Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
13070137
CITY OF CUPERTINO BUILDING PERMIT BUILDING ADDRESS: 11886 WOODHILL CT I CONTRACTOR.: CA/v 0-#u'"/> PERMIT NO: 13070137 15Y5VVIS A1A C 0AV1 nvN MNG OWNER'S NAME: KIM DUK J AND SUSAN DATE ISSUED:07/23/2013 OWNER'S PHONE: 4088900888 PHONE NO: Qa LICENSED CONTRACTOR'S DECLARATION JOB DESCRIPTION: RESIDENTIAL COMMERCIALS License Class'�e� REPLACE(E)FURNACE,SAME LOCATION&ADD(N)A/C n UNIT IN SIDE YARD AREA Contracto,4 ,6 rl�i t'�( Date 7 0�3 I hereby affirm that I am licensed under the provisions of Chapter 9 (commencing with Section 7000)of Division 3 of the Business&Professions Code and that my license is in full force and effect. I"y affirm under penalty of perjury one of the following two declarations: naY6 and will maintain a certificate of consent to self-insure for Worker's ompensation,as provided for by Section 3700 of the Labor Code,for the performance of the work for which this permit is issued. Sq.Ft Floor Area: Valuation:$5700 I have and will maintain Worker's Compensation Insurance,as provided for by Section 3700 of the Labor Code,for the performance of the work for which this APN Number:36655044.00 Occupancy Type: permit is issued. APPLICANT CERTIFICATION I certify that I have read this application and state that the above information is PERMIT EXPIRES IF WORK IS NOT STARTED correct.I agree to comply with all city and county ordinances and state laws relating WITHIN 180 DAYS IT ISSUANCE OR to building construction,and hereby authorize representatives of this city to enter upon the above mentioned property for inspection purposes. (We)agree to save 180 DAYS F LA LLED INSPECTION. indemnify and keep harmless the City of Cupertino against liabilities,judgments, costs,and expenses which may accrue against said City in consequence of the Date: 23 1 (.'3 granting of this permit. Additionally,the applicant understands and will comply with all non-point source regulations per the Cupertino Municipal Code,Sectio 9.18. _— RE-ROOFS: Signature Date All roofs shall be inspected prior to any roofing material being installed.If a roof is installed without first obtaining an inspection,I agree to remove all new materials for inspection. ❑ ER-BUILDER DECLARATION Signature of Applicant: Date: I hereby affirm that I am exempt from the Contractor's License Law for one of the following two reasons: ALL ROOF COVERINGS TO BE CLASS"A"OR BETTER I;as owner of the property,or my employees with wages as their sole compensation, will do the work,and the structure is not intended or offered for sale(Sec.7044, Business&Professions Code) I,as owner of the property,am exclusively contracting with licensed contractors to HAZARDOUS MATERIALS DISCLOSURE construct the project(Sec.7044,Business&Professions Code). I have read the hazardous materials requirements under Chapter 6.95 of the California Health&Safety Code,Sections 25505,25533,and 25534. I will I hereby affirm under penalty of perjury one of the following three maintain compliance with the Cupertino Municipal Code,Chapter 9.12 and the declarations: Health&Safety Code,Section 25532(a)should I store or handle hazardous I have and will maintain a Certificate of Const to self-insure for Worker's material. Additionally,should I use equipment or devices which emit hazardous Compensation,as provided for by Section 3700 bf the Labor Code,for the air contaminants as defined by the Bay Area Air Quality Management District I performance of the work for which this permit is issued. will maintain compliance with the Cupertino Municipal Code,Chapter 9.12 and I have and will maintain Worker's Compensation Insurance,as provided for by the Health&Safety Code,Sections 25505,25533,a E Section 3700 of the Labor Code,for the performance of the work for which this Owner or authorized agent: Date: permit is issued. I certify that in the performance of the work for which this permit is issued,I shall not employ any person in any manner so as to become subject to the Worker's CONSTRUCTION LENDING AGENCY Compensation laws of California. If,after making this certificate of exemption,I become subject to the Worker's Compensation provisions of the Labor Code,I must I hereby affirm that there is a construction lending agency for the performance of forthwith comply with such provisions or this permit shall be deemed revoked. work's for which this permit is issued(Sec.3097,Civ C.) Lender's Name APPLICANT CERTIFICATION Lender's Address I certify that I have read this application and state that the above information is correct.I agree to comply with all city and county ordinances and state laws relating to building construction,and hereby authorize representatives of this city to enter upon the above mentioned property for inspection purposes.(We)agree to save ARCHITECT'S DECLARATION indemnify and keep harmless the City of Cupertino against liabilities,judgments, costs,and expenses which may accrue against said City in consequence of the I understand my plans shall be used as public records. granting of this permit.Additionally,the applicant understands and will comply with all non-point source regulations per the Cupertino Municipal Code,Section Licensed Professional 9.18. Signature Date GENERAL PERMIT APPLICATION �� M E P 10 COMMUNITY DEVELOPMENT DEPARTMENT•BUILDING DIVISION /yO 10300 TORRE AVENUE•CUPERTINO,CA 95014-3255 CUPERTINO (408)777-3228•FAX(408)777-3333•building(cDcupertino.org / misc ❑PLUMBING OMECHANICAL [—]ELECTRICAL ❑MISCELLANEOUS F JECT ADDRESS APN# 3C O f IRA o P NE 7E- WNERTJA�,AP v ,d8 STREET ADDRESS Cle5 STATE,ZI FAX CONTACT NAME PH NE E-MAIL STREET ADDRESS CITY,STATE,ZIP FAX ❑OWNER ❑ OWNER-BUILDER ❑ OWNERAGENT t❑ CONTRACTOR ❑CONTRACTOR AGENT ❑ ARCHITECT ❑ENGINEER ❑ DEVELOPER ❑ TENANT CONTRACTOR NAME I O / CENSE NUMBER LI SE YPE BUS.LIC# L`,,_ q J/t COMP N WLE-MAIL -T FAX STADDRESS CITY,STATE,ZIP p PHONE d If ! 2 ARCHITECT/ENGINEER NAME LICENSE NUMBER BUS.LIC# COMPANY NAME E-MAIL FAX STREET ADDRESS CITY,STATE,ZIP PHONE USE OF ❑SFD.,DUPLEX ❑ MULTI-FAMILY PROJECT IN WH,DLAND ❑ YES PROJECT IN ❑YES IS THE BLDG AN ❑YES BUILDING: ❑COMMERCIAL URBAN INTERFACE AREA ❑ NO FLOOD ZONE ❑NO EICHLER HOME? ❑NO DE RIPTION OF WORKS I /y�,G a E' iY GDtAJj1OV\ TOTAL VALUATION: SQV By my signature below,I certify to each of the following: I am the property owner or authorized agent to actproperty owner's be . I read this application and the information I have provided is correct. I have read th of Work and verify I is accurate. I agree to com all applicable local ordinances and state laws relating to buildipg construction. resen ves o upertino to enter the above-identified pro erty for inspection purposes. Signature of Applicant/Agent: Date: D�3 S NtI&IFORMATION REQUIRED OFFICE USE ONLY w OVER-THE-COUNTER H ❑ EXPRESS x U - ❑ STANDARD U ❑ LARGE a MAJOR MEPMiscApp_201Ldoe revised 06/21111 CITY OF CUPERTINO FEE ESTIMATOR—BUILDING DIVISION ADDRESS: 11886 woodhill ct DATE: 07/23/2013 REVIEWED BY: melissa APN: 366 55 04 BP#: "VALUATION: 1$5,700 *PERMIT TYPE: Mechanical Permit PLAN CHECK TYPE: Alteration/Addition/ Repair PRIMARY SFD or Duplex PENTAMATION FURN/AC USE: p PERMIT TYPE: WORK replace a furnace same location &add n a/c unit in side yard area SCOPE APPLIANCE/EQUIP TYPE FEE ID QTY UNITS BP FEES A/C Units (<=10K cfm) 1BREMAIR 1 # $70 Furnace, Forced-Air 1MFR=<100 1 # $139 TOTALS: $209 00 4 . nMM Mech.Plan Check 0.0 hrs $0.00 Plumb.Plan Check Elec.Plan(.heck Mech.Permit Fee: 1MPERMIT Plumh.Permit Fee: Elec. Permit Fere: Mech.Insp. hrs $47.00 Other-Plumb InsP. Other Eta-Insp.[Other aeeh. Insp.Fee: 0.0 Plumb.Irrsp.Jec:; El(,,(.InsP, Fee: NOTE:This estimate does not include fees due to other Departments(i.e.Planning,Public Works,Fire,Sanitary Sewer District,School District,etc). These _f -fees are based on the relimina information available and are onlyan estimate Contact the Detor addn'l in o. FEE ITEMS (Fee Resolution 11-053 E . 7ff /1/12) FEE QTY/FEE MISC ITEMS Plan Check Fee.: Suppl. PC.Fee PME Plan Check: $0.00 Permit Fee: :Supp/ Insp Fee PME Unit Fee: $209.00 PME Permit Fee: $47.00 Construction:?pax: T I Administrative Fee: IADMIN $44.00 Work Without Permit? ® Yes (j) No $0.00 AdvancedPlanning Fees: Travel Documentation Fee: ITRAVDOC $47.00 Strong Motion Fee: 1BSEISMICR $0.57 Select an Administrative Item Bldg Stds Commission Fee: IBCBSC $1.00 I, $348.57 $0.00gym, , $348.57 � v Revised: 07/01/2013 HVAC ALTERATIONS ENERGY COMPLIANCE FORM COMMUNITY DEVELOPMENT DEPARTMENT•BUILDING DIVISION ALBERT SALVADOR, P.E.,C.B.O., BUILDING OFFICIAL CUPERTIN.0 10300 TORRE AVENUE•CUPERTINO,CA 95014-3255 (408)777-3228•FAX(408)777-3333•buildingacupertino.org WHEN IS A PERMIT REQUIRED A construction permit shall be obtained from the enforcement agency prior to the erection, construction,reconstruction, installation,relocation, or alteration of any mechanical system, except as permitted in Chapter 1, Section 112.2 of the 2010 California Mechanical Code. Projects requiring permits include, but are not limited to: • New HVAC installation • HVAC Changeout • Replacement of furnace, coil,FAU or condenser • Relocation of an existing HVAC unit • Adding or replacing more than 40ft ducting in unconditioned space BUSINESS AND PROFESSIONS CODE, SECTION 7110 Willful or deliberate disregard and violation of the building laws, including the California Building Code, and local permit requirements constitutes a cause for disciplinary action from the Contractors State License Board working in conjunction with the local building department. This action may consist of fines up to $5,000 per violation or suspension/revocation of a contractor's license. 2008 BUILDING ENERGY EFFICIENCY STANDARDS (Title 24,Part 6) REQUIREMENTS INCLUDE: 1. Heating equipment must have a minimum 78%AFUE(Exception: Wall &floor furnaces; room heaters). 2. Central air conditioners &heat pumps less than 65,000 Btu/hr must have a minimum 13 SEER. 3. Newly installed or replaced ducts must have a minimum insulation value of R-4.2. 4. A setback type thermostat(24 hr clock with four set points) is required for all alterations. 5. New or replacement ducts must meet the mandatory requirement of Section 150(m). • All joints and openings in the HVAC system must be sealed. • Only UL 181, UL 181A, or UL 181B approved tapes or mastic shall be used to seal duct openings. • Connections of metal ducts and the inner core of flex ducts shall.be mechanically fastened. Flex ducts must be connected using a metal sleeve/coupling. • Flex ducts that are suspended must be supported every 4 ft. max for horizontal runs with no more than 2"of sag between supports and 6 ft. max for vertical runs. 6. The CF-6R-MECH-04 must be completed and signed by the installing contractor. The Inspector will collect this form and verify that the model numbers are the same as the installed equipment. 2008 Residential Compliance Forms.doc revised 04/10/12 Simplified Prescriptive Certificate of Compliance:2008 Residential HVACAlterations CF-IR-ALT-MVAC , Climate Zones l and 3-7 Site Address: / q/ oQ✓ ;mforowwlvAgency. O b 1iYG! I �( Conditioned Duct insulation Equip-ont T I ist 2.�mi�um'Efficien' ' Floor Ara re Tlsbimosfai Packaged Unit ;rr Furnace Over 40$of dins C�AFUE C4P [Setback Served by system added or replaced in Indoor Cott ��-13— HSPF (Ifnot already present,must be Condensing Unit ®EER Resistance sf unconditioned space, • f /� Other E3 R 6 (CZ 1,3-5) • 1.Equipment Type:Choose the equipment being installed;if more than one-system,use another CF-I R-ALTd3VAC for each system. 2.AEnimum Equipment Efficiencies:13 SEER,7S%AFUE,7.7HSPF for typical residential systems. Contractor(Documentation Author's/Responsible Designer's Declaration Statement) • I certify that this Certificate of Compliance documentation is accurate and complete. ; I am eligible under Division 3 of the California Business and Professions Code to accept responsibility for the design identified on this Certificate of Compliance. • I certify that the energy features and performance specifications for the design identified on this Certificate of Compliance conform to the requirements of Title 24,Parts I and 6 of the California Code of Regulations. • The design features identified on this Certificate of Compliance are consistent with the infomration documented on other applicable compliance forms,worksheets,calculations,plans and specifications submitted to the enforcement agency for approval with the pen-nit lication. _ Name: Signature: Company: (( Date: Y✓1� it ch:t k Ad ,r License: 3.✓v c C'�cr #,k City/StateiZip: Sic s^ 05 �� Phone: 2008 Residential Compliance Forms.doc revised 04110112 t vv� i 1 i 11 4 S s hG 44 ©1GOMIV UN D ELOF MEWDEP RT ENT BUILMGDVl---1CN-CJPERrIN0 APFROVD + THE set of plans ar d sp 3cification MUST be kept at the jot site during cor stru tion. it is unIm ful to make an changes or al erati Dns cn same,o to c eviatz p thereft m,w thou approval from the uildi ig Olficial Elm JW The 3 n ing f thi pla and spe ificatlonsSHALLNCT 72, 7 be held top rmit p oval of th viol tion of n i ons f Ord ancs or tate Law. Y ' DATE, C a(K PERMIT N .or ( O O! O t ° B O P4/, C