Loading...
13090130 CITY OF CUPERTINO BUILDING PERMIT BUILDING ADDRESS: 10511 DEODARA DR CONTRACTOR:HELIOFARM PERMIT NO:13090130 OWNER'S NAME: DION LOY 1166 PIMENTO AVE DATE ISSUED:09/17/2013 OWNER'S PHONE: 6502012957 SUNNYVALE,CA 94087 PHONE NO:(408)507-4110 LICENSED CONTRACTOR'S DECLARATION JOB DESCRIPTION: RESIDENTIAL COMMERCIAL License Class C-1 O Lic.# C( 6( S$y' INSTALL PV SYSTEM ON ROOFTOP 4.56,16 PANELS, UPGRADE MAIN SERVICE 200AMP Contractor k -lu ci- � t Date — —*3L�\ I hereby affirm that I am licensed under the provisions of Chapter 9 (commencing with Section 7000)of Division 3 of the Business&Professions Code and that my license is in full force and effect. I hereby affirm under penalty of perjury one of the following two declarations: I have and will maintain a certificate of consent to self-insure for Worker's Compensation,as provided for by Section 3700 of the Labor Code,for the performance of the work for which this permit is issued. Sq.Ft Floor Area: Valuation:$16000 have and will maintain Worker's Compensation Insurance,as provided for by Section 3700 of the Labor Code,for the performance of the work for which this APN Number:31630047.00 Occupancy Type: permit is issued. APPLICANT CERTIFICATION I certify that I have read this application and state that the above information is PERMIT EXPIRES IF WORK IS NOT STARTED correct.I agree to comply with all city and county ordinances and state laws relating WITHIN 80 DAYS OF PERMIT ISSUANCE OR to building construction,and hereby authorize representatives of this city to enter upon the above mentioned property for inspection purposes. (We)agree to save 180 DA FOM LAST CALLED INSPECTION. indemnify and keep harmless the City of Cupertino against liabilities,judgments, /r`/ costs,and expenses which may accrue against said City in consequence of the w ;;/7`, granting of this permit. Additionally,the applicant understands and will comply Issued by: Date: with all non-point source regulations per the Cupertino Municipal Code,Section 9.18. RE-ROOFS: Signature Date 1'� 3 All roofs shall be inspected prior to any roofing material being installed.If a roof is installed without first obtaining an inspection,I agree to remove all new materials for inspection. ❑ OWNER-BUILDER.DECLARATION Signature of Applicant: Date: I hereby affirm that I am exempt from the Contractor's License Law for one of the following two reasons: ALL ROOF COVERINGS TO BE CLASS"A"OR BETTER I,as owner of the property,or my employees with wages as their sole compensation, will do the work,and the structure is not intended or offered for sale(Sec.7044, Business&Professions Code) 1,as owner of the property,am exclusively contracting with licensed contractors to HAZARDOUS MATERIALS DISCLOSURE construct the project(Sec.7044,Business&Professions Code). I have read the hazardous materials requirements under Chapter 6.95 of the California Health&Safety Code,Sections 25505,25533,and 25534. I will I hereby affirm under penalty of perjury one of the following three maintain compliance with the Cupertino Municipal Code,Chapter 9.12 and the declarations: Health&Safety Code,Section 25532(a)should I store or handle hazardous I have and will maintain a Certificate of Consent to self-insure for Worker's material. Additionally,should I use equipment or devices which emit hazardous Compensation,as provided for by Section 3700 of the Labor Code,for the air contaminants as defined by the Bay Area Air Quality Management District I performance of the work for which this permit is issued. will maintain compliance with the Cupertino Municipal Code,Chapter 9.12 and I have and will maintain Worker's Compensation Insurance,as provided for by the Health&Safety Code,Sections 25505,25533, 5534. Section 3700 of the Labor Code,for the performance of the work for which this Owner or authorized agent: Date: permit is issued. I certify that in the performance of the work for which this permit is issued,I shall not employ any person in any manner so as to become subject to the Worker's Compensation laws of California. If,after making this certificate of exemption,I CONSCTION LENDING AGENCY TRU become subject to the Worker's Compensation provisions of the Labor Code,I must I hereby affirm that there is a construction lending agency for the performance of forthwith comply with such provisions or this permit shall be deemed revoked. work's for which this permit is issued(Sec.3097,Civ C.) Lender's Name APPLICANT CERTIFICATION Lender's Address I certify that I have read this application and state that the above information is correct.I agree to comply with all city and county ordinances and state laws relating to building construction,and hereby authorize representatives of this city to enter upon the above mentioned property for inspection purposes.(We)agree to save ARCHITECT'S DECLARATION indemnify and keep harmless the City of Cupertino against liabilities,judgments, costs,and expenses which may accrue against said City in consequence of the I understand my plans shall be used as public records. granting of this permit.Additionally,the applicant understands and will comply with all non-point source regulations per the Cupertino Municipal Code,Section Licensed Professional 9.18. Signature Date ALTERNATIVE ENERGY PERMIT APPLICATION f� its COMMUNITY DEVELOPMENT DEPARTMENT•BUILDING DIVISION f�,V 10300 TORRE AVENUE•CUPERTINO,CA 95014-3255 A��l CUPERTIINO (408)777-3228•FAX(408)777-3333•building0cupertino.org VV�� PROJECT ADDRESS 1 o� l t T>r D^ ,, �n APN# `^ /L / -J' �Q OWNER NAME —D (O.� , ^� / 1 PHONE d Z�T E-MAIL +--U O STREET ADDRESS ( `-�� n rCITY, STATE,ZIP r J p ( t O)l-Z) (LI FAX CONTACT NAME ,J i } 'J PHONE / �tel_2�I t �p, IJ E-MAIL t0 b -1 J STREET ADDRESS t r n CITY,STATE,ZIP FAX 0 OWNER ❑ OWNER-BUL,DER ❑ owNER AGENT ❑ CONTRACTOR ❑CONTRACTOR AGENT ❑ ARCHrMCT ❑ENGINEER ❑ DEVELOPER ❑TENANT CONTRACTOR NAME 1 _"1 �P. LICENSE NUMBER (\,t (-; LICENSE TEE BUS.LIC# WIWI COMPANY NAME �, (�`O f�� Q- E- "��C D t� • FAX STREET ADDRESS \'6 b 1 CITY,STATE,ZIP �v `t, u �y PHONE a 1 0 ARCHITECT/ENGINEER NAME LICENSE NUMBER ^''1 D BUS.LIC# COMPANY NAME E-MAIL FAX STREET ADDRESS CITY,STATE,ZIP PHONE USE OF SFD or Duplex ❑ Multi-Family PROJECT IN WILDLAND PROJECT IN STRUCTURE: ❑ Commercial URBAN INTERFACE AREA ❑ Yes YNO FLOOD ZONE ❑ Yes No IS SOLAR PANELS El ELECTRIC VEHICLE CHARGING STATION El SOLAR WATER HEATING �f OTHER: (� //// FOR SOLAR PANELS. NUMBER OF PANELS/UNITS: I f KILOWATTS(COMMERCIAL ONLY): � l TOTAL VALUATION: 401 o�� DESCRIPTION OF WORK PULLD WnP '�LJkCL-- 7 -0 tae �4 a By my signature below,I certify to each of the following: I am the property owner or authorized agent to act on the property owner's behalf. I have read this application and the information I have provided is correct. I have read the Description of Work and verify it is accurate. I agree to comply with all applicable local ordinances and state laws relating to buil ing construction. authorizer s tatives of Cupertino to enter the above --id ntified rope rty for inspection purposes. Signature of Applicant/Agent: Date: "t N� SUPPLEMENTAL INF TIO D ' �,,,,,• :: �2 9� PVApp 2011.doc revised 03/16/11 CITY OF CUPERTINO FEE ESTIMATOR—BUILDING DIVISION ADDRESS: 10511 deodara dr DATE: 09/17/2013 REVIEWED BY: Mendez APN: BP#: *VALUATION: 1$16,000 PERMIT TYPE: Building Permit PLAN CHECK TYPE: Alteration/ Repair PRIMARY SFD or Du lex PENTAMATION SOLAR-RES USE: p PERMIT TYPE: WORK install pv system on rooftop 4.56 16 anels upqrade main service 200am SCOPINE ,R MIT y w ,L1cch. Plan Check Plumb,Plan Check Elec.Plan Check 0.0 hrs $0.00 Nfech. Permit Fee: Plumb.Permit Pee: Elec.Permit Fee: IEPERMIT FI,/,,h. :1lech.Insp. Other Plumb Insp. Other Elee.Insp.Insp.Fee: Plumb. Insp.Pec:: Elec.Insp. Fee: NOTE.This estimate does not include fees due to other Departments(i.e.Planning,Public Works,Fire,Sanitary Sewer District,School District,etc.). Theseees are based on the prellmina information available and are only an estimate. Contact the Dept for addn'l in o. FEE ITEMS(Fee Resolution 11-053 E . 711113) FEE QTY/FEE MISC ITEMS Plan Check Fee: $0.00 F1 # Alternative Energy System Suppl.PC Fee: (E) Reg. 0 OT 0.0 hrs $0.00 $229.00 IPHOTOVRES I Photovoltaic System PME Plan Check: $0.00 F-2-007 amps Electrical Permit Fee: $0.00 $47.00 IBELEC2007 Services Suppl. Insp.Fee:Q Reg. ®OT0,0 hrs $0.00 PME Unit Fee: $0.00 PME Permit Fee: $47.00 C;onsiruction Tax. Administrative Fee: IADMIN $44.00 Work Without Permit? ® Yes (j) No $0.00 E) Advanced.Planning Fee: $0.00 Select a Non-Residential G Travel Documentation Fee: ITPA VDOC $47.00 1 Building or Structure i Strong Motion Fee: 1BSEISMICR $1.60 Select an Administrative Item Bldg,Stds Commission Fee: IBCBSC $1.00 $140.60 $276.001fl,91 �8 $416.60 Revised: 08/01/2013 1 1 Mechanical Properties Electrical Properties(STC') Cells 6 z 10 LG270S1C-A3 LG265S1C-A3 LG260S1C-A3 _....._....._.__......_...._...._._....._...._..._._ ..____....______._. ._...._..._.. ..........m.,,u.........................S,'T".................................................................................................................................... Cell vendor LG Maximum power at STC(Prnpp) 270 .........265.......... 260.............. Cell type Monocrystalline MPP voltage(Vmpp) 31.5 31.3 31.1 Cell dimensions 156 x 156 mm/6 x 6 in MPP current(Impp) 8.58 8.49 8.38 _..._ .__..._. _ .................................................................................................................................................................... i of busbar 3Open circuit (Voc) 38.5 38.3 38.1 _. ................................................................................. Dimensions(L x W x H) 1640 x 1000 x 35 mm Short circuit current(Isc) 9.17 9.11 9.05 64.57 x 39.37 x 1.38 in Module efficiency(%) 16.5 16.2 15.9 _....._....-._...._....__...._..... ...._...._...._.__._...._..._.....__...._...._....._...._...._....__...._. _. Static snow load 5,400 Pa/113 sf ................................................................................................................................................................................... ....P_....__.._....._...._......._...__ ,Operating,temperature.(�C)..._............_ -40-+90 .......__..............__...._......__...._.....__.._...:.__.............._..__.._. ................................................................................_..................... Static wind load 2400 Pa/50 psf Maximum,system voltage M 1000(IEC),600(UL) _....__....__..._._..__.. ....__..._..._.. _ .._..._. _..._..._.. ..._._ __.�_._ .................................................... Weight 16.8 t 0.5 kg/36.96±1.1 Ib Maximum series fuse rating(A) 15 .. .......... . .............................................. ............................ (%) Connector type _ MC4 connector IP 67 Power tolerance 0-+3 Junction box IP 67 with 3 bypass diodes 'STC(Standard Test Condition):Irradiance 1000 W/m',module temperature 25'C,AM 1.5 Length of cables 2 x 1000 mm/2 x 39.37 in The nameplate power output is measured and determined by LG Electronics at its sole and absolute discretion. Glass ^!� High transmission tempered glass . . . ......... _.._._...._....._....__..,._..._.. ...._...._...._...._...._. Frame Anodized aluminum Electrical Properties(NOCT') Certifications and Warranty LG270S1C-A3 LG265S1C-A3 LG260S1C-A3 ................................................................................................................................................................................... Certifications IEC 61215,IEC 61730-1/-2,IEC 61701, Maximum power(Pmpp).............................198 195 191 ........................... DLG-Fokus Test Ammonia Resistance'; MPP voltage(Vmpp) 29.0 28.8 28.6 .................................................................................................................................................................................... UL 1703,ISO 9001 MPP current(Impp) 6.84 6.77 6.68 _......_....._......_......_....._...._..._...._..�.._..._...._...._...._._..._..._._._..._...._... ....................................................................................................................................... ..._................................. Product warranty 10 years Open circuit voltage(Voc) 35.7 35.5 35.3 _.... ....._...._....__.....__....__....__...._._._....�...._...._....._....__._.... ..._._.._....._..._.. ...................-.......................................................................................................................... Output warranty of Pmax Short circuit current(Isc) .739 .......................734........................._729 (measurement Tolerance t 3%) - Linear warranty' ............................................... �r°. g`�-0 Efficiency reduction <4.5 C r i - •1)1st year 97%,2)After 2nd year.0.7%annual degradation,3)80.2%for 25 years (from 1000 W/m2 to 200 W/ms) ''��1-1 'J NOCT(Nominal to Cell Te tur� FadIS ce 800 W/m',amb t O lay, .) TemperatureCoefficients g a' � `" � 7c( I1le It wind speed l m/s u� ' 1 e ,s) NOCT 45.0±2°C Pmpp _0.43%/°C __. ` •'---•• -"--'- M/OAO 10!0.40 von -0.31%/°c 1$ Dimensions(mm/i NSVIEVVED FOR 2 Characteristic Curves Reviewed By _ 1000/39.aT 2e/M 22/O.ar Q 10 1000 5.'•4'0 xwew tsize of wrsWe) Lerysld9f- Shortsld9frame O 4.0'13 lY vbw (gsfa,we beM'een mwn5n91,aMe) $ 80OW deM holay4ee) F 18/a.T U d 7- 6 6 600 W a,,,,rp.mz 2943 5 Gro°n,Yrq M1er.elrzeel 4 400 W aea. .sew 3 Ab°ntpp h°1ez18ea) 2 200 W t < O 5 10 15 20 25 30 35 40 VoMage M 100013 r.,9 3 ,7 140 g Dif�% n ` R n xq AO/0.16 Iso € a � 4 100 .----------- g n. _.__..-_..._____ _.___..__.._ £ t We 80 --____-_-.________..__._---...........__.__. ----- .--. 944/nn ^ ma/o.al/o.. 60 PmaX 40 _-____.--____.__.__.__..__.___-__.---------_.__.__-.__.____..__ q D,°y Z A 3 o asn.ae -40 -25 O 25 50 75 90 Temperature(°C) •The distance between the center of the mounting/grounding holes LG Electronics Inc. Product specifications are subject to change without notice. r�sw Solar Business Division DS-A3-60-C-G-P-EN-30521 #tl�,e;Q LG Seoul Square 541,Namdaemunro 5-ga, : _ Jung-gu,Seoul 100-714,Korea Email:solarinfo@Ige.com Copyright©2013 LG Electronics.All rights reserved. Life's Good www.lg-solarcom 05/01/2013 LO Life's Good LG Electronics,Inc.(Korea Exchange:06657KS)is one of the globally leading companies and technology innovator for electronics,information and communication products.The LG Electronics currently employs more than 91,000 people worldwide in 117 companies.In fiscal year 2011, 48.97 billion US0 of revenue was achieved. LG is one of the world's largest manufacturers of mobile phones,flat screen TVs,air conditioners, washing machines and refrigerators.As a future- oriented company,LG enables others to use technology consisting of renewable energies. LG's high quality solar products are being manufactured in LG's leading production facility in South Korea. V of c(DUS C E APMMED PROM= World's Ist KM 564573 BS EN 61215 Phot [.io Modules Light and Robust A Convenient Installation With a weight of just 16.8 kg,LG modules are LG modules are carefully designed to benefit proven to demonstrate outstanding durability installers by allowing quick and easy installations �rwesig against external pressure up to 5440 Pa. throughout the carrying,grounding,and connecting stages of modules. 100%EL Test Completed The Extra %Power All LG modules pass Electroluminescence MAM To minimize losses due to mismatch,LG produces "" inspection.This EL inspection detects cracks andjoin 3 groups of solar modules which are sorted by its ELT"r other imperfections unseen by the naked eye. C—* ne current class.This enables MonoXTI to maximize the system's output by around 2%based off the theoretical calculation. Reliable Warranties Positive PowerTolerance LG stands by its products with the strength of a LG provides rigorous quality testing to solar U...'W.—ty global corporation and sterling warranty policies. modules to assure customers of the stated power LG offers a 10 year product limited warranty and a outputs of all modules,with a positive nominal 25 year limited linear output warranty. tolerance starting at 0%. - Maximum energy production The Enphase Energy Microinverter PRODUCTIVE - Resilient to dust, debris and shading - Performance monitoring per module System improves energy harvest, increases reliability, and dramatically - System availability greater simplifies design, installation and RELIABLE than 99.8% - No single point of system failure management of solar power systems. _—Quick and si ' ,d allation The Enphase System includes the Pff SMART_ ��`arr managefpp Deparfinent microinverter, the Envoy Communications 241,'7 monitoring and analysis Gateway, and Enlighten, Enphase's monitoring and analysis software. S A F CE s�® C us M215 MICROINVERTER TECHNICAL DATA Recommended input power(STC) 190-260W Maximum input DC voltage 45V Peak power tracking voltage 22V-36V Operating range 16V-36V Min./Max.start voltage 22V/45V Max. DC short circuit current 15A Max.input current 10.5A Maximum output power 215W 215W Nominal output current 1.OA (arms at nominal duration) 0.9A(arms at nominal duration) Nominal voltage/range 208W183-229V 240V/211-264V Extended voltage/range 208W179-232V 240V/206-269V Nominal frequency/range 60.0/59.3-60.5 Hz 60.0/59.3-60.5 Hz Extended frequency range 60.0/59.2-60.6 Hz 60.0/59.2-60.6 Hz Power Factor >0.95 >0.95 Maximum units per 20A branch circuit 25(three phase) 17(single phase) Maximum output fault current 1.05 Arms,over 3 cycles;25.2 Apeak, 1.74ms duration CEC weighted efficiency 96.0% Peak inverter efficiency 96.3% Static MPPT efficiency(weighted,reference EN50530) 99.6% Dynamic MPPT efficiency(fast irradiation changes, reference EN50530) 99.3% Night time power consumption 46mW Ambient temperature range -40°C to+65°C Operating temperature range(internal) -40°C to+85°C Dimensions(WxHxD) 17.3 cm x 16.4 cm x 2.5 cm(6.8"x 6.45"x 1.0")* Weight 1.6 kg(3.5 lbs) Cooling Natural convection-No fans Enclosure environmental rating Outdoor-NEMA 6 *without mounting bracket Compatibility Pairs with most 60-cell PV modules Communication Power line Warranty 25-year limited warranty Monitoring Free lifetime monitoring via Enlighten software Compliance UL1741/IEEE1547, FCC Part 15 Class B CAN/CSA-C22.2 NO.0-M91,0.4-04,and 107.1-01 Enphase Energy, Inc. 201 1 st Street Petaluma,CA 94952 Phone:877-797-4743 Fax:707-763-0784 info@enphaseenergy.com http://www.enphase.com 142-00010 Rev 03 Classic Composition Mount I AMSC THIS EDGE TOWARDS RACKING COMPONENTS 2.50 ROOF RIDGE i NI I NOT INCLUDED II r I II 5 1 6 - 'I 5 7 4 1200. 3 1.50 2 ±3.00 1 ITEM DESCRIPTION QTY. 6.00 1 FLASHING,12"X 12"X.050",5052,MILL 1 12.00 2 QBLOCK,CLASSIC,A360.1 CAST AL,MILL 1 3 HANGER BOLT,PLAIN CENTER,5/16"x 6",18-8 SS 1 I:-- =i I I 4 WASHER,SEALING, 5/16"ID X 3/4"OD,EPDM BONDED SS 1 i I 5 NUT,HEX,5/16-18,UNC-213, 18-8 SS 2 6 WASHER,FLAT,19/64"ID x 7/8"OD x 1/8" EPDM 1 1.30 7 WASHER,FENDER,5/16"ID X 1"OD,18-8 SS 1 8 WASHER,SPLIT-LOCK,5/16"ID,18-8 SS 1 -T duck Mount PV 3.00 TITLE: AMSC: CLASSIC COMPOSITION MOUNT AVAILABLEIN MILL,CLEAR ANODIZED, ............................................................................................................................... AND BRONZE ANODIZED FINISHES. uNLEssorHERWSESPECIFIED: SIZE DRAWN BY: RAD REV DIMENSIONS ARE IN INCHES L TOLERANCES: A : DATE: 7/23/2013 6 FRACTIONAL:1/8 PWMETARYANDCONNDENTIAI TWO PLACE DECIMAL 2.18 THE INFORMATION CONTAINED IN THS DMWMG S THE SOLE PROPERTY OF QUICK MOUNT PV.ANYREPRODUCTIONINPARTORAS I DO NOT SCALE DRAWING THREE PLACE AL 2.125 SCALE:1:4 WEIGHT:1.24 SHEETI OFI AWHOLEWIIHOWMEWRRIENPERM nNOFOUICKMOUNTPVSPROHETIED. 5 4 3 2 1 Lag pull-out(withdrawal)capacities(lbs)in typical lurnber: Lag Bolt Specifications Specific Gravity 5/16"shaft per 3"thread depth 5/16"shaft per 1"thread depth Douglas Fir,Larch .50 798 266 Douglas Fir,South .46 705 235 Engelmann Spruce,Lodgepole Pine(MSR 1650 f&higher) .46 705 235 Hem,Fir .43 636-.. , 114 r, Hem,Fir(North) .46 705 7 7r I .e` 235 E` Southern Pine .55 921:` 0 Spruce,Pine,Fir 42 6151 205 Spruce,Pine,Fir(E of 2 million psi and higher grades of MSR and MEL) .50 798 _ 266 Sources:American Wood Council,NDS 2005,Table 11.2 A,11.3.2 A E iE4'^1c_fi FUR CODE COMPLIANCE Notes: 1)Thread must be embedded in a rafter or other structural roof member. Reviewed By. 2)See IBC for required edge distances. IMPORTANT,To maintain waterproofing It is important that the aluminum flashing(item 1)is properly placed under one full course above the mounting block with at least 1/2"of the flashing extending up under an additional course above(3rd course).The bottom of the flashing should never overhang the shingle drip edge.See instructions on back quick Mourl OD BI 7.2.3-7 " "` Jul-2013,Rev 5 uick Mount PYv 1 Classic Composition Mounting Instructions Installation Tools Required:tape measure, roofing bar,chalk line,stud finder,caulking gun,one tube of sealant compatible with roofing materials,drill with 7/32"bit,drill or impact gun with 1/2"deep socket. WARNING:Ouick Mount PV r)roducts are NOT desicined for and should NOT be used to anchor fall protection equiornent. I „ 1 L, 3r�2 1 ` Locate,choose,and mark centers of rafters to be Carefully lift composition roof shingle with roofing Insert flashing between 1st and 2nd course.Slide mounted. Select the courses of shingles where bar,just above placement of Quick Mount. up so top edge of flashing is into the 3rd course Quick Mounts will be placed. and lower edge is above drip edge of 1st course. Remove any nails to position flashing properly. Mark center for drilling. .,i:a9, VV 'll,.,V, t c a,f.,B"' P YY I' i9 iV..,, i9 v—i'�'..•••sq'. q'�iylP III iplllu�l I �VIII wl,alIP IIS w ,III �Ir P i I I III Ilulll I (} I I ' IPi IIIA ''P�f II' I�I'Illll I IIiq q cul I Ips, III I',�,I I Using drill with 7/32"bit,drill pilot hole into roof Clean off any sawdust,and fill hole with sealant Slide flashing into position. Prepare hanger bolt and rafter,taking care to drill square to the roofcompatible with roofing materials. with hex nut and sealing washer. Insert into hole Do not use mount as a drill guide. and drive hanger bolt until QBlock stops rotating. Do NOT over torque. - ill„iil,l ��� IIPillll V • °• • • • • k • Insert EPDM rubber washer over hanger bolt into Using the rack kit hardware secure the rack of your * NOTE:It is not necessary or advisable to use nails or block. choice. other fasteners to secure the perimeter of the flashing. 925-478-8269 • www.quickmountpv.com • info@quickmountpv.com BI 7.2.3-7 2700 Mitchell Dr.,Bldg 2 • Walnut Creek,CA 94598 Jul-2013,Rev ©2013 by Quick Mount PV.All rights reserved. f SHEET INDEX: NOTES: COVER SHEET PROJECT ADDRESS: 10511 DEODARA DR. 1 . COVER SHEET CUPERTINO, CA 95014 2. SITE PLAN OWNER, DION LOY and GERMAINE FU 3. ROOF PLAN 10511 DEODARA DR. 4. SINGLE LINE ELECTRICAL DRAWING CUPERTINO, CA 95014 (650) 201 2951 C JPERTINO PLANS :PREPARED BY: ADITYA AGARWAL 1 ! 3.i '.ing Departrnent HELIOFARM PLOT PLANS 1166 PIMENTO AVE., --A CHECKED BY SUNNYVALE CA 94087 REVlE'.' F -'� COMPLIANCE (7 l 3 (408) 507 4110 DATE ANNIN F.P'r• SCOPE OF WORK: THIS IS A 4.16 IOW SOLAR ELECTRIC SYSTEM INSTALLATION CONSISTING OF (12) SOLAR DATE _ MODULES ON THE ROOF OF A PRE-EXISTING BLDG. DEPT-— REMEME. COMMUNITY DEVELOPMENT DEPARTMENT BUILDINGDIVISION-CUPERTINO THE SYSTEM IS GRID INTER-TIED VIA UL- APPROVED LISTED MICROINVERTERS AND HAS NO This set of plans and specifications MUST be kept at the BATTEI ES OR UPS. job site during construction. It is unlawful to make any ALL SY=STEM COMPONENTS ARE SELECTED ' changes or alterations on same,or to deviate _therefrom,without approval from the Building Official. AND SIZED Hq ACCORDANCE WITH ARTIOLE The stamping of this plan and specifications SHALL NOT 690 10F THE-2011 NEC. be held to permit or to be an approval of the violation of any pr i lops of any City Ordinance or State Law. �. INSTALLER, HELIOFARM BY DATE LICENSED ELECTRICAL CONTRACTOR ' Pr ;;��IT NO. 0 #961584 CONTACT: ADITYA AGARWAL 1166 PIMENTO AVE, pw, Am SUNNYVALE CA 94087 0 P (408) 507 4110 HELIOFARM PROPERTY OWNER PROJECT ADDRESS: SHEET 1166 Pimento Ave. - COVER SHEET Sunnyvale CA 94087 DION LOY 10511 DEODARA DR. Drawing by: Agarwal (408) 507 4110 GERMAINE FU CUPERTINO'L_-1 0 F7 H H, M , CA 95014 9/17/13 OF SHEETS MAIN ELECTRICAL SERVICE LOCATED ON EXTERNAL WALL UNDER EAVE NORTH ><X9 xxx 0 M xx O xx �v D O w CUPERTINO f�;-. ' jinn Department 1 I. 'v REVIEVVF L 'CR C ,DE COMPLIANCE Revlewe--' B� HELIOFARM PROPERTY OWNER PROJECT ADDRESS: SHEET 1166 Pimento Ave. SITE PLAN C L ,1 F"" R M Sunnyvale CA 94087 DION LOY 10511 DEODARA DR. Drawing by: Agarwal 2 (408) 507 4110 GERMAINE FU CUPERTINO, CA 95014 9/17/13 OF 4 SHEETS F PLAN VIEW OF WEST FACING ROOF SHOWING RAFTERS AND ROOF ATTACHMENT DETAIL MOUNT POINTS HEX NUT EPDM HANGER BOLT 5/6'x 3 XF QUICKMOUNT STANDOFFS AND FLASHINGS CAST BLOCK SUPPORTING PROSOLAR RAILS :... ..... 1 support/11 sq.ft. QUICKMOUNT PV ALUMINUM C MP-SHINGLE FLASHING PLYWOOD NOTES QUICKMOUNT 1 . THIS IS A4.16 KW SOLAR ELECTRIC SYSTEM USING (16) LG STANDOFFS AND 260S1 CA-3 PHOTOVOLTAIC MODULES. FLASHINGS 2. THIS SYSTEM IS GRID-INTERTIED VIA UL-LISTED ENPHASE SUPPORTING PROSOLAR RAILS M215-60-2LL-S23 MICROINVERTERS. pport/11 sq.ft. 3. THIS SYSTEM HAS NO UPS, NO BATTERIES. 2"x6" 4. THIS SYSTEM IS A ROOF MOUNTED SYSTEM ADDING A ROOF LOAD RAFTERS OF 2.65 LBS/SQ.FT. SYSTEM IS MOUNTED ON PROSOLAR 24" ON ALUMINUM RAILS MOUNTED ON TO ROOF RAFTERS USING CENTER QUICKMOUNT SOLAR FLASHINGS. 5. THERE IS A MINIMUM OF 1 SUPPORT PER 16 SQ FT OF PV ARRAY. PUPERTINO THE ROOF STRUCTURE CONSISTS OF COMP SHINGLE ON 5/ PLY t S!' Sinn Department �� i i ON 2"X6" RAFTERS, 24" ON CENTER. 6. BUILDING IS 1 STORY RESIDENTIAL. REVIE ,. J � ;;C�i L= COMPLIANCE 1S HELIOFARM PROPERTY OWNER PROJECT ADDRESS: ROOF PLAN SHEET 1166 Pimento Ave. 3 # lk t A ff A I "HM HE: L 1 \0� Fri 1 Sunnyvale CA 94087 DION LOY 10511 DEODARA DR. Drawing by: Agarwal (408) 507 4110 GERMAINE FU CUPERTINO, CA 95014 9/17/13 OF 4 SHEETS NOTES 1. The PV source circuit is negatively grounded (16) LG 260A1 CA-3, 260W-STC Electrical meter photovoltaic modules with 2. Wire and Sizes are as indicated or larger. microinverters wired in parallel 3. All equipment is bonded by mechanical means or by a grounding For each module: conductor. Modules and racking system are grounded using WEEB's Voc = 38.1 VDC 200A, 2 pole, (Wiley Electronic Equipment Bonding) and WEEB-Lugs. Vmp = 31.1 VDC main service breaker Isc = 9.05 A 20A, 2 pole 4. The grounding electrode conductor shall be #8AWG copper ground Imp = 8.38 A solar backfed circuit breaker wire and bonded to the existing grounding electrode system. Modules and racking system 5. The electrical Service panel will be clearly labeled with signage saying: grounded using WEEBs (Wiley Electronic Equipment Grounding) THIS PANEL IS FED BY TWO SOURCES: and WEEB-Lugs. SOLAR PHOTOVOLTAIC SYSTEM ON PREMISES WARNING: ELECTRICAL SHOCK HAZARD, DO NOT TOUCH (cont = (16) * 0.9 = 14.6 A TERMINALS. TERMINALS ON BOTH THE LINE AND LOAD 14.6 * 1.25 = 18.25 A SIDES MAY BE ENERGIZED IN THE OPEN POSITION (240V AC) SOLAR CIRCUIT MAXIMUM CURRENT: 14.6 A (3) #10 THWN-2 SOLAR CIRCUIT OPERATING VOLTAGE: 240V (1) #8 Gnd in 3/4" EMT conduit CUPERTINO Building Department e E 4 9 Vi `o " 7 ;: :`:';-_)E COMPLIANCE (16) Enphase M215-60-2LL-S23 Microinverters, 215W Max Output Imax (each) = 0.9A AC, 240 VAC HELIOFARM PROPERTY OWNER PROJECT ADDRESS: SINGLE LINE DRAWING SHEET 1166 Pimento Ave. Sunnyvale CA 94087 DION LOY 10511 DEODARA DR. Drawing by: Agarwal H* CL L I FH# M (408) 507 4110 GERMAINE FU CUPERTINO, CA 95014 4 9/17/13 OF 4 SHEETS