13090189 CITY OF CUPERTINO BUILDING PERMIT
BUILDING ADDRESS: 11795 RIDGE CREEK CT CONTRACTOR:CASTILLO'S ROOFING PERMIT NO:13090189
OWNER'S NAME: CHOI JASON S AND KIM SEO-HWANG 1703 CATHAY DR DATE ISSUED:09/24/2013
OWNER'S PHONE: 4088232872 SAN JOSE,CA 95122 PHONE NO:(408)251-3565
❑ LICENSED CONTRACTOR'S DECLARATION JOB DESCRIPTION: RESIDENTIAL❑ COMMERCIAL[]
License Class Lic.# zy/3zs qS (16 SQ'S)TEAR OFF(E)WOOD SHINGLES,INSTALL 30
/C S — LBS FELT,GAF COMP(E)SHEETING TO REMAIN
Contractor .� 1�� a �— Date -
I hereby affirm that I am licensed under the provisions of Chapter 9
(commencing with Section 7000)of Division 3 of the Business&Professions
Code and that my license is in full force and effect.
I hereby affirm under penalty of perjury one of the following two declarations:
I have and will maintain a certificate of consent to self-insure for Worker's
Compensation,as provided for by Section 3700 of the Labor Code,for the
performance of the work for which this permit is issued. Sq.Ft Floor Area: Valuation:$8900
I have and will maintain Worker's Compensation Insurance,as provided for by
Section 3700 of the Labor Code,for the performance of the work for which this APN Number:36604048.00 Occupancy Type:
permit is issued.
APPLICANT CERTIFICATION
I certify that I have read this application and state that the above information is PERMIT EXPIRES IF WORK IS NOT STARTED
correct.I agree to comply with all city and county ordinances and state laws relating WITHIN 180 DAYS OF PERMIT ISSUANCE OR
to building construction,and hereby authorize representatives of this city to enter
upon the above mentioned property for inspection purposes. (We)agree to save 180 DAYS RO D INSPECTION.
indemnify and keep harmless the City of Cupertino against liabilities,judgments,
costs,and expenses which may accrue against said City in consequence of theZ �3
granting of this permit. Additionally,the applicant understands and will comply ate:
with all non-point source regulations per the Cupertino Municipal Code,Section
9.18. J///�/�
�.r47(,ill Date 2 l any
roofing
Signature /� All roofs shall be inspected prior to any roofing material being installed.If a roof is
installed without first obtaining an inspection,I agree to remove all new materials for
inspection. !�
❑ OWNER-BUILDER DECLARATION/
Signature of Applicant: 6 C�.. �cJ Date:
I hereby affirm that I am exempt from the Contractors License Law for one of
the following two reasons: ALL ROOF COVERINGS TO BE CLASS"A"OR BETTER
I,as owner of the property,or my employees with wages as their sole compensation,
will do the work,and the structure is not intended or offered for sale(Sec.7044,
Business&Professions Code)
I,as owner of the property,am exclusively contracting with licensed contractors to HAZARDOUS MATERIALS DISCLOSURE
construct the project(Sec.7044,Business&Professions Code). I have read the hazardous materials requirements under Chapter 6.95 of the
California Health&Safety Code,Sections 25505,25533,and 25534. I will
I hereby affirm under penalty of perjury one of the following three maintain compliance with the Cupertino Municipal Code,Chapter 9.12 and the
declarations: Health&Safety Code,Section 25532(a)should I store or handle hazardous
I have and will maintain a Certificate of Consent to self-insure for Worker's material. Additionally,should I use equipment or devices which emit hazardous
Compensation,as provided for by Section 3700 of the Labor Code,for the air contaminants as defined by the Bay Area Air Quality Management District I
performance of the work for which this permit is issued. will maintain compliance with the Cupertino Municipal Code,Chapter 9.12 and
I have and will maintain Worker's Compensation Insuranceas provided for by the Health&Safety Code,Sections 2 505,25533,and 25534.
, �J
Section 3700 of the Labor Code,for the performance of the work for which this Owner or authorized agent: Date: / /
permit is issued.
I certify that in the performance of the work for which this permit is issued,I shall
not employ any person in any manner so as to become subject to the Worker's
Compensation laws of California. If,after making this certificate of exemption,I CONSTRUCTION LENDING AGENCY
become subject to the Worker's Compensation provisions of the Labor Code,I must I hereby affirm that there is a construction lending agency for the performance of
forthwith comply with such provisions or this permit shall be deemed revoked. work's for which this permit is issued(Sec.3097,Civ C.)
Lender's Name
APPLICANT CERTIFICATION Lender's Address
I certify that I have read this application and state that the above information is
correct.I agree to comply with all city and county ordinances and state laws relating
to building construction,and hereby authorize representatives of this city to enter
upon the above mentioned property for inspection purposes.(We)agree to save ARCHITECT'S DECLARATION
indemnify and keep harmless the City of Cupertino against liabilities,judgments,
costs,and expenses which may accrue against said City in consequence of the I understand my plans shall be used as public records.
granting of this permit.Additionally,the applicant understands and will comply
with all non-point source regulations per the Cupertino Municipal Code,Section Licensed Professional
9.18.
Signature Date
REROOF PERMIT APPLICATION
COMMUNITY DEVELOPMENT DEPARTMENT•BUILDING DIVISION O
10300 TORRE AVENUE•CUPERTINO,CA 95014-3255
CUPERTINO. n
(408)777-3228•FAX(408)777-3333•building(a�cupertino.Org 1117
PROJECT ADDRESS '�.�675 7N- 17
6 O Lf
OWNER NAME S 1�l Z k l l rl PHONE oZ (J E-MAIL,
STREET ADDRESSE e L CITY,STATE,ZIP �5�' FAX
CONTACT NAMI G� PHONE E MAII
3s�s-
STREETADDRESSO®3 j Q�, /` ISTATE Z� OS
❑OWNER ❑ owNER.BuiLooL ri❑3 o"'wI�RAma W CONTRACTOR ❑coNRtACToRAmgr ❑ ARCHrECr ❑ENGIDIEER ❑ DEVELOPER ❑TENANT
CONTRACTOR NAME ` t� S / LICENSE NUMBER 7111110:51 BUS.LIG#
COMPANY NAME E-MAIL ✓�! FAX
STREET ADDRESS '—)o
3 0 /1 CITY,STATE,ZIP ;j�jo eR �� . j otf
�q PHONE
ARCHITECT/ENGWEENAME LICENSENUMBEP [ ' G BUS.LIG#
COMPANY NAME E-MAIL FAX
STREET ADDRESS CITY,STATE,ZIP PHONE
USE OF SFD or Duplex ❑ Multi-Family RQOFAREA: VALUATION:
STRUCTURE: ❑ Commercial lb SO cl!n.
EXISTING ROOF TYPE. . ❑BUILT-UP ROOF ❑ASPHALT SHINGLES WOOD SHAKES 13 WOOD SHINGLES ❑OTHER(SPECIFY)
PLYWOOD _ PITCH '12ROOF
AREMOVE/REPLACE YES
1:1 O #LA oTHI ❑5/s 13 SS:
PROPOSED ROOF TYPE: []BUILT-UP-- ASPHALT SHINGLES ❑WOOD sHmm ❑WOOD SHINGLES ❑OTHER ICC-ES REPORT#
DESCRIPTION OF WORK „
eC�- v
Z/ 116 A�0'—” "7
By my signature below,I certify to each of the following: I am the property owner or authorized agent to act on the property owner's behalf. I have read this
application and the information I have provided is rrect I have read the Description of Work and verify it is accurate. I agree to comply with all applicable local
ordinances and state laws relating to b 'ld, . I authorize representatives of Cupertino to enter the abo id ti6ed property for inspection purposes.
Signature of Applicant! Date:
SUPPLE AL ' ORMATION REQUIRED ,. ���-f� .�o�c��Js�Qrt>VM �<
_If building is associated with a Home Owner's Association,provide IetterWNW
of approval from HOA. mums
' $
BCy;
Provide Planning approval to verify if there any restrictions. � �'
_Provide copy of Manufacturer's Installation Specifications. y 3s
Provide signed copy of Cupertino's Tear-OffPolicy. 'M
P
ReroofApp 2011.doc revised 03116111.
CITY OF CUPERTINO
FEE ESTIMATOR—BUILDING DIVISION
ADDRESS: 11795 RIDGE CREEK CT DATE: 09/24/2013 REVIEWED BY: MELISSA
till APN: 366 04 048 BP#: *VALUATION: 1$8,900
*PERMIT TYPE: Minor Building Permit PLAN CHECK TYPE: Re-roof
PRIMARY SFD or Duplex PENTAMATION 1SFDWLR00F
USE: PERMIT TYPE:
wORK 16 SQ'S TEAR OFF E WOOD SHINGLES INSTALL 30 LBS FELT, GAF COMP E SHEETING TO
SCOPE REMAIN
FEE ID ROOF AREA
S.f.
1REROOFFRES 1,600
gg
?ec:n.I7iEtf-£xc I'iutnl�.I'ic:n£saec ><:.AU? Cl'
1,.fn',,h. !'<:'i'frryt Fee: .�jJtet;?Y;..��E:r1iJ.zd l'E!E!: s t£>^../�f'rn iY Fuc:
I.pt'aE:P.%fec 2.3n t;. C)„tet.I.ltr r i>11"'s P' 0d'ie 1'.; .InsJ.;. Li
Afo—'h. Inst=.F1'e tlhvrrb.bs q,3,I ee: E`ec:.f uji .I oe.
NOTE:This estimate does not include fees due to other Departments(Le.Planning,Public Works,Fire,Sanitary Sewer District,School
District,etc. . Theseees are based on the prelimina information available and are only an estimate. Contact the De t or addn'l info,
FEE ITEMS (Fee Resolution 11-053 E . 711113) FEE QTY/FEE MISC ITEMS
Man ClieckTee:
Permit Fee: $256.00
f'e�rntrl1-€.>e
Construction Ttx:
Ahvin straiiw Fe=e:
(Work Without Permit? 0 Yes (E) No $0.00
d
..`.4G 1'C It'L.E�47 j1:fI �I1ZEA Tf.es
1'7^Cti'f'l.f.�€3ei�ii?L,'J2iC1/It3Yi.l'`C't';S; �
Strong Motion Fee: IBSEISMICR $0.89 Select an Administrative Item
Bldg Stds Commission Fee: IBCBSC $1.00
y
TALS $257.89 $0.00TOTAL FEE $257.89
Revised: 08/01/2013
REROOF TEAR-OFF POLICY
COMMUNITY DEVELOPMENT DEPARTMENT•BUILDING DIVISION
ALBERT SALVADOR,P.E.,C.B.O.,BUILDING OFFICIAL
10300 TORRE AVENUE•CUPERTINO,CA 95014,3255
CUPERTINO
(408).777-3228. FAX(408)777-3333•buildin-go-cuperfing.org
r7MDRE4s " _ o - D 8T ADDRESS �5 CITY STAB,aP a r FAX
CONTRAINAMB _ IlffiiSENUMBER. 7 LCI _ u�ET�rf��430 BUS IIG
"ILJIFJ
COMPANY NAME FAX
STREET ADDRESS P ,Q �a P �Jl lJJ
I UNDERSTAND AND AGREE TO THE FOLLOWING:
1. The re-roof project shall comply with all applicable provisions of the 2010 California Codes.
2. An inspection request can be scheduled uv to one business day before the requested inspection date.
Please call(408)777-3228 from 7:30-3:30pm(Mon-Thurs)or 7:30-2:34pm(Friday)to schedule
inspection. For Tear-Offand Nailing Inspections,you must also call on the day of the inspection only
after that phase of the work is completed. The building inspector will be available within one hour.
Final Inspections will be given a two hour window.
3. Tear-Off Inspection is required. Any and all dry-rotted wood shall be replaced prior to this inspection.
Unless new plywood roof sheathing is proposed throughout,all the nails/fasteners shall be either
completely knocked-down or removed prior to this inspection.
4. If plywood is installed,a plywood Nailing b!pection is required.
5. Roofing shall not be applied without first obtaining all prior inspection and written approvals from the
building inspector. Any roofing which is applied without first obtaining an approved inspection will
require the removal of all new material down to the sheathing so a proper inspection can be performed.
b. A Final Inspection and approval shall be obtained from the building inspector when the re-roofing is
completed. To receive a finsign-off,the following items will be verified:
al
a. Flat roofs shall have a minimum.of V4"per foot of slope and demonstrate there is no ponding.
b. Listings from approved testing agencies for all pre-manufactured products used shall be
available on-site to review at the time of the inspection.
c. Proper spark arrestor installation,vents painted,gutter/downspouts installed,debris removed.
7. NOTE: If you call for a tear-off or plywood nailing inspection and the work is not complete,you will be
charged a re-inspection fee. The re-inspection fee shall be paid before another inspection can be
scheduled.
By my signing below,I certify each of the following is true: I am the property owner or authorized agent to act on the
property owner's behalf. I understand and agree to comply with the re-roof policy stated above. I also understand that
smoke detectors and carbon monoxide detectors are required to be installed in accordance with Sections 8314 and R315 of
the 2010 California Residential Code.V -Vq hq 3
Signature of A plicaadAge _.,Le .
RerooJPoJicy 2012.doc revised 10/7/12
Seven Springs Owners Association
Application for Approval of Architectural Change/Addition
CATEGORY C
Category C-Modifications that ate exterior modiffcations with no changes to the original building structure or floor plan.All roofing,
sidittg,window naledal change,exterior paint color doge,addition of a roof attic fan,or garage door,fall into this category.
Date: _l 7 1.D f 3 Request for Approval of Proposed Change
PL E ASE PRINT THE P9 ,OWING INFORMATION
Na%e:..._`_s.��-1�' i''7 .Address: -
-
£3ome Pbome: �y f 2►'1 Work phone: entail
�.
Description of Change:
Paint Collor Change:Please eboose from"approved list"(Garage door outer trim should be diamond white or frost).
specified calor_
Trite color:diamond white or frost
Front door color:diamond white_frost_natural oak or specified"approved color._
2)Roaring Material Change(please check one choice)
a.Lightweight Concrete Tile l rota MonierLifetile-style"Cedarlite 5780",color"Muirwood"
b.GAF Laminated Fiberglass Asphalt-style"Grand Canyon,color"Mission Brown".
c.GAF Laminated Fiberglass Asphalt-style"Grand Canyon',color""Stonelslrood"
d.Decra Stone Coated Steel Rood System-style°Aeera Shake,color"Shadowood"_
e.Class"A"Fire Rftrdattt X0011ag System using pressured treated cellar wood shingles with fire retardant 6berglass cap sheet
underlay-Need to have&.City of.Cupwtino perink accompanying this application for all wood shiagle roofs.
3)Siding 1Taterial ith" ge'(Plleaie-clieck quo ehok*)
New Sidu g' MatenBT Hariiiplank C�.adbina LU(wood'gain fixrish) or lUrdiplank Smooth Finial
Wlticli sides aro you are cTiaciging tuaterial?(leant ` ;baelc IeR_night_____)
4)Window Material and Design change:(Please check this box): Milgard Vinyl Windows-style"Tuscany",color Whits
5)A dding,a roo 2ttic;tan,Tubular,Skylight,or satellite dish
Please attach informauon.reg»dtng the proposed,changc.Applicatlon must include dimension;color of the proposed fan and its
location on the roof.please include detailed drawings,specifications,and product brochures,ifi available.
Tubular Aylight up to!d"diameter,one roof atttofan up to 26"in width&height-paint to neateA roof
6)Garage doors:a.Recessed weod panel,not raised in center same style for windows("PLAIN"-non decorative)
Style 84(8 panels acz 64(6 panels iotas),44(4 panels across). Style with windows or Style no windows
b.Insulated wood,insulated metal w/-woop facing or"Carriage House"style 303C windows 303 no window
1�attleownces 57enatUiY
...— _ •The request is in compliance uxtki
Seven Springs HOA Arebitectuuat Guidelines:http://Seven-spritkgs.org/:Fles/mhitectual-guideNnes.pdf
Architectural Control Committee/Board: Approwc J 4 -f
--Pending
Denied Pending f'
Arebltertirral Control Committee)3oard:Signature. 1 Date:
1.27.11 cat C
Denied Pending -
Architectural Control Committee Board:Signature: _—__ Date: ._ _
1.27.11 cat