12040078 - SI.� FNOV
r�TESTING ENGINEERS, INC.2 6 20122811 Teagarden St 510-835-3142 510-834-3777 fax
San Leandro, CA 94577 800-660-3142
San Leandro • San Jose • Martinez
INSPECTION REPORT Week Ending: 10/19/12
PROJECT # 56111
PROJECT:
22475 Rancho Deep Cliff Drive
Cupertino, CA
Permit #s: 12040078; 11100214
DATE 10/17/12
HOURS 4
INSPECTOR T. Woodbeck
TYPE OF INSPECTION:
Expansion Anchors
PLACE OF INSPECTION
Jobsite
Reported to Patrick of Bothwell Construction at the jobsite as requested.
Inspected predrilled holes for proper diameter and depth. Observed the cleaning of holes and witnessed the proper insertion
of eight (8)1/2" diameter Purcell Cabinet anchors, 5-1/i' in length, embedded 4-1/2" into new concrete pad at AT&T cell site
CN4008.
The preceding work was, to the best of my knowledge, in compliance with approved plans and specifications, including
revisions by engineer, and Drawing D2, dated 7/1/12.
Reviewed by:
David Chippero
Special Inspection Division Manager
1cc: Bothwell Construction / B. Goodard
City of Cupertino / Bldg. Inspection Dept.
This report can be reproduced only in its entirety unless written permission from TEI is obtained.
Page 1 of 1
W'W
TESTING ENGINEERS, INC.
L . L/
2811 Teagarden St 510-835-3142 + 10-,834-37j
San Leandro, CA 94577 800-660-3142
San Leandro • San Jose Martinez
PROJECT # 56111
INSPECTION REPORT Week Ending: 9/21/12
TYPE OF INSPECTION:
Expansion Anchors
PROJECT: PLACE OF INSPECTION: 22475 Rancho Deep CliffrDrie'' Jobsite FILE
Cupertino, CAS
Permit # 11100214
DATE 9/20/12 9/21/12
• 03
4
INSPECTOR T. Nelson
9/20/1
2
Reported to the jobsite as requested.
4
Inspected predrilled holes for proper diameter and depth. Observed the cleaning of holes and witnessed the proper insertion
of fifteen (15)1/2" diameter Hilti KB -TZ expansion anchors, 7" in length, embedded 6"; and one (1)1/2' diameter Hilti KB -TZ
expansion anchor, 5" in length, embedded 3-1/2" for outdoor equipment pad at right front of mod cell CAB # 7.
The preceding work was, to the best of my knowledge, in compliance with approved plans and specifications, including
revisions by engineer.
9/21A2
Reported to Brent Goodard of Bothwell Construction at the jobsite as requested.
Inspected predrilled holes for proper diameter and depth. Observed the cleaning of holes and witnessed the proper insertion
of eighteen (18)1/2' diameter Hilti KB -TZ expansion anchors, 4-1/2' in length, embedded 4"; and twelve (12)1/2' diameter Hilti
KB -TZ expansion anchors, 5-1/2' in length, embedded 5" at slab on grade.
The preceding work was, to the best of my knowledge, in compliance with approved plans and specifications, including
revisions by engineer, and Drawing D.2, Details 10 and 3.
Reviewed by:
vidChip ero
Special Inspection Division Manager
1cc: Bothwell Construction / B. Goodard
City of Cupertino / Bldg. Inspection Dept.
This report can be reproduced only in its entirety unless written permission from TEI is obtained.
Page 1 of 1