Loading...
13060024CITY OF CUPERTINO BUILDING PERMIT BUILDING ADDRESS: 10887 NORTHRIDGE SQ CONTRACTOR: FOUR SEASONS PERMIT NO: 13060024 ROOFING OWNER'S NAME: ROBERT YAMAMOTO PO BOX 1668 DATE ISSUED: 06/04/2013 OWNER'S PHONE: 4082538360 SAN JOSE, CA 95109 PHONE NO: (408)278-0330 ❑ LICENSED CONTRACTOR'S DECLARATION JOB DESCRIPTION: RESIDENTIAL COMMERCIALE] License Class Lic. # Q RE -ROOF 10 SQ- REMOVE EXISTING ROOF SYSTEM AND c r l INSTALL NEW GAF GRAND SEQUOIA, CLASS A ContractoJfirm Date 7 I hereby that I am licensed der the provisions of Chapter 9 (commencing with Section 7000) of Division 3 of the Business & Professions Code and that my license is in full force and effect. I hereby affirm under penalty of perjury one of the following two declarations: I have and will maintain a certificate of consent to self -insure for Worker's Compensation, as provided for by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued. Sq. Ft Floor Area: Valuation: $5500 I have and will maintain Worker's Compensation Insurance, as provided for by Section 3700 of the Labor Code, for the performance of the work for which this APN Number: 31636028.00 Occupancy Type: permit is issued. APPLICANT CERTIFICATION I certify that I have read this application and state that the above information is PERMIT EXPIRES IF WORK IS NOT STARTED correct. I agree to comply with all city and county ordinances and state laws relating WITHIN 180 DAYS OF PERMIT ISSUANCE OR to building construction, and hereby authorize representatives of this city to enter upon the above mentioned property for, inspection purposes. (We) agree to save 180 DA F OM LAST CALLED INSPECTION. indemnify and keep harmless the City of Cupertino against liabilities, judgments, costs, and expenses which may accrue against said City in consequence of the Issued by Date: granting of this permit. Additionally, the applicant understands and will comply with all non- i source regulations per th Cupertino Municipal Code, Section 9.18. RE -ROOFS: Signatur ate ` "� All roofs shall be inspected prior to any roofing material being installed. If a roof is installed without first obtaining an inspection I a ee to remove all new materials for inspection. ❑ OWNER -BUILDER DECLARATION Signature of App • Date: I hereby affirm that I am exempt from the Contractor's License Law for one of the following two reasons: ALL OOF COVERINGS TO BE CLASS "A" OR BETTER I, as owner of the property, or my employees with wages as their sole compensation, will do the work, and the structure is not intended or offered for sale (See. 7044, Business & Professions Code) I, as owner of the roe y g HAZARDOUS MATERIALS DISCLOSURE property, rty, am exclusively contracting with licensed contractors to construct the project (Sec.7044, Business & Professions Code). I have read the hazardous materials requirements under Chapter 6.95 of the California Health & Safety Code, Sections 25505, 25533, and 25534. li will I hereby affirm under penalty of perjury one of the following three maintain compliance with the Cupertino Municipal Code, Chapter 9.12 and the declarations: Health & Safety Code, Section 25532(a) should I store or handle hazardous I have and will maintain a:Certificate of Consent to self -insure for Worker's material. Additionally, should I use equipment or devices which emit hazardous Compensation, as provided for by Section 3700 of the Labor Code, for the air contaminants as defined by the Bay Area Air Quality Management District I performance of the work for which this permit is issued. will maintain compliance with the Cupertino Municipal Code, Chapter 9.12 and I have and will maintain Worker's Compensation Insurance, as provided for by the Health &Safe o ,Section 25505 ",and 534. r` Section 3700 of the Labor Code, for the performance of the work for which this Owner or autho ' Date: `� I permit is issued. I certify that in the performance of the work for which this permit is issued, I shall not employ any person in any manner so as to become subject to the Worker's CONSTRUCTION LENDING AGENCY Compensation laws of California. If, after making this certificate of exemption, I become subject to the Worker's Compensation provisions of the Labor Code, I must I hereby affirm that there is a construction lending agency for the performance of forthwith comply with such provisions or this permit shall be deemed revoked. work's for which this permit is issued (Sec. 3097, Civ C.) Lender's Name APPLICANT CERTIFICATION Lender's Address I certify that I have read this application and state that the above information is correct. I agree to comply with all city and county ordinances and state laws relating to building construction, and hereby authorize representatives of this city to enter upon the above mentioned property for inspection purposes. (We) agree to save ARCHITECT'S DECLARATION indemnify and keep harmless the City of Cupertino against liabilities, judgments, costs, and expenses which may accrue against said City in consequence of the I understand my plans shall be used as public records. granting of this permit. Additionally, the applicant understands and will comply with all non -point source regulations per the Cupertino Municipal Code, Section Licensed Professional 9.18. Signature Date CUPERTINO REROOF PERMIT APPLICATION COMMUNITY DEVELOPMENT DEPARTMENT - BUILDING DIVISION 1Y 10300 TORRE AVENUE - CUPERTINO, CA 95014-3255 0(408) 777-3228 - FAX (408) 777-3333 - building0 perdno.ora PROJECT ADDRESS/ APN f W v v ME 1* a - E-MAIL STREET ADDRESS , STATEj2V 1�+ FAX CONTACTNAME PHONE E-MAIL r . 9Z STA_ ❑ owNER ❑ owNFR-BUILDER ❑ owNERAGETrr YCONTRACTOI CONTRACTOR AGENT ❑ ARCWTECr ❑ ENGINWR ❑ TENANT CONTRACT R NAME n �xy 1 CEN�a O¢ LIC�T3 c L❑ #DEVELOPER ��I 7 FAX COMPANY NAME E-MAILC, SAD TIEGr! .STA1P O-3 .ci3 3 ARCHITECTIENGINEER NAME LICENSE NUMBER BUS. LIC. N COMPANY NAME E-MAIL FAX STREET ADDRESS CITY, STATE, ZIP PHONE USE ❑ SFD or Duplex Multi-Family71 R AREA :VALUATION: i' TURE El Commercial STRUCTURE I EXISTING ROOF TYPE: ❑ BUB.T-UP ROOF ❑ ASPHALT SHINGLES 0 WOOD SHARES ❑ WOOD SHINGLES )OTHER (SPECIFY) awo.O-Aw s REMOVE/REPLACE YES TFNO, PLYWOOD- ❑ PLYWD ❑ OSS PITCH: �/ i2 ROOF A N YERS: /8- X —E1-- PROPOSED ROOF TYPE: ❑ BUMT-UP ROOF ASPHALT SHINGLES ❑ WOOD SHAKES ❑ WOOD SHINGLES ❑ OTHER ICC -ES REPORT # DESCRH'i'[ON OF WORK �l ko. � h/ /r 4s/G✓ G,J�,ri�iit K /'ZGa✓'o+.+C / Ire !J ReroofApp 2011.doc revised 03116/11 .. r RIEROOF TEAR -OFF POLICY COMMUNITY DEVELOPMENT DEPARTMENT • BUILDING DIVISION ALBERT SALVADOR, P.E., C.B.O., BUILDING OFFICIAL 10300 TORRE AVENUE • CUPERTINO; CA 95014-3255 (408).777-3228 • FAX (408) 777-3333 • buildingacupertino.org v ..I UNDERSTAND AND AGREE TO THE FOLLOWING: 1. The re -roof project shall comply with all applicable provisions of the 2010 California Codes. 2. An inspection request can be scheduled -up to one business day before the requested inspection date. Please call (408) 777-3228.from 7:30-3:30pm (Mon-Thurs) or 7:30-2:30pm (Friday) to schedule inspection: For Tear -Off and Nailing Inspections, you must also call on the day of the inspection only. . after that -phase of the work is completed The building inspector will be available within one hour. Final Inspections will be given a two hour window. 3. Tear -Off Inspection is required. Any and all dry -rotted wood shall be replaced prior to this inspection. Unless new plywood roof sheathing is proposed throughout, all the nails/fasteners shall be either completely knocked -down or removed prior to this inspection. 4. if plywood is installed, a plywood Nailing Inspection is required. 5:.- Roofing. shall not be applied without first obtaining all prior inspection and written approvals from the . building inspector. Any roofing which is applied without first obtaining an approved inspection Will require'the removal of all new material down to the sheathing so a proper inspection ban be performed. 6'. A Final fnspection and approval shall be obtained from the building inspector when the re -roofing is completed. Toreceive a final sign -off, the following items will be verified: a. Flat roofs shall have a minimum of 1/a" per foot of slope and demonstrate there is no ponding. b. Listings from approved testing agencies for all pre -manufactured products used shall be available'on-rsite to review at the time of the inspection. c. Pkoper spark arrestor installation, vents painted, gutter/downspouts installed, debris removed. .7. NOTE:' If you call' for a tear -off or plywood nailing inspection and the work is not complete, you will be charged a re -inspection fee. The re -inspection fee shall be paid before ahother inspection can be scheduled.. By my signing below, I certify each of the following is true: I am the property owner or authorized agent to act on the property owner's behalf. I understand and agree to comply with the re -roof policy stated above. I also understand that smoke detectors and carbon monoxi ectors are requ. d o be installed in accordance with Sections R314 and R3.15 of the -2010 C alifornia Residential Signature of Atmlicant/Agent: Date: % 3 ReroofPolicy_2012.doc revised 1017112 awn",aw v ..I UNDERSTAND AND AGREE TO THE FOLLOWING: 1. The re -roof project shall comply with all applicable provisions of the 2010 California Codes. 2. An inspection request can be scheduled -up to one business day before the requested inspection date. Please call (408) 777-3228.from 7:30-3:30pm (Mon-Thurs) or 7:30-2:30pm (Friday) to schedule inspection: For Tear -Off and Nailing Inspections, you must also call on the day of the inspection only. . after that -phase of the work is completed The building inspector will be available within one hour. Final Inspections will be given a two hour window. 3. Tear -Off Inspection is required. Any and all dry -rotted wood shall be replaced prior to this inspection. Unless new plywood roof sheathing is proposed throughout, all the nails/fasteners shall be either completely knocked -down or removed prior to this inspection. 4. if plywood is installed, a plywood Nailing Inspection is required. 5:.- Roofing. shall not be applied without first obtaining all prior inspection and written approvals from the . building inspector. Any roofing which is applied without first obtaining an approved inspection Will require'the removal of all new material down to the sheathing so a proper inspection ban be performed. 6'. A Final fnspection and approval shall be obtained from the building inspector when the re -roofing is completed. Toreceive a final sign -off, the following items will be verified: a. Flat roofs shall have a minimum of 1/a" per foot of slope and demonstrate there is no ponding. b. Listings from approved testing agencies for all pre -manufactured products used shall be available'on-rsite to review at the time of the inspection. c. Pkoper spark arrestor installation, vents painted, gutter/downspouts installed, debris removed. .7. NOTE:' If you call' for a tear -off or plywood nailing inspection and the work is not complete, you will be charged a re -inspection fee. The re -inspection fee shall be paid before ahother inspection can be scheduled.. By my signing below, I certify each of the following is true: I am the property owner or authorized agent to act on the property owner's behalf. I understand and agree to comply with the re -roof policy stated above. I also understand that smoke detectors and carbon monoxi ectors are requ. d o be installed in accordance with Sections R314 and R3.15 of the -2010 C alifornia Residential Signature of Atmlicant/Agent: Date: % 3 ReroofPolicy_2012.doc revised 1017112 04/22/2013 22:57 4089960226 NORTHPOINT NORTHPOINT HOMEOWNERS ASSOCIATION Northpoint Homeowners Association 10880 Northpoint Way Cupertino, CA 95014 PH: 408-9,96-3734 FX: 406.996-0226 UNC Community Management 6840 Via Del Caro Suite 265 Son Jose, SGA 95116 PH: 408-229-6000 FX: 408-229-6001 April 23, 2013 City of Cupertino Re: Roofs To whom it may concern; Northpoint Homeownefa Association has contracted Four Season's Roofing to install new OAF Grand Sequoia Roof Shingles on homes here at Northpoint. Sincerely, /1 Ak;L— Linda Starnes On Site Manager PAGE 02/02