Certification of Administrative Record of Proceedings Apple Campus 2•
OFFICE OF THE CITY CLERK
CITY HALL
10300 TORRE AVENUE • CUPERTINO, CA 95014 -3255
TELEPHONE: (408) 777 -3223 • FAX: (408) 777 -3366
Apple Campus 2 Project
CERTIFICATION OF ADMINISTRATIVE RECORD OF PROCEEDINGS
I, Grace Schmidt, hereby state:
1. I am the City Clerk of the City of Cupertino.
2. Pursuant to Section 21186 subsection (g) of the Public Resources Code, I certify
that the documents listed in the Index to Administrative Record for the Apple
Campus 2 Project, attached hereto as Attachment 1, constitute the full, true and
correct administrative record of proceedings for the following actions as of the
date of this certification:
a. Resolution No. 13 -082 of the City Council of the City of Cupertino
Approving Certification of an Environmental Impact Report for the
Apple Campus 2 Project; and Adoption of Findings and a Statement of
Overriding Considerations, Mitigation Measures, and a Mitigation
Monitoring and Reporting Program.
b. Resolution No. 13 -083 of the City Council of the City of Cupertino
Approving a General Plan Amendment to Allow a Change in the Land
Use Designation of a 1.1 Acre Area from Parks and Open Space to
Industrial/Residential to Be Reflected in the Land Use Map and Various
Figures and Tables, the Elimination of a Segment of Pruneridge Avenue
from Various References as a Minor Collector and Bike Lane to Reflect the
Closure and Vacation of this Segment of the Street, the Potential
Relocation of Glendenning Barn from the Project Site and a Change in the
Primary Building Bulk Setback for N. Tantau Avenue from 1.5 to 1 Slope
Line from the Curb Line to a I to 1 Slope Line from the Curb Line,
Changes Associated with the Development of the Apple Campus and
Potential Development Agreement in Policy 2 -35: Vallco Park North for a
Project Located at the Area Bounded by East Homestead Road, North
Tantau Avenue, I -280, North Wolfe Road Including Properties Located on
the East Side of North Tantau Avenue.
C. Resolution No. 13 -084 of the City Council of the City of Cupertino
Approving a Development Permit to Allow the Demolition of
Approximately 2.66 Million Square Feet of Existing Office, Research and
Development Buildings and the Construction of 3.42 Million Square Feet
of Office, Research and Development Buildings; 120,000 sq.ft. (1,000 Seat)
Corporate Auditorium, 100,000 sq.ft. Corporate Fitness Center, and 25,000
sq.ft Valet Parking Reception Uses; 92,000 Square Feet of Utility Plants;
and Associated Parking Facilities and Ancillary Buildings (Such as
Security Reception Areas and Landscape Maintenance Buildings); Use
Permit to Allow a Corporate Auditorium and Fitness Center at a New
Office, Research and Development Campus; Architectural and Site
Approval to Allow a New 2.82 Million Square Feet Office, Research and
Development Building with 2,385 Basement Parking Spaces and a
Cafeteria, a 5,870 Parking Space Structured Parking Facility with
Attached Central Plant, a 1,000 Seat Corporate Auditorium, a Fitness
Center, and Associated Site Improvements Including Access Tunnels, a
Surface Parking Lot, Outdoor Dining and Recreational Facilities and
Landscaping; Tree Removal Permit to Allow the Removal of
Approximately 3,710 Trees, of which, Approximately 90 Trees Are
Proposed to Be Transplanted, and Replacement with at Least 6,2000 Trees
to Allow the Construction of an Office, Research and Development
Campus for a Project Located at the Area Bounded by East Homestead
Road, North Tantau Avenue, 1 -280, North Wolfe Road Including
Properties Located on the East Side of North Tantau Avenue.
d. Resolution No. 13 -085 of the City Council of the City of Cupertino
Approving the Subdivision of Approximately 176.2 Acres from 17 Lots
into Five Lots, Located in the North Vallco Area, APNS 316 -06 -033, 316-
06 -038, 316 -06 -039, 316 -06 -045, 316- 06 -046, 316 -06 -048, 316 -06 -049, 316 -06-
050, 316 -06 -051, 316 -06 -052, 316 -06 -053, 316 -07 -044, 316 -07 -045, 316 -07-
046, 316 -09 -019, 316 -09 -027, 316 -09 -028, 316 -18- 025, 316 -18 -012, 316 -18-
026, 316 -18 -027 and 316 -18 -035.
e. Resolution No. 13 -086: A Resolution of the City Council of the City of
Cupertino Vacating a Portion of the Pruneridge Avenue Right -of -Way
Between North Tantau Avenue and North Wolfe Road and Various
Easements Bounded by North Wolfe Road, Homestead Road, North
Tantau Avenue, and Highway 280, as Provided in Section 8320 et seq. of
the Streets and Highways Code of the State of California.
Resolution No, 13 -087; A Resolution of the City Council of the City of
Cupertino Authorizing the Execution of a Purchase and Sale Agreement,
and Authorizing the Sale of a Portion of Pruneridge Avenue, Subject to
and upon the Terms and Conditions set forth in the Purchase and Sale
Agreement.
g. Extension of Agreement for Consultation Services with Baz Industries,
the successor in interest to ACI Holdings, Inc.
Dated: October �I 2013 , �� L, , —A-'
Grace Schmidt, City Clerk
City of Cupertino
ATTACHMENT I
INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2
PROJECT
(A) Notice Of Determination:
(B) Resolutions or Ordinances Approving Project:
DATE
DOCUMENT
10/17/2013
City of Cupertino, Notice of Determination, Development of an office,
research and development campus with associated ancillary uses
(Oct. 17, 2013)
10/17/2013
County of Santa Clara, CEQA Documentation Declaration
(Oct. 17, 2013)
• Notice of Determination, Apple Campus 2 Project
(Oct. 16, 2013)
(B) Resolutions or Ordinances Approving Project:
1 -1
sf- 3345921 Q
DATE
DOCUMENT
10/02/2013
Resolution No. 13 -6727 Of The Planning Commission Of The City of
Cupertino Recommending Certification Of An Environmental Impact
Report For The Apple Campus 2 Project; And Recommending
Adoption Of Findings And A Statement Of Overridings
Considerations, Mitigation Measures, And A Mitigation Monitoring
And Reporting Program (Oct. 2, 2013)
• Exhibit EA -1. California Environmental Quality Act Findings
and Statement of Overriding Considerations For The Apple
Campus 2 Project
• Exhibit EA -2. Mitigation Monitoring and Reporting Program
(MMRP)
• Exhibit EA -2a. Tree Replacement Worksheet
• Exhibit EA -2b — Transportation Demand Management
Program Expansion
10/02/2013
Resolution No. 6728 Of The Planning Commission Of the City of
Cupertino Recommending Approval Of A General Plan Amendment
To Allow A Change In The Land Use Designation of a 1.1 Acre Area
From Parks And Open Space to Industrial / Residential To Be
Reflected In The Land Use Map And Various Figures And Tables,
The Elimination Of A Segment Of Pruneridge Avenue From Various
1 -1
sf- 3345921 Q
ATTACHMENT I
INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2
PROJECT
1 -2
sf- 3345921 Q
DATE
DOCUMENT
References As A Collector And Bike Lane To Reflect The Closure
And Vacation Of This Segment Of The Street, The Potential
Relocation Of Glendenning Barn From The Project Site And A Change
In The Primary Building Bulk Setback For N. Tantau Avenue From 1.5
To 1 Slope Line From The Curb Line TO A 1 TO 1 Slope Line From
The Curb Line, Changes Associated With The Development Of The
Apple Campus And Potential Development Agreement In Policy 2 -35:
Vallco Park North For A Project Located At The Area Bounded By
East Homestead Road, North Tantau Avenue, I -280, North Wolfe Road
Including Properties Located On The East Side Of North Tantau
Avenue (Oct. 2, 2013)
10/02/2013
Resolution No. 6729 Of The Planning Commission Of The City Of
Cupertino Recommending That The City Council Approve The
Rezoning Of An Approximately 1.1 Acre Area From Park and
Recreation (PR) To Planned 1.2 Industrial Park (P(MP)) Located AT
APN 316 06 050 and 316 06 051 (Oct. 2, 2013)
• Exhibit Z. Ordinance No. 13 -An Ordinance Of The Cupertino
City Council Approving The Rezoning Of An Approximately
1.1 Acre Area From Park and Recreation (PR) To Planned
Industrial Park (P(MP)) Located At APN 316 06 050 and 316
06 051
10/02/2013
Resolution No. 6730 of the Planning Commission of the City of
Cupertino Recommending That The City Council Approve A
Development Agreement For a 20 Year Term For The Development Of
An Office, Research and Development Campus Located At The Area
Bounded By East Homestead Road, North Tantau Avenue, I -280,
North Wolfe Road Including Properties Located on the East Side of
North Tantau Avenue (Oct. 2, 2013)
• Exhibit DA. Ordinance No. 13 -2114 Ordinance of the City
Council of the City of Cupertino Repealing Ordinance No. 1702
and Approving a New a New Development Agreement By and
Between the City of Cupertino and Apple Inc. For The
Development of a New Corporate Campus
■ Exhibit DA -1. Development Agreement
Between City of Cupertino, a California
municipal corporation, and Apple, Inc., a
California corporation
1 -2
sf- 3345921 Q
ATTACHMENT I
INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2
PROJECT
1 -3
sf- 3345921 Q
DATE
DOCUMENT
• Exhibit DA -la. Legal Description of the
Property
• Exhibit DA- Ib. Project Site Diagram
• Exhibit DA -lc. Tax Localization Plan
• Exhibit DA- I d. General Plan Office
Space Development Allocations
• Exhibit DA- Ie. Campus Amenity Space
• Exhibit DA -If. Impact Fees
• Exhibit DA -lg. Pruneridge Avenue
Vacation
10/02/2013
Resolution No.6731 of the Planning Commission of the City of
Cupertino Recommending Approval of Development Permit To Allow
The Demolition Of Approximately 2.66 Million Square Feet Of
Existing Office, Research and Development Buildings And The
Construction Of 3.42 Million Square Feet Of Office, Research and
Development Buildings; 120,000 SQ.FT. (1,000 Seat) Corporate
Auditorium, 100,000 SQ.FT. Corporate Fitness Center, and 25,000
SQ.FT. Valet Parking Reception Uses; 92,000 Square Feet of Utility
Plants; And Associated Parking Facilities And Ancillary Buildings
(Such As Security Reception Areas And Landscape Maintenance
Buildings); Use Permit To Allow A Corporate Auditorium And Fitness
Center At A New Office, Research And Development Campus;
Architectural and Site Approval To Allow A New 2.82 Million Square
Feet Office, Research And Development Building With 2,385
Basement Parking Spaces And A Cafeteria, A 5,870 Parking Space
Structured Parking Facility With Attached Central Plant, A 1,000 Seat
Corporate Auditorium, A Fitness Center, And Associated Site
Improvements Including Access Tunnels, A Surface Parking Lot,
Outdoor Dining and Recreational Facilities And Landscaping; Tree
Removal Permit To Allow The Removal Of Approximately 4,501
Trees, Of Which, Approximately 90 Trees Are Proposed TO BE
Transplanted, And Replacement With At Least 6,200 Trees To Allow
The Construction Of An Office, Research and Development Campus
For A Project Located At the Area Bounded By East Homestead Road,
North Tantau Avenue, I -280, North Wolfe Road Including Properties
1 -3
sf- 3345921 Q
ATTACHMENT I
INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2
PROJECT
1 -4
sf- 3345921 Q
DATE
DOCUMENT
Located On The East Side Of North Tantau Avenue (Oct. 2, 2013)
• Exhibit DP -l. Mitigation Monitoring and Reporting
Program (MMRP)
• Exhibit EA -2a. Tree Replacement Worksheet
• Exhibit EA -2b — Transportation Demand Management
Program Expansion
• Exhibit DP -2. Conditions of Approval - AB 900
Compliance Apple Campus 2 Project
10/02/2013
Resolution No. 6732 Of The Planning Commission Of The City Of
Cupertino Recommending Approval To Subdivide Approximately
176.2 Acres From 17 Lots Into Five Lots, Located In The North
Vallco Area, APNS 316 -06 -033, 316 -06 -038, 316 -06 -039, 316 -06 -045,
316 -06 -046, 316 -06 -048, 316 -06 -049, 316 -06 -050, 316 -06 -051, 316-
06 -052, 316 -06 -053, 316 -07 -044, 316 -07 -045, 316 -07 -046, 316 -09-
019, 316 -09 -027, 316 -09 -028, 316 -18 -025, 316 -18 -012, 316 -18 -026,
316 -18 -027 AND 316 -18 -035 (Oct. 2, 2013)
• Exhibit TM -1. Mitigation Monitoring and Reporting Program
(MMRP)
10/17/2013
Resolution No. 13 -082 of the City Council of the City of Cupertino
Approving Certification of an Environmental Impact Report for the
Apple Campus 2 Project; and Adoption of Findings and a Statement of
Overriding Considerations, Mitigation Measures, and a Mitigation
Monitoring and Reporting Program.
• Exhibit EA -1. California Environmental Quality Act Findings
and Statement of Overriding Considerations for the Apple
Campus 2 Project
• Exhibit EA -2. Mitigation Monitoring and Reporting Program
(MMRP)
10/17/2013
Resolution No. 13 -083 of the City Council of the City of Cupertino
Approving a General Plan Amendment to Allow a Change in the Land
Use Designation of a 1.1 Acre Area from Parks and Open Space to
Industrial /Residential to Be Reflected in the Land Use Map and
Various Figures and Tables, the Elimination of a Segment of
1 -4
sf- 3345921 Q
ATTACHMENT I
INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2
PROJECT
1 -5
sf- 3345921 Q
DATE
DOCUMENT
Pruneridge Avenue from Various References as a Minor Collector and
Bike Lane to Reflect the Closure and Vacation of this Segment of the
Street, the Potential Relocation of Glendenning Barn from the Project
Site and a Change in the Primary Building Bulk Setback for N. Tantau
Avenue from 1.5 to 1 Slope Line from the Curb Line to a 1 to 1 Slope
Line from the Curb Line, Changes Associated with the Development of
the Apple Campus and Potential Development Agreement in Policy 2-
35: Vallco Park North for a Project Located at the Area Bounded by
East Homestead Road, North Tantau Avenue, I -280, North Wolfe Road
Including Properties Located on the East Side of North Tantau Avenue.
10/17/2013
Resolution No. 13 -084 of the City Council of the City of Cupertino
Approving a Development Permit to Allow the Demolition of
Approximately 2.66 Million Square Feet of Existing Office, Research
and Development Buildings and the Construction of 3.42 Million
Square Feet of Office, Research and Development Buildings; 120,000
sq.ft. (1,000 Seat) Corporate Auditorium, 100,000 sq.ft. Corporate
Fitness Center, and 25,000 sq.ft Valet Parking Reception Uses; 92,000
Square Feet of Utility Plants; and Associated Parking Facilities and
Ancillary Buildings (Such as Security Reception Areas and Landscape
Maintenance Buildings); Use Permit to Allow a Corporate Auditorium
and Fitness Center at a New Office, Research and Development
Campus; Architectural and Site Approval to Allow a New 2.82 Million
Square Feet Office, Research and Development Building with 2,385
Basement Parking Spaces and a Cafeteria, a 5,870 Parking Space
Structured Parking Facility with Attached Central Plant, a 1,000 Seat
Corporate Auditorium, a Fitness Center, and Associated Site
Improvements Including Access Tunnels, a Surface Parking Lot,
Outdoor Dining and Recreational Facilities and Landscaping; Tree
Removal Permit to Allow the Removal of Approximately 3,710 Trees,
of which, Approximately 90 Trees Are Proposed to Be Transplanted,
and Replacement with at Least 6,2000 Trees to Allow the Construction
of an Office, Research and Development Campus for a Project Located
at the Area Bounded by East Homestead Road, North Tantau Avenue,
I -280, North Wolfe Road Including Properties Located on the East Side
of North Tantau Avenue.
• Exhibit DP -l. Mitigation Monitoring and Reporting Program
(MMRP)
• Exhibit DP -2. Conditions Of Approval - AB 900 Compliance
1 -5
sf- 3345921 Q
ATTACHMENT I
INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2
PROJECT
1 -6
sf- 3345921 Q
DATE
DOCUMENT
Apple Campus 2 Project
10/17/2013
Resolution No. 13 -085 of the City Council of the City of Cupertino
Approving the Subdivision of Approximately 176.2 Acres from 17
Lots into Five Lots, Located in the North Vallco Area, APNS 316 -06-
033, 316 -06 -038, 316 -06 -039, 316 -06 -045, 316 -06 -046, 316 -06 -048,
316 -06 -049, 316 -06 -050, 316 -06 -051, 316 -06 -052, 316 -06 -053, 316-
07 -044, 316 -07 -045, 316 -07 -046, 316 -09 -019, 316 -09 -027, 316 -09-
028, 316 -18 -025, 316 -18 -012, 316 -18 -026, 316 -18 -027 and 316 -18-
035.
• Exhibit TM -1. Mitigation Monitoring and Reporting Program
(MMRP)
10/17/2013
Resolution No. 13 -086: A Resolution of the City Council of the City of
Cupertino Vacating a Portion of the Pruneridge Avenue Right -of -Way
Between North Tantau Avenue and North Wolfe Road and Various
Easements Bounded by North Wolfe Road, Homestead Road, North
Tantau Avenue, and Highway 280, as Provided in Section 8320 et seq.
of the Streets and Highways Code of the State of California.
• Exhibit V -1. Legal Description For Street Vacation (Oct. 15,
2013)
• Exhibit V -2. Kier & Wright, Plat to Accompany Legal
Description For Street Vacation (Oct. 2013)
• Exhibit V -3. Legal Description For Light And Air Easement
Vacation
• Exhibit V -4. Legal Description For Roadway Easement
Vacation
• Exhibit V -5. Legal Description For Roadway Easement
Vacation
• Exhibit V -6. Legal Description For Roadway Easement
Vacation
• Exhibit V -7. Legal Description For Street Easement Vacation
• Exhibit V -8. Legal Description For Street Easement Vacation
1 -6
sf- 3345921 Q
ATTACHMENT I
INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2
PROJECT
1 -7
sf- 3345921 Q
DATE
DOCUMENT
• Exhibit V -9. Legal Description For Public Utility Easement
Vacation
• Exhibit V -10. Legal Description For Public Utility Easement
Vacation
• Exhibit V -11. Legal Description For Public Utility Easement
Vacation
• Exhibit V -12. Legal Description For Public Utility Easement
Vacation
• Exhibit V -13. Legal Description For Public Utility Easement
Vacation
• Exhibit V -14. Legal Description For Public Utility Easement
Vacation
• Exhibit V -15. Legal Description For Light And Air Easement
Vacation
10/17/2013
Resolution No. 13 -087: A Resolution of the City Council of the City of
Cupertino Authorizing the Execution of a Purchase and Sale
Agreement, and Authorizing the Sale of a Portion of Pruneridge
Avenue, Subject to and upon the Terms and Conditions set forth in the
Purchase and Sale Agreement.
• Exhibit PSA. Purchase And Sale Agreement And Joint Escrow
• Exhibit PSA -1. Legal Description for: Street Vacation
(Oct. 15, 2013)
• Exhibit PSA -l. Kier & Wright, Plat to Accompany
Legal Description For Street Vacation (Oct. 2013)
• Exhibit PSA -2. Deed.
• Exhibit PSA -2a. Legal Description for Street Vacation
(Oct. 15, 2013)
• Exhibit PSA -2a. Kier & Wright, Plat to Accompany
Legal Description for Street Vacation (Oct. 2013)
1 -7
sf- 3345921 Q
ATTACHMENT I
INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2
PROJECT
DATE DOCUMENT
10/17/2013 Extension of Agreement for Consultation Services
(C) Cal. Pub. Res. Code §21081 Findings:
(D) Final EIR, including DEIR, & all other CEQA Documentation:
DATE
DOCUMENT
10/17/2013
Resolution No. 13 -082 of the City Council of the City of Cupertino
Approving Certification of an Environmental Impact Report for the
Apple Campus 2 Project; and Adoption of Findings and a Statement of
Overriding Considerations, Mitigation Measures, and a Mitigation
Monitoring and Reporting Program. (Not duplicated here)
• Exhibit EA -1. California Environmental Quality Act Findings
and Statement of Overriding Considerations for the Apple
Campus 2 Project. (Not duplicated here)
• Exhibit EA -2. Mitigation Monitoring and Reporting Program
(MMRP). (Not duplicated here)
(D) Final EIR, including DEIR, & all other CEQA Documentation:
1 -8
sf- 3345921 Q
DATE
DOCUMENT
06/06/2013
Public Review Draft Apple Campus 2 Project Environmental Impact
Report, State Clearinghouse No. 2011082055 (June 2013)
• Appendix A: Notice of Preparation and Scoping Letters
• Appendix B: Transportation Impact Analysis
• Appendix C: Noise Data
• Appendix D: Greenhouse Gas Emissions Data
• Appendix E: Air Quality Data
• Appendix F: Cumulative Projects
1 -8
sf- 3345921 Q
ATTACHMENT I
INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2
PROJECT
(F) Staff Reports in Chronological Order:
DATE
DOCUMENT
10/01/2013
• Appendix G: SB610 Water Supply Assessment
• Appendix H: Student Generation/Enrollment Reports
• Appendix I: Public Resources Code Chapter 6.5
09/23/2013
Final Apple Campus 2 Project EIR Response to Comments Document,
State Clearinghouse No. 2011082055 (Sept. 2013)
• Appendix A Comment Letters
10/08/2013
Memorandum from LSA Associates, Inc. to City of Cupertino re:
Supplemental Text Revisions, Apple Campus 2 Project Final
Environmental Impact Report (EIR) (Oct. 8, 2013)
10/01/2013
• Attachment A: Fehr & Peers Memo, October 4, 2013
• Attachment B: Assembly Bill 900 (Amended)
10/15/2013
Notice of Certification of Environmental Leadership Development
Project Pursuant to California Public Resources Code Chapter 6.5 For
the Apple Campus 2 Project, State Clearinghouse 9: 2011082055 (SB-
743 Notice)
(F) Staff Reports in Chronological Order:
1 -9
sf- 3345921 Q
DATE
DOCUMENT
10/01/2013
Joint City Council and Planning Commission Study Session Staff
Report, Oct. 1, 2013
• A - SS -1 Apple Campus 2 Project EIR Response to Comments
Document, September 2013
• B - SS -2 Public Review Draft Apple Campus 2 Project
Environmental Impact Report, June 2013
10/01/2013
Exhibit CC /PC 10 -01 -13 91 Fehr and Peers Transportation Impact
Analysis, Joint City Council and Planning Commission Study Session
regarding the Apple Campus 2 Final Environmental Impact Report,
1 -9
sf- 3345921 Q
ATTACHMENT I
INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2
PROJECT
1 -10
sf- 3345921 Q
DATE
DOCUMENT
October 1, 2013
10/01/2013
Exhibit CC /PC 10 -01 -13 91 LSA Presentation Apple Campus 2 Final
EIR, Joint City Council and Planning Commission Study Session
regarding the Apple Campus 2 Final Environmental Impact Report,
October 1, 2013
10/01/2013
Exhibit CC /PC 10 -01 -13 91 Written Communications, Joint City
Council and Planning Commission Study Session regarding the Apple
Campus 2 Final Environmental Impact Report, October 1, 2013
10/01/2013
Exhibit Dan Whisenhunt Apple Presentation, October 1, 2013
10/02/2013
Planning Commission Staff Report, Development of an office, research
and development campus with associated ancillary uses (Oct. 2, 2013)
• PC -1. Resolution No. 13 -6727 of the Planning Commission of
the City of Cupertino Recommending Certification of an
Environmental Impact Report for the Apple Campus 2 Project;
And Recommending Adoption Of Findings and A Statement of
Overriding Considerations, Mitigation Measures, And A
Mitigation Monitoring and Reporting Program
• Exhibit EA -1. California Environmental Quality Act
Findings and Statement Of Overriding Considerations
For The Apple Campus 2 Project
• Exhibit EA -2. Mitigation Monitoring and Reporting
Program (MMRP)
• Exhibit EA -2a. Tree Replacement Worksheet
• Exhibit EA -2b. Transportation Demand
Management Program Expansion
• PC -2. Resolution No. 6728 Of The Planning Commission Of
the City Of Cupertino Recommending Approval Of A General
Plan Amendment To Allow A Change In The Land Use
Designation Of A 1.1 Acre Area From Parks And Open Space
To Industrial / Residential To Be Reflected In The Land Use
Map And Various Figures And Tables, The Elimination Of A
Segment Of Pruneridge Avenue From Various References As A
Minor Collector And Bike Lane To Reflect The Closure and
1 -10
sf- 3345921 Q
ATTACHMENT I
INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2
PROJECT
1 -11
sf- 3345921 Q
DATE
DOCUMENT
Vacation Of This Segment Of The Street, The Potential
Relocation Of Glendenning Barn From The Project Site And A
Change In The Primary Building Bulk Setback For N. Tantau
Avenue From 1.5 to I Slope Line From The Curb Line To A 1
To 1 Slope Line From The Curb Line, Changes Associated
With The Development Of The Apple Campus And Potential
Development Agreement In Policy 2 -35: Vallco Park North
For A Project Located At The Area Bounded By East
Homestead Road, North Tantau Avenue, I -280, North Wolfe
Road Including Properties Located On The East Side Of North
Tantau Avenue
• PC -3. Resolution No. 6729 Of The Planning Commission Of
The City Of Cupertino Recommending That The City Council
Approve The Rezoning Of An Approximately 1.1 Acre Area
From Park And Recreation (PR) To Planned Industrial Park
(P(MP)) Located At APN 316 06 050 AND 316 06 051
o Exhibit Z. Ordinance No. 13- An Ordinance Of The
Cupertino City Council Approving The Rezoning Of
AN Approximately 1.1 Acre Area From Park And
Recreation (PR) To Planned Industrial Park (P(MP))
Located At APN 316 06 050 AND 316 06 051
• Exhibit Z -1. Legal Description For Rezoning
• Exhibit Z -2. Sandis, Zoning Plat Map Pruneridge
Ave. At Ridgeview Court, Cupertino, CA (Sept.
23, 2013)
• PC -4. Resolution No. 6732 Of The Planning Commission Of
the City of Cupertino Recommending Approval To Subdivide
Approximately 176.2 Acres From 17 Lots Into Five Lots,
Located In The North Vallco Area, APNS 316 -06 -033, 316 -06-
038, 316 -06 -039, 316 -06 -045, 316 -06 -046, 316 -06 -048, 316-
06 -049, 316 -06 -050, 316 -06 -051, 316 -06 -052, 316 -06 -053,
316 -07 -044, 316 -07 -045, 316 -07 -046, 316 -09 -019, 316 -09 -027,
316 -09 -028, 316 -18 -025, 316 -18 -012, 316 -18 -026, 316 -18 -027
AND 316 -18 -0353
• PC -5. Resolution No .6731 Of The Planning Commission Of
The City Of Cupertino Recommending Approval Of
1 -11
sf- 3345921 Q
ATTACHMENT I
INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2
PROJECT
1 -12
sf- 3345921 Q
DATE
DOCUMENT
Development Permit To Allow The Demolition Of
Approximately 2.66 Million Square Feet Of Existing Office,
Research and Development Buildings And The Construction Of
3.42 Million Square Feet Of Office, Research and Development
Buildings; 120,000 S.F. (1,000 SEAT) Corporate Auditorium,
100,000 S.F. Corporate Fitness Center, And 25,000 S.F. Valet
Parking Reception Uses; 92,000 Square Feet Of Utility Plants;
And Associated Parking Facilities And Ancillary Buildings
(Such As Security Reception Areas And Landscape
Maintenance Buildings); Use Permit To Allow A Corporate
Auditorium And Fitness Center At A New Office, Research and
Development Campus; Architectural And Site Approval To
Allow A New 2.82 Million Square Feet Office, Research and
Development Building With 2,385 Basement Parking Spaces
And A Cafeteria, A 5,870 Parking Space Structured Parking
Facility With Attached Central Plant, A 1,000 Seat Corporate
Auditorium, A Fitness Center, And Associated Site
Improvements Including Access Tunnels, A Surface Parking
Lot, Outdoor Dining and Recreational Facilities And
Landscaping; Tree Removal Permit To Allow The Removal Of
Approximately 4,501 Trees, Of Which Approximately 90
Trees Are Proposed To Be Transplanted, And Replacement
With At Least 6,200 Trees TO Allow The Construction Of An
Office, Research And Development Campus For A Project
Located At The Area Bounded By East Homestead Road, North
Tantau Avenue, I -280, North Wolfe Road Including Properties
Located On The East Side Of North Tantau Avenue
• Exhibit DP -l. Mitigation Monitoring and Reporting
Program
• Exhibit DP -la. Tree Replacement Worksheet
• Exhibit DP -lb. Transportation Demand
Management Program Expansion
• Exhibit DP -2. Conditions of Approval — AB 900
Compliance Apple Campus 2 Project
• PC -6. Resolution No. 6730 Of The Planning Commission Of
The City Of Cupertino Recommending That The City council
Approve A Development Agreement For A 20 Year Term For
1 -12
sf- 3345921 Q
ATTACHMENT I
INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2
PROJECT
1 -13
sf- 3345921 Q
DATE
DOCUMENT
The Development Of An Office, Research and Development
Campus Located At The Area Bounded By East Homestead
Road, North Tantau Avenue, I -280, North Wolfe Road
Including Properties Located On The East Side Of North
Tantau Avenue
o Exhibit DA. Development Agreement Between City of
Cupertino, a California municipal corporation and
Apple, Inc., a California corporation
• Exhibit DA -1. Real Property Description
• Exhibit DA -lb. Project Site Diagram
• Exhibit DA -lc. Tax Localization Plan
• Exhibit DA -ld. General Plan Office Space
Development Allocations
• Exhibit DA -le. Campus Amenity Space
• Exhibit DA- If. Impact Fees
• Exhibit DA- Ig. Pruneridge Avenue Vacation
• PC -7. Apple Campus 2 Project Description, Sept. 16, 2013
• PC -8 Plan Set. Sept. 16, 2013
• Apple Campus 2 Introduction, Sept. 16, 2013
• Apple Campus 2 Site Plan Part 1, Sept. 16, 2013.
• Apple Campus 2 Site Plan Part 2, Sept. 16, 2013
• Apple Campus 2 Floor Plan Part 1, Sept. 16, 2013
• Apple Campus 2 Floor Plan Part 2, Sept. 16, 2013
• Apple Campus 2 Renderings, Sept. 16, 2013
• Apple Campus 2 Bicycle Plan, Sept. 16, 2013
1 -13
sf- 3345921 Q
ATTACHMENT I
INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2
PROJECT
1 -14
sf- 3345921 Q
DATE
DOCUMENT
o Apple Campus 2 Development Area Allocation, Sept.
16, 2013
• PC -9. Redlines to Plan PC -8, Sept. 23, 2013
• PC -10. Joint City Council /Planning Commission Study Session
Staff Report, Study Session for the Environmental Impact
Report for the development of a new office, research and
development campus (Oct. 1, 2013)
• PC -11. Findings Revision 91 (October 1, 2013) to California
Environmental Quality Act And Statement Of Overriding
Considerations For The Apple Campus 2 Project
• PC -12. Findings Revision 92 (October 1, 2013) to California
Environmental Quality Act Findings And Statement Of
Overriding Considerations For The Apple Campus 2 Project
• PC -14. Memorandum from LSA Associates, Inc. to City of
Cupertino re: Apple Campus 2 Project Draft Environmental
Impact Report (EIR) — Late Comments Received after the 45-
Day Comment Period (Sept. 18, 2013)
10/15/2012
City Council Staff Report, Development of an office, research and
development campus with associated ancillary uses. (Oct 15, 2013)
• CC -1. Resolution No. 13 -082 of the City Council of the City of
Cupertino Approving Certification of an Environmental Impact
Report for the Apple Campus Project 2; and Adoption of
Findings of Findings and a Statement of Overriding
Considerations, Mitigation Measures, and a Mitigation
Monitoring and Reporting Program
• Exhibit EA -1 — California Environmental Quality Act
Findings and Statement of Overriding Considerations
for the Apple Campus 2 Project
• Exhibit EA -2 — Mitigation Monitoring and Reporting
Program (MMRP)
■ Exhibit EA -2a — Tree Replacement Worksheet
1 -14
sf- 3345921 Q
ATTACHMENT I
INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2
PROJECT
1 -15
sf- 3345921 Q
DATE
DOCUMENT
■ Exhibit EA -2b — Transportation Demand
Management Program Expansion
• CC -2. Resolution No. 13 -083 of the City Council of the City of
Cupertino Approving a General Plan Amendment to Allow a
Change in the Land Use Designation of a 1.1 Acre Area From
Parks and Open Space to Industrial / Residential to be to be
Reflected in the Land Use Map and Various Figures and
Tables, the Elimination of a Segment of Pruneridge Avenue
from Various References as a Minor Collector and Bike Land to
Reflect the Closure and Vacation of this Segment of the Street,
the Potential Relocation of Glendenning Barn From the Project
Site and a Change in the Primary Building Bulk Setback For N.
Tantau Avenue from 1.5 to I Slope Line from the Curb Line to
a 1 to 1 Slope Line from the Curb Line, Changes Associated
with the Development of the Apple Campus and Potential
Development Agreement in Policy 2 -35: Vallco Park North for
a Project Located by the Area Bounded by East Homestead
Road, North Tantau Avenue, I -280, North Wolfe Road
Including Properties Located on the East Side of North Tantau
Avenue
• CC -3. Ordinance No. 13 -2113 An Ordinance of the Cupertino
City Council Approving the Rezoning of an Approximately 1.1
Acre Area From Park and Recreation (PR) to Planned
Industrial Park (P(MP)) Located at APN 316 06 050 and 316 06
051
• Exhibit Z -1 — Legal Description for Rezoning
• Exhibit Z -2 — Sandis, Zoning Plat Map Pruneridge
Avenue at Ridgeview Court, Cupertino, CA (Sept. 23,
2013)
• CC -4. Resolution No. 13 -085 of the City Council of the City of
Cupertino Approving the Subdivision of Approximately 176.2
Acres Form 17 Lots Into Five Lots, Located in the North Vallco
Area, APNS 316 -06 -033, 316 -06 -038, 316 -06 -039, 316 -06 -045,
316 -06 -046, 316 -06 -048, 316 -06 -049, 316 -06 -050, 316 -06 -051,
316 -06 -052, 316 -06 -053, 316 -07 -044, 316 -07 -045, 316 -07 -046,
316 -09 -019, 316 -09 -027, 316 -09 -028, 316 -18 -025, 316 -18 -012,
1 -15
sf- 3345921 Q
ATTACHMENT I
INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2
PROJECT
1 -16
sf- 3345921 Q
DATE
DOCUMENT
316 -18 -026, 316 -18 -027 AND 316 -18 -035
o Exhibit TM -1. Mitigation Monitoring and Reporting
Program (MMRP)
• CC -5. Resolution NO. 13-084 Of The City Council Of The City
Of Cupertino Approving A Development Permit To Allow The
Demolition Of Approximately 2.66 Million Square Feet Of
Existing Office, Research And Development Buildings And
The Construction of 3.42 Million Square Feet Of Office
Research And Development Buildings; 120,000 SQ.FT. (1,000
Seat) Corporate Auditorium, 100,000 Sq. Ft. Corporate Fitness
Center, And 25,000 Sq. Ft. Valet Parking Reception Uses,
92,000 Square Feet of Utility Plants; And Associated Parking
Facilities And Ancillary Buildings (Such As Security Reception
Areas And Landscape Maintenance Buildings); Use Permit To
Allow A Corporate Auditorium And Fitness Center At A New
Office, Research And Development Campus; Architectural And
Site Approval To Allow A new 2.82 Million Square Feet
Office, Research And Development Building With 2,385
Basement Parking Spaces And A Cafeteria, 5,870 Parking
Space Structured Parking Facility With Attached Central Plant,
A 1,000 Seat Corporate Auditorium, A Fitness Center And
Associated Site Improvements Including Access Tunnels, A
Surface Parking Lot, Outdoor Dining And Recreational
Facilities And Landscaping; Tree Removal Permit To Allow
The Removal Of Approximately 4,501 Trees, Of Which,
Approximately 90 Trees Are Proposed To Be Transplanted,
And Replacement With At Least 6,200 Trees To Allow The
Construction Of An Office, Research and Development
Campus For A Project Located At The Area Bounded By East
Homestead Road, North Tantau Avenue, , I -280, North Wolfe
Road Including Properties Located On The East Side Of North
Tantau Avenue
• Exhibit DP -1. Mitigation Monitoring and Reporting
Program (MMRP)
• Exhibit DP -2. Conditions Of Approval - AB 900
Compliance Apple Campus 2 Project
■ Exhibit EA -2a. Tree Replacement Worksheet
1 -16
sf- 3345921 Q
ATTACHMENT I
INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2
PROJECT
1 -17
sf- 3345921 v2
DATE
DOCUMENT
■ Exhibit EA -2b — Transportation Demand
Management Program Expansion
• CC -6. Ordinance No. 13 -2114 Ordinance of the City Council
Of The City of Cupertino Repealing Ordinance No. 1702 And
Approving A New Development Agreement By And Between
The City Of Cupertino And Apple Inc. For The Development
Of A New Corporate Campus
o Exhibit DA -1. Development Agreement Between City
of Cupertino, a California municipal corporation, and
Apple, Inc., a California corporation
• Exhibit DA -la. Legal Description of the
Property
• Exhibit DA -lb. Project Site Diagram
• Exhibit DA -lc. Tax Localization Plan
• Exhibit DA -1 d. General Plan Office Space
Development Allocations
• Exhibit DA -le. Campus Amenity Space
• Exhibit DA- If. Impact Fees
• Exhibit DA -lg. Pruneridge Avenue Vacation
10/02/2013
• CC -7. Planning Commission Staff Report, Development of an
office, research and development campus with associated
ancillary uses (Oct. 2, 2013) (attachments to the Planning
Commission staff report are in italics)
o PC -1. Resolution No. 13 -6727 of the Planning
Commission of the City of Cupertino Recommending
Certification of an Environmental Impact Report for the
Apple Campus 2 Project; And Recommending Adoption
Of Findings and A Statement of Overriding
Considerations, Mitigation Measures, And A Mitigation
Monitoring and Reporting Program
1 -17
sf- 3345921 v2
ATTACHMENT I
INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2
PROJECT
1 -18
sf- 3345921 v2
DATE
DOCUMENT
• Exhibit EA -1. California Environmental Quality
Act Findings and Statement Of Overriding
Considerations For The Apple Campus 2 Project
• Exhibit EA -2. Mitigation Monitoring and
Reporting Program (MMRP)
• Exhibit EA -2a. Tree Replacement
Worksheet
• Exhibit EA -2b. Transportation Demand
Management Program Expansion
o PC -2. Resolution No. 6728 Of The Planning
Commission Of the City Of Cupertino Recommending
Approval Of A General Plan Amendment To Allow A
Change In The Land Use Designation Of A 1.1 Acre
Area From Parks And Open Space To Industrial/
Residential To Be Reflected In The Land Use Map And
Various Figures And Tables, The Elimination Of A
Segment Of Pruneridge Avenue From Various
References As A Minor Collector And Bike Lane To
Reflect The Closure and Vacation Of This Segment Of
The Street, The Potential Relocation Of Glendenning
Barn From The Project Site And A Change In The
Primary Building Bulk Setback For N. Tantau Avenue
From 1.5 to I Slope Line From The Curb Line To A I
To I Slope Line From The Curb Line, Changes
Associated With The Development Of The Apple
Campus And Potential Development Agreement In
Policy 2 -35: Vallco Park North For A Project Located
At The Area Bounded By East Homestead Road, North
Tantau Avenue, I -280, North Wolfe Road Including
Properties Located On The East Side Of North Tantau
Avenue
o PC -3. Resolution No. 6729 Of The Planning
Commission Of The City Of Cupertino Recommending
That The City Council Approve The Rezoning Of An
Approximately 1.1 Acre Area From Park And
Recreation (PR) To Planned Industrial Park (P(MP))
1 -18
sf- 3345921 v2
ATTACHMENT I
INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2
PROJECT
1 -19
sf- 3345921 v2
DATE
DOCUMENT
Located At APN 316 06 050 AND 316 06 051
■ Exhibit Z. Ordinance No. 13- An Ordinance Of
The Cupertino City Council Approving The
Rezoning Of AN Approximately 1.1 Acre Area
From Park And Recreation (PR) To Planned
Industrial Park (P(MP)) Located At APN 316
06 050 AND 316 06 051
• Exhibit Z -1. Legal Description For
Rezoning
• Exhibit Z -2. Sandis, Zoning Plat Map
Pruneridge Ave. At Ridgeview Court,
Cupertino, CA (Sept. 23, 2013)
• PC -4. Resolution No. 6732 Of The Planning
Commission Of the City of Cupertino Recommending
Approval To Subdivide Approximately 176.2 Acres
From 17 Lots Into Five Lots, Located In The North
Vallco Area, APNS 316 -06 -033, 316 -06 -038, 316 -06-
039, 316 -06 -045, 316 -06 -046, 316 -06 -048, 316 -06 -049,
316 -06 -050, 316 -06 -051, 316 -06 -052, 316 -06 -053, 316-
07 -044, 316 -07 -045, 316 -07 -046, 316 -09 -019, 316 -09-
027, 316 -09 -028, 316 -18 -025, 316 -18 -012, 316 -18 -026,
316-18-027 AND 316 -18 -0353
• PC -5. Resolution No. 6731 Of The Planning
Commission Of The City Of Cupertino Recommending
Approval Of Development Permit To Allow The
Demolition Of Approximately 2.66 Million Square Feet
Of Existing Office, Research and Development
Buildings And The Construction Of 3.42 Million Square
Feet Of Office, Research and Development Buildings;
120, 000 S.F. (1, 000 SEAT) Corporate Auditorium,
100, 000 S.F. Corporate Fitness Center, And 25, 000 S.F.
Valet Parking Reception Uses; 92, 000 Square Feet Of
Utility Plants; And Associated Parking Facilities And
Ancillary Buildings (Such As Security Reception Areas
And Landscape Maintenance Buildings); Use Permit To
Allow A Corporate Auditorium And Fitness Center At A
New Office, Research and Development Campus;
1 -19
sf- 3345921 v2
ATTACHMENT I
INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2
PROJECT
1 -20
sf- 3345921 v2
DATE
DOCUMENT
Architectural And Site Approval To Allow A New 2.82
Million Square Feet Office, Research and Development
Building With 2,385 Basement Parking Spaces And A
Cafeteria, A 5,8 70 Parking Space Structured Parking
Facility With Attached Central Plant, A 1, 000 Seat
Corporate Auditorium, A Fitness Center, And
Associated Site Improvements Including Access
Tunnels, A Surface Parking Lot, Outdoor Dining and
Recreational Facilities And Landscaping; Tree Removal
Permit To Allow The Removal Of Approximately 4,501
Trees, Of Which Approximately 90 Trees Are Proposed
To Be Transplanted, And Replacement With At Least
6,200 Trees TO Allow The Construction Of An Office,
Research And Development Campus For A Project
Located At The Area Bounded By East Homestead
Road, North Tantau Avenue, I -280, North Wolfe Road
Including Properties Located On The East Side Of
North Tantau Avenue
• Exhibit DP -1. Mitigation Monitoring and
Reporting Program
• Exhibit DP-1a. Tree Replacement
Worksheet
• Exhibit DP-1b. Transportation Demand
Management Program Expansion
• Exhibit DP -2. Conditions of Approval AB 900
Compliance Apple Campus 2 Project
o PC -6. Resolution No. 6730 Of The Planning
Commission Of The City Of Cupertino Recommending
That The City council Approve A Development
Agreement For A 20 Year Term For The Development
Of An Office, Research and Development Campus
Located At The Area Bounded By East Homestead
Road, North Tantau Avenue, I -280, North Wolfe Road
Including Properties Located On The East Side Of
North Tantau Avenue
■ Exhibit DA. Development Agreement Between
1 -20
sf- 3345921 v2
ATTACHMENT I
INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2
PROJECT
1 -21
sf- 3345921 v2
DATE
DOCUMENT
City of Cupertino, a California municipal
corporation and Apple, Inc., a California
corporation
• Exhibit DA -1. Real Property Description
• Exhibit DA-1b. Project Site Diagram
• Exhibit DA-1c. Tax Localization Plan
• Exhibit DA-1d. General Plan Office
Space Development Allocations
• Exhibit DA-le. Campus Amenity Space
• Exhibit DA -If. Impact Fees
• Exhibit DA-1g. Pruneridge Avenue
Vacation
• PC -7. Apple Campus 2 Project Description, Sept. 16,
2013
• PC -8 Plan Set. Sept. 16, 2013
• PC -9. Redlines to Plan PC -8, Sept. 23, 2013
• PC -10. Joint City Council /Planning Commission Study
Session Staff Report, Study Session for the
Environmental Impact Report for the development of a
new office, research and development campus (Oct. 1,
2013)
• PC -11. Findings Revision #1 (October 1, 2013) to
California Environmental Quality Act And Statement Of
Overriding Considerations For The Apple Campus 2
Project
• PC -12. Findings Revision #2 (October 1, 2013) to
California Environmental Quality Act Findings And
Statement Of Overriding Considerations For The Apple
Campus 2 Project
1 -21
sf- 3345921 v2
ATTACHMENT I
INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2
PROJECT
1 -22
sf- 3345921 v2
DATE
DOCUMENT
o PC -14. Memorandum from LSA Associates, Inc. to City
of Cupertino re: Apple Campus 2 Project Draft
Environmental Impact Report (EIR) Late Comments
Received after the 45 -Day Comment Period (Sept. 18,
2013)
• CC -8. Final Planning Commission Resolutions (No. 6727,
6728, 6729, 6730, 6731 and 6732)
• Resolution No. 13 -6727 Of The Planning Commission
Of The City of Cupertino Recommending Certification
Of An Environmental Impact Report For The Apple
Campus 2 Project; And Recommending Adoption Of
Findings And A Statement Of Overridings
Considerations, Mitigation Measures, And A Mitigation
Monitoring And Reporting Program (Oct. 2, 2013)
• Exhibit EA -1. California Environmental Quality
Act Findings and Statement of Overriding
Considerations For The Apple Campus 2 Project
• Exhibit EA -2. Mitigation Monitoring and
Reporting Program (MMRP)
• Exhibit EA -2a. Tree Replacement
Worksheet
• Exhibit EA -2b — Transportation Demand
Management Program Expansion
• Resolution No. 6728 Of The Planning Commission Of
the City of Cupertino Recommending Approval Of A
General Plan Amendment To Allow A Change In The
Land Use Designation of a 1.1 Acre Area From Parks
And Open Space to Industrial / Residential To Be
Reflected In The Land Use Map And Various Figures
And Tables, The Elimination Of A Segment Of
Pruneridge Avenue From Various References As A
Collector And Bike Lane To Reflect The Closure And
Vacation Of This Segment Of The Street, The Potential
Relocation Of Glendenning Barn From The Project Site
And A Change In The Primary Building Bulk Setback
1 -22
sf- 3345921 v2
ATTACHMENT I
INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2
PROJECT
1 -23
sf- 3345921 Q
DATE
DOCUMENT
For N. Tantau Avenue From 1.5 To 1 Slope Line From
The Curb Line TO A 1 TO 1 Slope Line From The Curb
Line, Changes Associated With The Development Of
The Apple Campus And Potential Development
Agreement In Policy 2 -35: Vallco Park North For A
Project Located At The Area Bounded By East
Homestead Road, North Tantau Avenue, I -280, North
Wolfe Road Including Properties Located On The East
Side Of North Tantau Avenue (Oct. 2, 2013)
o Resolution No. 6729 Of The Planning Commission Of
The City Of Cupertino Recommending That The City
Council Approve The Rezoning Of An Approximately
1.1 Acre Area From Park and Recreation (PR) To
Planned 1.2 Industrial Park (P(MP)) Located AT APN
316 06 050 and 316 06 051 (Oct. 2, 2013)
■ Exhibit Z. Ordinance No. 13 -An Ordinance Of
The Cupertino City Council Approving The
Rezoning Of An Approximately 1.1 Acre Area
From Park and Recreation (PR) To Planned
Industrial Park (P(MP)) Located At APN 316 06
050 and 316 06 051
10/02/2013
o Resolution No. 6730 of the Planning Commission of the
City of Cupertino Recommending That The City
Council Approve A Development Agreement For a 20
Year Term For The Development Of An Office,
Research and Development Campus Located At The
Area Bounded By East Homestead Road, North Tantau
Avenue, I -280, North Wolfe Road Including Properties
Located on the East Side of North Tantau Avenue
• Exhibit DA. Ordinance No. 13 -2114 Ordinance
of the City Council of the City of Cupertino
Repealing Ordinance No. 1702 and Approving a
New a New Development Agreement By and
Between the City of Cupertino and Apple Inc.
For The Development of a New Corporate
Campus
• Exhibit DA -1. Development Agreement
1 -23
sf- 3345921 Q
ATTACHMENT I
INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2
PROJECT
1 -24
sf- 3345921 Q
DATE
DOCUMENT
Between City of Cupertino, a California
municipal corporation, and Apple, Inc., a
California corporation
• Exhibit DA -la. Legal Description of the
Property
• Exhibit DA -lb. Project Site Diagram
• Exhibit DA -lc. Tax Localization Plan
• Exhibit DA -ld. General Plan Office
Space Development Allocations
• Exhibit DA -le. Campus Amenity Space
• Exhibit DA- If. Impact Fees
• Exhibit DA -1g. Pruneridge Avenue
Vacation
10/02/2013
o Resolution No.6731 of the Planning Commission of the
City of Cupertino Recommending Approval of
Development Permit To Allow The Demolition Of
Approximately 2.66 Million Square Feet Of Existing
Office, Research and Development Buildings And The
Construction Of 3.42 Million Square Feet Of Office,
Research and Development Buildings; 120,000 SQ.FT.
(1,000 Seat) Corporate Auditorium, 100,000 SQ.FT.
Corporate Fitness Center, and 25,000 SQ.FT. Valet
Parking Reception Uses; 92,000 Square Feet of Utility
Plants; And Associated Parking Facilities And
Ancillary Buildings (Such As Security Reception Areas
And Landscape Maintenance Buildings); Use Permit To
Allow A Corporate Auditorium And Fitness Center At
A New Office, Research And Development Campus;
Architectural and Site Approval To Allow A New 2.82
Million Square Feet Office, Research And Development
Building With 2,385 Basement Parking Spaces And A
Cafeteria, A 5,870 Parking Space Structured Parking
Facility With Attached Central Plant, A 1,000 Seat
Corporate Auditorium, A Fitness Center, And
1 -24
sf- 3345921 Q
ATTACHMENT I
INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2
PROJECT
1 -25
sf- 3345921 Q
DATE
DOCUMENT
Associated Site Improvements Including Access
Tunnels, A Surface Parking Lot, Outdoor Dining and
Recreational Facilities And Landscaping; Tree Removal
Permit To Allow The Removal Of Approximately 4,501
Trees, Of Which, Approximately 90 Trees Are Proposed
TO BE Transplanted, And Replacement With At Least
6,200 Trees To Allow The Construction Of An Office,
Research and Development Campus For A Project
Located At the Area Bounded By East Homestead
Road, North Tantau Avenue, I -280, North Wolfe Road
Including Properties Located On The East Side Of
North Tantau Avenue (Oct. 2, 2013)
• Exhibit DP -1. Mitigation Monitoring and
Reporting Program (MMRP)
• Exhibit EA -2a. Tree Replacement Worksheet
• Exhibit EA -2b — Transportation Demand
Management Program Expansion
• Exhibit DP -2. Conditions of Approval - AB 900
Compliance Apple Campus 2 Project
10/02/2013
o Resolution No. 6732 Of The Planning Commission Of
The City Of Cupertino Recommending Approval To
Subdivide Approximately 176.2 Acres From 17 Lots
Into Five Lots, Located In The North Vallco Area,
APNS 316 -06 -033, 316 -06 -038, 316 -06 -039, 316 -06-
045, 316 -06 -046, 316 -06 -048, 316 -06 -049, 316 -06 -050,
316 -06 -051, 316 -06 -052, 316 -06 -053, 316 -07 -044, 316-
07 -045, 316 -07 -046, 316 -09 -019, 316 -09 -027, 316 -09-
028, 316 -18 -025, 316 -18 -012, 316 -18 -026, 316 -18 -027
AND 316 -18 -035 (Oct. 2, 2013)
■ Exhibit TM -1. Mitigation Monitoring and
Reporting Program (MMRP)
• CC -9. City of Cupertino Recommendation of Environmental
Review Committee September 26, 2013
1 -25
sf- 3345921 Q
ATTACHMENT I
INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2
PROJECT
1 -26
sf- 3345921 Q
DATE
DOCUMENT
• CC -10. Memorandum from LSA Associates, Inc. to City of
Cupertino re: Supplemental Text Revisions, Apple Campus 2
Project Final Environmental Impact Report (EIR) (Oct. 8, 2013)
• Attachment A: Fehr & Peers Memo, October 4, 2013
• Attachment B: Assembly Bill 900 (Amended)
• CC -I 1. Findings Revision 93 (October 15, 2013) to California
Environmental Quality Act Findings and Statement of
Overriding Considerations for the Apple Campus 2 Project
• CC -12. Comments Received Between September 20, 2013 and
October 4, 2013
• CC -13. Memorandum from LSA Associates, Inc. Apple
Campus 2 Project Final Environmental Impact Report (EIR) —
Late Comments Received Between September 20 and October
4, 2013 (Oct. 8, 2013)
• CC -14. Memorandum from Department of Community
Development to City Council re: Memo Regarding Comments
Not Related to the EIR (Oct. 8, 2013)
10/15/2012
City Council Staff Report, Adopt Resolution No. 13 -086, vacating a
portion of Pruneridge Avenue, between Wolfe Road and Tantau
Avenue, and various public easements; and Resolution No. 13 -087,
authorizing the City Manager to execute a Purchase and Sale
Agreement with Campus Holdings, Inc. (a subsidiary of Apple Inc.) for
a portion of Pruneridge Avenue. (Oct. 15, 2013)
• CC -1. Resolution No. 13 -086 A Resolution Of The City
Council Of the City of Cupertino Vacating A Portion Of The
City Pruneridge Avenue Right -Of -Way Between North Tantau
Avenue And North Wolfe Road And Various Easements
Bounded By North Wolfe Road, Homestead Road, North
Tantau Avenue, And Highway 280, As Provided In Section
8320 Et. Seq. Of The Streets And Highways Code Of The State
of California
o Exhibit V -1. Legal Description For Pruneridge Avenue
1 -26
sf- 3345921 Q
ATTACHMENT I
INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2
PROJECT
1 -27
sf- 3345921 Q
DATE
DOCUMENT
o Exhibit V -2. Sandis, Pruneridge Avenue Vacation Key
Map, Cupertino, CA (Sept. 3, 2013)
o Exhibit V -3. Legal Description For Light And Air
Easement Vacation
o Exhibit V -4. Legal Description For Roadway Easement
Vacation
o Exhibit V -5. Legal Description For Roadway Easement
Vacation
o Exhibit V -6. Legal Description For Roadway Easement
Vacation
o Exhibit V -7. Legal Description For Street Easement
Vacation
o Exhibit V -8. Legal Description For Street Easement
Vacation
o Exhibit V -9. Legal Description For Public Utility
Easement Vacation
o Exhibit V -10. Legal Description For Public Utility
Easement Vacation
o Exhibit V -11. Legal Description For Public Utility
Easement Vacation
o Exhibit V -12. Legal Description For Public Utility
Easement Vacation
o Exhibit V -13. Legal Description For Public Utility
Easement Vacation
o Exhibit V -14. Legal Description For Public Utility
Easement Vacation
o Exhibit V -15. Legal Description For Light And Air
Easement Vacation
1 -27
sf- 3345921 Q
ATTACHMENT I
INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2
PROJECT
1 -28
sf- 3345921 Q
DATE
DOCUMENT
• CC -2. Resolution No. 13 -087 A Resolution Of The City
Council Of The City Of Cupertino Authorizing The Execution
Of A Purchase And Sale Agreement, And Authorizing The Sale
Of A Portion Of Pruneridge Avenue, Subject To And Upon The
Terms And Conditions Set Forth In The Purchase And Sale
Agreement
o Exhibit PSA. Purchase And Sale Agreement And Joint
Escrow Instructions
• Exhibit PSA -1. Legal Description For
Pruneridge Avenue
• Exhibit PSA -2. Deed.
• Exhibit PSA -2a. Legal Description For
Pruneridge Avenue
10/15/2012
City Council Staff Report, Authorize the City Manager to enter into an
Extension of Agreement for Consultation Services with Baz Industries,
the successor in interest to ACI Holdings, Inc. (Oct. 15, 2013)
• Extension of Agreement For Consultation Services
• Agreement for Consultation Services
10/15/2013
EX- CC- 10 -15 -13 Item 9, Written Communication, City Council
Meeting, October 15, 2013
10/15/2013
EX- CC -15 -13 Item 9 Staff Presentation Apple Campus 2, City Council
Meeting, October 15, 2013
10/15/2013
Exhibit CC- 10 -15 -13 Item CC -10 Supplemental Text Revisions, Apple
Campus 2 Project Final Environmental Impact (Oct. 8, 2013)
10/15/2013
EX- CC- 10 -15 -13 Item 10 CC -6 Development Agreement
• Exhibit DA -1. Development Agreement Between City of
Cupertino, a California municipal corporation, and Apple, Inc.,
a California corporation
1 -28
sf- 3345921 Q
ATTACHMENT I
INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2
PROJECT
(G) Transcripts and Minutes of Hearings in Chronological Order:
(H) Remainder of the Record
a. DEIR References
DATE
DOCUMENT
09/08/2011
Transcript of the EIR Scoping Session Meeting (Sept. 8, 2011)
06/26/2013
Transcript of the DEIR Comment Meeting (June 26, 2013)
09/26/2013
Transcript of the Environmental Review Committee Meeting (Sept.
26, 2013)
10/01/2013
Approved Minutes Cupertino City Council Cupertino Planning
Commission Special Meeting Tuesday October 1, 2013 Joint Meeting
of Cupertino City Council and Cupertino Planning Commission
10/01/2013
Transcript of the Joint City Council /Planning Commission Study
Session, Oct. 1, 2013
10/02/2013
Transcript of the Planning Commission Meeting (Oct. 2, 2013)
10/15/2013
Transcript of the City Council Meeting (Oct. 15, 2013)
(H) Remainder of the Record
a. DEIR References
1 -29
sf- 3345921 Q
DATE
DOCUMENT
00 /00 /0000
Notice of Completion and Environmental Document Transmittal
00 /00 /0000
Apple Campus 2 ITE Trip Generation
00 /00 /0000
California Code Regulations, Title 14, Sections 15064.4, Determining
the Significance of Impacts from Greenhouse Gas Emissions (Cal.
Code Regs. tit. 14, § 15064.4)
00 /00 /0000
California Code Regulations, Title 14, Sections 15064.7, Thresholds of
Significance (Cal. Code Regs. tit. 14, § 15064.7)
00 /00 /0000
Cupertino Municipal Code Chapter 16.72: Recycling And Diversion of
Construction and Demolition Waste
http: / /www.amlegal.com /nxt/ ag teway.dll /California /cupertino /titlel6bu
1 -29
sf- 3345921 Q
ATTACHMENT I
INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2
PROJECT
1 -30
sf- 3345921 v2
DATE
DOCUMENT
ildingsandconstruction /chap... (last visited May 1, 2012)
00 /00 /0000
Undated document entitled "Traffic: Mitigation"
00/00/1951
Hertlein, L.G., Invertebrate Fossils and Fossil Localities in the San
Francisco Bay Area, pp. 189-192
00/00/1951
Stirton, R. A., Prehistoric Land Mammals of the San Francisco Bay
Region, in Geologic Guidebook of the San Francisco Bay Counties,
History, Landscape, Geology, Fossils, Minerals, Industry, and Routes
to Travel, Bulletin 165, pp. 177 -186
00/00/1961
U.S. Geological Survey, Cupertino Quadrangle 7.5' series Topographic
Map
00/00/1974
Fredrickson, David A., Cultural Diversity in Early Central California:
A View from the North Coast Ranges, The Journal of California
Anthropology, (1)1:41 -53, Spring 1974
03/00/1974
U.S. Environmental Protection Agency, Information on Levels of
Environmental Noise Requisite to Protect Public Health and Welfare
with an Adequate Margin of Safety,
htlp: / /www.nonoise.org /library /levels74 /levels74.htm (last visited May
3, 2012)
05/00/1974
Edwards, Rob, An Archaeological Reconnaissance of Calabazas Creek
(from Lawrence Expressway to Wolfe Road) for the Santa Clara Valley
Water District
07/01/1974
California Geological Survey, Special Studies Zones, Mindego Hill
Quadrangle
07/01/1974
California Geological Survey, Special Studies Zones, Castle Rock
Ridge Quadrangle
07/01/1974
California Geological Survey, Special Studies Zones, Cupertino
Quadrangle
07/01/1974
California Geological Survey, Special Studies Zones, Palo Alto
Quadrangle, Official Map, Effective July 1, 1974
03/00/1976
California Department of Parks and Recreation, California Inventory of
1 -30
sf- 3345921 v2
ATTACHMENT I
INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2
PROJECT
1 -31
sf- 3345921 Q
DATE
DOCUMENT
Historic Resources, p. 265
00/00/1979
Nilsen, T. H., Wright, R. H., et al., Relative Slope Stability and Land -
use Planning in the San Francisco Bay Region, California, Geological
Survey Professional Paper 944
00/00/1979
Helley, E.J, et al., Flatland Deposits of the San Francisco Bay Region,
California - their geology and engineering properties, and their
importance to comprehensive planning, California, Geological Survey
Professional Paper 943
01/01/1982
California Geological Survey, Special Studies Zones, Milpitas, Revised
Official Map, Effective Jan. 1, 1982
03/17/1982
Bay Area Air Quality Management District, Rules and Regulations,
Regulation 7: Odorous Substances
00/00/1987
Connelly, AB 2588, Chaptered in the California Health and Safety
Code Section 44300, et al.,
http: / /oehha.ca.gov /air /chronic_rels /HSC44300.htm (last visited
7/6/12)
00/00/1987
Bolt Beranek and Newman, Noise Control for Buildings and
Manufacturing Plants, pp. 8 -5, 8 -7 & 8 -9
07/00/1987
Cartier, Robert, Cultural Resource Evaluation of the Calabasas Creek
Flood Control Project in the Cities of Cupertino and Santa Clara,
County of Santa Clara, for Santa Clara Valley Water District 96080-
87 -274
00/00/1988
U.S. Geological Survey, Landslides, Floods, and Marine Effects of the
Storm of January 3 -5, 1982, in the San Francisco Bay Region,
California, U.S. Geological Survey Professional Paper 1434
12/00/1988
California Department of Parks and Recreation, Five Views: An Ethnic
Historic Site Survey for California
00/00/1991
Holland, D.C., Western Pond Turtles Clemmys marmorata as
referenced in Jennings, M. R., and M. P. Hayes, Amphibian and reptile
species of special concern in California, pp. 98 -103 (1994)
11/01/1991
California Geological Survey, Special Studies Zones, Los Gatos
1 -31
sf- 3345921 Q
ATTACHMENT I
INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2
PROJECT
1 -32
sf- 3345921 v2
DATE
DOCUMENT
Quadrangle, Revised Official Map, Nov. 1, 1991
05/01/1992
California Department of Parks and Recreation, California Points of
Historical Interest, pp. 64 -67
00/00/1993
Hickman, J.C. (Ed.), The Jepson Manual, Higher Plants of California
00/00/1994
Holland, D.C., Western Pond Turtles Clemmys marmorata as
referenced in Jennings, M. R., and M. P. Hayes, Amphibian and reptile
species of special concern in California, p. 101 (1994)
05/00/1994
Bennyhoff, James A., and David A. Fredrickson, A Proposed
Integrative Taxonomic Systems for Central California Archaeology
(1969). In Toward A New Taxonomic Framework for Central
California Archaeology: Essays by James A. Bennyhoff and David A.
Fredrickson, Assembled and Edited by Richard E. Hughes, May 1994,
pp. 15 -24
11/01/1994
Jennings, M. R., and M. P. Hayes, Amphibian and reptile species of
special concern in California (1994)
00/00/1995
California Regional Water Quality Control Board, San Francisco Bay
Region, San Francisco Bay Basin (Region 2) Water Quality Control
Plan (Basin Plan)
00/00/1995
Milliken, Randall, A Time of Little Choice: The Disintegration of
Tribal Culture in the San Francisco Bay Area 1769 -1810, p. 256
03/00/1995
California Department of Parks and Recreation, Instructions for
Recording Historical Resources
00/00/1996
California Department of Conservation, Division of Mines and
Geology, Update of Mineral Land Classification: Aggregate Materials
in the South San Francisco Bay Production - Consumption Region,
DMG Open File Report 96 -03
00/00/1996
California Office of Historic Preservation, California Historical
Landmarks (1996)
03/00/1997
California Air Resources Board, Technical Support Document,
Proposed Identification of Inorganic Lead as a Toxic Air Contaminant,
Part A- Exposure Assessment, Stationary Source Division, March 1997
1 -32
sf- 3345921 v2
ATTACHMENT I
INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2
PROJECT
1 -33
sf- 3345921 v2
DATE
DOCUMENT
05/05/1997
Rauch, Alan F., EPOLLS: An Empirical Method for Predicting Surface
Displacements Due to Liquefaction - Induced Lateral Spreading in
Earthquakes, Dissertation submitted to the Faculty of the Virginia
Polytechnic Institute and State University in partial fulfillment of the
requirements for the degree in Doctor of Philosophy in Civil
Engineering
00/00/1998
Harris, Cyril M, Handbook of Acoustical Measurements and Noise
Control, pp. 2.6 -2.17
00/00/1998
Baker, Suzanne. 1998. Archaeological Survey, San Tomas
Aquino /Saratoga Creeks Trail Project, Santa Clara County, California
00/00/1998
Joint Venture: Silicon Valley, The Joint Venture Way: Lessons for
Regional Rejuvenation, Volume 1
00/00/1998
Joint Venture: Silicon Valley, The Joint Venture Way: Lessons for
Regional Rejuvenation, Volume 2
00/00/1999
World Health Organization, Guidelines for Community Noise
http: / /www.who.int /docstore /peh /noise /guidelines2.html (last visited
May 3, 2012)
00/00/1999
Bass, Ronald E., Albert L Herson, and Kenneth M. Bogdan, CEQA
Deskbook: A Step -by -Step Guide on how to Comply with the
California Environmental Quality Act (Solano Press Book, 2nd Ed.,
1999), p. 105
00/00/1999
Sacramento County, Department of Environmental Review and
Assessment, Bollard and Brennan, Report of the Status of Rubberized
Asphalt Traffic Noise Reduction in Sacramento County
00/00/1999
National Park Service, Guidelines for Evaluating and Documenting
Rural Historic Landscapes, National Register Bulletin, Revised 1999
00/00/1999
California Office of Historic Preservation, California Register and
National Register: A Comparison (for purposes of determining
eligibility for the California Register)
09/00/1999
English, P., et al, Examining Associations Between Childhood Asthma
and Traffic Flow Using a Geographic Information System,
Environmental Health Perspectives 107(9):761 -767, September 1999
1 -33
sf- 3345921 v2
ATTACHMENT I
INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2
PROJECT
1 -34
sf- 3345921 v2
DATE
DOCUMENT
12/00/1999
Bay Area Air Quality Management District, BAAQMD CEQA
Guidelines, Assessing the Air Quality Impacts of Projects and Plans
00/00/2000
United Nations Environment Programme, The Montreal Protocol on
Substances that Deplete the Ozone Layer as adjusted and /or amended
in London 1990, Copenhagen 1992, Vienna 1995, Montreal 1997,
Beijing 1999 (2000) htlp://www.unep.org/ozone/Montreal-
Protocol /Montreal- Protocol2000.shtmI (last visited Apr. 25, 2012)
00/00/2000
Transportation Research Board, Highway Capacity Manual 2000,
Chapter 16, Signalized Intersections
00/00/2000
National Park Service, Guidelines for Evaluating and Registering
Archaeological Properties, National Register Bulletin
00/00/2000
U.S. Geological Survey, Geological Map and Map Database of the
Palo Alto 30' x 60' Quadrangle, California
00/00/2000
Santa Clara Valley Water District, Clean, Safe Creeks and Natural
Flood Protection Plan,
http: / /www.valleywater.or /g Programs /CleanSafeCreeksPlan.aspx (last
visited June 4, 2012)
04/10/2000
American Planning Association, Policy Guide on Planning for
Sustainability (Apr. 16, 2000)
10/00/2000
California Air Resources Board, Risk Reduction Plan to Reduce
Particulate Matter Emissions from Diesel - Fueled Engines and
Vehicles, Stationary Source Division and Mobile Source Control
Division. October 2000
02/00/2001
Agency for Toxic Substances and Disease Registry, Toxic FAQs for
Polychlorinated Biphenyls (Feb. 2001
05/23/2001
California Department of Parks and Recreation, California Office of
Historic Preservation, Technical Assistance Series 91, Environmental
Quality Act (CEQA) & Historical Resources
10/25/2001
California Regional Water Quality Control Board, San Francisco Bay
Region, Order No 01 -114: Rescission of Site Cleanup Requirements
Order No 96 -085 for the Property at 10900 North Wolfe Road,
Cupertino, Santa Clara County
1 -34
sf- 3345921 v2
ATTACHMENT I
INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2
PROJECT
1 -35
sf- 3345921 v2
DATE
DOCUMENT
00/00/2002
California Geological Survey, Seismic Hazard Zones, Cupertino
Quadrangle 2002b
00/00/2002
California Geological Survey, Note 36, California Geomorphic
Provinces 2002a
00/00/2002
California Geological Survey, Seismic Hazard Zone Report for the
Cupertino 7.5 Minute Quadrangle, Santa Clara County, California,
Seismic Hazard Zone 068
00/00/2002
U.S. Environmental Protection Agency, 2002 Waterbody Report for
Calabazas Creek, Updated on Nov. 14, 2011
02/13/2002
California Department of Health Service, A Summary of Cal /OSHA's
Lead in Construction Standard, Title 8, California Code of Regulations,
Section 1532.1 (Cal. Code Regs. tit. 8., § 1532.1)
02/26/2002
Santa Clara, County of, Fault Rupture Hazard Zones Map
08/00/2002
Delfino, R.J., Epidemiologic Evidence for Asthma and Exposure to Air
Toxics: Linkages Between Occupational, Indoor, and Community Air
Pollution Research, Environmental Health Perspectives, 110(4):573-
579, August 2002
09/23/2002
Santa Clara, County of, Santa Clara County Geologic Hazard Zones
Map
12/00/2002
California Department of Transportation, Guide for the Preparation of
Traffic Impact Studies
00/00/2003
Stebbins, R. C., A Field Guide to Western Amphibians and Reptiles
(Houghton Mifflin, 3rd Ed. 2003)
03/17/2003
Santa Clara County, Ordinance No. , An Ordinance of the Board
of Supervisors of the County of Santa Clara Repealing Division B 11
and Enacting a New Division BI I of the Santa Clara County
Ordinance Code Pertaining to Health and Sanitation, Amending Title
A18, Chapter One, Pertaining to the Department of Public Health, and
Amending Title A33, Chapter VI, Pertaining to the Department of
Environmental Health (Division B 11 Ordinance Changes)
06/00/2003
Santa Clara Valley Transportation Authority, 2003 Traffic Level of
1 -35
sf- 3345921 v2
ATTACHMENT I
INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2
PROJECT
1 -36
sf- 3345921 v2
DATE
DOCUMENT
Service Analysis Guidelines, Adopted January 1995, Updated June
2003
06/19/2003
California Code of Regulations, Title 8, Section 5198, General Industry
Safety Orders — Lead, as amended June 19, 2003 (Cal. Code Regs. tit.
8, § 5198 (2003)
08/00/2003
California Environmental Protection Agency, The Air Toxics Hot
Spots Program Guidance Manual for Preparation of Health Risk
Assessments. August 2003
08/00/2003
U.S. Department of Energy, 2003 Buildings Energy Databook (Aug.
2003)
09/00/2003
California Department of Fish and Game, Wildlife and Habitat Data
Analysis Branch, List of California Terrestrial Natural Communities
Recognized by the California Natural Diversity Data Base
10/20/2003
Association of Bay Area Governments, Dam Failure Inundation
Hazard Map for Cupertino www.abag.ca.gov /c ig bin /pickdam.pi (last
visited Nov. 13, 2011)
00/00/2004
Santa Clara Valley Water District, Lines of Equal Subsidence Map,
Santa Clara Valley, North County, 1934 -1967
00/00/2004
Kim, J.J., et al., Traffic- Related Air Pollution Near Busy Roads: The
East Bay Children's Respiratory Health Study, Am. J. Respir. Crit.
Care Med. Vol 170. pp 520 -526, 2004
00/00/2004
Association of Bay Area Governments, ABAG Earthquake Shaking
Scenario, Entire San Andreas (1906 Quake) — Magnitude 7.9
06/00/2004
Institute of Transportation Engineers, Trip Generation Handbook, An
ITE Informational Report, 2nd Edition, Publication No. RP -028B
09/04/2004
Gauderman, W. J., The Effect of Air Pollution on Lung Development
From 10 to 18 Years of Age, New England Journal of Medicine
351:11, pp. 1057 -1067
00/00/2005
Leidy, R.A., G.S. Becker, and B.N. Harvey, Historical distribution and
current status of steelhead /rainbow trout (Oncorhynchus mykiss) in
Streams of the San Francisco Estuary, California.
1 -36
sf- 3345921 v2
ATTACHMENT I
INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2
PROJECT
1 -37
sf- 3345921 v2
DATE
DOCUMENT
00/00/2005
Fellers, G. M., Rana draytonii Baird and Girard, 1852(b) California
Red - Legged Frog, Amphibian Declines, The Conservation Status of
United States Species, pp. 552 -554
00/00/2005
Doeker, Randi, Bird -safe Design Practices, Birds & Building Forum,
www.birdsa,ndbuildings.org
00/00/2005
World Resources Institute, Navigating the Numbers Greenhouse Gas
Data and International Climate Policy (2005)
04/00/2005
California Air Resources Board, Air Quality and Land Use Handbook:
A Community Health Perspective, April 2005,
www.arb.ca.gov/ch/la,nduse.htm
09/00/2005
City of Cupertino, Emergency Operations Plan, adopted by City
Council Sept. 20, 2005
10/25/2005
United Nations Framework Convention on Climate Change,
Inventories of anthropogenic emissions by sources and removals by
sinks of greenhouse gases, Sixth compilation and synthesis of initial
national communications from Parties not included in Annex I to the
Convention (Oct. 25, 2005)
11/15/2005
City of Cupertino General Plan 2000 -2020, Adopted by the Cupertino
City Council, November 15, 2005
00/00/2006
Erler & Kalinowski, Inc., Phase I Environmental Site Assessment and
Subsurface Investigations Report, 10480 and 10500 Ridgeview Court,
Cupertino, California, 2006d
00/00/2006
Erler & Kalinowski, Inc., Phase I Environmental Site Assessment and
Subsurface Investigations Report, 10600 Ridgeview Court, Cupertino,
California, 2006g
00/00/2006
California Climate Change Center, Our Changing Climate. Assessing
the Risks to California (2006)
02/00/2006
California Regional Water Quality Control Board, San Francisco Bay
Region, Fact Sheet, Status of Environmental Cleanup, 3800 Homestead
Road, Santa Clara, Santa Clara County
03/00/2006
California Environmental Protection Agency, Climate Action Team
1 -37
sf- 3345921 v2
ATTACHMENT I
INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2
PROJECT
1 -38
sf- 3345921 Q
DATE
DOCUMENT
Report to Governor Schwarzenegger and the Legislature (Mar. 2006)
04/14/2006
Erler & Kalinowski, Inc., Phase I Environmental Site Assessment and
Subsurface Investigations Report, 19310 and 19320 Pruneridge
Avenue, Cupertino, California, 2006c
04/20/2006
Erler & Kalinowski, Inc., Phase I Environmental Site Assessment and
Subsurface Investigations Report, 10501 North Tantau Avenue,
Cupertino, California, 2006e
04/24/2006
Erler & Kalinowski, Inc., Phase I Environmental Site Assessment and
Subsurface Investigations Report, 10435 North Tantau Avenue,
Cupertino, California, 2006a
04/26/2006
Erler & Kalinowski, Inc., Phase I Environmental Site Assessment and
Subsurface Investigations Report, 10555 Ridgeview Court, Cupertino,
California, 2006f
05/00/2006
McConnell, R., et al., Traffic, Susceptibility, and Childhood Asthma,
Environmental Health Perspectives, Vol. 114., No. 5, pp. 766 -772,
2006
05/00/2006
U.S. Department of Transportation, Federal Transit Administration,
Transit Noise and Vibration Impact Assessment Final Report, Report
No. FTA- VA -90- 1003 -06
05/12/2006
Erler & Kalinowski, Inc., Phase I Environmental Site Assessment and
Subsurface Investigations Report, 10400 and 10450 Ridgeview Court,
Cupertino, California, 2006b
06/06/2006
California Department of Toxic Substances Control, Interim Guidance
Evaluation of School Sites with Potential Soil Contamination as a
Result of Lead from Lead -Based Paint, Organochlorine Pesticides from
Termiticides, and Polychlorinated Biphenyls from Electrical
Transformers, Revised June 6, 2006, 2006b
06/08/2006
Erler & Kalinowski, Inc., Phase I Environmental Site Assessment and
Subsurface Investigations Report, 19050 Pruneridge Avenue,
Cupertino, California, 2006h
07/00/2006
Excerpts from Santa Clara Valley Water Resources Protection
Collaborative, User's Manual, Guidelines and Standards for Land Use
Near Streams, A Manual of Tools, Standards and Procedures to Protect
1 -38
sf- 3345921 Q
ATTACHMENT I
INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2
PROJECT
1 -39
sf- 3345921 Q
DATE
DOCUMENT
Streams and Streamside Resources in Santa Clara County, August
2005, Revised July 2006
07/00/2006
Excerpts from Santa Clara Valley Water Resources Protection
Collaborative, Guidelines & Standards for Land Use Near Streams: A
Manual of Tools, Standards and Procedures to Protect Streams and
Streamside Resources in Santa Clara County
07/00/2006
California Department of Water Resources, Progress on Incorporating
Climate Change into Management of California's Water Resources,
Technical Memorandum Report (July 2006)
00/00/2007
New York City Audubon, Bird Safe Building Guidelines
00/00/2007
U.S. Environmental Protection Agency, Air and Radiation: National
Ambient Air Quality Standards (NAAQS),
http: / /www.epa.gov /air /criteria.htmI (last visited 4/24/12)
00/00/2007
Milliken, Randall, Punctuated Culture Change in the San Francisco
Bay Area, in California Prehistory, Colonization, Culture and
Complexity, edited by Terry L. Jones and Kathryn A. Klar, pp. 116-
117
00/00/2007
Cupertino, City of, North Vallco Master Plan — Phase I
00/00/2007
Santa Clara, City of, City of Santa Clara, CA Zoning Map, Updated
December 2007
00/00/2007
California Energy Commission, Inventory of California Greenhouse
Gas Emissions and Sinks: 1990 to 2004, Staff Final Report (Dec. 2006)
00/00/2007
Intergovernmental Panel on Climate Change, Climate Change 2007:
The Physical Science Basis, Summary for Policymakers
00/00/2007
United Nations Framework Convention on Climate Change, 2007
Greenhouse Gas Inventory Data
http: / /unfccc.int/ghhg data /items /3800.php (last visited Apr. 30, 2012)
02/00/2007
Remy, Thomas, Moose, and Manley, Guide to the California
Environmental Quality Act (Solano Press Books, 11th Ed.)
03/00/2007
Toronto, City of, Bird - Friendly Development Guidelines
1 -39
sf- 3345921 Q
ATTACHMENT I
INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2
PROJECT
1 -40
sf- 3345921 v2
DATE
DOCUMENT
04/00/2007
Leidy, R. A., Ecology, Assemblage Structure, Distribution, and Status
of Fishes in Streams Tributary to the San Francisco Estuary, California
04/24/2007
Erler & Kalinowski, Inc., Phase I Environmental Site Assessment and
Subsurface Investigations Report, 10400 North Tantau Avenue,
Cupertino, California, 2007a
04/24/2007
Erler & Kalinowski, Inc., Phase I Environmental Site Assessment and
Subsurface Investigations Report, 10300 North Tantau Avenue,
Cupertino, California, 2007b
06/00/2007
Meyer, Jack, and Jeffrey Rosenthal, Geoarchaeological Overview of
the Nine Bay Area Counties in Caltrans District 4, p 8
08/00/2007
Bay Area Air Quality Management District, Toxic Air Contaminant
Control Program Annual Report, Last Updated 10/4/2010
08/14/2007
Santa Clara, County of, 2007 Drainage Manual, Adopted August 14,
2007
10/00/2007
California Air Resources Board, Expanded List of Early Action
Measures to Reduce Greenhouse Gas Emissions in California
Recommended for Board Consideration (Oct. 2007)
10/25/2007
California Air Resources Board, ARB approves tripling of early action
measures required under AB 32, News Release 07 -46 (Oct. 25, 2007)
12/13/2007
Santa Clara Valley Transportation Authority, Bicycle Technical
Guidelines: A Guide for Local Agencies in the Planning, Design and
Maintenance of Bicycle Facilities and Bicycle - Friendly Roadways,
Adopted Sept. 2, 1999, Revision I Adopted Dec. 13, 2007
00/00/2008
San Jose, City of, Traffic Impact Analysis Handbook- Volume II-
Policies and Guidelines 2008
00/00/2008
California Department of Forestry and Fire Protection, Very High Fire
Hazard Severity Zones in LRA As Recommended by CAL FIRE, Map
ID No. FHSZL_c43_Cupertino
00/00/2008
California Geological Survey, Guidelines for Evaluating and
Mitigating Seismic Hazards in California, Special Publication 117A
1 -40
sf- 3345921 v2
ATTACHMENT I
INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2
PROJECT
1 -41
sf- 3345921 v2
DATE
DOCUMENT
00/00/2008
U.S. Geological Survey, Forecasting California's Earthquakes — What
Can We Expect in the Next 30 Years
01/01/2008
Institute of Transportation Engineers, Trip Generation Handbook, An
ITE Informational Report, 8th Edition, Land Use 210: Single - Family
Detached Housing, pp. 289 -569
01/01/2008
Institute of Transportation Engineers, Trip Generation Handbook, An
ITE Informational Report, 8th Edition, Land Use 310: Hotel, pp.570-
657
01/01/2008
Institute of Transportation Engineers, Trip Generation Handbook, An
ITE Informational Report, 8th Edition, Land Use: 501 Military Base,
pp. 922 -1132
01/01/2008
Institute of Transportation Engineers, Trip Generation Handbook, An
ITE Informational Report, 8th Edition, Land Use: 710 General Office
Building, pp. 1194 -1355
01/01/2008
Institute of Transportation Engineers, Trip Generation Handbook, An
ITE Informational Report, 8th Edition, Land Use: 812 Building
Materials and Lumber Store pp. 1356 -1743
01/01/2008
Institute of Transportation Engineers, Trip Generation Handbook, An
ITE Informational Report, 8th Edition, Land Use: 911 Walk -In Bank,
pp. 1744 -1922
03/00/2008
Sunnyvale, City of, City of Sunnyvale Zoning Map
03/18/2008
Santa Clara County, Operational Area Emergency Operations Plan
05/00/2008
California Regional Water Quality Control Board, San Francisco Bay
Region, Screening for Environmental Concerns at Sites with
Contaminated Soil and Groundwater, San Francisco Bay Region,
Interim Final, November 2007 (as revised May 2008)
06/00/2008
Santa Clara Valley Transportation Authority, Santa Clara Countywide
Bicycle Plan, 2008 Final Draft
06/00/2008
Association of Bay Area Governments, San Francisco Bay Area
Housing Needs Plan 2007 -2014
1 -41
sf- 3345921 v2
ATTACHMENT I
INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2
PROJECT
1 -42
sf- 3345921 Q
DATE
DOCUMENT
08/07/2008
California Department of Toxic Substances Control, Interim Guidance
for Sampling Agricultural Properties (Third Revision)
12/00/2008
California Air Resources Board, Climate Change Scoping Plan: a
framework for change (Dec. 2008)
12/16/2008
Sunnyvale, City of, 2010 Urban Water Management Plan, Appendix F,
Water Resources Sub - element of the General Plan, 2008 Update,
Adopted by City Council on Dec. 16, 2008
00/00/2009
Santa Clara Valley Transportation Authority, Valley Transportation
Plan 2035
00/00/2009
San Francisco Public Utilities Commission, Water Utilities Climate
Alliance
http: / /www.wucaonline.org/html /about member agencies.html (last
visited Apr. 30, 2012)
00/00/2009
Association of Bay Area Governments, Projections and Priorities 2009,
Building Momentum, San Francisco Bay Area Population, Household,
and Job Forecasts, pp. 118 -121
03/00/2009
Santa Clara Valley Transportation Authority, Transportation Impact
Analysis Guidelines, Adopted March 2009
03/00/2009
Santa Clara Valley Transportation Authority, Transportation Impact
Analysis Guidelines, Adopted May 1998, Updated March 2009
03/03/2009
Santa Clara, County of, Comprehensive County Expressway Planning
Study 2008 Update, March 3, 2009
05/00/2009
California Energy Commission, The Future is Now: An Update on
Climate Change Science, Impacts, and Response Options for California
(May 2009)
07/00/2009
California Air Pollution Control Officers Association, Health Risk
Assessment for Proposed Land Use Projects, CAPCOA Guidance
Document, Approved for Release July 2009
10/14/2009
Letter from Bruce H. Wolfe, California Regional Water Quality
Control Board, San Francisco Bay Region, to Larry Cowles, Apple,
Inc. re: Approval of Remedial Action Completion Report, Addendum
1 -42
sf- 3345921 Q
ATTACHMENT I
INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2
PROJECT
1 -43
sf- 3345921 Q
DATE
DOCUMENT
to Remedial Action Completion Report, and Second Addendum to
Remedial Action Completion Report for the Former Tandem
Computers Facility, 19333 Vallco Parkway, Cupertino, Santa Clara
County
12/00/2009
Santa Clara Valley Water District, Calabazas Creek Flood Protection
Project: Final Initial Study and Mitigated Negative Declaration (Project
Number 26104001), prepared by Environmental Sciences Associates
12/00/2009
Milpitas, City of, 2009 Water Master Plan Update (Dec. 2009)
00/00/2010
U.S. Environmental Protection Agency, Press Release: EPA to Set
Modest Pace for Greenhouse Gas Standards / Agency stresses
flexibility and public input in developing cost - effective and protective
GHG standards for largest emitters (Dec. 23, 2010)
http: / /yosemite.epa. gov /opa /admpress.nsf /dOcf6618525 a9efb 852573 59
003fb69d /d2f038e9daed78.. (last visited Apr. 30, 2012)
00/00/2010
Santa Clara Valley Water District, Calabazas Creek Flood Protection
Project Brochure
00/00/2010
U.S. Census Bureau, Profile of General Population and Housing
Characteristics: 2010, 2010 Demographic Profile Data
00/00/2010
California Air Resources Board, California Clean Car Standards —
Pavely, Assembly Bill 1493, http: / /arb.ca.gov /cc /ccros /ccros.htm (last
visited Apr. 30, 2012)
00/00/2010
California Air Resources Board, Trends in California Greenhouse Gas
Emissions for 2000 to 2008 — by Category as Defined in the Scoping
Plan (May 28, 2010)
00/00/2010
CalRecycle, 2010 Estimated Solid Waste Generation Rates for
Commercial Establishments
http: / /www.calrecycle. ca. gov /wastechar /wastegenrates /C ommercial.ht
m (last visited May 1, 2012)
01/00/2010
Bay Area Air Quality Management District, Air Toxics NSR Program
Health Risk Screening Analysis Guidelines, January 2010
01/14/2010
Santa Clara Unified School District, Long Range Facilities Master
Plan, Looking at School Facility Needs 2010 -2038, pp. 237, 293 -294
1 -43
sf- 3345921 Q
ATTACHMENT I
INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2
PROJECT
1 -44
sf- 3345921 Q
DATE
DOCUMENT
02/00/2010
Bay Area Air Quality Management District, Source Inventory of Bay
Area GHG Emissions (Feb. 2010)
04/00/2010
Bay Area Economics, City of Cupertino Housing Element Update,
2007 -2014
04/10/2010
American Planning Association, Policy Guide on Surface
Transportation (Apr. 10, 20 10)
http: / /www.planning. org_/policy/guides /adopted /surfacetransportation.h
tm (last visited May 1, 2012)
04/20/2010
Cupertino, City of, City Council Staff Report, Agenda Item No. 13,
Consider authorizing staff to move forward with the Historic
Preservation Policy and related General Plan Amendment, Application
No. CP- 2007 -03, City of Cupertino, Citywide
07/12/2010
California Public Utilities Commission, & the Water Energy Team of
the Climate Action Team (WetCat), Implementing a Public Goods
Charge for Water (July 12, 20 10)
09/15/2010
Bay Area Air Quality Management District, Bay Area 2010 Clean Air
Plan, Final Clean Air Plan — Volume 1, Adopted September 15, 2010
09/15/2010
Bay Area Air Quality Management District, Bay Area 2010 Clean Air
Plan, Volume 2, Adopted September 15, 2010
09/28/2010
Stantec Consulting Corporation, Phase I Environmental Site
Assessment, Hewlett- Packard Company Cupertino, North Campus,
Cupertino, California, Buildings 42 through 48
09/30/2010
California Regional Water Quality Control Board, San Francisco Bay
Region, Fourth Five Year Review, Intersil Inc. /Siemens Components
Superfund Site, 10900 and 10950 North Tantau Road, Cupertino, Santa
Clara County, California
11/03/2010
Erler & Kalinowski, Inc., Phase I Environmental Site Assessment and
Results of Subsurface Investigations, 10590 -10596 and 10600 North
Tantau Avenue, Cupertino, California, 2010
11/17/2010
Fehr & Peers, Saratoga, City of, Circulation and Scenic Highway
Element Update, City of Saratoga, California, Background Report and
Goals, Policies and Implementation Measures, Nov. 17, 2010
1 -44
sf- 3345921 Q
ATTACHMENT I
INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2
PROJECT
1 -45
sf- 3345921 v2
DATE
DOCUMENT
00/00/2010
Santa Clara General Plan 2010 -2035
00/00/2011
CalRecycle, 2011 Solid Waste Characterization Database Waste
Disposal Rates for Business Types
http: / /www.calrecycle.ca.gov /wastechar /DispRate.htm (last visited
May 1, 2012)
00/00/2011
Santa Clara Valley Water District, 2010 Urban Water Management
Plan
00/00/2011
Santa Clara, City of, Santa Clara, Municipal Code Chapter 9. 10,
Regulation of Noise and Vibration,
htlp:// www .codepublishing.com /ca/santacl ara /frameless /index.pl ?path=
../html /SantaClara09 /Santa... (last visited May 3, 2012)
00/00/2011
San Francisco Planning Department, Standards for Bird -Safe
Buildings, Adopted July 14, 2011
00/00/2011
Sunnyvale, City of, Community Vision - Citywide Goals (General
Plan)
00/00/2011
Cupertino, City of, City of Cupertino Demographics 2011
00/00/2011
Allied Waste Services, Newby Island Resource Recovery Park,
http:// www. alliedwastescco .com /facilities.cfm (last visited June 4,
2012)
00/00/2011
Apple Inc., Apple Reuse and Recycling Program,
hLtp://www.gpple.com/recycling/gift-card/ (last visited June 4, 2012)
00/00/2011
California Department of Resources Recycling and Recovery, Waste
Stream Information Profiles: Jurisdiction Profile for City of Cupertino.
00/00/2011
California Department of Resources Recycling and Recovery,
California Waste Stream Profiles: Active Landfills Profile for Newby
Island Sanitary Landfill (43 -AN -0003)
00/00/2011
California Gas and Electric Utilities, 2010 California Gas Report 2010
00/00/2011
California Department of Resources Recycling and Recovery, Solid
Waste Characterization Database, Waste Disposal Rates for Business
Types, http:Hcalrecycle.ca.gov /wastechar /Dis]2Rate.htm (last visited
1 -45
sf- 3345921 v2
ATTACHMENT I
INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2
PROJECT
1 -46
sf- 3345921 Q
DATE
DOCUMENT
June 4, 2012)
00/00/2011
California Water Service Company, 2010 Urban Water Management
Plan, Los Altos Suburban District, Adopted June 2011
00/00/2011
California Water Service Company, Los Altos District,
http: / /www.calwater.com /your_ district /index.php ?district =las (last
visited June 4, 2012)
00/00/2011
Cupertino Municipal Code, Chapter 16.40.130 Fire Code
http: / /www.amlegal .com /alpscripts /get- content.aspx (last visited June
4, 2012)
00/00/2011
Cupertino, City of, City of Cupertino Municipal Code, Chapter 16.72:
Recycling and Diversion of Construction and Demolition Waste
http: / /www.amlegal .com /alpscripts /get- content.aspx (last visited June
4, 2012)
00/00/2011
Cupertino, City of, Public Safety, Sheriffs Office,
http : / /www.cupertino.org /index.aspx ?page =364 (last visited June 4,
2012)
00/00/2011
Fremont Union High School District, Concurrent Enrollment,
http: / /www.fuhsd.org /concurrent (last visited June 4, 2012)
00/00/2011
Pacific Gas & Electric Company, Electric System,
http: / /pge. com /mybusiness /edusafety/systemworks /electric/ (last
visited June 4, 2012)
00/00/2011
San Jose, City of, Wastewater, San Jose /Santa Clara Water Pollution
Control Plant, htlp: / /www.sanjoseca.gov /esd /wastewater /water-
pollution- control- plant.aM (last visited June 4, 2012)
00/00/2011
Santa Clara County Fire Department, Department Information,
http: / /www.sccfd.org/de]t inform ation.html (last visited June 4, 2012)
00/00/2011
Santa Clara Valley Water District, Calabazas Creek Capacity
Improvement Project,
hU:// www. valleywater. org/ CalabazasCreckCgpaciiylmprovement .aspx (last
visited June 1, 2012)
00/00/2011
Sunnyvale Municipal Code, Title 16, Buildings and Construction,
htlp:Hgcode.us/ codes /sunnyvale /view.php ?topic =16 &frames =on (last
1 -46
sf- 3345921 Q
ATTACHMENT I
INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2
PROJECT
1 -47
sf- 3345921 Q
DATE
DOCUMENT
visited May 3, 2012)
00/00/2011
Sunnyvale Municipal Code, Title 19, section 19.42.030, Noise or
Sound Level, htlp://gcode.us/ codes /sunnyvale /view.php ?topic =19 -4-
19_42- 19_42_030 &frames =on (last visited May 3, 2012)
00/00/2011
Association of Bay Area Governments, Bay Area Census,
http: / /www.bayareacensus.ca.gov /cities /Cupertino.htm (last visited
May 17, 2013)
00/00/2011
California, State of, E -5 Population and Housing Estimates for Cities,
Counties, and the State, 2010 -2011, with 2010 Benchmark (2011b)
00/00/2011
California, State of, E -1 City /County Population Estimates with Annual
Percent Change, January 1, 2010 and 2011 (2011 a)
00/00/2011
Santa Clara Valley Water District, Water Resources Protection
Ordinance
00/00/2011
California Air Resources Board, Fact Sheets, last reviewed May 3,
2013, htlp:/ /www.a.rb.ca.gov/html /fslist.htm (last visited May 22, 2013)
00/00/2011
California Department of Transportation, California Scenic Highway
Mapping System,
www.dot.ca.gov /hg /LandArch /scenic highwUs/index.htm (last visited
June 1, 2012)
00/00/2011
Cupertino Municipal Code, Title 19: Zoning,
http: / /www.amlegal.com /alpscripts /get- content.aspx (last visited June
5, 2012)
00/00/2011
U.S. Department of Labor, Occupational Safety & Health
Administration, Regulations, Standards 29 CFR, Occupational Noise
Exposure 1910.95
http: / /www.osha.gov /pls/ oshaweb /owadisp.show_document ?p table =S
TANDARDS &p_id =9735 (last visited May 3, 2012)
00/00/2011
Erler & Kalinowski, Inc, Site Investigation Report, 10900 North Wolfe
Road, Cupertino, California, Buildings 42 through 48, 2011 a
00/00/2011
Erler & Kalinowski, Inc., Phase I Environmental Site Assessment and
Results of Sub -Slab Soil Gas Sampling, 10670 and 10700 -10710 North
1 -47
sf- 3345921 Q
ATTACHMENT I
INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2
PROJECT
1 -48
sf- 3345921 v2
DATE
DOCUMENT
Tantau Avenue, Cupertino, California, 201 lb
00/00/2011
Cupertino Municipal Code, Chapter 19.60: General Commercial (CG)
Zones, http: / /www.amlegal. com /alpscripts /get - content.aspx (last
visited May 23, 2012)
00/00/2011
Cupertino Municipal Code, Chapter 10.48: Community Noise Control,
http: / /www.amlegal .com /alpscripts /get- content.aspx (last visited Nov.
28, 2011)
00/00/2011
State Water Resources Control Board, Geotracker Environmental
Database
00/00/2011
Environmental Data Resources Inc., The EDR Radius Map Report with
GeoCheck, Apple Campus 2, 10900 North Wolfe Road, Cupertino,
California, 95014, Inquiry Number 3176121.1s
00/00/2011
U.S. Geological Survey, EHP Quaternary Faults
00/00/2011
Association of Bay Area Governments, Earthquake and Hazards
Program, Geologic Materials Shaking Amplification Maps
00/00/2011
Association of Bay Area Governments, Liquefaction Susceptibility
Map
00/00/2011
Bay Area Air Quality Management District, BAAQMD Specified
Speciation Profile for OFFROAD Diesel TOG, p. 88
03/21/2011
Federal Aviation Administration, Airport Facilities Data, Santa Clara
County, Information Current as of 02/09/12
hLtp://www.faa.gov/aip2orts/aip2ort safety/aip2ortdata_5010 /menu /inde
x.cfm (last visited Mar. 21, 2012)
03/22/2011
U.S. Geological Survey, Earthquake Hazards Program, 2008 National
Seismic Hazard Maps - Fault Parameters,
http:// geohazards. usgs .gov /cfusion/hazfaults_search /disp hf info.cfin?
cfault id =1abcd (last visited Mar. 22, 2012)
04/01/2011
Muffly, Dave, Apple Campus 2 Consolidated Arborist Report
04/25/2011
Stantec Consulting Corporation, Sub - Surface Investigations, Hewlett -
Packard Company, Cupertino North Campus, Buildings 42 through 48
1 -48
sf- 3345921 v2
ATTACHMENT I
INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2
PROJECT
1 -49
sf- 3345921 v2
DATE
DOCUMENT
04/28/2011
Stantec Consulting Corporation, Additional Sub - Surface Investigation,
Hewlett- Packard Company, Cupertino North Campus, Buildings 42
through 48, 201 lb
05/00/2011
Bay Area Air Quality Management District, Recommended Methods
for Screening and Modeling Local Risks and Hazards
05/00/2011
Bay Area Air Quality Management District, CEQA Air Quality
Guidelines Updated May 2011
05/15/2011
California Department of Parks and Recreation, Office of Historic
Preservation, Directory of Properties in the Historic Property Data File
for Santa Clara County, p. 4
05/25/2011
Santa Clara County Airport Land -Use Commission, Comprehensive
Land Use Plan Santa Clara County, Norman Y. Mineta, San Jose
International Airport
05/31/2011
Fehr & Peers, Apple Campus 2 Draft Transportation Impact Analysis
06/00/2011
Santa Clara Valley Water District, 2010 Groundwater Quality Report
06/00/2011
California Water Service Company, 2010 Urban Water Management
Plan Los Altos- Suburban District, Adopted June 2011
06/10/2011
Citizens For Responsible Equitable Environmental Development v.
City of Chula Vista, 197 Cal.App.4th 327 (2011)
07/00/2011
Fehr & Peers, Apple Headquarters Campus Transportation Study
07/00/2011
Sunnyvale General Plan, Consolidated in 2011
07/11/2011
Unidocs, Who Regulates What in Santa Clara County, Page Updated
on 7/11/2011 http: / /www.unidocs.org /members /whoregulateswhat.html
(last visited Sept. 26, 2011)
07/14/2011
San Francisco Planning Department, Standards for Bird -Safe
Buildings, Adopted by the San Francisco Planning Commission July
14, 2011
07/15/2011
Page and Turnbull, Inc., Historic Resource Evaluation, Glendenning
Barn
1 -49
sf- 3345921 v2
ATTACHMENT I
INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2
PROJECT
1 -50
sf- 3345921 v2
DATE
DOCUMENT
07/27/2011
U.S. Environmental Protection Agency, Test Methods for Evaluating
Solid Waste, Physical /Chemical Methods, SW -846, Last Updated July
27, 2011 http: / /www.epa.gov /epawaste /hazard /testmethods /index.htm
(last visited Mar. 21, 2012)
08/09/2011
AC2 Application Form, Community Development Department, City of
Cupertino
09/00/2011
California, State of, Monthly Labor Force Data for Cities and Census
Designated Places (CDP), September 2011- Preliminary
09/08/2011
Agenda, City of Cupertino Community Development, Environmental
Impact Report (EIR) Scoping Session, Thursday, September 8, 2011,
htlp: // Cupertino. granicus.com /DocumentViewer.php ?file= cupertino_ff3
e7a33d27eOb185c6.. (last visited Sept. 25, 2013)
09/08/2011
Agenda, City of Cupertino, Environmental Impact Report (EIR)
Scoping Session, September 8, 2011
09/08/2011
Final PowerPoint Presentation, City of Cupertino, Environmental
Impact Report (EIR) Scoping Session, September 8, 2011
09/08/2011
LSA Associates, Scoping Session Slides, Environmental Impact Report
(EIR) Scoping Session, September 8, 2011
09/16/2011
USDA Natural Resources Conservation Service, Soil Map — Santa
Clara Area, California, Western Part (Apple Campus 2 Soil Map)
09/22/2011
California Geological Survey, Probabilistic Seismic Hazards, Peak
Ground Acceleration,
hLtp://www.conservafion.ca.gov/cgs/rghm/Tsha/Pages/Tga.aspX (last
visited Sept. 22, 2011)
09/26/2011
Cupertino Municipal Code, Chapter 9.12, Hazardous Materials
Storage, http : / /www.amlegal.com /alpscfipts /get - content.aspx (last
visited Sept. 26, 2011)
10/00/2011
California Department of Fish and Wildlife, California Natural
Diversity Data Base Computer Printout for Species Occurrences
Within a 5 -mile Radius of the Project Site, Figure 999 prepared by
LSA
1 -50
sf- 3345921 v2
ATTACHMENT I
INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2
PROJECT
1 -51
sf- 3345921 v2
DATE
DOCUMENT
10/00/2011
California Department of Toxic Substances Control, Final Guidance
for the Evaluation and Mitigation of Subsurface Vapor Intrusion to
Indoor Air (Vapor Intrusion Guidance) (Oct. 2011)
10/14/2011
California Native Plant Society, Electronic Inventory of Rare and
Endangered Plants of California,
http: / /www.rareplants.cnps.org /result.html ?adv =t &quad= 37122C 1:9
(last visited Oct. 14, 2011)
10/17/2011
United States Fish and Wildlife Service, Federal Endangered and
Threatened Species That Occur in or may be affected by Projects in the
Cupertino (428D) U.S.G.S. 7.5 Minute Quad, On -line Database.
10/27/2011
California Air Resources Board, California's Greenhouse Gas
Inventory, Last Reviewed Oct. 27, 2011
http: / /www.arb.ca.gov /cc /inventory old /doc /doc.htm (May 1, 2012)
11/03/2011
Email from Gary Chao, to Adam Weinstein re: Requested Employee
Data
11/04/2011
Memorandum from Deputy Chief Don Jarvis, to Caroline Park, LSA
Associates, Inc., re: Apple Campus 2 Project Environmental Impact
Report
11/07/2011
Letter from Richard Tanaka, Cupertino Sanitary District, to Caroline
Park, LSA Associates, re: Apple Campus 2 Environmental Impact
Report
11/09/2011
Letter from LSA Associates, Inc. to Santa Clara County Historical &
Genealogical Society and Cupertino Historical Society re Apple
Campus 2
11/10/2011
U.S. Geological Survey, Fault number 56, Monte Vista - Shannon fault
zone, in Quaternary fault and fold database of the United States:,
http: / /earthquakes.usgs.gov /re iog nal /qfaults (last visited Nov. 10, 2011)
11/10/2011
Western Regional Climate Center, General Climate Summary, San
Jose, CA
11/12/2011
Letter from Cupertino Historical Society to LSA Associates, Inc., re:
Apple Campus 2
1 -51
sf- 3345921 v2
ATTACHMENT I
INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2
PROJECT
1 -52
sf- 3345921 v2
DATE
DOCUMENT
11/14/2011
Memorandum from Caroline Park, Assistant Planner, LSA Associates,
Inc., re: November 14, 2011 Telephone Conversation with Cheri
Donnelly, Environmental Program Manager, Solid Waste and
Stormwater. City of Cupertino Public Works Department,
(408)- 777 -3242
11/14/2011
Letter from Bobbie Plough, Santa Clara Unified School District, to
Caroline Park, LSA Associates, re: Apple Campus 2 Project EIR —
Schools Input
11/16/2011
Email from Miguel R. Grey to Cheri Page, Baseline, Re: Emergency
Operations Plan (EOP) Request
11/17/2011
Letter from Laurie Smith, County of Santa Clara, Office of the Sheriff,
to Caroline Park, LSA Associates re: West Valley Patrol Division
11/18/2011
Memorandum from Don Jarvis, to Caroline Park, re: Apple Campus 2
Fire response
'12/00/2011
California Air Resources Board, Trends in California Greenhouse Gas
Emissions for 2000 to 2009 by Category as Defined in the Air
Resources Board's 2008 Scoping Plan (Dec. 2011)
00/00/2012
U.S. Environmental Protection Agency, Inventory of U.S. Greenhouse
Emissions and Sinks: 1990 — 2010, EPA 430 -R -12 -001 (Apr. 15, 2012)
00/00/2012
AEP, 2012 California Environmental Quality Act (CEQA) Statute and
Guidelines p.7, htlp: / /Ieginfo.ca.gov/ (last updated Jan. 1, 2012)
00/00/2012
Cupertino Union School District, Possible School Repair Bond,
http: / /www.edline.net /pa esg /CUpertino_Union_SD /About_ the District
/Bond (last visited June 4, 2012)
00/00/2012
Fremont Union High School District, Bond Program,
hLtp://www.fuhsd.org/BONDprogram (last visited June 4, 2012)
00/00/2012
Pacific Gas & Electric Company, Clean Energy Solutions,
http: / /pge. com /mybusiness/ environment /pge /cleanenergy /index.shtml
(last visited June 4, 2012)
00/00/2012
Santa Clara Unified School District, Bond Projects,
htlp://www.santaclarausd.org/bondplqiqglLg_ft (last visited June 4,
1 -52
sf- 3345921 v2
ATTACHMENT I
INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2
PROJECT
1 -53
sf- 3345921 v2
DATE
DOCUMENT
2012)
00/00/2012
Santa Clara Valley Water District, Trails and Open Space Program
http: / /www.valleywater.org/ Services /TrailsAndOpenSpace.aspx (last
visited June 4, 2012)
00/00/2012
Cupertino, City of, Community Development Department, Building
Division, Chapter 16.72: Recycling and Diversion of Construction and
Demolition Waste, http://www.amlegal.com/alpscripts/get-
content.aspx (last visited June 4, 2012)
00/00/2012
California Department of Education, California Public School
Enrollment District Report: 2002 -03 District Enrollment by Grade
Santa Clara Unified, Data as o£ 5/22/2006 3:43:02 PM
00/00/2012
Arup, MEP — Central Plants Energy and Equipment Summary (2012)
01/16/2012
Community Development Department, Personal communication with
LSA Associates, Inc., January 16. (Table V.M -4)
01/23/2012
Letter from Two Very Concerned Citizens to Cupertino City Council
re: Closure of Pruneridge
01/24/2012
Ghosh, Piu, Personal communication with LSA Associates, Inc.,
January 24
02/01/2012
Yarne & Associates, Inc, Apple Campus 2 Development Project SB610
Water Supply Assessment, Final February 1, 2012
02/02/2012
California Code of Regulations, Title 23, Section 66273.30, Standards
for Universal Waste Handlers (Cal. Code Regs. tit. 23, § 66273.30)
02/07/2012
California Air Resources Board, Ambient Air Quality Standards, Table
V.L -3)
03/08/2012
Letter from Richard Tanaka, Cupertino Sanitary District, to Piu Ghosh,
City of Cupertino re: Application Comments
03/20/2012
California Health and Safety Code, Section 25500- 25520,
htlp: / /www.leginfo. ca. gov /cgi_
bin/displaycode? section =hsc &group= 25001 -26000 &file = 25500 -25520
(last visited Mar. 20, 2012)
1 -53
sf- 3345921 v2
ATTACHMENT I
INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2
PROJECT
1 -54
sf- 3345921 Q
DATE
DOCUMENT
03/20/2012
California Health and Safety Code, Section 25404- 25404.9,
htlp: / /www.leginfo.ca. gov/cgii-
bin /displUcode? section =hsc &group= 25001- 26000 &file= 25404-
25404.9 (last visited Mar. 20, 2012)
03/20/2012
California Code of Regulations, Title 8, Section 5192, Hazardous
Waste Operations and Emergency Response (Cal. Code Regs. tit. 8, §
5192) http:// www.dir.ca.gov /Title8 /5192.html (last visited Mar. 20,
2012)
03/20/2012
California Code of Regulations, Title 8, Section 5208, Asbestos, (Cal.
Code Regs. tit. 8, § 5208
http: / /weblinks.westlaw. com /result/default.aspx? action = Search &cfi d =1
&cnt= DOC &db= CA %2DADC &eq =sea.. (last visited Mar. 20, 2012)
03/20/2012
California Code of Regulations, Title 17, Section 93105, Asbestos
Airborne Toxic Control Measure for Construction, Grading, Quarrying,
and Surface Mining Operations (Cal. Code Regs. tit. 17, § 93105)
htlp: / /www.arb.ca.gov /toxics /atcm /asb2atcm.htm (last visited Mar. 20,
2012)
03/20/2012
Email from Michael Balliet to Piu Ghosh re: comments on ASA
Approval
03/20/2012
Email from Patrick Grant to City of Cupertino Planning Dept.,
treagankgpple.com re: Comment on Apple 2 updated plan
03/22/2012
Cupertino, City of, Community Development, Building,
www.cLipertino.org/index.aspx?page=296, (last visited Mar. 22, 2012)
03/27/2012
Foster + Partners and Olin, Apple Campus 2, Draft Streetscape
Strategy
03/28/2012
Letter from Roy Moleed, Valley Transportation Authority to Gary
Chao, City of Cupertino re: Apple Campus 2
04/00/2012
Apple Campus 2, Waste Diversions Programs in Cupertino, Draft —
April 2012
04/12/2012
Email from Adam Weinstein, LSA Associates, to Caroline Park re:
FW: Draft School Reports — Apple Campus 2
1 -54
sf- 3345921 Q
ATTACHMENT I
INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2
PROJECT
1 -55
sf- 3345921 Q
DATE
DOCUMENT
04/12/2012
Letter from Peter Oppenheimer, SVP and Chief Financial Officer,
Apple, Inc., to Aarti Shrivastava, City of Cupertino, re: Apple Campus
2 Project: Acknowledgement of Obligations under Public Resources
Code § 21183(d), (e) and (f)
04/13/2012
Email from Adam Weinstein, LSA Associates, to Caroline Park, re:
FW: LSA data table (Cupertino Union School District Capacity and
Enrolment Data)
04/16/2012
Email from Steve Newgren to Manish Dalia re: Apple Campus 2 and
Coordination with VTA (Apr. 16, 2012 10:29 AM PDT)
04/17/2012
Environmental Protection Agency, Table V.L -2 Reference (Table V.L-
2) Monitor Values Report, Santa Clara County, CO Pollutant, 2008-
2010, http: / /www.epa.gov /airdata (last visited Apr. 17, 2012)
04/17/2012
Environmental Protection Agency, Table V.L -2 Reference (Table V.L-
2) Monitor Values Report, Santa Clara County, NO2 Pollutant, 2008-
2010, http: / /www.epa.gov /airdata (last visited Apr. 17, 2012)
04/17/2012
Environmental Protection Agency, Table V.L -2 Reference (Table V.L-
2) Monitor Values Report, Santa Clara County, Ozone Pollutant, 2008-
2010, http: / /www.epa.gov /airdata (last visited Apr. 17, 2012)
04/17/2012
Environmental Protection Agency, Table V.L -2 Reference (Table V.L-
2) Monitor Values Report, Santa Clara County, PM 10 Pollutant, 2008-
2010, http: / /www.epa.gov /airdata (last visited Apr. 17, 2012)
04/17/2012
Environmental Protection Agency, Table V.L -2 Reference (Table V.L-
2) Monitor Values Report, Santa Clara County, PM2.5 Pollutant, 2008-
2010, http: / /www.epa.gov /airdata (last visited Apr. 17, 2012)
04/17/2012
Environmental Protection Agency, Table V.L -2 Reference (Table V.L-
2) Monitor Values Report, Santa Clara County, S02 Pollutant, 2009-
2010, http: / /www.epa.gov /airdata (last visited Apr. 17, 2012)
04/18/2012
Application for Environmental Leadership Development Project,
Apple, Inc., April 18, 2012
04/24/2012
California Air Resources Board, ARB Fact Sheet: Air Pollution
Sources, Effects and Control, page reviewed December 2, 2009,
http:// www. arb. ca. gov /research/bealth /fs /fs2 /fs2.htm (last visited
1 -55
sf- 3345921 Q
ATTACHMENT I
INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2
PROJECT
1 -56
sf- 3345921 v2
DATE
DOCUMENT
04/24/12)
05/00/2012
Bay Area Air Quality Management District, CEQA Air Quality
Guidelines, Updated May 2012
05/00/2012
Schoolhouse Services, Apple Campus 2 School Impacts on the
Cupertino Union School District, May 2012 (2012a)
05/00/2012
Schoolhouse Services, Apple Campus 2 School Impacts on the
Fremont Union High School District, May 2012 (2012b)
05/04/2012
Email from Cathy Van Pernis to Caroline Park re: Data from SCUSDC
(Santa Clara Unified School District Capacity and Enrollment Data)
05/07/2012
California Department of Transportation, Highway Design Manual,
Chapter 1000: Bicycle Transportation Design, Topic 1001 -
Introduction
05/16/2012
Bay Area Air Quality Management District, Summary and Analysis of
Cupertino Air Monitoring Results, Updated May 16, 2012
05/18/2012
Letter from Gavin R. Keith, Preconstruction Director, DPR Skanska, a
Joint Venture, to Terry Reagan, Apple, Inc. re: Apple Campus 2,
Cupertino, CA, Prevailing & Union Wage Rate Comparison
05/18/2012
Letter from Neil Struthers, CEO, Santa Clara & Benito Counties
Building & Construction Trades Council to Ken Alex, Governor's
Office of Planning and Research re: Comments in Support of Apple
Campus 2 Project AB 900 Application (SCH # 2011 082055)
05/21/2012
Letter from Robert Cartier, Archaeological Resource Management, to
Aarti Shrivastava, City of Cupertino re: The New Apple Campus
Construction
05/22/2012
Letter from Kitty Moore to Cupertino Planning Department
06/00/2012
LSA Associates, Apple Campus 2 Project EIR, V. Setting, Impacts and
Mitigation Measures, C. Population, Employment, and Housing,
Administrative Draft #1, p. 103 (Redline version)
06/00/2012
LSA Associates, Apple Campus 2 Project EIR, V. Setting, Impacts and
Mitigation Measures, M. Public Services and Utilities, Administrative
1 -56
sf- 3345921 v2
ATTACHMENT I
INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2
PROJECT
1 -57
sf- 3345921 Q
DATE
DOCUMENT
Draft 91, p. 292 (Redline version)
06/00/2012
Governor's Certification Granting Judicial Streamlining For the Apple
Campus 2 Project in the City of Cupertino
Exhibits to Governor's Certification
• Exhibit 1: Application for Environmental Leadership
Development Project (Apr. 18, 2012)
• Exhibit II: Transportation efficiency required by AB 900
• Exhibit III: Letter from Gavin R. Keith, DPR and Skanska,
to Terry Reagan, Apple Campus 2, Cupertino, CA,
Prevailing & Union Wage Rate Comparison
• Exhibit IV: Letter from Lynn M. Terry, Air Resource
Board, to Ken Alex, Office of Governor Edmund G. Brown
Jr. re: AB 900 Certification
• Exhibit V: Letter from Peter Oppenheimer, Apple, Inc., to
Aarti Shrivastava, City of Cupertino, re: Apple Campus 2
Project: Acknowledgement of Obligations Under Public
Resources Code § 21183(d), (e) and (f)
06/04/2012
Cupertino Municipal Code 19.124 Parking Regulation
www.amlegal. com /alpscripts /get - content.aspx (last updated June 4,
2012)
06/04/2012
Santa Clara Valley Water District, Silicon Valley Advanced Water
Purification Center, http:/ /www.valleMater.org/SVAWPC.aspx (last
visited June 4, 2012)
06/05/2012
Cupertino, City of, Chapter 14.18: Protected Trees. Ordinance No. 07-
2003, http: / /www.amlegal .com /alpscripts /get- content.aspx (last visited
June 5, 2012
06/08/2012
Letter from Beez Glendenning Jones to Mark Santoro, City of
Cupertino
06/10/2012
Email from Blue to City of Cupertino Planning Department re:
Cupertino Apple Campus 2
1 -57
sf- 3345921 Q
ATTACHMENT I
INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2
PROJECT
1 -58
sf- 3345921 v2
DATE
DOCUMENT
06/14/2012
Letter from Lynn M. Terry, California Air Resources Board to Ken
Alex Office of Governor Edmund G. Brown Jr. (June 14, 20 10)
06/14/2012
• Executive Order LP -12 -002 Relating to Determination of Any
Net June Additional Greenhouse Gas Emissions Pursuant to
Public Resources Code section 21183, subd.(c).
• Attachment A Air Resource Board Staff Assessment of
the Apple Campus 2 Application for Environmental
Leadership Development Project
• Attachment B Application for Environmental
Leadership Development Project
• Attachment C Net Zero Energy Strategy for Apple
Campus 2
• Attachment D Statement of Construction Emissions and
Participation in California's Direct Access Program
06/18/2012
Email from David McWalters to
Santa Clara Neighbors for Responsible_ Developmentgyahoogroups
.corn re: Re: [Santa — Clara _ Neighbors_ for Responsible_ Development]
Apple's proposed new campus
06/20/2012
Santa Clara Valley Transportation Authority, CMP Monitoring and
Conformance Report 2011
06/24/2012
Email from Susan Sievert to Mark Santoro, Orrin Mahoney, Gilbert
Wong, Barry Chang re: I'm done with Apple's mind - boggling greed
06/26/2012
California Department of Transportation, Highway Design Manual,
Chapter 1000: Bikeway Planning and Design, Topic 1001 — General
Criteria
06/27/2012
Memorandum from Chad Mosley, re: Caroline Park, re: Apple 2 DEIR-
Signal Preemption System Information Request
06/29/2012
Email from Darrel Lum to Amy Chan re: Apple Campus 2
06/30/2012
Willdan Financial Services with Urban Economics, Santa Clara Valley
Habitat Plan Development Fee Nexus Study
1 -58
sf- 3345921 v2
ATTACHMENT I
INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2
PROJECT
1 -59
sf- 3345921 Q
DATE
DOCUMENT
06/30/2012
Email from Jim Walker to Cupertino City Council re: Apple Campus 2
07/23/2012
Letter from Mark Leno, Joint Legislative Budget Committee, to Ken
Alex, Governor's Office of Planning and Research, re: AB900
Certification
08/00/2012
Santa Clara, County of, Final Santa Clara Valley Habitat Plan
08/01/2012
Letter from Carl Guardino, Silicon Valley Leadership Group to City of
Cupertino
08/14/2012
Email from Jim Dobbins to City Council re: New Apple Campus &
Apple Buses
08/16/2012
Email from Kenneth Binder to Caroline Park re: Apple Campus 2
Project EIR Updated Information
09/04/2012
Email from Piu Ghosh to Adam Weinstein, Judith Malamut re Kao Lee
Comment
10/00/2012
CH2M Hill, Draft Initial Study/Mitigated Negative Declaration for
Wolfe Road Recycled Water Project, prepared for the City of
Sunnyvale
10/26/2012
Email from Piu Ghosh to Adam Weinstein and Judith Malamut re
Melissa Hippard Email Chain
10/29/2012
Arup North America Ltd., Apple Campus 2 Project Environmental
Impact Report Lighting Technical Report - ISSUE
10/31/2012
OLIN, Memorandum to Peter Sokoloff, Foster + Partners, EIR
Landscape Narrative
11/00/2012
WRA, Inc., Biological Resources Assessment, Apple Campus 2 Study
Area, Cupertino, Santa Clara County
11/06/2012
Memo from OLIN to the City of Cupertino re: Adjustments to
Response to the Review of the Consolidated Arborist Report per EIR
Plan Revisions
11/09/2012
Arup, Apple Campus 2 Project Environmental Impact Report,
Applicable Noise Requirements
1 -59
sf- 3345921 Q
ATTACHMENT I
INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2
PROJECT
1 -60
sf- 3345921 v2
DATE
DOCUMENT
12/11/2012
Skansa and DPR, AC2 Construction Equipment Summary,
12/11/2012
Skansa and DPR, Apple Campus 2 Construction Equipment Summary
12/14/2012
Apple Inc, RE: AC2 Event Management & Parking
11/00/2012
Apple Inc., Apple Campus 2 Project Description, November 2012
11/09/2012
Arup, Apple Campus 2 Project Environmental Impact Report,
Applicable Noise Requirements
11/21/2012
Letter from Habitat Conservation Now to City of Cupertino
12/14/2012
Apple Inc, RE: AC2 Event Management & Parking
00/00/2013
San Francisco Bay Conservation and Development Commission, San
Francisco Bay Scenarios for Sea Level Rise Index Map
http: / /www.bcdc.ca.gov/planning /climate change /index map.shtml
(last visited May 17, 2013)
00/00/2013
California, State of, 2012 California Environmental Quality Act
(CEQA) Statute and Guidelines, Section 15126.2(c), pp. 154 -55
00/00/2013
California, State of, 2012 California Environmental Quality Act
(CEQA) Statute and Guidelines, Section 21068, p. 7
00/00/2013
Metropolitan Transportation Commission & Association of Bay Area
Governments, Draft Plan Bay Area Released: Public Invited to
Comment Online or at Public Hearings, hLtp://onebqyarea.org/regional-
initiatives/pla,n-bay-area/draft-pla,n-bay-area.htmI (last visited June 3,
2013)
00/00/2013
Association of Bay Area Governments, Bay Area Census,
http: / /www.bayareacensus.ca.gov /cities /Cupertino.htm (last visited
June 1, 2012)
00/00/2013
Bay Area Air Quality Management District, Ambient Air Quality
Standards and Bay Area Attainment Status,
http: //hank.baagmd.gov/pin /air quality /ambient_ air _quality htm (last
visited May 29, 2013)
00/00/2013
California, State of, 2012 California Quality Act (CEQA) Statute and
1 -60
sf- 3345921 v2
ATTACHMENT I
INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2
PROJECT
1 -61
sf- 3345921 Q
DATE
DOCUMENT
Guidelines, Section 15126.6
01/07/2013
Letter from Sohan Vichare to Aarti Shrivastava re: Scoping Comments
01/14/2013
Memorandum from Gary Black, Gicela Del Rio, Hexagon
Transportation Consultants, Inc. to Dan Whiseenhunt & John
Hillegass, Apple re: Results of the Traffic Simulation Analysis for the
Construction Phase of the Proposed Apple Campus Project in the City
of Cupertino
01/23/2013
Bench, Michael L., A Review of the Trees Recommended for
Transplant at the Apple Campus 2 Project, Cupertino, California
02/13/2013
Apple Inc., Memorandum re: AC2 Event Parking
04/00/2013
Supplement to Application for Environmental, Leadership
Development Project, Apple, Inc., April 2013
04/00/2013
Apple Inc., Apple Campus 2 Planned Development Permit
04/12/2013
AC2 Planned Development Permit (April 12, 2013)
04/12/2013
Questions regarding City and Apple edits on Revised Admin 91B [for
Apple], April 12 Questions from LSA, Apr. 12, 2013
04/12/2013
Memo from Manish Dalia, Arup, Wolfgang Wagener, Foster +
Partners, Peter Sokoloff, Foster + Partners re: AC2 Campus - EIR
Modifications — Grading [AM NOTE: Needs to follow 4/12/2013 Qs
from LSA], Apr. 15, 2013
04/12/2013
Arup, P -4.10, Revision 6, Apple Campus 2, Proposed Grading Plan
North, Apr. 15, 2013
04/12/2013
Arup, P -4.11, Revision 6, Apple Campus 2, Proposed Grading Plan
South, Apr. 15, 2013
04/12/2013
Arup, P -4.20, Revision 3, Apple Campus 2, Street Improvements, Apr.
15, 2013
04/12/2013
Arup, P -4.21, Revision 3, Apple Campus 2, Street Improvements, Apr.
15, 2013
04/12/2013
Arup, P -4.22, Revision 6, Apple Campus 2, Street Improvements, Apr.
1 -61
sf- 3345921 Q
ATTACHMENT I
INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2
PROJECT
1 -62
sf- 3345921 Q
DATE
DOCUMENT
15, 2013
04/12/2013
Arup, P -4.23, Revision 6, Apple Campus 2, Street Improvements, Apr.
15, 2013
04/12/2013
Arup, P -4.24, Revision 6, Apple Campus 2, Street Improvements, Apr.
15, 2013
04/12/2013
Arup, P -4.25, Revision 6, Apple Campus 2, Street Improvements and
Structural Sections, Apr. 15, 2013
04/12/2013
Arup, P -4.30, Revision 6, Apple Campus 2, Proposed Storm Water
Control Plan, North, Apr. 15, 2013
04/12/2013
Arup, P -4.31, Revision 6, Apple Campus 2, Proposed Storm Water
Control Plan South, Apr. 15, 2013
04/12/2013
Arup, P -4.32, Revision 2, Apple Campus 2, Stormwater Quality BMP
Typical Details, Apr. 15, 2013
04/12/2013
Arup, P -6.10, Revision 6, Apple Campus 2, Proposed Site Utility Plan
North, Apr. 15, 2013
04/12/2013
Arup, P -6.11, Revision 6, Apple Campus 2, Proposed Site Utility Plan
South, Apr. 15, 2013
04/12/2013
EIR Alternative Diagrams
04/12/2013
Recycled Water Routing, Potential Connections
04/12/2013
Foster + Partners, P.1 -13, Revision 5, Proposed Conceptual Site Plan,
Aug. 9, 2011
04/12/2013
Foster + Partners, P1.19, Revision 1, Bicycle and Pedestrian Perimeter
Experience, Feb. 29, 2012
04/12/2013
Foster + Partners, P1.26, Revision 4, Site Circulation Plan, Aug. 9,
2011, Aug. 9, 2011
04/12/2013
Foster + Partners, P1.40, Revision 6, Proposed Site Plan North, Aug. 9,
2011
04/12/2013
Foster + Partners, P1.41, Revision 6, Proposed Site Plan South, Aug. 9,
1 -62
sf- 3345921 Q
ATTACHMENT I
INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2
PROJECT
1 -63
sf- 3345921 Q
DATE
DOCUMENT
2011
04/12/2013
Foster + Partners, P -8.01, Revision 6, Proposed Main Building Level 1
Plan, Aug. 9, 2011
04/12/2013
Foster + Partners, P- 10.01, Revision 5, Proposed Main Building
Sections Restaurant, Feb. 24, 2011
04/12/2013
Foster + Partners, P- 10.03, Revision 5, Proposed Main Building
Section Typical Office, Aug. 9, 2011
04/12/2013
Foster + Partners, P- 11.01, Revision 5, Proposed Parking Structure
Level BO & O1 Plan, Aug. 9, 2011
04/12/2013
Foster + Partners, P- 13.00, Revision 5, Proposed Parking Structure
Section NS — Building D, Aug. 9, 2011
04/12/2013
Foster + Partners, P- 14.00, Revision 5, Proposed Central Plant, Nov. 1,
2012
04/12/2013
Foster + Partners, P- 17.00, Revision 5, Corporate Auditorium Level 01
Plan, Aug. 9, 2011
04/12/2013
Foster + Partners, P- 20.00, Revision 5, Corporate Fitness Center Level
02 Plan, Aug. 9, 2011
04/12/2013
Foster + Partners, P- 21.00, Revision 5, Corporate Fitness Center
Sections, Aug. 9, 2011
04/12/2013
Foster + Partners, P- 30.00, Revision 1, Proposed Phase 2
Development, Nov. 1, 2011
04/12/2013
Foster + Partners, P- 30.01, Revision 1, Proposed Phase 2
Development, Nov. 1, 2011
04/12/2013
Olin, P1.23, Revision 4, Existing and Proposed Trees, Apr. 5, 2013
04/12/2013
Olin, P -2.00, Revision 3, Proposed Site Sections, Apr. 5, 2013
04/12/2013
Olin, P -2.01, Revision 4, Proposed Site Sections, Apr. 5, 2013
04/12/2013
Olin, P -7.10, Revision 4, Landscape Plan —North, Apr. 5, 2013
1 -63
sf- 3345921 Q
ATTACHMENT I
INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2
PROJECT
1 -64
sf- 3345921 Q
DATE
DOCUMENT
04/12/2013
Olin, P -7.11, Revision 4, Landscape — South, Apr. 5, 2013
04/12/2013
DPR and Skanska, Apple Campus 2, Phase 2: Fence Installation
Logistics During Construction, February 2014, Feb. 27, 2013
04/22/2013
Letter from James C. Fowler, Assistant Secretary, Apple, Inc., to Kurt
Karperos, Assistant Chef, California Air Resources Board, re: AB 900
Supplemental Information / Net Zero Energy Strategy (Apple Campus
2 — SCH 9 2011082055)
04/29/2013
Letter from Richard W. Corey, Air Resources Board, to Ken Alex,
Office of Governor Edmond G. Brown, Jr., re: AB 900 Certification
04/30/2013
Arup, Apple Campus 2 Geotechnical Interpretive Report, Issue 3
05/02/2013
Email from Ken Tang to applecampus2(c gpple.com, Wing Tang re:
Response to Apple Campus 2 and Submittal 6
05/03/2013
Supplement to Application for Environmental, Leadership
Development Project, Apple, Inc., April 2013 (signed)
05/08/2013
Letter from Ken Alex, Governor's Office of Planning and Research, to
James C. Fowler, Assistant Secretary, Apple, Inc., re: AB 900
Certification
05/09/2013
Letter from Dolly Sandoval, to City Councilmembers re: Apple
Campus 2
05/16/2013
Letter from David Jamieson, Kimco Realty, to Orrin Mahoney, City of
Cupertino re: Support for Apple Campus 2
05/24/2013
Letter from Scott Morgan, Governor's Office of Planning and
Research, to James C. Fowler, Assistant Secretary, Apple, Inc., re:
AB900 Certification
05/29/2013
Bench, Michael L., A review of the Consolidated Arborist Report For
The Apple Campus 2 Project, Cupertino, CA
05/29/2013
Letter from Peter Pau, Sand Hill Property Company to Orrin Mahoney,
City of Cupertino re: Sand Hill Property Company's Support of Apple
Campus 2
1 -64
sf- 3345921 Q
ATTACHMENT I
INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2
PROJECT
b. Other, including AB 900, Proposal Documents & Late Comments
DATE
DOCUMENT
05/31/2013
Fehr & Peers, Final Apple Campus 2 Draft Transportation Impact
Analysis
05/31/2013
SCI Consulting Group, 2013 - Personal Communication with LSA
00 /00 /0000
(Apple — School Impacts in Cupertino) (Apple — School Impacts in
Santa Clara Unified)
05/31/2013
Letter from Matthew Mahood, San Jose Silicon Valley Chamber of
Commerce to Orrin Mahoney, City of Cupertino re: Apple Campus 2
06/03/2013
Apple Campus 2 Project Environmental Impact Report (EIR)
04/21/2011
Administrative Record, SCH 9 20110 82055, DEIR Reference
Materials Index (Updated 6 -3 -2013)
06/03/2013
Apple Campus 2 Project Environmental Impact Report (EIR)
Administrative Record SCH 9 20110 82055 Comments Received After
the DEIR Scoping Period (Updated 6 -3 -2013)
b. Other, including AB 900, Proposal Documents & Late Comments
1 -65
sf- 3345921 Q
DATE
DOCUMENT
00 /00 /0000
Traffic: Mitigation, Suggestions: Predetermine acceptable traffic level
Establish Trip Cap Penalty Monitor Result of Apple Transportation
Demand Management
00 /00 /0000
Email from Jenna Browning to Jill Bicknell, Chad Mosley, Grant
Schlereth re: SCVURPPP / Apple Campus stormwater discussion
04/06/2011
Email from Gary Chao to Aarti Shrivastava, Kelly Kline, Albert
Salvador, Timm Borden re: Action Items from Apple's meeting (Apr.
06, 20112:31:29 PM PDT)
04/21/2011
Email from Albert Salvador to Gary Chao RE: Fees (Apr. 21, 2011
5:13:47 PM PDT)
• City of Cupertino Fee Estimator — Building Division (Apr.
21. 2011) (Fee Estimate - Apple Campus.pdf)
1 -65
sf- 3345921 Q
ATTACHMENT I
INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2
PROJECT
1 -66
sf- 3345921 Q
DATE
DOCUMENT
04/21/2011
Email from Gary Chao to Aarti Shrivastava re: FW: Fees (Apr. 21,
2011 5:21:56 PM PDT)
• City of Cupertino Fee Estimator — Building Division (Apr.
21, 2011) (Fee Estimate - Apple Campus.pdf)
04/21/2011
Email from Gary Chao to Aarti Shrivastava re: Fee estimates for Apple
Campus (Apr. 21, 20115:31:40 PM PDT)
• City of Cupertino Fee Estimator — Building Division (Apr.
21, 2011) ( Fee Estimate - Apple Campus.pdf)
• Apple Fees (Apple Fees.xls)
• Staff Time Log (Staff Time Log.xls)
05/01/2011
Email from Kermit Cuff to Manish Dalia, David Stillman, Newgren,
Steve RE: Apple Campus 2 and Coordination with VTA (May 01, 2012
11:56:08 AM PDT)
05/05/2011
Email from Gary Chao to Aarti Shrivastava, Albert Salvador re: Apple
FeesAS.xls (May 05, 2011 3:12:18 PM PDT) )
• Apple Fees (Apple FeesAS.xls)
05/05/2011
Email from Albert Salvador to Gary Chao, Aarti Shrivastava RE:
Apple FeesAS.xls (May 05, 20115:13:41 PM PDT)
05/17/2011
Email from Piu Ghosh to Aarti Shrivastava, Gary Chao re: Update -
Apple campus /properties owned north of 280 in North Vallco (May 17,
2011 11:29:00 AM PDT)
• Property Report (Report(1).csv)
05/26/2011
Email from Gary Chao to Aarti Shrivastava re: Apple — height (May
26, 2011 8:39:01 PM PDT)
05/31/2011
Email from Gary Chao to Aarti Shrivastava re: Apple — height (May
31, 2011 10:48:17 AM PDT)
06/15/2011
Email from Gary Chao to Aarti Shrivastava to FW: Bldg Fees - Apple -
REVISED 6.15.1 Lxlsx (June 15, 20115:15:47 PM PDT)
1 -66
sf- 3345921 Q
ATTACHMENT I
INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2
PROJECT
1 -67
sf- 3345921 Q
DATE
DOCUMENT
• Preliminary Estimate of Public Works Department Fees for
the Apple Campus 2 Project (Apple Campus 2 - Public
Works Planning Application Estimate.xls)
07/11/2011
Email from Piu Ghosh to jnoorikkierwright.com re: City of
Cupertino's Protected Trees (July 11, 20115:00:00 PM PDT)
07/12/2011
Email from Don Young to Gary Chao Re: Kick -off meeting (July 12,
2011 10:41:45 AM PDT)
07/12/2011
Email from Piu Ghosh to jnoorikkierwright.com re: FW: City of
Cupertino's Protected Trees (July 12, 2011 9:09:00 AM PDT)
07/13/2011
Arup, Meeting Minutes, Apple Innovation Campus
08/03/2011
Email from Gary Chao to Adam Weinstein Discussion items for
Wednesday August 3, 2011 (July 28, 20114:29:35 PM PDT)
08/03/2011
Email from Adam Weinstein to Aarti Shrivastava, Kelly Kline, Gary
Chao, Piu Ghosh, David Stillman, tre�anggpple.com,
wwagener @fosterandpartners.com, don @dryoungassociates.com,
dgold @mofo.com, mimwalle(c raofo.com re: Apple EIR -- agenda for
10:30 call (Aug. 03, 2011 10:07:37 AM PDT)
• Apple 2 Campus EIR (LSA Job# COC1101) Contact List
(Revised 8 -3 -11) (8 -3 -11 CONTACTS.pdf)
08/09/2011
Apple Campus 2, August 09, 2011, Planned Development Permit,
Introduction
08/09/2011
Apple Campus 2, August 09, 2011, Planned Development Permit, Site
Plan, Landscaping
08/09/2011
Apple Campus 2, August 09, 2011, Planned Development Permit,
Floor Plan Cross Section
08/09/2011
Apple Campus 2, August 09, 2011, Planned Development Permit,
Renderings
08/12/2011
Email from Rick Kitson to City Council re: Apple Talking Points v5 8-
11 -2011 final. docx (Aug. 12, 2011 12:18:10 PM PDT)
1 -67
sf- 3345921 Q
ATTACHMENT I
INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2
PROJECT
1 -68
sf- 3345921 Q
DATE
DOCUMENT
• Apple Talking Points v5, Aug. 12, 2011 (Apple Talking
Points v5 8 -11 -2011 final.docx)
08/16/2011
Email from Gary Chao to Piu Ghosh, Aarti Shrivastava re: Follow up
items for Apple project review (Aug. 16, 2011 11:25:23 AM PDT)
08/17/2011
Email from Adam Weinstein to Aarti Shrivastava, Kelly Kline, Gary
Chao, Piu Ghosh, David Stillman, treagan(c gpple.com,
wwagener @fosterandpartners.com, don @dryoungassociates.com,
dgoldkmofo.com, mimwalle(dr mofo.com, jfowlerkEple.com, Gary
Baum, eric(2morleybros.com, mguberma (2fosterandpartners.com re:
Apple EIR -- agenda for 10:30 call (August 17, 2011 10:00:01 AM
PDT)
08/23/2011
Email from Piu Ghosh to Aarti Shrivastva, Gary Chao RE: DA
description (Aug. 23, 2011 3:10:01 PM PDT)
08/25/2011
Email from Rick Kitson to City Council re: Apple Talking Points v7 8-
25-1 l.docx (Aug. 25, 2011 11:57:23 AM PDT)
• Apple Talking Points v7 (Aug. 25, 2011) (Apple Talking
Points v7 8 -25 -1 l.docx)
08/26/2011
Legal Notice of Environmental Impact Report Scoping Meeting for the
Apple Campus 2 Project (notices, mailing labels, covers)
08/30/2011
Arup, Meeting Minutes, Apple Campus 2
08/30/2011
Email from Adam Weinstein to Gary Chao re: Apple EIR -- agenda for
8/31 call (Aug. 30, 20112:54:3 0 PM PDT)
• Apple Campus 2 EIR August 17, 2011 (Bi- weekly
Conference Call) Meeting Summary (8 -17 -11 Meeting
Summary.doc)
08/31/2011
Email from Adam Weinstein to Aarti Shrivastava, Gary Chao, Piu
Ghosh, David Stillman, tre(2gpple.com,
wwagener @fosterandpartners.com, don(2dryoungassociates.com,
dgoldc�r�,mofo.com, mimwallec�r�,mofo.com, jfowler(24pple.com, Gary
Baum, eric(,morleybros.com, mgubermakfosterandpartners.com,
Rick Kitson, psokolof (c�r�fosterandpartners.com re: Apple EIR -- agenda
for 10:30 call (August 31, 2011 10:01:28 AM PDT)
1 -68
sf- 3345921 Q
ATTACHMENT I
INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2
PROJECT
1 -69
sf- 3345921 Q
DATE
DOCUMENT
• Apple Campus 2 EIR August 17, 2011 (Bi- weekly
Conference Call) Meeting Summary (8 -17 -11 Meeting
Summary.pdf)
09/01/2011
Email from Manish Dalia to Chad Mosle, Timm Borden, David
Stillman, Glenn Goepfert RE: Apple Campus 2 and DPW - Planning
Application and Traffic - Meeting Minutes (Sept. 01, 20114:32:49 PM
PDT)
• Arup, Introduction to Apple Innovation Campus Meeting
Minutes, Aug. 30, 2011 (2011 -08 -30 Cupertino Public
Works -Apple Meeting Minutes - Draft.pdf)
09/02/2011
Email from Wolfgang Wagener to Piu Ghosh re: FW: Project
clarification (Sept. 02, 20118:38:21 PM PDT)
09/02/2011
Email from Timm Borden to Manish Dalia, Chad Mosley, David
Stillman, Glenn Goepfert RE: Apple Campus 2 and DPW - Planning
Application and Traffic - Meeting Minutes (Sept. 02, 2011 7:50:00 AM
PDT)
09/12/2011
Email from Albert Salvador to Gary Chao, David Stillman re: FW:
Campus - Minutes for SCCFD Meeting #1 (Sept. 12, 20119:10:22 AM
PDT)
09/13/2011
Email from Timm Borden to Glenn Goepfert, Chad Mosley, David
Stillman re: Fwd: Apple Campus 2 and DPW - Planning Application
and Traffic - Meeting Minutesc (Sept. 13, 2011 10:33:05 PM PDT)
09/14/2011
Email from Manish Dalia to Timm Borden, Chad Mosley, David
Stillman, Glenn Goepfert RE: Apple Campus 2 and DPW - Planning
Application and Traffic - Meeting Minutes (Sept. 14, 2011 7:46:15 AM
PDT)
• Arup, Meeting Minutes (Aug. 30, 2011) (2011 -08 -30
Cupertino Public Works -Apple Meeting Minutes -
Final.pdf)
09/15/2011
Email from Aarti Shrivastava to Caroline Park, Adam Weinstein RE:
next Apple EIR conference call (Sept. 15, 20115:12:37 PM PDT
09/16/2011
Email from Chad Mosley to Timm Borden FW: agenda for the special
1 -69
sf- 3345921 Q
ATTACHMENT I
INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2
PROJECT
1 -70
sf- 3345921 Q
DATE
DOCUMENT
pre - hearing meeting (Sept. 16, 2011 8:09:18 AM PDT)
• Memo from Community Development Department re:
Special Pre - hearing Review Meeting of Tuesday,
September 20, 2011 (Sept. 7, 2011) (special ph 09 -20-
11. doc)
09/16/2011
Email from Adam Weinstein to Aarti Shrivastava, Gary Chao, Piu
Ghosh, David Stillman, treagang,apple.com,
wwagener @fosterandpartners.com, dongdryoungassociates.com,
dgold @mofo.com, mimwallec�r�,mofo.com, jfowler @apple.com, Gary
Baum, erickmorleybros.com, mgubermakfosterandpartners.com,
Rick Kitson, psokolof (a�fosterandpartners.com RE: next Apple EIR
conference call (Sept. 16, 2011 12:34:55 PM PDT)
09/19/2011
Email from Nichol Bowersox to Piu Ghosh, Chad Mosley re: FW:
Apple's Innovation Campus in Cupertino - Sanitary Sewer (Sept. 19,
20113:19:44 PM PDT)
• Arup, Meeting Minutes (Aug. 3, 2011) (2011 -08 -03
Cupertino Sanitary Sewer District -Apple Meeting Minutes -
Final.pdf)
09/19/2011
Email from Chad Mosley to David Stillman, Glenn Goepfert, Timm
Borden re: Apple - General Conditions
• Apple Campus 2 General Conditions Administered By The
Public Works Dept. (Pre - Hearing General Conditions.doc)
09/19/2011
Email from Timm Borden to Chad Mosley Re: Apple - General
Conditions (Sept. 19, 2011 11:25:28 PM PDT)
09/26/2011
Email from Timm Borden to Chad Mosley FW: Apple field (Sept. 26,
2011 12:31:00 PM PDT)
09/27/2011
Arup, Meeting Minutes, Apple Campus 2
09/28/2011
Email from Judith Malamut to Aarti Shrivastava, Gary Chao, Piu
Ghosh, David Stillman, tre(2apple.com,
wwagener @fosterandpartners.com, don @dryoungassociates.com,
dgold @mofo.com, mimwalle @mofo.com,jfowler @apple.com, Gary
Baum, eric @morleybros.com, mgubermakfosterandpartners.com,
Rick Kitson, psokolof (a�fosterandpartners.com re: Next Apple EIR
1 -70
sf- 3345921 Q
ATTACHMENT I
INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2
PROJECT
1 -71
sf- 3345921 Q
DATE
DOCUMENT
conference call (Sept. 28, 2011 10:19:28 AM PDT)
10/02/2011
Email from Manish Dalia to Chad Mosley, Timm Borden, David
Stillman, Glenn Goepfert, Grant McInnes, Jim Daisa, Joseph McCue,
Peter Sokoloff, Marc Guberman, jmc rg athc�r�,fosterandpartners.com,
wwa eg nergfosterandpartners.com, Piu Ghosh RE: Apple Campus 2
and DPW (Date: Sunday, October 02, 2011 8:04:37 PM PDT)
• Arup, Apple Campus 2 and DPW Coordination Meeting
Minutes, Sept. 27, 2011 (2011 -09 -27 Cupertino Public
Works -Apple Meeting Minutes - DRAFT.pdf)
10/03/2011
Email from Manish Dalia to Timm Borden RE: Apple Campus 2 and
DPW (Oct. 03, 2011 12:59:39 PM PDT)
10/03/2011
Email from Manish Dalia to Timm Borden RE: Apple Campus 2 and
DPW (Oct. 03, 2011 12:59:39 PM PDT)
10/05/2011
Email from Chad Mosley to Timm Borden re: Streamside permit (Oct.
05, 2011 3:01:00 PM PDT)
10/06/2011
Email from Chad Mosley to Cheri Donnell RE: Guidelines and
Standards for developing property adjacent to a creeky (Oct. 05, 2011
3:05:00 PM PDT)
10/10/2011
Email from Manish Dalia to Chad Mosley, Timm Borden, David
Stillman, Glenn Goepfert, Grant McInnes, Jim Daisa, Marc Guberman
Piu Ghosh re: Apple Campus 2 and Cupertino Department of Public
Works - Final Meeting Minutes (Oct. 10, 2011 12:11:07 PM PDT)
• Arup, Apple Campus 2 and DPW Coordination Meeting
Minutes, Sept. 27, 2011 (2011 -09 -27 Cupertino Public
Works -Apple Meeting Minutes - Final.pdf)
10/12/2011
Email from Adam Weinstein to Wolfgang Wagener, Aarti Shrivastava,
Gary Chao, Piu Ghosh, David Stillman, tre�anggpple.com,
dongdrungassociates.com, dgoldgmofo.com,
mimwalle @mofo.com, jfowler @apple.com, Gary
Baum,eric @morleybros.com, Marc Guberman, Rick Kitson, Peter
Sokoloff re: Apple EIR conference call (October 12, 2011 10:02:34
AM PDT)
1 -71
sf- 3345921 Q
ATTACHMENT I
INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2
PROJECT
1 -72
sf- 3345921 Q
DATE
DOCUMENT
10/17/2011
Email from Chad Mosley to Manish Dalia, Timm Borden, David
Stillman, Glenn Goepfert, Grant McInnes, Peter Sokoloff
( psokolof (cr�,fosterandpartners.com) RE: Apple Campus 2 and DPW
(Oct. 17, 20113:46:06 PM PDT)
10/18/2011
Email from Timm Borden to david.tuckergsanjoseca.gov re: Apple
Water (October 18, 20112:29:00 PM PDT)
10/25/2011
Email from David Tucker to Timm Borden RE: Apple Water (Oct. 25,
201111:05:01 AM PDT)
10/25/2011
Email from Adam Weinstein to Gary Chao re: 10/26/11 Apple EIR
conf. call (Oct. 25, 2011 8:43:28 PM PDT)
10/26/2011
Email from Adam Weinstein to Wolfgang Wagener, Aarti Shrivastava,
Gary Chao, Piu Ghosh, David Stillman, tre�anggpple.com,
don(,daoungassociates.com, dgold2mofo.com,
mimwalle @mofo.com, jfowlerggpple.com, Gary Baum,
eric(,morleybros.com, Marc Guberman, Rick Kitson, Peter Sokoloff
re: Apple EIR Conference Call (Oct. 26, 2011 10:02:28 AM PDT)
• Apple Campus 2 EIR: Information Needs (as of October 26,
2011) (10 -26 -11 Information Needs.xls)
10/27/2011
Email from Manish Dalia to Timm Borden re: FW: Apple Campus 2
and SBWR - Preliminary Water Demand Assessment (Oct. 27, 2011
2:46:13 PM PDT)
• Civil — Water Demand Assessment Water Demand
Scenarios (Apple Campus 2 - Water Demand
Assessment.pdf)
10/27/2011
Email from Terry Reagan to Gary Chao re: Requested Employee Data
(Oct. 27, 20114:07: 10 PM PDT)
10/28/2011
Email from Timm Borden to Chad Mosley FW: Apple Campus 2 and
SBWR - Preliminary Water Demand Assessment (Oct. 28, 2011
2:23:43 PM PDT)
• Civil — Water Demand Assessment Water Demand
Scenarios (Apple Campus 2 - Water Demand
Assessment.pdf)
1 -72
sf- 3345921 Q
ATTACHMENT I
INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2
PROJECT
1 -73
sf- 3345921 Q
DATE
DOCUMENT
11/01/2011
Email from Don Young to Gary Chao Re: Requested Employee Data
(Nov. 01, 20114:11:43 PM PDT)
11/02/2011
Email from Terry Reagan to Gary Chao Re: Requested Employee Data
(Nov. 02, 20119:06:21 PM PDT)
11/02/2011
Email from Chad Mosley to Piu Ghosh, Aarti Shrivastava re, Calabazas
Creek Plans (Nov. 02, 2011 8:00:16 AM PDT)
11/04/2011
Apple Campus 2, November 4, 2011, Planning Revision, Update to
Planned Development Permit Submitted 09 August 2011, Introduction
11/04/2011
Apple Campus 2, November 4, 2011, Planning Revision, Update to
Planned Development Permit Submitted 09 August 2011, Site Plan
11/04/2011
Apple Campus 2, November 4, 2011, Planning Revision, Update to
Planned Development Permit Submitted 09 August 2011, Floor Plans
11/04/2011
Apple Campus 2, November 4, 2011, Planning Revision, Update to
Planned Development Permit Submitted 09 August 2011, Renderings
11/06/2011
Email from Manish Dalia to Chad Moslsey re: Apple Campus 2
Meeting (Nov. 06, 20114:31:30 PM PDT)
11/07/2011
Email from Chad Mosley to Timm Borden, Glenn Goepfert, David
Stillman re: FW: Apple Campus 2 Meeting (Nov. 07, 2011 7:24:57
AM PDT)
11/15/2011
Email from Manish Dalia to Chad Mosley, Timm Borden, David
Stillman, Glenn Goepfert, Piu Ghosh, Phil Carter re: Apple Campus 2
and DPW
11/17/2011
Email from Gary Chao to Adam Weinstein re: Jobs Housing Nexus
study (Nov. 17, 2011 11:46:08 AM PDT)
• Agenda Item No. 8, Consider adopting a resolution
Resolution No 07 109 approving housing mitigation fees
continued from June 5 2007 (June 19, 2007) (Housing
Mitigation fees.pdf)
• Keyser Marston Associates, Inc., Jobs Housing Nexus
Update (Oct. 2004) (Final JH Nexus Report.pdf)
1 -73
sf- 3345921 Q
ATTACHMENT I
INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2
PROJECT
1 -74
sf- 3345921 Q
DATE
DOCUMENT
11/17/2011
Email from Gary Chao to Aarti Shrivastva, Gary Baum re: FW: Event
Usage (Nov. 17, 2011 8:38:19 AM PDT)
11/17/2011
Email from Gary Chao to Adam Weinstein re: Jobs Housing Nexus
study (Nov. 17, 2011 11:46:07 AM PDT)
• Agenda Item No. 8, Consider adopting a resolution
Resolution No 07 109 approving housing mitigation fees
continued from June 5 2007 (June 19, 2007) (Housing
Mitigation fees.pdf) (Housing Mitigation fees.pdf)
• Keyser Marston Associates, Inc., Jobs Housing Nexus
Update (Oct. 2004) (Final JH Nexus Report.pdf)
11/21/2011
Email from Aarti Shrivastava to Aarti Shrivastava, Gary Baum RE:
FW: Requested Employee Data (Nov. 21, 20114:40:26 PM PDT)
12/02/2011
Email from Piu Ghosh to usha.chatwani @valleywater.org, Sue Tippets
re: November 30, 2011 meeting between City of Cupertino and Water
District (December 02, 20113:00:21 PM PDT)
12/05/2011
Email from Gary Chao to Timm Borden, Aarti Shrivastava re: Smart
Board Concept (Dec. 05, 20112:48:02 PM PDT)
12/07/2011
Email from Adam Weinstein to Wolfgang Wagener, Aarti Shrivastava,
Gary Chao, Piu Ghosh, David Stillman, tre�anggpple.com,
don @dryoungassociates.com, dgoldkmofo.com,
mimwalle @mofo.com, jfowler @apple.com, Gary Baum,
eric @morleybros.com, Marc Guberman, Rick Kitson, Peter Sokoloff
re: Apple EIR Conference Call -- 10:30 a.m. (Dec. 07, 2011 10:01:16
AM PDT)
12/09/2011
Email from Gary Chao to Piu Ghosh, Aarti Shrivastava RE: Height &
Mechanical Equipment (Dec. 09, 20114:13:08 PM PDT)
12/20/2011
Email from Piu Ghosh to: Aarti Shrivastava, Timm Borden, Chad
Mosley, Gary Chao, David Stillman re: FW: Campus Masterplan
Review With City of Cupertino (Dec. 20, 2011 5:04:48 PM PDT)
12/20/2011
Email from Piu Ghosh to Aarti Shrivastava, Timm Borden, Chad
Mosley, Gary Chao, David Stillman re: FW: Campus Masterplan
Review With City of Cupertino (Dec. 20, 20115:04:48 PM PDT)
1 -74
sf- 3345921 Q
ATTACHMENT I
INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2
PROJECT
1 -75
sf- 3345921 v2
DATE
DOCUMENT
12/22/2011
Email from Piu Ghosh to Terry Reagan, Don Young, Wolfgang
Wagener re: Second Submittal Comment Letter (December 22, 2011
1:31:26 PM PDT)
• Letter from City of Cupertino to Apple, Inc. re: Preliminary
Comments Letter (Dec. 21, 2011) (Apple Campus 2
Incomplete Letter 12- 22- 11.pdf)
12/23/2011
Email from Don Young to Timm Borden Re: Wolfe Access (Dec. 23,
2011 10:57:32 AM PDT)
12/23/2011
Email from Don Young to Gary Chao Re: New driveway consideration
(Dec. 23, 20115:13:58 PM PDT)
12/27/2011
Email from Hossein Ashktorab to Bill Tuttle, Bob Wilson, Chris de
Groot, Curtis Lam, David Tucker, Eric Hansen, George Belhumeur,
Jim Craig, Jim Fiedler, Jo Zientek, John Stufflebean, Lorrie Gervin,
Mansour Nasser, Mary Hoang, Nichol Bowersox, Pam John, Richard
Tanaka, Ron Richardson, Steve Machida, Timm Borden, Tom Salzano,
Tom Smegal, Beth Redmond re: Draft letters of intent and Apple Inc
Information (Dec. 27, 2011 1:43:58 PM PDT)
• Draft Letter of Intent to Bureau of Reclamation (Oct. 13,
2011) (Letter of Intent to Fund Northern Regional
Connector.doc)
• Draft Letter of Intent to Bureau of Reclamation (Jan. 10,
2012) (DRAFT Letter of Intent - SCVWD.DOCX)
01/04/2012
Email from Gary Chao to Timm Borden, David Stillman re: FW:
Apple: Citizens for East Shore Parks v. California State Lands: New
CEQA case re existing conditions Baseline (January 04, 2012 4:05:25
PM PDT)
• Citizens For East Shore Parks v. California State Lands
Commission, No. A129896 (Cal. Ct. App filed Dec. 30,
2011) (2011 East Bay Parks Baseline Case.pdf)
01/04/2012
Email from Hossein Ashktorab to Bill Tuttle, Bob Wilson, Chris de
Groot, Curtis Lam, David Tucker, Eric Hansen, George Belhumeur,
James O'Brien, Jim Craig, Jim Fiedler, Jo Zientek, John Stufflebean,
Lorrie Gervin, Mansour Nasser, Mary Hoang, Nichol Bowersox, Pam
1 -75
sf- 3345921 v2
ATTACHMENT I
INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2
PROJECT
1 -76
sf- 3345921 Q
DATE
DOCUMENT
John, Richard Tanaka, Ron Richardson, Steve Machida, Timm Borden,
Tom Salzano, Tom Smegal, Toni Vye, Val Conzet re: Tomorrow's
meeting- agenda and the Notes (Date: Wednesday, January 04, 2012
5:24:19 PM PDT)
• Draft Meeting Notes, Regional Recycled Water Team
Meeting, Dec. 22, 2011 (RRWT Meeting Notes - Draft
December 22 201 Ldoc)
• Meeting Agenda, Regional Recycled Water Intertie (RRWI)
Meeting, Jan. 5, 2012 (1 -5 -12 meeting- agenda RRWLdoc)
01/09/2012
Email from Michael Bench to Piu Ghosh to Apple Campus 2 (Jan. 09,
2012 2:35:56 PM PDT)
01/14/2012
Email from Franziska Church to Piu Ghosh RE: Parking requirement
(Jan. 14, 2013 5:11:15 PM PDT)
01/17/2012
Apple Campus 2, Development Plan Update, January 17, 2012
01/18/2012
Email from Jaclyn Winkel to Piu Ghosh re: Comments on the Apple
Campus 2 proposed plans (Jan. 18, 2012 3:28:52 PM PDT)
01/18/2012
Email from Jaclyn Winkel to Piu Ghosh re: Comments on the Apple
Campus 2 proposed plans (Jan. 18, 2012 3:29 PM PDT)
01/18/2012
Email from Adam Weinstein to Aarti Shrivastava, Gary Chao, Piu
Ghosh, David Stillman, treagan @apple.com, jfowlerkUple.com,
wwagener @fosterandpartner.com, Peter Sokoloff,
don @dryoungassociates.com, dgoldkmofo.com,
mimwalle @mofo.com, Judith Malamut, Franziska Church, Jane
Bierstedt, Rick Kitson, Gary Baum, Eric Morley, Foulkes @apple.com,
Scott D. Pinsky re: Apple Campus 2 EIR -- Biweekly Call 10:30 a.m.
(Jan. 18, 2012 10:02:29 AM PDT)
01/25/2012
Email from Traci Caton to Aarti Shrivastava re: Hamptons Apts are
COMPLETELY in SCUSD
01/25/2012
Email from Megan King RE: SBWR WaterSMART 2012 Application
(Jan. 25, 2012 4:25:34 PM PDT)
• Grant Application Package (SBWR WaterSMART 2012
1 -76
sf- 3345921 Q
ATTACHMENT I
INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2
PROJECT
1 -77
sf- 3345921 Q
DATE
DOCUMENT
Application Compressed.pdf)
01/25/2012
Email from Nichol Bowersox to Chad Mosley Re: Apple Campus 2 -
Relocation Options (Jan. 25, 2012 4:40:24 PM PDT)
01/26/2012
Email from Mark Linder to Aarti Shrivastava, Gary Baum, Timm
Borden re: RE: Barn (Jan. 26, 2012 4:29:16 PM PDT)
01/26/2012
Email from Albert Salvador to Eric Borchers RE: Campus Parking
Structure Code Question (Jan. 26, 2012 2:01:33 PM PDT)
01/31/2012
Email from Gary Chao to Aarti Shrivastava Re: How about this for the
SCVWD? (Jan. 31, 2012 7:37:14 AM PDT)
01/31/2012
Email from Piu Ghosh to Sue Tippets, Usha Chatwani re: Apple
Campus 2 - proposed relocation of SCVWD easements (Jan. 31, 2012
10:09:35 AM PDT)
02/01/2012
Email from Adam Weinstein to Aarti Shrivastava, Gary Chao, Piu
Ghosh, David Stillman, treagan@apple.com, jfowlerggpple.com,
wwagener @fosterandpartner.com, Peter Sokoloff,
don @dryoungassociates.com, dgoldgmofo.com,
mimwalle @mofo.com, Judith Malamut, Franziska Church, Jane
Bierstedt, Rick Kitson, Gary Baum, Eric Morley, Foulkes @apple.com,
Scott D. Pinsky, Chad Mosley re: Apple Campus 2 EIR -- Biweekly
Call 10:30 a.m. (February 01, 2012 10:02:42 AM PDT)
02/01/2012
Email from Adam Weinstein to Aarti Shrivastava, Gary Chao, Piu
Ghosh, David Stillman, treagan@apple.com, jfowlerggpple.com,
wwagener @fosterandpartner.com, Peter Sokoloff,
don @dryoungassociates.com, dgoldkmofo.com,
mimwallegmofo.com, Judith Malamut, Franziska Church, Jane
Bierstedt, Rick Kitson, Gary Baum, Eric Morley, Foulkes @apple.com,
Scott D. Pinsky, Chad Mosley re: Apple Campus 2 EIR -- Biweekly
Call 10:30 a.m. (Feb. 01, 2012 10:02:42 AM PDT)
02/06/2012
Email from Aarti Shrivastava to Timm Borden, Adam Weinstein,
Judith Malamut, Gary Baum, Gary Chao, Piu Ghosh, Chad Mosley,
David Stillman RE: Apple EIR schedule (Feb. 06, 2012 5:48:48 PM )
• DRAFT Schedule for Apple Campus 2 Project EIR
(Revised 2/06/2012) (
1 -77
sf- 3345921 Q
ATTACHMENT I
INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2
PROJECT
1 -78
sf- 3345921 Q
DATE
DOCUMENT
AppleEIRschedule020612andAltentrystaffcopy .xlsx)
• DRAFT Schedule for Apple Campus 2 Project EIR
(Revised 2/06/2012)
( AppleEIRschedule020612andAltentry .xlsx)
02/06/2012
Email from Orrin Mahoney to David Knapp, Timm Borden, Aarti
Shrivastava, Carol Korade, Rick Kitson, Mark Linder re: Apple
campus vs Pentagon (Feb. 06, 2012 9:43:46 PM PDT)
• A Size Comparison (June 9, 2011) ( Size compare.pdf)
02/08/2012
Email from Adam Weinstein to Aarti Shrivastava, Gary Chao, Piu
Ghosh, David Stillman, treagan @apple.com, jfowlerkgpple.com,
wwa eng ergfosterandpartner.com, Peter Sokoloff,
don @dryoungassociates.com, dgoldkmofo.com,
mimwalle @mofo.com, Judith Malamut, Franziska Church, Jane
Bierstedt, Rick Kitson, Gary Baum, Eric Morley, Foulkes @apple.com,
Scott D. Pinsky, Chad Mosley re: RE: Apple Campus 2 EIR --
Biweekly Call 10:30 a.m. (Wed., February 08, 2012 3:20:22 PM
• Apple Campus 2 EIR, February 1, 2012 (Bi- weekly
Conference Call) Meeting Summary (2 -1 -12 Meeting
Summary.pdf)
02/14/2012
Email from Piu Ghosh to Don Young, Terry Reagan re: Comment
Letter (Feb. 14, 2012 1:53:44 PM PDT)
• Letter from City of Cupertino to Apple, Inc. re: Preliminary
Comment Letter (Feb. 14, 2012) (Apple Campus 2
Comment Letter 2- 14- 12.pdf)
02/15/2012
Email from Aarti Shrivastava to Gary Baum, Gary Cha, David
Stillman, Chad Mosley, Timm Borden re: FW: Apple RE: Draft
Schedule for tomorrow's discussion (Feb. 15, 2012 2:00:23 PM PDT)
02/15/2012
Email from Aarti Shrivastava to Adam Weinstein, Gary Baum, Piu
Ghosh re: Revised Schedule - please review (Feb. 15, 2012 6:21:20 PM
PDT)
• DRAFT Schedule for Apple Campus 2 Project EIR
(Revised 2/16/2012) (Revised EIR Schedule 021612.xlsx)
1 -78
sf- 3345921 Q
ATTACHMENT I
INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2
PROJECT
1 -79
sf- 3345921 Q
DATE
DOCUMENT
02/16/2012
Email from Aarti Shrivastava to Gary Baum, Adam Weinstein, Judith
Malamut, Timm Borden, Piu Ghosh, Gary Chao, Chad Mosley, David
Stillman re: Revised EIR schedule for Apple (Feb. 16, 2012 10:44:10
AM PDT)
• DRAFT Schedule for Apple Campus 2 Project EIR
(Revised 2/16/2012) (Revised EIR Schedule 021612.xlsx )
02/21/2012
Email from Gary Chao to Piu Ghosh, Aarti Shrivastava Re: number of
sets for RC2A Prototype (Feb. 21, 2012 10:17:12 PM PDT)
02/24/2012
Email from Aarti Shrivastava to David Woo re: Assessment
comparisons (Feb. 24, 2012 11:52:45 AM PDT)
• Apple Assessment (Oct. 11, 2013) (Apple Assessment.xls)
03/01/2012
Email from Gary Chao to Adam Weinstein, Piu Ghosh, Aarti
Shrivastava, Chad Mosley, Timm Borden re: Revised construction
logistics plan (Mar. 01, 2012 4:51:27 PM PDT)
03/05/2012
Email from Peter Sokoloff to Piu Ghosh re: Follow -up Traffic meeting
(Mar. 05, 2012 3:13:59 PM PDT)
03/06/2012
Email from Adam Weinstein To: Gary Chao, Piu Ghosh, David
Stillman, jfowler @apple.com, Peter Sokoloff, dgoldkmofo.com,
mimwalle @mofo.com, Judith Malamut, Franziska Church, Jane
Bierstedt, Rick Kitson, Gary Baum, Eric Morley, Foulkes @apple.com,
Scott D. Pinsky, Chad Mosley, Timm Borden, JJeffers(c rofo.com,
dwhisenhunt @apple.com, Aarti Shrivastava, diana.fazely @gmail.com,
David Brandt, wwagener @fosterandpartners.com,
soki @fosterandpartners.com, william.baura arg dnergarup.com,
Michael.iswaltc�r�gM.com RE: Apple EIR -- Weekly Team Meeting
3/7 (March 06, 2013 3:17:44 PM PDT)
03/08/2012
Letter from Richard Tanaka to Piu Ghosh
03/11/2012
Email from John Brazil to Mark Santoro re: Proposed Apple Campus -
provide housing and great for transit/walking/biking connections (Mar.
11, 2012 5:32:39 PM PDT)
03/12/2012
Email from Gary Chao to Chad Mosley RE: Apple
Building /grading/relocation of utilities and other permits (Mar. 12,
1 -79
sf- 3345921 Q
ATTACHMENT I
INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2
PROJECT
1 -80
sf- 3345921 Q
DATE
DOCUMENT
2012 3:38:16 PM PDT)
03/12/2012
Email from Chad Mosley to Piu Ghosh, Gary Chao, Albert Salvador,
David Stillman, Larry Squarcia RE: Apple building/grading /relocation
of utilities and other permits (Mar. 12, 2012 4:11:09 PM PDT)
03/12/2012
Email from Timm Borden to David Stillman, Aarti Shrivastava, Gary
Chao, Piu Ghosh re: FW: Proposed Apple Campus - provide housing
and great for transit / walking / biking connections
03/12/2012
Email from Piu Ghosh to Peter Sokoloff RE: Follow -up Traffic
meeting (March 12, 2012 11:48:30 AM PDT)
03/12/2012
Email from Gary Chao to Chad Mosley RE: Apple
building/grading /relocation of utilities and other permits (Mar. 12,
2012 3:38:16 PM PDT)
03/12/2012
Email from Chad Mosley to Piu Ghosh, Gary Chao, Albert Salvador,
David Stillman, Larry Squarcia RE: Apple building/grading /relocation
of utilities and other permits (Mar. 12, 2012 4:11:00 PM PDT)
03/12/2012
Email from Chad Mosley to Piu Ghosh, Gary Chao, Albert Salvador,
David Stillman, Larry Squarcia RE: Apple building/grading /relocation
of utilities and other permits (Mar. 12, 2012 4:11:09 PM PDT)
03/15/2012
Email from Timm Borden to Aarti Shrivastava, Gary Baum, Gary
Chao, Chad Mosley, Piu Ghosh re: Apple Campus Recycled Water
(Mar. 15, 2012 12:51:20 PM PDT)
03/15/2012
Email from Mike Foulkes to Timm Borden Re: Apple Situation Room
(Mar. 15, 2012 11:55:23 AM PDT)
03/16/2012
Email from Adam Weinstein to Aarti Shrivastava RE: Apple Campus
Recycled Water (March 16, 2012 9:01:32 AM PDT)
03/20/2012
Email from Piu Ghosh to Adam Weinstein, Judith Malamut, Eric
Morley, Donald R. Young, Terry Reagan RE: FW: Comments on ASA
Approval
03/20/2012
Email from Patrick Grant to City of Cupertino Planning Dept.,
trreagan(c gpple.com re, Comment on Apple 2 updated plan
1 -80
sf- 3345921 Q
ATTACHMENT I
INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2
PROJECT
1 -81
sf- 3345921 v2
DATE
DOCUMENT
03/20/2012
Email from Aarti to Timm Borden re: Google and Mountain View May
Pursue "Personal Rapid Transit" To Solve Commute Congestion
California Planning & Development Report (Mar. 20, 2012 4:37:40
PM PDT)
03/22/2012
Email from Aarti Shrivastava to Timm Borden, David Stillman, Chad
Mosley re: FW: Comment on Apple 2 updated plan (Mar. 22, 2012
9:35:50 AM PDT)
03/23/2012
Email from Cupertino Patch to Timm Borden re: Apple at Core of
Conflict of Interest with Councilmember and more from Cupertino
Patch (Mar. 23, 2012 12:14:35 PM PDT)
03/26/2012
Email from Wolfgang Wagener to Piu Ghosh RE: Development Area
Analysis (Mar. 26, 2012 8:31:48 PM PDT)
• Arup, Pedestrian and Bicycle Surveys on Pruneridge
Avenue (Mar. 26, 2012) (20120326—Pruneridge Pedestrian
and Bicyclists memo.pdf)
03/26/2012
Email from Wolfgang Wagener to Piu Ghosh RE: Development Area
Analysis (Mar. 26, 2012 8:31:48 PM PDT)
• Arup, Pedestrian and Bicycle Surveys on Pruneridge
Avenue (Mar. 26, 2012) (20120326—Pruneridge Pedestrian
and Bicyclists memo.pdf)
03/27/2012
Email from Wolfgang Wagener to Piu Ghosh, Peter Sokoloff,
Donkdaoungassociates.com Re: Additional needs from Nelson
Nygaard (Mar. 27, 2012 3:04:05 PM PDT)
• Draft Employee Traffic Distribution (120327—Perimeter
Condition_ employee distribution.pdf)
03/27/2012
Email from Wolfgang Wagener to Piu Ghosh, Peter Sokoloff,
Donkdaoungassociates.com Re: Additional needs from Nelson
Nygaard (Mar. 27, 2012 3:04:05 PM PDT)
• Draft Employee Traffic Distribution (120327—Perimeter
Condition_ employee distribution.pdf)
03/28/2012
Email from Chad Mosley to Piu Ghosh, Aarti Shrivastava Gary Chao
1 -81
sf- 3345921 v2
ATTACHMENT I
INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2
PROJECT
1 -82
sf- 3345921 Q
DATE
DOCUMENT
re: FW: Question regarding Newby Island Landfill capture of biogas
(Mar. 28, 2012 1:40:00 PM PDT)
03/28/2012
Letter from Roy Molseed, Santa Clara Valley Transportation Authority
to Gary Chao, City of Cupertino re: Apple Campus 2
03/30/2012
Email from Chad Mosley to Timm Borden re: FW: Title
documentation for Apple Campus 2 (Mar. 30, 2012 8:35:13 AM PDT)
03/31/2012
Email from David Stillman to Rick Kitson RE: Roadshow -- I -280 road
final -- Wolfe Rd. S. to 280 N. Lane Confusion (Mar. 21, 2012 9:05:21
AM PDT)
04/02/2012
Email from Peter Sokoloff to Piu Ghosh re: FW: Reply to Arborist's
comments (Apr. 02, 2012 6:06:30 PM PDT)
• Olin Memorandum to City of Cupertino Response to the
Review of the Consolidated Arborist Report (Apr. 2, 2012)
(120402_ ResponsetoArboristC omments_REVISED.pdf)
04/03/2012
Email from Miles Imwalle to Piu Ghosh CONFIDENTIAL: Environ
back up data (Date: Tuesday, April 03, 2012 2:34:00 PM PDT)
• Back -up data for Environ's GHG analysis (CaIEEMod Input
and Results Files.zip)
• Apple — Baseline — 2005 Santa Clara County,
Annual (Apr. 2, 2012) (Baseline 2005 - Apple -
Results.xls)
• Baseline 2005 Apple (Baseline 2005 - Apple.xls)
• HP - Baseline — 2005, Santa Clara County, Annual
(Apr. 2, 2012) (Baseline 2005 - HP - Results.xls)
• Baseline 2005 HP (Baseline 2005 - HP.xls)
• Apple - Baseline — 2011 Santa Clara County,
Annual (Apr. 2. 2012) (Baseline 2011 - Apple -
Results.xls)
• Baseline 2011 Apple (Baseline 2011 - Apple.xls)
1 -82
sf- 3345921 Q
ATTACHMENT I
INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2
PROJECT
1 -83
sf- 3345921 Q
DATE
DOCUMENT
• HP - Baseline — 2011 Santa Clara County, Annual
(Mar. 23, 2012) (Baseline 2011 - HP - Results.xls)
• Baseline 2011 HP (Baseline 2011 - HP.xls)
• Apple - Project - 2016 - Electric Vehicles Santa
Clara County, Annual (Apr. 2, 2012) (Project 2016 -
300 Electric Vehicle - Results.xls)
• Project 2016 — 300 Electric Vehicles (Project 2016 -
300 Electric Vehicle.xls)
• Apple - Project— 2016 Santa Clara County, Annual
(Apr. 2, 2012) (Project 2016 - Results.xls)
• Project 2016 (Project 2016.xls)
• Apple - Project - 2017 - Electric Vehicles Santa
Clara County, Annual (Apr. 2, 2012) (Project 2017 -
300 Electric Vehicle - Results.xls)
• Project 2017 — 300 Electric Vehicle (Project 2017 -
300 Electric Vehicle.xls)
• Apple - Project— 2017 Santa Clara County, Annual
(Apr. 2, 2012) (Project 2017 - Results.pdf)
• Project 2017 (Project 2017.xls)
• Apple - Project - 2018 - Electric Vehicles Santa
Clara County, Annual (Apr. 2, 2012) (Project 2018 -
300 Electric Vehicle - Results.pdf)
• Project 2018 — 300 Electric vehicles) (Project 2018 -
300 Electric Vehicle.xls)
• Apple - Project — 2018 Santa Clara County, Annual
(Apr. 2, 2012) (Project 2018 - Results.pdf)
o Project 2018 (Project 2018.xls)
• Apple - Project - 2019 - Electric Vehicles Santa
Clara County, Annual (Apr. 2, 2012) (Project 2019 -
1 -83
sf- 3345921 Q
ATTACHMENT I
INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2
PROJECT
1 -84
sf- 3345921 Q
DATE
DOCUMENT
300 Electric Vehicle - Results.xls)
• Project 2019 — 300 Electric Vehicle (Project 2019 -
300 Electric Vehicle.xls)
• Apple - Project— 2019 Santa Clara County, Annual
(Apr. 2, 2012) (Project 2019 - Results.xls)
• Project 2019 (Project 2019.xls)
• Apple - Project - 2020 - Electric Vehicles Santa
Clara County, Annual (Apr. 2, 2012) (Project 2020 -
300 Electric Vehicle - Results.xls)
• Project 2020 — 300 Electric Vehicle (Project 2020 -
300 Electric Vehicle.xls)
• Apple - Project— 2020 Santa Clara County, Annual
(Apr. 2, 2012) (Project 2020 - Results.xls)
• Project 2020 (Project 2020.xls)
04/04/2012
Email from Wolfgang Wagener to Piu Ghosh, Adam Weinstein re:
Apple ADEIR 92 - Waste Diversion and Central Plant (Apr. 04, 2012
9:24:24 PM PDT)
• Apple Campus 2 Waste Diversion Programs in Cupertino
• DRAFT - -- April 2012 (Apple Campus 2 Waste
Diversion.pdf)
• MEP — Central Plant Energy and Equipment Summary
(04042012 Central Plant EIR Information - REDUCED
PV.pdf)
04/04/2012
Email from Aarti Shrivastava to Timm Borden, Chad Mosley, David
Stillman re: FW: Pruneridge Ave. -- Bike and Ped Counts (Apr. 04,
2012 8:32:12 PM PDT)
04/04/2012
Email from David Stillman to Manish Dalia, Timm Borden RE: Apple
Campus 2 - Caltrans Coordination (Apr. 04, 2012 3:49:00 PM PDT)
04/05/2012
Email from Manish Dalia to David Stillman, Timm Borden RE: Apple
1 -84
sf- 3345921 Q
ATTACHMENT I
INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2
PROJECT
1 -85
sf- 3345921 Q
DATE
DOCUMENT
Campus 2 - Caltrans Coordination (Apr. 05, 2012 8:45:06 AM PDT)
• Street Improvements, P -4.2, Revision 2 (Feb. 29, 2012)
(Tantau Street Cross Sections - Planning Application 02-29 -
12.pdf)
• Tantau Bridge with landscaped median (Tantau Bridge with
landscaped median.pdf)
04/06/2012
Email from Aarti Shrivastava to Gary Baum, Timm Borden re: FW:
Map requested — Confidential (Apr. 06, 2012 12:56:12 PM PDT)
• Map (Map.pdf)
04/06/2012
Email from Piu Ghosh to Timm Borden, Chad Mosley, David Stillman,
Gary Chao re: FW: Apple EIR Schedule 04052012staf£xlsx (Apr. 06,
2012 4:27:04 PM PDT)
• DRAFT Schedule for Apple Campus 2 Project EIR
(Revised 3/5/2012) (Apple EIR Schedule
04052012staff.xlsx)
04/11/2012
Email from Adam Weinstein Aarti Shrivastava, Gary Chao, Piu Ghosh,
David Stillman, tre�anggpple.com, jfowlerggpple.com,
wwa eg ner(,fosterandpartner.com, Peter Sokoloff,
don @dryoungassociates.com, dgoldgmofo.com,
mimwalle @mofo.com, Judith Malamut, Franziska Church, Jane
Bierstedt, Rick Kitson, Gary Baum, Eric Morley, Foulkes @apple.com,
Scott D. Pinsky, Chad Mosley, Traci Caton, Timm Borden re: Apple
Campus 2 EIR -- Biweekly Call 10:30 a.m. (Apr. 11, 2012 10:06:11
AM PDT)
04/11/2012
Email from Adam Weinstein to Aarti Shrivastava, Gary Chao, Piu
Ghosh, David Stillman, treagankUple.com, jfowler(c gpple.com,
wwa enger c�r�,fosterandpartner.com, Peter Sokoloff,
don @dryoungassociates.com, dgold(,mofo.com,
mimwalle @mofo.com, Judith Malamu, Franziska Church, Jane
Bierstedt, Rick Kitson, Gary Baum, Eric Morley, Foulkes @apple.com,
Scott D. Pinsky, Chad Mosley, Traci Caton, Timm Borden re: Apple
Campus 2 EIR -- Biweekly Call 10:30 a.m. (Apr. 11, 2012 10:06:11
AM PDT)
1 -85
sf- 3345921 Q
ATTACHMENT I
INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2
PROJECT
1 -86
sf- 3345921 v2
DATE
DOCUMENT
04/12/2012
Email from Piu Ghosh to David Stillman re: Bike Lane on Vallco
Pkway (Apr. 12, 2013 10:05:00 AM PDT)
04/12/2012
Letter from Peter Oppenheimer, Apple, Inc. to Aarti Shrivastava, City
of Cupertino Re: Apple Campus 2 Project: Acknowledgement of
Obligations under Public Resources Code§ 21183(d), (e) and (f)
04/15/2012
Email from Piu Ghosh to Timm Borden RE: Apple Campus 2 -
City/VTA Coordination (Apr. 15, 2013 9:24:16 AM PDT)
04/16/2012
Email from Steve Newgren to David Stillman re: Line 81 Bus Stops
Near Vallco Area (Apr. 16, 2012 10:43:17 AM PDT)
04/19/2012
Email from Miles Imwalle to Aarti Shrivastava, Gary Baum re:
Updated Project Description (Apr. 19, 2012 11:25:43 AM PDT)
• Apple Campus 2 Project Description, April 2012
(120417_ Project Description_ City_Application _ v9.pdf)
04/24/2012
Email from Wolfgang Wagener to Gary Chao, Piu Ghosh, Adam
Weinstein, Aarti Shrivastava re: FW: EIR - Light Pollution (Apr. 24,
2012 1:44:47 PM PDT)
04/24/2012
Email from Peter Sokoloff to Gary Chao, Piu Ghosh re: Alternative
Auditorium service tunnel curb cut location (Apr. 24, 2012 1:44:50 PM
PDT)
• Potential Auditorium Service Entry (120424 potential
auditorium entry.pdf)
04/26/2012
Email from Wolfgang Wagener re: AC2 TDM description (April 26,
2012 8:02:47 AM PDT)
• Apple I Existing TDM Programs 12012 (Apple TDM April
2012.pdf)
05/01/2012
Email from David Stillman to Kermit Cuff RE: Apple Campus 2 and
Coordination with VTA (May 01, 2012 9:34:31 AM PDT)
05/01/2012
Email from Aarti Shrivastava to Timm Borden re: Fwd: AC2: Proposed
agenda for Wednesday's meeting (May 01, 2012 1:42:49 PM PDT)
1 -86
sf- 3345921 v2
ATTACHMENT I
INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2
PROJECT
1 -87
sf- 3345921 Q
DATE
DOCUMENT
05/01/2012
Apple Otreach, May 2012 and March 2013
05/03/2012
Email from Rick Kitson to City Council re: 4- 28 -12: NY times article
(May 03, 2012 11:12:34 PM PDT)
• Charles Duhigg and David Kocieniewki, How Apple
Sidesteps Billions in Tares, The New York Times, Apr. 28,
2012, http: / /www.nytimes.com /2012 /04 /29/business /apples-
tax- strategy- aims -at -low- tax - states -an.. (last visited May 2,
2012) (apples- tax - strategy -.pdf)
05/03/2012
Email from Aarti Shrivastava to Piu Ghosh, Gary Chao, Timm Borden
re: FW: AB 900 Application (May 03, 2012 1:03:16 PM PDT)
• Apple, Application for Environmental Leadership
Development Project, April 18, 2012 (Final
AB900_Application.pdf)
05/09/2012
Email from Manish Dalia to Timm Borden, David Stillman re: Apple
Campus 2 and Caltrans - Draft Meeting Minutes (May 09, 2012
1:54:27 PM PDT)
• Arup, Meeting Minutes (May 3, 2012) (Draft - 2012-05 -
07_C altrans_and_Apple_Campus_2_-
_Meeting_Minutes.pdf )
05/09/2012
Email from Michael Bench to Piu Ghosh Re: Coast Redwoods at the
Apple Campus site (May 09, 2012 5:42:48 PM PDT)
05/09/2012
Email from Michael Bench to Piu Ghosh Re: Coast Redwoods at the
Apple Campus site (May 09, 2012 5:52:25 PM PDT)
05/09/2012
Email from Michael Bench to Piu Ghosh Re: Coast Redwoods at the
Apple Campus site (May 09, 2012 5:57:18 PM PDT)
05/09/2012
Email from Manish Dalia to David Stillman, Timm Borden RE: Apple
Campus 2 and Caltrans - Draft Meeting Minutes (May 09, 2012
7:49:14 PM PDT)
05/14/2012
Email from Piu Ghosh to Timm Borden, Aarti Shrivastava re: Things
to discuss with Apple (May 14, 2012 10:13:06 AM PDT)
1 -87
sf- 3345921 Q
ATTACHMENT I
INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2
PROJECT
1 -88
sf- 3345921 Q
DATE
DOCUMENT
05/15/2012
Email from Cheri Donnelly to Adam Weinstein RE: recycling rate in
Cupertino (May 15, 2012 1:14:22 PM PDT)
• City of Cupertino, City Council Staff Report, Ordinance
amending Chapter 6.24 (Garbage and Recycling Collection
and Disposal) of the Cupertino Municipal Code to address
"Mandatory Recycling" requirements (AB 341) for multi-
family and commercial business recycling (May 1, 2012)
(Document Cupertino's 75 percent Diversion Goal.5 -1 -12
Council Mtg.pdf)
05/16/2012
Email from Adam Weinstein to Aarti Shrivastava, Gary Chao, Piu
Ghosh, David Stillman, treagan@apple.com, jfowlerggpple.com,
wwagener @fosterandpartner.com, Peter Sokoloff,
donc�r�,daoungassociates.com, dgoldgmofo.com,
mimwalle @mofo.com, Judith Malamut, Franziska Church, Jane
Bierstedt, Rick Kitson, Gary Baum, Eric Morley, Foulkes @apple.com,
Scott D. Pinsky, Chad Mosley, Traci Caton, Timm Borden RE: Apple
Campus 2 EIR -- Weekly Call 10:30 a.m. Wed. (May 16, 2012 9:58:53
AM PDT)
05/16/2012
Email from Adam Weinstein to Aarti Shrivastava, Gary Chao, Piu
Ghosh, David Stillman, treagangUple.com, jfowler(c gpple.com,
wwa engerc�r�,fosterandpartner.com, Peter Sokoloff,
dongdrungassociates.com, dgoldgmofo.com,
mimwalle(,mofo.com, Judith Malamut, Franziska Church, Jane
Bierstedt, Rick Kitson, Gary Baum, Eric Morley, Foulkes(c gpple.com,
Scott D. Pinsky, Chad Mosley, Traci Caton, Timm Borden re: RE:
Apple Campus 2 EIR -- Weekly Call 10:30 a.m. Wed. (May 16, 2012
9:58:53 AM PDT)
05/20/2012
Email from Nichol Bowersox to Chad Mosley re: FW: Apple Campus
2 and Sanitary Sewer (May 20, 2012 3:10:15 PM PDT)
05/21/2012
Letter from Robert Cartier, Archaeological Resource Management, to
Aarti Shrivastava, City of Cupertino re: New Apple Campus
Construction
05/22/2012
Email from William Baumgardner to Adam Weinstein, Peter Sokoloff
RE: Apple VISSIM analysis (May 22, 2012 8:24:16 PM PDT)
1 -88
sf- 3345921 Q
ATTACHMENT I
INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2
PROJECT
1 -89
sf- 3345921 Q
DATE
DOCUMENT
05/22/2012
Letter from Kitty Moore to Cupertino Planning Department
05/22/2012
Email from Aarti Shrivastava to Piu Ghosh, Timm Borden, Gary
Baum, Gary Chao, David Stillman, Chad Mosley re, Fwd: Apple
Campus 2 effect on Westwood Oaks (May 22, 2012 6:41:54 AM PDT)
05/22/2012
Email from Piu Ghosh to Gary Chao, Chad Mosley re: FW: Apple
VISSIM analysis meeting Tuesday May 22nd 1:30pm (May 22, 2012
7:34:47 AM PDT)
05/22/2012
Email from Aarti Shrivastava to Amy Chan, Rick Kitson re: Apple
Outreach Brochure (May 22, 2012 4:14:38 PM PDT)
• Apple Campus 2 Brochure (AppleOutreachBrochure.pdf)
05/23/2012
Email from Adam Weinstein to Aarti Shrivastava, Gary Chao, Piu
Ghosh, David Stillman, treagan @apple.com, jfowlerggpple.com,
wwa eng ergfosterandpartner.com, Peter Sokoloff,
don @dryoungassociates.com, dgoldkmofo.com,
mimwalle @mofo.com, Judith Malamut, Franziska Church, Jane
Bierstedt, Rick Kitson, Gary Baum, Eric Morley, Foulkes @apple.com,
Scott D. Pinsky, Chad Mosley, Traci Caton, Timm Borden RE: Apple
Campus 2 EIR -- Weekly Call 10:30 a.m. Wed. (May 23, 2012
10:03:59 AM PDT)
05/23/2012
Email from Adam Weinstein to Aarti Shrivastava, Gary Chao, Piu
Ghosh, David Stillman, treagan@apple.com, jfowlerggpple.com,
wwa engerc�r�,fosterandpartner.com, Peter Sokoloff,
don(,daoungassociates.com, dgoldkmofo.com,
mimwalle(c rofo.com, Judith Malamut, Franziska Church, Jane
Bierstedt, Rick Kitson, Gary Baum, Eric Morley, FoulkeskUple.com,
Scott D. Pinsky, Chad Mosley, Traci Caton, Timm Borden RE: Apple
Campus 2 EIR -- Weekly Call 10:30 a.m. Wed. (May 23, 2012
10:03:59 AM PDT)
05/25/2012
Apple Campus 2, May 25, 2012, Planned Development Permit,
Introduction
05/25/2012
Apple Campus 2, May 25, 2012, Planned Development Permit, Site
Plan Submittal
05/25/2012
Apple Campus 2, May 25, 2012, Planned Development Permit, Floor
1 -89
sf- 3345921 Q
ATTACHMENT I
INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2
PROJECT
1 -90
sf- 3345921 Q
DATE
DOCUMENT
Plan Part 1
05/25/2012
Apple Campus 2, May 25, 2012, Planned Development Permit, Floor
Plan Part 2
05/25/2012
Apple Campus 2, May 25, 2012, Planned Development Permit,
Renderings
05/29/2012
Email from Peter Sokoloff to David Stillman re: FW: Fehr & Peers
VISSIM Review Memo/Model (May 29, 2012 2:39:57 PM PDT)
• Arup Memorandum to Foster + Partners re; AC2 VISSIM
Analysis Review (May 29, 2012) (2012 05 29 Arup Review
of FP VISSIM Model.pdf)
05/29/2012
Email from Amy Chan to Aarti Shrivastava, Gary Baum, Timm
Borden, Carol Korade re: Tree Removal (May 29, 2012 7:25:22 PM
PDT)
05/30/2012
Email from Piu Ghosh to Wolfgang Wagener re: Sound wall locations
(May 03, 2012 4:55:00 PM PDT)
05/30/2012
Email from Adam Weinstein to Aarti Shrivastava, Gary Chao, Piu
Ghosh, David Stillman, treagan@apple.com, jfowler(c gpple.com,
wwa engerc�r�,fosterandpartner.com, Peter Sokoloff,
don(,daoungassociates.com, dgoldkmofo.com,
mimwallec�r�,mofo.com, Judith Malamut, Franziska Church, Jane
Bierstedt, Rick Kitson, Gary Baum, Eric Morley, Foulkes @apple.com,
Scott D. Pinsky, Chad Mosley, Traci Caton, Timm Borden RE: Apple
Campus 2 EIR -- Weekly Call 10:30 a.m. Wed (May 30, 2012 10:09:13
AM PDT)
05/30/2012
Email from Aarti Shrivastava to Amy Chan RE: Tree Removal (May
30, 2012 8:52:59 AM PDT)
05/30/20/12
Email from Adam Weinstein to Aarti Shrivastava, Gary Chao, Piu
Ghosh, David Stillman, treagan@apple.com, jfowlerggpple.com,
wwa eg ner(,fosterandpartner.com, Peter Sokoloff,
donc�r�,daoungassociates.com, dgoldc�r�,mofo.com,
mimwalle @mofo.com, Judith Malamut, Franziska Church, Jane
Bierstedt, Rick Kitson, Gary Baum, Eric Morley, Foulkes @apple.com,
Scott D. Pinsky, Chad Mosley, Traci Caton, Timm Borden RE: Apple
Campus 2 EIR -- Weekly Call 10:30 a.m. Wed. (May 30, 2012
1 -90
sf- 3345921 Q
ATTACHMENT I
INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2
PROJECT
1 -91
sf- 3345921 Q
DATE
DOCUMENT
10:09:13 AM PDT)
06/05/2012
Email from Aarti Shrivastava to Gary Baum to Piu Ghosh re: FW:
Police Protection Services Generated by Apple (June 05, 2012 8:37:06
AM PDT)
06/06/2012
Email from Adam Weinstein to Aarti Shrivastava, Gary Chao, Piu
Ghosh, David Stillman, treagan @apple.com, jfowlergppple.com,
wwagener @fosterandpartner.com, Peter Sokoloff,
don @dryoungassociates.com, dgoldc�r�,mofo.com,
mimwallegraofo.com, Judith Malamut, Franziska Church, Jane
Bierstedt, Rick Kitson, Gary Baum, Eric Morley, Foulkesggpple.com,
Scott D. Pinsky, Chad Mosley, Timm Borden,
lynnjohnsonggpple.com RE: Apple Campus 2 EIR -- Weekly Call
10:30 a.m. Wed. (June 06, 2012 10:21:54 AM PDT)
06/08/2012
Letter from Beez Glendenning Jones to Mark Santoro
06/11/2012
Email from Stephen Buckley to Whom It May Concern
06/12/2012
Email from Blue to City of Cupertino re: Planning Department
Cupertino: Apple Campus 2
06/13/2012
Email from Piu Ghosh to Peter Sokoloff RE: Updated Project
Description (June 13, 2012 9:18:59 AM PDT)
06/13/2012
Email from Adam Weinstein to Aarti Shrivastava, Gary Chao, Piu
Ghosh, David Stillman, treagan @apple.com, jfowlerk4pple.com,
wwa eg ner(,fosterandpartner.com, Peter Sokoloff,
don @dryoungassociates.com, dgoldc�r�,mofo.com,
mimwalle @mofo.com, Judith Malamut, Franziska Church, Jane
Bierstedt, Rick Kitson, Gary Baum, Eric Morley, Foulkes @apple.com,
Scott D. Pinsky, Chad Mosley, Timm Borden,
lynnjohnsonggpple.com RE: Apple Campus 2 EIR -- Weekly Call
10:30 a.m. Wed. (June 13, 2012 10:12:52 AM PDT)
06/13/2012
Email from Adam Weinstein to Aarti Shrivastava, Gary Chao, Piu
Ghosh, David Stillman, treagan2ople.com, jfowler2ople.com,
wwagener @fosterandpartner.com, Peter Sokoloff,
don @dryoungassociates.com, dgold(,mofo.com,
mimwalle @mofo.com, Judith Malamut, Franziska Church, Jane
Bierstedt, Rick Kitson, Gary Baum, Eric Morley, Foulkeskgpple.com,
Scott D. Pinsky, Chad Mosley, Timm Borden,
1 -91
sf- 3345921 Q
ATTACHMENT I
INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2
PROJECT
1 -92
sf- 3345921 Q
DATE
DOCUMENT
lynnjohnsonkgpple.com RE: Apple Campus 2 EIR -- Weekly Call
10:30 a.m. Wed. (June 13, 2012 10:12:52 AM PDT)
06/14/2012
Email from Adam Weinstein to Aarti Shrivastava, Piu Ghosh, Gary
Baum re, Apple EIR -- Toxic Air Contaminants (June 14, 2012 4:07:22
PM PDT)
06/14/2012
Email from David Muffly to Piu Ghosh re: Confusion Regarding
Protected Tree Designation (June 14, 2012 5:40:54 AM PDT)
06/14/2012
Email from Mick Bench to Piu Ghosh Re: Confusion Regarding
Protected Tree Designation (June 14, 2012 7:33:39 AM PDT)
06/14/2012
Email from David Muffly to Piu Ghosh Re: Confusion Regarding
Protected Tree Designation (June 14, 2012 11:08:46 AM PDT)
06/19/2012
Email from Piu Ghosh to Adam Weinstein re: FW:
[Santa — Clara _ Neighbors_ for Responsible—Development] Apple's
proposed new campus
06/20/2012
Email from Piu Ghosh to David Muffly re: Meet on HP campus re:
memorial tree (June 20, 2012 11:56:00 AM PDT)
06/20/2012
Email from Adam Weinstetin to: Aarti Shrivastava, Gary Chao, Piu
Ghosh, David Stillman, treagan @apple.com, jfowler(c gpple.com,
wwagener @fosterandpartner.com, Peter Sokoloff,
don @dryoungassociates.com, dgoldkmofo.com,
mimwalle @mofo.com, Judith Malamut, Franziska Church, Jane
Bierstedt, Rick Kitson, Gary Baum, Eric Morley, Foulkes @apple.com,
Scott D. Pinsky, Chad Mosley, Timm Borden,
lynnjohnsonkgpple.com RE: Apple Campus 2 EIR -- Weekly Call
10:30 a.m. TODAY (June 20, 2012 10:01:19 AM PDT)
06/20/2012
Email from Piu Ghosh to: Aarti Shrivastava, Gary Baum, Timm
Borden, Adam Weinstein, Judy Malamut re: New Schedule (June 20,
2012 2:01:57 PM PDT)
• DRAFT Schedule for Apple Campus 2 Project EIR
(Revised 6/20/2012) (Apple EIR Schedule 06202012_TIA
review.xlsx)
06/22/2012
Email from Piu Ghosh to Dave Muffly, Peter Sokoloff, Wolfgang
Wagener re: Irrigation in project area (June 22, 2012 12:11:00 PM
1 -92
sf- 3345921 Q
ATTACHMENT I
INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2
PROJECT
1 -93
sf- 3345921 Q
DATE
DOCUMENT
PDT)
06/25/2012
Email from Piu Ghosh to Adam Weinstein, Judith Malamut re: FW:
I'm done with Apple's mind - boggling greed
06/25/2012
Email from Piu Ghosh to Peter Sokoloff, Dave Muffly, Wolfgang Wa
RE: Irrigation in project area (June 25, 2012 8:52:55 PM PDT)
06/26/2012
Email from Piu Ghosh to Paul Cebrowski RE: Irrigation in project area
(June 26, 2012 12:13:59 PM PDT)
06/28/2012
Email from Miles Imwalle to Aarti Shrivastava re: JOINT DEFENSE
AGREEMENT -- On -Site Trees (June 28, 2012 8:03:25 AM PDT)
06/29/2012
Email from Timm Borden to David Stillman, Chad Mosley re:
Sunnyvale Birdland - Apple Feedback (June 19, 2012 8:40:29 AM
PDT)
• Email from dmcwl2 @juno.com to:
Santa Clara Neighbors for Responsible_Developmentgy
ahoogroups.com Re:
[Santa_ Clara_ Neighbors_ for Responsible_ Development]
Apple's proposed new campus (June 18, 2012 4:07 PM
PDT) (FW
Santa_ Clara_ Neighbors — for Responsible_ Development
Apple's proposed new campus.msg)
• Email from Michael Belef to:
Santa Clara Neighbors for Responsible DevelopmentLy
ahoogroups.com Re:
[Santa _ Clara _ Neighbors _ for Responsible_ Development]
Apple's proposed new campus (June 18, 2012 11:33 AM
PDT) ((FW
Santa_Clara_Neighbors_for Responsible_ Development
Apple's proposed new campus.msg)
• Email from Tappan Merrick to: City Council; Cupertino
City Manager's Office re: Apple's proposed new campus
(June 18, 2012 10:29 AM PDT) ((FW Apple's proposed
new campus.msg)
06/30/2012
Email from Jim Walker citycouncilgcupertino.org re: Apple Campus 2
1 -93
sf- 3345921 Q
ATTACHMENT I
INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2
PROJECT
1 -94
sf- 3345921 Q
DATE
DOCUMENT
07/02/2012
Email from David Stillman to Timm Borden re: FW: AC2 - Wolfe
Road Analysis (July 02, 2012 8:04:05 PM PDT)
• Arup, Wolfe Rd 3rd Lane Option (Wolfe.pdf)
07/03/2012
Email from Jill Bicknell to Cheri Donnelly Re: Clarification on Apple
street widening adjacent to Apple campus (July 03, 2012 2:17:31 PM
PDT)
07/09/2012
Email from Donna Austin to Mark Santoro, Amy Chan
07/09/2012
Email from Aarti Shrivastava to Piu Ghosh, Gary Baum, Timm Borden
re: FW: Apple Campus 2 (July 09, 2012 11:22:25 AM PDT)
• Community Benefits NOT associated with any pending
project or as a condition of approval to any project
(Community Benefits.pdf)
• Housing; Mitigation (Housing- Mitigation docx.pdf)
07/11/2012
Email from Adam Weinstein to Aarti Shrivastava, Gary Chao, Piu
Ghosh, David Stillman, treagan@apple.com, jfowler(c gpple.com,
wwagener @fosterandpartner.com, Peter Sokoloff,
dongdrungassociates.com, dgoldgmofo.com,
mimwalle(,mofo.com, Judith Malamut, Franziska Church, Jane
Bierstedt, Rick Kitson, Gary Baum, Eric Morley, Foulkes @apple.com,
Scott D. Pinsky, Chad Mosley, Timm Borden,
lynnjohnson(c gpple.com RE: Apple EIR -- Weekly Call 7/11 @10:30
a.m. (July 11, 2012 10:28:36 AM PDT)
07/11/2012
Email from Aarti Shrivastava to Piu Ghosh, Gary Baum, Scott Pinsky,
Timm Borden, David Stillman, Chad Mosley re: The opportunity that
Apple is missing to build a better neighborhood I Better! Cities &
Towns Online (July 11, 2012 11:17:23 AM PDT)
07/12/2012
Email from Timm Borden to Timm Borden re: Apple KLIV podcast
(July 12, 2012 3:54:30 PM PDT)
07/13/2012
Email from Amy Chan to jfowlerggpple.com re: Review of the
analysis from Keyser Marston (July 13, 2012 5:22:59 PM PDT)
• Memorandum from City Manager to Apple, Inc. re:
1 -94
sf- 3345921 Q
ATTACHMENT I
INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2
PROJECT
1 -95
sf- 3345921 Q
DATE
DOCUMENT
Assumptions of Draft Fiscal Impact analysis of Apple (July
13, 2012) (Apple Fiscal Analysis 7- 12- 12.doc)
07/18/2012
Email from mbelef(a�comcast.net
[Santa_Clara_Neighbors_ for Responsible—Development] Apple's
proposed new campus
07/19/2012
Email from Aarti Shrivastava to James Fowler RE: AC2 (July 19,
2012 8:49:18 AM PDT)
07/23/2012
Email from Manish Dalia to Chad Mosley, Steven Smith, Steven O,
TACg @pge.com, PL02 @pge.com, DRMR2pge.com RE:
PG &E /DPW /Apple Campus 2 (July 23, 2012 6:14:22 PM PDT)
• Arup, City of Cupertino Public Works Plan Review
Meeting Minutes (July 19, 2012) (2012 07 19 AC2 and
DPW Plan Review Minutes.pdf)
07/25/2012
Email from Aarti Shrivastava to Piu Ghosh, Adam Weinstein re: FW:
Biking Considerations at Apple Campus (Wed. July 25, 2012 3:22:06
PM PDT)
07/25/2012
Email from Adam Weinstein To: Aarti Shrivastava, Gary Chao, Piu
Ghosh, David Stillman, treagan@apple.com, jfowlerggpple.com,
wwagener @fosterandpartner.com, Peter Sokoloff,
don @dryoungassociates.com, dgoldgmofo.com,
mimwalle @mofo.com, Judith Malamut, Franziska Church, Jane
Bierstedt, Rick Kitson, Gary Baum, Eric Morley, Foulkes @apple.com,
Scott D. Pinsky, Chad Mosley, Timm Borden, Jeffers, Jennifer R. RE:
Apple EIR -- Weekly Call 7/25 @10:30 a.m. (July 25, 2012 10:04:12
AM PDT)
07/27/2012
Email from Piu Ghosh to Adam Weinstein, Franziska Church re:
Parking (July 27, 2012 11:12:00 AM PDT)
07/27/2012
Email from Piu Ghosh to Aarti Shrivastava re: Parking (July 27, 2012
11:14:16 AM PDT)
08/01/2012
Email from Piu Ghosh to Adam Weinstein FW: Apple Campus 2
08/01/2012
Email from Piu Ghosh to Adam Weinstein, Judith Malamut re: FW:
Apple Campus 2 Comment Letter (Aug. 01, 2012 10:18 AM PDT)
1 -95
sf- 3345921 Q
ATTACHMENT I
INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2
PROJECT
1 -96
sf- 3345921 Q
DATE
DOCUMENT
08/01/2012
Email from Adam Weinstein to: Aarti Shrivastava, Gary Chao, Piu
Ghosh, David Stillman, treagan @apple.com, jfowlerggpple.com,
wwagener @fosterandpartner.com, Peter Sokoloff,
don @dryoungassociates.com, dgoldgmofo.com,
mimwalle @mofo.com, Judith Malamut, Franziska Church, Jane
Bierstedt, Rick Kitson, Gary Baum, Eric Morley, Foulkes @apple.com,
Scott D. Pinsky, Chad Mosley, Timm Borden, Jeffers, Jennifer R. RE:
Apple EIR -- Weekly Call 8/1 @10:30 a.m. (Aug. 01, 2012 10:07:45
AM PDT)
08/07/2012
Email from Ryan Roman To: Service Center, Carmen Lynaugh, Chad
Mosley, Cheri Donnelly, David Stillman, Gail Seeds, Herman Loman,
Joanne Johnson, Kevin Rieden, Lauren Tacke, Mike Vandeveer, Ryan
Roman, Tiffanie Cardenas, Timm Borden, Katy Jensen re: Apple EIR
Public Comment Process (Aug. 07, 2012 9:35:22 AM PDT)
08/08/2012
Email from Wolfgang Wagener to Aarti Shrivastava, Piu Ghosh re:
Today's AC2 Review (Aug. 08, 2013 7:45:29 AM PDT)
08/08/2012
Email from Rick Kitson to Aarti Shrivastava, Gary Baum re: FW: FW:
Apple bus using Birdland neighborhood as parking lot (Aug. 08, 2013
8:37 AM PDT)
08/15/2012
Email from Piu Ghosh to Adam Weinstein to Judith Malamut re: FW:
New Apple Campus & Apple Buses (Aug. 15, 2012 9:04 AM PDT)
08/17/2012
Email from Chad Mosley to Piu Ghosh, David Stillman re: Apple -
Wolfe Rd ped/bike wishlist (Aug. 17, 2012 9:41:51 AM PDT)
• Wolfe Road Pedestrian and Bicycle Improvement Wish List
(Wolfe Road Pedestrian and Bicycle improvement wish list
for Apple.doc)
08/17/2012
Email from Piu Ghosh to Aarti Shrivastava re: FW: Apple - Wolfe Rd
ped/bike wishlist (Aug. 17, 2012 10:26:48 AM PDT)
• Wolfe Road Pedestrian and Bicycle Improvement Wish List
(Wolfe Road Pedestrian and Bicycle improvement wish list
for Apple.doc)
08/21/2012
Email from Aarti Shrivastava to Timm Borden, David Stillman, Chad
Mosley re: FW: Apple Campus 2 (Aug. 21, 2012 4:49:26 PM PDT)
1 -96
sf- 3345921 Q
ATTACHMENT I
INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2
PROJECT
1 -97
sf- 3345921 Q
DATE
DOCUMENT
• Cool Cities Comments on Bike Use around the Apple 2
Campus July 17, 2012 (Apple Campus Memo -Bike Plan
drafted 7- 12- 12.pdf )
08/30/2012
Email from Aarti Shrivastava to Amy Chan re: FW: Main Street Vallco
Parkway alternative (Aug. 30, 2012 5:53:39 PM PDT)
• Main Street Vallco Parkway Options, Alternative 5
(image003.png)
08/31/2012
Email from Piu Ghosh to Franziska Church, Adam Weinstein RE:
Main Street Vallco Parkway alternative (Aug. 31, 2012 11:39:00 AM
PDT)
08/31/2012
Email from Darrel Lum to Amy Chan, Timm Borden re: Vacation of
Pruneridge Avenue (Aug. 31, 2012 8:56:39 AM PDT)
• Vacation of Pruneridge Avenue (Vacation of Pruneridge
Avenue.pdf)
09/04/2012
Email from Piu Ghosh to Adam Weinstein, Judith Malamut (Sept. 04,
2012 2:25 PM PDT)
09/20/2012
Email from Piu Ghosh to Adam Weinstein, Judith Malamut re: FW:
Rubberized AC (Sept. 20, 2012 2:04:31 PM PDT
09/20/2012
Email from Manish Dalia to Chad Mosley RE: Apple Campus 2 and
DPW coordination - 3rd Thursday (Sept. 20, 2012 11:13:42 AM PDT)
09/20/2012
Email from Piu Ghosh to David Stillman re: FW: Rubberized AC
(Sept. 20, 2012 4:58:04 PM PDT)
09/24/2012
Email from David Stillman to Piu Ghosh FW: Bus shelters (Sept. 24,
2012 7:56:00 AM PDT)
09/24/2012
Email from Piu Ghosh to Aarti Shrivastava, Gary Baum re: Fwd: Bus
shelters (September 24, 2012 8:15:25 AM (Sept. 24, 2012 8:15:25 AM
PDT)
10/03/2012
Email from Manish Dalia to Chad Mosley RE: Apple Campus 2 and
DPW coordination - Report/Narrative feedback (Oct. 03, 2012 1:33:05
PM PDT)
1 -97
sf- 3345921 Q
ATTACHMENT I
INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2
PROJECT
1 -98
sf- 3345921 Q
DATE
DOCUMENT
10/04/2012
Email from Manish Dalia to Chad Mosley re: AC2 - Hamptons
Stormwater (Oct. 04, 2012 8:58 AM PDT)
10/04/2012
Email from Manish Dalia to Chad Mosley re: AC2 - Hamptons
Stormwater
10/16/2012
Email from Chad Mosley to Piu Ghosh RE: Storm Drain issue — Apple
(Oct. 16, 2012 4:30:54 PM PDT)
10/25/2012
Email from Timm Borden to Piu Ghosh, David Stillman RE: Right of
way acquisition language (Oct. 25, 2012 3:26:35 PM PDT)
10/25/2012
Email from Piu Ghosh to Aarti Shrivastava, Gary Baum, Timm
Borden, David Stillman re, Items of discussion re: Apple EIR and
project 10252012 (Oct. 25, 2012 2:44:16 PM PDT)
• Outstanding Issues for Discussion for the Apple EIR/Prcject
(Items of discussion 10252012.docx)
10/25/2012
Email from Piu Ghosh to Aarti Shrivastava, Gary Baum re: Items of
discussion 10252012 (Oct. 25, 2012 4:03:39 PM PDT)
• Outstanding Issues for Discussion for the Apple EIR/Proj ect
(Items of discussion 10252012.docx)
10/26/2012
Email from Piu Ghosh to Adam Weinstein, Judith Malamut re: FW:
Apple 2 campus (Oct. 26, 2012 11:31 AM PDT)
10/29/2012
Email from Kermit Cuff to David Stillman re: VTA & Pruneridge
closure (Oct. 29, 2012 11:32:18 AM PDT)
10/29/2012
Email from Aarti Shrivastava to David Brandt re: Apple building
permit schedule (Oct. 29, 2012 1:20:26 PM PDT)
10/30/2012
Email from Dan Whisenhunt to David Brandt, Aarti Shrivastava,
Albert Salvador, Piu Ghosh, Timm Borden, David Stillman, Chad
Mosley, Wolfgang Wagener, Peter Sokoloff, Saran Oki, Steven Carter,
Mike Leondi, Rob Westover, Jim Fowler, Dana Pesce, Gary Baum re:
Apple Campus 2 (Oct. 30, 2012 11:08:18 AM PDT)
• Apple Campus 2 Permit Timeline Summary
(121026 permit summary—V3.pdf)
1 -98
sf- 3345921 Q
ATTACHMENT I
INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2
PROJECT
1 -99
sf- 3345921 Q
DATE
DOCUMENT
11/01/2012
Apple Campus 2, Project Description, November 2012
11/01/2012
Apple Campus 2, Planned Development Permit, November 2012,
Introduction
11/01/2012
Apple Campus 2, Planned Development Permit, November 2012, Plan
Submittal Part 1
11/01/2012
Apple Campus 2, Planned Development Permit, November 2012, Plan
Submittal Plan 2
11/01/2012
Apple Campus 2, Planned Development Permit, November 2012, Floor
Plan Part 1
11/01/2012
Apple Campus 2, Planned Development Permit, November 2012, Floor
Plan Part 2
11/01/2012
Apple Campus 2, Planned Development Permit, November 2012,
Renderings
11/02/2012
Email from Charlie to Piu Ghosh re: Apple Campus 2 (Nov. 02, 2012
9:17 AM PDT)
11/10/2012
Email from Piu Ghosh to Michael Bench, Aarti Shrivastava re: Fwd:
Tree list - Apple Campus (Nov. 16, 2012 5:34:41 PM PDT)
• Tree Removal Plan North, No. L1.43, Revision 0, Nov. 6,
2012 (Tree Removals.pdf)
• Table 2 — Tree Removals Associated with Transplanting of
Existing Trees (Removal List - PhlCityPermit.pdf)
11/13/2012
Letter from Cay C. Goude, U.S. Fish & Wildlife Service and Scott
Wilson, California Department of Fish and Game to John Doughty,
City of East Palo Alto, Terrence Grindall, City of Newark, Hanson
Hom, City of Sunnyvale, Steven McHarris, City of Milipitas, Kevin
Riley, City of Santa Clara, Jeff Schwob, City of Fremont, Aarti
Shrivastava, City of Cupertino, Randy Tsuda, City of Mountain View,
Curtis Williams, City of Palo Alto re: Streamlining Mitigation for
Impacts to Biological Resources
11/15/2012
Email from Piu Ghosh to Michael Bench re: Tree Transplant Memo
1 -99
sf- 3345921 Q
ATTACHMENT I
INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2
PROJECT
1 -100
sf- 3345921 Q
DATE
DOCUMENT
and Dwgs (Nov. 15, 2012 11:00:00 AM PDT)
• Table 1 — Existing Trees to be Transplanted
(I 21114—Table 1_ ExistingTreesToBeTransplanted .pdf)
• Tree Relocation Plan North, No. L1.41, Revision 0, Nov. 6,
2012 ( 121114_ TreeRelocationPlans_11xI7.pdf)
• Memorandum from Olin to City of Cupertino re:
Adjustments to Response to the Review of the Consolidated
Arborist Report per EIR Plan Revisions (Nov. 14, 2012)
(121114_ ResponsetoArboristC omments_EIRReissue_Adde
ndum.pdf)
11/21/2012
Email from Rick Kitson to Barry Chang, Gilbert Wong, Mark Santoro,
Orrin Mahoney re: Latest Apple Plans Posted to Web (Nov. 21, 2012
1:46:05 PM PDT)
• Apple Messages v10 November 21, 2012 (Apple Talking
Points v10 20121121.docx)
11/27/2012
Email from James Fowler to Cupertino City Manager's Office, Aarti
Shrivastava re: AC2 (Nov. 27, 2012 6:38:32 PM PDT)
11/27/2012
Email from Rick Kitson to Department Heads re: Apple Talking Points
v1I 20121127.docx (Nov. 27, 2012 2:47:43 PM PDT)
• Apple Messages vl l November 27, 2012 (Redline) (Apple
Talking Points v1I 20121127.docx)
12/05/2012
Email from Manish Dalia to Chad Mosley RE: Apple f (Dec. 05, 2012
1:14 PM PDT)
12/05/2012
Email from Piu Ghosh to Michael Bench RE: Apple Trees (Dec. 05,
2012 7:21:48 PM PDT)
12/07/2012
Email from Piu Ghosh to Aarti Shrivastava, Gary Barum re: New AC2
Schedule (Dec. 07, 2012 9:39:20 AM PDT)
• DRAFT Schedule for Apple Campus 2 Project EIR
(Revised 12/6/12) (Apple EIR Schedule- 8.pdf)
1 -100
sf- 3345921 Q
ATTACHMENT I
INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2
PROJECT
1 -101
sf- 3345921 Q
DATE
DOCUMENT
12/11/2012
Email from Chad Mosley to Manish Dalia RE: Apple Campus 2
Coordination (Dec. 11, 2012 5:18:22 PM PDT)
12/19/2012
Email from Aarti Shrivastava to Miles Imwalle re: FW: Correction!
(Dec. 19, 2012 2:56:04 PM PDT)
12/19/2012
Email from Aarti Shrivastava to Judith Malamut, Gary Baum, Timm
Borden re: Schedule after meeting 121912 (Dec. 19, 2012 4:00:18 PM
PDT)
• DRAFT Schedule for Apple Campus 2 Project EIR
(Revised 12/19/12) (AppleSchedulel21912.xls)
12/20/2012
Email from Aarti Shrivastava to Miles Imwalle re: Schedule (Dec. 20,
2012 11:52:04 AM PDT)
• DRAFT Schedule for Apple Campus 2 Project EIR
(Revised 12/19/12) (AppleSchedulel21912.pdf)
12/20/2012
Email from Dan Whisenhunt to Miles Imwalle Re: Schedule (Dec. 20,
2012 12:25:31 PM PDT)
12/20/2012
Email from James Fowler to Dan Whisenhunt Re: Schedule (Dec. 20,
2012 1:10:57 PM PDT)
12/21/2012
Email from David Brandt to Aarti Shrivastava, Gary Baum re: Apple
Development Agreement (Dec. 21, 2012 3:50:48 PM PDT)
12/23/2012
Email from Gary Chao to Timm Borden, Adam Weinstein, Aarti
Shrivastava RE: Apple new driveway consideration (December 23,
2011 12:14:54 PM PDT)
01/02/2013
Email from Jennifer Jeffers to Adam Weinstein RE: Apple EIR --
Weekly Meetings, etc (Jan. 02, 2013 3:12:20 PM PDT)
01/02/2013
Email from Adam Weinstein to: Gary Chao, Piu Ghosh, David
Stillman, jfowler @apple.com, wwagener @fosterandpartner.com, Peter
Sokoloff, dgold @mofo.com, mimwalle @mofo.com, Judith Malamut,
Franziska Church, Jane Bierstedt, Rick Kitson, Gary Baum, Eric
Morley, Foulkes @apple.com, Scott D. Pinsky, Chad Mosley, Timm
Borden, JJeffersc�r�,mofo.com, dwhisenhunt @apple.com, Aarti
Shrivastava, diana.fazely gmail.com, David Brandt re: Apple EIR --
1 -101
sf- 3345921 Q
ATTACHMENT I
INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2
PROJECT
1 -102
sf- 3345921 Q
DATE
DOCUMENT
Weekly Meetings, etc. (Jan. 02, 2013 1:18:40 PM PDT)
01/03/2013
Email from Colin Burgett to Aarti Shrivastava Re: Coordinating
Nelson\Nygaard Memo with TIA and EIR for Apple Campus 2 (Jan.
03, 2013 9:20:17 PM PDT)
01/03/2013
Email from Adam Weinstein to Gary Chao, Piu Ghosh, David
Stillman, jfowlerggpple.com, wwa eng erc�r�,fosterandpartner.com,
Peter Sokoloff, dgold @mofo.com, mimwalle @mofo.com, Judith
Malamut, Franziska Church, Jane Bierstedt, Rick Kitson, Gary
Baum, Eric Morley, Foulkes @apple.com, Scott D. Pinsky, Chad
Mosley, Timm Borden, JJeffers(c rofo.com, dwhisenhunt @apple.com,
Aarti Shrivastava, diana.fazely@gmail.com, David Brandt RE: Apple
EIR -- Weekly Meetings, etc. (Jan. 03, 2013 8:28:19 AM PDT)
01/03/2013
Email from Adam Weinstein to: Gary Chao, Piu Ghosh, David
Stillman, jfowler @apple.com, wwagener @fosterandpartner.com, Peter
Sokoloff, dgold @mofo.com, mimwalle @mofo.com, Judith Malamut,
Franziska Church, Jane Bierstedt, Rick Kitson, Gary Baum, Eric
Morley, Foulkes @apple.com, Scott D. Pinsky, Chad Mosley, Timm
Borden, JJeffers(c rofo.com, dwhisenhunt @apple.com, Aarti
Shrivastava, diana.fazely @gmail.com, David Brandt RE: Apple EIR --
Weekly Meetings, etc. (January 03, 2013 8:28:19 AM PDT)
01/03/2013
Email from Timm Borden to David Brandt Re: barn maintenance (Jan.
03, 2013 12:11:53 PM PDT)
01/04/2013
Email from Aarti Shrivastava to David Brandt RE: Apple Development
Agreement (Jan. 04, 2013 11:32:59 AM
• Apple Guarantee of Sales Tax - DA (Apple Sales Tax.xls)
01/09/2013
Email from Adam Weinstein to Gary Chao, Piu Ghosh, David
Stillman, jfowler @apple.com, wwagener (,fosterandpartner.com, Peter
Sokoloff, dgold @mofo.com, mimwalle @mofo.com, Judith Malamut,
Franziska Church, Jane Bierstedt, Rick Kitson, Gary Baum, Eric
Morley, Foulkesggpple.com, Scott D. Pinsky, Chad Mosley, Timm
Borden, JJeffersgmofo.com, dwhisenhuntggpple.com, Aarti
Shrivastava, diana.fazelyg gm ail. com, David Brandt RE: Apple EIR --
Weekly Team Meeting 1 /10 (Jan. 09, 2013 12:05:14 PM PDT)
01/09/2013
Email from Adam Weinstein to: Gary Chao, Piu Ghosh, David
1 -102
sf- 3345921 Q
ATTACHMENT I
INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2
PROJECT
1 -103
sf- 3345921 Q
DATE
DOCUMENT
Stillman, jfowler @apple.com, wwagener @fosterandpartner.com, Peter
Sokoloff, dgold @mofo.com, mimwalle @mofo.com, Judith Malamut,
Franziska Church, Jane Bierstedt, Rick Kitson, Gary Baum, Eric
Morley, Foulkes @apple.com, Scott D. Pinsky, Chad Mosley, Timm
Borden, JJeffers(,mofo.com, dwhisenhunt @apple.com, Aarti
Shrivastava, diana.fazely @gmail.com, David Brandt re: RE: Apple
EIR -- Weekly Team Meeting 1 /10 (Jan. 09, 2013 12:05:13 PM PDT)
01/10/2013
Email from Piu Ghosh to Adam Weinstein RE: rubberized asphalt (Jan.
10, 2013 9:00:00 AM PDT)
01/10/2013
Email from Timm Borden to Aarti Shrivastava, David Brandt, Gary
Baum re: Bicycle Pedestrian Commission — Apple (Jan. 10, 2013
10:25:42 AM PDT)
01/10/2013
Email from Timm Borden to David Brandt, Aarti Shrivastava, Gary
Baum RE: Bicycle Pedestrian Commission — Apple (Jan. 10, 2013
10:44:06 AM PDT)
01/10/2013
Email from Timm Borden to David Stillman re: FW: Bicycle
Pedestrian Commission — Apple (Jan. 10, 2013 11:21:20 AM PDT)
01/14/2013
Email from Sohan Vichare to Aarti Shrivastava
01/15/2013
Email from David Stillman to Manish Dalia re: City comments on AC2
offsite roadway improvements (Jan. 15, 2013 7:47:50 AM PDT)
01/15/2013
Email from Ryan Kauffman to Adam Weinstein Re: Question re. AC2
Transit (Jan. 15, 2013 8:39:05 AM PDT)
01/15/2013
Email from Piu Ghosh to Aarti Shrivastava RE: Parking requirement
(Jan. 15, 2013 9:16:47 AM PDT)
01/15/2013
Email from Franziska Church to Piu Ghosh RE: Parking requirement
(Jan. 15, 2013 11:37:35 AM PDT)
01/16/2013
Email from Adam Weinstein to Aarti Shrivastava, Judith Malamut,
Gary Baum, Timm Borden, David Stillman, Chad Mosley, Piu Ghosh,
£churchc�r�,fehrandpeers.com, J.Bierstedt@fehrandpeers.com,
spinsky@earthlink.net re: Apple EIR -- Internal Mtg at 10:30 (Jan. 16,
2013 9:04:48 AM PDT)
1 -103
sf- 3345921 Q
ATTACHMENT I
INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2
PROJECT
1 -104
sf- 3345921 Q
DATE
DOCUMENT
01/16/2013
Email from Adam Weinstein to Gary Chao, Piu Ghosh, David
Stillman, jfowler @apple.com, Peter Sokoloff, dgoldgmofo.com,
mimwalle(,mofo.com, Judith Malamut, Franziska Church, Jane
Bierstedt, Rick Kitson, Gary Baum, Eric Morley, Foulkes @apple.com,
Scott D. Pinsky, Chad Mosley, Timm Borden, JJeffersgraofo.com,
dwhisenhuntggpple.com, Aarti Shrivastava, diana.fazely @gmail.com,
David Brandt, wwa eg ner(2fosterandpartners.com,
sokic�r�,fosterandpartners.com RE: Apple EIR -- Weekly Team Meeting
1/17 (Jan. 16, 2013 12:01:02 PM PDT)
01/16/2013
Email from Adam Weinstein To: Gary Chao, Piu Ghosh, David
Stillman, jfowler @apple.com, Peter Sokoloff, dgold(,mofo.com,
mimwalle @mofo.com, Judith Malamut, Franziska Church, Jane
Bierstedt, Rick Kitson, Gary Baum, Eric Morley, Foulkes @apple.com,
Scott D. Pinsky, Chad Mosley, Timm Borden, JJeffersc�r�,mofo.com,
dwhisenhunt @apple.com, Aarti Shrivastava, diana.fazely @gmail.com,
David Brandt, wwagener @fosterandpartners.com,
soki(,fosterandpartners.com RE: Apple EIR -- Weekly Team Meeting
1/17 (January 16, 2013 12:01:02 PM PDT)
01/18/2013
Email from Steve Newgren to David Stillman re: Bus Shelters at Apple
Campus (Jan. 18, 2013 1:36:47 PM PDT)
01/23/2013
Email from Adam Weinstein to Aarti Shrivastava, Judith Malamut,
Gary Baum, Timm Borden, David Stillman, Chad Mosley, Piu Ghosh,
£church @fehrandpeers.com, J.Bierstedtgfehrandpeers.com,
spinsky@earthlink.net RE: Apple EIR -- Internal Mtg at 10:30 (Jan. 23,
2013 9:52:48 AM PDT)
01/23/2013
Email from Adam Weinstein to Gary Chao, Piu Ghosh, David
Stillman, jfowler @apple.com, Peter Sokoloff, dgold(2mofo.com,
mimwalle @mofo.com, Judith Malamut, Franziska Church, Jane
Bierstedt, Rick Kitson, Gary Baum, Eric Morley, Foulkes @apple.com,
Scott D. Pinsky, Chad Mosley, Timm Borden, JJeffersc�r�,mofo.com,
dwhisenhunt @apple.com, Aarti Shrivastava, diana.fazely @gmail.com,
David Brandt, wwagener @fosterandpartners.com,
sokigfosterandpartners.com RE: Apple EIR -- Weekly Team Meeting
1/24 (Jan. 23, 2013 12:32:01 PM PDT)
• Apple Campus 2 EIR January 17, 2013 (Weekly
Conference Call) Meeting Summary (1 -17 -13 LSA Meeting
1 -104
sf- 3345921 Q
ATTACHMENT I
INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2
PROJECT
1 -105
sf- 3345921 Q
DATE
DOCUMENT
Summary.doc.pdf)
01/23/2013
Email from Adam Weinstein to: Aarti Shrivastava, Judith Malamut,
Gary Baum, Timm Borden, David Stillman, Chad Mosley, Piu
Ghosh,£church @fehrandpeers.com, J.Bierstedt @fehrandpeers.com,
spinsk@earthlink.net RE: Apple EIR -- Internal Mtg at 10:30 (Jan. 23,
2013 9:52:48 AM PDT)
01/23/2013
Email from Timm Borden to David Stillman, Chad Mosley re: Fwd:
Apple EIR -- Internal Mtg at 10:30 (Jan. 23, 2013 1:05:08 PM PDT)
01/24/2013
Email from Adam Weinstein To: Gary Chao, Piu Ghosh, David
Stillman, jfowler @apple.com, Peter Sokoloff, dgoldc�r�,mofo.com,
mimwalle @mofo.com, Judith Malamut, Franziska Church, Jane
Bierstedt, Rick Kitson, Gary Baum, Eric Morley, Foulkes @apple.com,
Scott D. Pinsky, Chad Mosley, Timm Borden, JJeffers(,mofo.com,
dwhisenhunt @apple.com, Aarti Shrivastava, diana.fazely @gmail.com,
David Brandt, wwagener @fosterandpartners.com,
soki @fosterandpartners.com, william.baum arg dner(a MM.com RE:
Apple EIR -- Weekly Team Meeting 1/24 (January 24, 2013 6:39:13
PM PDT)
• Apple Campus 2 EIR January 24, 2013 (Weekly
Conference Call) Meeting Summary (1 -24 -13 LSA Meeting
Summary.pdf)
01/28/2013
Email from Meg Thomas to Mick Bench re: Dead, Diseased and
Dying Trees (Jan. 28, 2013 11:10:41 AM PDT)
• Tree Removal Plan South, No. L1.44, Revision 0, Dec. 4,
2012 (L1.44_TreeRemovalSouth_Diseased-
DeadOnly_ 121205- REV.pdf)
• Tree Removal Plan North, No. L1.43, Revision 0, Dec. 4,
2012 (L1.43_TreeRemovalNorth_Diseased-
DeadOnly_121205.pdf)
01/28/2013
Email from Timm Borden to David Stillman, Chad Mosley RE: Apple
EIR -- Internal Mtg at 10:30 (Jan. 28, 2013 11:32:56 AM PDT)
01/29/2013
Email from Carmen Lynaugh to Timm Borden re: interesting article
regarding Apple campus built (Jan. 29, 2013 10:12:14 AM PDT)
1 -105
sf- 3345921 Q
ATTACHMENT I
INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2
PROJECT
1 -106
sf- 3345921 Q
DATE
DOCUMENT
01/30/2013
Email from Adam Weinstein to: Gary Chao, Piu Ghosh, David
Stillman, jfowler @apple.com, Peter Sokoloff, dgoldgmofo.com,
mimwalle @mofo.com, Judith Malamut, Franziska Church, Jane
Bierstedt, Rick Kitson, Gary Baum, Eric Morley, Foulkes @apple.com,
Scott D. Pinsky, Chad Mosley, Timm Borden, JJeffersgraofo.com,
dwhisenhunt @apple.com, Aarti Shrivastava, diana.fazely @gmail.com,
David Brandt, wwagener @fosterandpartners.com,
soki @fosterandpartners.com, william.baura arg dner( gM.com RE:
Apple EIR -- Weekly Team Meeting 1/31 (January 30, 2013 12:07:11
PM PDT)
• Apple Campus 2 EIR January 24, 2013 (Weekly
Conference Call) Meeting Summary (Revised January 30,
2013) (1 -24 -13 LSA Meeting Summary - Revised.pdf)
01/31/2013
Email from Adam Weinstein To: Gary Chao, Piu Ghosh, David
Stillman, jfowler @apple.com, Peter Sokoloff, dgoldc�r�,mofo.com,
mimwalle @mofo.com, Judith Malamut, Franziska Church, Jane
Bierstedt, Rick Kitson, Gary Baum, Eric Morley, Foulkes @apple.com,
Scott D. Pinsky, Chad Mosley, Timm Borden, JJeffersgraofo.com,
dwhisenhunt @apple.com, Aarti Shrivastava, diana.fazely @gmail.com,
David Brandt, wwagener @fosterandpartners.com,
soki @fosterandpartners.com, william.baum arg dner(a gM.com RE:
Apple EIR -- Weekly Team Meeting 1/31 (January 31, 2013 10:57:51
AM PDT) (Outstanding list of issues Apple 30 Jan 2013.docx)
• Ongoing Outstanding list of issues re: AC2 Note: Some are
items that have previously been identified and new items
that have been identified as a result of changes to the plans
with the November 2012 submittal. (Jan. 30, 2013)
(Outstanding list of issues Apple 30 Jan 2013.docx)
02/02/2013
Email from Piu Ghosh to Aarti Shrivastava, Timm Borden, Gary Baum
re: FW: Discuss City's changes to the Draft EIR (Feb. 02, 2012 9:18:55
AM PDT)
02/04/2013
Email from Piu Ghosh to Meg Thomas re: FW: Fwd: Dead, Diseased
and Dying Trees (Feb. 04, 2013 11:44:30 AM PDT)
• Tree Removal Plan North, No. L1.43, Revision 0, Nov. 6,
2012 (1141 -L 143_TRN- REM - North.pdf)
1 -106
sf- 3345921 Q
ATTACHMENT I
INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2
PROJECT
1 -107
sf- 3345921 Q
DATE
DOCUMENT
• Tree Removal Plan South, No. L1.44, Revision 0, Nov. 6,
2012 (1141- L144_TRN- REM- South.pdf)
02/05/2013
Email from Grant Schlereth to Jill Bicknell, Chad Mosley RE:
SCVURPPP / Apple Campus stormwater discussion (Feb. 05, 2013
1:49:40 PM PDT)
• Arup, Discussion of proposed stormwater treatment strategy
for Apple Campus with SCVURPPP Meeting Minutes (Jan.
24, 2013) (130124_ SCVURPPP—C3—Draft Meeting
Minutes.docx)
02/06/2013
Email from Franziska Church to Piu Ghosh re: Auditorium Parking
(Feb. 06, 2013 3:55:03 PM PDT)
• Auditorium Parking worksheet (Auditorium
Parking_rev.xlsx)
02/06/2013
Email from Aarti Shrivastava to Franziska Church, Piu Ghosh RE:
Auditorium Parking (Feb. 06, 2013 6:07:09 PM PDT)
02/06/2013
Email from Adam Weinstein to: Gary Chao, Piu Ghosh, David
Stillman, jfowler @apple.com, Peter Sokoloff, dgoldkmofo.com,
mimwalle @mofo.com, Judith Malamut, Franziska Church, Jane
Bierstedt, Rick Kitson, Gary Baum, Eric Morley, Foulkes @apple.com,
Scott D. Pinsky, Chad Mosley, Timm Borden, JJeffersc�r�,mofo.com,
dwhisenhunt @apple.com, Aarti Shrivastava, diana.fazely @gmail.com,
David Brandt, wwagener @fosterandpartners.com,
soki @fosterandpartners.com, william.baumgardnerkarup.com,
Michael.iswalt@gM.com Apple EIR -- Weekly Team Meeting 2/7
(Feb. 06, 2013 12:06:05 PM PDT)
• Apple Campus 2 EIR January 31, 2013 (Weekly
Conference Call) Meeting Summary — Revised February 6,
2013 (1 -31 -13 LSA Meeting Summary REV.pdf)
02/06/2013
Email from Adam Weinstein to: Aarti Shrivastava, Judith Malamut,
Gary Baum, Timm Borden, David Stillman, Chad Mosley, Piu Ghosh,
f church @fehrandpeers.com, J.Bierstedt @fehrandpeers.com,
spinsk@earthlink.net re: Apple EIR -- Internal Mtg at 10:30 (Feb. 06,
2013 9:25:19 AM PDT)
1 -107
sf- 3345921 Q
ATTACHMENT I
INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2
PROJECT
1 -108
sf- 3345921 Q
DATE
DOCUMENT
02/07/2013
Email from Piu Ghosh to Aarti Shrivastava RE: Fwd: Dead, Diseased
and Dying Trees (Feb. 07, 2013 7:41:22 AM PDT)
02/08/2013
Email from Meg Thomas to Piu Ghosh, Mick Bench re: Apple Tree
Transplants (Feb. 08, 2013 4:47:46 PM PDT)
• Tree Relocation Plan North No. L1.41, Revision 0, Nov. 6,
2012 (130208_ TransplantDwgs_City.pdf)
• Table 1 — Existing Trees to be Transplanted (Feb. 8, 2013)
(130208_ TransplantSchedule.pdf )
02/10/2013
Email from Adam Weinstein to: Gary Chao, Piu Ghosh, David
Stillman, jfowler @apple.com, Peter Sokoloff, dgoldkmofo.com,
mimwalle @mofo.com, Judith Malamut, Franziska Church, Jane
Bierstedt, Rick Kitson, Gary Baum, Eric Morley, Foulkes @apple.com,
Scott D. Pinsky, Chad Mosley, Timm Borden, JJeffersc�r�,mofo.com,
dwhisenhunt @apple.com, Aarti Shrivastava, diana.fazely @gmail.com,
David Brandt, wwagener @fosterandpartners.com,
soki @fosterandpartners.com, william.baum ard�ner(a MM.com,
Michael.iswalt(a gM.com RE: Apple EIR -- Weekly Team Meeting
2/7 (February 10, 2013 8:21:20 PM PDT)
• Apple Campus 2 EIR February 7, 2013 (Weekly
Conference Call) Meeting Summary (2 -7 -13 LSA Meeting
Summary.pdf)
02/11/2013
Email from Franziska Church to David Stillman RE: Apple: Bike
Lanes on Wolfe Road (Feb. 11, 2013 9:54:50 AM PDT)
02/11/2013
Email from David Heslop to Chad Mosley, David Stillman re: Apple
2C offsite bedding and backfill materials (Feb. 11, 2013 3:07:33 PM
PDT)
02/12/2013
Email from Meg Thomas to Michael Bench Re: Tree 9 1459 (Feb. 12,
2013 9:37:03 AM PDT)
02/12/2013
Email from Meg Thomas to Piu Ghosh Re: Tree 9 1459 (Feb. 12, 2013
10:03:17 AM PDT)
02/13/2013
Email from Adam Weinstein to: Gary Chao, Piu Ghosh, David
Stillman, jfowler apple.com, Peter Sokoloff, d old mofo.com,
1 -108
sf- 3345921 Q
ATTACHMENT I
INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2
PROJECT
1 -109
sf- 3345921 Q
DATE
DOCUMENT
mimwalle @mofo.com, Judith Malamut, Franziska Church, Jane
Bierstedt, Rick Kitson, Gary Baum, Eric Morley, Foulkes @apple.com,
Scott D. Pinsky, Chad Mosley, Timm Borden, JJeffers(,mofo.com,
dwhisenhunt @apple.com, Aarti Shrivastava, diana.fazely @gmail.com,
David Brandt, wwagener @fosterandpartners.com,
soki @fosterandpartners.com, william.baura ard�ner(a gM.com,
Michael.iswalt( gaM.com RE: Apple EIR -- Weekly Team Meeting
2/13 (Feb. 13, 2013 8:35:44 AM PDT)
02/13/2013
Email from Adam Weinstein to: Aarti Shrivastava, Judith Malamut,
Gary Baum, Timm Borden, David Stillman, Chad Mosley, Piu Ghosh,
f church @fehrandpeers.com, J.Bierstedt @fehrandpeers.com,
spinsky@earthlink.net re: Apple EIR -- Internal Mtg at 10:30 (Feb.
13, 2013 8:47:21 AM PDT)
02/13/2013
Email from Adam Weinstein To: Gary Chao, Piu Ghosh, David
Stillman, jfowler @apple.com, Peter Sokoloff, dgold(,mofo.com,
mimwalle @mofo.com, Judith Malamut, Franziska Church, Jane
Bierstedt, Rick Kitson, Gary Baum, Eric Morley, Foulkes @apple.com,
Scott D. Pinsky, Chad Mosley, Timm Borden, JJeffers(c rofo.com,
dwhisenhunt @apple.com, Aarti Shrivastava, diana.fazely @gmail.com,
David Brandt, wwagener @fosterandpartners.com,
soki @fosterandpartners.com, william.baura arg dner(a gM.com,
Michael.iswalt(a gM.com RE: Apple EIR -- Weekly Team Meeting
2/13 (Feb. 13, 2013 8:35:44 AM PDT)
02/13/2013
Email from Adam Weinstein to Aarti Shrivastava, Judith Malamut,
Gary Baum, Timm Borden, David Stillman, Chad Mosley, Piu Ghosh,
f church @fehrandpeers.com, J.Bierstedt @fehrandpeers.com,
spinsky@earthlink.net re: Apple EIR -- Internal Mtg at 10:30 (Feb.
13, 2013 8:47:21 AM PDT)
02/15/2013
Email from Meg Thomas to Piu Ghosh Re: Couple of items (Feb. 15,
2013 5:29:05 PM PDT)
02/18/2013
Email from Meg Thomas to Piu Ghosh Re: Couple of items (Feb. 18,
2013 4:26:52 PM PDT)
• Side Boxing /Round Ball Transplant Trees (Side Boxing
impact on adjacent trees.xlsx)
02/19/2013
Email from Ryan Kauffman to Aarti Shrivastava, Piu Ghosh re:
1 -109
sf- 3345921 Q
ATTACHMENT I
INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2
PROJECT
1 -110
sf- 3345921 Q
DATE
DOCUMENT
Additional Background Points — TDM (Feb. 19, 2013 9:14:10 AM
PDT)
02/19/2013
Email from Rob Westover to Chad Mosley, David Stillman AC2 -
Notes from 1/21/13 Off -Site Utility Relocation /Public Works Meeting
(Feb. 19, 2013 9:42:22 PM PDT)
• Apple Campus 2 — Off- - -Site Utility Relocation Meeting
with Cupertino Department of Public Works January 21,
2013 (AC2 Offsite Utility Relocation Meeting
2013_01_21.pdf)
• Traffic Operations Analysis for the Proposed Lane Closures
During Utilities Trenching January 21, 2013 (Figure 5 -
Recommended Lane Closures.pdf)
• Hexagon Transportation Consultants Memorandum to DPR
re: Traffic Operations Analysis With the Proposed Lane
Closures along Wolfe Road and the Closure of Pruneridge
Avenue (Feb. 12, 2013) (LOS Analysis w Pruneridge
Closure 021213.pdf)
02/19/2013
Email from Chad Mosley to David Heslop, David Stillman RE: Apple
2C offsite bedding and backfill materials (Feb. 19, 2013 5:34:47 PM
PDT)
02/21/2013
Email from Adam Weinstein to: Gary Chao, Piu Ghosh, David
Stillman, jfowler @apple.com, Peter Sokoloff, dgoldkmofo.com,
mimwalle @mofo.com, Judith Malamut, Franziska Church, Jane
Bierstedt, Rick Kitson, Gary Baum, Eric Morley, Foulkes @apple.com,
Scott D. Pinsky, Chad Mosley, Timm Borden, JJeffers(,mofo.com,
dwhisenhunt @apple.com, Aarti Shrivastava, diana.fazely @gmail.com,
David Brandt, wwagener @fosterandpartners.com,
soki @fosterandpartners.com, william.baum ard�nergarup.com,
Michael.iswaltkarup.com re: Apple EIR -- Weekly Team Meeting
2/21 (Feb. 21, 2013 10:21:16 AM PDT)
02/21/2013
Email from Adam Weinstein To: Gary Chao, Piu Ghosh, David
Stillman, jfowler @apple.com, Peter Sokoloff, dgoldkmofo.com,
mimwalle @mofo.com, Judith Malamut, Franziska Church, Jane
Bierstedt, Rick Kitson, Gary Baum, Eric Morley, Foulkes @apple.com,
Scott D. Pinsky, Chad Mosley, Timm Borden, JJeffers mofo.com,
1 -110
sf- 3345921 Q
ATTACHMENT I
INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2
PROJECT
1 -111
sf- 3345921 Q
DATE
DOCUMENT
dwhisenhunt @apple.com, Aarti Shrivastava, diana.fazely @gmail.com,
David Brandt, wwagener @fosterandpartners.com,
soki @fosterandpartners.com, william.baumgardner(a gM.com,
Michael.iswaltc�r�gM.com re: Apple EIR -- Weekly Team Meeting
2/21 (Feb. 21, 2013 10:21:16 AM PDT)
02/25/2013
Email from Manish Dalia to Chad Mosley RE: AC2 - Package 91
Coordination (Feb. 25, 2013 9:39:16 AM PDT)
02/25/2013
Email from Piu Ghosh to Aarti Shrivastava, Stephen Rose, Gary Chao
RE: Enhanced bus shelter (Feb. 25, 2013 9:27:20 AM PDT)
02/26/2013
Email from Rob Westover to Chad Mosley re: Re: AC2 - Meeting on
Tuesday 2/26 (Feb. 26, 2013 9:19:03 AM PDT)
02/26/2013
Email from Dan Whisenhunt to Piu Ghosh Re: Visitor Parking (Feb.
26, 2013 6:49:14 PM PDT)
02/27/2013
Email from Piu Ghosh to Franziska Church to re: FW: Employees at
SE corner of Pruneridge and N. Tantau (Feb. 27, 2013 1:17:05 PM
PDT)
02/27/2013
Email from Manish Dalia to Chad Mosley re: RE: AC2 /DPW -
Package 91 Coordination - Utility providers (Feb. 27, 2013 1:51:59 PM
PDT)
02/27/2013
Email from Adam Weinstein to Gary Chao, Piu Ghosh, David
Stillman, jfowler @apple.com, Peter Sokoloff, dgold @mofo.com,
mimwalle2mofo.co, Judith Malamut, Franziska Church, Jane
Bierstedt, Rick Kitson, Gary Baum, Eric Morley, Foulkes @apple.com,
Scott D. Pinsky, Chad Mosley, Timm Borden, JJeffers @mofo.com,
dwhisenhunt @apple.com, Aarti Shrivastava, diana.fazely @gmail.com,
David Brandt, wwagenerkfosterandpartners.com,
soki @fosterandpartners.com, william.baura ard�ner(a gM.com,
Michael.iswalt(a gM.com re: RE: Apple EIR -- Weekly Team Meeting
2/28 (Feb. 27, 2013 6:49:42 PM PDT)
02/27/2013
Email from Manish Dalia to Steve.NewgrengVTA.Org,
Kermit.CuffkVTA.Org re: AC2 - VTA /City Meeting (Feb. 27, 2013
12:56:23 PM PDT)
1 -111
sf- 3345921 Q
ATTACHMENT I
INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2
PROJECT
1 -112
sf- 3345921 Q
DATE
DOCUMENT
02/27/2013
Email from Piu Ghosh to Franziska Church, Adam Weinstein re: FW:
Employees at SE corner of Pruneridge and N. Tantau (Feb. 27, 2013
5:34:46 PM PDT)
02/27/2013
Email from Adam Weinstein to: Gary Chao, Piu Ghosh, David
Stillman, jfowler @apple.com, Peter Sokoloff, dgoldkmofo.com,
mimwalle @mofo.com, Judith Malamut, Franziska Church, Jane
Bierstedt, Rick Kitson, Gary Baum, Eric Morley, Foulkes @apple.com,
Scott D. Pinsky, Chad Mosley, Timm Borden, JJeffersc�r�,mofo.com,
dwhisenhunt @apple.com, Aarti Shrivastava, diana.fazely @gmail.com,
David Brandt, wwagener @fosterandpartners.com,
soki @fosterandpartners.com, william.baumgardner( gnM.com,
Michael.iswalt(a gM.com RE: Apple EIR -- Weekly Team Meeting
2/28 (Feb. 27, 2013 6:49:43 PM PDT)
02/28/2013
Email from Adam Weinstein to Gary Chao, Piu Ghosh, David
Stillman, jfowler @apple.com, Peter Sokoloff, dgold(,mofo.com,
mimwalle @mofo.com, Judith Malamut, Franziska Church, Jane
Bierstedt, Rick Kitson, Gary Baum, Eric Morley, Foulkes @apple.com,
Scott D. Pinsky, Chad Mosley, Timm Borden, JJeffersc�r�,mofo.com,
dwhisenhunt @apple.com, Aarti Shrivastava ,diana.fazely @gmail.com,
David Brandt, wwagener @fosterandpartners.com,
soki(,fosterandpartners.com, william.baumgardnerkarup.com,
Michael.iswaltc�r�,arup.com RE: Apple EIR -- Weekly Team Meeting
2/28 (Feb. 28, 2013 11:00:00 AM PDT)
02/28/2013
Email from Piu Ghosh to Adam Weinstein re: FW: Apple Possible
Agenda Items for tomorrow (Feb. 28, 2013 9:24:33 AM PDT
02/28/2013
Email from Adam Weinstein to: Gary Chao, Piu Ghosh, David
Stillman, jfowler @apple.com, Peter Sokoloff, dgoldgmofo.com,
mimwalle @mofo.com, Judith Malamut, Franziska Church, Jane
Bierstedt, Rick Kitson, Gary Baum, Eric Morley, Foulkes @apple.com,
Scott D. Pinsky, Chad Mosley, Timm Borden, JJeffers(c rofo.com,
dwhisenhunt @apple.com, Aarti Shrivastava, diana.fazely @gmail.com,
David Brandt, wwagener @fosterandpartners.com,
soki @fosterandpartners.com, william.baum arg dner( gRM.com,
Michael.iswalt(a gM.com RE: Apple EIR -- Weekly Team Meeting
2/28 (Feb. 28, 2013 11:00:00 AM PDT)
03/02/2013
Email from Adam Weinstein to bploughgscusd.net re: Apple Campus
1 -112
sf- 3345921 Q
ATTACHMENT I
INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2
PROJECT
1 -113
sf- 3345921 v2
DATE
DOCUMENT
2 EIR -- Student Generation (May 02, 2013 9:40:13 AM PDT)
• SCUSD Excerpt ( SCUSD Excerpt 5- 2- 13.doc)
03/05/2013
Email from John Noori to Chad Mosley, Manish Dalia RE: AC2 -
Survey Hard Copy (Mar. 05, 2013 8:34 AM PDT)
03/05/2013
Email from John Noori to Chad Mosley, Manish Dalia RE: AC2 -
Survey Hard Copy (Mar. 05, 2013 8:16 AM PDT)
03/05/2013
Email from Chad Mosley to John Noon RE: AC2 - Survey Hard Copy
(Mar. 05, 2013 8:42:23 AM PDT)
03/06/2013
Email from Adam Weinstein To: Gary Chao, Piu Ghosh, David
Stillman, jfowler @apple.com, Peter Sokoloff, dgoldgmofo.com,
mimwalle @mofo.com, Judith Malamut, Franziska Church, Jane
Bierstedt, Rick Kitson, Gary Baum, Eric Morley, Foulkes @apple.com,
Scott D. Pinsky, Chad Mosley, Timm Borden, JJeffers(c rofo.com,
dwhisenhunt @apple.com, Aarti Shrivastava, diana.fazely @gmail.com,
David Brandt, wwagener @fosterandpartners.com,
soki @fosterandpartners.com, william.baumgardner(a gM.com,
Michael.iswaltc�r�gM.com RE: Apple EIR -- Weekly Team Meeting
3/7 (March 06, 2013 3:17:44 PM PDT)
03/07/2013
Email from Wolfgang Wagener to: Aarti Shrivastava, Piu Ghosh,
dwhisenhunt @apple.com, Saran Oki re: Permit Fee Areas (Mar. 07,
2013 10:22:36 PM PDT)
• Area Breakdown Worksheet
(130306—Area Breakdown.xls)
03/12/2013
Email from Wolfgang Wagener to Aarti Shrivastava re: AC2 Design
Review (Mar. 12, 2013 4:35:58 PM PDT)
03/13/2013
Email from Adam Weinstein to: Gary Chao, Piu Ghosh, David
Stillman, jfowler @apple.com, Peter Sokoloff, dgoldgmofo.com,
mimwalle @mofo.com, Judith Malamut, Franziska Church, Jane
Bierstedt, Rick Kitson, Gary Baum, Eric Morley, Foulkes @apple.com,
Scott D. Pinsky, Chad Mosley, Timm Borden, JJeffersgraofo.com,
dwhisenhunt @apple.com, Aarti Shrivastava, diana.fazely @gmail.com,
David Brandt, wwagener @fosterandpartners.com,
soki fosterandpartners.com, william.baum ardner aru .com,
1 -113
sf- 3345921 v2
ATTACHMENT I
INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2
PROJECT
1 -114
sf- 3345921 Q
DATE
DOCUMENT
Michael.iswalt( gaM.com RE: Apple EIR -- Weekly Team Meeting
3/14 (Mar. 13, 2013 5:57:11 PM PDT)
03/13/2013
Email from Adam Weinstein To: Gary Chao, Piu Ghosh, David
Stillman, jfowler @apple.com, Peter Sokoloff, dgoldc�r�,mofo.com,
mimwalle @mofo.com, Judith Malamut, Franziska Church, Jane
Bierstedt, Rick Kitson, Gary Baum, Eric Morley, Foulkes @apple.com,
Scott D. Pinsky, Chad Mosley, Timm Borden, JJeffers(,mofo.com,
dwhisenhunt @apple.com, Aarti Shrivastava, diana.fazely @gmail.com,
David Brandt, wwagener @fosterandpartners.com,
soki @fosterandpartners.com, william.baura ard�ner(a gM.com,
Michael.iswalt( gaM.com RE: Apple EIR -- Weekly Team Meeting
3/14 (Mar. 13, 2013 5:57:10 PM PDT)
03/19/2013
Email from Manish Dalia to Chad Mosley, Mike Mills, Rob Westover
RE: AC2 /DPW - Package 91 Coordination - Abandon Utilities In Place
(Mar. 19, 2013 9:21 AM PDT)
03/19/2013
Email from Manish Dalia to Michael Smith, Devi Prasanna RE: AC2 -
Cal Water Coordination Meeting
03/19/2013
Email from Manish Dalia to Chad Mosley, Mike Mills, Rob Westover
RE: AC2 /DPW - Package 91 Coordination - Abandon Utilities In Place
(Mar. 19, 2013 9:21:34 AM PDT)
03/20/2013
Email from Aarti Shrivastava to Gary Chao, Gary Baum, Piu Ghosh,
Timm Borden, Chad Mosley (Fwd: Roadshow -- I -280 roadfinal --
Wolfe Rd. S. to 280 N. Lane Confusion PDT)
03/20/2013
Email from Adam Weinstein To: Aarti Shrivastava, Judith Malamut,
Gary Baum, Timm Borden, David Stillman, Chad Mosley, Piu Ghosh,
£church @fehrandpeers.com, J.Bierstedt @fehrandpeers.com,
spinsky@earthlink.net re: Apple EIR -- Internal Mtg at 9:30a (Mar.
20, 2013 8:37:26 AM PDT)
04/01/2013
Apple Campus 2, Project Description, April 2013
04/01/2013
Apple Campus 2, Planned Development Permit, April 2013,
Introduction
04/01/2013
Apple Campus 2, Planned Development Permit, April 2013, Site Plan
Part 1
1 -114
sf- 3345921 Q
ATTACHMENT I
INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2
PROJECT
1 -115
sf- 3345921 Q
DATE
DOCUMENT
04/01/2013
Apple Campus 2, Planned Development Permit, April 2013, Site Plan
Part 2
04/01/2013
Apple Campus 2, Planned Development Permit, April 2013, Floor Plan
Part 1
04/01/2013
Apple Campus 2, Planned Development Permit, April 2013, Floor Plan
Part 2
04/01/2013
Apple Campus 2, Planned Development Permit, April 2013,
Renderings
04/01/2013
Apple Campus 2, Planned Development Permit, April 2013, Bicycle
Plan
04/01/2013
Email from Chad Mosley to Saran Oki RE: Vallco Parkway (Apr. 01,
2013 11:33:43 AM PDT)
04/03/2013
Email from Chad Mosley to Piu Ghosh to RE: Storm Drain Capacity
(Apr. 03, 2013 7:30:41 AM PDT)
04/03/2013
Email from Piu Ghosh to Chad Mosley RE: Storm Drain Capacity
(Apr. 03, 2013 10:28:13 AM PDT)
04/03/2013
Email from Adam Weinstein to: Gary Chao, Piu Ghosh, David
Stillman, jfowler @apple.com, Peter Sokoloff, dgold(,mofo.com,
mimwalle @mofo.com, Judith Malamut, Franziska Church, Jane
Bierstedt, Rick Kitson, Gary Baum, Eric Morley, Foulkes @apple.com,
Scott D. Pinsky, Chad Mosley, Timm Borden, JJeffers(c rofo.com,
dwhisenhunt @apple.com, Aarti Shrivastava, diana.fazely @gmail.com,
David Brandt, wwagener @fosterandpartners.com,
soki @fosterandpartners.com, william.baum arg dner(a gM.com,
Michael.iswalt(a gM.com RE: Apple EIR -- Weekly Team Meeting
4/4 at 1:30p (Apr. 03, 2013 5:26:20 PM PDT
• Apple Campus 2 ADEIR -- Open Issues List (San Francisco
- AC2 ADEIR Open Issues Matrix- 3269897.xls)
04/04/2013
Email from Piu Ghosh to Albert Salvador re: Bldg Fees - Apple - EFF
4 1 13.xlsx (Apr. 04, 2013 1:25:00 PM PDT)
• Building Plan Check and Permit Fee Estimate for New
1 -115
sf- 3345921 Q
ATTACHMENT I
INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2
PROJECT
1 -116
sf- 3345921 Q
DATE
DOCUMENT
Campus Buildings 2/20/12 (Bldg Fees - Apple - EFF 4 1
13.xlsx)
04/04/2013
Email from Timm Borden to Orrin Mahoney re: Fwd: Article on Apple
campus (Apr. 04, 2013 11:26:05 AM PDT)
04/04/2013
Email from Manish Dalia To: Smith, Michael, Ouyang, Elissa,
Prasanna, Devi, Wilson, Christopher, Mike Mills, Rob Westover, Ian
Cunningham, Tommy Bishop, Grant Schlereth RE: AC2 - Cal Water
Coordination Meeting (April 04, 2013 12:25:20 PM PDT)
• Arup, Design and Construction Meeting Minutes, Apr. 3,
2013 (2013 -04 -03 Cal Water -Apple Campus 2- Meeting
Minutes.pdf)
04/05/2013
Email from Adam Weinstein To: Gary Chao, Piu Ghosh, David
Stillman, jfowler @apple.com, Peter Sokoloff, dgoldgmofo.com,
mimwalle @mofo.com, Judith Malamut, Franziska Church, Jane
Bierstedt, Rick Kitson, Gary Baum, Eric Morley, Foulkes @apple.com,
Scott D. Pinsky, Chad Mosley, Timm Borden, JJeffersgraofo.com,
dwhisenhunt @apple.com, Aarti Shrivastava, diana.fazely @gmail.com,
David Brandt, wwagener @fosterandpartners.com,
soki @fosterandpartners.com, william.baum ard�nergarup.com,
Michael.iswalt(,arup.com RE: Apple EIR -- Weekly Team Meeting
4/4 at 1:30p (Apr. 05, 2013 1:38:59 PM PDT)
• Apple Campus 2 EIR April 4, 2013 (Weekly Conference
Call) Meeting Summary (4 -4 -13 LSA Meeting
Summary.pdf)
04/09/2013
Email from Piu Ghosh to Saran Oki RE: Technical Meeting (Apr. 09,
2013 9:09:00 AM PDT)
04/10/2013
Email from Manish Dalia to Chad Mosley, David Stillman RE:
AC2 /DPW - Package #1 Coordination and Wolfe Widening (Apr. 10,
2013 12:31:57 PM PDT)
04/10/2013
Email from Piu Ghosh to Meg Thomas, Michael Bench re: Tree
Removal for Round Balling (Apr. 10, 2013 10:07:00 AM PDT)
04/10/2013
Email from Steve Newgren to Manish Dalia, Piu Ghosh, Smith, Ying,
Littlehales, Jody RE: Apple Campus 2 - CityNTA Coordination (Apr.
1 -116
sf- 3345921 Q
ATTACHMENT I
INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2
PROJECT
1 -117
sf- 3345921 Q
DATE
DOCUMENT
10, 2013 2:04:31 PM PDT)
04/10/2013
Email from Franziska Church to David Stillman RE: Tantau design
(Apr. 10, 2013 3:26:03 PM PDT)
04/11/2013
Email from Chad Mosley to Manish Dalia, David Stillman RE:
AC2 /DPW - Package 91 Coordination and Wolfe Widening (Apr. 11,
2013 4:41:51 PM PDT)
04/12/2013
Email from Piu Ghosh to Timm Borden re: FW: Apple Campus 2 -
CityNTA Coordination (Apr. 12, 2013 9:58:59 AM PDT)
04/12/2013
Email from Manish Dalia to Piu Ghosh RE: Apple Campus 2 -
CityNTA Coordination (Apr. 12, 2013 9:27:49 AM PDT)
04/15/2013
Email from Timm Borden to Piu Ghosh RE: Apple Campus 2 -
CityNTA Coordination (Apr. 15, 2013 9:07:38 AM PDT)
04/15/2013
Email from Piu Ghosh to Aarti Shrivastava RE: Replacement Tree list
(Apr. 15, 2013 11:35:00 AM PDT)
04/15/2013
Email from Timm Borden to Piu Ghosh RE: Apple Campus 2 -
CityNTA Coordination (Apr. 15, 2013 9:07:38 AM PDT)
04/17/2013
Email from Adam Weinstein to: Gary Chao, Piu Ghosh, David
Stillman, jfowler @apple.com, Peter Sokoloff, dgoldkmofo.com,
mimwalle @mofo.com, Judith Malamut, Franziska Church, Jane
Bierstedt, Rick Kitson, Gary Baum, Eric Morley, Foulkes @apple.com,
Scott D. Pinsky, Chad Mosley, Timm Borden, JJeffersc�r�,mofo.com,
dwhisenhunt @apple.com, Aarti Shrivastava, diana.fazely @gmail.com,
David Brandt, wwagener @fosterandpartners.com,
soki @fosterandpartners.com, william.baumgardner( gnM.com,
Michael.iswaltgarup.com RE: Apple EIR -- Weekly Team Meeting
4/17 at 2:30p (Apr. 17, 2013 11:51:58 AM PDT)
04/17/2013
Email from Adam Weinstein To: Gary Chao, Piu Ghosh, David
Stillman, jfowler @apple.com, Peter Sokoloff, dgold(,mofo.com,
mimwalle @mofo.com, Judith Malamut, Franziska Church, Jane
Bierstedt, Rick Kitson, Gary Baum, Eric Morley, Foulkes @apple.com,
Scott D. Pinsky, Chad Mosley, Timm Borden, JJeffers(c rofo.com,
dwhisenhunt @apple.com, Aarti Shrivastava, diana.fazely @gmail.com,
David Brandt, wwagener @fosterandpartners.com,
soki fosterandpartners.com, william.baum ardner aru .comet
1 -117
sf- 3345921 Q
ATTACHMENT I
INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2
PROJECT
1 -118
sf- 3345921 Q
DATE
DOCUMENT
Michael.iswalt( gaM.com RE: Apple EIR -- Weekly Team Meeting
4/17 at 2:30p (Apr. 17, 2013 11:51:58 AM PDT)
04/19/2013
Email from Manish Dalia to Chad Mosley, David Stillman RE: AC2 -
Package 91 Permitting and Wolfe Widening (Apr. 19, 2013 5:15:13
PM PDT)
• Wolfe Widening Coordination Sketch (Mar. 18, 2013)
04/19/2013
Email from Adam Weinstein To: Gary Chao, Piu Ghosh, David
Stillman, jfowler @apple.com, Peter Sokoloff, dgoldkmofo.com,
mimwalle @mofo.com, Judith Malamut, Franziska Church, Jane
Bierstedt, Rick Kitson, Gary Baum, Eric Morley, Foulkes @apple.com,
Scott D. Pinsky, Chad Mosley, Timm Borden, JJeffersc�r�,mofo.com,
dwhisenhunt @apple.com, Aarti Shrivastava, diana.fazely @gmail.com,
David Brandt, wwagener @fosterandpartners.com,
soki @fosterandpartners.com, william.baumgardner( gnM.com,
Michael.iswalt(a gM.com RE: Apple EIR -- Weekly Team Meeting
4/17 at 2:30p (Apr. 19, 2013 4:51:46 PM PDT)
• Apple Campus 2 EIR April 4, 2013 (Weekly Conference
Call) Meeting Summary (4 -4 -13 LSA Meeting Summary -
Revised.pdf)
• Apple Campus 2 EIR April 17, 2013 (Weekly Conference
Call) Meeting Summary (4 -17 -13 LSA Meeting
Summary.pdf)
04/20/2013
Email from Piu Ghosh to Adam Weinstein RE: Apple EIR -- barn
relocation discussion (Apr. 30, 2013 2:13:00 PM PDT)
04/20/2013
Email from Piu Ghosh to Meg Thomas re: Replacement Tree list (Apr.
02, 2013 5:01:00 PM PDT)
04/21/2013
Email from James Fowler to Adam Weinstein re: Fwd: Apple EIR --
Weekly Team Meeting 4/17 at 2:30p (Apr. 21, 2013 9:29:50 AM
PDT)
• LSA Associates, Inc. Apple Campus 2 EIR, April 4, 2013
(Weekly Conference Call) Meeting Summary (4 -4 -13 LSA
Meeting Summary - Revised.pdf)
1 -118
sf- 3345921 Q
ATTACHMENT I
INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2
PROJECT
1 -119
sf- 3345921 Q
DATE
DOCUMENT
• LSA Associates, Inc. Apple Campus 2 EIR April 17, 2013
(Weekly Conference Call) Meeting Summary (4 -17 -13 LSA
Meeting Summary.pdf)
04/22/2013
Email from Michael Bench to Piu Ghosh Re: Apple Campus 2 (Apr.
22, 2013 12:34:32 PM PDT)
• Transplant Appraisals worksheet (Apple C 2 Transplant
Appraisals.xls)
• Transplant Trees worksheet (Apple Campus 2 Transplant
Trees.xls)
04/22/2013
Email from Piu Ghosh to Adam Weinstein RE: Apple EIR -- Minutes
from Weekly Team Meeting 4/17 at 2:30p (Apr. 22, 2013 1:42:00 PM
PDT)
04/23/2013
Email from Miles Imwalle to Adam Weinstein Re: Apple EIR -- misc.
follow -up questions (Apr. 23, 2013 10:17:29 AM PDT)
04/23/2013
Email from Miles Imwalle to Adam Weinstein Re: Apple EIR -- misc.
follow -up questions (Apr. 23, 2013 10:17:29 AM PDT)
04/23/2013
Email from Piu Ghosh to Michael Bench RE: Apple Campus 2 (Apr.
23, 2013 2:36:00 PM PDT)
04/24/2013
Email from David Stillman to Marsh Dalia, Chad Mosley RE: AC2 -
Package #1 Permitting and Wolfe Widening (Apr. 24, 2013 8:03:00
AM PDT)
04/26/2013
Email from Chad Mosley to Grant Schereth RE: Wolfe Road Widening
C.3 Requirements (Apr. 26, 2013 2:55:52 PM PDT)
04/26/2013
Email from Grant Schlereth to Chad Mosley RE: Road Widening - C.3
Requirements (Apr. 26, 2013 5:36:09 PM PDT)
05/00/2013
Economic and Fiscal Impacts Generated by Apple in Cupertino —
Current Facilities and Apple Campus 2, prepared for Apple, Inc., by
Keyser Martson Associates
1 -119
sf- 3345921 Q
ATTACHMENT I
INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2
PROJECT
1 -120
sf- 3345921 Q
DATE
DOCUMENT
05/00/2013
Keyser Marston Associates, Economic and Fiscal Impacts Generated
by Apple in Cupertino — Current Facilities and Apple Campus 2,
Prepared for Apple
05/01/2013
Email from Meg Thomas to Piu Ghosh Re: 89 or 90 transplant trees?
(May 01, 2013 5:56:16 PM PDT)
05/01/2013
Email from Manish Dalia to David Stillman, Chad Mosley RE: AC2 -
Package 91 Permitting and Wolfe Widening (May 01, 2013 9:17:30
AM PDT)
• Street Improvements P -4.20, Revision 3, Apr. 15, 2013 (P-
4.20.pdf)
05/01/2013
Email from Piu Ghosh to David Stillman re: List of outstanding items -
April 11 (May 01, 2013 11:15:35 AM PDT)
05/01/2013
Email from Piu Ghosh to: Adam Weinstein, Franziska Church, Jane
Bierstedt, Judith Malamut Oudith.malamut @lsa- assoc.com) re: FW:
Draft Agenda for Thursday's Apple meeting (May 01, 2013 5:15:00
PM PDT)
05/01//2013
Email from Adam Weinstein to: Gary Chao, Piu Ghosh, David
Stillman, jfowler @apple.com, Peter Sokoloff, dgoldc�r�,mofo.com,
mimwalle @mofo.com, Judith Malamut, Franziska Church, Jane
Bierstedt, Rick Kitson, Gary Baum, Eric Morley, Foulkes @apple.com,
Scott D. Pinsky, Chad Mosley, Timm Borden, JJeffersgraofo.com,
dwhisenhunt @apple.com, Aarti Shrivastava, diana.fazely @gmail.com,
David Brandt, wwagener @fosterandpartners.com,
soki @fosterandpartners.com, william.baura ard�ner(a gM.com,
Michael.iswalt(a gM.com RE: Apple EIR -- Weekly Team Meeting
5/2 at 2:00p (May 01, 2013 5:27:11 PM PDT)
05/01/2013
Email from Adam Weinstein To: Gary Chao, Piu Ghosh, David
Stillman, jfowler @apple.com, Peter Sokoloff, dgoldc�r�,mofo.com,
mimwalle @mofo.com, Judith Malamut, Franziska Church, Jane
Bierstedt, Rick Kitson, Gary Baum, Eric Morley, Foulkes @apple.com,
Scott D. Pinsky, Chad Mosley, Timm Borden, JJeffersgraofo.com,
dwhisenhunt @apple.com, Aarti Shrivastava, diana.fazely @gmail.com,
David Brandt, wwagener @fosterandpartners.com,
soki @fosterandpartners.com, william.baum ard�ner(a gM.com,
Michael.iswalt aru .com RE: Apple EIR -- Weekly Team Meeting
1 -120
sf- 3345921 Q
ATTACHMENT I
INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2
PROJECT
1 -121
sf- 3345921 Q
DATE
DOCUMENT
5/2 at 2:00p (May 01, 2013 5:27:11 PM PDT)
05/02/2013
Email from Rob Westover to Chad Mosley re: AC2 - Pruneridge
Avenue Closure Request
• Letter from DPR Skanska to City of Cupertino re: Apple
Campus 2 Memorandum of Understanding Pruneridge
Avenue Closure Request (May 2, 2013) ( Prunridge Closure
Letter 2013_05_02.pdf)
05/03/2013
Email from Meg Thomas to Piu Ghosh Re: Tree Transplant Final
Locations (May 03, 2013 4:24:38 PM PDT)
• Planting Plan Canopy Trees, No. LP 1.05, Revision 0, Apr.
12, 2013 (130501_LP105 NETransplantEnlargement.pdf)
05/03/2013
Email from Piu Ghosh to David Stillman re: FW: Satellite Parking
Facility (May 03, 2013 10:25:22 AM PDT)
05/06/2013
Email from Gilbert Wong to David Brandt, Timm Borden, Aarti
Shrivastava, Carol Atwood, Carol Korade, Amy Chan, Gilbert Wong
re: Fwd: Sale of Pruneridge Avenue (May 06, 2013 9:07:58 AM PDT)
• Vacation of Pruneridge Avenue (Vacation of Pruneridge
Avenue.pdf)
• Sale of Pruneridge Avenue, Revised 5/7/13 (Sale of
Pruneridge Avenue - Revised 5- 7- 13.pdf)
05/09/2013
Letter from Dolly Sandoval to City Councilmembers
05/09/2013
Email from Piu Ghosh to Saran Oki (soki @FosterandPartners.com),
Wolfgang Wagener, , Dan Whisenhunt (dwhisenhuntggpple.com) re:
Outstanding list of issues Apple 9 May 2013.docx (May 09, 2013
4:41:27 PM PDT)
• Ongoing /Outstanding project review items re: AC2 Note:
Some are items that have previously been identified and
new items that have been identified as a result of changes to
the plans with the April 2013 submittal and ongoing
discussions (Apr. 12, 2013) (Outstanding list of issues
Apple 9 May 2013.docx)
1 -121
sf- 3345921 Q
ATTACHMENT I
INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2
PROJECT
1 -122
sf- 3345921 Q
DATE
DOCUMENT
05/13/2013
Email from Chad Mosley to David Stillman re: FW: AC2 - Pruneridge
Avenue Closure Request (May 13, 2013 8:47:27 AM PDT)
• Letter from DPR Skanska to City of Cupertino re: Apple
Campus 2 Memorandum of Understanding Pruneridge
Avenue Closure Request (May 2, 2013)
05/13/2013
Email from Piu Ghosh to Wolfgang Wagener, Dan Whisenhunt, Meg
Thomas re: Trees (May 13, 2013 4:46:22 PM PDT)
05/13/2013
Email form Piu Ghosh to Wolfgang Wagener, Dan Whisenhunt, Meg
Thomas RE: Trees (May 13, 2013 4:50:48 PM PDT)
05/14/2013
Email from Timm Borden to Timm Borden, Aarti Shrivastava RE:
park values (May 14, 2013 11:37:19 AM PDT)
05/14/2013
Email from Piu Ghosh to Adam Weinstein re: FW: Suggested Agenda
for Meeting with Apple (May 14, 2013 5:44:00 PM PDT)
05/15/2013
Email from Timm Borden to Kristina Alfaro Re: park values (May 15,
2013 2:18:07 PM PDT)
05/15/2013
Email from Adam Weinstein To: Gary Chao, Piu Ghosh, David
Stillman, jfowler @apple.com, Peter Sokoloff, dgoldkmofo.com,
mimwalle @mofo.com, Judith Malamut, Franziska Church, Jane
Bierstedt, Rick Kitson, Gary Baum, Eric Morley, Foulkes @apple.com,
Scott D. Pinsky, Chad Mosley, Timm Borden, JJeffers(c rofo.com,
dwhisenhunt @apple.com, Aarti Shrivastava, diana.fazely @gmail.com,
David Brandt, wwagener @fosterandpartners.com,
soki @fosterandpartners.com, william.baumgardnerkarup.com,
Michael.iswaltc�r�,arup.com RE: Apple EIR -- Team Meeting 5115 at
2:00p (May 15, 2013 8:30:54 AM PDT)
05/15/2013
Email from Adam Weinstein to: Gary Chao, Piu Ghosh, David
Stillman, jfowler @apple.com, Peter Sokoloff, dgold(,mofo.com,
mimwalle @mofo.com, Judith Malamut, Franziska Church, Jane
Bierstedt, Rick Kitson, Gary Baum, Eric Morley, Foulkes @apple.com,
Scott D. Pinsky, Chad Mosley, Timm Borden, JJeffersc�r�,mofo.com,
dwhisenhunt @apple.com, Aarti Shrivastava, diana.fazely @gmail.com,
David Brandt, wwagener @fosterandpartners.com,
soki @fosterandpartners.com, william.baumgardnerkarup.com,
Michael.iswalt@gM.com .com RE: Apple EIR -- Team Meeting 5115 at
1 -122
sf- 3345921 Q
ATTACHMENT I
INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2
PROJECT
1 -123
sf- 3345921 Q
DATE
DOCUMENT
2:00p (May 15, 2013 8:30:54 AM PDT)
05/15/2013
Email from Timm Borden to Kristina Alfaro Re: park values (May 15,
2013 3:25:41 PM PDT)
05/16/2013
Letter from David Jamieson to Orrin Mahoney re: Support for Apple
Campus 2
05/16/2013
Email from Manish Dalia to Chad Mosley RE: AC2 - Pruneridge
Avenue Closure Request (May 16, 2013 12:38:48 PM PDT)
05/16/2013
Email from Chad Mosley to Manish Dalia RE: AC2 - Pruneridge
Avenue Closure Request (May 16, 2013 4:34:28 PM PDT)
05/16/2013
Email from Aarti Shrivastava to: Gary Baum, Carol Korade, Timm
Borden re: FW: Letter in Support of Apple II Campus (May 16, 2013
1:42:37 PM PDT)
• Letter from David Jamieson to City of Cupertino re:
Support for Apple Campus 2 (Document.pdf)
05/20/2013
Email from Timm Borden to Aarti Shrivastava, David Brandt, Gary
Baum, Gary Chao, Piu Ghosh, Stephen Rose, Chad Mosley, David
Stillman RE: Main St (May 20, 2013 10:02:36 AM PDT)
05/20/2013
Email from Piu Ghosh to Meg Thomas RE: 89 or 90 transplant trees?
(May 02, 2013 9:29:55 AM PDT)
05/23/2013
Email from Dan Whisenhunt to Piu Ghosh Re: Logistics - needs for
EIR (May 23, 2013 7:02:44 PM PDT)
05/23/2013
Email from Piu Ghosh to Aarti Shrivastava re: Batch Plant for
Concrete Mixing (May 23, 2013 10:09:00 AM PDT)
05/23/2013
Email from Dan Whisenhunt to Piu Ghosh re: Logistics (May 23, 2013
4:01:52 PM PDT)
05/24/2013
Email from Piu Ghosh to Cody Bennett RE: Apple Campus 2 Sound
Wall (May 24, 2013 12:13:06 PM PDT)
05/24/2013
Email from Apple Campus 2 to: Orrin Mahoney, Gilbert Wong, Barry
1 -123
sf- 3345921 Q
ATTACHMENT I
INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2
PROJECT
1 -124
sf- 3345921 Q
DATE
DOCUMENT
Chang, Mark Santoro re: Apple Campus 2 Community Outreach
Update (May 24, 2013 4:48:21 PM PDT)
• Picture of Apple Campus 2 (AC2- Community Outreach
Update.png)
05/29/2013
AB900Index
05/29/2013
Letter from Peter Pau to Orrin Mahoney re: Sand Hill Property
Company's Support of Apple Campus 2
05/29/2013
Email from Timothy Cusseaux to Manish Dalia, Steven Smith re: RE:
AC2 - Pruneridge Avenue Traffic Closure (May 29, 2013 12:57:50 PM
PDT)
05/30/2013
Email from Piu Ghosh to Adam Weinstein, Judith Malamut FW:
Response to Apple Campus 2 and Submittal 6
05/30/2013
Letter from Ken Alex, Governor's Office of Planning and Research, to
Planning Department, City of Cupertino re: Apple Campus, AB 900
Proj ect
05/31/2013
Letter from Matthew Mahood, San Jose Silicon Valley Chamber of
Commerce to Orrin Mahoney, City of Cupertino
06/04/2013
Email from Piu Ghosh to Adam Weinstein, Judith Malamut, Franziska
Church, Jane Bierstedt re: DEIR - Correction!! (June 04, 2013 4:04:00
PM PDT)
• LSA Associates, Inc., Apple Campus 2 Project EIR, V.
Setting. Impacts and Mitigation Measures 1. Transportation
and Circulation, June 2013, p. 418 (Apple Campus 2 Project
EIR Public Review 430.pdf)
06/04/2013
Email from Piu Ghosh to Dan Whisenhunt re: DEIR Notice - On site
(June 04, 2013 5:00:00 PM PDT)
• Notice of Availability of Draft Environmental Impact
Report
1 -124
sf- 3345921 Q
ATTACHMENT I
INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2
PROJECT
1 -125
sf- 3345921 Q
DATE
DOCUMENT
06/05/2013
Email from Piu Ghosh to Adam Weinstein, Judith Malamut re:
ABAG Regional Clearinghouse (June 05, 2013 12:48:00 PM PDT)
06/05/2013
Email from Piu Ghosh to Dan Whisenhunt, Gary Baum re: Dedication
vs. Easement (June 05, 2013 2:16:00 PM PDT)
06/05/2013
Email from William Baumgardner to David Stillman, Franziska
Church re: [PHISHING]: RE: SCI 280 Wolfe Rd. - Metering Rates
(June 05, 2012 9:35:58 AM PDT)
06/06/2013
Email from Rick Kitson to City Council re: Apple DEIR Update (June
06, 2013 2:46:05 PM PDT)
• News Release, Draft Environmental Impact Report for the
Proposed Apple Campus 2 released for public comment
(June 6, 2013) (Cupertino DEIR for Apple Campus 2 6 -6-
13.docx)
• Apple Messages v13 June 5, 2013 (Apple Talking Points
v14 20130606.docx)
06/06/2013
Email from David Stillman to Joy Bhattacharya RE: Draft
Recommendation Report (June 06, 2013 2:30:48 PM PDT)
06/06/2013
Email from David Brandt to All of City of Cupertino Users / Council
Members re: Draft Environmental Impact Report (EIR) for the
proposed Apple Campus 2 Project (June 06, 2013 11:47:37 AM PDT)
06/06/2013
Email from Rick Kitson to Public Information Officer re: Draft
Environmental Impact Report for the Proposed Apple Campus 2
released for public comment (June 06, 2013 11:41:47 AM PDT)
06/06/2013
Email from Apple Campus 2 to Orrin Mahoney, Gilbert Wong, Barry
Chang, Mark Santoro re: We Support Apple Campus 2 (June 06, 2013
10:30:54 AM PDT)
• Letter from Apple to City of Cupertino (June 3, 2013)
(AC2- Supporters and Map.pdf)
06/10/2013
Email from Aarti Shrivastava to David Brandt, Timm Borden,
Judith.Malamutklsa- assoc.com, Adam Weinstein, Piu Ghosh, Ellen J.
Garber, Scott D. Pinsky re: Apple meeting (June 10, 2013 2:03:19 PM
1 -125
sf- 3345921 Q
ATTACHMENT I
INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2
PROJECT
1 -126
sf- 3345921 Q
DATE
DOCUMENT
PDT)
06/11/2013
Email from Apple Campus 2 to Orrin Mahoney, Gilbert Wong, Barry
Chang, Mark Santoro re: Apple Campus 2 Community Update (June
11, 2013 9:39:01 AM PDT)
06/11/2013
Letter from Dan Whisenhunt to Aarti Shrivastava
06/12/2013
Chart, Piu /Aarti /David S. /David B. Emails, BIOLOGICAL
RESOURCES
06/13/2013
Email from Piu Ghosh to Aarti Shrivastava, Gary Baum, David Brandt,
Timm Borden re: Apple latest schedule — Confidential (June 13, 2013
10:24:29 AM PDT)
• DRAFT Schedule for Apple Campus 2 Project EIR
(Revised 05/21/13) (AppleSchedule061313.pdf)
06/13/2013
Letter to Neighbor from Peter Oppenheimer
06/14/2013
Email from Piu Ghosh to Dan Whisenhunt re: Temporary Power /Site
prep (June 14, 2013 3:31:00 PM PDT)
06/14/2013
Email from Adam Weinstein to Gary Chao, Piu Ghosh, David
Stillman, jfowler @apple.com, Peter Sokoloff, dgoldkmofo.com,
mimwalle @mofo.com, Judith Malamut, Franziska Church, Jane
Bierstedt, Rick Kitson, Gary Baum, Eric Morley, Foulkes @apple.com,
Scott D. Pinsky, Chad Mosley, Timm Borden, JJeffersc�r�,mofo.com,
dwhisenhuntkople.com, Aarti Shrivastava, diana.fazely@gmail.com,
David Brandt, wwa eg nergfosterandpartners.com,
soki @fosterandpartners.com, william.baumgardner(c gM.com,
Michael.iswalt(a gM.com, lynnjohnsonggpple.co,
Garbergsmwlaw.com re: Apple EIR -- Team Meeting 6/12 (June 14,
2013 4:30:33 PM PDT)
• Apple Campus 2 EIR, June 12, 2013 (Weekly Conference
Call), Meeting Summary ( 6 -12 -13 LSA Meeting
Summary.pdf)
06/17/2013
Email from Rick Kitson to David Brandt re: FW: Apple Campus 2
Commenting Process activity (June 17, 2013 1:53:12 PM PDT)
1 -126
sf- 3345921 Q
ATTACHMENT I
INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2
PROJECT
1 -127
sf- 3345921 Q
DATE
DOCUMENT
06/17/2013
Email from Gary Baum to Timm Borden Re: CalTrans (June 17, 2013
12:31:44 PM PDT)
06/17/2013
Index of Chad Mosley / Timm Borden's Emails
06/18/2013
Email from Terry Bowen to James Fowler, Robertson, Jesse G @DOT,
Finney, Jean@DOT, Alm, Erik @DOT, einar acunakdot.ca.gov,
Timm Borden, william.baumgardner @ arup.com, Franziska Church,
Nick Saleh, (Lance.D.Hall(, dot. ca.gov), Lester_S_Lee @dot.ca.gov,
Philip Cox (pcox @dot.ca.gov), David Salladay, Saleh, Nick @DOT,
Grant Schlere@ Cox, Phillip @DOT, Ramiel Gutierrez RE:
CT /Cupertino /Apple: IGR CEQA Coordination for Apple Campus 2
(June 18, 2013 4:32:27 PM PDT)
• Agenda, Apple Campus 2 Caltrans /City of Cupertino /Apple
Intergovernmental Review /CEQA Coordination, June 24:
10:30 -12 Caltrans District 4, 111 Grand Ave, Oakland
Conference Room 13 -220 (Tamalpais Room) (Agenda 6-
2013 CT Cupertino Apple IGR CEQA
C oordinati on. doc. docx)
06/19/2013
Email from Franziska Church to Piu Ghosh re: RE: MMRP - Apple
Campus 2 (June 19, 2013 10:20:12 AM PDT)
06/19/2013
Email from Adam Weinstein to Gary Chao, Piu Ghosh, David
Stillman, jfowlerggpple.com, Peter Sokoloff, dgoldc�r�,mofo.com,
mimwallegmofo.com, Judith Malamut, Franziska Church, Jane
Biersted, Rick Kitson, Gary Baum, Eric Morley, Foulkes @apple.com,
Scott D. Pinsky, Chad Mosley, Timm Borden, JJeffersgraofo.com,
dwhisenhuntggpple.com, Aarti Shrivastava, diana.fazely @gmail.com,
David Brandt, wwagener2fosterandpartners.com,
soki @fosterandpartners.com, william.baum arg dnergarup.com,
Michael.iswalt @arup.com, lynnjohnson(cr Eple.com,
Garberc�r�,smwlaw.com re: RE: Apple EIR -- Team Meeting 6/20 (June
19, 2013 5:45:04 PM PDT)
06/20/2013
Email from Adam Weinstein to Gary Chao, Piu Ghosh, David
Stillman, jfowler(c gpple.com, Peter Sokoloff, dgold(,mofo.com,
mimwallec�r�,mofo.com, Judith Malamut, Franziska Church, Jane
Bierstedt, Rick Kitson, Gary Baum, Eric Morley,
Foulkesggpple.com„ Scott D. Pinsky, Chad Mosley, Timm Borden,
JJeffers(,mofo.com, dwhisenhunt @apple.com, Aarti Shrivastava,
1 -127
sf- 3345921 Q
ATTACHMENT I
INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2
PROJECT
1 -128
sf- 3345921 Q
DATE
DOCUMENT
diana.fazely @gmail.com, David Brandt,
wwagener @fosterandpartners.com, soki c�r�,fosterandpartners.com,
william.baumgardnerk M.com, Michael.iswaltkarup.com,
lynnjohnsonggpple.com, Garberc�r�,smwlaw.com re: RE: Apple EIR --
Team Meeting 6/20 (June 20, 2013 12:23:15 PM PDT)
06/20/2013
Email from Kent Steffens to Timm Borden re: Wolfe Road Traffic
Counts (June 20, 2013 5:14:44 PM PDT)
• City of Sunnyvale, Division of Transportation and Traffic,
Weekly Event Counts (Wolfe traffic counts.pdf)
06/20/2013
Email from Adam Weinstein to Gary Chao, Piu Ghosh, David
Stillman, jfowlerggpple.com, Peter Sokoloff, dgoldc�r�,mofo.com,
mimwallegraofo.com„ Judith Malamut, Franziska Church, Jane
Bierstedt, Rick Kitson, Gary Baum, Eric Morley, Foulkes @apple.com,
Scott D. Pinsky, Chad Mosley, Timm Borden, Jefferskmofo.com,
dwhisenhuntggpple.com, Aarti Shrivastava, diana.fazelyg mail.com,
David Brandt, wwagener2fosterandpartners.com,
sokigfosterandpartners.com, william.baum arg dner(a Mm.com,
Michael.iswalt @arup.com, lynnjohnsonggpple.com,
Garberc�r�,smwlaw.com RE: Apple EIR -- Team Meeting 6/20 (June 20,
2013 12:23:15 PM PDT)
06/20/2013
Email from Terry Bowen to Timm Borden, Franziska Church, FW:
VTA- County - Cupertino -Apple Campus 2 CEQA Coordination (June
20, 2013 10:40:51 AM PT)
• DRAFT AGENDA Apple Campus 2 SCVTA /SC County
Road Department/City of Cupertino /Apple CEQA
Coordination Time /date TBD ( Draft Agenda VTA- County-
Cupertino -Apple CEQA Coordination.docx)
06/21/2013
Email from Manish Dalia to Chad Mosley, David Stillman RE: AC2 -
Pruneridge Avenue Traffic Closure (June 21, 2013 1:30:42 PM PDT)
06/21/2013
Email from Franziska Church to Ellen J. Garber re: Administrative
Draft Responses (June 21, 2013 2:26:20 PM PDT)
• Administrative Draft Responses to Comments — Apple
Questions from City of Sunnyvale (06/19/2013)
(20130621 AdminDraft -City of Sunnyvale Apple
1 -128
sf- 3345921 Q
ATTACHMENT I
INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2
PROJECT
1 -129
sf- 3345921 Q
DATE
DOCUMENT
Questions &Responses.docx)
06/24/2013
Email from Piu Ghosh to Timm Borden RE: I need EIR schedule
stuff... Leaving for Oakland in 10 minutes!— (June 24, 2013 9:17:00
AM PDT)
06/24/2013
Email from Dawn Cameron to Erika McCulloch, Terry Bowen, James
Fowler, £churchgfehrandpeers.com, Swierk, Robert, Timm Borden,
dwhisenhuntkgpple.com, foulkes(c gpple.com RE: VTA- County-
Cupertino -Apple Campus 2 CEQA Coordination (June 24, 2013
4:37:33 PM PDT)
06/24/2013
Email from Piu Ghosh to Timm Borden RE: I need EIR schedule
stuff... Leaving for Oakland in 10 minutes!— (June 24, 2013 9:17:14
AM PDT)
06/24/2013
Email from Aarti Shrivastava to Timm Borden; Katy Jensen re: Apple
Project (June 24, 2013 8:34:17 AM PDT)
06/25/2013
Email from Adam Weinstein to Piu Ghosh RE: Photo metric study
(June 25, 2013 3:49:57 PM PDT)
06/25/2013
Email from Michael Stamp to Timm Borden, Gary Baum Re:
Appraisals for Street Projects /Apple (June 25, 2013 4:56:26 PM PDT)
06/25/2013
Email from Franziska Church to Timm Borden, Erika McCulloch,
Terry Bowen, James Fowler, dwhisenhuntkgpple.com,
foulkesggpple.com, Scott Pinsky (spinskygearthlink.net), David
Stillman RE: VTA - County - Cupertino -Apple Campus 2 CEQA
Coordination (June 25, 2013 10:17:02 AM PDT)
06/26/2013
Email from Franziska Church to Swierk, Robert, Cameron, Dawn,
Erika McCulloch, Terry Bowen, James Fowler, Timm Borden,
dwhisenhunt @apple.com, foulkes(c gpple.com RE: VTA- County-
Cupertino -Apple Campus 2 CEQACoordination (June 26, 2013
1:33:01 PM PDT)
• Fehr & Peers, Percent Apple Employees by Travel Zone B
(June 2013) (Apple_ Employee_ Zone_B.pdf)
• Fehr & Peers, Percent Apple Employees by Travel Zone A
(June 2013) (Apple_ Employee_ Zone_A.pdf)
1 -129
sf- 3345921 Q
ATTACHMENT I
INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2
PROJECT
1 -130
sf- 3345921 Q
DATE
DOCUMENT
06/26/2013
Email from Franziska Church to Timm Borden, David Stillman RE:
VTA- County - Cupertino -Apple Campus 2 CEQA Coordination (June
26, 2013 11:27:51 AM PDT)
• Fehr & Peers, Percent Apple Employees by Travel Zone B
(June 2013) (Apple_ Employee_ Zone_B.pdf)
• Fehr & Peers, Percent Apple Employees by Travel Zone A
(June 2013) (Apple_ Employee_ Zone_A.pdf)
06/26/2013
Email from David Stillman to ksteffens (,ci.sunnyvale.ca.us re:
Homestead Road median (June 26, 2013 9:50:31 AM PDT)
06/27/2013
Email from James Fowler to Franziska Church re: Sunnyvale (June 27,
2013 6:31:17 PM PDT)
06/27/2013
Email from Franziska Church to Jack Witthaus,
ksteffensgci.sunnyyale.ca.us, re: Apple Campus Trip Distribution
(June 27, 2013 1:07:47 PM PDT)
• Fehr & Peers, Percent Apple Employees by Travel Zone B
(June 2013) (Apple_ Employee_ Zone_B.pdf)
• Fehr & Peers, Percent Apple Employees by Travel Zone A
(June 2013) (Apple_ Employee_ Zone_A.pdf)
06/27/2013
Email from Ryan Roman to Timm Borden re: FW: Some online
reporting of Apple Campus 2 meeting (June 27, 2013 12:04:54 PM
PDT)
06/27/2013
Email from Gary Baum to Aarti Shrivastava, Piu Ghosh, Chad Mosley,
David Brand, David Stillman, Timm Borden, Rick Kitson re: Apple E-
mails for the Month of June (June 27, 2013 11:02:33 AM PDT)
06/30/2013
Email from Gilbert Wong to Carol Korade re: Fwd:
[Santa _Clara_ Neighbors_ for Responsible_ Development] Apple II
Campus meeting last night (June 30, 2013 8:47:06 AM PDT)
07/00/2013
July AB900 Emails Index
07/01/2013
Email from Aarti Shrivastava to Keith Murphy RE: Where is the city's
web site link for development projects? (July 01, 2013 8:44:23 AM
1 -130
sf- 3345921 Q
ATTACHMENT I
INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2
PROJECT
1 -131
sf- 3345921 Q
DATE
DOCUMENT
PDT)
07/01/2013
Email from Piu Ghosh to Aarti Shrivastava re: Architectural Details for
Apple Campus 2 Phase Ia. buildings (July 01, 2013 4:09:00 PM PDT)
07/02/2013
Email from Jesse Robertson to Fransiska Church re: Apple Campus 2
TIA (July 02, 2013 6:15:02 AM PDT)
07/02/2013
Email from Piu Ghosh to Wolfgang Wagener, Dan Whisenhunt re:
Architectural Details for Apple Campus 2 Phase I a. buildings (July 02,
2013 9:19:00 AM PDT)
07/02/2013
Email from Thorisa Yap to Aarti Shrivastava re: Fw: [McBB] Apple 2
fortress - comment period (July 02, 2013 11:59:21 AM PDT)
07/02/2013
Email from Piu Ghosh to Aarti Shrivastava re: Items for Council -
Apple Community Meeting for EIR comments (July 02, 2013 12:16:00
PM PDT)
07/03/2013
Email from Robert Swierk to Erika McCulloch, Terry Bowen, James
Fowler, Franziska Church, Timm, Borden, dwhisenhunt @apple.com,
foulkesggpple.com, David Stillman RE: VTA- County- Cupertino-
Apple Campus 2 CEQA Coordination (July 03, 2013 5:53:14 PM PDT)
07/03/2013
Email from Dan Collen to Robert Swierk Re: VTA- County - Cupertino-
Apple Campus 2 CEQA Coordination (July 03, 2013 6:34:35 PM PDT)
07/03/2013
Email from Piu Ghosh to Timm Borden re: FW: Apple DEIR --
Conditions of Approval (July 03, 2013 1:18:19 PM PDT)
• Conditions of Approval Apple Campus 2 Project Draft EIR
(Conditions of Approval.doc)
07/03/2013
Email from Judith Malamut to Piu Ghosh re: FW: Apple - Air Intake
Noise? (July 03, 2013 1:41:22 PM PDT)
07/03/2013
Email from Aarti Shrivastava to David Brandt re: FW: Items for
Council - Apple Campus 2 — Public Meeting for EIR (July 03, 2013
3:32:09 PM PDT)
07/03/2013
Email from Piu Ghosh to Dan Whisenhunt RE: Architectural Details
for Apple Campus 2 Phase la. buildings (July 03, 2013 4:38:52 PM
1 -131
sf- 3345921 Q
ATTACHMENT I
INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2
PROJECT
1 -132
sf- 3345921 Q
DATE
DOCUMENT
PDT)
07/03/2013
Email from Robert Kim to Rick Kitson, Michelle Combs, Nidhi Mathu,
Peter Coglianese, Rei Delgado, Robert Kim re: FYI: (July 05, 2013
11:40:00 AM PDT)
07/03/2013
Email from Aarti Shrivastava to David Brandt re: FW: Items for
Council - Apple Campus 2 — Public Meeting for EIR (July 03, 2013
3:32:09 PM PDT)
07/05/2013
Email from Dawn Cameron to Timm Borden re: Caltrans contact for
Apple DEIR (July 05, 2013 3:09:12 PM PDT)
07/05/2013
Email from Piu Ghosh to Andrew Miner Re: Pretty Pictures (July 05,
2013 12:31:54 PM PDT)
07/08/2013
Email from Robert Cunningham to David Stillman,
timmbkcupertino.org, Franziska Church re: Question about
intersection impacts in Apple 2 TIA (July 08, 2013 2:59:49 PM PDT)
07/09/2013
Email from Franziska Church to David Stillman re: FW: Question
about intersection impacts in Apple 2 TIA (July 09, 2013 7:55:43 AM
PDT)
07/09/2013
Email from Piu Ghosh to David Stillman, Gary Baum re: Draft
Conditions/Mitigation Measures from the City of Santa Clara — Advice
(July 09, 2013 10:42:07 AM PDT)
07/09/2013
Email from Timm Borden to Aarti Shrivastva, Piu Ghosh, David
Stillman, Gary Baum re: RE: Draft Conditions/Mitigation Measures
from the City of Santa Clara — Advice (July 09, 2013 11:02:05 AM
PDT)
07/09/2013
Email from Piu Ghosh to Aarti Shrivastava, David Stillman, Gary
Baum RE: Draft Conditions/Mitigation Measures from the City of
Santa Clara — Advice (July 09, 2013 11:02:34 AM PDT)
07/09/2013
Email from Piu Ghosh to David Stillman, Gary Baum re: Draft
Conditions/Mitigation Measures from the City of Santa Clara — Advice
(July 09, 2013 10:42:07 AM PDT)
07/09/2013
Email from David Stillman to Aki Hond, Aarti Shrivastava, Gary
Chao, George Schroeder re: RE: Traffic Analysis GPU (July 09, 2013
1 -132
sf- 3345921 Q
ATTACHMENT I
INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2
PROJECT
1 -133
sf- 3345921 Q
DATE
DOCUMENT
1:01:30 PM PDT)
07/09/2013
Email from Rick Kitson Aarti Shrivastava, Gary Baum, David Brandt
re: FW: Apple Campus 2 Commenting Process activity report,
Thursday, June 6 to Sunday, July 7, 2013 (July 09, 2013 2:50:48 PM
PDT)
07/10/2013
Email from Manish Dalia to Chad Mosley re: AC2 - Wolfe Road
Widening and Pruneridge Streetscape Workshop (July 10, 2013
4:05:51 PM PDT)
07/11/2013
Email from Chad Mosley to Mike Rohde RE: VTA Route 182 (July 11,
2013 8:13:20 AM PDT)
07/11/2013
Email from Adam Weinstein to Gary Chao, Piu Ghosh, David
Stillman, jfowlerkgpple.com, Peter Sokoloff, dgoldgmofo.com,
mimwalle @mofo.com, Judith Malamut, Franziska Church, Jane
Bierstedt, Rick Kitson, Gary Baum, Eric Morley, Foulkes @apple.com,
Scott D. Pinsky, Chad Mosley, Timm Borden, JJeffers(,mofo.com,
dwhisenhunt @apple.com, Aarti Shrivastava, diana.fazely @gmail.com,
David Brandt, wwa eg ner(,fosterandpartners.com,
soki @fosterandpartners.com, william.baum arg dner(a 4m.com,
Michael.iswalt @arup.com, lynnjohnsonkUple.com,
Garbergsmwlaw.com RE: Apple EIR -- Team Meeting 7/11 (July 11,
2013 10:16:31 AM PDT)
07/11/2013
Email from Piu Ghosh to Steve Lynch RE: Meeting with Cupertino
(July 11, 2013 11:54:00 AM PDT)
07/11/2013
Email from Rick Kitson to Karen Guerin, David Brandt re: Apple
Comments (July 11, 2013 4:45:00 PM PDT)
07/12/2013
Email from Franziska Church to David Stillman re: Wolfe Bus Stop
(July 12, 2013 8:21:58 AM PDT)
07/12/2013
Email from David Stillman to Yang Smith re: Fair share spreadsheet
(July 12, 2013 4:09:00 PM PDT)
• Cupertino's Freeway Volumes (20130312_cupertino I -280
Volumes- F &P.xls)
07/12/2013
Email from Steve Lynch to Piu Ghosh RE: Meeting with Cupertino
1 -133
sf- 3345921 Q
ATTACHMENT I
INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2
PROJECT
1 -134
sf- 3345921 Q
DATE
DOCUMENT
(July 12, 2013 10:49:34 AM PDT)
07/12/2013
Email from Brendan Lahiff to David Brandt Re: Steve Reed's vehicles
(July 12, 2013 6:28:17 PM PDT)
07/14/2013
Email from Grant Schereth to Chad Mosley re: AC2 H &H Report and
DD Addendum Review (July 14, 2013 11:19:06 AM PDT)
07/15/2013
Email from Robert Kim to Andrea Sanders, Donna Henriques, Ryan
Roman, Kirsten Squarcia, Marianna Khienkina, Karen B. Guerin,
Brittany Carey, Julia Kinst, Grace Schmidt, Liz Nunez, Chylene
Osborne, Tiffanie Cardenas, Nidhi Mathur, Robert Kim, Mary
Redwine, Lisa Atwood, Rei Delgado, Peter Coglianese, Rick Kitson,
Piu Ghosh re: Apple Campus 2 Commenting Process activity report,
Thursday, June 6 to Sunday, July 14, 2013 (July 15, 2013 9:55:42 AM
PDT)
07/16/2013
Email from Nidhi Mathur to Ellen J. Garber, Gary Baum, Rick Kitson
re: online comments after July 22 (July 16, 2013 4:40:09 PM PDT)
07/16/2013
Email from David Stillman to Chad Mosley re: Requested info re:
properties (July 16, 2013 4:45:43 PM PDT)
07/17/2013
Email from Chad Mosley to dwhisenhuntggpple.com re: Appendix H
exhibits (July 17, 2013 7:46:58 AM PDT)
• Fehr & Peers, City of Cupertino, Homestead Road & De
Anza Boulevard, Sunnyvale — Saratoga Road, Mitigation
Conceptual Plan
07/17/2013
Email from Piu Ghosh to Adam Weinstein re: City's Agenda Items for
Apple meeting 7/18/2013 (July 17, 2013 12:14:00 PM PDT)
07/17/2013
Email from Adam Weinstein to Gary Chao, Piu Ghosh, David
Stillman, jfowlerggpple.com, Peter Sokoloff, dgoldc�r�,mofo.com,
mimwalle @mofo.com, Judith Malamut, Franziska Church, Jane
Bierstedt, Rick Kitson, Gary Baum, Eric Morley,Foulkesggpple.com,
Scott D. Pinsky, Chad Mosley, Timm Borden,
JJeffers @mofo.com,dwhisenhunt @apple.com, Aarti Shrivastava,
diana.fazely @gmail.com, David Brandt,
wwagener @fosterandpartners.com, soki c�r�,fosterandpartners.com,
william.baumgardnergarup.com, Michael.iswalt @arup.com,
lynnjohnsonggpple.com, Garber smwlaw.com RE: Apple EIR --
1 -134
sf- 3345921 Q
ATTACHMENT I
INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2
PROJECT
1 -135
sf- 3345921 Q
DATE
DOCUMENT
Team Meeting 7/18 (July 17, 2013 6:05:11 PM PDT)
07/18/2013
Email from Dan Whisenhunt to Chad Mosley Re: Appendix H exhibits
Re: Appendix H exhibits (July 18, 2013 9:04:57 AM PDT)
07/18/2013
Email from Piu Ghosh to Nidhi Mathur, Aarti Shrivastava, Rick Kitson
RE: online comments after July 22 (July 18, 2013 9:42:00 AM PDT)
07/18/2013
Email from Gary Chao to Aarti Shrivastava, Piu Ghosh FW: Apple EIR
Report and Cupertino Village (July 18, 2013 11:13:41 AM PDT)
07/18/2013
Email from Keith Murphy to City Council re: New construction in rear
of Apple parking lot, adjacent to Calabazas Creek (July 18, 2013
1:22:51 PM PDT)
07/18/2013
Email from Timm Borden to Aarti, Ellen J. Garber, Carol Korade,
David Brandt re: RE: Permit list - DRAFT.docx (July 18, 2013 1:56:03
PM PDT)
07/18/2013
Email from Adam Weinstein to Aarti Shrivastava to Piu Ghosh re:
Apple EIR — alternatives (July 18, 2013 3:43:27 PM PDT)
• Apple Campus 2 Project EIR Technical Studies Needed to
Approve Project Alternatives (Alternatives -Tech Reports
Needed. doc)
07/19/2013
Email from Gilbert Wong to David Brandt, Carol Korade, Aarti
Shrivastava, Timm Borden re: Fwd: New construction in rear of Apple
parking lot, adjacent to Calabazas Creek (July 19, 2013 9:08:41 PM
PDT)
07/19/2013
Email from Piu Ghosh to Adam Weinstein re: FW: Permit list -
DRAFT.docx (July 19, 2013 10:33:00 AM PDT)
07/19/2013
Email from Aarti Shrivastava to Piu Ghosh, Adam Weinstein RE:
Permit list - DRAFT.docx (July 19, 2013 12:09:34 PM PDT)
07/19/2013
Email from Dan Whisenhunt, Apple, Inc., to Orrin Mahoney, Gilbert
Wong, Barry Chang, Mark Santoro re: Apple Campus 2 (July 19, 2013
3:23:41 PM PDT)
• Letter from Apple Inc. to the City of Cupertino (July 19,
1 -135
sf- 3345921 Q
ATTACHMENT I
INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2
PROJECT
1 -136
sf- 3345921 Q
DATE
DOCUMENT
2013)
07/19/2013
Email from Apple Campus 2 to Orrin Mahoney, Gilbert Wong, Barry
Chang, Mark Santoro re: FW: Apple Campus 2 (July 19, 2013 3:22 PM
PDT)
• Letter from Apple Inc. to the City of Cupertino (July 19,
2013)
07/19/2013
Letter from Dan Whisenhunt to Rick Kitson
07/22/2013
Email from Franziska Church to David Stillman re: SCB /Calvert (July
22, 2013 8:08:52 AM PDT)
• Stevens Creek Graphic
(SJ11_ 1272_ AppleCampus2 _GraphicsStevensCreek .p
df)
07/22/2013
Email from Robert Kim to Andrea Sanders, Donna Henriques, Ryan
Roman, Kirsten Squarcia, Marianna Khienkina, Karen B. Guerin,
Brittany Carey, Julia Kinst, Grace Schmidt, Liz Nunez, Chylene
Osborne, Tiffanie Cardenas, Nidhi Mathur, Robert Kim, Mary
Redwine, Lisa Atwood, Rei Delgado, Peter Coglianese, Rick Kitson,
Piu Ghosh re: Public Commenting: Ahh, I remember when... (July 22,
2013 10:08:10 AM PDT)
07/22/2013
Email from Beth Ebben to Piu Ghosh re: FW: Apple Campus 2 re: FW:
Apple Campus 2 (July 22, 2013 10:45:33 AM)
• Letter from Apple Inc. to the City of Cupertino (July 19,
2013)
07/22/2013
Email from Christina Uribe to Piu Ghosh, Aarti Shrivastava re: City of
Sunnyvale Comments on the Draft EIR for the Apple 2 Campus (July
22, 2013 11:16:52 AM PDT)
• City of Sunnyvale Comment Letter (July 22, 2013) (COS
Comments to Apple 2 DEIR 7- 22- 13.pdf)
07/22/2013
Email from Roy Molseed to Aarti Shrivastava, applecampus2 re:
Apple Campus 2 Draft EIR (July 22, 2013 3:39:52 PM PDT)
1 -136
sf- 3345921 Q
ATTACHMENT I
INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2
PROJECT
1 -137
sf- 3345921 Q
DATE
DOCUMENT
• Santa Clara Valley Transportation Authority Comment
Letter (July 22, 2013) (CU1102_apple2_DEIR_7-22-
13.pdf)
07/22/2013
Email from Payal Bhagat to Piu Ghosh, Aarti Shrivastava re: Apple
Campus 2 Project DEIR - Comments from City of Santa Clara (July
22, 2013 4:20:16 PM PDT)
• City of Santa Clara Comment Letter (July 19, 2013) (City
of Santa Clara Comments on DEIR for Apple Campus 2
Proj ect.pdf)
07/22/2013
Email from Jesse Robertson to Roy Molseed, Aarti Shrivastava,
applecampus2 re: Caltrans comments for the Apple Campus 2 Draft
EIR (July 22, 2013 4:58:59 PM PDT)
• Caltran Comment Letter (July 22, 2013) (Apple Campus 2
DEIR Letter 22JUL2013.pdf)
07/22/2013
Email from Dawn Cameron to applecampus2, Timm Borden, Aarti
Shrivastava, Piu Ghosh re: County of Santa Clara Comments on Apple
Campus 2 DEIR (July 22, 2013 5:14:15 PM PDT)
• County of Santa Clara Comment Letter (July 22, 2013)
07/22/2013
Email from Piu Ghosh to Dawn Cameron RE: County of Santa Clara
Comments on Apple Campus 2 DEIR (July 22, 2013 5:20:00 PM PDT)
07/22/2013
Email from Rick Kitson to Rick Kitson re: Apple Campus 2 Proceeds
to Next Phase of Environmental Review re: Apple Campus 2 Proceeds
to Next Phase of Environmental Review (July 22, 2013 5:30:00 PM
PDT)
07/22/2013
Email from Andrew Crabtree re: Emailing:
CSJ_ Comments—Apple _2_Campus_DEIR.pdf (July 22, 2013 5:35:16
PM PDT)
• City of San Jose Comment Letter (July 22, 2013)
(C SJ_ Comments _Apple_2_Campus_DEIR.pdf)
07/22/2013
Email from Robert Kim to Andrea Sanders, Donna Henriques, Ryan
Roman, Kirsten Squarcia, Marianna Khienkina, Karen B. Guerin,
1 -137
sf- 3345921 Q
ATTACHMENT I
INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2
PROJECT
1 -138
sf- 3345921 Q
DATE
DOCUMENT
Brittany Carey, Julia Kins, Grace Schmidt, Liz Nunez, Chylene
Osborne, Tiffanie Cardenas, Nidhi Mathur, Robert Kim, Mary
Redwine, Lisa Atwood, Rei Delgado, Peter Coglianese, Rick Kitson,
Piu Ghosh re: Apple Campus 2 Commenting Process activity report,
Thursday, June 6 to Sunday, July 21, 2013 (Date: Monday, July 22,
2013 5:40:33 PM PDT)
07/22/2013
Email from Karen Guerin to Apple Campus 2 re: FW: Apple Campus 2
(Apple Campus 2- Updated List of Supporters & Map 071913.pdf)
• Letter from Apple, Inc. to City of Cupertino (July 19, 2013)
07/22/2013
Comment letter (Letter ID 3)
07/23/2013
Email from Franziska Church to David Stillman re: Wolfe Rd Transit
Stop (July 23, 2013 10:24:49 AM PDT)
• Fehr & Peers, City of Cupertino Option I N. Wolfe Road —
Bus Duckout Mitigation Conceptual Plan (Wolfe Rd -Bus
Duckout A.pdf)
• Fehr & Peers, City of Cupertino Option 1 N. Wolfe Road —
Bus Duckout Mitigation Conceptual Plan (Wolfe Rd -Bus
Duckout B.pdf)
07/23/2013
Email from David Stillman to Chad Mosley FW: Wolfe layover bus
stop (July 23, 2013 4:31:45 PM PDT)
• Santa Clara Valley Transportation Authority, Bus Parallel
Pull -In & Pull -Out Figure 24 (INOUTALL.pdf)
07/23/2013
Email from Andrew Miner to Piu Ghosh Re: City of Sunnyvale
Comments on the Draft EIR for the Apple 2 Campus re: July 23, 2013
8:04:18 AM PDT)
07/23/2013
Email from Piu Ghosh to Andrew Miner RE: City of Sunnyvale
Comments on the Draft EIR for the Apple 2 Campus (July 23, 2013
9:03:00 AM PDT)
07/23/2013
Email from Piu Ghosh to Timm Borden, Aarti Shrivastava, David
Stillman re: FW: Emailing:
CSJ Comments_ Apple _2_Campus_DEIR.pdf (July 23, 2013 9:09:17
1 -138
sf- 3345921 Q
ATTACHMENT I
INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2
PROJECT
1 -139
sf- 3345921 Q
DATE
DOCUMENT
AM PDT)
• City of San Jose Comment Letter (July 22, 2013)
07/23/2013
Email from Piu Ghosh to Andrew Crabtree re: RE: Emailing:
CSJ_ Comments—Apple _2_Campus_DEIR.pdf (July 23, 2013 9:18:00
AM PDT)
07/23/2013
Email from Beth Ebben to Piu Ghosh, Nidhi Mathur re: FW: Apple
Campus 2- DEIR_JPB Comments (July 23, 2013 9:43:28 AM PDT)
• Peninsula Corridor Joint Power Board Comment Letter
(July 22, 2013)
07/23/2013
Email from Beth Ebben to Piu Ghosh, Nidhi Mathur re: FW: Apple
EIR comments (July 23, 2013 9:44:30 AM PDT)
07/23/2013
Email from Piu Ghosh to Andrew Miner RE: Cupertino Village (July
23, 2013 10:12:00 AM PDT)
07/23/2013
Email from Keith Murphy to Gary Chao re: Fwd: New construction in
rear of Apple parking lot, adjacent to Calabazas Creek (July 23, 2013
10:40:05 AM PDT)
07/23/2013
Email from J Feng to City Council re: Support of Apple Campus II
(July 23, 2013 1:09 AM PDT) (Letter ID e- 13 -07 -23 -001)
07/23/2013
Email from Dolf Payer to City Council re: Apple 2 Campus (July 23,
2013 2:52 PM PDT) (Letter ID e- 13 -07 -23 -002)
07/23/2013
Comment letter from Sonja Cook (Letter ID 500157)
07/24/2013
Email from Franziska Church to David Stillman re: TRAFFIX Queue
(July 24, 2013 2:32:50 PM PDT)
07/24/2013
Email from Franziska Church to David Stillman RE: Intersection
counts (July 24, 2013 3:57:20 PM PDT)
07/24/2013
Email from Nidhi Mathur to Adam. Weinstein(,lsa- assoc. com, Gary
Baum, Ellen J. Garber, Aarti Shrivastava, Piu Ghosh, Rick Kitson re:
Apple Campus 2 Public Comments Full Data Export (July 24, 2013
1 -139
sf- 3345921 Q
ATTACHMENT I
INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2
PROJECT
1 -140
sf- 3345921 Q
DATE
DOCUMENT
9:27:11 AM PDT)
07/24/2013
Email from Nidhi Mathur to Adam Weinstein, Rick Kitson, Aarti
Shrivastava, Piu Ghosh RE: Apple Campus 2 Public Comments Full
Data Export (July 24, 2013 10:05:37 AM PDT)
07/24/2013
Comment letter from Tyler Courtney (Letter ID 500158)
07/24/2013
Email from Georgyne Purcell to City Council re: Apple Campus 2
(July 23, 2013 8:51 PM PDT) (Letter ID e- 13 -07 -24 -002 PDT)
07/24/2013
Email from Theresa to City Council re: Apple Campus 2 (July 23,2013
9:36 PM PDT) (Letter ID e- 13 -07 -24 -001)
07/25/2013
Email from Piu Ghosh to Adam Weinstein RE: Apple EIR -- Team
Meeting 7/25 (July 25, 2013 10:06:00 AM PDT)
07/25/2013
Email from Adam Weinstein to Gary Chao, Piu Ghosh, David
Stillman, jfowler @apple.com, Peter Sokoloff, dgold(,mofo.com,
mimwallec�r�,mofo.com, Judith Malamut, Franziska Church, Jane
Bierstedt, Rick Kitson, Gary Baum, Eric Morley, Foulkes @apple.com,
Scott D. Pinsky, Chad Mosley, Timm Borden, JJeffersgraofo.com,
dwhisenhuntkgpple.com, Aarti Shrivastava, diana.fazely @gmail.com,
David Brandt, wwa eng ergfosterandpartners.com,
sokigfosterandpartners.com, william.baura arg dnerggrup.com,
Michael.iswaltc�r�,arup.com, lynnjohnsonggpple.com,
Garberksmwlaw.com RE: Apple EIR -- Team Meeting 7/25 (July 25,
2013 11:50:34 AM PDT)
07/25/2013
Comment letter from Sang Lam (Letter ID 500159)
07/25/2013
Comment letter from Rahul Agrawal (Letter ID 500160)
07/26/2013
Comment letter from Rajani Gudi (Letter ID 500161)
07/26/2013
Memo from Richard Berkson, Ashleigh Kanat, to Gary M. Baum, re:
EPS Peer Review of KMA's Draft Report: Economic and Fiscal
Impacts Generated by Apple in Cupertino CONFIDENTIAL — AC2
Economic / Fiscal Impact Report, EPS 9131019
07/26/2013
Email from Rick Kitson to David Brandt re: FW: Apple Campus 2
Commenting Process activity report, Thursday, June 6 to Monday, July
1 -140
sf- 3345921 Q
ATTACHMENT I
INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2
PROJECT
1 -141
sf- 3345921 Q
DATE
DOCUMENT
22, 2013, 5:30PM (July 26, 2013 10:34:04 AM PDT)
07/29/2013
Email from Manish Dalia to Chad Mosley re: AC2 - Wolfe /Homestead
Intersection Boundary (July 29, 2013 1:54:47 PM PDT)
07/29/2013
Email from: Chuck Worley to City council re: Apple Campus 2 (July
26, 2013 11:23 PM PDT) (Letter ID e- 13 -07 -29 -001)
07/30/2013
Email from Rick Kitson to Jennifer Garnett re: RE: Accepted:
Invitation: Cupertino /Sunnyvale PIO check -in (July 30, 2013 9:22:00
AM PDT)
07/30/2013
Email from Adam Weinstein to Gary Chao, Piu Ghosh, David
Stillman, jfowlerggpple.com, Peter Sokoloff, dgoldgmofo.com,
mimwalle @mofo.com, Judith Malamut, Franziska Church, Jane
Bierstedt, Rick Kitson, Gary Baum, Eric Morley, Foulkes @apple.com,
Scott D. Pinsky, Chad Mosley, Timm Borden, JJeffers(,mofo.com,
dwhisenhunt @apple.com, Aarti Shrivastava, diana.fazely @gmail.com,
David Brandt, wwagener2fosterandpartners.com
sokic�r�,fosterandpartners.com, william.baum arg dnerc�r�MM.com,
Michael.iswalt(ab,arup.com, lynnjohnson(c gpple.com,
Garberc�r�,smwlaw.com re: Apple EIR -- Team Meeting 8/1 (July 30,
2013 10:49:10 AM PDT)
07/30/2013
Email from Adam Weinstein to Aarti Shrivastava, Piu Ghosh, Gary
Baum, Garbergsmwlaw.com re: Apple DEIR -- enumerated comments
(rough draft) (July 30, 2013 5:03:34 PM PDT)
07/30/2013
Comment letter from Jon Ramos (Letter Id 500163)
07/30/2013
Comment letter from Admas Zewdie (Letter ID 500162)
07/30/2013
Email from dhsiao_98 @yahoo.com to City Council re: Support Apple
2 (July 30, 2013 1:07 PM PDT) (Letter ID e- 13 -07 -30 -001)
07/30/2013
Email from: Chris Schultz to City Council re: I support the Apple
Campus (July 30, 2013 12:40 PM PDT) (Letter ID e- 13 -07 -30 -002)
07/31/2013
Email from Chad Mosley to Manish Dalia RE: AC2 -
Wolfe /Homestead Intersection Boundary (July 31, 2013 7:26:06 AM
PDT)
1 -141
sf- 3345921 Q
ATTACHMENT I
INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2
PROJECT
1 -142
sf- 3345921 Q
DATE
DOCUMENT
07/31/2013
Email from Amy Taylor to Timm Borden, David Stillman, Chad
Mosley re: Cupertino 7/31 - Meeting Notes (July 31, 2013 9:56:56 PM
PDT)
07/31/2013
Email from Rick Kitson to Karen Guerin, David Brandt re: FW: Apple
Campus 2 Commenting Process activity report, Thursday, June 6 to
Sunday, July 28, 2013 (July 31, 2013 3:22:00 PM PDT)
07/31/2013
Email from Rick Kitson to Robert Kim re: RE: Apple Campus 2
Commenting Process activity report, Thursday, June 6 to Sunday, July
28, 2013 (July 31, 2013 3:22:00 PM PDT)
07/31/2013
Email from Piu Ghosh to Adam Weinstein FW: Apple: Suggested
Agenda for Thursday's Meeting (July 31, 2013 4:31:00 PM PDT)
07/31/2013
Email from Adam Weinstein to Gary Chao, Piu Ghosh, David
Stillman, jfowler @apple.com, Peter Sokoloff, dgold(,mofo.com,
mimwalle @mofo.com, Judith Malamut, Franziska Church, Jane
Bierstedt, Rick Kitson, Gary Baum, Eric Morley, Foulkes @apple.com,
Scott D. Pinsky, Chad Mosley, Timm Borden, JJeffers(c rofo.com,
dwhisenhunt @apple.com, Aarti Shrivastava, diana.fazely @gmail.com,
David Brandt, wwa eng ergfosterandpartners.com,
sokikfosterandpartners.com, william.baumgardnerkarup.com,
Michael.iswalt @arup.com, lynnjohnsonggpple.com,
Garbergsmwlaw.com re: RE: Apple EIR -- Team Meeting 8/1 (July
31, 2013 4:58:03 PM PDT)
07/31/2013
Email from Diane A Nguyen to City Council re: I support APPLE 2
Campus (July 30, 2013 10:29 PM PDT) (Letter ID e- 13 -07 -31 -001)
08/01/2013
Comment letter from Jon Ramos (Letter ID 500164)
08/01/2013
Comment letter from John Davies (Letter ID 500165)
08/01/2013
Email from Amy Taylor to David Stillman, Chad Mosley, Aarti
Shrivastava re: AC2 Protected Intersection — Tantau and Stevens Creek
(MIT L -M) (Aug. 01, 2013 1:23:26 AM PDT)
• Revised Intersection Graphic (revised - intersection.pdf)
• California Department of Transportation, Complete
Intersections: A Guide to Reconstructing Intersections and
1 -142
sf- 3345921 Q
ATTACHMENT I
INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2
PROJECT
1 -143
sf- 3345921 Q
DATE
DOCUMENT
Interchanges for Bicyclists and Pedestrians, Title Page
(2010)
(www. dot. ca. gov_hq_traffops _survey _pedestrian _ Complete
- Intersections -A- Guide -to- Reconstructing- Intersections-
and- Interchanges- for - Bicyclists - and - Pedestirans.pdf)
• California Department of Transportation, Complete
Intersections: A Guide to Reconstructing Intersections and
Interchanges for Bicyclists and Pedestrians, Figure 3.1
Issues Associated with Signalized Intersections, Complete
Intersections p. 22 (2010) (2013-08-01signalized-
intersection- problems.pdf)
• California Department of Transportation, Complete
Intersections: A Guide to Reconstructing Intersections and
Interchanges for Bicyclists and Pedestrians, Figure 3.2
Common Intersection Treatments for Pedestrians, p. 25
(2010) ( 2013- 08- 01_signalized- intersection- protected.pdf)
• Protected Intersection Graphic (protected - intersection.pdf))
08/01/2013
Email from David Stillman to Amy Taylor, Chad Mosley, Aarti
Shrivastava re: RE: AC2 protected intersection - Tantau and Stevens
Creek (MIT L -M) (Aug. 01, 2013 9:20:39 AM PDT)
• California Department of Transportation, Complete
Intersections: A Guide to Reconstructing Intersections and
Interchanges for Bicyclists and Pedestrians, Table 3.1
Treatments for Signalized Intersections, p. 23, Figure 3.2
Common Intersection Treatments for Pedestrians, p. 25
(2010) (Complete Intersections.pdf)
08/01/2013
Email from Franziska Church to Amy Taylor, Dan Whisenhunt re:
Introduction (Aug. 01, 2013 9:32:23 AM PDT)
08/01/2013
Email from David Stillman to Piu Ghosh re: FW: Cupertino 7/31 —
Meeting Notes (Aug. 01, 2013 10:36:00 AM PDT)
08/01/2013
Email from Amy Taylor to David Stillman, Chad Mosley, Aarti
Shrivastava re: Apple De Anza / Homestead Take Exhibit Update
(Aug. 01, 2013 11:01:16 PM PDT)
1 -143
sf- 3345921 Q
ATTACHMENT I
INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2
PROJECT
1 -144
sf- 3345921 Q
DATE
DOCUMENT
08/01/2013
Email from David Stillman to Ying Smith re Freeway segment
volumes needed (Aug. 01, 2013 4:18:00 PM PDT)
08/01/2013
Email Aarti Shrivastava to Gilbert Wong re: FW: New construction in
rear of Apple parking lot, adjacent to Calabazas Creek (August 01,
2013 11:17:33 AM PDT)
08/02/2013
Email from Chad Mosley to Amy Taylor, David Stillman, Aarti
Shrivastava RE: Apple De Anza / Homestead Take Exhibit Update
(Aug. 02, 2013 8:19:21 AM PDT)
08/02/2013
Email from Amy Taylor to Chad Mosley, David Stillman, Aarti
Shrivastava re: Wolf Rd. Bus stop revision (Aug. August 02, 2013
10:18:29 AM PDT)
• Santa Clara Valley Transportation Authority, Typical Bus
Duckout, Figure 22 (Dukout70.pdf)
• Public Utility Easement Graphic (MIT_K.pdf) )
08/02/2013
Email from David Stillman to Piu Ghosh re: FW: Freeway segment
volumes needed (Aug. 02, 2013 10:51:04 AM PDT)
08/02/2013
Email from Chad Mosley to Steve Newgren re: FW: Wolf Rd. Bus stop
revision (Aug. 02, 2013 11:02:16 AM PDT)
• Santa Clara Valley Transportation Authority, Typical Bus
Duckout, Figure 22 (Dukout70.pdf)
• Public Utility Easement Graphic (MIT_K.pdf)
08/02/2013
Email from David Stillman to Piu Ghosh re: FW: Freeway segment
volumes needed (Aug. 02, 2013 1:50:53 PM PDT)
08/02/2013
Email from Ken Olcott to Sara Doi, David Stillman, Chad Mosley re:
RE: AC2 protected intersection - Tantau and Stevens Creek (MIT L -M)
(Aug. 02, 2013 5:11:12 PM PDT)
08/03/2013
Email from Amy Taylor to David Stillman, David Mosley RE:
Cupertino 7/31 - Meeting Notes - Revised Comments (Aug. 03, 2013
5:16:27 PM PDT)
1 -144
sf- 3345921 Q
ATTACHMENT I
INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2
PROJECT
1 -145
sf- 3345921 Q
DATE
DOCUMENT
• Email from Amy Taylor to Chad Mosley; David Stillman;
Aarti Shrivastava re: Wolf Rd. Bus stop revision (Aug. 02,
2013 10:20 AM PDT) (Wolf Rd. Bus stop revision.msg)
• Santa Clara Valley Transportation Authority,
Typical Bus Duckout, Figure 22 (Dukout70.pdf)
• Public Utility Easement Graphic (MIT_K.pdf) )
• PG &E Graphic (DeAnza.Homestead PGE Asbuilt.pdf)
• Sandis, Grading and Utility Plan, Apple MIT Intersection L-
M: Tantau Avenue, San Jose, California, Sheet C -3.0 (July
19, 2013) (C- 3.0_GRAD_MIT -L- M.pdf)
• Sandis, Grading and Utility Plan, Apple MIT Intersection A
North Saratoga Sunnyvale Road at Homestead Road,
Cupertino, California, Sheet C -3.0 (July 19, 2013) (C-
3.0_GRAD_MIT- A.pdf)
08/05/2013
Email from Amy Taylor to David Stillman, Chad Mosley re: Cupertino
7/31 — Meeting Notes — Revised Comment (Aug. 05, 2013 4:28:00 PM
PDT)
• Email from Flores, Osvaldo OCFlk]2ge.com to Sara Doi;
Nate Dickinson' re: RE: potential vault adjustment (Aug.
05, 2013 9:53 AM PDT) (RE potential vault
adjustment.msg)
• Sandis, Grading and Utility Plan, Apple MIT Intersection A
North Saratoga Sunnyvale Road at Homestead Road,
Cupertino, California, Sheet C -3.0 (July 19, 2013) (C-
3.0_GRAD- MITA.PDF)
• Sandis, Intersection Mitigation A (Aug. 5, 2013) (2013-08 -
05_MIT- A.PDF)
08/05/2013
Email from Piu Ghosh to Julia Kinst re: FW: Apple EIR --
scope/budget augment (Aug. 05, 2013 9:12:55 AM PDT)
• Letter from LSA Associates to City of Cupertino re:
Amendment 5 to Apple Campus 2 Project Environmental
1 -145
sf- 3345921 Q
ATTACHMENT I
INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2
PROJECT
1 -146
sf- 3345921 v2
DATE
DOCUMENT
Impact Report (EIR) Scope of Work and Budget (July 19,
2013) (7 -19 -13 Con Mod 95 LTR.pdf)
08/05/2013
Email from Piu Ghosh to Dan Whisenhunt RE: EIR notification
signage (Aug. 05, 2013 11:17:00 AM PDT)
08/05/2013
Email from Chad Mosley to Amy Taylor re: FW: Wolf Rd. Bus stop
revision (August 05, 2013 2:43:35 PM PDT)
08/05/2013
Email from Piu Ghosh to Meg Thomas, Dan Whisenhunt, Dave Muffly
re: FW: Tree Transplant Scope (Aug. 05, 2013 2013 3:13:08 PM PDT)
• Michael Bench, Protection During Demolition and Under
Boxing of Transplant Trees Apple Campus 2 Cupertino,
California (Apple C 2 8- 13.doc)
08/05/2013
Comment letter from David Lofgren (Letter ID 500166)
08/05/2013
Letter from Habitat Conservation Now to City of Cupertino (Nov. 21,
2012) (Letter ID s- 13 -08 -05 -002)
08/05/2011
Letter from Shani Kleinhaus, Santa Clara Valley Audubon Society to
City of Cupertino re: DEIR for Apple Campus 2 (July 19, 2013) (Letter
ID s- 13 -08 -05 -001)
08/06/2013
Email from Piu Ghosh to Michael Bench RE: Apple Campus 2 (Aug.
06, 2013 9:19:00 AM PDT)
08/06/2013
Email from Rick Kitson to Robert Kim re: RE: Apple Campus 2
Commenting Process activity report, Thursday June 6 to Sunday, July
28, 2013 (Aug. 06, 2013 10:10 AM PDT)
08/07/2013
Email from Keith Murphy to Cupertino City Manager's Office re:
Fwd: New construction in Apple parking lot: new follow up questions
(Aug. 07, 2013 10:42:34 AM PDT)
Email from Keithddl527(,aol.com to Gary Chao Re: New construction
in Apple parking lot: new follow up questions (Aug. 06, 2013 11:16
AM PDT)
08/07/2013
Email from Piu Ghosh to Adam Weinstein, Aarti Shrivastava, Gary
Baum, Timm Borden, David Stillman, Chad Mosley,
f churchkfehrandpeers.com, J. Bierstedt(,fehrandpeers.com,
1 -146
sf- 3345921 v2
ATTACHMENT I
INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2
PROJECT
1 -147
sf- 3345921 Q
DATE
DOCUMENT
spinskykearthlink.net, Garberksmwlaw.com, Judith Malamut re: RE:
Apple EIR -- Internal Mtg at 10:30a - Admin. Draft Responses (Aug.
07, 2013 12:29:00 PM PDT)
08/07/2013
Email from Piu Ghosh to Aarti Shrivastava, Gary Baum, Timm
Borden, David Stillman, Chad Mosley re: RE: Apple EIR -- Internal
Mtg at 10:30a - Admin. Draft Responses (Aug. 07, 2013 1:46:50 PM
PDT)
08/07/2013
Email from Rick Kitson to Karen B. Guerin re: Items: Apple Campus
2 Commenting Process activity report, Thursday June 6 to Sunday,
August 4, 2013 (Aug. 07, 2013 07:02 PM PDT)
08/08/2013
Email from Piu Ghosh to Dan Whisenhunt re: Re: Apple bus using
Birdland neighborhood as parking lot (Aug. 08, 2013 9:32:25 PM
PDT)
08/08/2013
Email from Gary Chao to Keith Murphy re: RE: New construction in
Apple parking lot: new follow up questions (Aug. 08, 2013 1:21:37 PM
PDT)
• City of Cupertino Building Permit No. 13040053 (MX-
M 1100_20130808_114331.pdf)
08/08/2013
Email from Piu Ghosh re: Kirsten Squarcia re: RE: Petition for
Reconsideration.docx (Aug. 08, 2013 1:07:00 PM PDT)
08/08/2013
Email from David Brandt to Keith Murphy re: Re: New construction in
Apple parking lot: new follow up questions (Aug. 08, 2013 11:05:46
AM PDT)
08/08/2013
Letter from Susan Valenta, Gilroy Chamber of Commerce to City
Council (Letter ID s- 13 -08 -08 -001)
08/08/2013
Email from Feiyan to City Council re: Support Apple Campus 2 (Oct.
07, 2013 7:58 PM PDT) (Letter ID e- 13 -10 -08 -002)
08/08/2013
Email from Ravi Savanur to City Council re: Apple campus 2 (Oct. 01,
2013 11:23 AM PDT) (Letter ID e- 13 -10 -08 -003)
08/08/2013
Email from Gordon Lee to City Council re: Support Apple Campus 2
(Oct. 07, 2013 5:15 PM PDT) (Letter ID e- 13 -10 -08 -004)
1 -147
sf- 3345921 Q
ATTACHMENT I
INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2
PROJECT
1 -148
sf- 3345921 Q
DATE
DOCUMENT
08/08/2013
Email from Karl Sanford to City Council re: Apple 2 Campus (Oct. 08,
2013 7:07 AM PDT) (Letter ID e- 13 -10 -08 -005)
08/09/2013
Email from David Brandt to Keith Murphy re: Re: New construction in
Apple parking lot: new follow up questions (Aug. August 09, 2013
10:10:17 AM PDT)
08/09/2013
Email from Robert Shackelford to Chad Mosley RE: Cost Estimates for
off -site (Aug. 09, 2013 12:06:03 PM PDT)
08/09/2013
Email from Ying Smith to David Stillman re: RE: Freeway segment
volumes needed (Aug. 09, 2013 1:29:09 PM PDT)
08/10/2013
Email from Keith Murphy to David Brandt re: Re: New construction in
Apple parking lot: new follow up questions (Aug. 9, 2013, 4:57:14 PM
PDT)
08/12/2013
Email from David Stillman to Timm Borden re: Fair share update
(Aug. 12, 2013 10:59:34 AM PDT)
08/12/2013
Email from Julia Kinst to Piu Ghosh re: RE: Postcard for Apple
meetings (Aug. 12, 2013 12:16:55 PM PDT)
08/12/2013
Email from Keith Murphy to David Brandt re: A request for review of
an administrative determination is requested in writing (Aug. 12, 2013
12:18:38 PM PDT)
08/12/2013
Email from Rick Kitson to Robert Kim re: RE: Apple Campus 2
Commenting Process activity report, Thursday, June 6 to Sunday,
August 11, 2011 (Aug. 12, 2013 4:40 PM PDT)
08/12/2013
Email from Said Mohammed to City Council re: I Said Mohammed
living in Cupertino registering my full support for Apple Campus 2.
(Aug. 11, 2013 11:20 AM PDT) (Letter ID e- 13 -08 -12 -001)
08/13/2013
Email from Michael Bench to Meg Thomas Re: Draft Tree Protection
Narrative and Details (Aug. 13, 2013 11:14:38 AM PDT)
08/14/2013
Email from Adam Weinstein to Gary Chao, Piu Ghos, David Stillman,
jfowlerggpple.com, Peter Sokoloff, dgold(,mofo.com,
mimwallegmofo.com, Judith Malamut, Franziska Church, Jane
Bierstedt, Rick Kitson, Gary Baum, Eric Morley, Foulkes apple.com,
1 -148
sf- 3345921 Q
ATTACHMENT I
INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2
PROJECT
1 -149
sf- 3345921 Q
DATE
DOCUMENT
Scott D. Pinsky, Chad Mosley, Timm Borden, Heffers(,mofo.com,
dwhisenhunt @apple.com, Aarti Shrivastava, diana.fazelyggmail.com,
David Brandt, wwagenerkfosterandpartners.com,
sokigfosterandpartners.com, william.baura ard�ner(a Mm.com,
Michael.iswalt(&arup.com, lynnjohnson(cr Uple.com,
Garberc�r�,smwlaw.com re: RE: Apple EIR -- Team Meeting 8/15
(Wednesday, Aug. 14, 2013 8:40:23 PM PDT)
08/14/2013
Email from Adam Weinstein to Piu Ghosh re: RE: Draft EIR —
distribution (Aug. 14, 2013 8:51:08 AM PDT)
08/14/2013
Email from Piu Ghosh to Adam Weinstein re: RE: Draft EIR —
distribution (Aug. 14, 2013 9:42:00 AM PDT)
08/14/2013
Email from Franziska Church to Piu Ghosh, Adam Weinstein RE:
Status (Aug. 14, 2013 2:14:54 PM PDT)
08/14/2013
Email from Adam Weinstein to Franziska Church, Piu Ghosh re: RE:
Status (Aug. 14, 2013 2:21:20 PM PDT)
08/14/2013
Email from Piu Ghosh to Aarti Shrivastava, Gary Baum re: Emailing:
Consolidated comments - 8- 14- 13.pdf (Aug. 14, 2013 3:38:28 PM
PDT)
• Agency Comments to DEIR (Aug. 4, 2013) (Consolidated
comments - 8- 14- 13.pdf)
08/15/2013
Email from David Stillman to Franziska Church re: Vallco Parkway
(August 15, 2013 1:53 PM PDT)
08/15/2013
Email from Piu Ghosh to Laura Shipman re: RE: citywide postcard
(Aug. 15, 2013 8:59:28 PM PDT)
08/16/2013
Email from Wolfgang Wagener to Aarti Shrivastava, Piu Ghosh re:
Planning Update (Aug. 16, 2013 8:14:18 PM PDT)
08/19/2013
Comment letter from Francesco Ferretti (Letter ID 500167)
08/19/2013
Email from Francesco Ferretti to City Council re: Apple Campus 2
(Aug. 19, 2013 8:45 AM PDT) (Letter ID e- 13 -08 -19 -001)
08/19/2013
Email from Amy Taylor to Chad Mosley re: RE: Wolf Bus stop
1 -149
sf- 3345921 Q
ATTACHMENT I
INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2
PROJECT
1 -150
sf- 3345921 Q
DATE
DOCUMENT
updates (Aug. 19, 2013 9:05:42 AM PDT)
• First American Title Insurance Company, Preliminary
Report, 10989, 10905,10827, 10883, 10435, 11111 and
10751 North Wolfe Road, Cupertino, CA (Nov. 7, 2011)
(Preliminary Report - NCAL.PDF)
• ALTA Graphic (ALTA- Model.pdf)
08/19/2013
Email from Franziska Church to Piu Ghosh, David Stillman re: Ramp -
Metering (Aug. 19, 2013 9:29:11 AM PDT)
08/19/2013
Email from Robert Kim to David Brandt, Andrea Sanders, Donna
Henriques, Ryan Roman, Kirsten Squarcia, Marianna Khienkina,
Karen B. Guerin, Brittany Carey, Julia Kinst, Grace Schmidt, Liz
Nunez, Chylene Osborne, Tiffanie Cardenas, Nidhi Mathur, Robert
Kim, Mary Redwin, Lisa Atwood, Rei Delgado, Peter Coglianese, Rick
Kitson, Piu Ghosh re: Apple Campus 2 Commenting Process activity
report, Thursday, June 6 to Sunday, August 18, 2013 (Aug. 19, 2013
9:38:15 AM PDT)
08/19/2013
Email from Albert Salvador to Michelle Wendler RE: Monday Meeting
Agenda (Aug. 19, 2013 9:38:17 AM PDT)
• Letter from Pan- Pacific Mechanical to City of Cupertino re:
Request for Modification of Code for Parking Garage
Drains (Aug. 16, 2013) ( Cupertino RFM Justification.pdf)
08/19/2013
Email from Diana Navarro to Chad Mosley RE: Encroachment Permit
(Aug. 19, 2013 11:11:46 AM PDT)
• North Tantau Avenue Utility Plan, No. C -UR- 1603 -T,
Revision 0 (Feb. 25, 2013) (POTHOLE MARKUPS.pdf)
• Granite Potholing Plan (Potholing Plan.pdf)
08/19/2013
Email from Meg Thomas to Mick Bench, Piu Ghosh re: Review of
Final Tree Protection Plans (Aug. 19, 2013 5:07:15 PM PDT)
• Tree Protection Narrative (Tree Protection Narrative
130819.docx)
1 -150
sf- 3345921 Q
ATTACHMENT I
INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2
PROJECT
1 -151
sf- 3345921 Q
DATE
DOCUMENT
• Details - Tree Protection, No L1.90, Revision (Jan. 25,
2013) ( 130819- L190TreeProtectionDetails.pdf)
08/20/2013
Email from David Brandt to Gilbert Wong, Carol Korade, Gilbert
Wong re: RE: Small Business Development in Cupertino (Aug. 20,
2013 9:23:00 AM PDT)
08/20/2013
Email from Simon Vuong to Sean Hatch re: RE: Sound Wall Apple 2
Campus (Aug. 20, 2013 9:47:49 AM PDT)
08/20/2013
Email from Piu Ghosh to Saran Oki, dwhisenhuntkUple.com re: RE:
Planned Development Permit - August 2013 (Aug. 20, 2013 10:07:00
AM PDT)
08/20/2013
Email from Piu Ghoshto Saran Oki re: Lighting standards for off -site
glare (Aug. 20, 2013 12:56:00 PM PDT)
08/20/2013
Email from Aarti Shrivastava to Grace Schmidt re: Schedule (Aug. 20,
2013 5:05:06 PM PDT)
08/20/2013
Email from Piu Ghosh to Aarti Shrivastava Re: Apple EIR -- Team
Meeting 8/29 (Aug. 30, 2013 8:01:43 AM PDT)
08/21/2013
Email from Adam Weinstein to Gary Chao, Piu Ghosh, David
Stillman, jfowlerggpple.com, Peter Sokoloff, dgoldgmofo.com,
mimwallegmofo.com, Judith Malamut, Franziska Church, Jane
Bierstedt, Rick Kitson, Gary Baum, Eric Morley, Foulkes @apple.com,
Scott D. Pinsky, Chad Mosley, Timm Borden, JJeffers(,mofo.com,
dwhisenhuntggpple.com, Aarti Shrivastava, diana.fazely @gmail.com,
David Brandt, wwagener2fosterandpartners.com,
sokigfosterandpartners.com, william.baum arg dner(a MM.com,
Michael.iswalt @arup.com, lynnjohnson(c gpple.com,
Garberc�r�,smwlaw.com re: RE: Apple EIR -- Team Meeting 8/22 (Aug.
21, 2013 4:26:04 PM PDT)
08/21/2013
Email from Chad Mosley to Dan Whisenhunt re: RE: Wolf Bus stop
updates (Aug. 21, 2013 5:26:53 PM PDT)
08/22/2013
Email from Nichol Bowersox re: FW: Wolfe / Homestead / Pruneridge
(Aug. 22, 2013 8:41:34 AM PDT)
• V &A Technical Memorandum to Cupertino Sanitary
1 -151
sf- 3345921 Q
ATTACHMENT I
INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2
PROJECT
1 -152
sf- 3345921 Q
DATE
DOCUMENT
District and County Sanitation District 2 -3 re Cupertino
Sanitary District — Pruneridge Trunk Sewer Rerouting
Project: Capacity Analysis for a 10 -Year, 24 -Hour Rainfall
Event (August 20, 2013, (Revision 1 of July 12, 2013
Technical Memorandum)) (12 -0139 CSD Pruneridge
Rerouting TM Revl.pdf)
08/22/2013
Email from Jon Hagwood to Chad Mosley re: AC -2 Encroachment
Permit for Potholing (Aug. 22, 2013 2:31:45 PM PDT)
08/22/2013
Email from Wolfgang Wagener to Piu Ghosh, Saran Oki, Aarti
Shrivastava, dwhisenhuntggpple.com re: RE: Planned Development
Permit - August 2013 (Aug. 22, 2013 8:40:34 PM PDT)
08/23/2013
Comment letter from Holly Lofgren (Letter ID 500168)
08/23/2013
Email from Manish Dalia to Chad Mosley re: AC2 - Wolfe /Pruneridge
Utility Comments (Aug. 23, 2013 10:01:42 AM PDT)
08/23/2013
Email from Karen Guerin to Piu Ghosh, Chad Mosley, David Brandt,
David Stillman, Gary Baum, Timm Borden, Ellen J. Garber, Aarti
Shrivastava re: RE: Meet re: Admin RTC APPLE - Comments due to
LSA by 8/28 (August 23, 2013 10:22:49 AM PDT)
08/23/2013
Email from Karen Guerin to Aarti Shrivastava, David Brandt, Gary
Baum, Timm Borden, Adam Weinstein, Judith.Malamutc�r�,lsa-
assoc.com, Franziska Church, Ian Barnes, Jane Bierstedt, Piu Ghosh,
Ellen J. Garber, David Stillman, James Fowler, Dan Whisenhunt, Eric
Morley re: RE: Dry run of study session (August 23, 2013 11:30:41
AM PDT)
8/24/2013
Email from David Brandt to Karen Guerin Re: Dry run of study session
(Aug. 24, 2013 9:28:01 AM PDT)
08/26/2013
Email from hongyi wang to City Council re: Support Apple Campus
(Aug. 24, 2013 7:44 AM PDT) (Letter ID e- 13 -08 -26 -001)
08/27/2013
Comment letter from Maria Teiwes (Letter ID 500169)
08/27/2013
Email from Molholm Tyler to Joanne Johnson, Chad Mosley re: RE:
REVISED FILES (Aug. 27, 2013 9:52:15 AM PDT)
1 -152
sf- 3345921 Q
ATTACHMENT I
INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2
PROJECT
1 -153
sf- 3345921 Q
DATE
DOCUMENT
• Wolfe Sanitary Sewer Relocation Plan and Profile, No. C-
UR- 2101 -W -SS, Rev. 0 (Jan. 10, 2013) (WOLFE -
INTERSECTION.PDF)
• Wolfe Sanitary Sewer Relocation Plan and Profile, No. C-
UR- 2101 -W -SS, Rev. 0 (Jan. 10, 2013) (WOLFE - Typical
CLOSURE.PDF)
08/27/2013
Email from Ying Smith to David Stillman re: Project Development
Study (PSR -PSD) (Aug. 27, 2013 10:08:28 AM PDT)
08/27/2013
Email from Robert Shackelford to David Stillman RE: City of
Cupertino - Scope information (Aug. 27, 2013 12:44:30 PM PDT)
08/27/2013
Email from Diana Navarro to Chad Mosley re: Encroachment Permit
August 27, 2013 12:45:52 PM PDT)
08/27/2013
Email from Ryan Roman to Grace Schmidt, Katy Jensen, Chad Mosley
re: RE: FYI - changes to upcoming council agenda item dates (Aug. 27,
2013 4:04:16 PM PDT)
08/28/2013
Email from Dan Whisenhunt to Chad Mosley Re: AC2 - Technical
Letter on Storm Drainage Design (Aug. 28, 2013 9:47:28 AM PDT)
08/28/2013
Email from Adam Weinstein to Piu Ghosh RE: (Aug. 28, 2013 8:38:02
AM PDT)
08/28/2013
Email from Aarti Shrivastava to David Stillman RE: Project
Development Study (PSR -PSD) (Aug. 28, 2013 8:53:31 AM PDT)
08/28/2013
Email from Rick Kitson to Martyah Epich Serratos re: VPN access to
Piu Ghosh (Aug. 28, 2013 9:37 AM PDT)
08/28/2013
Email from Franziska Church to David Stillman RE: Apple Delay
Calculation.xlsx (Aug. 28, 2013 10:01:07 AM PDT)
• Apple Delay Calculation Worksheet (Copy of Apple Delay
Calculation - Expanded.xlsx)
08/28/2013
Email from Piu Ghosh to Kelly Cattaneo RE: Demo Permit - Apple
Campus 2 (Aug. 28, 2013 3:53:00 PM PDT)
1 -153
sf- 3345921 Q
ATTACHMENT I
INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2
PROJECT
1 -154
sf- 3345921 Q
DATE
DOCUMENT
08/28/2013
Email from Piu Ghosh to Kristen Squarcia RE: Legal Ad for Planning
Commission Dates (Aug. 28, 2013 5:33:00 PM PDT)
08/29/2013
Email from Adam Weinstein to Gary Chao, Piu Ghosh, David
Stillman, jfowler @apple.com, Peter Sokoloff, dgoldc�r�,mofo.com,
mimwallegraofo.co, Judith Malamu, Franziska Church, Jane Bierstedt,
Rick Kitson, Gary Baum, Eric Morley, Foulkes @apple.com, Scott D.
Pinsky, Chad Mosley, Timm Borden, JJeffers(,mofo.com,
dwhisenhunt @apple.com, Aarti Shrivastava, diana.fazely @gmail.com,
David Brandt, wwa eg nergfosterandpartners.com,
soki @fosterandpartners.com, william.baum arg dnergarup.com,
Michael.iswalt @arup.com, lynnjohnsonkUple.com,
Garbergsmwlaw.com RE: Apple EIR -- Team Meeting 8/29 (Aug. 29,
2013 9:28:23 AM PDT)
08/29/2013
Email from Kristen Squarcia to Piu Ghosh RE: Legal Ad for Planning
Commission Dates (Aug. 29, 2013 9:36:38 AM PDT)
08/29/2013
Email from Rick Kitson to Peter Cogllanese re: Apple Study Session
Drawings (Aug. 29, 2013 3:11 PM)
08/29/2013
Email from Rick Kitson to Peter Cogllanese re: apple meeting CAD
drawings (Aug. 29, 2013 5:26 PM PDT)
08/30/2013
Email from David Stillman to Piu Ghosh, Adam Weinstein, Ellen J.
Garber RE: Emailing: 4- TextRevisions tb DSPG 8- 29.doc (Aug. 30,
2013 8:23:34 AM PDT)
08/30/2013
Email from David Stillman to Timm Borden RE: Emailing: 4-
TextRevisions tb DSPG 8- 29.doc (Aug. 30, 2013 8:25:19 AM PDT)
08/30/2013
Email from David Stillman to Robert Shackelford RE: Cupertino
Agreement (Aug. 30, 2013 8:28:45 AM PDT)
08/30/2013
Email from Piu Ghosh to Grace Schmidt RE: Question on estimate cost
of legal ad (Aug. 30, 2013 9:18:00 AM PDT)
08/30/2013
Email from Piu Ghosh to Julia Kinst FW: Apple EIR -- Scope /Budget
Augment (Aug. 30, 2013 3:20:00 PM PDT)
• Letter from LSA Associates, Inc. to City of Cupertino re:
Amendment I to Apple Campus 2 Project Environmental
1 -154
sf- 3345921 Q
ATTACHMENT I
INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2
PROJECT
1 -155
sf- 3345921 v2
DATE
DOCUMENT
Impact Report (EIR) Scope of Work and Budget (Feb. 27,
2012) (2 -27 -12 Con Mod Chao LTR.pdf)
08/30/2013
Email from Piu Ghosh to Josh Fronen, Chad Mosley RE: Tantau
Layout (Aug. 30, 2013 3:15:00 PM PDT)
08/30/2013
Email from Piu Ghosh to Julia Kinst FW: Invoice for LSA Budget
Augment (Date: Friday, Aug. 30, 2013 3:21:00 PM PDT)
• Letter from Fehr & Peers to LSA Associates, Inc. re: Re:
Additional Services for the Transportation Impact Analysis
(TIA) for the Proposed Apple Campus 2 in Cupertino,
California (Feb. 21, 2012)
(20120221_AppleC ampus2AddOn.pdf)
08/30/2013
Email from Piu Ghosh to Julia Kinst FW: Apple EIR Authorization
(Aug. 30, 2013 3:22:00 PM PDT)
• LSA Associates, Inc. Contract Modification (Feb. 1, 2013)
(2 -1 -2013 Con Mod 4 Form.pdf)
• Letter from LSA Associates, Inc. to City of Cupertino re:
Amendment 3 to Apple Campus 2 Project Environmental
Impact Report (EIR) Scope of Work and Budget (July 25,
2012) (7 -25 -12 Con Mod #3.pdf)
• Letter from LSA Associates, Inc. to City of Cupertino re:
Amendment 4 to Apple Campus 2 Project Environmental
Impact Report (EIR) Scope of Work and Budget (Dec. 12,
2012) (12 -12 -12 Con Mod 94 LTR.pdf)
• Table 1: Contract Modification 4 Cost Estimate (12 -12 -12
Augment 4- Budget.pdf))
08/30/2013
Email from Piu Ghosh to Adam Weinstein RE: Apple -- PC Study
Session attendance (Aug. 30, 2013 4:22:22 PM PDT)
08/31/2013
Email from Piu Ghosh to Aarti Shrivastava Re: Question on estimate
cost of legal ad (August 31, 2013 12:22:40 PM PDT)
09/00/2013
• City of Cupertino, City Council Staff Report — Amended,
Set a public hearing and adopt a resolution related to the
1 -155
sf- 3345921 v2
ATTACHMENT I
INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2
PROJECT
1 -156
sf- 3345921 Q
DATE
DOCUMENT
City's intent to vacate Finch Avenue, between Stevens
Creek Boulevard and Vallco Parkway (Mar. 30, 2012)
(STAFF REPORT - (Amended) Notice of Intent to V.pdf)
09/00/2013
• Kier & Wright, Pruneridge Area Exhibit, Apple Campus 2
(Revised Mar. 11, 2013) (A130311- Pruneridge Take.pdf)
09/00/2013
• Fehr & Peers, I -280 SB On -Ramp Option 2 Lawrence
Expressway & Calvert Drive Conceptual Plan
(Administrative Draft 1272 -C onceptualOnRamp- OPT.pdf)
09/00/2013
• Memorandum from Piu Ghosh to City Council members
and Planning Commission members re: Apple Campus 2
meetings (Sept. 23, 2013) (apple docs memo.pdf)
09/00/2013
• Joint City Council / Planning commission Study Session
Staff Report (Oct. 1, 2013) (Final Study Session Staff
Report DP- 2011- 04.pdf)
09/00/2013
• Attachment A Amended Resolution No. 12 -A Resolution
Of The City Council Of The City Of Cupertino Declaring
Its Intention To Order Vacation Of A Portion Of Finch Ave
As Provided In Section 8320 Et Seqq. Of The Streets And
Highways Code Of The State Of California, Fixing Time
And Place For Public Hearing And Providing For Notice
Thereof (RESOLUTION - (Amended) Notice of Intent to
Vac.pdf)
09/00/2013
• Attachment A Amended Resolution No. 13 -A Resolution of
the City of Cupertino Declaring Its Intention To Order
Vacation Of A Portion Of Pruneridge Ave As Provided In
Section 8320 Et Seq. Of The Streets And Highways Code
Of The State Of California, Fixing Time And Place For
Public Hearing And Providing For Notice Thereof
(RESOLUTION - Notice of Intent to Vacate - Prun.pdf)
09/00/2013
• City of Cupertino City Council Staff Report — Amended,
Set a public hearing and adopt a resolution related to the
City's intent to vacate Pruneridge Avenue, between Wolfe
Road and Tantau Avenue (Sept. 17, 2013) (STAFF
REPORT - Notice of Intent to Vacate - P.pdf)
1 -156
sf- 3345921 Q
ATTACHMENT I
INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2
PROJECT
1 -157
sf- 3345921 Q
DATE
DOCUMENT
09/01/2013
Apple Campus 2, Project Description, September 2013
09/01/2013
Apple Campus 2, Planned Development Permit, September 2013,
Introduction
09/01/2013
Apple Campus 2, Planned Development Permit, September 2013, Site
Plan Part 1
09/01/2013
Apple Campus 2, Planned Development Permit, September 2013, Site
Plan Part 2
09/01/2013
Apple Campus 2, Planned Development Permit, September 2013, Floor
Plan Part 1
09/01/2013
Apple Campus 2, Planned Development Permit, September 2013, Floor
Plan Part 2
09/01/2013
Apple Campus 2, Planned Development Permit, September 2013,
Renderings
09/01/2013
Apple Campus 2, Planned Development Permit, September 2013,
Bicycle Plan
09/01/2013
Apple Campus 2, Planned Development Permit, September 2013,
Development Area Allocation Submittal
09/04/2013
Email from Chad Mosley to Piu Ghosh RE: AC2 - Development
Application Date? (Sept. 04, 2013 9:38:50 AM PDT)
09/04/2013
Email from Chad Mosley to Michelle Wendler RE: AC2 Parking
Structure (Sept. 04, 2013 7:31:06 AM PDT)
09/04/2013
Email from Adam Weinstein To: Gary Chao; Piu Ghosh; David
Stillman; jfowler @apple.com; Peter Sokoloff, dgold(,mofo.com;
mimwalle @mofo.com; Judith Malamut; Franziska Church; Jane
Bierstedt; Rick Kitson; Gary Baum; Eric Morley; Foulkes @apple.com;
Scott D. Pinsky; Chad Mosley; Timm Borden; JJeffers(c raofo.com;
dwhisenhunt @apple.com; Aarti Shrivastava; diana.fazely @gmail.com;
David Brandt; wwagener @fosterandpartners.com;
1 -157
sf- 3345921 Q
ATTACHMENT I
INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2
PROJECT
1 -158
sf- 3345921 Q
DATE
DOCUMENT
soki @fosterandpartners.com; william.baura arg dnerkarup.com;
Michael.iswalt @arup.com; lynnjohnson @apple.com;
Garber @smwlaw.com; JRamizakbwslaw.com RE: Apple EIR --
Team Meeting 9/5 (Sept. 04, 2013 7:07:42 PM PDT)
09/04/2013
Email from Aarti Shrivastava to Grace Schmidt, Beth Ebben RE:
Notice of Determination (Sept. 04, 2013 5:41:10 PM PDT)
09/04/2013
Email from Dan Whisenhunt to Chad Mosley Re: Pruneridge Plat and
Legal (Sept. 04, 2013 5:47:03 PM PDT)
• Exhibit A Legal Description for Pruneridge Avenue
(EXHIBIT A Pruneridge Vac Legal.pdf)
• Exhibit A, Pruneridge Avenue Vacation Key map,
Cupertino, CA (Pruneridge_Plat.pdf)
09/04/2013
Email from Dan Whisenhunt to Chad Mosley Re: Pruneridge Plat and
Legal (Sept. 04, 2013 1:59:04 PM PDT)
• Pruneridge land purchase exhibit I- Layout 1 ( Pruneridge
land purchase exhibit I- Layoutl.pdf)
09/04/2013
Email from Chad Mosley to Dan Whisenhunt RE: Pruneridge Plat and
Legal (Sept. 04, 2013 2:22:00 PM PDT)
09/04/2013
Email from Chad Mosley to Dan Whisenhunt RE: Pruneridge Plat and
Legal (Sept. 04, 2013 8:03:09 AM PDT)
09/04/2013
Email from Chad Mosley to Diana Navarro RE: Working Hours At
Night (Sept. 04, 2013 3:16:18 PM PDT)
09/05/2013
Email from Grant Schlereth to David Stillman re: AC2 Package IA
Crosswalk discussion (Sept. 05, 2013 6:05:56 PM PDT)
• Wolfe & AC2 Signal Sketch MFS small (Sept. 5, 2013)
(20130905 Wolfe & AC2 Signal Sketch MFS small.pdf)
09/05/2013
Email from Molholm, Tyler to Joanne Johnson re: Changes to TC plan
- Permit 96198 (Sept. 05, 2013 12:51:20 PM PDT)
• Wolfe — Intersection (WOLFE - INTERSECTION.pdf)
1 -158
sf- 3345921 Q
ATTACHMENT I
INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2
PROJECT
1 -159
sf- 3345921 Q
DATE
DOCUMENT
09/05/2013
Email from Chad Mosley to David Stillman re: FW: Package IA
Discussion Items (1 of 1) (Sept. 05, 2013 4:48:49 PM PDT)
• Alternative Bus stop location options MFS REV 2 small
(Sept. 5, 2013) (20130905 Alternative Bus stop location
options MFS REV 2 smalll.pdf)
09/05/2013
Email from Angela Tsui to David Brandt, Orrin Mahoney, Gilbert
Wong re: Fwd: Introduction to Skanska USA (Sept. 05, 2013 9:53:21
PM PDT)
09/05/2013
Email from Aarti Shrivastava To: "Adam Weinstein "; Piu Ghosh;
David Stillman; jfowler @apple.com; dgold @mofo.com;
mimwallegmofo.com; Judith Malamut; Franziska Church; Jane
Bierstedt; Rick Kitson; Gary Baum; Eric Morley; Foulkeskuple.com;
Scott D. Pinsky; Chad Mosley; Timm Borden; JJeffers @mofo.com;
dwhisenhuntkople.com; diana.fazely @gmail.com; David Brandt;
wwagener @fosterandpartners.com; soki c�r�,fosterandpartners.com;
william.baumgardner @arup.com; Michael.iswalt @arup.com;
lynnjohnson @apple.com; Garbergsmwlaw.com;
JRamiza @bwslaw.com; Carol Korade (carolakoradekgmail.com) re:
Meetings (Sept. 05, 2013 6:22:15 PM PDT)
09/05/2013
Email from Grant Schlereth to Chad Mosley re: Package IA
Discussion Items (2 of 2) (Sept. 05, 2013 3:26:59 PM PDT)
(20130905 Wolfe & AC2 Signal Sketch MFS small.pdf)
• Wolfe & AC2 Signal Sketch MFS small (Sept. 5, 2013)
(20130905 Wolfe & AC2 Signal Sketch MFS small.pdf)
09/05/2013
Email from ken olcott to Chad Mosley Re: Pruneridge Plat and
Description (Sept. 05, 2013 10:31:06 AM PDT)
09/05/2013
Email from Amy Taylor to Chad Mosley RE: Pruneridge Plat and
Legal (Sept. 05, 2013 5:38:58 PM PDT)
• Exhibit A Legal Description for Pruneridge Avenue
(201309051728.pdf)
09/05/2013
Email from Amy Taylor to Chad Mosley, Dan Whisenhunt RE:
Pruneridge Plat and Legal (Sept. 05, 2013 3:41:27 PM PDT)
1 -159
sf- 3345921 Q
ATTACHMENT I
INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2
PROJECT
1 -160
sf- 3345921 Q
DATE
DOCUMENT
• Pruneridge Avenue Vacation Cupertino, CA, Sheet 1
(PRUNERIDGE l.pdf)
• Pruneridge Avenue Vacation Cupertino, CA, Sheet 2
(PRUNERIDGE 2.pdf)
• Pruneridge Avenue Vacation Cupertino, CA, Sheet 3
(PRUNERIDGE 3.pdf)
• Pruneridge Avenue Vacation Cupertino, CA, Sheet 4
(PRUNERIDGE 4.pdf)
• Exhibit A Legal Description For Pruneridge Avenue
(201309051516.pdf)
09/05/2013
Email from Chad Mosley to Dan Whisenhunt RE: Pruneridge Plat and
Legal (Sept. 05, 2013 9:50:54 AM PDT)
• Exhibit A Legal Description For Pruneridge Avenue
(redline) (MX- M1100- 20130905- 120332.pdf)
09/05/2013
Email from Eric Butte to City Council re: Support the Apple 2 Campus
(Aug. 16, 2013 10:49 AM PDT) (Letter ID e- 13 -09 -05 -001)
09/06/2013
Email from Molholm, Tyler to Joanne Johnson re: Additional Changes
to TC plan - Permit 96198 (Sept. 06, 2013 9:06:59 AM PDT)
• Wolfe — Intersection (Sept. 13, 2013) (WOLFE -
INTERSECTIONB - 9- 13- 2013.pdf)
09/06/2013
Email from Piu Ghosh to Meg Thomas re: FW: Replacement Tree list
(Sept. 06, 2013 4:20:00 PM PDT)
• Tree Replacement Worksheet (Apr. 2013)
(TreeReplacementWorksheet April2013.xlsx)
09/06/2013
Email from Kirsten Squarcia to Piu Ghosh re: FW: SJMN Legal Rates /
Specifications (Sept. 06, 2013 1:26:53 PM PDT)
09/06/2013
Email from Timm Borden to Ryan Roman Re: Adding an Item to 9/17
- Don Burnett Bridge, Approve Grant Deed to Transfer ROW to
Caltrans (Sept. 06, 2013 9:39:56 AM PDT)
1 -160
sf- 3345921 Q
ATTACHMENT I
INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2
PROJECT
1 -161
sf- 3345921 Q
DATE
DOCUMENT
09/06/2013
Email from Piu Ghosh to David Stillman, Chad Mosley RE: Package
IA Discussion Items (1 of 1) (Sept. 06, 2013 9:00:21 AM PDT)
09/06/2013
Email from Meg Thomas to Piu Ghosh Re: Replacement Tree list
(Sept. 06, 2013 4:20:06 PM PDT)
09/06/2013
Email from Manish Dalia to Steve Newgren, Kermit Cuff RE: Apple
Campus 2 - City/VTA Coordination (Sept. 05, 2013 7:03:46 AM PDT)
09/07/2013
Comment letter from veysel mutlu (Letter ID 500170)
09/09/2013
Email from Andrew Chafer to Chad Mosley re: AC2 Easement
Vacations (Sept. 09, 2013 9:09:09 AM PDT)
• Exhibit A Legal Description For Public Utility Easement
Vacation (23 -7582 OR 607.pdf)
• Exhibit A Legal Description For Public Utility Easement
Vacation (28 -489 M 13.pdf)
• Exhibit A Legal Description For Public Utility Easement
Vacation (52 -7582 OR 607.pdf)
• Exhibit A Legal Description For Public Utility Easement
Vacation (53 -8049 OR 100.pdf)
• Exhibit A Legal Description For Light and Air Easement
Vacation (58- 13789966.pdf)
• Exhibit A Legal Description For Street Easement Vacation
(76 -7631 OR 644.pdf)
• Exhibit A Legal Description For Street Easement Vacation
(77 -7631 OR 645.pdf)
• Exhibit A Legal Description For Public Utility Easement
Vacation (82 -7757 OR 626.pdf)
• Exhibit A Legal Description For Roadway Easement
Vacation (83- 14826068.pdf)
• Exhibit A Legal Description For Roadway Easement
1 -161
sf- 3345921 Q
ATTACHMENT I
INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2
PROJECT
1 -162
sf- 3345921 Q
DATE
DOCUMENT
Vacation (85- 14826070.pdf)
• Exhibit A Legal Description For Roadway Easement
Vacation (87- 14826072.pdf)
• First American Title Insurance Company, Preliminary
Report for 19050 Pruneridge Avenue; 10300, 10400, 10435,
10501, 10590, 10670, 10700, 10955 North Tantau Avenue;
10955 and 19111 Pruneridge Avenue; 10400, 10500, 10555
and 10600 Ridgeview Court, Cupertino, CA (Mar. 13,
2012) (Order No NCS- 492192- SC.pdf)
• Exhibit A Legal Description For Public Utility Easement
Vacation (7 -7757 OR 626.pdf)
• Exhibit A Legal Description For Public Utility Easement
Vacation (10 -7582 OR 607.pdf)
• Exhibit A Legal Description For Public Utility Easement
Vacation (19 -8069 OR 646.pdf)
09/09/2013
Email from David Stillman to Timm Borden re: FW: 280 I/C Final
Conceptual Alternative Analysis Study (Sept. 09, 2013 9:25:38 AM
PDT)
• URS, Interstate 280 /Wolfe Road Interchange Improvement
Project Conceptual Alternative Analysis Study (Sept. 5,
2013) (280 -Wolfe Final CAA.pdf)
09/09/2013
Email from Aarti Shrivastava to David Brandt re: FW: special meeting
of the Planning Commission (Sept. 09, 2013 9:53:34 AM PDT)
09/09/2013
Email from David Brandt to Karen Guerin re: Fwd: Concerned Citizens
of Cupertino Response to Draft Environmental Impact Report for
Apple Campus 2 (Sept. 09, 2013 10:46:58 PM PDT)
09/09/2013
Email from David Brandt to Rick Kitson re: Fwd: Concerned Citizens
of Cupertino Response to Draft Environmental Impact Report for
Apple Campus 2 (Sept. 09, 2013 10:44:53 PM PDT)
09/09/2013
Email from Rick Kitson to City Council re: Link restored: Resent:
Concerned Citizens of Cupertino Response to Draft Environmental
1 -162
sf- 3345921 Q
ATTACHMENT I
INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2
PROJECT
1 -163
sf- 3345921 Q
DATE
DOCUMENT
Impact Report for Apple Campus 2 (Sept. 09, 2013 2:44:00 PM PDT)
09/09/2013
Email from Karen Guerin To: David Brandt; Aarti Shrivastava; Piu
Ghosh; Scott D. Pinsky; Timm Borden; Rick Kitson; Ellen J. Garber;
stamp @stamplaw.us; Carol Korade; Ramiza, Gerald J.; Ben Stock;
Chip Eady Lunch for Apple DA Meeting (Sept. 09, 2013 4:45:47 PM
PDT)
• Lebou Menu (Lebou Menu.pdf)
09/09/2013
Email from Chad Mosley to Amy Taylor, Andrew Chafer re: more
redlines of plats and legals (Sept. 09, 2013 3:03:21 PM PDT)
• Exhibit A Legal Description For Public Utility Easement
Vacation (redline) (MX -M 1100_20130909_171514.pdf)
09/09/2013
Email from Dan Whisenhunt to Adam Weinstein Re: Apple EIR --
visual simulation (Sept. 09, 2013 10:13:09 AM PDT)
09/09/2013
Email from Rick Kitson to Aarti Shrivastava, Piu Ghosh RE: Meeting
times (Sept. 09, 2013 2:29:00 PM PDT)
09/09/2013
Email from Andrew Chafer to Chad Mosley, Amy Taylor RE: more
redlines of plats and legals (Sept. 09, 2013 3:43:21 PM PDT)
• Exhibit A Legal Description For Light And Air Easement
Vacation (58- 13789966.pdf)
• Exhibit A Legal Description For Street Easement Vacation
(76 -7631 OR 644.pdf)
• Exhibit A Legal Description For Street Easement Vacation
(77 -7631 OR 645.pdf)
• Exhibit A Legal Description For Public Utility Easement
Vacation (82 -7757 OR 626.pdf)
• Exhibit A Legal Description For Roadway Easement
Vacation (83- 14826068.pdf)
• Exhibit A Legal Description For Roadway Easement
Vacation (85- 14826070.pdf)
1 -163
sf- 3345921 Q
ATTACHMENT I
INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2
PROJECT
1 -164
sf- 3345921 Q
DATE
DOCUMENT
• Exhibit A Legal Description For Roadway Easement
Vacation (87- 14826072.pdf)
• Exhibit A Legal Description For Public Utilities Easement
Vacation (07 -7757 OR 626.pdf)
• Exhibit A Legal Description For Public Utilities Easement
Vacation (10 -7582 OR 607.pdf)
• Exhibit A Legal Description For Public Utilities Easement
Vacation (19 -8069 OR 646.pdf)
• Exhibit A Legal Description For Public Utilities Easement
Vacation (23 -7582 OR 607.pdf)
• Exhibit A Legal Description For Public Utilities Easement
Vacation (28 -489 M 13.pdf)
• Exhibit A Legal Description For Public Utilities Easement
Vacation (52 -7582 OR 607.pdf)
• Exhibit A Legal Description For Public Utilities Easement
Vacation (53 -8049 OR 100.pdf)
09/09/2013
Email from Kristen Squarcia to Piu Ghosh, Aarti Shrivastava RE: PFR
noticing (Sept. 09, 2013 2:53:46 PM PDT)
09/09/2013
Email from Piu Ghosh to Wolfgang Wagener, Dan Whisenhunt RE:
Plans (Sept. 09, 2013 12:12:00 PM PDT)
09/09/2013
Email from Rick Kitson to David Brandt RE: Resent: Concerned
Citizens of Cupertino Response to Draft Environmental Impact Report
for Apple Campus 2 (Sept. 09, 2013 12:06:00 PM PDT)
09/09/2013
Email from Beth Ebben to Piu Ghosh RE: special agenda of the ERC
(Sept. 09, 2013 4:45:02 PM PDT)
09/10/2013
Letter from Dan Whisenhunt to Aarti Shrivasta
09/10/2013
Email from Piu Ghosh to Julia Kinst re: Post card Apple — final (Sept.
10, 2013 4:26:00 PM PDT)
1 -164
sf- 3345921 Q
ATTACHMENT I
INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2
PROJECT
1 -165
sf- 3345921 v2
DATE
DOCUMENT
• City of Cupertino Courtesy Notice Apple Campus 2 (AC2
Final meetings & FEIR.pdf)
09/10/2013
Email from Apple Campus 2 to Aarti Shrivastava re: Apple Campus 2
(Sept. 10, 2013 3:46:37 PM PDT)
• Letter from Apple to City (Sept. 10, 2013) (Apple Campus
2 Community Outreach and Engagement Overview
091013.pdf)
09/10/2013
Email from Piu Ghosh to Julia Kinst, Aarti Shrivastava re: Apple
courtesy postcard (Sept. 10, 2013 5:45:05 PM PDT)
• City of Cupertino Courtesy Notice Apple Campus 2 (AC2
Final meetings & FEIR.pdf)
09/10/2013
Email from Piu Ghosh to Julia Kinst, Aarti Shrivastava re: Courier Ad
- Apple meetings (Sept. 10, 2013 5:42:00 PM PDT)
• City of Cupertino Courtesy Notice Apple Campus 2 (Apple
Study Session Courier Notice.pdf)
09/10/2013
Email from Aarti Shrivastava to: Ellen J. Garber; Gerald J. Ramiza;
Edsell (Chip) M. Eady, Jr.; Benjamin L. Stock; Gary Baum; Diana
Fazely; Timm Borden; Chad Mosley; Ryan Roman re: Font (Sept. 10,
2013 11:05:28 PM PDT)
09/10/2013
Email from Rick Kitson to David Brandt re: FW: Concerned Citizens
of Cupertino Response to Draft Environmental Impact Report for
Apple Campus 2 (Sept. 10, 2013 8:21:00 AM PDT)
09/10/2013
Email from Piu Ghosh to Nidhi Mathur RE: Concerned Citizens of
Cupertino Response to Draft Environmental Impact Report for Apple
Campus 2 (Sept. 10, 2013 9:47:00 AM PDT)
09/10/2013
Email from Julia Kinst to Piu Ghosh RE: Display ad in Courier for Oct
1 joint SS (Sept. 10, 2013 3:31:54 PM PDT)
09/10/2013
Email from Aarti Shrivastava To: "Adam Weinstein "; Piu Ghosh;
David Stillman; jfowler @apple.com; dgold @mofo.com;
mimwallegmofo.com; Judith Malamut; Franziska Church; Jane
Bierstedt; Rick Kitson; Gary Baum; Eric Morley; Foulkesg apple. com;
1 -165
sf- 3345921 v2
ATTACHMENT I
INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2
PROJECT
1 -166
sf- 3345921 Q
DATE
DOCUMENT
Scott D. Pinsky; Chad Mosley; Timm Borden; JJeffers @mofo.com;
dwhisenhuntggpple.com; diana.fazely @gmail.com; David Brandt;
wwagener @fosterandpartners.com; william.baumgardner(cr gRM.com;
lynnjohnson @apple.com; Garber @smwlaw.com;
JRamiza @bwslaw.com; stamp @stamplaw.us; "Stock, Benjamin L. ";
"Edsell M Eady Jr "; David Woo; Grace Schmidt; Julia Kinst; Beth
Ebben Re: Draft Apple schedule (Sept. 10, 2013 4:43:45 PM PDT)
• Apple Project Schedule — 9/9/13 (Apple
Schedule09O9 l 3 .xlsx)
09/10/2013
Email from Beth Ebben to Julia Kinst, Piu Ghosh re: RE: Post card
Apple — final (Sept. 10, 2013 5:26:31 PM PDT)
09/10/2013
Email from Meg Thomas to Piu Ghosh Re: Replacement Tree list
(Sept. 10, 2013 8:26:03 AM PDT
• Tree Replacement Worksheet (TreeReplacementWorksheet
130910.xlsx; TreeReplacementWorksheet 130910.pdf)
09/10/2013
Email from Franziska Church to Piu Ghosh RE: Widening of N. Tantau
(Sept. 10, 2013 3:36:17 PM PDT)
09/10/2013
Email from Meg Thomas to Mick Bench, Piu Ghosh re: Wolfe Road
Median Trees (Sept. 10, 2013 8:33:12 AM PDT)
09/11/2013
Email from Rick Kitson to Darrel Lum RE: Concerned Citizens of
Cupertino Response to Draft Environmental Impact Report for Apple
Campus 2 (Sept. 11, 2013 2:31:52 PM PDT)
09/11/2013
Email from Adam Weinstein to Piu Ghosh RE: Dust Control (Sept. 11,
2013 7:25:32 PM PDT)
09/11/2013
Email from Aarti Shrivasta To: Aarti Shrivastava; "Adam Weinstein ";
Piu Ghosh; David Stillman; jfowler @apple.com; dgoldkmofo.com;
mimwalle @mofo.com; Judith Malamut; Franziska Church; Jane
Bierstedt; Rick Kitson; Gary Baum; Eric Morley; Foulkes @apple.com;
Scott D. Pinsky; Chad Mosley; Timm Borden; JJeffers(c raofo.com;
dwhisenhunt @apple.com; diana.fazely @gmail.com; David Brandt;
wwa eg nergfosterandpartners.com; william.baumgardner @arup.com;
lynnjohnson @apple.com; Garber @smwlaw.com;
JRamiza bwslaw.com; stamp@ stamplaw.us; "Stock, Benjamin L. ";
1 -166
sf- 3345921 Q
ATTACHMENT I
INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2
PROJECT
1 -167
sf- 3345921 Q
DATE
DOCUMENT
"Edsell M Eady Jr "; David Woo; Grace Schmidt; Julia Kinst; Beth
Ebben RE: Draft Apple schedule (Sept. 11, 2013 10:26:38 AM PDT)
• Apple Project Schedule — 9/10/13 (Apple Schedule091013
revised.xlsx )
09/11/2013
Email from Piu Ghosh to Aarti Shrivastava; Beth Ebben; Grace
Schmidt; Julia Kinst RE: legal ad for the 10/2 PC meeting (Sept. 11,
2013 9:27:00 AM PDT)
09/11/2013
Email from Piu Ghosh To: Aarti Shrivastava; Beth Ebben; Grace
Schmidt; Julia Kinst RE: legal ad for the 10/2 PC meeting (Sept. 11,
2013 9:27:14 AM PDT)
09/11/2013
Email from Rick Kitson to David Brandt, Grace Schmidt RE: Oct 8
and Oct 16 possible Council meetings (Sept. 11, 2013 8:33:00 AM
PDT)
09/11/2013
Email from Julia Kinst to Aarti Shrivastava, Piu Ghosh re: AC2 Ads
and Postcard Confirmation (Sept. 11, 2013 8:38:42 AM PDT)
09/11/2013
Email from Michael Bench to Piu Ghosh re: Apple Campus 2 Nursery
Stock (Sept. 11, 2013 8:29:13 PM PDT)
• Bench, Michael. A Brief Review of the Nursery Stock
Replacement Trees For the Apple Campus 2 Project
Cupertino, California (Sept. 13, 2013) (Apple C2 Nursery
Stock 9- 13.doc)
09/11/2013
Email from Michael Bench to Piu Ghosh re: Apple Campus 2 Nursery
Trees — Revised (Sept. 11, 2013 9:07:56 PM PDT)
• Bench, Michael. A Brief Review of the Nursery Stock
Replacement Trees For the Apple Campus 2 Project
Cupertino, California (Sept. 13, 2013) (Apple C2 Nursery
Stock 9- 13.doc
09/11/2013
Email from Adam Weinstein to: Gary Chao; Piu Ghosh; David
Stillman; jfowler @apple.com; Peter Sokoloff, dgoldkmofo.com;
mimwalle @mofo.com; Judith Malamut; Franziska Church; Jane
Bierstedt; Rick Kitson; Gary Baum; Eric Morley; Foulkes @apple.com;
Scott D. Pinsky; Chad Mosley; Timm Borden; JJefferskmofo.com;
dwhisenhunt @apple.com; Aarti Shrivastava; diana.fazely @gmail.com;
1 -167
sf- 3345921 Q
ATTACHMENT I
INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2
PROJECT
1 -168
sf- 3345921 Q
DATE
DOCUMENT
David Brandt; wwagener @fosterandpartners.com;
soki @fosterandpartners.com; william.baum arg dnergarup.com;
Michael.iswalt @arup.com; lynnjohnson @apple.com;
Garber @smwlaw.com; JRamizac�r�,bwslaw.com Apple EIR -- Team
Meeting 9/12 (Sept. 11, 2013 8:17:42 AM PDT)
09/11/2013
Email from David Stillman to Chad Mosley re: COA (Sept. 11, 2013
4:25:00 PM PDT)
09/11/2013
Email from Chad Mosley to Amy Taylor re: FW: Administrative Draft
- SCB /Calvert (Sept. 11, 2013 10:25:21 AM PDT)
• City of Cupertino, Calvert Drive — Stevens Creek Boulevard
to Southbound I -280 On -Ramp Mitigation Conceptual Plan
(Administrative
Draft StevensCreek SB280- 20130909.pdf)
09/11/2013
Email from David Stillman to Timm Borden, Piu Ghosh, Aarti
Shrivastava re: FW: Apple fair -share (Sept. 11, 2013 4:58:47 PM PDT)
09/11/2013
Email from Grace Schmidt to Aarti Shrivastava, David Brandt re: FW:
Mark's Oct vacation (Sept. 11, 2013 11:52:01 AM PDT)
09/11/2013
Email from Piu Ghosh to Meg Thomas re: FW: Tree Replacement
Table (Sept. 11, 2013 6:16:00 PM PDT)
09/11/2013
Email from Rick Kitson to Andrea Sanders re: FW: USB Pen drives re:
(Sept. 11, 2013 7:47:00 AM PDT)
09/11/2013
Email from Beth Ebben to Piu Ghosh re: mailings (Sept. 11, 2013
2:23:20 PM PDT)
09/11/2013
Email from Julia Kinst to Piu Ghosh, Aarti Shrivastava RE: AC2 Ads
and Postcard Confirmation (Sept. 11, 2013 9:35:34 AM PDT)
09/11/2013
Email from Franziska Church to Adam Weinstein, Piu Ghosh RE:
Specific Criteria for the Construction of Additional Parking (Sept. 11,
2013 3:17:03 PM PDT)
09/11/2013
Email from Chad Mosley to Robert Shackelford re: Two more
estimates for Apple (Sept. 11, 2013 1:24:50 PM PDT)
1 -168
sf- 3345921 Q
ATTACHMENT I
INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2
PROJECT
1 -169
sf- 3345921 v2
DATE
DOCUMENT
• Sandis, AC2 OFFSITE Mitigations, Mitigation Q1 -
Lawerance at Calvert and I -280 on -ramp (Sept. 11, 2013)
(Estimate QI - Calvert + 280 onramp.pdf)
• Sandis, AC2 OFFSITE Mitigations, Mitigation NI -
Stevens Creek at Calvert — Alternative (Sept. 11, 2013)
(Estimate N1 - SC free Rturn.pdf)
09/12/2013
Email from Mark Santoro to Grace Schmidt Re: SAVE THE DATE -
Continuation of Apple Campus 2 hearing if needed (Sept. 12, 2013
2:42:29 PM PDT)
09/12/2013
Email from Robert Shackelford to Chad Mosley RE: Two more
estimates for Apple (Sept. 12, 2013 4:54:50 PM PDT)
• Harris & Associates, Peer Review of Cost Estimate for 2
Revised Improvements (dated 9/11/13) related to future
Apple Campus mitigations (Sept. 12, 2013) (Peer review 2
letter to Cupertino 9- 12- 13.pdf)
09/12/2013
Email from Sylvia Mendez to Piu Ghosh re: AC2 (Sept. 12, 2013
1:57:52 PM PDT)
• Plan Review Stop Report (Sept. 12, 2013)
(tmpsylvia 9332.pdf)
• Apple Campus 2 Parking Structure - Foundation
(https://mbc.box.com/s/8bnmOcjumiej3ubuhi4b)
09/12/2013
Email from 09/22/2013 from Julia Kent to Finance re: ACH Payments
from Apple Anticipated (Sept. 12, 2013 7:46:43 AM PDT)
09/12/2013
Email from Timm Borden to David Stillman re: Caltrans (Sept. 12,
2013 7:27:21 AM PDT)
09/12/2013
Email from Piu Ghosh to Nidhi Mathur re: FW: Apple Campus 2 (Sept.
12, 2013 11:10:00 AM PDT)
• Letter from Apple to City of Cupertino (Sept. 10, 2013)
(Apple Campus 2 Community Outreach and Engagement
Overview 091013.pdf)
1 -169
sf- 3345921 v2
ATTACHMENT I
INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2
PROJECT
1 -170
sf- 3345921 Q
DATE
DOCUMENT
09/12/2013
Email from Piu Ghosh to Aarti Shrivastava, Gary Baum re: Permit
Issuance Dates .xls (Sept. 12, 2013 1:46:40 PM PDT)
• Permit Issuance Dates — Updated 09/12/13 (Permit Issuance
Dates .xls)
09/12/2013
Email from Chad Mosley to Timm Borden re: Pruneridge Vacation Plat
and Legal - In Fee portion (Sept. 12, 2013 10:25:43 AM PDT)
• Exhibit A Legal Description For Pruneridge Avenue
(Exhibit A - Pruneridge Avenue Vacation Legal
Description.pdf)
• Exhibit B Pruneridge Avenue Vacation Key Map Cupertino,
CA (Exhibit B - Pruneridge Ave Vacation Plat.pdf)
09/12/2013
Email from Piu Ghosh to Nidhi Mathur, Rick Kitson RE: Apple
Campus 2 — Question (Sept. 12, 2013 1:05:00 PM PDT)
09/12/2013
Email from Vikram Kowshik to City Council re: Apple Campus 2
(Sept. 12, 2013 2:53 PM PDT) (Letter ID e- 13 -09 -12 -001)
09/12/2013
Email from Piu Ghosh to Wolfgang Wagener RE: Draft submittal
(Sept. 12, 2013 3:58:00 PM PDT)
09/13/2013
Email from Terry Bowen To: Eric Alm (erik alm @dot.ca.gov);
jean — finney @dot.ca.gov; Taubeneck, Lee @DOT; Timm Borden;
David Stillman; Dan Whisenhunt; Jim Fowler; Amy Taylor re: Apple
Campus 2 (Sept. 13, 2013 5:20:35 PM PDT)
• Agenda, Apple Campus 2 Caltrans /City of Cupertino /Apple,
Intergovernmental Review /CEQA Coordination, Sept. 16,
2013, 11:00, Caltrans District 4, 111 Grand Ave, Oakland,
15th Floor, Conference Room 15 -220 (Agenda 9 -16 -2013
CT Cupertino Apple IGR CEQA Coordination.doc)
09/13/2013
Email from Timm Borden to Chad Mosley re: FW: Pruneridge vacation
legal ad - Courier okay? (Sept. 13, 2013 8:51:07 AM PDT)
09/13/2013
Email from Chad Mosley to David Stillman re: FW: Two more
estimates for Apple (Sept. 13, 2013 7:52:45 AM PDT)
1 -170
sf- 3345921 Q
ATTACHMENT I
INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2
PROJECT
1 -171
sf- 3345921 Q
DATE
DOCUMENT
• Harris & Associates, Peer Review of Cost Estimate for 2
Revised Improvements (dated 9/11/13) Related to Future
Apple Campus Mitigations (Sept. 12, 2012) (Peer review 2
letter to Cupertino 9- 12- 13.pdf)
• Sandis, AC2 Offsite Mitigations, Mitigation Q I -
Lawerance at Calvert and I -280 on -ramp (Sept. 11, 2012)
(Estimate Q1 - Calvert + 280 onramp.pdf)
• Sandis, AC2 Offsite Mitigations, Mitigation N1 - Stevens
Creek at Calvert — Alternative (Sept. 11, 2013) (Estimate
N1 - SC free Rturn.pdf)
09/13/2013
Email from Chad Mosley to Ian Cunningham RE: AC2 - Grading
Permit — Requirements (Sept. 13, 2013 10:56:58 AM PDT)
09/13/2013
Email from Timm Borden to Grace Schmidt RE: Pruneridge vacation
hearing on Oct 15 - legal ad (Sept. 13, 2013 9:25:44 AM PDT)
09/13/2013
Email from Timm Borden to Aarti Shrivastava Re: Pruneridge vacation
legal ad - Courier okay? (Sept. 13, 2013 12:16:26 AM PDT)
09/13/2013
Email from Saran Oki to Piu Ghosh re: RE: September Planned
Development Permit (Sept. 13, 2013 3:15:30 PM PDT)
09/13/2013
Email from Piu Ghosh to Saran Oki RE: September Planned
Development Permit (Sept. 13, 2013 2:56:24 PM PDT)
09/13/2013
Email from Chad Mosley to Roger Lee RE: Tantau Avenue at Hwy
280 (Sept. 13, 2013 2:40:55 PM PDT)
09/14/2013
Email from Judith Malamut to Adam Weinstein Re: Comments
received after close of the EIR public review period (Sept. 14, 2013
8:42:14 AM PDT)
09/15/2013
Email from Rick Kitson to applecampus2 re: FW: Concerned Citizens
of Cupertino Response to Draft Environmental Impact Report for
Apple Campus 2 (Sept. 15, 2013 7:28:00 PM PDT)
09/16/2013
Email from Beth Ebben to Planning Dept. re: agendas /notices to go out
this week (Sept. 16, 2013 9:03:40 AM PDT)
1 -171
sf- 3345921 Q
ATTACHMENT I
INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2
PROJECT
1 -172
sf- 3345921 Q
DATE
DOCUMENT
• City of Cupertino Notice Of Cancellation Cupertino
Administrative Hearing Committee (Sept. 19, 2013) (Cancel
Sept2613.doc)
• City of Cupertino, Notice Of cancellation Cupertino
Planning Commission (Sept. 19, 2013) (CANCEL
Sept2413.doc)
• City of Cupertino, Agenda of the Special Meeting of the
Environmental Review Committee, EOC Room —
Thursday, September 26, 2013 — 9:30 a.m. (Sept. 26, 2013)
(Sp Agenda 09- 26- 13.doc)
• Legal Notice of Special Public Hearing Before the Planning
Commission of the City of Cupertino, California, on
October 2, 2013 (Sept. 20, 2013) (09- 17- 13legal Merc.doc)
09/16/2013
Email from Piu Ghosh to Adam Weinstein, Ellen J. Garber re: Bus
Duck out for rerouting of Route 81 (Sept. 16, 2013 4:20:23 PM PDT)
09/16/2013
Email from Chad Mosley to Timm Borden re: encroachment permit
with insurance requirements (Sept. 16, 2013 7:43:26 AM PDT)
• Department of Public Works Encroachment Permit
Application Form (Encroachment Permit Application.pdf)
09/16/2013
Email from Ryan Roman to Aarti Shrivasta re: FW: Pruneridge
vacation hearing on Oct 15 - legal ad (Sept. 16, 2013 4:51:57 PM PDT)
09/16/2013
Email from Chad Mosley to David Stillman re: FW: Vallco- Striping
Changes (Sept. 16, 2013 3:03:06 PM PDT)
• Biking Stripe Removed, Vallco Parkway 09/09/13
(20130909 Biking Stripe Removed.pdf)
• Crosswalk Perimeter Road, Vallco Parkway 09/09/13
(20130909 Crosswalk Perimeter Road.pdf)
09/16/2013
Email from Erik @DOTTo: Taubeneck, Lee @DOT; Finney,
Jean@DOT; Saleh, Nick @DOT; Seriani, David D @DOT; El-
Tawansy, Dina @DOT; Timm Borden; David Stillman; "Terry @gray -
bowen.com "; "dwhisenhunt apple.com "; "j fowler apple. com ";
1 -172
sf- 3345921 Q
ATTACHMENT I
INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2
PROJECT
1 -173
sf- 3345921 Q
DATE
DOCUMENT
Naseer, Amjad @DOT; kolcott @sandis.net; ata lorksandis.net Re:
Apple Campus 2 - mitigation project development process issues (Sept.
16, 2013 2:26:33 PM PDT)
• Apple Campus 2 Caltrans / City of Cupertino / Apple
Intergovernmental Review / CEQA Coordination Sign -In
Sheet (Sept. 16, 2013) (Apple Campus- Caltrans meet sign
in 091613.pdf)
09/16/2013
Email from Chad Mosley to Timm Borden RE: encroachment permit
with insurance requirements (Sept. 16, 2013 8:24:08 AM PDT)
• Draft Improvement Agreement Template (July 18, 2013)
(Improvement Agreement Template - PW Director
Approval Draft 7- 18- 13.doc)
09/16/2013
Email from Nidhi Mathur to Piu Ghosh re: RE: How many people on
the interested parties a -list> (Sept. 16, 2013 3:05:38 PM PDT)
09/16/2013
Email from Piu Ghosh to Meg Thomas, Mick Bench, Dave Muffly RE:
Review of Wolfe Road Median Trees (Sept. 16, 2013 9:02:16 AM
PDT)
09/16/2013
Email from Meg Thomas to Piu Ghosh, Dave Muffly re: Review of
Wolfe Road Median Trees (Sept. 16, 2013 8:53:54 AM PDT)
09/16/2013
Email from Piu Ghosh to Aarti Shrivastava re: Study Session - Offsite
Improvements (Sept. 16, 2013 5:16:14 PM PDT)
• Joint City Council / Planning Commission Study Session
Staff Report (Oct. 1, 2013) (Study Session Staff Report -
PGLSAASPG091413tb (2).docx)
09/16/2013
Email from Chad Mosley to Piu Ghosh re: Vesting Tentative Map
Conditions (Sept. 16, 2013 2:45:55 PM PDT)
• Vesting Tentative Map Conditions (redline) (Conditions of
Approval - Vesting Tentative Map.doc)
09/17/2013
Email from Piu Ghosh to Adam Weinstein to Judith Malamut re: FW:
September Planned Development Permit (Sept. 17, 2013 10:48:00 AM
PDT)
1 -173
sf- 3345921 Q
ATTACHMENT I
INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2
PROJECT
1 -174
sf- 3345921 v2
DATE
DOCUMENT
09/17/2013
Email from Chad Mosley to David Stillman re: FW: Vallco
Configuration - Main Street (Sept. 17, 2013 2:49:14 PM PDT)
09/17/2013
Email from Dan Whisenhunt to Aarti Shrivastava re: Fwd: City of
Cupertino Invoices -Apple Campus 2 (Sept. 17, 2013 6:53:43 PM PDT)
• Invoice (Sept. 5, 2013) (Apple Invoice - Planning, 9 -5-
13.pdf)
• Invoice (Sept. 4. 2013) (Apple Invoice- Building, 9 -4-
13.pdf)
09/17/2013
Email from David Stillman to Amy Taylor re: I -280 cost estimate
(Sept. 17, 2013 2:02:40 PM PDT)
• I -280 from Google Earth (Redline) (280 El
Monte_Magdelena.pdf)
09/17/2013
Email from Julia Kinst to Piu Ghosh, Aarti Shrivastava re: LSA
Contract (Sept. 17, 2013 5:48:06 PM PDT)
• Agreement between the City of Cupertino and LSA
Associates, Inc. for Consultant Services for Preparation of
the Environmental Impact Report for the Apple Campus 2
Project (July 8, 2011) (11 -073 LSA Associates, Consultant
Services, Apple Campus 2 Project.pdf)
09/17/2013
Email from Adam Weinstein to Piu Ghosh Re: Apple -- Response to
Comments Doc (Sept. 17, 2013 5:27:11 PM PDT)
09/17/2013
Email from Aarti Shrivastava to Grace Schmidt, Beth Ebben, Julia
Kinst, Piu Ghosh, City Clerk RE: Apple schedule (Sept. 17, 2013
9:03:12 AM PDT)
09/17/2013
Email from Aarti Shrivastava To: Aarti Shrivastava; "Adam
Weinstein "; Piu Ghosh; David Stillman; Judith Malamut; Franziska
Church; Jane Bierstedt; Gary Baum; Scott D. Pinsky; Chad Mosley;
Timm Borden; diana.fazely @gmail.com; David Brandt;
Garber @smwlaw.com; JRamiza @bwslaw.com; stamp @stamplaw.us;
"Stock, Benjamin L. "; "Edsell M Eady Jr "; David Woo; Grace
Schmidt; Julia Kinst; Beth Ebben; Susan Bloch; jfowler @apple.com;
d old mofo.com; mimwalle mofo.com; dwhisenhunt a le.com
1 -174
sf- 3345921 v2
ATTACHMENT I
INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2
PROJECT
1 -175
sf- 3345921 Q
DATE
DOCUMENT
RE: Draft Apple schedule (Sept. 17, 2013 7:14:14 PM PDT)
• Apple Project Schedule — 9/17/13 (Apple Schedule091713
revised.xlsx)
09/17/2013
Email from Amy Taylor to David Stillman RE: I -280 cost estimate
(Sept. 17, 2013 6:10:29 PM PDT)
• Sandis, AC2 I -280 HOV Lane Reconfiguration, El Monte
Rd south 280 pass Magdalena (Sept. 17, 2013) (280 —HOV
Cost Estimate.pdf)
09/17/2013
Email from Amy Taylor to David Stillman RE: I -280 cost estimate
(Sept. 17, 2013 6:10:29 PM PDT)
• Sandis, AC2 I -280 HOV Lane Reconfiguration, El Monte
Rd south 280 pass Magdalena (Sept. 17, 2013) (280 —HOV
Cost Estimate.pdf)
09/17/2013
Email from Grace Schmidt to Aarti Shrivastava, Julia Kinst RE:
Number of City staff /consultants and Apple consultants for Oct 1, 2
and 15 meetings (Sept. 17, 2013 2:23:15 PM PDT)
09/17/2013
Email from Simon Vuong to Aarti Shrivastava RE: Tentative Map reso
(Sept. 17, 2013 3:53:31 PM PDT)
• Resolution No. 6722 of the Planning Commission of the
City of Cupertino Recommending Approval to Subdivid a
.96 Gross Arrew Lot into Four Lots: One Lot is for a Private
Road Totaling 13,075 Square Feet, and the Remaining
Three Lots Range in Size From 8,051 TO 9,448 Square Feet
to be Developed as Single - Family Homes, Located at 20840
Mclellan Rd, APN 359 -20 -031 (TM- 2012 -03) (TM- 2012 -03
res.doc)
09/17/2013
Email from Timm Borden to Aarti Shrivastava, Piu Ghosh, David
Stillman RE: Vallco condition (Sept. 17, 2013 5:16:59 PM PDT)
09/17/2013
Email from Aarti Shrivastava to Timm Borden, Chad Mosley RE:
VTM Reso
09/17/2013
Email from Nidhi Mathur to Susan Oki RE: Web friendly plans (Sept.
1 -175
sf- 3345921 Q
ATTACHMENT I
INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2
PROJECT
1 -176
sf- 3345921 Q
DATE
DOCUMENT
17, 2013 10:01:35 AM PDT)
09/17/2013
Email from Aarti Shrivastava to Simon Vuong re: Tentative Map reso
(Sept. 17, 2013 3:39:49 PM PDT)
09/17/2013
Email from Timm Borden to Chad Mosley re: The vacations stay Don
consent calendar step one (Sept. 17, 2013 10:44:23 PM PDT)
09/17/2013
Email from David Stillman to Piu Ghosh re: Vallco condition (Sept.
17, 2013 5:00:27 PM PDT)
09/17/2013
Email from Chad Mosley to Timm Borden re: Vallco Configuration -
Main Street (Sept. 17, 2013 7:46:37 AM PDT)
09/17/2013
Email from Darrel Lum to Rick Kitson re: Concerned Citizens of
Cupertino Response to Draft Environmental Impact Report for Apple
Campus 2 (Sept. 11, 2013 2:51 PM PDT) (Letter ID e- 13 -09 -17 -001)
09/18/2013
Email from Piu Ghosh to Beth Ebben re: AC 2 Public Hearing Notice
(Sept. 18, 2013 5:38:21 PM PDT)
• Notice of Public Hearing, Cupertino Planning Commission,
Oct. 2, 2013 (apple campus 2.doc)
09/18/2013
Email from Beth Ebben to Piu Ghosh, Aarti Shrivastava re: FW: legal
ad REVISED!! (Sept. 18, 2013 10:48:57 AM PDT)
• Legal Notice of Special Public Hearing Before The
Planning Commission of the City of Cupertino, California
on October 2, 2013, at 5:00 p.m. (CUPERTINO
4974568.pdf)
09/18/2013
Email from Beth Ebben to Piu Ghosh, Aarti Shrivastava re: FW: legal
ad REVISED!! (Sept. 18, 2013 10:48:57 AM PDT)
• Legal Notice of Special Public Hearing Before the Planning
Commission of the City of Cupertino, California on
October 2, 2013, at 5:00 p.m. (CUPERTINO 4974568.pdf)
09/18/2013
Email from Piu Ghosh to Aarti Shrivastava re: FW: Notice Signs (Sept.
18, 2013 5:47:10 PM PDT)
1 -176
sf- 3345921 Q
ATTACHMENT I
INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2
PROJECT
1 -177
sf- 3345921 Q
DATE
DOCUMENT
09/18/2013
Email from David Stillman to Alm, Erik @DOT re: FW: Your question
about 280 btw/Magdalena and El Monte (Sept. 18, 2013 1:24:00 PM
PDT)
09/18/2013
Email from Grant Schlereth to Chad Mosley, David Stillman re: NB
Wolfe Lane Shift Follow Up (Sept. 18, 2013 9:05:23 PM PDT)
• California MUTCD 2012 manual, pp. 1030, 1037 (Jan. 13,
2012) (Pages from CAMUTCD2012.pdf)
09/18/2013
Email from Dan Whisenhunt to Piu Ghosh re: Notice Signs (Sept. 18,
2013 5:18:58 PM PDT)
09/18/2013
Email from Grace Schmidt to Chad Mosley re: Pruneridge vacation
notice and legal ad (Sept. 18, 2013 2:40:27 PM PDT)
• Notice of Public Hearing Intent to Vacate (Sept. 17, 2013)
(Notice to vacate Pruneridge.docx )
• City of Cupertino Notice of Public Hearing Vacation of a
Portion of the Pruneridge Avenue Right -Of -Way and
Various Easements Bounded by North Wolfe Road,
Homestead Road, North Tantau Avenue, and Highway 280
(Sept. 17, 2013) ( Pruneridge Ave. vacation Res. 13-
078.docx)
09/18/2013
Email from Piu Ghosh to John Roach RE: AC2 Planning Drawings
(Sept. 18, 2013 12:21:00 PM PDT)
09/18/2013
Email from Rick Kitson to Nidhi Mathur Re: Apple Campus 2 (Sept.
18, 2013 2:27:43 PM PDT)
09/18/2013
Email from Adam Weinstein to: Gary Chao; Piu Ghosh; David
Stillman; jfowler @apple.com; Peter Sokoloff, dgold(,mofo.com;
mimwalle @mofo.com; Judith Malamut; Franziska Church; Jane
Bierstedt; Rick Kitson; Gary Baum; Eric Morley; Foulkes @apple.com;
Scott D. Pinsky; Chad Mosley; Timm Borden; JJeffersc�r�,mofo.com;
dwhisenhunt @apple.com; Aarti Shrivastava; diana.fazely @gmail.com;
David Brandt; wwagener @fosterandpartners.com;
soki @fosterandpartners.com; william.baura arg dnergarup.com;
Michael.iswalt @arup.com; lynnjohnson @apple.com;
Garber smwlaw.com; JRamiza@ b wslaw.com RE: Apple EIR -- Team
1 -177
sf- 3345921 Q
ATTACHMENT I
INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2
PROJECT
1 -178
sf- 3345921 Q
DATE
DOCUMENT
Meeting Rescheduled to 9/18 @3:00p (Sept. 18, 2013 2:06:19 PM
PDT)
09/18/2013
Email from Adam Weinstein to Piu Ghosh, Nidhi Mathur RE:
Comments collected to date (Sept. 18, 2013 8:17:29 AM PDT)
09/18/2013
Email from Beth Ebben to Piu Ghosh RE: Extension of the Scoping
Period (Sept. 18, 2013 12:24:48 PM PDT)
• City of Cupertino, Notice of Preparation of a Draft
Environmental Impact Report for the Proposed Apple
Campus 2 Project (NOP -LSA Edits (2).doc)
09/18/2013
Email from Amy Taylor to David Stillman RE: I -280 cost estimate
(Sept. 18, 2013 10:05:09 AM PDT)
09/18/2013
Email from Amy Taylor to David Stillman RE: I -280 cost estimate
(Sept. 18, 2013 10:02:11 AM PDT)
• Sandis, AC2 I -280 HOV Lane Reconfiguration, El Monte
Rd south 280 pass Magdalena (Sept. 18, 2013) (Copy of
280_HOV Cost Estimate.pdf)
09/18/2013
Email from Grace Schmidt to Beth Edden RE: legal ad REVISED!!
(Sept. 18, 2013 5:22:12 PM PDT)
09/18/2013
Email from Wolfgang Wagener to Piu Ghosh Re: Planning Drawing
4.25 edit (Sept. 18, 2013 9:07:58 AM PDT)
09/18/2013
Email from Aarti Shrivastava to Timm Borden, David Stillman, Piu
Ghosh RE: Vallco condition (Sept. 18, 2013 1:46:03 PM PDT)
09/18/2013
Email from Dan Whisenhunt to Aarti Shrivastava Re: Wording for
Signs (Sept. 18, 2013 1:51:08 PM PDT)
09/18/2013
Email from Piu Ghosh to Beth Ebben re: Sp Agenda 09- 26- 13.doc
(Sept. 18, 2013 5:25:23 PM PDT)
• City of Cupertino Agenda of the Special Meeting of the
Environmental Review Committee, Sept. 26, 2013 (Sp
Agenda 09- 26- 13.doc)
1 -178
sf- 3345921 Q
ATTACHMENT I
INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2
PROJECT
1 -179
sf- 3345921 Q
DATE
DOCUMENT
09/19/2013
Email from Beth Ebben to Piu Ghosh re: 9/26 ERC (Sept. 19, 2013
11:10:36 AM PDT)
09/19/2013
Email from Chad Mosley to David Stillman re: Calvert Stevens Creek -
Cost Estimates (Sept. 19, 2013 12:12:35 PM PDT)
• Sandis, AC2 OFFSITE Mitigations, Mitigation N - Stevens
Creek at Calvert (Sept. 11, 2013) (Estimate N1 - SC free
Rturn.pdf)
• Sandis, AC2 Offsite Mitigations, Mitigation N1 - Stevens
Creek at Calvert — Alternative (Sept. 11, 2013) (Estimate N
- SC original Rturn.pdf)
09/19/2013
Email from Aarti Shrivastava to Piu Ghosh re: FW: special agenda for
the 9/26 ERC (Sept. 19, 2013 8:45:03 AM PDT)
• City of Cupertino, Agenda of the Special Meeting of the
Environmental Review Committee, Sept. 26, 2013 (Sp
Agenda 09- 26- 13.doc)
09/19/2013
Email from Chad Mosley To: Aarti Shrivastava; Piu Ghosh; David
Stillman; Timm Borden re: Pruneridge Vacation Plat and Legal for
Exhibits (Sept. 19, 2013 5:26:50 PM PDT)
• Legal Description For Pruneridge Avenue ( Pruneridge
Vacation Plat and Legal.pdf)
09/19/2013
Email from Piu Ghosh to Beth Ebben Re: AC 2 Public Hearing Notice
(Sept. 19, 2013 8:49:31 AM PDT)
09/19/2013
Email from Andrew Chafer to Chad Mosley, Amy Taylor RE: AC2 -
Number of Existing Lots? (Sept. 19, 2013 2:43:14 PM PDT)
09/19/2013
Email from Manish Dalia to Chad Mosley RE: AC2 - Wolfe Joint
Trench Coordination (Sept. 19, 2013 10:08:06 AM PDT)
09/19/2013
Email from Judith Malamut to Piu Ghosh, Adam Weinstein RE: Apple
EIR -- late comments memo (Sept. 19, 2013 10:19:20 AM PDT)
09/19/2013
Email from Adam Weinstein to Piu Ghosh RE: Apple EIR --
scope/budget augment (Sept. 19, 2013 10:18:02 AM PDT)
1 -179
sf- 3345921 Q
ATTACHMENT I
INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2
PROJECT
1 -180
sf- 3345921 Q
DATE
DOCUMENT
09/19/2013
Email from Chad Mosley to Amy Taylor RE: Apple Exhibits (Sept. 19,
2013 5:27:47 PM PDT)
09/19/2013
Email from Dan Whisenhunt to Aarti Shrivastava Re: City of
Cupertino Invoices -Apple Campus 2 (Sept. 19, 2013 7:01:09 AM PDT)
9/19/2013
Email from Amy Taylor to Piu Ghosh Re: Property Description (Sept.
19, 2013 1:21:52 PM PDT)
09/19/2013
Email from Amy Taylor to Piu Ghosh, Chad Mosley, Dan Whisenhunt
RE: Property Description (Sept. 19, 2013 12:32:05 PM PDT)
• LSA, Figure IV -2, Apple Campus 2 EIR, Zoning
Designations (May 31, 2013) (201309191207.pdf)
09/19/2013
Email from Aarti Shrivastava to Chad Mosley RE: Pruneridge
Vacation Plat and Legal for Exhibits (Sept. 19, 2013 6:18:05 PM PDT)
09/19/2013
Email from Dan Whisenhunt to David Stillman Re: Stevens
Creek/Calvert mitigation TRANS -9 (Sept. 19, 2013 4:38:14 PM PDT)
09/19/2013
Email from Chad Mosley to Grant Schlereth RE: SWMP Process (Sept.
19, 2013 7:30:49 AM PDT)
09/19/2013
Email from Grant Schlereth to Chad Mosley RE: SWMP Process (Sept.
19, 2013 12:36:02 PM PDT)
09/19/2013
Email from Piu Ghosh to Chad Mosley RE: Vesting Tentative Map
COA (Sept. 19, 2013 3:09:27 PM PDT)
09/19/2013
Email from Beth Ebben to Aarti Shrivastava, Barry Chang, David
Brandt, Don Sun, Timm Borden re: special agenda for the 9/26 ERC
(Sept. 19, 2013 8:05:17 AM PDT)
• City of Cupertino, Agenda of the Special Meeting of the
Environmental Review Committee, Sept. 26, 2013 (Sp
Agenda 09- 26- 13.doc)
09/19/2013
Email from Chad Mosley to Amy Taylor re: Found - Park Exhibit
(Sept. 19, 2013 2:40:56 PM PDT)
• Exhibit A, Zoning Plat Map Pruneridge Ave. at Ridgeview
1 -180
sf- 3345921 Q
ATTACHMENT I
INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2
PROJECT
1 -181
sf- 3345921 Q
DATE
DOCUMENT
Ct., Cupertino, CA (AC2 - park area.pdf)
09/20/2013
Comment letter from Tina lee (Letter ID 500171)
09/20/2013
Comment letter from Bryan Dockter (Letter ID 500172)
09/20/2013
Email from Aarti Shrivastava to: David Brandt; Gary Baum;
Garber @smwlaw.com; Ramiza, Gerald J.; stamp @stamplaw.us; Timm
Borden; Piu Ghosh; David Stillman; Chad Mosley; "Adam Weinstein ";
Judith Malamut re: Packets for Study Session and Planning
Commission (Sept. 20, 2013 10:26:16 AM PDT)
09/20/2013
Email from Aarti Shrivastava To: David Brandt; Gary Baum;
Garber @smwlaw.com; Ramiza, Gerald J.; stamp @stamplaw.us; Timm
Borden; Piu Ghosh; David Stillman; Chad Mosley; "Adam Weinstein ";
Judith Malamut re: Packets for Study Session and Planning
Commission (Sept. 20, 2013 10:26:16 AM PDT)
09/20/2013
Email from Beth Ebben to: "Dwhisenhunt @ apple. com
"brumm@ apple. com"; jnoorikkierwri hg t.com re: public hearing
notice (Sept. 20, 2013 9:58:21 AM PDT)
• City of Cupertino Notice of Public Hearing (apple campus
2.doc)
09/20/2013
Email from Wolfgang Wagener to Aarti Shrivastava Re: AC2 Parking
Numbers (Sept. 20, 2013 7:20:01 PM PDT)
09/20/2013
Email from Amy Taylor to Chad Mosley RE: Apple Exhibits (Sept. 20,
2013 3:08:52 PM PDT)
• Real Property Description (CampusLegal.docx)
09/20/2013
Email from Timm Borden to Chad Mosley RE: Right of way
acquisition (Sept. 20, 2013 9:35:39 AM PDT)
09/20/2013
Email from Adam Weinstein to Aarti Shrivastava, Piu Ghosh RE: Trail
location (Sept. 20, 2013 11:17:59 AM PDT)
09/20/2013
Email from Beth Ebben to City Council, Alan Takahashi, Don Sun,
Margaret Gong, Paul Brophy, Winnie Lee re: study /reference materials
for the Apple Campus 2 meetings (Sept. 20, 2013 10:36:30 AM PDT)
1 -181
sf- 3345921 Q
ATTACHMENT I
INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2
PROJECT
1 -182
sf- 3345921 Q
DATE
DOCUMENT
09/21/2013
Email from Piu Ghosh to Grace Schmidt, Kristen Squarcia re: Agenda
Manager (Sept. 21, 2013 11:18:00 AM PDT)
09/21/2013
Email from Piu Ghosh to Adam Weinstein, Judith Malamut re: Draft
EIR (Sept. 21, 2013 11:20:00 AM PDT)
09/21/2013
Email from Piu Ghosh to Aarti Shrivastava RE: PC report (Sept. 21,
2013 11:15:00 AM PDT)
09/22/2013
Comment letter from Jim Dobbins (Letter ID 500173)
09/22/2013
Email from Piu Ghosh to Aarti Shrivastava re: Keyser Marsten Report
(Sept. 22, 2013 10:55:23 AM PDT)
• Keyser Marston Associates, Economic and Fiscal Impacts
Generated by Apple in Cupertino — Current Facilities and
Apple Campus 2 (May 2013) (Keyser Marston Report -
Economic Impact of Apple in Cupertino May 2013.pdf)
09/22/2013
Email from Piu Ghosh to Timm Borden RE: VTM Street Improvement
Permit Conditions (Sept. 22, 2013 10:59:24 PM PDT)
09/22/2013
Email from David Stillman to Timm Borden, Piu Ghosh, Aarti
Shrivastava RE: VTM Street Improvement Permit Conditions (Sept.
22, 2013 6:27:20 PM PDT)
• Vesting Tentative Map Conditions (Redline) (VTM- Street
Improvement Agreement Requirements 9 -2 Ldoc)
09/22/2013
Email from Chad Mosley to Timm Borden RE: VTM Street
Improvement Permit Conditions (Sept. 22, 2013 3:05:58 PM PDT)
09/23/2013
Email from Piu Ghosh to Aarti Shrivastava re: FW: Apple EIR -- late
comments memo (Sept. 23, 2013 3:53:27 PM PDT)
• LSA Associates Memorandum to City of Cupertino re:
Apple Campus 2 Project Draft Environmental Impact
Report (EIR) — Late Comments Received after the 45 -Day
Comment Period (Sept. 18, 2013) (9 -18 -13 Late Comments
Memo to City.pdf)
09/23/2013
Email from Dirk Mattern to Piu Ghosh re: Fwd: Fire Department
1 -182
sf- 3345921 Q
ATTACHMENT I
INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2
PROJECT
1 -183
sf- 3345921 Q
DATE
DOCUMENT
Review of Apple Campus 2 (Sept. 23, 2013 9:29:24 AM PDT)
09/23/2013
Email from Andrew Chafer to Piu Ghosh re: Park Zoning (Sept. 23,
2013 3:09:41 PM PDT)
• Exhibit A Legal Description For Rezoning (EXHIBIT A
PARK ZONING.pdf)
• Exhibit B Zoning Plat Map Pruneridge Ave at Ridgeview
Court, Cupertino, CA (EXHIBIT B PARK ZONING.pdf)
09/23/2013
Email from Beth Ebben to Piu Ghosh, Grace Schmidt, Kirsten Squarcia
RE: Agenda Manager (Sept. 23, 2013 10:49:44 AM PDT)
09/23/2013
Email from Aarti Shrivastava to Marjorie Estavillo RE: Apple Campus
2 (Sept. 23, 2013 2:02:07 PM PDT)
09/23/2013
Email from Piu Ghosh To: Beth Ebben; Aarti Shrivastava; Julia Kinst
RE: County Filing of Availability of Final EIR? (Sept. 23, 2013
8:59:00 AM PDT)
09/23/2013
Email from Grant Schlereth to Chad Mosley, David Stillman RE: NB
Wolfe Lane Shift Follow Up (Sept. 23, 2013 4:39:10 PM PDT)
09/23/2013
Email from Grace Schmidt to Piu Ghosh RE: October 1 agenda (Sept.
23, 2013 4:27:05 PM PDT)
09/23/2013
Email from Chad Mosley to Andrew Chafer, Piu Ghosh RE: Park
Zoning (Sept. 23, 2013 3:43:03 PM PDT)
• Exhibit Z -1, Legal Description For Rezoning (Redline)
(MX -M 1100_20130923_175554.pdf)
09/23/2013
Email from Andrew Chafer to Chad Mosley RE: Park Zoning (Sept.
23, 2013 4:18:45 PM PDT)
• Exhibit Z -1 Legal Description For Rezoning (EXHIBIT Z-
I .pdf)
• Exhibit Z -2, Zoning Plat Map Pruneridge Ave at Ridgeview
Ct, Cupertino, CA (EXHIBIT Z- 2.pdf)
1 -183
sf- 3345921 Q
ATTACHMENT I
INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2
PROJECT
1 -184
sf- 3345921 Q
DATE
DOCUMENT
09/23/2013
Email from Grace Schmidt to Kevin Rieden RE: Posting notice of
Pruneridge vacation (Sept. 23, 2013 5:28:58 PM PDT)
09/23/2013
Email from Piu Ghosh to Adam Weinstein RE: RTC Docs — ETA
(Sept. 23, 2013 4:39:00 PM PDT)
09/23/2013
Email from Adam Weinstein to Julia Kinst, Nidhi Mathur RE: Why is
Chapter II missing in the TOC of the RTC? (Sept. 23, 2013 3:38:30
PM PDT)
• Table of Contents (Sept. 23, 2013) (00- Cover -TOC i.pdf)
09/23/2013
Email from Timm Borden to Piu Ghosh re: Revised VTM requirements
update per Master COA (Sept. 23, 2013 11:42:06 AM PDT)
• Vesting Tentative Map Conditions (VTM- Street
Improvement Agreement Requirements 9 -23 clean.doc)
09/23/2013
Email from clerkgcupertino.org to Piu Ghosh re: Your agenda item
"Joint City Council and Planning Commission Study Session regarding
the Apple Campus 2 Final Environmental Impact Report" has been
fully approved (Sept. 23, 2013 7:05:00 PM PDT)
09/23/2013
Email from Piu Ghosh to Chad Mosley re: Zoning PC Reso with
Zoning Ordinance" (Sept. 23, 2013 3:31:10 PM PDT)
• Attachment PC -4, Resolution No. 6729 of the Planning
Commission of the city of Cupertino Recommending that
the City Council Approve the Rezoning of an
Approximately 1.1 Acre Area from Park and Recreation
(PR) to Planned Industrial Park (P(MP)) Located at APN
316 06 050 and 316 06 051 (Z- 2011 -03 PC RES.docx)
09/24/2013
Email from Robert Kim To: David Brandt; Andrea Sanders; Donna
Henriques; Ryan Roman; Kirsten Squarcia; Marianna Khienkina;
Karen B. Guerin; Brittany Carey; Julia Kinst; Grace Schmidt; Liz
Nunez; Chylene Osborne; Tiffanie Cardenas; Nidhi Mathur; Robert
Kim; Mary Redwine; Lisa Atwood; Rei Delgado; Peter Coglianese;
Rick Kitson; Piu Ghosh re: Apple Campus 2 Commenting Process
activity report, Thursday, June 6 to Sunday, September 22, 2013 (Sept.
24, 2013 11:32:18 AM PDT)
1 -184
sf- 3345921 Q
ATTACHMENT I
INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2
PROJECT
1 -185
sf- 3345921 Q
DATE
DOCUMENT
09/24/2013
Email from Adam Weinstein to Piu Ghosh re: calls /meetings this week
(Sept. 24, 2013 12:06:29 PM PDT)
09/24/2013
Email from Beth Ebben to: Adam Weinstein; Judith Malamut;
Franziska Church; Jane Bierstedt; Ian Barnes; Gary Baum; "Ellen J.
Garber "; Ramiza, Gerald J.; "Stock, Benjamin L. "; Edsell M Eady Jr;
"Richard Berkson "; Rick Kitson re: electronic packet for the 10/2/2013
PC meeting (Sept. 24, 2013 8:14:31 PM PDT)
09/24/2013
Email from Dirk Mattern to Piu Ghosh re: Fwd: Fire Department
Review of Apple Campus 2 (Sept. 24, 2013 9:44:58 AM PDT)
• Apple Campus 2 conditions of approval (Apple Campus 2
conditions of approval.docx)
09/24/2013
Email from Piu Ghosh to Chad Mosley RE: COA's (Sept. 24, 2013
8:33:12 AM PDT)
09/24/2013
Email from Timm Borden to Piu Ghosh RE: Conditions of Approval -
Final 9 -24 (Sept. 24, 2013 2:46:54 PM PDT)
• Additional Master COA comments (Additional Master
COA comments.docx)
09/24/2013
Email from Judith Malamut to Piu Ghosh RE: Late comments response
memo (Sept. 24, 2013 9:39:41 AM PDT)
• LSA Memorandum to City re: Apple Campus 2 Project
Draft Environmental Impact Report (EIR) — Late Comments
Received after the 45 -Day Comment Period (Sept. 20,
2013) ( 9 -20 -13 Late Comments Memo to City.doc; 9 -20 -13
Late Comments Memo to City.pdf)
09/24/2013
Email from Grace Schmidt to David Brandt RE: PC Staff RPT (Apple)
(Sept. 24, 2013 8:20:53 AM PDT)
09/24/2013
Email from David Stillman to Grant Schlereth; Chad Mosley re: RE:
RE: NB Wolfe Lane Shift Follow Up (Sept. 24, 2013 8:48:38 PM
PDT)
09/24/2013
Email from David Stillman To: Grant Schlereth; Chad Mosley RE: RE:
NB Wolfe Lane Shift Follow Up (Sept. 24, 2013 8:48:38 PM PDT)
1 -185
sf- 3345921 Q
ATTACHMENT I
INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2
PROJECT
1 -186
sf- 3345921 Q
DATE
DOCUMENT
09/24/2013
Email from Grant Schlereth to David Stillman, Chad Mosley RE: RE:
NB Wolfe Lane Shift Follow Up (Sept. 24, 2013 6:38:03 PM PDT)
• Caltrans, Highway Design Manual, Ch. 4 Ref (May 7,
2012) (Caltrans HDM Ch. 4 Re£pdf)
09/24/2013
Email from David Stillman to Grant Schlereth, Chad Mosley RE: RE:
NB Wolfe Lane Shift Follow Up (Sept. 24, 2013 2:22:01 PM PDT)
09/24/2013
Email Robertson, Jesse G @DOT to David Stillman re: Apple Campus
2 FEIR (Sept. 24, 2013 9:57:15 AM PDT)
09/24/2013
Email from Chad Mosley to Grant Schlereth RE: Wolfe Road Irrigation
(Sept. 24, 2013 8:25:34 AM PDT)
09/24/2013
Email from Grant Schlereth to Chad Mosley, David Stillman RE: RE:
NB Wolfe Lane Shift Follow Up (Sept. 24, 2013 9:30:38 AM PDT)
• Caltrans, Highway Design Manual 2012, pp. 400 -28, 400-
29 (May 7, 2012) (Caltrans HDM Ch. 4 Ref.pdf)
09/25/2013
Email from Piu Ghosh to Nidhi Mathur re: For the website (Sept. 25,
2013 10:07:00 AM PDT)
• EPS Peer Review of KMA's Draft Report: Economic and
Fiscal Impacts Generated by Apple in Cupertino (July 26,
2013) (131019mm_KMA peer review 2013- 07- 26.pdf)
09/25/2013
Email from Aarti Shrivastava to Piu Ghosh re: FW: Technical needs
for Study Session (Sept. 25, 2013 3:47:36 PM PDT)
09/25/2013
Email from Piu Ghosh to: "Francisco Navarro "; Aarti Shrivastava;
Chris Grimmer (cgrimmerggpple.com) RE: AC2 Parking Structure
Mockup review notes (Sept. 25, 2013 9:27:00 AM PDT)
09/25/2013
Email from Chad Mosley to Piu Ghosh, Dan Whisenhunt RE: Intent to
Vacate (Sept. 25, 2013 2:52:03 PM PDT)
09/25/2013
Email from Judith Malamut to: Aarti Shrivastava; Piu Ghosh; Adam
Weinstein; Franziska Church; Timm Borden; Jane Bierstedt; Ian
Barnes; David Stillman; Chad Mosley; Gary Baum; Ellen J. Garber;
Ramiza, Gerald J.; Stock, Benjamin L.; Edsell M Eady Jr; David Woo;
1 -186
sf- 3345921 Q
ATTACHMENT I
INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2
PROJECT
1 -187
sf- 3345921 Q
DATE
DOCUMENT
Richard Berkson; Julia Kinst; Rick Kitson; Nidhi Mathur; Peter
Coglianese; Rei Delgado; Robert Kim; Beth Ebben; Marianna
Khienkina; Karen B. Guerin; Grace Schmidt RE: PC packet loaded in
Agenda Manager (PC -8 Plan Set, September 16, 2013 PDT)
09/25/2013
Email from Nidhi Mathur to Beth Ebben, Piu Ghosh RE: public
notices & cover letters (Sept. 25, 2013 8:48:55 AM PDT)
09/25/2013
Email from Peter Coglianese To: Aarti Shrivastava; "Ian Barnes ";
Franziska Church; Jane Bierstedt RE: Technical needs for Study
Session (Sept. 25, 2013 3:53:12 PM PDT)
09/25/2013
Email from Aarti Shrivastava to Nidhi Mathur, Piu Ghosh RE: Website
updates (Sept. 25, 2013 11:56:47 AM PDT)
09/25/2013
Email from Aarti Shrivastava to Gilbert Wong RE: Cupertino: Apple
Camus 2 Project Update (Sept. 25, 2013 11:51:35 AM PDT)
09/25/2013
Email from David Brandt to Aarti Shrivastava re: Couple of thoughts
(Sept. 15, 2013 9:54:17 AM PDT)
09/25/2013
Email from Amar Guptato City Council re: Apple Campus 2 (Sept. 24,
2013 5:17 PM PDT) (Letter ID e- 13 -09 -25 -002)
09/25/2013
Email from albert liu to City Council re Apple Campus 2 (Sept. 24,
2013 5:12 PM PDT) (Letter ID e- 13 -09 -25 -001)
09/26/2013
Email from Akshay Suggula to City Council re Apple Campus 2 (Sept.
25, 2013 9:48 PM PDT) (Letter ID e- 13 -09 -26 -003)
09/26/2013
Email from Antonio Ibanez to City Council re: apple office in
Cupertino (Sept. 25, 2013 8:41 PM PDT) (Letter ID e- 13 -09 -26 -002)
09/26/2013
Email from annwoo(,comcast.net to City Council re Apple Campus 2
(Sept. 25, 2013 6:27 PM PDT) (Letter ID e- 13 -09 -26 -001)
09/26/2013
Email from Jessica Epstein to City Council re: Comment on Apple
Campus 2 (Sept. 26, 2013 9:31 AM PDT) (Letter ID e- 13 -09 -26 -004)
09/26/2013
Email from Grant Schlereth to Steve Newgren, Kermit Cuff re: AC2
Wolfe Road Widening VTA bus shelter locations (Sept. 26, 2013
11:43:10 AM PDT)
1 -187
sf- 3345921 Q
ATTACHMENT I
INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2
PROJECT
1 -188
sf- 3345921 Q
DATE
DOCUMENT
• VTA bus shelter layout Wolfe (VTA bus shelter layout
Wolfe .pdf)
09/26/2013
Email from Mark Summers to Chad Mosley re: Campus - Wolfe &
Pruneridge - Existing Lighting Information (Sept. 26, 2013 11:20:24
AM PDT)
09/26/2013
Email from Rick Kitson to: dwhisenhunt(c gpple.com re: Fwd: Apple
bus in Birdland again (Sept. 26, 2013 10:51:21 AM PDT)
• Apple bus 9 -24 -13 (Apple bus 9_24_13.jpeg)
• Apple bus close up 9 -24 -13 (Apple bus close up
9_24_13.jpg)
09/26/2013
Email from Rick Kitson to Jennifer Garnett Re: Apple bus in Birdland
again (Sept. 26, 2013 10:55:10 AM PDT)
09/26/2013
Email from David Stillman to Ian Cunningham RE: Package 1 - Traffic
Control Plan (Sept. 26, 2013 1:06:51 PM PDT)
09/26/2013
Email from Aarti Shrivastava to Wolfgang Wagener Re: Tunnel Fire
Apparatus Access (Sept. 26, 2013 9:42:46 PM PDT)
09/26/2013
Email from Wolfgang Wagener to Chad Mosley, Piu Ghosh re: Tunnel
Fire Apparatus Access (Sept. 26, 2013 9:31:08 PM PDT)
09/26/2013
Email from Timm Borden to Chad Mosley re: Quitclaim deed (Sept.
26, 2013 5:01:49 PM PDT)
09/26/2013
Email from Piu Ghosh to Nidhi Matthur re: For the website (Sept. 25,
2013 10:02:00 AM PDT)
• Keyser Martson Associates, Economics and Fiscal Impacts
Generated by Apple in Cupertino — Current Facilities and
Apple Campus 2 (May 2013) (Keyser Marston Report -
Economic Impact of Apple in Cupertino May 2013.pdf)
09/26/2013
Email from Francisco Navarro to: Piu Ghosh; Aarti Shrivastava; Chris
Grimmer (cgrimmer(c gpple.com) RE: AC2 Parking Structure Mockup
review notes. (Sept. 25, 2013 8:00:40 AM PDT)
1 -188
sf- 3345921 Q
ATTACHMENT I
INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2
PROJECT
1 -189
sf- 3345921 Q
DATE
DOCUMENT
• Moch up review 09 -17 -13 Minutes (Mock up review 09 -17-
13 Minutes.pdf)
09/26/2013
Agenda of the Special Meeting of the Environmental Review
Committee
09/27/2013
Email from Andrew Park to City Council re: Formal support for Apple
Campus 2 (Sept. 26, 2013 2:32 PM PDT) (Letter ID e- 13 -09 -27 -002)
09/27/2013
Email from Carol Wong to City Council re: support for Apple Campus
2 (Sept. 26, 2013 2:36 PM PDT) (Letter ID e- 13 -09 -27 -001)
09/27/2013
Email from Diana Loredo to City Council re: Apple campus 2. Yes we
want it! (Sept. 26, 2013 4:40 PM PDT) (Letter ID e- 13 -09 -27 -007)
09/27/2013
Email from Chuck Worley to City Council re: Apple Campus 2 (Sept.
26, 2013 4:30 PM PDT) (Letter ID e- 13 -09 -27 -006)
09/27/2013
Email from Betsy Eskeldson to City Council re: Apple Building (Sept.
26, 2013 4:20 PM PDT) (Letter ID e- 13 -09 -27 -005)
09/27/2013
Email from Alex Pashintsev to City Council re: Fwd: Apple Campus 2
(Sept. 25, 2013 3:51 PM PDT) (Letter ID e- 13 -09 -27 -004)
09/27/2013
Email from ingbudge(,aol.com to City Council re: support to Apple
campus (Sept. 26, 2013 3:17 PM PDT) (Letter ID e- 13 -09 -27 -003)
09/27/2013
Email from Jessica Epstein to City Council re: Comment on Apple
Campus 2 (Sept. 26, 2013 9:31 AM PDT) (Letter ID _e- 2013- 09 -27-
008)
09/27/2013
Comment letter from Robert Neff (Letter ID 500174)
09/27/2013
Comment letter from paulette Altmaier (Letter ID 500175)
09/27/2013
Comment letter from Susan Dole (Letter ID 500176)
09/27/2013
Email from Dan Whisenhunt to: City Council; book.sun @gmail.com;
pauldbrophy @yahoo.com; margiegong @icloud.com;
alantcLipg mail.com; Aarti Shrivastava; David Brandt; Piu Ghosh re:
Apple Campus 2 (Sept. 27, 2013 6:01:54 PM PDT)
1 -189
sf- 3345921 Q
ATTACHMENT I
INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2
PROJECT
1 -190
sf- 3345921 Q
DATE
DOCUMENT
• Apple Campus 2 PC CC pkg (Apple Campus 2 PC CC pkg-
1 .pdf)
09/27/2013
Email from Peter Coglianese To: Rick Kitson; Grace Schmidt; Julia
Kinst; Aarti Shrivastava; Thomas Walters; Jason Bisely; Ron Bullock;
Piu Ghosh; Timm Borden re: Oct. 1 Apple Campus 2 Study Session:
Room Layout Revision 93D (Sept. 27, 2013 5:06:43 PM PDT)
• Apple 2 Community Meeting 10 -1 -13 Rev3D (Apple 2
Community Meeting 10 -1 -13 Rev3D.pdf)
09/27/2013
Email from Ian Cunningham to Chad Mosley re: PKG 1 — Submittals
(Sept. 27, 2013 9:43:24 AM PDT)
09/27/2013
Email from Eleanor Dwyer to Chad Mosley re: Storm Water
Management Plan - 1858 - File Transfer (Sept. 27, 2013 10:32:50 AM
PDT)
• Transmittal — 02742 (Transmittal - 02742.pdf)
• Foster + Partners, Apple Campus 2, Storm Water
Management Plan SWMP Draft 1 I September 23, 2013
09/27/2013
Email from Adam Weinstein to Piu Ghosh RE: Apple EIR --
scope/budget augment (Sept. 27, 2013 12:08:39 PM PDT)
09/27/2013
Email from Darrel Lum to: Orrin Mahoney; Gilbert Wong; Barry
Chang; Mark Santoro; Rod Sinks re: September 17th Oral
Communications: Thank You (Sept. 17, 2013 8:39:23 PM PDT)
09/29/2013
Email from Gilbert Wong to: Gilbert Wong; David Brandt; Carol
Korade; Aarti Shrivastava; Gary Chao; Piu Ghosh; Timm Borden; Rick
Kitson; Carol Atwood re: Fwd: Proposed Apple Campus (Sept. 29,
2013 9:52:10 PM PDT)
09/29/2013
Comment letter (Letter ID 500177)
09/30/2013
Email from Ari Katz to City Council re: My Support for Apple Campus
2 (Sept. 29, 2013 3:58 PM PDT) (Letter ID e- 13 -09 -30 -010.)
09/30/2013
Email from Lyn Faust to Lyn Faust re: Poposed Apple Campus (Sept.
29, 2013 11:18 AM PDT) (Letter ID e- 13 -09 -30 -009)
1 -190
sf- 3345921 Q
ATTACHMENT I
INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2
PROJECT
1 -191
sf- 3345921 Q
DATE
DOCUMENT
09/30/2013
Email from Robert Kim to: David Brandt; Andrea Sanders; Donna
Henriques; Ryan Roman; Kirsten Squarcia; Marianna Khienkina;
Karen B. Guerin; Brittany Carey; Julia Kinst; Grace Schmidt; Liz
Nunez; Chylene Osborne; Tiffanie Cardenas; Nidhi Mathur; Robert
Kim; Mary Redwine; Lisa Atwood; Rei Delgado; Peter Coglianese;
Rick Kitson; Piu Ghosh re: Apple Campus 2 Commenting Process
activity report, Thursday, June 6 to Sunday, September 29, 2013 (Sept.
30, 2013 9:40:17 AM PDT)
09/30/2013
Email from Timm Borden to Chad Mosley re: apple construction
management trees (Sept. 30, 2013 2:01:06 PM PDT)
09/30/2013
Email from Piu Ghosh to Aarti Shrivastava re: Apple Presentation
(Sept. 30, 2013 3:41:00 AM PDT)
09/30/2013
Email from Darrel Lum to: Orrin Mahoney; Gilbert Wong; Barry
Chang; Mark Santoro; Rod Sinks; Don Sun; Paul Brophy; Winnie Lee;
City Council; City of Cupertino Planning Dept. Planning
Commission/City Council Study Session on Apple Campus 2 (Sept. 30,
2013 11:45:26 PM PDT)
• Section 3.5 Tax Consulting Agreement ( Sales Tax
Agreement @PC -CC 2013.pdf)
• Fiscal Impact Analysis (Fiscal Impact Analysis PC- CC.pdf)
• Mitigation: Traffic (Mitigation - Traffic @PC -CC 2013.pdf)
• Mitigation: Housing (Mitigation- Housing PC- CC.pdf)
• Community Benefits As condition of approval to project
(Community Benefits -As Condition of Approval PC-
CC.pdf)
• Community Benefits Provided by Other Companies NOT as
a condition of approval to any project (Community
Benefits -Not As Condition of Approval @PC -CC 2013.pdf)
09/30/2013
Email from Darrel Lum to: Orrin Mahoney; Gilbert Wong; Barry
Chang; Mark Santoro; Rod Sinks; Don Sun; Paul Brophy; Winnie Lee;
City Council; City of Cupertino Planning Dept. re: Planning
Commission /City Council Study Session on Apple Campus 2 (Sept.
1 -191
sf- 3345921 Q
ATTACHMENT I
INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2
PROJECT
1 -192
sf- 3345921 Q
DATE
DOCUMENT
30, 2013 11:42:06 PM PDT)
• Section 3.5 Tax Consulting Agreement (Sales Tax
Agreement @PC -CC 2013.pdf)
• Fiscal Impact Analysis (Fiscal Impact Analysis PC- CC.pdf)
• Mitigation: Traffic (Mitigation - Traffic @PC -CC 2013.pdf)
• Mitigation: Housing (Mitigation- Housing PC- CC.pdf)
• Community Benefits As condition of approval to project
(Community Benefits -As Condition of Approval PC-
CC.pdf)
• Community Benefits Provided by Other Companies NOT as
a condition of approval to any project (Community
Benefits -Not As Condition of Approval @PC -CC 2013.pdf)
09/30/2013
Email from Piu Ghosh to David Stillman RE: Apple 2 project and Bike
lanes on Tantau (Sept. 30, 2013 12:22:36 PM PDT)
09/30/2013
Email from Piu Ghosh to David Stillman RE: Apple 2 project and Bike
lanes on Tantau (Sept. 30, 2013 12:22:00 PM PDT)
09/30/2013
Email from Chad Mosley to Timm Borden RE: apple construction
management trees (Sept. 30, 2013 3:11:02 PM PDT)
09/30/2013
Email from Piu Ghosh to Grace Schmidt RE: Apple consultants who
will speak at Oct 1 meeting (Sept. 30, 2013 11:04:00 AM PDT)
09/30/2013
Email from Nidhi Mathur to Beth Ebben RE: apple's latest brochure
(Sept. 30, 2013 2:52:27 PM PDT)
09/30/2013
Email from Piu Ghosh to Adam Weinstein, Aarti Shrivastava RE: PC
Hearing (Sept. 30, 2013 6:41:27 PM PDT)
09/30/2013
Email from Grace Schmidt to Nidhi Mathur, Beth Ebben, Piu Ghosh
RE: Staff Report Links
09/30/2013
Email from Nidhi Mathur to Piu Ghosh, Beth Ebben, Grace Schmidt
RE: Staff Report Links (Sept. 30, 2013 11:13:28 AM PDT)
1 -192
sf- 3345921 Q
ATTACHMENT I
INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2
PROJECT
1 -193
sf- 3345921 Q
DATE
DOCUMENT
• Plan Set 9 -16 -2013 (PS 9- 16- 2013.docx)
09/30/2013
Email from David Stillman to Timm Borden RE: wolfe stuff (Sept. 30,
2013 3:39:16 PM PDT)
09/30/2013
Email from Timm Borden to David Stillman Re: wolfe stuff (Sept. 30,
2013 2:47:09 PM PDT)
09/30/2013
Email from David Stillman to Timm Borden RE: wolfe stuff (Sept. 30,
2013 3:04:40 PM PDT)
09/30/2013
Email from Nidhi Mathur to Beth Ebben, Grace Schmdit, Piu Ghosh
re: Staff Report Links (Sept. 30, 2013 10:57:00 AM PDT)
• SS -1 — SS -2 (SSI- SS2.docx)
09/30/2013
Email from Barbara Chang to City Council re: I support Apple Campus
2 (Sept. 28, 2013 7:44 AM PDT) (Letter ID e- 13 -09 -30 -008)
09/30/2013
Email from Balakrishnan Thyagarajan to City Council re: Support of
Apple Campus 2 (Sept. 27, 2013 10:28 PM PDT) (Letter ID e- 13 -09-
30 -007)
09/30/2013
Email from Bill Liu to City Council re: Apple Campus II (Sept. 27,
2013 2:04 PM PDT) (Letter ID e- 13 -09 -30 -006)
09/30/2013
Email from Balaram Nair to City Council re: Support for Apple
Campus 2 (Sept. 27, 2013 12:35 PM PDT) (Letter ID e- 13 -09 -30 -005)
09/30/2013
Email from Debbie Bergantz to City Council re: Apple 2 (Sept. 27,
2013 11:13 AM PDT) (Letter ID e- 13 -09 -30 -004)
09/30/2013
Email from David Eberhardt to City Council re: Apple Campus (Sept.
27, 2013 9:23 AM PDT) (Letter ID e- 13 -09 -30 -003. PDT)
09/30/2013
Email from Carlos McEvilly to City Council re: Apple Campus (Sept.
27, 2013 9:00 AM PDT) (Letter ID e- 13 -09 -30 -002)
09/30/2013
Email from David Kopels to City Council re: Apple Campus 2 (Sept.
27, 2013 3:17 AM PDT) (Letter ID e- 13 -09 -30 -001)
09/30/2013
Email from Sam Ashknaz to City Council re: Campus 2 (Sept. 30, 2013
1 -193
sf- 3345921 Q
ATTACHMENT I
INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2
PROJECT
1 -194
sf- 3345921 Q
DATE
DOCUMENT
12:59 PM PDT) (Letter ID e- 13 -09 -30 -012)
09/30/2013
Email from Donna Austin to City Council re: Apple Campus 2 (Sept.
30, 2013 12:20 PM PDT) (Letter ID e- 13 -09 -30 -011)
09/30/2013
Email from Robert Neff to David Stillman re: Fwd: Apple 2 project
and Bike lanes on Tantau (Sept. 27, 2013 10:50 AM PDT) (Letter ID e-
13-09-30 -014)
09/30/2013
Email from Doug Warmke to City Council re: I Like Apple Campus 2
(Sept. 30, 2013 2:07 PM PDT) (Letter ID e- 13 -09 -30 -013)
09/30/2013
Email from brian ong to Orrin Mahoney re: Apple and The City of
Cupertino (Sept. 30, 2013 12:05 PM PDT) (Letter ID e- 13 -09 -30 -016)
09/30/2013
Email from George Crosby to City Council re: Apple campus (Sept.
30, 2013 2:18 PM PDT) (Letter ID e- 13 -09 -30 -015)
09/30/2013
Email from Darci Hodder to City Council re: Apple (Sept. 30, 2013
4:46 PM PDT) (Letter ID e- 13 -09 -30 -021)
09/30/2013
Email from Liling Wang to City Council (Sept. 30, 2013 4:23 PM
PDT) (Letter ID e- 13 -09 -30 -020)
09/30/2013
Email from Grace Nadolny to City Council re: Apple 2 campus support
(Sept. 30, 2013 4:18 PM PDT) (Letter ID e- 13 -09 -30 -019)
09/30/2013
Email from John Zirelli to City Council re: Apple Campus 2 Support
(Sept. 30, 2013 3:24 PM PDT) (Letter ID e- 13 -09 -30 -018)
09/30/2013
Email from Edward Hirshfield to City Council re: Apple Campus 2
(Sept. 30, 2013 3:45 PM PDT) (Letter ID e- 13 -09 -30 -017)
10/01/2013
Email from Jason Tsai to City Council re: Apple Campus 2 (Oct. 01,
2013 10:19 AM PDT) (Letter ID e- 13 -10 -01 -021)
10/01/2013
Email from Chrstie Lafrance to City Council re: support for Apple
Campus 2 (Oct. 1, 2013 10:24 AM PDT) (Letter ID e- 13 -10 -01 -020)
10/01/2013
Email from Willow Hopkins to City Council re: Apple Campus 2 (Oct.
1, 2013 10:27 AM PDT) (Letter ID e- 13 -10 -01 -019)
10/01/2013
Email from Lana to City Council re: Apple complex (Oct. 1, 2013
1 -194
sf- 3345921 Q
ATTACHMENT I
INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2
PROJECT
1 -195
sf- 3345921 Q
DATE
DOCUMENT
10:41 AM PDT) (Letter ID e- 13 -10 -01 -018)
10/01/2013
Email from Judy Gaffney to City Council re: Apple (Oct. 1, 2013 10:17
AM PDT) (Letter ID e- 13 -10 -01 -017)
10/01/2013
Email from Uparkar Bhushan to City Council re: Support for apple
campus (Oct. 01, 2013 10:14 AM PDT) (Letter ID e- 13 -10 -01 -016)
10/01/2013
Email from Char Marshall to City Council (Oct. 1, 2013 10:09 AM
PDT) (Letter ID e- 13 -10 -01 -015 PDT)
10/01/2013
Email from sfarella @aol.com to City Council re: Apple 2 (Oct. 01,
2013 9:53 AM PDT) (Letter ID e- 13 -10 -01 -014)
10/01/2013
Email from Nancy Gabriel to City Council re: I support the Apple
Campus II (Oct. 1, 2013 9:41 AM PDT) (Letter ID e- 13 -10 -01 -013)
10/01/2013
Email from Jun Nishimura to City Council re: Supporting Apple in
Cupertino (Oct. 1, 2013 9:40 AM PDT) (Letter ID e- 13 -10 -01 -012)
10/01/2013
Email from Arushi to City Council re: Apple campus (Oct. 1, 2013
9:43 AM PDT) (Letter ID e- 13 -10 -01 -011)
10/01/2013
Email from Brad Meyer to City Council re: Apple 2 Campus Support
(Oct. 1, 2013 9:28 AM PDT) (Letter ID e- 13 -10 -01 -010)
10/01/2013
Email from Darrel Lum to Orrin Mahoney; Gilbert Wong; Barry
Chang; Mark Santoro; Rod Sinks; Don Sun; Paul Brophy; Winnie Lee;
City Council; City of Cupertino Planning Dept. re: Planning
Commission/City Council Study Session on Apple Campus 2 (Sept. 30,
2013 11:42 PM PDT) (Letter ID e- 13 -10 -01 -009)
10/01/2013
Email from CJRE to City Council re: Apple's new building (Oct. 01,
2013 9:24 AM PDT) (Letter IDe- 13 -10 -01 -008)
10/01/2013
Email from Fan, Ching to City Council re:I support the apple campus
and we should expedite the process to make it happen - from the
Cupertino resident. (Oct. 01, 2013 9:22 AM PDT)
10/01/2013
Email from Nancy Neibel to City Council re: Apple Campus 2 (Oct.
01, 2013 9:17 AM PDT) (Letter ID e- 13 -10 -01 -006)
10/01/2013
Email from Shankar T to City Council re: Support for Apple Campus 2
1 -195
sf- 3345921 Q
ATTACHMENT I
INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2
PROJECT
1 -196
sf- 3345921 Q
DATE
DOCUMENT
(Oct. 01, 2013 9:15 AM PDT) (Letter ID e- 13 -10 -01 -005)
10/01/2013
Email from Gopakumar Pillai to City Council re: Support for Apple
Campus 2 (Sept. 30, 2013 5:13 PM PDT) (Letter ID e- 13 -10 -01 -004)
10/01/2013
Email from henry zoellner to City Council re: Support....... yes (Sept.
30, 2013 7:29 PM PDT) (Letter ID e- 13 -10 -01 -003)
10/01/2013
Email from: GuntlyDuffyFamily @comcast.net to City Council re:
Apple Campus Support (Sept. 30, 2013 9:53 PM PDT) (Letter ID e -13-
10 -01 -002)
10/01/2013
Email from Dolf Payer to City Council re: Apple 2 Campus (Oct. 01,
2013 5:42 AM PDT) (Letter ID e- 13 -10 -01 -001)
10/01/2013
Email from Rich Altmaier to City Council re: Supporting the new
Apple Campus (Oct. 01, 2013 1:58 PM PDT) (Letter ID e- 13- 10 -01-
027)
10/01/2013
Email from John & Helen Trollman to City Council re: Apple Campus
(Oct. 01, 2013 2:27 PM PDT) (Letter ID e- 13 -10 -01 -026)
10/01/2013
Email from Mary Spagnol to City Council re: Apple 2 Campus (Oct.
01, 2013 2:48 PM PDT) (Letter ID e- 13- 10- 01 -02)
10/01/2013
Email from Lever Wang to City Council re: Support of Apple campus
2 (Oct. 1, 2013 3:48 PM PDT) (Letter ID e- 13 -10 -01 -024)
10/01/2013
Email from Naeem Zafar to City Council re: support for Apple Campus
project (Oct. 01, 2013 11:49 AM PDT) (Letter ID e- 13 -10 -01 -023)
10/01/2013
Email from David Li to City Council (Oct. 1, 2013 12:08 PM PDT)
(Letter ID e- 13 -10 -01 -022)
10/01/2013
Comment letter from Moustafa Moustafa (Letter ID 500178)
10/01/2013
Email from Roy Molseed to Aarti Shrivastava re: Apple Campus 2
Final EIR (Oct. 01, 2013 4:02:59 PM PDT)
• Letter from Santa Clara Valley Transportation Authority to
City of Cupertino re: Final EIR for Apple Campus 2 (Oct. 1,
2013) (CU1102_apple2_FEIR.pdf)
1 -196
sf- 3345921 Q
ATTACHMENT I
INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2
PROJECT
1 -197
sf- 3345921 Q
DATE
DOCUMENT
10/01/2013
Email from David Brandt to Mike Foulkes re: Fwd: Planning
Commission/City Council Study Session on Apple Campus 2 (Oct. 01,
2013 9:52:28 AM PDT)
• Section 3.5 Tax Consulting Agreement (Sales Tax
Agreement @PC -CC 2013.pdf)
• Fiscal Impact Analysis (Fiscal Impact Analysis PC- CC.pdf)
• Excerpted from Concerned Citizens of Cupertino Response
to the Draft Environmental Impact Report for Apple
Campus 2: Mitigation: Traffic (Mitigation - Traffic @PC -CC
2013.pdf)
• Mitigation: Housing (Mitigation- Housing PC- CC.pdf)
• Community Benefits As condition of approval to project
(Community Benefits -As Condition of Approval PC-
CC.pdf)
• Updated Excerpt from Concerned Citizens of Cupertino
Response to the Draft Environmental Impact Report for
Apple Campus 2: Community Benefits Provided by Other
Companies NOT as a condition of approval to any project
(Community Benefits -Not As Condition of Approval @PC -
CC 2013.pdf)
10/01/2013
Email from Rick Kitson to Aarti Shrivastava; Piu Ghosh; Timm
Borden; Chad Mosley; David Stillman; Ryan Roman; Julia Kinst;
Karen B. Guerin; David Brandt; 'Gary Baum'; 'Diana Fazely' re:
Wednesday Apple email collection (Oct. 01, 2013 9:20 AM PDT)
10/01/2013
Email from Grant Schlereth to David Stillman, Chad Mosley re: NB
Wolfe Widening Options (Oct. 01, 2013 12:06:23 PM PDT)
• N. Wolfe Road Utilities General Arrangement Sheet, No. C-
P1A -UT -102, Revision 2 (Sept. 3, 2013) (NB Wolfe
Widening Options REVl.pdf)
• Caltrans, Highway Design Manual, p. 200 -11 (July 24,
2009) (Pages from chp0200.pdf))
1 -197
sf- 3345921 Q
ATTACHMENT I
INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2
PROJECT
1 -198
sf- 3345921 Q
DATE
DOCUMENT
10/01/2013
Agenda Packet for the Joint City Council and Planning Commission
Study Session regarding the Apple Campus 2 Final Environmental
Impact Report, October 1, 2013
10/02/2013
Email from Roy Molseed to Aarti Shrivastava re: Apple Campus 2
Final EIR (Oct. 01, 2013 4:03 PM PDT) (Letter ID e- 13- 10- 02 -004a)
10/02/2013
Email from Cynthia Smyth to City Council re: Apple 2 support (Oct. 2,
2013 10:04 AM PDT) (Letter ID e- 13 -10 -02 -003)
10/02/2013
Email from Lidia Blair to City Council re: Lidia Blair Business owner
and a proud neighbor (Oct. 02, 2013 10:22 AM PDT) (Letter ID e -13-
10-02 -002)
10/02/2013
Email from Ben Hsu to City Council re: Apple Campus 2 (Oct. 02,
2013 12:09 AM PDT) (Letter ID e- 13 -10 -02 -001)
10/02/2013
Email from Bill Cooper to City Council re: Apple 2 Support (Oct. 02,
2013 2:15 PM PDT) (Letter ID e- 13 -10 -02 -009)
10/02/2013
Email from Sissy Wood to winnieleedds @yahoo.com; Aarti
Shrivastava; davekgcuperrino.org re: Comments for Agenda Item No.
8 -- Public Hearing Apple Campus 2 Development (Oct. 02, 2013 12:31
PM PDT) (Letter ID e- 13- 10- 02 -008a)
10/02/2013
Email from Grace Abercrombie to City Council re: Support for Apple
Campus 2 (Oct. 02, 2013 1:18 PM PDT) (Letter ID e- 13 -10 -02 -007)
10/02/2013
Email from David Richards to City Council re: New Apple Campus
(Oct. 02, 2013 11:03 AM PDT) (Letter ID e- 13 -10 -02 -006)
10/02/2013
Email from David Nilsson to City Council re: Support for Apple
Campus 2 (Oct. 02, 2013 11:07 AM PDT) (Letter ID e- 13 -10 -02 -005)
10/02/2013
Email from Bruce Capron to City Council re: New Apple Facility (Oct.
02, 2013 3:45 PM PDT) (Letter ID e- 13 -10 -02 -010.)
10/02/2013
Agenda Packet for the Special Planning Commission Meeting, October
2, 2013
10/02/2013
Email from Chad Mosley to Timm Borden; "Grant Schlereth
(grant.schlereth arup.com) "; Rob Westover; Tom Bishop; Chad
1 -198
sf- 3345921 Q
ATTACHMENT I
INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2
PROJECT
1 -199
sf- 3345921 Q
DATE
DOCUMENT
Mosley re: FW: AC2 Grading Permit Package
10/02/2013
Email from Sissy Wood to Cupertino City Manager's Office re:
Comments for Agenda Item No. 8 -- Public Hearing Apple Campus 2
Development (Oct. 02, 2013 12:42:52 PM PDT)
• Letter from Gideon Kracov to Planning Commission, City
of Cupertino re: Comments For Agenda Item No. 8 — Public
Hearing Apple Campus 2 Development [Final
Environmental Impact Report & Application No(s): ASA-
2011-14, DA- 2011 -01, DP 2011 -04, GPA- 2011 -03, TM-
2011-03, TR- 2011 -39, U- 2011 -11, Z- 2011 -03 (EA -2011-
12)] (Oct. 2, 2013) (USWW CommentLetter Apple
PlanningCommission 2.pdf)
10/02/2013
Email from Chad Mosley to Timm Borden re: FW: Contact
information for 4LEAF, Inc. (re: potential PW inspector for Apple
project) (October 02, 2013 1:15:22 PM PDT)
• Burlingame, City of, 4LEAF Project Descriptions (4LEAF
Project Descriptions.pdf)
10/02/2013
Email from Grace Schmidt to Chad Mosley re: List of utilities noticed
regarding Pruneridge vacation (Oct. 02, 2013 3:15:25 PM PDT)
• Contacts for Utility Companies (Utility Companies to
Contact for Vacations.xlsx)
10/02/2013
Email from Piu Ghosh to Grace Schmidt, Kirsten Squarcia re: LSA -
10 -1 -13 Study Session Slides.ppt (Oct. 02, 2013 11:35:00 AM PDT)
• LSA Associates, Inc., Study Session Apple Campus 2
Project Final EIR (Oct. 1, 2013) ( LSA - 10 -1 -13 Study
Session Slides.ppt)
10/02/2013
Email from Chad Mosley to Aarti Shrivastava, Piu Ghosh re: Outside
Agency Exhibits (Oct. 02, 2013 4:53:15 PM PDT)
• Sandis, AC2 OFFSITE Mitigations, Mitigation P -
Lawerance at Stevens Creek (Oct. 7, 2013) ( AC2 Offsite
Mitigations P- N -N1 -Q Cost Estimates.pdf
1 -199
sf- 3345921 Q
ATTACHMENT I
INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2
PROJECT
1 -200
sf- 3345921 Q
DATE
DOCUMENT
• Sandis, AC2 OFFSITE Mitigations, Mitigation N1 -
Stevens Creek at Calvert — Alternative (Sept. 11, 2013)
(Estimate N1 - SC free Rturn.pdf)
• Sandis, AC2 OFFSITE Mitigations, Mitigation Q1 -
Lawerance at Calvert and I -280 on -ramp (Sept. 11, 2013)
(Estimate Q1 - Calvert + 280 onramp.pdf)
10/02/2013
Email from Kirsten Squarcia to "book.sun @gmail.com ";
"pauldbrophy@ yahoo. com "; "margiegong @sbcglobal.net ";
"winnieleedds @yahoo.com "; "at- kt @sbcglobal.net ";
alan.takahashic�r�,cobham.com re: Planning Commission: additional
comments Sept 20 — 3 pm Oct 2 (Oct. 02, 2013 3:52:42 PM PDT)
10/02/2013
Email from Piu Ghosh to Jane Bierstedt RE: Apple Study Session --
LSA Slides (Oct. 02, 2013 3:30:00 PM PDT)
10/02/2013
Email from Chad Mosley to Mark Summers RE: Campus - Wolfe &
Pruneridge - Existing Lighting Information (Oct. 02, 2013 12:00:07
PM PDT)
10/02/2013
Email from Nidhi Mathur to Piu Ghosh re: RE: Comments from
Website 9/20 - 10 /1 (Oct. 02, 2013 3:01:07 PM PDT)
10/02/2013
Email from Piu Ghosh to Grace Schmidt, Aarti Shrivastava, Gary
Baum re: Consultant PowerPoint presentations (Oct. 02, 2013 11:32:00
AM PDT)
10/02/2013
Email from Grace Schmidt to MN, Mercury News RE: Cupertino legal
ads heads -up (Oct. 02, 2013 10:10:58 AM PDT)
10/02/2013
Email from Grace Schmidt to Ryan Roman, Chad Mosley RE: List of
utilities noticed regarding Pruneridge vacation (Oct. 02, 2013 4:14:04
PM PDT)
10/02/2013
Email from Aarti Shrivastava to Grace Schmidt, David Brandt RE:
Packet for Oct 15 (Oct. 02, 2013 10:10:39 AM PDT)
10/02/2013
Email from Adam Weinstein to Piu Ghosh Re: Presentation (Oct. 02,
2013 3:05:07 PM PDT)
10/02/2013
Email from Aarti Shrivastava to Peter Coglianese; Rick Kitson; Grace
1 -200
sf- 3345921 Q
ATTACHMENT I
INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2
PROJECT
1 -201
sf- 3345921 Q
DATE
DOCUMENT
Schmidt; Gary Baum RE: Voting/Timer System Update (Oct. 02, 2013
10:12:52 AM PDT)
10/02/2013
Email from David Stillman to Grant Schlereth RE: Wolfe Road (Oct.
02, 2013 9:54:10 AM PDT)
10/03/2013
Email from Edith Sandoval to Piu Ghosh re: AC2- PC/ CC Package
(Oct. 03, 2013 9:42:55 AM PDT)
10/03/2013
Email from Beth Ebben to Piu Ghosh, Aarti Shrivastava re: desk items
from last night (Oct. 03, 2013 10:56:09 AM PDT)
10/03/2013
Email from Piu Ghosh to Nidhi Mathur; David Stillman; Aarti
Shrivastava; Gary Baum; Timm Borden; Chad Mosley; Ellen J. Garber
(Garber @smwlaw.com); Adam Weinstein; Judith Malamut
Oudith.malamut @lsa- assoc.com); Jane Bierstedt; Franziska Church re:
FW: Apple Campus 2 (Oct. 03, 2013 5:54:00 PM PDT)
10/03/2013
Email from Piu Ghosh to: Nidhi Mathur; David Stillman; Aarti
Shrivastava; Gary Baum; Timm Borden; Chad Mosley; Ellen J. Garber
(Garber @smwlaw.com); Adam Weinstein; Judith Malamut
Oudith.malamut @lsa- assoc.com); Jane Bierstedt; Franziska Church re
FW: Apple Campus 2 (Oct. 03, 2013 5:54:00 PM PDT)
10/03/2013
Email from Piu Ghosh to Nidhi Mathur; Aarti Shrivastava; Timm
Borden; Gary Baum; Ellen J. Garber (Garber @smwlaw.com); David
Stillman; Chad Mosley; Adam Weinstein; Judith Malamut
Oudith.malamut @lsa- assoc.com); Jane Bierstedt;
Franziska Church re: FW: Bike lane plans for Tantau in Apple 2
documents (Oct. 03, 2013 5:56:12 PM PDT)
10/03/2013
Email from Nidhi Mathur to diana.fazely @gmail.com; Piu Ghosh;
Rick Kitson re: off next week (Oct. 03, 2013 12:12:46 PM PDT)
10/03/2013
Email from Grace Schmidt to Mercury News
(legalskmercMnews.com) re: Public Hearing Apple Campus 2 - Oct
15 (to be published 10/5) (Oct. 03, 2013 9:40:16 AM PDT)
• City of Cupertino Notice of Public Hearing Apple Campus
2, Oct. 15, 2013 (Public Hearing Apple Campus 2 - Oct
15.docx PDT)
1 -201
sf- 3345921 Q
ATTACHMENT I
INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2
PROJECT
1 -202
sf- 3345921 Q
DATE
DOCUMENT
10/03/2013
Email from Aarti Shrivastava to "Adam Weinstein "; Gary Chao; Piu
Ghosh; David Stillman; jfowler @apple.com; Peter Sokoloff,
dgold @mofo.com; mimwalle @mofo.com; Judith Malamut; Franziska
Church; Jane Bierstedt; Rick Kitson; Gary Baum; Eric Morley;
Foulkes @apple.com; Scott D. Pinsky; Chad Mosley; Timm Borden;
JJeffers(c rofo.com; dwhisenhunt @apple.com;
diana.fazely @gmail.com; David Brandt;
wwa eg nerc�r�,fosterandpartners.com; soki @fosterandpartners.com;
william.baumgardner @arup.com; Michael.iswalt(cr�gm.com;
lynnjohnson @apple.com; Garber @smwlaw.com;
JRamizagbwslaw.com RE: Apple EIR -- Team Meeting 9/12 (Oct. 03,
2013 12:32:32 PM PDT)
10/03/2013
Email from Grace Schmidt to Piu Ghosh, Aarti Shrivastava RE: Oct 15
legal ad and notices DONE (Oct. 03, 2013 5:57:09 PM PDT)
10/04/2013
Email from carbone.cupertinokgmail.com to City Council re: Apple
Campus 2 (Oct. 03, 2013 4:57 PM PDT) (Letter ID e- 13 -10 -04 -002)
10/03/2013
Email from Kevin Eggleston to City Council re Apple Campus 2 (Oct.
02, 2013 5:16 PM PDT) (Letter ID e- 13 -10 -03 -001)
10/03/2013
Email from Bryan Ruli to City Council re: Apple Campus 2 (Oct. 3,
2013 4:55 AM PDT) (Letter ID e- 13 -10 -03 -002)
10/03/2013
Email from Charles Liggett to City Council re: Apple Campus 2 (Oct.
2, 2013 6:33 PM PDT) (Letter ID e- 13 -10 -03 -003)
10/03/2013
Email from Dan Karraker to City Council re: Apple campus — a ringing
endorsement (Oct. 02, 2013 5:45 PM PDT) (Letter ID e- 13 -10 -03 -004)
10/03/2013
Email from Beth Ebben to Piu Ghosh, Aarti Shrivastava re: speaker
cards (Oct. 03, 2013 12:18:21 PM PDT)
10/04/2013
Email from fukumal489c�r�,comcast.net to City Council re: Apple
Campus 2 (Oct. 4, 2013 9:13 AM PDT) (Letter ID e- 13 -10 -04 -004)
10/04/2013
Email from g7m5gririgg(cjuno.com to re: Apple Campus 2 (Oct. 3, 2013
2:34 PM PDT) (Letter ID e- 13 -10 -04 -003)
10/04/2013
Email from carbone.cupertino @ gmail.com to City Council re: Apple
Campus 2 (Letter ID e- 13 -10 -04 -002)
1 -202
sf- 3345921 Q
ATTACHMENT I
INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2
PROJECT
1 -203
sf- 3345921 Q
DATE
DOCUMENT
10/04/2013
Email from Debbie Richmond to City Council re: Apple 2 Campus
(Oct. 3, 2013 8:40 PM PDT) (Letter ID e- 13 -10 -04 -001)
10/04/2013
Email from Robert Stern to City Council re: Support for Apple Campus
2 (Oct. 4, 2013 11:19 AM PDT) (Letter ID e- 13 -10 -04 -006)
10/04/2013
Email from Alp to City Council re: Complete Support of Apple
Campus 2 (Oct. 4, 2013 11:19 AM PDT) (Letter ID e- 13 -10 -04 -005)
10/04/2013
Email from Robert Neff to City of Cupertino Planning Department re:
Bike lane plans for Tantau in Apple 2 documents (Letter ID e- 13 -10-
04 -008)
10/04/2013
Email from Eleanor Selfridge -Field to City of Cupertino Planning
Department re: Apple Campus 2 (Oct. 2, 2013 10:45 PM PDT) (Letter
ID e- 13 -10 -04 -007
10/04/2013
Email from Jesse G Robertson @DOT to Timm Borden, David Stillman
re: Apple Campus 2 FEIR letter (SCH 92011082055) (Letter ID x -13-
10- 04 -01)
10/04/2013
Email from Roy Molseed to Aarti Shrivastava re: Apple Campus 2
Final EIR
• Letter from Santa Clara Valley Transportation Authority to
City of Cupertino (Oct. 1, 2013) (Letter ID s- 13- 10- 04 -02)
10/04/2013
Email from Ellen Kolstee to City Council re: Support for the Apple 2
Campus (Oct. 4, 2013 11:55 AM PDT) (Letter ID e- 13 -10 -04 -010)
10/04/2013
Email from ro erg carlc�r�,att.net to City Council re: Yes on Apple (Oct. 4,
2013 12:00 PM PDT) (Letter ID e- 13 -10 -04 -009)
10/04/2013
Email from Ronald Moore to City Council re: apple campus 2 (Oct. 4,
2013 2:41 PM PDT) (Letter ID e- 13 -10 -04 -011)
10/04/2013
Email from Dan Hauer to City Council re: Apple Campus 2 (Oct. 4,
2013 3:11 PM PDT) (Letter ID e- 13 -10 -04 -012)
10/04/2013
Email from Peter Coglianese to Piu Ghosh re: Another Public
Comment Email... (Oct. 04, 2013 2:52:33 PM PDT)
1 -203
sf- 3345921 Q
ATTACHMENT I
INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2
PROJECT
1 -204
sf- 3345921 Q
DATE
DOCUMENT
• Email from Ronald Moore to City Council re: apple campus
2 (Oct. 04, 2013 2:41 PM PDT) (e- 13- 10- 04- 01l.pdf)
10/04/2013
Email from Peter Coglianese to Piu Ghosh re: Another Public
Comment... (Oct. 04, 2013 3:13:53 PM PDT)
• Email from Dan Hauer to City Council re: Apple Campus 2
(Oct. 04, 2013 3:11 PM) (e- 13- 10- 04- 012.pdf)
10/04/2013
Email from Robertson, Jesse G @DOT to Timm Borden; David
Stillman; Swierk, Robert re: Apple Campus 2 FEIR letter
(SCH 92011082055) (Oct. 04, 2013 6:38:02 AM PDT)
• Letter from California Department of Transportation to City
Council re: Apple Campus 2 — Final Environmental Impact
Report (Oct. 3, 2013) (Apple Campus 2 FEIR Letter
030CT2013.pdf)
10/04/2013
Email from Timm Borden to Piu Ghosh re: FW: Cupertino Village -
Southerly Wolfe Road Driveway (Oct. 04, 2013 9:28:04 AM PDT)
10/04/2013
Email from Piu Ghosh to Peter Coglianese re: FW: more apple campus
postings (Oct. 04, 2013 2:19:00 PM PDT)
• Apple Campus 2 brochure (apple campus brochure l.pdf)
10/04/2013
Email from Beth Ebben to Peter Coglianese re: more apple campus
posting (Oct. 04, 2013 2:27:27 PM PDT)
• Apple Campus 2 brochure (apple campus replacement
2.pdf)
10/04/2013
Email from Beth Ebben to Nidhi Mathur re: more apple campus
postings (Oct. 04, 2013 1:25:50 PM PDT)
• Apple Campus 2 Brochure (apple campus brochure
replacmt.pdf)
• Apple Campus 2 Brochure (apple campus brochure l.pdf)
• Apple Campus 2 Brochure (apple campus brochure 2.pdf)
1 -204
sf- 3345921 Q
ATTACHMENT I
INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2
PROJECT
1 -205
sf- 3345921 Q
DATE
DOCUMENT
10/04/2013
Email from Piu Ghosh to Peter Coglianese RE: For the website (Oct.
04, 2013 1:56:00 PM PDT)
10/04/2013
Email from Peter Coglianese to Beth Ebben RE: more apple campus
posting (Oct. 04, 2013 2:33:38 PM PDT)
10/04/2013
Email from Peter Coglianese to Piu Ghosh RE: more apple campus
postings (Oct. 04, 2013 2:31:32 PM PDT)
10/04/2013
Email from David Stillman to Dan Whisenhunt re: Tantau bridge at
Calabazas Creek (Oct. 04, 2013 8:57:00 AM PDT)
10/04/2013
Email from Peter Coglianese to Piu Ghosh re: Two New Processed
Emails... (Oct. 04, 2013 2:38:32 PM PDT)
• Email from Roger Carr to City Council re: Yes on Apple
(Oct. 04, 2013 12:00 PM PDT) (e- 13 -10-04-009.pdf)
• Email from Ellen Kolstee to City Council re: Support for
the Apple 2 Campus (Oct. 04, 2013 11:55 AM PDT) (Letter
ID e- 13- 10- 04- 010.pdf)
10/05/2013
Email from Timm Borden to David Stillman re: FW: Apple Campus 2
(Oct. 05, 2013 2:41:56 PM PDT)
10/06/2013
Email from David Brandt to aartiskcupertino.org re: FW: bike ped
access (Oct. 06, 2013 10:35:00 PM PDT)
10/06/2013
Comment letter from Stanislav Napalkov (Letter ID 500179)
10/07/2013
Email from Robert Kim to David Brandt; Andrea Sanders; Donna
Henriques; Ryan Roman; Kirsten Squarcia; Marianna Khienkina;
Karen B. Guerin; Brittany Carey; Julia Kinst; Grace Schmidt; Liz
Nunez; Chylene Osborne; Tiffanie Cardenas; Nidhi Mathur; Robert
Kim; Mary Redwine; Lisa Atwood; Rei Delgado; Peter Coglianese;
Rick Kitson; Piu Ghosh re: Apple Campus 2 Commenting Process
activity report, Thursday, June 6 to Sunday, October 6, 2013 (Oct. 07,
2013 11:28:45 AM PDT)
10/07/2013
Email from Judith Malamut to David Stillman; Piu Ghosh; Adam
Weinstein; Ellen J. Garber RE: Apple Campus 2 (Oct. 07, 2013
10:26:23 AM PDT)
1 -205
sf- 3345921 Q
ATTACHMENT I
INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2
PROJECT
1 -206
sf- 3345921 Q
DATE
DOCUMENT
10/07/2013
Email from Dan Whisenhunt to Chad Mosley Re: MCI facilities in
Pruneridge (Oct. 07, 2013 1:32:23 PM PDT)
10/07/2013
Email from Wolfgang Wagener to David Stillman Re: Tantau drawings
(Oct. 07, 2013 2:00:24 PM PDT)
10/07/2013
Email from Fariba Nej at to City Council re: Apple campus #2 (Oct.
07, 2013 3:44 PM PDT) (Letter ID e- 13 -10 -07 -005)
10/07/2013
Email from Urmil to City Council re: 2 apple camp (Oct. 04, 2013
10:08 PM PDT)) (Letter ID e- 13 -10 -07 -004)
10/07/2013
Email from rooshabh varaiya to City Council (Oct. 04, 2013 11:09 PM
PDT) (Letter ID e- 13 -10 -07 -003)
10/07/2013
Email from Gilbert Wong to David Brandt, Carol Korade re: Fwd: bike
ped access (Oct. 6, 2013 9:19 PM PDT) (Letter ID e- 13 -10 -07 -002)
10/07/2013
Email from Cupertino 9235 to City Council re: Apple (Oct. 4, 2013
3:57 PM PDT) (Letter ID e- 13 -10 -07 -001)
10/08/2013
Email from Chad Mosley to Manish Dalia RE: AC2 - VTA Bus stop
Wolfe /SCB (Oct. 08, 2013 1 :37:13 PM PDT)0
10/08/2013
Email from Ian Barnes to Piu Ghosh re: RE: F &P Power point and
videos from Oct 1 (Oct. 08, 2013 4:21:30 PM PDT)
• Fehr & Peers, Transportation Impact Analysis Slides
(Transportation Slides_TZ5.pptx)
10/08/2013
Email from Chad Mosley to Saran Oki re: tantau exhibit limits (Oct.
08, 2013 9:45:04 AM PDT)
• Untitled Graphic (MX -M 1100_20131008_115801.pdf)
10/09/2013
FY 12 -13 Annual Report C.15 — Exempted and Conditionally
Exempted Discharges Permittee Name: (June 7, 2013)
(Cupertino - Part 1 and Part 2 forms for SWMPs 10.9.13.doc)
10/09/2013
Sample Inspection and Maintenance Logs (Sample Inspection and
Maintenance Logs 10.9.13.pdf)
1 -206
sf- 3345921 Q
ATTACHMENT I
INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2
PROJECT
1 -207
sf- 3345921 Q
DATE
DOCUMENT
10/09/2013
Email from Ian Barnes to Chad Mosley re: Apple Campus 2 - PM
Vallco Simulation Videos (Oct. 09, 2013 8:38:12 AM PDT)
10/09/2013
Email from Grace Schmidt to Rick Kitson, Nidhi Mathur re: Apple
Presentations and Videos for the website record (Oct. 09, 2013
10:56:57 AM PDT)
10/09/2013
Email from Piu Ghosh to Grace Schmidt; Kirsten Squarcia; Aarti
Shrivastava re: Attachment 10 (Oct. 09, 2013 9:01:53 AM PDT)
• Letter from LSA Associates, Inc. to City of Cupertino re:
Supplemental Text Revisions, Apple Campus 2 Project
Final Environmental Impact Report (EIR) (Oct. 8, 2013)
(Attachment CC- IO.pdf)
10/09/2013
Email from Piu Ghosh to Laura D Lee re: Block Group 4 (Oct. 09,
2013 2:58:00 PM PDT)
10/09/2013
Email from Adam Weinstein To: Gary Chao; Piu Ghosh; David
Stillman; jfowler @apple.com; Peter Sokoloff, dgoldgmofo.com;
mimwalle @mofo.com; Judith Malamut; Franziska Church; Jane
Bierstedt; Rick Kitson; Gary Baum; Eric Morley; Foulkes @apple.com;
Scott D. Pinsky; Chad Mosley; Timm Borden; JJeffersgraofo.com;
dwhisenhunt @apple.com; Aarti Shrivastava; diana.fazely @gmail.com;
David Brandt; wwagener @fosterandpartners.com;
soki @fosterandpartners.com; william.baura ard�nergarup.com;
Michael.iswalt @arup.com; lynnjohnson @apple.com;
Garber @smwlaw.com; JRamizac�r�,bwslaw.com RE: Apple EIR -- Team
Meeting 10 /10 @2:OOp (Oct. 09, 2013 9:40:01 PM PDT)
10/09/2013
Email from Grace Schmidt to Piu Ghosh; Kirsten Squarcia; Aarti
Shrivastava RE: Attachment 10 (Oct. 09, 2013 9:27:03 AM PDT)
10/09/2013
Email from Gene Barry to Chad Mosley re: RE: Meeting? (Oct. 09,
2013 3:51:16 PM PDT)
10/09/2013
Email from Piu Ghosh to Grace Schmidt, Kirsten Squarcia RE: Packet
(Oct. 09, 2013 8:26:31 AM PDT)
10/09/2013
Email from Ian Cunningham to David Stillman RE: Sunnyvale permit
for utility work (Oct. 09, 2013 1:37:58 PM PDT)
1 -207
sf- 3345921 Q
ATTACHMENT I
INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2
PROJECT
1 -208
sf- 3345921 Q
DATE
DOCUMENT
10/09/2013
Email from Frank Mangini to City Council re: Apple Campus 2 (Oct.
09, 2013 08:01 AM PDT) (Letter ID e- 13 -10 -09 -008)
10/09/2013
Email from Vivian Wang to City Council re: Support for Apple's new
campus (Oct. 09, 2013 9:18 AM PDT) (Letter ID e- 13 -10 -09 -007)
10/09/2013
Email from Sam Ashknaz to City Council re: In Support of Campus2
(Oct. 09, 2013 9:26 AM PDT) (Letter ID e- 13 -10 -09 -006)
10/09/2013
Email from Steve Hicks to City Council re: Apple Campus 2 (Oct. 09,
2013 10:41 AM PDT) (e- 13 -10 -09 -005 PDT)
10/09/2013
Email from gen Caro to City Council re: Support of Apple Campus 2
(Oct. 09, 2013 10:43 AM PDT) (Letter ID e- 13 -10 -09 -004)
10/09/2013
Email from Svetlana Kokoshvili to City Council re: Apple Campus
(Oct. 09, 2013 11:35 AM PDT) (Letter ID e- 13 -10 -09 -003)
10/09/2013
Email from Alice Lin to City Council re: Support Apple Campus 2
(Oct. 09, 2013 12:57 PM PDT) (Letter ID e- 13 -10 -09 -002)
10/09/2013
Email from Geoff Flavell to City Council re: Apple Campus 2 (Oct. 09,
2013 1:11 PM PDT) (Letter ID e- 13 -10 -09 -001)
10/09/2013
Email from Becky Amans to City Council re: Apple Campus 2 (Oct.
08, 2013 7:23 PM PDT) (Letter ID e- 13 -10 -09 -009)
10/09/2013
Email from Sandra and Don to City Council re: Looking forward to
Apple campus 2 (Oct. 08, 2013 4:58 PM PDT) (Letter ID e- 13- 10 -09-
010)
10/09/2013
Comment letter (Letter ID 500180)
10/10/2013
Email from Vikram Kowshik to City Council re: Apple Campus 2 (Oct.
10, 2013 3:07 PM PDT) (Letter ID _e- 13 -10 -10 -010)
10/10/2013
Email from Herbert McKaye to City Council re: Oct. 15 Public
Meeting (Oct. 10, 2013 3:27 PM PDT) (e- 13 -10 -10 -009 PDT)
10/10/2013
Email from Suzanne Dabadghav to City Council re: Apple Campus 2
(Oct. 10, 2013 1:27 PM PDT) (Letter ID e- 13 -10 -10 -008)
1 -208
sf- 3345921 Q
ATTACHMENT I
INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2
PROJECT
1 -209
sf- 3345921 Q
DATE
DOCUMENT
10/10/2013
Email from James Wang to City Council re: I support Apple's
Campu2 Construction (Oct. 10, 2013 11:25 AM PDT) (Letter ID e -13-
10-10 -007 PDT)
10/10/2013
Email from Gangadhar Gadepalli to Apple Campus 2; City Council re:
Apple Campus 2 (Oct. 10, 2013 10:35 AM PDT) (Letter ID e- 13 -10-
10 -006)
10/10/2013
Email from Gangadhar Gadepalli to Apple Campus 2; City Council re:
Oct. 10, 2013 10:35 AM PDT) (Letter ID e- 13 -10 -10 -005)
10/10/2013
Email from Julie Rose to City Council re: Support Apple 2 Campus
(Oct. 09, 2013 4:29 PM PDT) (Letter ID s- 13 -10 -10 -001)
10/10/2013
Email from AnneNgkaol.com to foulkeskEple.com to City Campus
re: Fwd: Apple Campus 2 (Oct. 10, 2013 09:08 AM PDT) (Letter ID e-
13-10-10 -004)
10/10/2013
Email from Biren Shah to City Council re: email to support Apple
Campus 2 (Oct. 1, 2013 11:17 AM PDT)
10/10/2013
Email from Ruthcmo to City Council re: Apple Campus 2 (Oct. 10,
2013 7:51 AM PDT)
10/10/2013
Email from William Mo to City Council re: Apple campus 2 (Oct. 09,
2013 4:34 PM PDT) (Letter ID e- 13 -10 -10 -001)
10/10/2013
Comment letter (Letter ID 50018 1)
10/10/2013
Email from Vikram Kowshik to City Council re: Apple Campus 2 (Oct.
10, 2013 3:07 PM PDT)
10/10/2013
Email from Andrew Chafer to Chad Mosley, Piu Ghosh re: AC2 Park
Zoning (Oct. 10, 2013 2:27:40 PM PDT)
• Exhibit Z -2, Zoning Plat Map Pruneridge Ave. at
Ridgeview Court, Cupertino, CA (213103LEGAL-PLAT-
PR-Rv- Court- EX.pdf)
• Exhibit Z -2, Zoning Plat Map Pruneridge Ave at Ridgeview
Court, Cupertino, CA (213103LEGAL- PLAT- PR -Rv-
Court.pdf)
1 -209
sf- 3345921 Q
ATTACHMENT I
INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2
PROJECT
1 -210
sf- 3345921 Q
DATE
DOCUMENT
10/10/2013
Email from Michael Bench to Piu Ghosh re: Apple Campus 2 Short
Report (Oct. 10, 2013 5:03:57 PM PDT)
• Michael Bench, Under Piping of Transplant Trees Apple
Campus 2 Cupertino, California (Oct. 2, 2013) (Apple C 2
Transplants, 10- 13.doc)
10/10/2013
Email from Ryan Arnaya to Chad Mosley re: Pruneridge Ave Vacation
(Oct. 10, 2013 3:55:07 PM PDT)
• Exhibit A, Legal Description For: Street Vacation (Oct. 10,
2013) (A131010 - Pruneridge Vacation - Signed.pdf)
10/10/2013
Email from Chad Mosley to Andrew Chafer, Piu Ghosh RE: AC2 Park
Zoning (Oct. 10, 2013 3:09:58 PM PDT)
10/10/2013
Email from Chad Mosley to Ryan Amaya RE: Pruneridge Ave
Vacation (Oct. 10, 2013 4:04:06 PM PDT)
10/11/2013
Email from Rick Kitson to Peter Coglianese re: Apple Campus 2
Comments Update (Oct. 11, 2013 1:14:10 PM PDT)
10/11/2013
Email from Piu Ghosh to Aart Shrivastava re: Dates per your request
(Oct. 11, 2013 9:19:00 AM PDT)
10/11/2013
Email from Aarti Shrivastava to David Brandt re: FW: Dates per your
request (Oct. 11, 2013 9:31:54 AM PDT)
10/11/2013
Email from Piu Ghosh to Julia Kinst RE: Apple EIR -- scope/budget
augment (Oct. 11, 2013 9:11:00 AM PDT)
10/11/2013
Email from Albert Salvador to Gilbert Wong re: Questions from
Gilbert (Oct. 11, 2013 8:55:45 AM PDT)
10/11/2013
Comment letter from Jeffrey Wurtz (Letter ID 500182)
10/11/2013
Comment letter from Vanaja Jagini (Letter ID 500183)
10/11/2013
Email from Rick Kitson to Peter Coglianese re: Apple Campus 2
Comments Update (Oct. 11, 2013 1:14:10 PM PDT)
10/11/2013
Email from Adam Weinstein to: Aarti Shrivastava; Gary Baum; Timm
1 -210
sf- 3345921 Q
ATTACHMENT I
INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2
PROJECT
1 -211
sf- 3345921 Q
DATE
DOCUMENT
Borden; David Stillman; Chad Mosley; Piu Ghosh;
£church @fehrandpeers.com; J.Bierstedt @fehrandpeers.com;
spinsky @earthlink.net; Garberksmwlaw.com; Judith Malamut;
JRamizac�r�,bwslaw.com re: Apple EIR -- Internal Mtg at 11:00a today
(Oct. 11, 2013 11:06:42 AM PDT)
10/13/2013
Comment letter from Eric Kothe (Letter ID 500184)
10/13/2013
Comment letter from Elizabeth Eppel (Letter ID 500185)
10/13/2013
Comment letter from Gladys Koke (Letter ID 500186)
10/13/2013
Email from Gilbert Wong to Gilbert Wong, David Brandt, Carol
Korade re: FYI (Oct. 13, 2013 10:38:29 PM)
• Troy, Wolverton, Apple's spaceship is landing in the wrong
place, San Jose Mercury News
htlp://www.mercganews.com/troy-
wolverton/ci 243 02684 /wolverton- apples- spaceship -is-
landing wrong - place#, (last visited Oct. 19, 2013
10/13/2013
Email from Gilbert Wong to Liao Ben re: Chinese students visit Apple
(Oct. 13, 2013 11:47:25 AM PDT)
10/14/2013
Email from Meenu to City Council re: Apple campus (Oct. 14, 2013
4:59 PM PDT) (Letter ID e- 13 -10 -14 -108)
10/14/2013
Email from james leahy to City Council re: Apple Campus 2 (Oct. 14,
2013 4:53 PM PDT) (Letter ID e- 13 -10 -14 -107)
10/14/2013
Email from Nancy Neibel to City Council re: We support Apple 2
Campus (Oct. 14, 2013 4:48 PM PDT) (Letter ID e- 13 -10 -14 -106)
10/14/2013
Email from Kathleen Elliott to City Council re: Apple Campus 2 (Oct.
14, 2013 4:33 PM PDT) (Letter ID e- 13 -10 -14 -105)
10/14/2013
Email from Pat Dentinger to City Council re: Please Approve
Construction of Apple Computer's "Spaceship" (Oct. 14, 2013 3:16
PM PDT) (Letter ID e-13-10-14-104)
10/14/2013
Email from Bvitro 1 204gaol.com to City Council re: The Spaceship
(Oct. 04, 2013 4:25 PM PDT) (Letter ID e- 13 -10 -14 -103)
1 -211
sf- 3345921 Q
ATTACHMENT I
INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2
PROJECT
1 -212
sf- 3345921 Q
DATE
DOCUMENT
10/14/2013
Email from Peter Hirsch to City Council re: Apple campus 2 (Oct. 14,
2013 4:15 PM PDT) (Letter ID e- 13 -10 -14 -102)
10/14/2013
Email from Ping Guo to City Council re: Supporting Apple Campus 2
(Oct. 14, 2013 3:59 PM PDT) (Letter ID e- 13 -10 -14 -101)
10/14/2013
Email from RBalack(,comcast.net to City Council re: Apple Campus 2
(Oct. 14, 2013 3:54 PM PDT) (Letter ID e- 13 -10 -14 -100)
10/14/2013
Email from Raj Patel to City Council re: I support Apple Campus 2
(Oct. 14, 2013 3:43 PM PDT) (Letter ID e- 13 -10 -14 -099)
10/14/2013
Email from Mandeep Chadha to City Council re: Support for Apple
Campus 2 (Oct. 14, 2013 3:19 PM PDT) (Letter ID e- 13 -10 -14 -098)
10/14/2013
Email from Qiwen Zhao to City Council re: Support Apple Campus 2
project (Oct. 14, 2013 3:26 PM PDT) (Letter ID e- 13 -10 -14 -096)
10/14/2013
Email from Peter Duggan to City Council re: Support for Apple's New
Campus (Oct. 14, 2013 3:36 PM PDT) (Letter ID _e- 13 -10 -14 -097)
10/14/2013
Email from Naren Suria to City Council re: Yes to campus 2 (Oct. 14,
2013 PM PDT) (Letter ID e- 13 -10 -14 -095)
10/14/2013
Email from Debanjan Chakraborty to City Council re: Feedback/
Comment on planned new Apple Campus (Oct. 14, 2013 2:55 PM
PDT) (Letter ID e- 13 -10 -14 -094)
10/14/2013
Email from Martin Janousek to City Council re: New Apple Campus
(Oct. 14, 2013 2:52 PM PDT)
10/14/2013
Email from Thorisa Yap to City Council (Oct. 14, 2013 2:51 PM PDT)
(Letter ID e- 13 -10 -14 -092)
10/14/2013
Email from kitekorimp.com to City Council re: comments on Apple
Campus 2 development (Oct. 14, 2013 2:50 PM PDT) (Letter ID e -13-
10-14 -091)
10/14/2013
Email from Michael Gor to City Council re: Apple Campus (Oct. 14,
2013 2:19 PM PDT) (Letter ID e- 13 -10 -14 -090)
10/14/2013
Email from Verma to City Council re: Apple campus 2 (Oct. 14, 2013
1 -212
sf- 3345921 Q
ATTACHMENT I
INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2
PROJECT
1 -213
sf- 3345921 Q
DATE
DOCUMENT
2:39 PM PDT) (Letter ID e- 13 -10 -14 -089)
10/14/2013
Email from Verma to City Council re: Apple Campus 2 (Oct. 14, 2013
2:39 PM PDT) (Letter ID e- 13 -10 -14 -088)
10/14/2013
Email from Sam Ashknaz to City Council re: FW: Support for Apple
Campus 2 (Oct. 14, 2013 2:02 PM PDT) (Letter ID e- 13 -10 -14 -087)
10/14/2013
Email from Linda Wells to City Council re: New Apple Campus (Oct.
14, 2013 12:55 PM PDT) (Letter ID e- 13 -10 -14 -074)
10/14/2013
Email from Steve Busby to City Council re: Apple Campus (Oct. 14,
2013 12:55 PM PDT) (Letter ID e- 13 -10 -14 -073)
10/14/2013
Email from Sunil Nethisinghe to City Council re: Iconic Apple Campus
(Oct. 14, 2013 1:08 PM PDT) (Letter ID e- 13 -10 -14 -072)
10/14/2013
Email from: marylourobson @comcast.net to City Council re: Apple
Campus (Oct. 14, 2013 1:11 PM PDT) (Letter ID e- 13 -10 -14 -071)
10/14/2013
Email from Mark Shih to City Council re: I Support Apple Campus 2
(Oct. 14, 2013 12:03 PM PDT) (Letter ID e- 13 -10 -14 -070)
10/14/2013
Email from Meir Statman to City Council re: I live in Cupertino and
support the Apple campus (Oct. 14, 2013 12:00 PM PDT) (Letter ID e-
13-10-14 -069)
12/14/2013
Email from James Ahern to City Council re: Apple Campus 2 (Oct. 14,
2013 11:38 AM PDT) (Letter ID e- 13 -10 -14 -068)
12/14/2013
Email from Larry Dean to City Council re: Apple Campus (Oct. 14,
2013 11:22 AM PDT) (Letter ID e- 13 -10 -14 -067)
12/14/2013
Email from Kent Harris to City Council re: Apple Campus 2 (Oct. 14,
2013 9:27 AM PDT) (Letter ID e- 13 -10 -14 -066)
12/14/2013
Email from Kelly Crosby to City Council re: Support of Apple Campus
2 (Oct. 14, 2013 7:53 AM PDT)
12/14/2013
Email from Kathy Nolan to City Council re: Apple Campus 2 (Oct. 14,
2013 7:24 AM PDT) (Letter ID e- 13 -10 -14 -064)
10/14/2013
Email from Craig Slayter to City Council re: Cupertino Resident
1 -213
sf- 3345921 Q
ATTACHMENT I
INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2
PROJECT
1 -214
sf- 3345921 Q
DATE
DOCUMENT
Supporting the Apple Campus (Oct. 14, 2013 7:11 AM PDT) (Letter
ID e- 13 -10 -14 -063)
10/14/2013
Email from Jenny Fu to City Council re: Support apple campus 2 (Oct.
14, 2013 12:29 AM PDT)
10/14/2013
Email from Philip Levine to City Council re: New Apple Campus (Oct.
13, 2013 11:25 PM PDT) (Letter ID e- 13 -10 -14 -061)
10/14/2013
Email from Krishan Chellakarai to City Council re: Apple Campus 2
(Oct. 13, 2013 10:07 PM PDT) (Letter ID e- 13 -10 -14 -060)
10/14/2013
Email from Robert Ponce to applecampus2kgpple.com City Council
re: Apple Campus 2 traffic problems in the Wolfe Road areas (Oct. 13,
2013 9:53 PM PDT) (Letter ID e- 13 -10 -14 -059)
10/14/2013
Email from Debjit Sarkar to City Council re: Our Support for Apple
Campus 2 (Oct. 13, 2013 5:48 PM PDT) (Letter ID e- 13 -10 -14 -0)58)
10/14/2013
Email from matthew.c.hallggmail.com to City Council re: Apple
Campus 2 (Oct. 13, 2013 5:02 PM PDT) (Letter ID e- 13 -10 -14 -057)
10/14/2013
Email from matthew.c.hall @gmail.com to City Council re: Apple
Campus 2 (Oct. 13, 2013 5:02 PM PDT) (Letter ID e- 13 -10 -14 -056)
10/14/2013
Email from Marieann Shovlin to City Council re: Apple Campus 2
Support (Oct. 13, 2013 1:33 PM PDT) (Letter ID e- 13 -10 -14 -055)
10/14/2013
Email from nfinarcuskaol.com to City Council re: Apple Campus
(Oct. 13, 2013 11:44 AM) (Letter ID e- 13 -10 -14 -054)
10/14/2013
Email from Lynn Puccinelli to City Council re: Support for Apple
Campus 2 (Oct. 13, 2013 11:16 AM PDT) (Letter ID e- 13 -10 -14 -053)
10/14/2013
Email from fanetti(,comcast.net to City Council re: Apple Campus 2
(Oct. 13, 2013 9:25 AM PDT) (Letter ID e- 13 -10 -14 -052)
10/14/2013
Email from Wade Worsham to City Council re: New Apple Campus
(Oct. 13, 2013 9:18 AM PDT) (Letter ID e- 13 -10 -14 -051)
10/14/2013
Email from Patrick Law to City Council re: To support Apple Campus
2 (Oct. 13, 2013 5:18 AM PDT) (Letter ID e- 13 -10 -14 -050)
1 -214
sf- 3345921 Q
ATTACHMENT I
INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2
PROJECT
1 -215
sf- 3345921 Q
DATE
DOCUMENT
10/14/2013
Email from awissinkkyahoo.com to City Council re: support for
Apple Campus 2 (Oct. 12, 2013 10:32 PM PDT) (Letter ID e- 13 -10-
14 -049)
10/14/2013
Email from Suzanne Chin -Sang to City Council re: Apple Campus 2
(Oct. 12, 2013 10:10 PM PDT) (Letter ID e- 13 -10 -14 -048)
10/14/2013
Email from Alan Tan to City Council re: support for Apple 2 building
(Oct. 12, 2013 9:49 PM PDT) (Letter ID e- 13 -10 -14 -047)
10/14/2013
Email from Paulin Chen to City Council re: Support building Apple
Campus 2 @ Cupertino (Oct. 12, 2013 7:54 PM) (Letter ID e- 13 -10-
14 -046)
10/14/2013
Email from John James to City Council re: Apple Campus (Oct. 12,
2013 7:28 PM PDT) (Letter ID e- 13 -10 -14 -045)
10/14/2013
Email from Brett Ryan to City Council re: Support Apple Campus 2
(Oct. 12, 2013 5:40 PM PDT) (Letter ID e- 13 -10 -14 -044)
10/14/2013
Email from Joanie to City Council re: Apple campus (Oct. 12, 2013
4:51 PM PDT) (Letter ID e- 13 -10 -14 -043)
10/14/2013
Email from Christine to City Council re: Apple2 Campus (Oct. 14,
2013 1:50 PM PDT) (Letter ID e- 13 -10 -14 -086)
10/14/2013
Email from Leon Chen to City Council re: Apple Campus 2 (Oct. 14,
013 12:05 PM PDT) (Letter ID e- 13 -10 -14 -085)
10/14/2013
Email from Jose Payne to City Council re: Apple Campus 2 (Oct. 14,
2013 12:06 PM PDT) (Letter ID e- 13 -10 -14 -084)
10/14/2013
Email from Deepna Nishar to City Council re: Support for Apple
Campus 2 (Oct. 14, 2013 12:13 PM PDT) (Letter ID e- 13 -10 -14 -083)
10/14/2013
Email from Voyle R McFarland to City Council (Oct. 14, 2013 12:20
PM PDT) (Letter ID e- 13 -10 -14 -082)
10/14/2013
Email from Victor Hung to City Council re: Apple camp 2 (Oct. 14,
2013 12:25 PM PDT) (Letter ID e- 13 -10 -14 -081)
10/14/2013
Email from Liling Wang to City Council re; Yes on Apple Campus 2
1 -215
sf- 3345921 Q
ATTACHMENT I
INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2
PROJECT
1 -216
sf- 3345921 Q
DATE
DOCUMENT
(Oct. 14, 2013 PM PDT) (Letter ID e- 13 -10 -14 -080)
10/14/2013
Email from Patrick Gannon to City Council re: Apple 2 Campus (Oct.
14, 2013 12:35 PM PDT) (Letter ID e- 13 -10 -14 -079)
10/14/2013
Email from Majid Babazadeh to City Council re: Apple 2 Support (Oct.
14, 2013 12:36 PM PDT) (Letter ID e- 13 -10 -14 -078)
10/14/2013
Email from Kathy Matulewicz to City Council re: Approval of Apple 2
Campus (Oct. 12, 2013 4:28 PM PDT) (Letter ID e- 13 -10 -14 -042)
10/14/2013
Email from John to City Council re: Support Apple Campus 2 (Oct. 11,
2013 4:12 PM PDT) (Letter ID e- 13 -10 -14 -041)
10/14/2013
Email from Kai Wiedman to City Council re: Apple Campus 2 (Oct.
12, 2013 3:58 PM PDT) (Letter ID e- 13 -10 -14 -040)
10/14/2013
Email from fennhortongsbcglobal.net to City Council (Oct .12, 2013
2:11 PM PDT) (Letter ID e- 13 -10 -14 -039)
10/14/2013
Email from Joan Trampenau to City Council re: Apple Campus 2 (Oct.
12, 2013 1:34 PM PDT) (Letter ID e- 13 -10 -14 -038)
10/14/2013
Email from Su Chen to City Council re: Support For Apple Campus 2
(Oct. 12, 2013 12:26 PM PDT) (Letter ID e- 13 -10 -14 -037)
10/14/2013
Email from John Michalka to City Council re: Apple Campus 2 (Oct.
12, 2013 12:00 PM PDT) (Letter ID e- 13 -10 -14 -036)
10/14/2013
Email from Kim Stocklmier to City Council re: Apple Campus 2 (Oct.
12, 2013 11:25 AM PDT) (Letter ID e- 13 -10 -14 -035)
10/14/2013
Email from John R. Berthold to City Council re: Support for Apple HQ
(Oct. 12, 2013 11:23 AM PDT) (Letter ID e- 13 -10 -14 -034)
10/14/2013
Email from lichong hu to City Council re: Support for Apple Campus 2
in Cupertino (Oct. 12, 2013 10:18 AM PDT) (Letter ID e- 13- 10 -14-
033)
10/14/2013
Email from Jesse Shiah to City Council re: Support Apple Campus 2
project (Oct. 12, 2013 10:09 AM PDT) (Letter ID e- 13 -10 -14 -032)
10/14/2013
Email from Dennis Los to City Council re: Proposed Apple Campus 2
1 -216
sf- 3345921 Q
ATTACHMENT I
INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2
PROJECT
1 -217
sf- 3345921 Q
DATE
DOCUMENT
(Oct. 12, 2013 9:57 AM PDT) (Letter ID e- 13 -10 -14 -031)
10/14/2013
Email from Jennifer to City Council re: Apple Campus (Oct. 11, 2013
11:02 PM PDT) (Letter ID e- 13 -10 -14 -030)
10/14/2013
Email from Ray Pastorino to City Council re: Apple Campus 2 (Oct.
11, 2013 10:50 PM PDT) (Letter ID e- 13 -10 -14 -029)
10/14/2013
Email from Zhang Ying to City Council re: support for apple campus 2
(Oct. 11, 2013 10:17 PM PDT) (Letter ID e- 13 -10 -14 -028)
10/14/2013
Email from Arch Chil to City Council re: support for Apple campus 2
(Oct .11, 2013 8:37 PM PDT) (Letter ID e- 13 -10 -14 -027)
10/14/2013
Email from jhc95014kyahoo.com to City Council re: Apple Campus 2
(Oct. 11, 2013 8:37 PM PDT) (Letter ID e- 13 -10 -14 -026)
10/14/2013
Email from jhc95014gyahoo.com to City Council re: Apple Campus 2
(Oct. 11, 2013 8:37 PM PDT) (Letter ID e- 13 -10 -14 -025)
10/14/2013
ail from jhc95014 @yahoo.com to City Council re: Apple Campus 2
(Oct. 11, 2013 8:37 PM PDT) (Letter ID e- 13 -10 -14 -024)
10/14/2013
Email from Steve Leu to City Council re: Apple campus 2 (Oct. 11,
2013 8:08 PM PDT) (Letter ID e- 13 -10 -14 -023)
10/14/2013
Email from Dsalt9718gaol.com to City Council re: Fwd: Apple
Campus 2 (Oct. 11, 2013 6:56 PM PDT) (Letter ID e- 13 -10 -14 -022)
10/14/2013
Email from Walter Li to City Council re: Support Apple Campus 2
project (Oct. 11, 2013 6:31 PM PDT) (Letter ID e- 13 -10 -14 -021)
10/14/2013
Email from Mike Sosna SOS Productions to Barbara Goldman re:
Apple Campus 2 (Oct. 11, 2013 6:01 PM PDT) (Letter ID e- 13- 10 -14-
020)
10/14/2013
Email from Barbara Goldman to City Council re: Apple Campus 2
(Oct. 11, 2013 5:37 PM PDT) (Letter ID e- 13 -10 -14 -019)
10/14/2013
Email from Jen Hong to City Council re: Support Apple campus 2
(Oct. 11, 2013 5:30 PM PDT) (Letter ID e- 13 -10 -14 -018)
10/14/2013
Email from: Amsmiker @aol.com to City Council re: Apple Campus 2
1 -217
sf- 3345921 Q
ATTACHMENT I
INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2
PROJECT
1 -218
sf- 3345921 Q
DATE
DOCUMENT
(Oct. 11, 2013 4:52 PM PDT)
10/14/2013
Email from Teresa Odom to City Council re: Support for Apple
Campus 2 (Oct. 11, 2013 4:38 PM PDT) (Letter ID e- 13 -10 -14 -016)
10/14/2013
Email from Greg Hurley to City Council re: Apple campus 2 (Oct. 11,
2013 4:33 PM PDT) (Letter ID e- 13 -10 -14 -015)
10/14/2013
Email from John & Helen Trollman to City Council re: Apple Campus
(Oct. 11, 2013 4:18 PM PDT) (Letter ID e- 13 -10 -14 -014)
10/14/2013
Email from Babu Jain to City Council re: support for Apple campus
(Oct. 11, 2013 3:41 PM PDT) (Letter ID e- 13 -10 -14 -013)
10/14/2013
Email from JeffA Ronne to City Council re: apple campus 2 (Oct. 11,
2013 3:22 PM PDT) (Letter ID e- 13 -10 -14 -012)
10/14/2013
Email from arun kumar to City Council re: Oct 15th city council
meeting (Oct. 11, 2013 2:26 PM PDT) (Letter ID e- 13 -10 -14 -011)
10/14/2013
Email from Raymond Lancon to City Council re: Cupertino: Contact
the City (Oct. 11, 2013 2:22 PM PDT) (Letter ID e- 13 -10 -14 -010)
10/14/2013
Email from Jared Porter to City Council re: In Support of Apple's New
Headquarters (Oct. 11, 2013 2:22 PM PDT) (Letter ID e- 13 -10 -14 -009)
10/14/2013
Email from Linda Aronson to City Council re: Apple Campus 2 (Oct.
11, 2013 1:51 PM PDT) (Letter ID e- 13 -10 -14 -008)
10/14/2013
Email from Edith Kwok to City Council re: Support of Apple Campus
2 (Oct. 11, 2013 1:43 PM PDT) (Letter ID e- 13 -10 -14 -007)
10/14/2013
Email from Jamshed Doctor to City Council re: Fwd: Apple Campus 2
in Cupertino (Oct. 11, 2013 12:36 PM PDT)
10/14/2013
Email from jerry.danggyahoo.com to City Council re: I support Apple
new campus with Cupertino (Oct. 11, 2013 12:03 PM PDT) (Letter ID
e- 13 -10 -14 -005)
10/14/2013
Email from jerry.danggyahoo.com to City Council re: I support Apple
new campus with Cupertino (Oct. 11, 2013 12:03 PM PDT) (Letter ID
e- 13 -10 -14 -004)
1 -218
sf- 3345921 Q
ATTACHMENT I
INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2
PROJECT
1 -219
sf- 3345921 Q
DATE
DOCUMENT
10/14/2013
Email from Jewel Chang to City Council re: Apple campus (Oct. 11,
2013 11:56 AM PDT) (Letter ID e- 13 -10 -14 -003)
10/14/2013
Email from Jamshed Doctor to City Council re: Apple Campus 2 in
Cupertino (Oct. 11, 2013 11:36 AM PDT) (Letter ID e- 13 -10 -14 -002)
10/14/2013
Email from Kent Harris to City Council re: Apple Campus 2 (Oct. 14,
2013 9:27 AM PDT) (Letter ID e- 13 -10 -14 -001)
10/14/2013
Email from Brooke Rahn to City Council re: Apple 2 Campus (Oct. 12,
2013 7:11 AM PDT) (Letter ID e- 13 -10 -14 -000)
10/14/2013
Email from Wesley Embry to City Council re: Please approve Ample
Campus 2 (Oct. 14, 2013 12:52 PM PDT) (Letter ID e- 13 -10 -14 -077)
10/14/2013
Email from James Duran to City Council re: Apple Campus 2 (Oct. 14,
2013 12:52 PM PDT) (Letter ID e- 13 -10 -14 -076)
10/14/2013
Email from kucera.jirikgmail.com to City Council re: Apple campus 2
(Oct. 14, 2013 12:53 PM PDT) (Letter ID e- 13 -10 -14 -075)
10/14/2013
Comment letter from Xiaofei Wang (Letter ID 500187)
10/14/2013
Comment letter from Sally Everett - Beaupre (Letter ID 500188)
10/14/2013
Email from Robert Kim to: David Brandt; Andrea Sanders; Donna
Henriques; Ryan Roman; Kirsten Squarcia; Marianna Khienkina;
Karen B. Guerin; Brittany Carey; Julia Kinst; Grace Schmidt; Liz
Nunez; Chylene Osborne; Tiffanie Cardenas; Nidhi Mathur; Robert
Kim; Mary Redwine; Lisa Atwood; Rei Delgado; Peter Coglianese;
Rick Kitson; Piu Ghosh re: Apple Campus 2 Commenting Process
activity report, Thursday, June 6 to Sunday, October 13, 2013 (Oct. 14,
2013 2:21:37 PM PDT)
10/14/2013
Email from Ian Barnes to David Stillman re: Apple Trip Distribution
Graphic Calculation (Oct. 14, 2013 11:28:37 AM PDT)
10/14/2013
Email from Marlana Telfer to Grace Schmdit re: AT &T Response to
"Vacation of a Portion of Pruneridge Avenue" (Oct. 14, 2013 5:18:57
PM PDT)
• Letter from AT &T to City of Cupertino re: Request for
1 -219
sf- 3345921 Q
ATTACHMENT I
INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2
PROJECT
1 -220
sf- 3345921 Q
DATE
DOCUMENT
Street Vacation Approval for a portion of Pruneridge
Avenue, between N Wolfe Road and N Tantau Avenue,
Cupertino, CA. APN: 316 -06- 037,050,051,048,049,045 &
033; APN: 316 -07 -044, 046 & 045 (Oct. 14, 2013)
(AT&T Pruneridge Abandonment Response Letter.pdf)
10/14/2013
Email from Franziska Church to David Stillman re: FW: Apple Trip
Distribution Graphic Calculation (Oct. 14, 2013 1:33:12 PM PDT)
10/14/2013
Email from Rick Kitson to Peter Coglianese re: FW: Bloomberg
Television Request (Oct. 14, 2013 5:23:00 PM PDT)
10/14/2013
Email Jane Bierstedt to Piu Ghosh re: FW: PPT (Oct. 14, 2013 2:33:33
PM PDT)
• Graphic (image002.png)
• Graphic (Graphic for MitigationMeasuresWHITE2.png)
10/14/2013
Email from Beth Ebben to Planning Dept. re: FW: Recommendations
for Main Street Project (Oct. 14, 2013 8:16:22 AM PDT)
10/14/2013
Email from Rick Kitson to Orrin Mahoney re: Press Conference? (Oct.
14, 2013 5:51:21 PM PDT)
10/14/2013
Email from Franziska Church to Ian Barnes, David Stillman RE: Apple
Trip Distribution Graphic Calculation (Oct. 14, 2013 11:31:09 AM
PDT)
10/14/2013
Email from Grace Schmidt to Marlena B Telfer re: RE: AT &T
Response to "Vacation of a Portion of Pruneridge Avenue" (Oct. 14,
2013 5:28:37 PM)
10/14/2013
Email from Piu Ghosh to Adam Weinstein RE: City Council
presentation tomorrow (Oct. 14, 2013 4:18:00 PM PDT)
10/14/2013
Email from Timm Borden to Chad Mosley RE: Further breakdown of
the $50M (Oct. 14, 2013 4:11:37 PM PDT)
10/14/2013
Email from Timm Borden to David Stillman re: lane summary (Oct.
14, 2013 8:51:47 PM PDT)
1 -220
sf- 3345921 Q
ATTACHMENT I
INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2
PROJECT
1 -221
sf- 3345921 Q
DATE
DOCUMENT
10/15/2013
Email from deastkyahoo.com to City Council re; Apple Campus 2
(Oct. 15, 2013 4:45 PM PDT) (Letter ID e- 13 -10 -15 -128)
10/15/2013
Email from Steve Andrews to City Council re: Apple (Oct. 15, 2013
5:12 PM PDT) (Letter ID e- 13 -10 -15 -127)
10/15/2013
Email from deast7kahoo.com to City Council re: Apple Campus 2
(Oct. 15, 2013 4:56 PM PDT) (Letter ID e- 13 -10 -15 -126)
10/15/2013
Email from Catherine Chen to City Council re: Support for Apple
Campus 2 Project (Oct. 15, 2013 4:15 PM PDT) (Letter ID e- 13- 10 -15-
125)
10/15/2013
Email from Susan Hubbart to City Council re: I support Apple Campus
2 (Oct. 15, 2013 4:32 PM PDT) (Letter ID e- 13 -10 -15 -124)
10/15/2013
Email from Kamvy Tseung to City Council re: Apple campus 2 (Oct.
15, 2013 4:00 PM PDT) (Letter ID e- 13 -10 -15 -123)
10/15/2013
Email from Roshan Gidwani to City Council re: Support for Apple
Campus 2 (Oct. 15, 2013 3:44 PM PDT) (Letter ID e- 13 -10 -15 -123)
10/15/2013
Email from SK Min to citycouncilkcupertino.org re: supporting Apple
Campus 2 (Oct. 15, 2013 3:21 PM PDT) (Letter ID e- 13 -10 -15 -121)
10/15/2013
Email from Maria Streeby to City Council re: Apple Campus 2 (Oct.
15, 2013 3:11 PM PDT) (Letter ID e- 13 -10 -15 -120)
10/15/2013
Email from Shing - Shwang Yao to City Council re: Apple (Oct. 15,
2013 3:01 PM PDT) (Letter ID e- 13 -10 -15 -119)
10/15/2013
Email from Richard Nebel to City Council re; apple campus 2 (Oct. 15,
2013 2:58 PM PDT) (Letter ID e- 13 -10 -15 -118)
10/15/2013
Email from Violet Dawson to City Council re: Apple's new campus
(Oct. 15, 2013 2:54 PM PDT) (Letter ID e- 13 -10 -15 -118)
10/15/2013
Email from Valerie Cregan to City Council re: Apple Campus (Oct. 15,
2013 2:10 PM PDT) (Letter ID e- 13 -10 -15 -116)
10/15/2013
Email from Adolfas Melinauskas to City Council re: Apple 2 Campus
(Oct. 15, 2013 2:32 PM PDT) (Letter ID e- 13 -10 -15 -115)
1 -221
sf- 3345921 Q
ATTACHMENT I
INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2
PROJECT
1 -222
sf- 3345921 Q
DATE
DOCUMENT
10/15/2013
Email from Dana Anderson to City Council re: Vote No on new Apple
Campus (Oct. 15, 2013 2:15 PM PDT) (Letter ID e- 13 -10 -15 -114)
10/15/2013
Email from Eva Fettchenhauer to City Council re: Apple Campus 2
(Oct. 15, 2013 2:07 PM PDT) (Letter ID e- 13 -10 -15 -113)
10/15/2013
Email from Marie Lin to City Council re: Apple Campus 2 (Oct. 15,
2013 12:07 PM PDT) (Letter ID e- 13 -10 -15 -112)
10/15/2013
Email from Penny to City Council re: Apple Campus (Oct. 15, 2013
12:11 PM PDT) (Letter ID e- 13 -10 -15 -111)
10/15/2013
Email from Samir Gehani to City Council re: Formal support of Apple
Campus 2 (Oct. 15, 2012 12:12 PM PDT) (Letter ID e- 13 -10 -15 -110)
10/15/2013
Email from Steve Elich to City Council re: Apple Campus (Oct. 15,
2013 12:31 PM PDT) (Letter ID e- 13 -10 -15 -109)
10/15/2013
Email from Annop Tiwari, HCL America to City Council re: Apple
Campus 2 plan (Oct. 15, 2013 12:34 PM PDT) (Letter ID e- 13- 10 -15-
108)
10/15/2013
Email from Jim Walker to City Council re: Apple Campus 2 — Support
(Oct. 15, 2013 12:36 PM PDT) (Letter ID e- 13 -10 -15 -107)
10/15/2013
Email from Sam Ashknaz to City Council re: Apple Campus 2 (Oct.
15, 2013 1:02 PM PDT) (Letter ID e- 13 -10 -15 -106)
10/15/2013
Email from Paolo Sacchetto to Barry Chang re: Please approve Apple
Campus 2 (Oct. 15, 2013 12:41 PM PDT) (Letter ID e- 13 -10 -15 -107)
10/15/2013
Email from picksnomosskaol.com to City Council re: Apple (Oct. 15,
2013 1:36 PM PDT) (Letter ID e- 13 -10 -15 -104)
10/15/2013
Email from Sheldon Orton to City Council re: Apple Campus 2 support
(Oct. 15, 2013 11:50 AM PDT) (Letter ID e- 13 -10 -15 -103)
10/15/2013
Email from Udayak101cr�gmail.com to City Council re: I support
Apple Campus 2 (Oct. 15, 2013 11:34 AM PDT) (Letter ID e- 13 -10-
15 -102)
10/15/2013
Email from Syed W. Hussain to City Council re: In Support of Apple
Computer Campus 2 (Oct. 15, 2013 10:51 AM PDT) (Letter ID e -13-
1 -222
sf- 3345921 Q
ATTACHMENT I
INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2
PROJECT
1 -223
sf- 3345921 Q
DATE
DOCUMENT
10 -15 -101)
10/15/2013
Email from Teresa Do to City Council re: Apple Campus 2 (Oct. 15,
2013 11:00 AM PDT) (Letter ID e- 13 -10 -15 -100)
10/15/2013
Email from Victor Malik to City Council re: Support for Apple
Campus 2 (Oct. 15, 2013 11:05 AM PDT) (Letter ID e- 13 -10 -15 -099)
10/15/2013
Email from Yvonne to City Council re: Support apple campus (Oct. 15,
2013 11:08 AM PDT) (Letter ID e- 13 -10 -15 -098)
10/15/2013
Email from Vikas Sud (3P) to City Council re: Support for Apple
Complex in Cupertino (Oct. 15, 2013 11:11 AM PDT) (Letter ID e -13-
10-15 -096)
10/15/2013
Email from Sridar Pootheri to City Council re: Supporting Apple
Campus 2 (Oct. 15, 2013 11:21 AM PDT) (Letter ID e- 13 -10 -15 -096)
10/15/2013
Email from Gopher to City Council re: Apple Campus 2 (Oct. 15, 2013
11:23 AM PDT) (Letter ID e- 13 -10 -15 -095)
10/15/2013
Email from Sam Nazhand to City Council re: Apple Campus 2 (Oct.
15, 2013 10:42 AM PDT) (Letter ID e- 13 -10 -15 -094)
10/15/2013
Email from Reilly Vince to City Council re: support (Oct. 15, 2013
10:37 AM PDT) (Letter ID e- 13 -10 -15 -093)
10/15/2013
Email from Tom Sherman to City Council re: I support the Apple
Campus (Oct. 15, 2013 10:37 AM PDT) (Letter ID e- 13 -10 -15 -092)
10/15/2013
Email from Tom DeFranco to City Council re: Apple's New Campus
(Oct. 15, 2013 10:28 AM PDT) (Letter ID e- 13 -10 -15 -091)
10/15/2013
Email from Jamie Rose to City Council re: Support for Apple Campus
2 (Oct. 15, 2013 9:38 AM PDT) (Letter ID e- 13 -10 -15 -090)
10/15/2013
Email from Liling Wang to Barry Chang re: Yes on Apple Campus 2
(Oct. 15, 2013 9:58 AM PDT) (Letter ID e- 13 -10 -15 -089)
10/15/2013
Email from Charlie Innis to City Council re: Approval of Apple
Campus 2 (Oct. 15, 2013 10:08 AM PDT) (Letter ID e- 13 -10 -15 -088)
10/15/2013
Email from Gary Ettinger to City Council re: Support for Apple
1 -223
sf- 3345921 Q
ATTACHMENT I
INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2
PROJECT
1 -224
sf- 3345921 Q
DATE
DOCUMENT
Campus 2 (Oct. 15, 2013 10:11 AM PDT) (Letter ID e- 13 -10 -15 -087)
10/15/2013
Email from Rattenhalli Sudesh to City Council re: Apple Campus 2
support (Oct. 15, 2013 10:12 AM PDT) (Letter ID e- 13 -10 -15 -086)
10/15/2013
Email from Yogi Chugh to City Council re: Apple Campus 2 (Oct. 15,
2013 10:16 AM PDT) (Letter ID e- 13 -10 -15 -085)
10/15/2013
Email from taysigcomcast.net to City Council re: City Council re:
Apple 2 (Oct. 15, 2013 10:19 AM PDT) (Letter ID e- 13 -10 -15 -084)
10/15/2013
Email from Steve Baron to City Council re: Apple Campus 2 (Oct. 15,
2013 10:20 AM PDT) (Letter ID e- 13 -10 -15 -083)
10/15/2013
Email from Marlana B Telfer to Grace Schmidt re: AT &T Response to
"Vacation of a Portion of Pruneridge Avenue" (Oct. 14, 2013 5:19 PM
PDT) (Letter ID e- 13- 10- 15 -082a)
10/15/2013
Email from Marcia Stein, PHR to Barry Chang re: I support the Apple
Campus 2 (Oct. 15, 2013 9:10 AM PDT) (Letter ID e- 13 -10 -15 -081)
10/15/2013
Email from James Duran to Barry Chang re: Apple Campus 2 (Oct. 14,
2013 11:59 PM PDT) (Letter ID e- 13 -10 -15 -080)
10/15/2013
Email from Barry Chang to Voyle R McFarland re: (Oct. 14, 2013
11:27 PM PDT) (Letter ID e- 13 -10 -15 -079)
10/15/2013
Email from Barry Chang to Liling Wang re: Yes on Apple Campus 2
(Oct. 14, 2013 11:25 PM PDT) (Letter ID e- 13 -10 -15 -078)
10/15/2013
Email from Barry Chang to Patrick Gannon re: Apple 2 Campus (Oct.
14, 2013 11:25 PM PDT) (Letter ID e- 13 -10 -15 -077)
10/15/2013
Email from Frank F.C. Lee to City Council re: Apple Campus 2 (Oct.
14, 2013 11:24 PM PDT) (Letter ID e- 13 -10 -15 -076)
10/15/2013
Email from Barry Chang to Majid Babazadeh re: Apple 2 Support (Oct.
14, 2013 11:23 PM PDT) (Letter ID e- 13 -10 -15 -075)
10/15/2013
Email from Richard Lowenthal to Barry Chang re: Comments in favor
of Apple Campus 2 (Oct. 14, 2013 11:23 PM PDT) (Letter ID e- 13 -10-
15 -074)
1 -224
sf- 3345921 Q
ATTACHMENT I
INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2
PROJECT
1 -225
sf- 3345921 Q
DATE
DOCUMENT
10/15/2013
Email from Barry Chang to wesembryk mail.com re: Please Approve
Apple Campus 2 (Oct. 14, 2013 11:19 PM PDT) (Letter ID e- 13 -10-
15 -073)
10/15/2013
Email from Barry Chang to James Duran re: Apple Campus 2 (Oct. 14,
2013 11:18 PM PDT) (Letter ID e- 13 -10 -15 -072)
10/15/2013
Email from Barry Chang to kucera.jiriggmail.com re: Apple Campus
2 (Oct. 14, 2013 11:18 PM PDT) (Letter ID e- 13 -10 -15 -071)
10/15/2013
Email from Barry Chang to Linda Wells re: New Apple Campus (Oct.
14, 2013 11:17 PM PDT) (Letter ID e- 13 -10 -15 -070)
10/15/2013
Email from Patricia Fairchild to Barry Chang re: We Support The
Apple Campus 2 (Oct. 14, 2013 11:11 PM PDT) (Letter ID e- 13 -10-
15 -069)
10/15/2013
Email from Barry Chang to Steve Busby re: Apple Campus (Oct. 14,
2013 11:11 PM PDT) (Letter ID e- 13 -10 -15 -068)
10/15/2013
Email from Barry Chang to RBalackkcomcast.net re: Apple Campus 2
(Oct. 14, 2013 11:07 PM PDT)
10/15/2013
Email from Naren Suria to Barry Chang re: Yes to campus 2 (Oct. 14,
2013 11:04 PM PDT) (Letter ID e- 13 -10 -15 -066)
10/15/2013
Email from Barry Chang to Kathleen Barbara -Keen re: Apple Campus
(Oct. 14, 2013 11:04 PM PDT) (Letter ID e- 13 -10 -15 -065)
10/15/2013
Email from Barry Chang to Nancy Yan re: We Support Apple Campus
2 (Oct. 14, 2013 11:02 PM PDT) (Letter ID e- 13 -10 -15 -064)
10/15/2013
Email from Barry Chang to Larry Stovall re: Apple Campus (Oct. 14,
2013 11:00 PM PDT)
10/15/2013
Email from Barry Chang to Paolo Sacchetto re: Please approve Apple
Campus 2 (Oct. 14, 2013 10:59 PM PDT) (Letter ID e- 13 -10 -15 -062)
10/15/2013
Email from Barry Chang to Phyllis Pei re: Support for Apple Campus 2
(Oct. 14, 2013 10:58 PM PDT) (Letter ID e- 13 -10 -15 -061)
10/15/2013
Email from Richard Lowenthal to City Council re: Comments in favor
of Apple Campus 2 (Oct. 14, 2013 9:53 PM PDT) (Letter ID e- 13 -10-
1 -225
sf- 3345921 Q
ATTACHMENT I
INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2
PROJECT
1 -226
sf- 3345921 Q
DATE
DOCUMENT
15 -042a)
10/15/2013
Email from Larry Stovall to City Council re: Apple Campus (Oct. 14,
2013 10:57 PM PDT) (Letter ID e- 13 -10 -15 -060)
10/15/2013
Email from Barry Chang to Marcia Stein, PHR re: I support the Apple
Campus 2 (Oct. 14, 2013 10:57 PM PDT) (Letter ID e- 13 -10 -15 -059)
10/15/2013
Email from Barry Chang to Raj Patel re: I support Apple Campus 2
(Oct. 14, 2013 10:49 PM PDT) (Letter ID e- 13 -10 -15 -058)
10/15/2013
Email from Raj Patel to Barry Chang re: I Support Apple Campus 2
(Oct. 14, 2013 10:46 PM PDT) (Letter ID e- 13 -10 -15 -057)
10/15/2013
Email from Barry Chang to Richard Lowenthal re: Comments in favor
of Apple Campus 2 (Oct. 14, 2013 10:35 PM PDT) (Letter ID e- 13 -10-
15 -056)
10/15/2013
Email from Barry Chang to John James re: Apple Campus (Oct. 14,
2013 10:32 PM PDT) (Letter ID e- 13 -10 -15 -055)
10/15/2013
Email from Barry Chang to Sunil Nethisinghe re: Iconic Apple Campus
(Oct. 14, 2013 10:30 PM PDT) (Letter ID e- 13 -10 -15 -054)
10/15/2013
Email from Barry Chang to mMlourobsonc�r�,comcast.net re: Apple
Campus (Oct. 14, 2013 10:27 PM PDT) (Letter ID e- 13 -10 -15 -053)
10/15/2013
Email from Barry Chang to Kathleen Mossotti re: Apple Complex
(Oct. 14, 2013 10:24 PM PDT) (Letter ID e- 13 -10 -15 -052)
10/15/2013
Email from Marcia Stein, PHR to City Council re: I support the Apple
Campus 2 (Oct. 14, 2013 10:18 PM PDT) (Letter ID e- 13 -10 -15 -051)
10/15/2013
Email from Barry Chang to Peter Hirsch re: Apple Campus 2 (Oct. 14,
2013 9:38 PM PDT) (Letter ID e- 13 -10 -15 -030)
10/15/2013
Email from Barry Chang to Ping Guo re: Supporting Apple Campus 2
(Oct. 14, 2013 9:39 PM PDT) (Letter ID e- 13 -10 -15 -031)
10/15/2013
Email from Barry Chang to Rbalackgcomcast.net re: Apple Campus 2
(Oct. 14, 2013 9:40 PM PDT) (Letter ID e- 13 -10 -15 -032)
10/15/2013
Email from Barry Chang to Raj Patel re: I support Apple Campus 2
1 -226
sf- 3345921 Q
ATTACHMENT I
INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2
PROJECT
1 -227
sf- 3345921 Q
DATE
DOCUMENT
(Oct. 14, 2013 9:41 PM PDT) (Letter ID e- 13 -10 -15 -033)
10/15/2013
Email from Barry Chang to Peter Duggan re: Support for Apple's New
Campus (Oct. 14, 2013 9:41 PM PDT) (Letter ID e- 13 -10 -15 -034)
10/15/2013
Email from Barry Chang to Maribel Andonian re: Apple Campus (Oct.
14, 2013 9:47 PM PDT) (Letter ID e- 13 -10 -15 -035)
10/15/2013
Email from Barry Chang to Naren Suria re: Yes to campus 2 (Oct. 14,
2013 9:47 PM PDT) (Letter ID e- 13 -10 -15 -036)
10/15/2013
Email from Kathleen Mossotti re: Apple Complex (Oct. 14, 2013 9:48
PM PDT) (Letter ID e- 13 -10 -15 -037)
10/15/2013
Email from Barry Chang to Qiwen Zhao re: Support Apple Campus 2
Project (Oct. 14, 2013 9:48 PM PDT) (Letter ID e- 13 -10 -15 -039)
10/15/2013
Email from Barry Chang to Mandeep Chadha re: Support for Apple
Campus 2 (Oct. 14, 2013 9:49 PM PDT) (e- 13 -10 -15 -039)
10/15/2013
Email from Paolo Sacchetto re: Please approve Apple Campus 2 (Oct.
14, 2013 9:51 PM PDT) (Letter ID e- 13 -10 -15 -040)
10/15/2013
Email from Phyllis Pei to City Council re; Support for Apple Campus 2
(Oct. 14, 2013 9:51 PM PDT) (Letter ID e- 13 -10 -15 -041)
10/15/2013
Email from Peter L Duggan to Barry Chang re: Support for Apple's
New Campus (Oct. 14, 2013 9:52 PM PDT) (Letter ID e- 13- 10 -15-
043)
10/15/2013
Email from Barry Chang to Pat Dentinger re: Please Approve
Construction of Apple Computer's "Spaceship" (Oct. 14, 2013 9:54
PM PDT) (Letter ID e-13-10-15-044)
10/15/2013
Email from Barry Chang to Debanjan Chakraborty re: Feedback /
Comment on planned new Apple Campus (Oct. 14, 9:59 PM PDT)
(Letter ID e- 13 -10 -15 -045)
10/15/2013
Email from Barry Chang to Martin Janousek re: New Apple Campus
(Oct. 14, 2013 10:00 PM PDT) (Letter ID e- 13 -10 -15 -046)
10/15/2013
Email from Barry Chang to kitegorimp.com re: comments on Apple
Campus 2 development (Oct. 14, 2013 10:08 PM PDT) (Letter ID e-
1 -227
sf- 3345921 Q
ATTACHMENT I
INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2
PROJECT
1 -228
sf- 3345921 Q
DATE
DOCUMENT
13 -10 -15 -047)
10/15/2013
Email from Barry Chang to Verma re: Apple campus 2 (Oct. 14, 2013
10:14 PM PDT) (Letter ID e- 13 -10 -15 -048)
10/15/2013
Email from Barry Chang to Michael Gor re: Apple campus (Oct. 14,
2013 10:15 PM PDT) (Letter ID e- 13 -10 -15 -049)
10/15/2013
Email from Barry Chang to Sam Ashknaz re: FW: Support for Apple
Campus 2 (Oct. 14, 2013 10:16 PM PDT) (Letter ID e- 13 -10 -15 -050)
10/15/2013
Email from Barry Chang to Kathleen Elliott re: Apple Campus 2 (Oct.
14, 2013 9:36 PM PDT) (Letter ID e- 13 -10 -15 -029)
10/15/2013
Email from Barry Chang to Meenu re: Apple campus (Oct. 14, 2013
9:34 PM PDT) (Letter ID e- 13 -10 -15 -028)
10/15/2013
Email from Barry Chang to ringo chao; Karen B. Guerin re: support for
Apple Campus 2 (Oct. 14, 2013 9:31 PM PDT) (Letter ID e- 13- 10 -15-
027)
10/15/2013
Email from Barry Chang to Nancy Neibel re: We support Apple 2
Campus (Oct. 14, 2013 9:30 PM PDT) (Letter ID e- 13 -10 -15 -026)
10/15/2013
Email from Barry Chang to Kathleen Barbara -Keen re: Apple Campus
(Oct. 14, 2013 9:27 PM PDT) (Letter ID e- 13 -10 -15 -025)
10/15/2013
Email from Barry Chang to Patricia Fairchild re: We Support the Apple
Campus 2 (Oct. 14, 2013 9:27 PM PDT) (Letter ID e- 13 -10 -15 -024)
10/15/2013
Email from Kathleen Barbera -Keen to City Council re: Apple Campus
(Oct. 14, 2013 9:27 PM PDT) (Letter ID e- 13 -10 -15 -023)
10/15/2013
Email from Barry Chang to Leo Levinson re: I support construction of
Apple Campus 2 in Cupertino (Oct. 14, 2013 9:26 PM PDT) (Letter ID
e- 13 -10 -15 -022)
10/15/2013
Email from Barry Chang to Su Chen re: Support for Apple Campus 2
(Oct. 14, 2013 9:25 PM PDT) (Letter ID e- 13 -10 -15 -021)
10/15/2013
Email from Barry Chang to Lynn.Huang(cr�,k° p.org re: I am in support of
the plans for the new apple campus (Oct. 14, 2013 9:21 PM PDT)
(Letter ID e- 13 -10 -15 -020)
1 -228
sf- 3345921 Q
ATTACHMENT I
INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2
PROJECT
1 -229
sf- 3345921 Q
DATE
DOCUMENT
10/15/2013
Email from Barry Chang to Nancy Yan re: We support Apple Campus
2 (Oct. 14, 2013 9:20 PM PDT) (Letter ID e- 13 -10 -15 -019)
10/15/2013
Email from Leo Levinson to City Council re: I support construction of
Apple Campus 2 in Cupertino (Oct. 14, 2013 9:19 PM PDT) (Letter ID
e- 13 -10 -15 -018)
10/15/2013
Email from Barry Chang to nessgitrenw.com re: Apple Campus (Oct.
14, 2013 9:18 PM PDT) (Letter ID e- 13 -10 -15 -017)
10/15/2013
Email from Barry Chang to Mina Taheri re: Apple campus support
(Oct. 14, 2013 9:18 PM PDT) (Letter ID e- 13 -10 -15 -016)
10/15/2013
Email from Barry Chang to jkhosla re: support Apple Campus (Oct. 14,
2013 9:17 PM PDT) (Letter ID e- 13 -10 -15 -015)
10/15/2013
Email from Barry Chang to james leahy re: Apple Campus 2 (Oct. 14,
2013 9:16 PM PDT) (Letter ID e- 13 -10 -15 -014)
10/15/2013
Email from Barry Chang to ming zhu re: FW: Apple Campus 2 (Oct.
14, 2013 9:15 PM PDT) (Letter ID e- 13 -10 -15 -013)
10/15/2013
Email from Ming Zhu to City Council re: Fw: Apple Campus 2 (Oct.
14, 2013 9:01 PM PDT)
10/15/2013
Email from jkhosla to City Council re: support Apple Campus (Oct. 14,
2013 7:56 PM PDT) (Letter ID e- 13 -10 -15 -011)
10/15/2013
Email from Mina Taheri to City Council re: Apple Campus Support
(Oct. 14, 2013 7:25 PM PDT) (Letter ID e- 13 -10 -15 -010)
10/15/2013
Email from nessgitrenew.com to City Council re: Apple Campus (Oct.
14, 2013 7:07 PM PDT) (Letter ID e- 13 -10 -15 -009)
10/15/2013
Email from Maribel Andonian to City Council re: Apple campus (Oct.
14, 2013 7:03 PM PDT) (Letter ID e- 13 -10 -15 -008)
10/15/2013
Email from ringo chao to City Council re: support for Apple Campus 2
(Oct. 14, 2013 6:33 PM PDT) (Letter ID e- 13 -10 -15 -007)
10/15/2013
Email from Nancy Yan to City Council re: We support Apple campus 2
(Oct. 14, 2013 5:48 PM PDT) (Letter ID e- 13 -10 -15 -006)
1 -229
sf- 3345921 Q
ATTACHMENT I
INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2
PROJECT
1 -230
sf- 3345921 Q
DATE
DOCUMENT
10/15/2013
Email from Lynn.Huangkkkp.org to City Council re: I am in support of
the plans for the new apple campus (Oct. 14, 2013 5:41 PM PDT)
(Letter ID e- 13 -10 -15 -005)
10/15/2013
Email from Patricia Fairchild to City Council re: We Support The
Apple Campus 2 (Oct. 14, 2013 5:10 PM PDT) (Letter ID e- 13- 10 -15-
004)
10/15/2013
Email from Meenu to City Council re: Apple campus (Oct. 14, 2013
4:59 PM PDT) (Letter ID e- 13 -10 -15 -003)
10/15/2013
Email from James Leahy to City Council re: Apple Campus 2 (Oct. 14,
2013 4:53 PM PDT) (Letter ID e- 13 -10 -15 -002)
10/15/2013
Email from Nancy Neibel to City Council re: We support Apple 2
campus (Oct. 14, 2013 4:48 PM PDT) (Letter ID e- 13 -10 -15 -001)
10/15/2013
Comment letter from Robert Neff (Letter ID 500189)
10/15/2013
Comment letter from David Poeschel (Letter ID 500190)
10/15/2013
Comment letter from Jeff Shen (Letter ID 500191)
10/15/2013
Comment letter from David Poeschel (Letter ID 500192)
10/15/2013
Email from Chad Mosley to Piu Ghosh re: DA- Ig (Oct. 15, 2013
8:45:01 AM PDT)
• Exhibit DA -Ig Legal Description For: Street Vacation
(Exhibit DA- Ig - Pruneridge Ave Vacation.pdf)
10/15/2013
Email from Orrin Mahoney to Aarti Shrivastava, David Brandt re: New
traffic plan from the Apple2 campus? (Oct. 15, 2013 11:06:19 AM
PDT)
10/15/2013
Email from Shane Barber to Chad Mosley re: Pruneridge Ave Vacation
(Oct. 15, 2013 8:03:06 AM PDT)
• Exhibit "_" Legal Description For: Street Vacation (Oct. 14,
2012) (A131015 - Pruneridge Vacation - Signed.pdf)
10/15/2013
Email from Ian Cunningham to David Stillman re: Sunnyvale permit
1 -230
sf- 3345921 Q
ATTACHMENT I
INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2
PROJECT
1 -231
sf- 3345921 Q
DATE
DOCUMENT
for utility work (Oct. 15, 2013 10:18:31 AM PDT)
10/15/2013
Email from David Stillman to Timm Borden re: VTA Route 81 (Oct.
15, 2013 9:45:46 AM PDT)
10/15/2013
Street Descriptions for Wolfe Road, Homestead Road, Tantau Avenue,
Vallco Parkway
10/15/2013
Agenda Packet, Cupertino City Council, Regular Adjourned Meeting,
10350 Torre Avenue, Community Hall Council Chamber, Tuesday,
October 15, 2013, 5:00 PM
10/17/2013
Letter from City of Cupertino to Gideon Kracov re: Development of an
office, research and development campus with associated ancillary uses
1 -231
sf- 3345921 Q