13060024CITY OF CUPERTINO BUILDING PERMIT
BUILDING ADDRESS: 10887 NORTHRIDGE SQ CONTRACTOR: FOUR SEASONS PERMIT NO: 13060024
ROOFING
OWNER'S NAME: ROBERT YAMAMOTO PO BOX 1668 DATE ISSUED: 06/04/2013
OWNER'S PHONE: 4082538360 SAN JOSE, CA 95109 PHONE NO: (408)278-0330
❑ LICENSED CONTRACTOR'S DECLARATION
JOB DESCRIPTION: RESIDENTIAL COMMERCIALE]
License Class Lic. # Q RE -ROOF 10 SQ- REMOVE EXISTING ROOF SYSTEM AND
c r l INSTALL NEW GAF GRAND SEQUOIA, CLASS A
ContractoJfirm
Date 7
I hereby that I am licensed der the provisions of Chapter 9
(commencing with Section 7000) of Division 3 of the Business & Professions
Code and that my license is in full force and effect.
I hereby affirm under penalty of perjury one of the following two declarations:
I have and will maintain a certificate of consent to self -insure for Worker's
Compensation, as provided for by Section 3700 of the Labor Code, for the
performance of the work for which this permit is issued. Sq. Ft Floor Area: Valuation: $5500
I have and will maintain Worker's Compensation Insurance, as provided for by
Section 3700 of the Labor Code, for the performance of the work for which this APN Number: 31636028.00 Occupancy Type:
permit is issued.
APPLICANT CERTIFICATION
I certify that I have read this application and state that the above information is PERMIT EXPIRES IF WORK IS NOT STARTED
correct. I agree to comply with all city and county ordinances and state laws relating WITHIN 180 DAYS OF PERMIT ISSUANCE OR
to building construction, and hereby authorize representatives of this city to enter
upon the above mentioned property for, inspection purposes. (We) agree to save 180 DA F OM LAST CALLED INSPECTION.
indemnify and keep harmless the City of Cupertino against liabilities, judgments,
costs, and expenses which may accrue against said City in consequence of the Issued by Date:
granting of this permit. Additionally, the applicant understands and will comply
with all non- i source regulations per th Cupertino Municipal Code, Section
9.18.
RE -ROOFS:
Signatur ate ` "� All roofs shall be inspected prior to any roofing material being installed. If a roof is
installed without first obtaining an inspection I a ee to remove all new materials for
inspection.
❑ OWNER -BUILDER DECLARATION
Signature of App • Date:
I hereby affirm that I am exempt from the Contractor's License Law for one of
the following two reasons: ALL OOF COVERINGS TO BE CLASS "A" OR BETTER
I, as owner of the property, or my employees with wages as their sole compensation,
will do the work, and the structure is not intended or offered for sale (See. 7044,
Business & Professions Code)
I, as owner of the roe y g HAZARDOUS MATERIALS DISCLOSURE
property, rty, am exclusively contracting with licensed contractors to
construct the project (Sec.7044, Business & Professions Code). I have read the hazardous materials requirements under Chapter 6.95 of the
California Health & Safety Code, Sections 25505, 25533, and 25534. li will
I hereby affirm under penalty of perjury one of the following three maintain compliance with the Cupertino Municipal Code, Chapter 9.12 and the
declarations: Health & Safety Code, Section 25532(a) should I store or handle hazardous
I have and will maintain a:Certificate of Consent to self -insure for Worker's material. Additionally, should I use equipment or devices which emit hazardous
Compensation, as provided for by Section 3700 of the Labor Code, for the air contaminants as defined by the Bay Area Air Quality Management District I
performance of the work for which this permit is issued. will maintain compliance with the Cupertino Municipal Code, Chapter 9.12 and
I have and will maintain Worker's Compensation Insurance, as provided for by the Health &Safe o ,Section 25505 ",and 534. r`
Section 3700 of the Labor Code, for the performance of the work for which this Owner or autho ' Date: `� I
permit is issued.
I certify that in the performance of the work for which this permit is issued, I shall
not employ any person in any manner so as to become subject to the Worker's CONSTRUCTION LENDING AGENCY
Compensation laws of California. If, after making this certificate of exemption, I
become subject to the Worker's Compensation provisions of the Labor Code, I must I hereby affirm that there is a construction lending agency for the performance of
forthwith comply with such provisions or this permit shall be deemed revoked. work's for which this permit is issued (Sec. 3097, Civ C.)
Lender's Name
APPLICANT CERTIFICATION Lender's Address
I certify that I have read this application and state that the above information is
correct. I agree to comply with all city and county ordinances and state laws relating
to building construction, and hereby authorize representatives of this city to enter
upon the above mentioned property for inspection purposes. (We) agree to save ARCHITECT'S DECLARATION
indemnify and keep harmless the City of Cupertino against liabilities, judgments,
costs, and expenses which may accrue against said City in consequence of the I understand my plans shall be used as public records.
granting of this permit. Additionally, the applicant understands and will comply
with all non -point source regulations per the Cupertino Municipal Code, Section Licensed Professional
9.18.
Signature Date
CUPERTINO
REROOF PERMIT APPLICATION
COMMUNITY DEVELOPMENT DEPARTMENT - BUILDING DIVISION 1Y
10300 TORRE AVENUE - CUPERTINO, CA 95014-3255 0(408) 777-3228 - FAX (408) 777-3333 - building0 perdno.ora
PROJECT ADDRESS/
APN f W v v
ME
1*
a -
E-MAIL
STREET ADDRESS
, STATEj2V
1�+
FAX
CONTACTNAME
PHONE E-MAIL
r .
9Z STA_
❑ owNER ❑ owNFR-BUILDER ❑ owNERAGETrr YCONTRACTOI CONTRACTOR AGENT ❑ ARCWTECr ❑ ENGINWR ❑ TENANT
CONTRACT R NAME n
�xy
1 CEN�a O¢ LIC�T3
c
L❑ #DEVELOPER
��I 7
FAX
COMPANY NAME
E-MAILC,
SAD
TIEGr!
.STA1P
O-3
.ci3 3
ARCHITECTIENGINEER NAME
LICENSE NUMBER
BUS. LIC. N
COMPANY NAME
E-MAIL
FAX
STREET ADDRESS
CITY, STATE, ZIP
PHONE
USE ❑ SFD or Duplex
Multi-Family71
R AREA
:VALUATION: i'
TURE El Commercial
STRUCTURE
I
EXISTING ROOF TYPE: ❑ BUB.T-UP ROOF
❑ ASPHALT SHINGLES 0 WOOD SHARES ❑ WOOD SHINGLES )OTHER (SPECIFY) awo.O-Aw
s
REMOVE/REPLACE YES
TFNO,
PLYWOOD- ❑
PLYWD ❑ OSS
PITCH: �/ i2
ROOF A
N
YERS:
/8-
X
—E1--
PROPOSED ROOF TYPE: ❑ BUMT-UP ROOF
ASPHALT SHINGLES ❑ WOOD SHAKES ❑ WOOD SHINGLES ❑ OTHER
ICC -ES REPORT #
DESCRH'i'[ON OF WORK
�l
ko. � h/ /r 4s/G✓ G,J�,ri�iit
K /'ZGa✓'o+.+C / Ire !J
ReroofApp 2011.doc revised 03116/11
.. r
RIEROOF TEAR -OFF POLICY
COMMUNITY DEVELOPMENT DEPARTMENT • BUILDING DIVISION
ALBERT SALVADOR, P.E., C.B.O., BUILDING OFFICIAL
10300 TORRE AVENUE • CUPERTINO; CA 95014-3255
(408).777-3228 • FAX (408) 777-3333 • buildingacupertino.org
v
..I UNDERSTAND AND AGREE TO THE FOLLOWING:
1. The re -roof project shall comply with all applicable provisions of the 2010 California Codes.
2. An inspection request can be scheduled -up to one business day before the requested inspection date.
Please call (408) 777-3228.from 7:30-3:30pm (Mon-Thurs) or 7:30-2:30pm (Friday) to schedule
inspection: For Tear -Off and Nailing Inspections, you must also call on the day of the inspection only. .
after that -phase of the work is completed The building inspector will be available within one hour.
Final Inspections will be given a two hour window.
3. Tear -Off Inspection is required. Any and all dry -rotted wood shall be replaced prior to this inspection.
Unless new plywood roof sheathing is proposed throughout, all the nails/fasteners shall be either
completely knocked -down or removed prior to this inspection.
4. if plywood is installed, a plywood Nailing Inspection is required.
5:.- Roofing. shall not be applied without first obtaining all prior inspection and written approvals from the .
building inspector. Any roofing which is applied without first obtaining an approved inspection Will
require'the removal of all new material down to the sheathing so a proper inspection ban be performed.
6'. A Final fnspection and approval shall be obtained from the building inspector when the re -roofing is
completed. Toreceive a final sign -off, the following items will be verified:
a. Flat roofs shall have a minimum of 1/a" per foot of slope and demonstrate there is no ponding.
b. Listings from approved testing agencies for all pre -manufactured products used shall be
available'on-rsite to review at the time of the inspection.
c. Pkoper spark arrestor installation, vents painted, gutter/downspouts installed, debris removed.
.7. NOTE:' If you call' for a tear -off or plywood nailing inspection and the work is not complete, you will be
charged a re -inspection fee. The re -inspection fee shall be paid before ahother inspection can be
scheduled..
By my signing below, I certify each of the following is true: I am the property owner or authorized agent to act on the
property owner's behalf. I understand and agree to comply with the re -roof policy stated above. I also understand that
smoke detectors and carbon monoxi ectors are requ. d o be installed in accordance with Sections R314 and R3.15 of
the -2010 C alifornia Residential
Signature of Atmlicant/Agent: Date: % 3
ReroofPolicy_2012.doc revised 1017112
awn",aw
v
..I UNDERSTAND AND AGREE TO THE FOLLOWING:
1. The re -roof project shall comply with all applicable provisions of the 2010 California Codes.
2. An inspection request can be scheduled -up to one business day before the requested inspection date.
Please call (408) 777-3228.from 7:30-3:30pm (Mon-Thurs) or 7:30-2:30pm (Friday) to schedule
inspection: For Tear -Off and Nailing Inspections, you must also call on the day of the inspection only. .
after that -phase of the work is completed The building inspector will be available within one hour.
Final Inspections will be given a two hour window.
3. Tear -Off Inspection is required. Any and all dry -rotted wood shall be replaced prior to this inspection.
Unless new plywood roof sheathing is proposed throughout, all the nails/fasteners shall be either
completely knocked -down or removed prior to this inspection.
4. if plywood is installed, a plywood Nailing Inspection is required.
5:.- Roofing. shall not be applied without first obtaining all prior inspection and written approvals from the .
building inspector. Any roofing which is applied without first obtaining an approved inspection Will
require'the removal of all new material down to the sheathing so a proper inspection ban be performed.
6'. A Final fnspection and approval shall be obtained from the building inspector when the re -roofing is
completed. Toreceive a final sign -off, the following items will be verified:
a. Flat roofs shall have a minimum of 1/a" per foot of slope and demonstrate there is no ponding.
b. Listings from approved testing agencies for all pre -manufactured products used shall be
available'on-rsite to review at the time of the inspection.
c. Pkoper spark arrestor installation, vents painted, gutter/downspouts installed, debris removed.
.7. NOTE:' If you call' for a tear -off or plywood nailing inspection and the work is not complete, you will be
charged a re -inspection fee. The re -inspection fee shall be paid before ahother inspection can be
scheduled..
By my signing below, I certify each of the following is true: I am the property owner or authorized agent to act on the
property owner's behalf. I understand and agree to comply with the re -roof policy stated above. I also understand that
smoke detectors and carbon monoxi ectors are requ. d o be installed in accordance with Sections R314 and R3.15 of
the -2010 C alifornia Residential
Signature of Atmlicant/Agent: Date: % 3
ReroofPolicy_2012.doc revised 1017112
04/22/2013 22:57 4089960226 NORTHPOINT
NORTHPOINT HOMEOWNERS ASSOCIATION
Northpoint Homeowners
Association
10880 Northpoint Way
Cupertino, CA 95014
PH: 408-9,96-3734
FX: 406.996-0226
UNC Community
Management
6840 Via Del Caro
Suite 265
Son Jose, SGA 95116
PH: 408-229-6000
FX: 408-229-6001
April 23, 2013
City of Cupertino
Re: Roofs
To whom it may concern;
Northpoint Homeownefa Association has contracted Four Season's
Roofing to install new OAF Grand Sequoia Roof Shingles on homes
here at Northpoint.
Sincerely,
/1 Ak;L—
Linda Starnes
On Site Manager
PAGE 02/02