Loading...
CC 09-17-2013, Exhibit B, Item 23 CC 9-17-13 Item#23 Cit y Cupertino of Capital Improvement P Construction U Report O"NZ ;P s E n i P R 4 r September 17, 2013 C I P Construction Update Report 1 Stevens Creek Corridor Park & Restoration , CUMMNO Phase 2 Project Schedule Pre-project creek condition • Construction Start dun 2013 • Install Bridge Oct 2013 • Creek Work Complete Oct 31 2013 • Construction Complete Feb 2014 Prior Month Activities • Complete creek channel excavation • Complete backwater excavation • Begin boulder step pools • Begin installation of logs & rootballs • Begin rough grading for trail4 : 4 Week Look-Ahead • Continue creek restoration work • Complete bridge foundations • Begin creek plantings September 17, 2013 C I P Construction Update Report 2 Stevens Creek Corridor Park & Restoration , CUPERTINO Phase 2 Concrete banks were removed from the creek channel. The removed concrete is being recycled. } September 17, 2013 C I P Construction Update Report 3 2 Stevens Creek Corridor Park & Restoration , CUrERTINO Phase 2 Cobble for Creek Channel d ' a Cobble material was harvested from the creek channel. k3, It is sorted and re-used to create the new channel bed in pool and riffle areas. It also provides spawning habitat for steelhead. September 17, 2013 C I P Construction Update Report 4 Stevens Creek Corridor Park & Restoration , Phase 2 CUPERTINO I �b4? n3£v�b r 'r �r Installation of Excavation & progress of boulder step, backwater area above & a �.. below ���✓� :��i ; III ;_ �I I I�/� September 17, 2013 C I P Construction Update Report 5 2 Main Street CUrIXTINO Project Schedule • Construction Start Sep 2013 • Construction Complete Nov 2015 • Occupancy Dec 2015 Prior Month Activities .p • Construction Plans _, iR 4 Week Look-Ahead ` , • Start of Grading Activities o September 17, 2013 C I P Construction Update Report 6 Main Street CurERTINO Grading Operations are scheduled to begin in September 2013 . � h �b, x � aL' Ili I�I� ,I Y�� $�•. Closure of Finch Avenue, from Stevens Creek Boulevard to Vallco Parkway, is anticipated soon after mart of thir. wnrk_ 6 �m y Site Clearing Operations 3 September 17, 2013 C I P Construction Update Report 7 2 2013 Annual Curb/Gutter & Sidewalk Project CUP ERTI NO Project Schedule • Construction Start: Sep 2013 • Streets Impacting Asphalt Project Complete: Sep 2013 • Project Complete: Jun 2014 4 Week Look-Ahead • Concrete improvements impacting Asphalt Project complete Sep 23 , 2013 September 17, 2013 C I P Construction Update Report g 2 2013 Annual Curb /Gutter & Sidewalk Project CUPERTINO a W yw ri li A � - 0 One of 50 locations with accessibility ramp improvement September 17, 2013 C I P Construction Update Report 9 2013 Annual Pavement Management GUFERTINO Phase 1 Project Schedule • Construction Start: Aug 2013 • Streets Impacting Schools Completed: Aug 2013 • Project On-Hold Pending Concrete Work: Aug 2013 • Project Resumes: Sept 2013 • Construction Complete: Nov 2013 September 17, 2013 C I P Construction Update Report 10 2 2013 Annual Pavement Management GUSeimmo Phase 1 Prior Month Activities Streets with asphalt improvements completed include: Full Width Overlay Full Width Leveling Ainsworth Drive Orange Avenue - McClellan Rd to north of Hermosa Ave Varian Drive Olive Avenue - Orange Ave to Imperial Ave Walnut Circle San Fernando Court Pasadena Avenue - Olive Ave. to Granada Ave Rucker Drive Imperial Avenue - south of Olive Ave. to end Bel Aire Court Anson Avenue Isolated Repair Lubec Street Rainbow Drive - Bubb Rd to Stelling Rd Milford Drive Stelling Road - Highway 280 bridge to Homestead Rd Meteor Place Stevens Creek Boulevard - De Anza Blvd east to City limit Esquire Place De Anza Boulevard - City limits * Greenleaf Drive - Flora Vista Ave to Stelling Rd Blaney Avenue - Bollinger Rd to Stevens Creek Blvd. *Work remains September 17, 2013 C I P Construction Update Report 1 1 w k c 3 , firt r t ° }t OP h IM xg r 24 l 7:{'H. F G 4 ft t I h t¢i fY/i"H e Ta t l'.`% 1 .- ` ww. WA O� 'NO k b ' •tip.. s `�t ! i x V-"A 4 2 2013 Annual Pavement Management curzfmmo Phase 1 y>Y .SY M� gga,fv.r If E� 9 OLIVE AVENUE (Orange Ave. to Pasadena Ave.) P 'n p. E Before r Afte r September 17, 2013 C I P Construction Update Report 13 2 2013 Annual Pavement Management CUPERTINO Phase 1 OLIVE AVENUE (Orange Ave. to Pasadena Ave.) Before ,.., After September 17, 2013 C I P Construction Update Report 14 2 Mary Avenue Dog Park GUrefumo Project Schedule Phase 1 - Soil Remediation • Construction Start Aug 2013 • Construction Complete Sep 2013 Phase 2 - Park Improvements • Construction Start Oct 2013 • Construction Complete Dec 2013 • Occupancy Dec 2013 M Prior Month Activities &; " £ = • Soil excavation, stockpiling and testing w . w 4 Week Look-Ahead ............ • Off-haul soil • Advertise for bids for Phase 2 - Park Excavating soil Improvements contract September 17, 2013 C I P Construction Update Report 15 2 Mary Avenue Dog Park CU!ERTINO Tree Protection during the Soil Remediation phase Stockpiled soil awaiting off- haul during the Soil Remediation phase September 17, 2013 C I P Construction Update Report 16