Loading...
12040078 - SI.� FNOV r�TESTING ENGINEERS, INC.2 6 20122811 Teagarden St 510-835-3142 510-834-3777 fax San Leandro, CA 94577 800-660-3142 San Leandro • San Jose • Martinez INSPECTION REPORT Week Ending: 10/19/12 PROJECT # 56111 PROJECT: 22475 Rancho Deep Cliff Drive Cupertino, CA Permit #s: 12040078; 11100214 DATE 10/17/12 HOURS 4 INSPECTOR T. Woodbeck TYPE OF INSPECTION: Expansion Anchors PLACE OF INSPECTION Jobsite Reported to Patrick of Bothwell Construction at the jobsite as requested. Inspected predrilled holes for proper diameter and depth. Observed the cleaning of holes and witnessed the proper insertion of eight (8)1/2" diameter Purcell Cabinet anchors, 5-1/i' in length, embedded 4-1/2" into new concrete pad at AT&T cell site CN4008. The preceding work was, to the best of my knowledge, in compliance with approved plans and specifications, including revisions by engineer, and Drawing D2, dated 7/1/12. Reviewed by: David Chippero Special Inspection Division Manager 1cc: Bothwell Construction / B. Goodard City of Cupertino / Bldg. Inspection Dept. This report can be reproduced only in its entirety unless written permission from TEI is obtained. Page 1 of 1 W'W TESTING ENGINEERS, INC. L . L/ 2811 Teagarden St 510-835-3142 + 10-,834-37j San Leandro, CA 94577 800-660-3142 San Leandro • San Jose Martinez PROJECT # 56111 INSPECTION REPORT Week Ending: 9/21/12 TYPE OF INSPECTION: Expansion Anchors PROJECT: PLACE OF INSPECTION: 22475 Rancho Deep CliffrDrie'' Jobsite FILE Cupertino, CAS Permit # 11100214 DATE 9/20/12 9/21/12 • 03 4 INSPECTOR T. Nelson 9/20/1 2 Reported to the jobsite as requested. 4 Inspected predrilled holes for proper diameter and depth. Observed the cleaning of holes and witnessed the proper insertion of fifteen (15)1/2" diameter Hilti KB -TZ expansion anchors, 7" in length, embedded 6"; and one (1)1/2' diameter Hilti KB -TZ expansion anchor, 5" in length, embedded 3-1/2" for outdoor equipment pad at right front of mod cell CAB # 7. The preceding work was, to the best of my knowledge, in compliance with approved plans and specifications, including revisions by engineer. 9/21A2 Reported to Brent Goodard of Bothwell Construction at the jobsite as requested. Inspected predrilled holes for proper diameter and depth. Observed the cleaning of holes and witnessed the proper insertion of eighteen (18)1/2' diameter Hilti KB -TZ expansion anchors, 4-1/2' in length, embedded 4"; and twelve (12)1/2' diameter Hilti KB -TZ expansion anchors, 5-1/2' in length, embedded 5" at slab on grade. The preceding work was, to the best of my knowledge, in compliance with approved plans and specifications, including revisions by engineer, and Drawing D.2, Details 10 and 3. Reviewed by: vidChip ero Special Inspection Division Manager 1cc: Bothwell Construction / B. Goodard City of Cupertino / Bldg. Inspection Dept. This report can be reproduced only in its entirety unless written permission from TEI is obtained. Page 1 of 1