CC 07-16-2013, Exhibit A, Item 11 n c
C, JI r.
C ID
A
I ZL
Address: 20803 Stevens Creek Blvd and
10033-10095 Sa 1ch Way
Applicant: Borelli Investment Co. (Diana Taylor)
as_771-1
17
—70
IT IM
41C
tllil M�a
4.
I 1
i
F err
U,
Stevens Greek Blvd..
-----------------
PC approves project
__ ' T Appeal of PC's approval filed
City Council denies appeal
and upholds PC's approval with several
required site modifications
j- ": Revised plans received for
Council's review
Hearin(y date rescheduled to 7/16
(--Rv Council's, cliion on February 191, 20-113'
1
lXc»ied the appeal MLI 111PIOc LI the 1-11Ojcct with tii;Iollo%vilig ink;dilieation�:
HL
CI
yy p
!
1.Remove parking stalls in driveway along SCB 5.Move Shop 6 north and attach to Bldg 2
2.Bldg 1(front bldg along SCB)may be reconfigured (rear bldg)
per:1 and stalls can be provided on north side of the 6.Provide a new two-way drive aisle
building connecting Peet's to Saich
3.The driveway along SCB shall remain two-way 7.Consult with Peet's prop.owner RE:
4.Retain existing parallel stalls and bus layover new access connection
along Saich Wy
7/16/2013
METHOD TION AREA CALCULA
transformer and traglh4.. ilitya-..4-- MIS
MW
finish_ ✓", .� _- ice
nIr^ ,
flodVelevatio -;
SP i INN
IM
�....R. ....... � �. .�
■ Applicant is requesting to retain parking stalls to
ensure success of tenants in Bldg 1
■ Significantly increase parking stall. setback from 20 feet
to 43 feet measured from curb
2. B�clg � Mfr®nl: ldg� nay ��� r�cc�ni•lgured p��r #
■ Building has been reconfigured to allow more room
for parking on west side, and has reduced in size by
194 square feet
■ Parking on north side aligned with new driveway
connection
7/16/2013
■ Two-way access retained With ne�n� pod. walkway
■ Aisle width widened from 2� to 25 feet
■ Parallel stalls and bus layover location retained
■ After�n'orking with the adjacent property owner, applicant
is requesting a more efficient driveway layout to connect
Saich Way to Poet's/Panora parking lot
■ Shop 6 would not need to be moved with this layout
■ New connection provided- see #5
■ Involves relocation of existing trash enclosure and
transformer on Poet's/Panora site
■ This alignment is preferred by City Traffic Engineer
7/16/2013
■ Alternative access connection reflected on the plans.
Applicant has obtained agreement from adjacent
property owner and managers for Peet's/Panera
■ Project parking conforms with the ordinance
■ 80 auto stalls provided onsii:e; 11 public parking stalls
provided on Saich; 6 bike parking stalls provided
onsite
Approve the modifications to the approved
Development Permit (DI'-2012-05),
Architectural and Site Approval (ASA-2012-13),
and Tree Removal Permit (TR-2012-41) in
accordance with the draft resolutions
5
b-3 I
LEGEND PROJECT SUMMARY
ZONING:P(CG.FES)
PEDESTRIAN POLE LT.10'H GENERAL PLAN=_OFFICE/RESDENTIA_CITY
SPECIFIC PLAN:\ APN NOS 263 -32-041 (10073 Saich Way)
PAFTKNG POLE LT.SINGLE HEAD 20'H
326-32-042 (20803 9tereFre Creels BNN
i+► PROPOSED FAR 28 all LIAR¢AANA
(E)STREET LT. SITE AREA- 129 AC 56.196 SF oomht 6 CA 94&*
BIKES(5C OF AUTO PAWNG-4 REO'D/ PRAT DATA:
-_ 6 PROVIDED) FLOOR AREA PA rNG REOUFT�BlfB 9254204M FAIL
(f ++ _ NO.
L - PAVING MATERIAL.TO MATCH PAVERS AT AREA(SF) RATIO STALLS
CUPER NO CROSSROADS CTRL SHOPS 2 1,533 1/250 3F
7 +., SHOPS 3 1533
I/ SHOPS 4
RED
I ---_' SHOPS 6 3.50 3,SD
0
� -_- - O R'OT'S SHOPS
7r
3 500
TOTAL AREA SHOPS 11,092 444
RAISED PLANTER W/SEATWALL RESTAURANT k 1749
9EATiJG 33 x 1/3- 11
EMPLOYS 4 x 1 4
PANERA O TRASH CONTAINERS RESTAURANT 5: 2809
0 ,.ro P/^ 2%E ow r ru>vv SEATING; 56 x v4- 14
- — EMPLOYEES 6 x 1- 6
TOTAL AREA 15,650 REO D PARKING 79.4
AREA CALCULATION METHOD URNIFORM PAWM PROVIDED 76 0
Z
d
(E)TRANSFORMER
ACCESSIBLE PAFTKNG F'RDVDFD 4
O m ca U
-�o BE RELOCATED OFFICE BUILDING AREAS ARE CALCIA.ATED FROM TOTAL PARKING PROV'D ON-SITE SD
OUTSIDE FACE OF OUTSIDE WALL TO TOTAL PAFTKNG F'ROYD CFF-SITE 11 O O W
T,----, BUILDING OF DBASNG WALLS. TOTAL PARKING FRONDED 91 U O7 E
SHARED DRIVEWAY L. NOME: ir► __ 0
TRANSFCRMER EASEMENT - °.ETAIN!NG WALL SUBJECT PARCEL WILL RALSE ITS �� VJ - A)
m''+tom` w%sEATWALL �. - _ ... -. -_ __ - - - - - -! -- ----- - - --_ _. _. .- -- --- - -- - _.. -- -- EXISTNGGRADE ATTl-EDRIVEWAY O C V'/
w^°� o `+3 - _ 50096 TO BE SHAFTED WTIT-I PANF3TA BFI=AD. C
2 BIKES
_._ _
W _
Zr �I, t �\ � �! I.'. u� . rTR K- NE _ _ O �O"V
UU 1.. {III v
"✓ -, '�✓ 4 \! ( 70r-CONC.PAD CONC.PAD co O
F _ONPWAY -OPTIONAL MOTORCY LE (V co(p { - O Iv DOORS PARKING-- 26'-0'.10'-8" ' 1
yr y R \ CLEAR INSIDE v
PLANTER W/ t I' --_ a EACH
SEATWALL
]3
F SHOPS ddI id 25'
7 POTENTIAL ,;6 r. _--I_ I S _ RESTAURANT S1Q,4S S OF$ STOPS RESTAURANT - _1 10'-. e._2.
} ~+ S LOPS I I 3
DEMISING j :. _._ --.._- ---OPTIONAL ♦ I�
WALL- a .. f• .' 1 I DEMISING WALL O O
r
1 O O .: I '
,r
r
rr
MONUMENT SIG I ...'. I - • I _.1
m f I
�IMPROVEMENT
IN-GROUND PUN 11 I S
BY OTHERS
i
I 22' m 2 BIKE$
L'LE)�I RB IN GROUND- _ _ ___—_J�_t�—_ _—_ _—_—_— —_—_ —_______—___—__
��—_—_—_ SAICH WAY
_ _..OuiB60R
ARCHITECTURAL SITE PLAN N SCALE: 1"=20'_0"
� D 2D' OD' 9D' Al
P W' THROAT OPTION W/ PARALLEL STREET PARKING 05115/13