13080070 CITY OF CUPERTINO BUILDING PERMIT
BUILDING ADDRESS: 11876 WOODHIL,L CT CONTRACTOR:CASTILLO'S ROOFING PERMIT NO:13080070
OWNER'S NAME: RAMAKRISHNA MANTRIPRAGADA 1703 CATHAY DR DATE ISSUED:08/09/2013
OWNER'S PHONE: 4085291029 SAN JOSE,CA 95122 PHONE NO:(408)251-3565
LICENSED CONTRACTOR'S DECLARATION JOB DESCRIPTION: RESIDENTIAL❑ COMMERCIALE]
License Class
r Lic.# RE-ROOF 18 SQ-TEAR OFF SHAKES,INSTALL 30LB FELT,
IF,
GAF GRAND CANYON COMP,EXISTING SOLID SHEETING
Contrac ._ Date o TO
I hereby affirm t m I am licensed under the provisions of Chapter 9 REMAIN,CLASS A
(commencing with Section 7000)of Division 3 of the Business&Professions
Code and that my license is in full force and effect.
I hereby affirm under penalty of perjury one of the following two declarations:
I have and will maintain a certificate of consent to self-insure for Worker's
Compensation,as provided for by Section 3700 of the Labor Code,for the
performance of the work for which this permit is issued. Sq.Ft Floor Area: Valuation:$9000
I have and will maintain Worker's Compensation Insurance,as provided for by
Section 3700 of the Labor Code,for the performance of the work for which this APN Number:36655043.00 Occupancy Type:
permit is issued.
APPLICANT CERTIFICATION
I certify that I have read this application and state that the above information is PERMIT EXPIRES IF WORK IS NOT STARTED
correct.I agree to comply with all city and county ordinances and state laws relating WITI-IIN DAYS OF PERMIT ISSUANCE OR
to building construction,and hereby authorize representatives of this city to enter
upon the above mentioned property for inspection purposes. (We)agree to save 180 DAY 1M LAST CALLED INSPE TON.
indemnify and keep harmless the City of Cupertino against liabilities,judgments, //
costs,and expenses which may accrue against said City in consequence of theWT
granting of this permit. Additionally,the applicant understands and will comply Issued by: Date:
with all non-point source regulations per the Cupertino Municipal Code,Section
9.18.
RE-ROOFS:
Signature Date _ All roofs shall be inspected prior to any roofing material being installed.If a roof is
c installed without first obtaining an inspection,I agree to remove all new materials for
inspection.
❑ OWNER-BUILDER DECLARATION
Signature of App Date: !r
I hereby affirm that I am exempt from the Contractors License Law for one of
the following two reasons: ALL ROOF C VERINGS TO BE CLASS"A"OR BETTER
I,as owner of the property,or my employees with wages as their sole compensation,
will do the work,and the structure is not intended or offered for sale(Sec.7044,
Business&Professions Code)
I,as owner of the property,am exclusively contracting with licensed contractors to HAZARDOUS MATERIALS DISCLOSURE
construct the project(Sec.7044,Business&Professions Code). I have read the hazardous materials requirements under Chapter 6.95 of the
California Health&Safety Code,Sections 25505,25533,and 25534. I will
I hereby affirm under penalty of perjury one of the following three maintain compliance with the Cupertino Municipal Code,Chapter 9.12 and the
declarations: Health&Safety Code,Section 25532(a)should I store or handle hazardous
I have and will maintain a Certificate of Consent to self-insure for Worker's material. Additionally,should I use equipment or devices which emit hazardous
Compensation,as provided for by Section 3700 of the Labor Code,for the air contaminants as defined by the Bay Area Air Quality Management District I
performance of the work for which this permit is issued. will maintain compliance with the Cupertino Municipal Code,Chapter 9.12 and
I have and will maintain Worker's Compensation Insurance,as provided for by the Health&Safety Code,Sections 25505,25533,and 25534.
Section 3700 of the Labor Code,for the performance of the work for which this rt'
Owner or authorized'agent: Date
permit is issued. .
I certify that in the performance of the work for which this permit is issued,I shall
not employ any person in any manner so as to become subject to the Worker's
Compensation laws of California. If,after making this certificate of exemption,I CONSTRUCTION LENDING AGENCY
become subject to the Worker's Compensation provisions of the Labor Code,I must I hereby affirm that there is a construction lending agency for the performance of
forthwith comply with such provisions or this permit shall be deemed revoked. work's for which this permit is issued(Sec.3097,Civ C.)
Lender's Name
APPLICANT CERTIFICATION Lender's Address
I certify that I have read this application and state that the above information is
correct.I agree to comply with all city and county ordinances and state laws relating
to building construction,and hereby authorize representatives of this city to enter
upon the above mentioned property for inspection purposes.(We)agree to save ARCHITECT'S DECLARATION
indemnify and keep harmless the City of Cupertino against liabilities,judgments,
costs,and expenses which may accrue against said City in consequence of the I understand my plans shall be used as public records.
granting of this permit.Additionally,the applicant understands and will comply
with all non-point source regulations per the Cupertino Municipal Code,Section Licensed Professional
9.18.
Signature Date
REROOF PERMIT APPLICATION
COMMUNITY DEVELOPMENT DEPARTMENT•BUILDING DIVISION
YJ+ 10300 TORRE AVENUE CUPERTINO,CA 95014-3255
{408):777-3228•FAX(408)777-3333•building(aDcupertino.org
CUREk1t,1 O.
PROJECTADDRESS , APN# jAtp C�
/y�. PHONE, q E-MAIL
OWNER NAME L'. + S L IA1I � a R 09-
FAX
HOZ 1
STREET ADDRESS �•l ^ 'a D �1( // CITYTATE,ZIP F
�J •et ' a CA o 95D/
CONTACT NAME o �J PHONE O a 5 /- �� EMAIL
r'3 X40 S !lL L
STREET ADDRESS CIT STATE,ZIP FAx
7..
❑OWNER' ❑ OWNER-BUIIAER ❑ OWNER AGENT CONTRACTOR ❑CONTRACTOR AGENT ❑ ARCIETECT ❑ENGINEER ❑ DEVELOPER TENANT
CONTRACTOR NAME . • > LICENSE NUMBER/ LICENSE TYPE /73 BUS.LIC.#
vS x 7�J C
COMPANY NAME E-MAIL FAX
STREET ADDRESS CITY,STAT /� PHONE
ARCHITECT/ENGINEERNAME LICENSE NUMBER BUS.LIC.#
COMPANY NAME E-MAIL FAX
STREET ADDRESS CITY,STATE,ZIP PHONE
USE.OF SFD or Duplex ❑ Multi-Family ROOF AREA: VALUATION:
STRUCTURE: ❑ Commercial J(w .
EXISTING ROOF TYPE: ❑'BUILT-UP ROOF ❑ASPHALT SHINGLES ZWooD SHAKES ❑WOOD SHINGLES ❑OTHER(SPECIFY)
REMOVE/REPLACE' YES IFNO,' PLYWOOD 111/2 1. ❑ PLYWD ❑OSBPITCH: ROOF
El NO #LAYERS: THICKNESS: ❑ 5/8" TYPE: ❑CDX :12 CLASS: �Y'
ICC-ES REPORT# ..
PROPOSED ROOF TYPE: ❑BUILT-UP ROOF /ASPHALT SHINGLES ❑WOOD SHAKES ❑WOOD SHINGLES ❑OTHER
� ��� -del sail
DESCRIPTION OF WORK: -3
El
y cam �.� ��
By MY signatbre below,I certify to each if the following: I am the property owner or authorized agent to act on the property owner's behalf. I have.read this
application and the information ,have vided is correct. I have read the Description of Work and verify it is accurate. agree to comply with all applicable local
ordinances ands in 4 ilding co cti . I auth n�tatives of Cupertino to enter the abode-id ti d for inspection purposes.
Signature of pp scan gent: Date:
a�t
SUPPLEMENTAL INF TION REQUIRED ,-.. . - . .
If buildingIs
' associated with a Ho a Owner's Association,provide letter
ofapproval from HOA. T `
Provide Planning approval to verify if there any restrictions. E,
Provide,copy of Manufacturer's Installation Specifications.
Provide signed copy of Cupertino's Tear-Off Policy. x
T
ReroofApp_2011.doc revised 03/16/11
CITY OF CUPERTINO
FEE ESTIMATOR—BUILDING DIVISION
ADDRESS: 11876 woodhill ct IDATE: REVIEWED BY: Mendez
MIAPN: BP#: `VALUATION: 1$9,000 -�
*PERMIT TYPE: Minor Building Permit PLAN CHECK TYPE: Re-roof
PRIMARY SFD or DuM
PENTAATION
USE: Duplex PERMIT TYPE: 1SFDWLR00
WORK
SCOPE
FEE ED ROOF AREA
s.f.
1REROOFFRES 1,800
e M
1Vine'.- y. ..
Mech. Plan Check Plunib.Plan Check Elec.Plan Check
vlech. PennitFee: Plumb.Permit Fee: Elec. Permit l ee:
Other Alech.Insp. Other Plumb Insp. I Li IC)tlrer Elec.1»sp. Li
Afech.Insp.Fee: Plumb. Insp.Fee: Elec.Insp.Fee:
NOTE:This estimate does not include fees due to other Departments(Le.Planning,Public Works,Fire,Sanitary Sewer District,School
District,etc). These ees are based on the prefinddna information available and are only an estimate. Contact the Dept for addn'1 info.
FEE ITEMS (Fee Resolution 11-053 E . 711/12) FEE QTY/FEE MISC ITEMS
Plan Check Fee:
Suppl. PC'Fee
Plumb.i 1ech.,,Elec
Permit Fee: $288.00
Supp/. Insp Pee
Plum h.iilllech./Llee
P/umh.1,Wech./E1ec Permit F"ee:
Construction ::Tax:
Administrative Fee:
Work Without Permit? ®Yes (j) No $0.00
Advanced Planning Fees:
Travel Uocumentution Fees:
Strong Motion Fee: 1BSEISMICR $0.90 Select an Administrative Item.
Bldg Stds Commission Fee: 1BCBSC $1.00
-- MIMI=, $289.90 $0.00 ° 'n � $289.90
Revised: 07/01/2013
REROOF TEAR-OFF POLICY
COMMUNITY DEVELOPMENT DEPARTMENT•BUILDING DIVISION
ALBERT SALVADOR, P.E.,C.B.O., BUILDING OFFICIAL
10300 TORRE AVENUE•CUPERTINO,CA 95014-3255
CUPERTINO
(408)777-3228•FAX(408)777-3333•buildinoCa-cupertino.org
PROJECT ADDRESS 36 . Wbd A ` APN#
OWNER NAME / PHONE 52Ci^ 16 E-MAIL
STREET ADDRESS J T-7/ ,��J CITY,STATE,ZIP S /T� 9S-6
CONTRACTOR NAME 4�S L+ /� ®�� LICENSE NUMBER j / LICENSE TYPr& BUS.LIC.#
COMPANY NAME ( E-MAIL J(� FAX
STREET ADDRESS J CITY,STATE,ZIP / yf �S Off_
l 6S /
I IJND RSTA AND AGREE TO THE FOLLOWING:
1. The re-roof project shall comply with all applicable provisions of the 2010 California Codes.
2. An inspection request can be scheduled up to one business day before the requested inspection date.
Please call(408) 777-3228 from 7:30-3:30pm(Mon-Thurs) or 7:30-2:30pm(Friday)to schedule
inspection. For Tear-Off and Nailing Inspections,you must also call on the day of the inspection`only
after that phase'of the work is completed. The building inspector will be available within one hour.
Final Inspections will.be given a two hour window.
3. Tear-Off Inspection is required. Any and all dry-rotted wood shall be replaced prior to this inspection.
Unless new plywood roof sheathing is proposed throughout, all the nails/fasteners shall be either
completely knocked-down or removed prior to this inspection.
4. _ If plywood is installed, a plywood Nailing Inspection is required.
5. Roofing shall not be applied without first obtaining all prior inspection and written approvals from the
building inspector. Any roofing which is applied without first obtaining an approved inspection will
require the removal of all new material down to the sheathing so a proper inspection can be performed.
6. A Final Inspection and approval shalt be obtained from the building inspector when the re-roofing is
completed. To receive a final sign-off,the following items will be verified:
a. Flat roofs shall have a minimum of I/4"per foot of slope and demonstrate there is no ponding.
b. Listings from approved testing agencies for all pre-manufactured products used shall be
available on-site to review at the time of the inspection.
c. Proper spark arrestor installation,vents painted, gutter/downspouts installed, debris removed.
7. NOTE: If you callfor a.tear-off or plywood nailing inspection and the work is not complete,you will be
charged:a re-inspection fee. The re-inspection fee shall be paid before another inspection can be
scheduled.
By my signing below,I certify each of the following is true: I am the property owner or authorized agent to act on the
property owner's behalf. I understand and agree to comply with the re-roof policy stated above. I also understand that
smoke.detectors and carbon.monoxide de ctors are required to be installed in accordance with Sections R3 and R315 of
the 20 Calift�rnra-K idential Code.
Signature of Applicant/Agent: Dater
ReroofPolicy_2012.doc revised 10/7/12
COMMUNITY MANAGEMENT SERVICES, INCORPORATED
August 6,2013
Ramakaishna Mantripragada
Aruna Laxmi Mantripragada
11876 Woodhill Court
Cupertino,CA 95014
Re: SEVEN SPRINGS OWNERS ASSOCIATIONS
11876 Woodhill Court
Dear Homeowners:
Enclosed you will find a copy of your Architecture Application for the re-roofing of your home,with the
approval from the Board of Directors,as well as any restrictions or conditions that the Board deemed
necessary. According to your application you are installing The GAF Laminated Fiberglass Asphalt-style
"Grand Canyon",color"Stonewood".Please fill out and return the included final completion form which
will begin the completion process.
Please keep in mind that any deviation from your approved application will require you to resubmit your
application for review.If you utilize an unapproved material you will be required to remove and replace the
material with an approved selection.
The approval of your project's architectural compatibility with the Seven Springs Owners'Association's
complex does not constitute or imply,that the Architectural Committee and/or the Association Board of
Directors deem your project as,meeting City of Cupertino/County of Santa Clara codes.The approval is
given contingent upon you and/or your contractor(s)obtaining the required construction permits and
meeting all code requirements,if any.
Sincerely,
C'onirnunity...Maiiagement Services, Ink.
r
1'uis 1 Ic milia Senior Association Manager,CCAM
SEVEN SPRINGS OWNERS ASSOCIATIONS
LH/nm
cc: Board of Directors
File#4
1935 Dry Creek Road, Suite 203•Campbell CA•95008-3631 •voice(408)559-1977•fax(408)559-1970
Seven Springs Owners Association
Application for Approval of Architectural Change/Addition
CATEGORY'C
Category C-Modifications that we exterior aaodificatiow with no changes to the original building structure or floor plan.All roofing,
siding,window material change,exterior paint color change,addition of a roof attic fart,or garage door,fall into this category.
]pate; ;2� t $ / 13 • Request for Approval of Proposed Change
PLEASE PRINT THE FOLLOWfNG INFORMATION
Name: �7i S 4AM o pY a� __Address: I 19-7-b Uj oO dGI,tM (-t , p„ wts, CA
Home Phone: 4 O 19$ 4 Z b 7_ Work Phone: 4 0$529 16 27 entail: te-m4 i"',O, iV o,writ c/• t.n i-
DescAption of Proposed Change:
Paint Color Change:Please choose ftom"approved list"(Garage door outer Irina should be diamond white or frost)
,specified color
Trim color:diamond white or frost
Front door color:diamond white_frost_natural oak: or specified"approved color_
2)Roofing Material Change(please check one choice)
a.Lightweight Concrete Tile from MatalerLifetile-style"Cedarlite 57$0",color MWrwood"__,
b.GAF Laminated Fiberglass Asphalt-style"Grand Ca:nyori",color"lviission Brown"
(�PbAF Lmninated Fiberglass Asphalt-style"Grand Canyon",color""Stonewood"
d.Decra Stone Coated Steel Rood System-style"Otero Shalee",color"Shadowood" .—
e.Class".A,"Fire Retardant Roofing System using pressured treated cedar Hood shingles with fire retardant fiberglass cap sheet
underlay.Need to have a City of Cupertino Permit accompanying this application for all wood shingle rood's.
3)Siding Material Change(Please cbeclx oac Choice)
Now Siding Material:Hardiplauk Cedarmill(wood grain 6»1.sh) .._-- ur Hardlplauk Sxuooth Finish
Which sides are you are changing material?(front_.-,_back IeR_right____j
4)Wludow Material and Design change:(Please check Ws bvx); blilgard Vinyl Windows-style'Tuscany",color Wbite
3)Addlgg a roof attic fan,Tubular Shylight,or satellite diab
Please attach information regarding the proposed change.Application must include diem oslon,color ofthe proposed fan and its
location on the roof_Please include detailed drawings,specifications,and product brochures if available.
Tubular skylight xP to 14"diameter,gne roof attic fan up to 26"in width&height—paint to match roof
6)Garage doors:a.Rocrosed wood panel,not raised in center same style for windows CT AIN"—hon decorative)
Style 84(S panels across,64(ti panels across),44(4 panels across)- Style with windows or Style no windows
b.Insulated wood,insulated metal w/wood facing or"Carriage House"style 303C windows 303 no window
Homeowner's Signature__.. . L _ ---- --.._. _ The request is in compliance with
Seven Springs HOA Archiectu:tl'Gu dehnes: friths:/tseven-springs.orglfle>s,<trchitectuat-gttidel.ictcs.ik9f
###as*fi•�i#*#M NtlNb.4+kR#!*t#;*ai*�4�Mkikiltetls*!a*�s i.R M bkt#####*#xsm�*#��4F KkbM#Mt+ktli#*lam*iRR#*
Arcbitectuml Control Co=nittee/Roard: Approved Pemding__ .
Denied pending
ArebitecxurW Control Committee Board:Signaturt. ~� _'' Date:
1.27,11 cat C