Loading...
13070148"M CITY OF CUPERTINO BUILDING PERMIT BUILDING ADDRESS: 20525 MARIANI AVE CONTRACTOR: STATEWIDE ROOFING PERMIT NO: 13070148 INC OWNER'S NAME: 20525 MARIANI DRIVE LP 5542 MONTEREY RD DATE ISSUED: 07/24/2013 OWNER'S PHONE: 4089961010 SAN JOSE, CA 95138 PHONE NO: (408)288-8680 JOB DESCRIPTION: RESIDENTIAL ❑ COMMERCIALD ❑ LICENSED CONTRACTOR'S DECLARATION ' License Class L�— t Lic.# REMOVE ONLY TOP LAYER OF (E) T & G, OVERLAY 404e--) Qe WITH Contractor I —> Date 1/4" ROOF BOARD & FLEECE BACK TPO SINGLE PLY I hereby affirm that I am licensed under the provisions of Chapter 9 SYSTEM (commencing with Section 7000) of Division 3 of the Business & Professions Code and that my license is in full force and effect. 7 I hereby affirm under penalty of perjury one of the following two declarations: I have and will maintain a certificate of consent to self -insure for Worker's Compensation, as provided for by Section 3700 of the Labor Code, for the Sq. Ft Floor Area: Valuation: $186400 performance of the work for which this permit is issued. I have and will maintain Worker's Compensation Insurance, as provided for by Section 3700 of the Labor Code, for the performance of the work for which this APN Number: 32656001.20525 Occupancy Type: permit is issued. APPLICANT CERTIFICATION I certify that I have read this application and state that the above information is PERMIT EXPIRES IF WORK IS NOT STARTED correct. I agree to comply with all city and county ordinances and state laws relating WITHIN 180 DAYS OF PERMIT ISSUANCE OR to building construction, and hereby authorize representatives of this city to enter upon the above mentioned property for inspection purposes. (We) agree to save 180 DAYS F ST CALLED INSPECTION. indemnify and keep harmless the City of Cupertino against liabilities, judgments, costs, and expenses which may accrue against said City in consequence of the Z Is Date: granting of this permit. Additionally, the applicant understands and will comply with all non -point source regulationger Cupertino Municipal Code, Section RE -ROOFS: 9.18. `Z J Signature Date f All roofs shall be inspected prior to any roofing material being installed. If roof is installed without first obtaining aninspection, I a ee remove all new materials for inspection. q12 ❑ OWNER -BUILDER DECLARATION Signature of Applicant: e: I hereby affirm that I am exempt from the Contractor's License Law for one of the following two reasons: ALL ROOF COVERINGS TO BE CLIA "A" OR BETTER I, as owner of the property, or my employees with wages as their sole compensation, will do the work, and the structure is not intended or offered for sale (Sec.7044, Business & Professions Code) I, as owner of the property, am exclusively contracting with licensed contractors to HAZARDOUS MATERIALS DISCLOSURE construct the project (Sec.7044, Business & Professions Code). I have read the hazardous materials requirements under Chapter 6.95 of the California Health & Safety Code, Sections 25505, 25533, and 25534. 1 will I hereby affirm under penalty of perjury one of the following three maintain compliance with the Cupertino Municipal Code, Chapter 9.12 and the declarations: Health & Safety Code, Section 25532(a) should I store or handle hazardous I have and will maintain a Certificate of Consent to self -insure for Worker's material. Additionally, should I use equipment or devices which emit hazardous Compensation, as provided for by Section 3700 of the Labor Code, for the air contaminants as defined by the Bay Area Air Quality Management District I performance of the work for which this permit is issued. will maintain compliance with the Cupertino Municipal 5ode, Chapter 9.12 and I have and will maintain Worker's Compensation Insurance, as provided for by Section 3700 of the Labor Code, for the performance of the work for which this the Health & Safety Code, SectioM 25505, 25533, 34. Owner or authorized agent: permit is issued. I certify that in the performance of the work for which this permit is issued, I shall not employ any person in any manner so as to become subject to the Worker's CONSTRUCTION LENDING AGENCY Compensation laws of California. If, after making this certificate of exemption, I become subject to the Worker's Compensation provisions of the Labor Code, I must I hereby affirm that there is a construction lending agency for the performance of forthwith comply with such provisions or this permit shall be deemed revoked. work's for which this permit is issued (Sec. 3097, Civ C.) Lender's Name APPLICANT CERTIFICATION Lender's Address I certify that I have read this application and state that the above information is . correct. I agree to comply with all city and county ordinances and state laws relating to building construction, and hereby authorize representatives of this city to enter upon the above mentioned property for inspection purposes. (We) agree to save ARCHITECT'S DECLARATION indemnify and keep harmless the City of Cupertino against liabilities, judgments, costs, and expenses which'may accrue against said City in consequence of the I understand my plans shall be used as public records. granting of this permit. Additionally, the applicant understands and will comply with all non -point source regulations per the Cupertino Municipal Code, Section Licensed Professional 9.18. Signature Date ReroofApp 2011.doc revised 03/16/11 CITY OF CUPERTINO FF.F ESTIMATOR — BUILDING DIVISION NOTE: This estimate does not include fees due to other Departments (ie. Planning, Public Works, tire, Sanitary Sewer Utstrict, school n-O.:..r nfn 1 Thorn root .aro h"Cad nn tho nroliminar" infnrmatinn availahle a"d are aniv apt ¢.ramal¢. Contact the Dent for addn I info. FEE ITEMS (Fee Resolution 11-053 E, . 7/1/12) ADDRESS: 20525 MARIANI AVE DATE: 07/24/2013 REVIEWED BY: MELISSA APN: 32656001.20525 BP#: *VALUATION: 1$186,400 *PERMIT TYPE: Building Permit PLAN CHECK TYPE: Alteration /Addition/ Repair PRIMARY Commercial Building Suppl. PC Fee:. (E) Reg. ® OT PENTAMATION 1COMMLR00 i USE: $0.00 PERMIT TYPE: WORK REMOVE ONLY TOP LAYER OF E T & G OVERLAY WITH 1/4" ROOF BOARD & FLEECE BACK SCOPE TPO SINGLE PLY SYSTEM NOTE: This estimate does not include fees due to other Departments (ie. Planning, Public Works, tire, Sanitary Sewer Utstrict, school n-O.:..r nfn 1 Thorn root .aro h"Cad nn tho nroliminar" infnrmatinn availahle a"d are aniv apt ¢.ramal¢. Contact the Dent for addn I info. FEE ITEMS (Fee Resolution 11-053 E, . 7/1/12) FEE QTY/FEE MISC ITEMS Plan Check Fee: $0.00 3500 s.f. $2,471.00 Re -roof IREROOFCOM Suppl. PC Fee:. (E) Reg. ® OT 0,0 hrs $0.00 PME Plan Check: $0.00 Permit Fee: $0.00 Suppl. Insp. Fee -0 Reg. ® OT0,0 hrs $0.00 PME Unit Fee: $0.00 PME Permit Fee: $0.00 (. onstr-uction Tax: fl dininistrative Fee: Work Without Permit? ® Yes 0 No $0.00 Advanced Planning_Fee.- $0.00 Select a Non -Residential Building or Structure i Travel Documentation Fcw: Strom Motion Fee: IBSEISMICO $39.14 Select an Administrative Item B1dp_ Stds Commission Fee: IBCBSC $8.00 $47.14,$2,471.00 S. WA F R $2,518.14 C(' Revised: 07/01/2013 CUPERTINO REROOF TEAR -OFF POLICY COMMUNITY DEVELOPMENT DEPARTMENT - BUILDING DIVISION ALBERT SALVADOR, P.E., C.B.O., BUILDING OFFICIAL 10300 TORRE AVENUE - CUPERTINO, CA 95014-3255 (408) 777-3228 • FAX (408) 777-3333 - building(a cupertino.or4 PROJECT ADDRESS APN # / 1 216 b .6 Q 1. 2 0 SZ 5 20525 Mariani Ave .5 OWNER NAME PHONE E-MAIL Apple Inc. STREET ADDRESS CITY, STATE, ZIP FAX 1 Infinite Loop Cupertino CA CONTRACTOR NAME LICENSE NUMBER 1803926 LICENSE TYPE BUS. LIC. # Michael Courtney C-39 23509 COMPANY NAME E-MAIL FAX Statewide Roofing, Inc. mbotil@swroof.net 408-286-7828 STREET ADDRESS CITY, STATE, ZIP PHONE 5542 Monterey Road #201 San Jose CA 95138 I UNDERSTAND AND AGREE TO THE FOLLOWING: 1. The re -roof project shall comply with all applicable provisions of the 2010 California Codes. 2. An inspection request can be scheduled up to one business day before the requested inspection date. Please call (408) 777-3228 from 7:30-3:30pm (Mon-Thurs) or 7:30-2:30pm (Friday) to schedule inspection. For Tear -Off and Nailing Inspections, you must also call on the day of the inspection only after that phase of the work is completed. The building inspector will be available within one hour. Final Inspections will be given a two hour window. 3. Tear -Off Inspection is required. Any and all dry -rotted wood shall be replaced prior to this inspection. Unless new plywood roof sheathing is proposed throughout, all the nails/fasteners shall be either completely knocked -down or removed prior to this inspection. 4. If plywood is installed, a plywood Nailing Inspection is required. 5. Roofing shall not be applied without first obtaining all prior inspection and written approvals from the building inspector. Any roofmg which is applied without first obtaining an approved inspection will require the removal of all new material down to the sheathing so a proper inspection can be performed. 6. A Final Inspection and approval shall be obtained from the building inspector when the re -roofing is completed. To receive a final sign -off, the following items will be verified: a. Flat roofs shall have a minimum of I/4" per foot of slope and demonstrate there is no ponding. b. Listings from approved testing agencies for all pre -manufactured products used shall be available on-site to review at the time of the inspection. c. Proper spark arrestor installation, vents painted, gutter/downspouts installed, debris removed. 7. NOTE: If you call for a tear -off or plywood nailing inspection and the work is not complete, you will be charged a re -inspection fee. The re -inspection fee shall be paid before another inspection can be scheduled. By my signing below, I certify each of the following is true: I am the property owner or authorized agent to act on the property owner's behalf. I understand and agree to comply with the re -roof policy stated above. I also understand that smoke detectors and carbon monoxide detectors are required to be installed in accordance with Sections R314 and 8315 of the 2010 California Residenti o e. �% ` �7 Signature of Avolicant/Agent: C(?4Date: �/ 2�/� S ReroofPolicX 2012.doc revised 10/7/12