13090067 CITY OF CUPERTINO BUILDING PERMIT
BUILDING ADDRESS: 22836 POPLAR GROVE SQ CONTRACTOR:BRIAN KOSKI HEATING PERMIT NO:13090067
OWNER'S NAME: SHARMA DEEPAK K AND ABHA 111 GLENN WAY STE 16 DATE ISSUED:09/11/2013
OWNER'S PHONE: 6507969884 SAN CARLOS,CA 94070 PHONE NO:(650)267-0373
❑ LICENSED CONTRACTOR'S DECLARATION JOB DESCRIPTION: RESIDENTIAL COMMERCIAL
License Class '),t7 Lic.# 3,1;- INSTALL A/C UNIT IN REAR OF SFDWL
Contractor l_ Date
I hereby affirm that I am licensed under the provision of Chapter 9
(commencing with Section 7000)of Division 3of the Business&Professions
Code and that my license is in full force and effect.
I hereby affirm under penalty of perjury one of the following two declarations:
I have and will maintain a certificate of consent to self-insure for Worker's
Compensation,as provided for by Section 3700 of the Labor Code,for the
performance of the work for which this permit is issued. Sq.Ft Floor Area: Valuation:$5000
I have and will maintain Worker's Compensation Insurance,as provided for by
Section 3700 of the Labor Code,for the performance of the work for which this APN Number:34233022.00 Occupancy Type:
permit is issued.
APPLICANT CERTIFICATION
I certify that I have read this application and state that the above information is PERMIT EXPIRES IF WORK IS NOT STARTED
correct.I agree to comply with all city and county ordinances and state laws relating WITBDV90 DAYS OF PERMIT ISSUANCE OR
to building construction,and hereby authorize representatives of this city to enter
upon the above mentioned property for inspection purposes. (We)agree to save 180 DA OM LAST CALLED INSPECTION.
indemnify and keep harmless the City of Cupertino against liabilities,judgments,
costs,and expenses which may accrue against said City in consequence of the 9!(
Issued by: Date:
granting of this permit. Additionally,the applicant understands and will comply
with all non-point source regulations per the Cupertino Municipal Code,Section
9.18.
RE-ROOFS:
Signature /f Date All roofs shall be inspected prior to any roofing material being installed.If a roof is
installed without first obtaining an inspection,I agree to remove all new materials for
inspection.
❑ OWNER-BUILDER DECLARATION
Signature of Applicant: Date:
I hereby affirm that I am exempt from the Contractor's License Law for one of
the following two reasons: ALL ROOF COVERINGS TO BE CLASS"A"OR BETTER
I,as owner of the property,or my employees with wages as their sole compensation,
will do the work,and the structure is not intended or offered for sale(Sec.7044,
Business&Professions Code)
I,as owner of the property,am exclusively contracting with licensed contractors to HAZARDOUS MATERIALS DISCLOSURE
construct the project(Sec.7044,Business&Professions Code). I have read the hazardous materials requirements under Chapter 6.95 of the
California Health&Safety Code,Sections 25505,25533,and 25534. I will
I hereby affirm under penalty of perjury one of the following three maintain compliance with the Cupertino Municipal Code,Chapter 9.12 and the
declarations: Health&Safety Code,Section 25532(a)should I store or handle hazardous
I have and will maintain a Certificate of Consent to self-insure for Worker's material. Additionally,should I use equipment or devices which emit hazardous
Compensation,as provided for by Section 3700 of the Labor Code,for the air contaminants as defined by the Bay Area Air Quality Management District I
performance of the work for which this permit is issued. will maintain compliance with the Cupertino yunicipal Code,Chapter 9.12 and
I have and will maintain Worker's Compensation Insurance,as provided for by the Health&Safety Code,Sect' ns 215505.29533,an 25534.
Section 3700 of the Labor Code,for the performance of the work for which this Owner or authorized agent: ^ -Date..
permit is issued.
I certify that in the performance of the work for which this permit is issued,I shall
not employ any person in any manner so as to become subject to the Worker's
Compensation laws of California. If,after making this certificate of exemption,I CONSTRUCTION LENDING AGENCY
become subject to the Worker's Compensation provisions of the Labor Code,I must I hereby affirm that there is a construction lending agency for the performance of
forthwith comply with such provisions or this permit shall be deemed revoked. work's for which this permit is issued(Sec.3097,Civ C.)
Lender's Name
APPLICANT CERTIFICATION Lender's Address
I certify that I have read this application and state that the above information is
correct.I agree to comply with all city and county ordinances and state laws relating
to building construction,and hereby authorize representatives of this city to enter
upon the above mentioned property for inspection purposes.(We)agree to save ARCHITECT'S DECLARATION
indemnify and keep harmless the City of Cupertino against liabilities,judgments,
costs,and expenses which may accrue against said City in consequence of the I understand my plans shall be used as public records.
granting of this permit.Additionally,the applicant understands and will comply
with all non-point source regulations per the Cupertino Municipal Code,Section Licensed Professional
9.18.
Signature Date
GENERAL PERMIT APPLICATION
MEP
10 COMMUNITY DEVELOPMENT DEPARTMENT•BUILDING DIVISION
10300 TORRE AVENUE•CUPERTINO,CA 95014-3255
CUPERTINO (408)777-3228•FAX(408)777-3333•buildingCcDcupertino.ora U MISC
Y�
❑PLUMBING ❑MECHANICAL ❑ELECTRICAL ❑MISCELLANEOUS
PROJECT ADDRESSP(AIC re 6rove,
APN# ?�-3 0'2
OWNERNAMEPH `�� EWj , r
STREET ADDRESS / ♦J CP O(�or 51
FAX
(� ITY„ST TE, 0
CONTACT NAME PH q tA
/, E-MA
STREET ADDRESga' CIT STrt1 /J (J �/q FAX
OWNER ❑ OWNER-BUILDER ❑ OWNERAGENT ❑ CONTRACTOR ❑CONTRACTOR AGENT ❑ ARCHITECT ❑ENGINEER ❑ DEVELOPER ❑ TENANT
CONTRACTOR NAME LIC R LICENS T BUS.LIC#
COMPANY N r FAX
�OSJ
E- r ),A �i40
STREET yS6 CI Y TATE,ZIP /' P ONE
ARCHITECT/ENGINEER NAME LICENSE NUMBER V BUS.LIC#
COMPANY NAME E-MAIL FAX
STREET ADDRESS CITY,STATE,ZIP PHONE
USE OF ❑SFD.,DUPLEX ❑ MULTI-FAMILY PROJECT IN WI DLAND ❑ YES PROJECT IN ❑YES IS THE BLDG AN ❑ YES
BUILDING: ❑COMMERCIAL URBAN INTERFACE AREA ❑ NO FLOOD ZONE ❑NO EICHLER HOME? ❑ NO
DESCRIPTION OF WORK � 4 an & _
L,
L 4nd 17YAin
TOTAL VALUATION: 45c/_ RECEIVEDBY:
By my signature below,I certify to each of the following: I am the property owner or authorized agent to act on the prope owner's behalf. I have read this
application and the information I have provided is correct. I have read the Description of Work and verify it is accurate. gree to comply with all applicable local
ordinances and state laws relating builddinng�construc n. I an orze representatives of Cupertino to enter the above-identified property for inspection purposes.
Signature of ApplicanUAgent:—�u�K- Z 4 Date:
SUPPLEMENTAL INFORMATION REQUIRED OFFICE USE ONLY
W ❑ OVER-THE-COUNTER
a
H ❑ EXPRESS
U
❑ STANDARD
V
Z
❑ LARGE
a
❑ MAJOR
MEPMiscApp_201 Ldoc revised 06121111
CITY OF CUPERTINO
FEE ESTIMATOR—BUILDING DIVISION
ADDRESS: 2283 poplar sq DATE: 09/11/2013 REVIEWED BY: Mendez
APN: BP#: 'VALUATION: 1$5,000
*PERMIT TYPE: Buil di g Permit PLAN CHECK TYPE: Alteration/ Repair
PRIMARY SFD or Du lex PENTAMATION FURN/AC
USE: p PERMIT TYPE:
WORK install a/c unit in rear of sfdwl
SCOPE
Mech.Plan Check 0.0 hrs $0.00 PhanL Plan Cheek Elec.Plan Check
Mech.Permit Fe;: IMPERMIT Plumb.Permit Fee: Elec. Permit Fee:
FOther Mech.Insp. 0.0 hrs $47.00 Other Plumb Insp. E3--L- Other Elec.Insl). Li
Insp.Fee: Plumb. hrsp.T etz: Elec.Insp. Fee:
NOTE:This estimate does not include fees due to other Departments(Le.Planning,Public Works,Fire,Sanitary Sewer District,School
District,eta). These fees are bused on the prelimina information available and are only an estimate. Contact the Dept for addn'1 info,
FEE ITEMS(Fee Resolution 11-053 E . 7/1/13) FEE QTY/FEE MISC ITEMS
Plan Check Fee: $0.00 1 # Mechanical
Suppl.PC Fee: Q Reg. Q OT 0.0 1 hrs $0.00 $70.00 IBREMAIR A/C Units(<=10K cfin)
PME Plan Check: $0.00
Permit Fee: $0.00
Suppl. Insp.Fee-.0 Reg. ®OT0,0 hrs $0.00
PME Unit Fee: $0.00
PME Permit Fee: $47.00
Construction Tax:
Administrative Fee: IADMIN $44.00
Work Without Permit? j ®Yes Q No $0.00
Advanced Planning Fee. $0.00 Select a Non-Residential 0
Travel Documentation Fee: ITRAVDOC $47.00 Building or Structure
i
Strong Motion Fee: IBSEISMICR $0.50 Select an Administrative Item
Bldg Stds Commission Fee; IBCBSC 1 $1.00
$139.50 $70.00 $209.50
Revised: 08/01/2013
Pei 4k ���I �Y�`�i/����j''ti oil 6'1
Pop* , t r i✓► c��� ��,
1-
cc: O c
� -1 N �z 32 E-5 CD .1 54,1j4re,
W m ° W C fn coN4J
�Z
cc
oa c m — 2
- - - -
z � N E ° � �f !
0 1
wE N «s 0
0-0 O vc ° r-
2
o �
o65 � � oc > m
�, a� U
v
cm
cl
0 CL co
oz ro aL o 0
o 'vo � o `�
o
p g 0° E Q ° ° O
o o !
w >_ in cG
LU
L O ... ® J F f`
F- F co a a
R I
n
PLOT PLANS
CHECKED BY
DATE 1 r cUPERTINO
Building Department
PIAN I EPT. `"' � � 1 2013
DATE ^`
! REVIEVJED FOR CODE COMPLIANCE
BLDG. DEPT. B
--�j •• D'
Reviewed y:
j f i
COMMUNITY MANAGEMENT SERVICES
September 6, 2013
Deepak Kumar/Sharma Abha Sharma
22836 Poplar Grove Square
Cupertino, CA 95014
Re: DeAnza Oaks Homeowners Association
Lot 53)
Dear Owners:
The Architectural Committee has approved OPTION 2 on your application for the installation of an air
conditioning condenser and plumbing lines per the General Description Of Proposed Work section of the
enclosed application. The metal conduit must be painted to match the exterior surface on which it is affixed
ithin 30 days of installation. Paint color information is available on the association's website at
w\\.deanzaoakshoa.com.
Since ly,
C mmunity Ma nt Services, Inc.
ubbard, Association Manager
DeAnza Oaks Homeowners Association
BH!st
Enclosure
cc: Board of Directors
1935 Dry Creek Road, Suite 203 Campbell,CA 95008-3631 voice (408) 559-1977 fax (408) 559-1970
INSTALLATION CERTIFICATE CF-6R-MECH-04
Space Conditioning Systems,Ducts and Fans (Page 1 of 2
B�AC —
Site Address: Lo Enforcement Agency: Permit Number:
Space Conditioning Systems
Heating Equipment
Duct
Efficiency Location
Equip (AFUE, (attic,
Type ARI #of etc.)1.3 crawl- Heating Heating
(package- CEC Certified Mfr.Name Reference Identical (>_CF-1R space, Duct Load Capacity
heat um and Model Number Number 2 Systems value a etc.) R-value Btu/hr (Btu/hr
A L frAyle3v d I goqul
^�. Cooling Equipment
Efficiency Duct
Equip (SEER Location
Type and EER) (attic,
(package #of �'3 crawl- Cooling Cooling
heat CEC Certified Mfr.Name ARI Reference Identical (>_CF-1R space, Duct Load Capacity
um ) and Model Number Number 2 Systems value)4 etc. R-value (Btu/hr) (Btu/hr
1.If project is new construction, see Footnotes to Standards Table 151-B and Table 151-C for duct ceiling alternative
compliance.
2.ARI Reference Number can be found by entering the equipment model number at http:1Avww.aridirectory.org/ari/ac.php#
3.Listed efficiency on this page must be greater than or equal(>_)to the value shown on the CF-1 R form.
4. When CF-IR is reference it is also applicable to the CF-IR, CF-IR-AA or CF-IR-ALT
ALL BOXES MUST BE CHECKED TO BE A VALID FORM
CR §1 10-§113:HVAC equipment is certified by the California Energy Commission.
❑ §150(h):Heating and/or cooling loads calculated in accordance with ASHRAE,SMACNA,or RCCA.
§150(i): Setback Thermostat on all applicable heating and/or cooling systems meet the requirements of§112(c).
® §1500)2:Pipe insulation for cooling system refrigerant suction,chilled water and brine lines meets minimum
requirements of Table 150-B and includes a vapor retardant or is enclosed entirely in conditioned space.
2008 Residential Compliance Forms August 2009
INSTALLATION CERTIFICATE CF-6R-MECH-04
Space Conditioning Systems,Ducts and Fans (Page 2 of 2
Site Address: Enforcement Agency: 7
ermit Number:
Ducts and Fans
§150(m):Duct and Fans
❑ 1.All air-distribution system ducts and plenums installed,sealed and insulated to meet the requirements of CMC
Sections 601,602,603,604,605 and Standard 6-5;supply-air and return-air ducts and plenums are insulated to a
minimum installed level of R-4.2 or enclosed entirely in conditioned space. Openings shall be sealed with mastic,tape
or other duct-closure system that meets the applicable requirements of UL 181,UL 181A,or UL 181B or aerosol
sealant that meets the requirements of UL 723. If mastic or tape is used to seal openings greater than 1/4 inch,the
combination of mastic and either mesh or tape shall be used;and
❑ 1.Building cavities,support platforms for air handlers,and plenums defined or constructed with materials other
than sealed sheet metal,duct board or flexible duct shall not be used for conveying conditioned air. Building cavities
and support platforms may contain ducts. Ducts installed in cavities and support platforms shall not be compressed to
cause reductions in the cross-sectional area of the ducts.
❑ 2D.Joints and seams of duct systems and their components shall not be sealed with cloth back rubber adhesive
duct tapes unless such tape is used in combination with mastic and draw bands.
❑ 7.Exhaust fan systems have back draft or automatic dampers.
❑ 8.Gravity ventilating systems serving conditioned space have either automatic or readily accessible,manually
operated dampers.
❑ 9.Protection of Insulation.Insulation shall be protected from damage,including that due to sunlight,moisture,
equipment maintenance,and wind.Cellular foam insulation shall be protected as above or painted with a coating that is
water retardant and provides shielding from solar radiation that can cause degradation of the material.
❑ 10.Flexible ducts cannot have porous inner cores.
DECLARATION STATEMENT
• I certify under penalty of perjury,under the laws of the State of California,the information provided on this form is true and correct.
• I am eligible under Division 3 of the Business and Professions Code to accept responsibility for construction,or an authorized
representative of the person responsible for construction(responsible person).
• I certify that the installed features,materials,components,or manufactured devices identified on this certificate(the installation)
conforms to all applicable codes and regulations,and the installation is consistent with the plans and specifications approved by the
enforcement agency.
• I reviewed a copy of the Certificate of Compliance(CF-1R)form approved by the enforcement agency that identifies the specific
requirements for the installation. I certify that the requirements detailed on the CF-1R that apply to the installation have been met.
• I will ensure_that a completed,,signed copy of this Installation Certificate shallbe postedi or made available with the building
permit(s)issued for the building,and made available to,the enforcement agency for all applicable inspections. I understand
that a signed copy of this Installation Certificate is required to be included with the documentation the builder provides to
the building owner at occupancy.
Com V Name: (Installing ubcontractor oy'eneral Contractor or Builder/Owner)
Respo ible Person's N e: x171 IjV Res sible Person's lure
K05AI
.
CSLB License: VE
ed Position With Company(Title):
J �Uj tl
2008 Residential Compliance Forms August 2009
i
HVAC ALTERATIONS ENERGY COMPLIANCE FORM
L' COMMUNITY DEVELOPMENT DEPARTMENT• BUILDING DIVISION
ALBERT SALVADOR, P.E.,C.B.O., BUILDING OFFICIAL
GUPERTthlO 10300 TORRE AVENUE•CUPERTINO,CA 95014-3255
(408)777-3228•FAX(408)777-3333•buildinaacupertino.ora
WHEN IS A PERMIT REQUIRED
A construction permit shall be obtained from the enforcement agency prior to the erection,
construction, reconstruction, installation, relocation, or alteration of any mechanical system, except as
permitted in Chapter 1, Section 112.2 of the 2010 California Mechanical Code. Projects requiring
permits include, but are not limited to:
• New HVAC installation
• HVAC Changeout
• Replacement of furnace, coil,FAU or condenser
• Relocation of an existing HVAC unit
• Adding or replacing more than 40ft ducting in unconditioned space
BUSINESS AND PROFESSIONS CODE, SECTION 7110
Willful or deliberate disregard and violation of the building laws, including the California Building
Code, and local permit requirements constitutes a cause for disciplinary action from the Contractors
State License Board working in conjunction with the local building department. This action may
consist of fines up to $5,000 per violation or suspension/revocation of a contractor's license.
2008 BUILDING ENERGY EFFICIENCY STANDARDS (Title 24,Part 6) REQUIREMENTS
INCLUDE:
1. Heating equipment must have a minimum 78%AFUE(Exception: Wall &floor furnaces; room
heaters).
2. Central air conditioners&heat pumps less than 65,000 Btu/hr must have a minimum 13 SEER.
3. Newly installed or replaced ducts must have a minimum insulation value of R-4.2.
4. A setback type thermostat(24 hr clock with four set points) is required for all alterations.
5. New or rep lac ',f tent,ducts must meet the mandatory requirement of Section 150(m).
• All joints and openings in the HVAC system must be sealed.
• Only UL 181, UL I SIA, or UL 181B approved tapes or mastic shall be used to seal duct
openings.
• Connections of metal ducts and the inner core of flex ducts shall.be mechanically fastened.
Flex ducts must be connected using a metal sleeve/coupling.
• Flex ducts that are suspeded must be supported every 4 ft. max for horizontal runs with no
more than 2"of sag betwien�s pports and 6 ft. max for vertical runs.
6. The CF-6R-MECH-04 must be complted and signed by the installing contractor. The Inspector
will collect this form and verify giat the,model numbers are the same as the installed equipment.
2008 Residential Compliance Forms.doc revised 04/10/12
.Y.
Shpplifted Prescriptive Certificate of Compliance:2008 Residendad HVACAiterations CF-IR-ALT-AVA C -
Climate Zones 1 and 3-7
Site Address: Enforc�nentAgency: �trie _ 'errnit#:
3 L &Ue 54Are
Consf boned Duct insulation
ent Type, 3si'rfmiiin Mcy-
El
a re ,- Tmosh�i
Packaged-Unit Over 40 8 of darts
Furnace AFfJE COP ed`hy system added or replaced m Setback
Indoor Coil (3Stt� HSPF_ (dfaoialrradypreseAnnwbe
Condensing Unit ®EER E3 Resistance sf unconditioned spasx - .:.
Other 1 1E3 R 6 (CZ 1,3-5) •
1.Equipment Type:Choose the equipment being installed;if more than one system,use another CF- HVAC.for each system
2.Afinimam Equipment Efficiencies:13 SEER,78%AFUE,7.7HSPF for t3pic2l residential systems.
Contractor(Documentation Author's/Responsible Desiper's Declaration Statement)
• I certify that this Certificate of Compliance documentation is accurate and compkte.
• I am eligible under Division 3 of the California Business and Professions Code to accept responsibility for the design identified_on this
Certificate of Compliance_
• I certify that the energy features and performance speeificaions for the design identified on this Certificate of Compliance conform to the
requirements of Title 24,Parts I and 6 of the California Code of Regulations.
• The design feaawes identified on this Certificate of Compliance are consistent with the infornration documented on other applicable
compliance forms,worksheets,calculations,plans and specifications submitted to the enforcement agency for approval with the permit
IicaSon.
Name - Signatrue:
Company: 4 ' f '{1 Dater �/ 1�1 .r
Address j / i ool n (;U4
,/► ' Litxnsel� .f
City/StwAzipr 5 M1 Phnne: �.
2008 Residential Compliance Forms.doc revised 04110112
Dee p I� 5h4rmA In S+4 ,++ibn Of Al i, d Govt,)e�ger ot,
popes %uArc 6rvve2
13
Powe-r
Ak unit TINO
CUPER
Building Department
11 2013
REVIEVV'E' F0'R OC—DE COMPLIANCE
Reviewed By: y`
�-G �� by rm e