Yes No If es, rovide letter fr[ HOA O Contractor: Phone #: �S"� Y6� � i ``� =Contractor #: �S`C1 6l 00O License #; Cuperti Business License Type of Roof Covering: Existing: P roposed: ❑ Built-Up Roof ❑ Built-Up roof ,Asphalt Shinglesft sphalt Shingles ❑ Wood Shakes ❑ Wood Shakes ❑ Wood Shingles ❑ Wood Shingles ❑ Other(Specify) ❑ Other(Specify) Number of existing coverings ❑ Provide I.C.C.E.S. Report# ,,To be Removed ❑ Provide Mfgr. Installation Specs. t�e Job Description: r � Residential C ercial ❑ Green Building: Please complete relevant portion of the Confirmed with Planning Dept. if Green Building Checklist & attach it to the application or if there are any restrictions: applicable, include in plan set & the sheet index. Valuation: /l 01 I Have Read, Understand and Will Comply with Cupertino's Tear-Off Policy: Signa ut re Revised 02/05/09 M.lndDDr Air Qu ity and FinisheS 1.use� o-vbc p 1 IAQ Health pts Yeses 0 0 2.Use Low VOC,Water-Based Wood Finishes 2 IAQHealth pts Yeses 3IAQ'Health es 0 3.Use Lt�>nr�ifOC Adkresives pts Y=y . 4.Use Salvaged Materials for Interior Finishes 3 Re`ource pts Y--yes 0 5.Use Engineered Sheet Goods with no added Urea D Formaldehyde 61AC/Health pts Y--yes B.Use Exterior Grade Plywood for Interior Uses 1 IAC/Health pts Y—yes 7,Beal� 0 FSg( 41 /Health s Y---Yes 0 e1 �' ------ - B.Use C Certified Materials for Interior Finish 4 Re source pts y=yes D 9.Use Finger-Jointed or Recycled-Content Trim 1 Re source pts Y--yes0 10.Install Whole House Vacuum System 3 W)II-1ealth pts Y--yes 0 1 1 1 N.Flooring 1.Select FSC Certified Wood Flooring B Resource pts Yeses 0 2.Use Rapi 13ecte�rat�ie F7cjoripg Ilatena�s 4 Resource pts yeses 0 3.Use Recycled Content Ceramic Tiles 4 Resc ource pts Y--yes D 4.Install Natural Linoleum in Place of Vinyl 5 IA[I/Health pts Y--yes 0 5.Use Exposed Concrete as Finished Floor 4 Re,'ource pts Y--yes 0 6.Install Recycled Content Carpet with Low VOCs 4 Re source pts Y--yes 0 1 1 1 Total Points Available: U01 130 57 Total Points Project Received: '1 01 01 0 G:datelproogreenbuil fiingguiderinesln;modelerslgrnenp6intsiinW2.12D4proteeled.xl5 REROOF TEAR-OFF POLIGIF COMMUNITY DEVELOPMENT DEPARTMENT•BUILDING DIVISION ALBERT SALVADOR, P.E.,C.B.O., BUILDING OFFICIAL 10300 TORRE AVENUE•CUPERTINO, CA 95014-3255 CUPERTINO (408)777-3228• FAX(408)777-3333•building a(�cupertino.org PROJECT AD E APN# OWNER NA PHONE,. D/rim E-MAIL STREET ADDRESS CITY, STATE,Z11 FAX CO C O N6E� ,/J _ LICENS�.jJUMB LIC E TYPE - ,+� BUS.LIC# COMPANY N EG �E-MAIL STREET E CITY,STA - // PHONE/ z� � v I UNDERSTAND AND AGREE TO THE FOLLOWING: 1. The re-roof project shall comply with all applicable provisions of the 2007 California Building Code. 2. You must schedule all needed inspections a minimum of one day before the requested inspection date. Please schedule inspections online or call (408)777-3228 between 7:30-3:30 (Mon-Fri). 3. Tear-off roof inspection is required. Please call foi tear-off inspection after the roof is torn off and all the nails/fasteners have been removed. Any and all dry-rotted wood shall be replaced prior to this inspection. A building inspector will be available wi hin one hour. There are special hours for this service: 7:30 — 10::30am and 1:00— 3:30pm (Mon—Thurs); 7:30 — 10::30am and 1:00—2:30pm (Friday). 4. If plywood is installed, a plywood nailing inspection is required. 5. In-Progress roof inspection is required. Call for an in-progress roof inspection to verify building is weather tight after installation of approximately 25% of the roofing material. 6. New roof coverings shall not be applied without first obtaining all inspections and written approvals from the building inspector. Any roofing which is applied without first obtaining an approved inspection will require the removal of all new material down to the sheathing so a proper inspection can be performed. 7. A final inspection and approval shall be obtained fro n the building inspector when the re-roofing is complete. To receive a final sign-off, the following tems will be verified: a. Flat roofs shall have a minimum of 1/4"per foot of slope and must demonstrate there is no ponding. b. Listings from approved testing agencies for all F re-manufactured products used shall be available on-site to review at the time of the inspection. c. Proper spark arrestor installation. 8. NOTE: If you call for a tear-off or plywood nailing inspection and the work is not complete, you will be charged a re-inspection fee of$126.00. The re-in ipection fee shall be paid before another inspection can be scheduled. By my signing below, I certify each of the following is truf: I am the property owner or authorized agent to act on the property owner's behalf. I understand and agree to comply with the re-roof policy stated ove. Signature of Applicant/Agent: Cw`, — 1 Date: / v ReroofPolicy_2010.doc revised 05/17/10 Building Department City Of Cupertino 10300 Torre Avenue Cupertino, CA 95014-3255 Telephone: 408-777-3228 CUPERTINO Fax: 408-777-3333 CONTRACTOR/ SUBCONTRACTOR LIST JOB ADDRESS: f 4PERMIT# OWNER'S NAME: NE# � GENERAL CONTRACTOR. l9'tti INESS LICENSE# ADDRESS: (S Y/ZIPCODE: "Our municipal code req fres all businesses working in the Aty to have a City of Cupertino business license. NO BUILDING FINAL OR FINAL OCCUPANCY INS11ECTION(S) WILL BE SCHEDULED UNTIL THE GENERAL CONTRACTOR AND ALL SUBCONTRACTORS HAVE OBTAINED A CITY OF CUPERTINO BUSINESS LICENSE. --__� F X.7Z') I am not using any subcontractors: to Signature Please check applicable subcontractors and complete the following information: SUBCONTRACTOR BUSINESS NAME BUSINESS LICENSE # Cabinets & Millwork Cement Finishing Electrical Excavation Fencing Flooring / Carpeting Linoleum/Wood Glass /Glazing Heating Insulation Landscaping Lathing Masonry Painting/Wallpaper Paving Plastering Plumbing Roofing Septic Tank Sheet Metal Sheet Rock Tile Owner/Contractor Signature Date