Loading...
Certification of Administrative Record of Proceedings Apple Campus 2• OFFICE OF THE CITY CLERK CITY HALL 10300 TORRE AVENUE • CUPERTINO, CA 95014 -3255 TELEPHONE: (408) 777 -3223 • FAX: (408) 777 -3366 Apple Campus 2 Project CERTIFICATION OF ADMINISTRATIVE RECORD OF PROCEEDINGS I, Grace Schmidt, hereby state: 1. I am the City Clerk of the City of Cupertino. 2. Pursuant to Section 21186 subsection (g) of the Public Resources Code, I certify that the documents listed in the Index to Administrative Record for the Apple Campus 2 Project, attached hereto as Attachment 1, constitute the full, true and correct administrative record of proceedings for the following actions as of the date of this certification: a. Resolution No. 13 -082 of the City Council of the City of Cupertino Approving Certification of an Environmental Impact Report for the Apple Campus 2 Project; and Adoption of Findings and a Statement of Overriding Considerations, Mitigation Measures, and a Mitigation Monitoring and Reporting Program. b. Resolution No. 13 -083 of the City Council of the City of Cupertino Approving a General Plan Amendment to Allow a Change in the Land Use Designation of a 1.1 Acre Area from Parks and Open Space to Industrial/Residential to Be Reflected in the Land Use Map and Various Figures and Tables, the Elimination of a Segment of Pruneridge Avenue from Various References as a Minor Collector and Bike Lane to Reflect the Closure and Vacation of this Segment of the Street, the Potential Relocation of Glendenning Barn from the Project Site and a Change in the Primary Building Bulk Setback for N. Tantau Avenue from 1.5 to 1 Slope Line from the Curb Line to a I to 1 Slope Line from the Curb Line, Changes Associated with the Development of the Apple Campus and Potential Development Agreement in Policy 2 -35: Vallco Park North for a Project Located at the Area Bounded by East Homestead Road, North Tantau Avenue, I -280, North Wolfe Road Including Properties Located on the East Side of North Tantau Avenue. C. Resolution No. 13 -084 of the City Council of the City of Cupertino Approving a Development Permit to Allow the Demolition of Approximately 2.66 Million Square Feet of Existing Office, Research and Development Buildings and the Construction of 3.42 Million Square Feet of Office, Research and Development Buildings; 120,000 sq.ft. (1,000 Seat) Corporate Auditorium, 100,000 sq.ft. Corporate Fitness Center, and 25,000 sq.ft Valet Parking Reception Uses; 92,000 Square Feet of Utility Plants; and Associated Parking Facilities and Ancillary Buildings (Such as Security Reception Areas and Landscape Maintenance Buildings); Use Permit to Allow a Corporate Auditorium and Fitness Center at a New Office, Research and Development Campus; Architectural and Site Approval to Allow a New 2.82 Million Square Feet Office, Research and Development Building with 2,385 Basement Parking Spaces and a Cafeteria, a 5,870 Parking Space Structured Parking Facility with Attached Central Plant, a 1,000 Seat Corporate Auditorium, a Fitness Center, and Associated Site Improvements Including Access Tunnels, a Surface Parking Lot, Outdoor Dining and Recreational Facilities and Landscaping; Tree Removal Permit to Allow the Removal of Approximately 3,710 Trees, of which, Approximately 90 Trees Are Proposed to Be Transplanted, and Replacement with at Least 6,2000 Trees to Allow the Construction of an Office, Research and Development Campus for a Project Located at the Area Bounded by East Homestead Road, North Tantau Avenue, 1 -280, North Wolfe Road Including Properties Located on the East Side of North Tantau Avenue. d. Resolution No. 13 -085 of the City Council of the City of Cupertino Approving the Subdivision of Approximately 176.2 Acres from 17 Lots into Five Lots, Located in the North Vallco Area, APNS 316 -06 -033, 316- 06 -038, 316 -06 -039, 316 -06 -045, 316- 06 -046, 316 -06 -048, 316 -06 -049, 316 -06- 050, 316 -06 -051, 316 -06 -052, 316 -06 -053, 316 -07 -044, 316 -07 -045, 316 -07- 046, 316 -09 -019, 316 -09 -027, 316 -09 -028, 316 -18- 025, 316 -18 -012, 316 -18- 026, 316 -18 -027 and 316 -18 -035. e. Resolution No. 13 -086: A Resolution of the City Council of the City of Cupertino Vacating a Portion of the Pruneridge Avenue Right -of -Way Between North Tantau Avenue and North Wolfe Road and Various Easements Bounded by North Wolfe Road, Homestead Road, North Tantau Avenue, and Highway 280, as Provided in Section 8320 et seq. of the Streets and Highways Code of the State of California. Resolution No, 13 -087; A Resolution of the City Council of the City of Cupertino Authorizing the Execution of a Purchase and Sale Agreement, and Authorizing the Sale of a Portion of Pruneridge Avenue, Subject to and upon the Terms and Conditions set forth in the Purchase and Sale Agreement. g. Extension of Agreement for Consultation Services with Baz Industries, the successor in interest to ACI Holdings, Inc. Dated: October �I 2013 , �� L, , —A-' Grace Schmidt, City Clerk City of Cupertino ATTACHMENT I INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2 PROJECT (A) Notice Of Determination: (B) Resolutions or Ordinances Approving Project: DATE DOCUMENT 10/17/2013 City of Cupertino, Notice of Determination, Development of an office, research and development campus with associated ancillary uses (Oct. 17, 2013) 10/17/2013 County of Santa Clara, CEQA Documentation Declaration (Oct. 17, 2013) • Notice of Determination, Apple Campus 2 Project (Oct. 16, 2013) (B) Resolutions or Ordinances Approving Project: 1 -1 sf- 3345921 Q DATE DOCUMENT 10/02/2013 Resolution No. 13 -6727 Of The Planning Commission Of The City of Cupertino Recommending Certification Of An Environmental Impact Report For The Apple Campus 2 Project; And Recommending Adoption Of Findings And A Statement Of Overridings Considerations, Mitigation Measures, And A Mitigation Monitoring And Reporting Program (Oct. 2, 2013) • Exhibit EA -1. California Environmental Quality Act Findings and Statement of Overriding Considerations For The Apple Campus 2 Project • Exhibit EA -2. Mitigation Monitoring and Reporting Program (MMRP) • Exhibit EA -2a. Tree Replacement Worksheet • Exhibit EA -2b — Transportation Demand Management Program Expansion 10/02/2013 Resolution No. 6728 Of The Planning Commission Of the City of Cupertino Recommending Approval Of A General Plan Amendment To Allow A Change In The Land Use Designation of a 1.1 Acre Area From Parks And Open Space to Industrial / Residential To Be Reflected In The Land Use Map And Various Figures And Tables, The Elimination Of A Segment Of Pruneridge Avenue From Various 1 -1 sf- 3345921 Q ATTACHMENT I INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2 PROJECT 1 -2 sf- 3345921 Q DATE DOCUMENT References As A Collector And Bike Lane To Reflect The Closure And Vacation Of This Segment Of The Street, The Potential Relocation Of Glendenning Barn From The Project Site And A Change In The Primary Building Bulk Setback For N. Tantau Avenue From 1.5 To 1 Slope Line From The Curb Line TO A 1 TO 1 Slope Line From The Curb Line, Changes Associated With The Development Of The Apple Campus And Potential Development Agreement In Policy 2 -35: Vallco Park North For A Project Located At The Area Bounded By East Homestead Road, North Tantau Avenue, I -280, North Wolfe Road Including Properties Located On The East Side Of North Tantau Avenue (Oct. 2, 2013) 10/02/2013 Resolution No. 6729 Of The Planning Commission Of The City Of Cupertino Recommending That The City Council Approve The Rezoning Of An Approximately 1.1 Acre Area From Park and Recreation (PR) To Planned 1.2 Industrial Park (P(MP)) Located AT APN 316 06 050 and 316 06 051 (Oct. 2, 2013) • Exhibit Z. Ordinance No. 13 -An Ordinance Of The Cupertino City Council Approving The Rezoning Of An Approximately 1.1 Acre Area From Park and Recreation (PR) To Planned Industrial Park (P(MP)) Located At APN 316 06 050 and 316 06 051 10/02/2013 Resolution No. 6730 of the Planning Commission of the City of Cupertino Recommending That The City Council Approve A Development Agreement For a 20 Year Term For The Development Of An Office, Research and Development Campus Located At The Area Bounded By East Homestead Road, North Tantau Avenue, I -280, North Wolfe Road Including Properties Located on the East Side of North Tantau Avenue (Oct. 2, 2013) • Exhibit DA. Ordinance No. 13 -2114 Ordinance of the City Council of the City of Cupertino Repealing Ordinance No. 1702 and Approving a New a New Development Agreement By and Between the City of Cupertino and Apple Inc. For The Development of a New Corporate Campus ■ Exhibit DA -1. Development Agreement Between City of Cupertino, a California municipal corporation, and Apple, Inc., a California corporation 1 -2 sf- 3345921 Q ATTACHMENT I INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2 PROJECT 1 -3 sf- 3345921 Q DATE DOCUMENT • Exhibit DA -la. Legal Description of the Property • Exhibit DA- Ib. Project Site Diagram • Exhibit DA -lc. Tax Localization Plan • Exhibit DA- I d. General Plan Office Space Development Allocations • Exhibit DA- Ie. Campus Amenity Space • Exhibit DA -If. Impact Fees • Exhibit DA -lg. Pruneridge Avenue Vacation 10/02/2013 Resolution No.6731 of the Planning Commission of the City of Cupertino Recommending Approval of Development Permit To Allow The Demolition Of Approximately 2.66 Million Square Feet Of Existing Office, Research and Development Buildings And The Construction Of 3.42 Million Square Feet Of Office, Research and Development Buildings; 120,000 SQ.FT. (1,000 Seat) Corporate Auditorium, 100,000 SQ.FT. Corporate Fitness Center, and 25,000 SQ.FT. Valet Parking Reception Uses; 92,000 Square Feet of Utility Plants; And Associated Parking Facilities And Ancillary Buildings (Such As Security Reception Areas And Landscape Maintenance Buildings); Use Permit To Allow A Corporate Auditorium And Fitness Center At A New Office, Research And Development Campus; Architectural and Site Approval To Allow A New 2.82 Million Square Feet Office, Research And Development Building With 2,385 Basement Parking Spaces And A Cafeteria, A 5,870 Parking Space Structured Parking Facility With Attached Central Plant, A 1,000 Seat Corporate Auditorium, A Fitness Center, And Associated Site Improvements Including Access Tunnels, A Surface Parking Lot, Outdoor Dining and Recreational Facilities And Landscaping; Tree Removal Permit To Allow The Removal Of Approximately 4,501 Trees, Of Which, Approximately 90 Trees Are Proposed TO BE Transplanted, And Replacement With At Least 6,200 Trees To Allow The Construction Of An Office, Research and Development Campus For A Project Located At the Area Bounded By East Homestead Road, North Tantau Avenue, I -280, North Wolfe Road Including Properties 1 -3 sf- 3345921 Q ATTACHMENT I INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2 PROJECT 1 -4 sf- 3345921 Q DATE DOCUMENT Located On The East Side Of North Tantau Avenue (Oct. 2, 2013) • Exhibit DP -l. Mitigation Monitoring and Reporting Program (MMRP) • Exhibit EA -2a. Tree Replacement Worksheet • Exhibit EA -2b — Transportation Demand Management Program Expansion • Exhibit DP -2. Conditions of Approval - AB 900 Compliance Apple Campus 2 Project 10/02/2013 Resolution No. 6732 Of The Planning Commission Of The City Of Cupertino Recommending Approval To Subdivide Approximately 176.2 Acres From 17 Lots Into Five Lots, Located In The North Vallco Area, APNS 316 -06 -033, 316 -06 -038, 316 -06 -039, 316 -06 -045, 316 -06 -046, 316 -06 -048, 316 -06 -049, 316 -06 -050, 316 -06 -051, 316- 06 -052, 316 -06 -053, 316 -07 -044, 316 -07 -045, 316 -07 -046, 316 -09- 019, 316 -09 -027, 316 -09 -028, 316 -18 -025, 316 -18 -012, 316 -18 -026, 316 -18 -027 AND 316 -18 -035 (Oct. 2, 2013) • Exhibit TM -1. Mitigation Monitoring and Reporting Program (MMRP) 10/17/2013 Resolution No. 13 -082 of the City Council of the City of Cupertino Approving Certification of an Environmental Impact Report for the Apple Campus 2 Project; and Adoption of Findings and a Statement of Overriding Considerations, Mitigation Measures, and a Mitigation Monitoring and Reporting Program. • Exhibit EA -1. California Environmental Quality Act Findings and Statement of Overriding Considerations for the Apple Campus 2 Project • Exhibit EA -2. Mitigation Monitoring and Reporting Program (MMRP) 10/17/2013 Resolution No. 13 -083 of the City Council of the City of Cupertino Approving a General Plan Amendment to Allow a Change in the Land Use Designation of a 1.1 Acre Area from Parks and Open Space to Industrial /Residential to Be Reflected in the Land Use Map and Various Figures and Tables, the Elimination of a Segment of 1 -4 sf- 3345921 Q ATTACHMENT I INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2 PROJECT 1 -5 sf- 3345921 Q DATE DOCUMENT Pruneridge Avenue from Various References as a Minor Collector and Bike Lane to Reflect the Closure and Vacation of this Segment of the Street, the Potential Relocation of Glendenning Barn from the Project Site and a Change in the Primary Building Bulk Setback for N. Tantau Avenue from 1.5 to 1 Slope Line from the Curb Line to a 1 to 1 Slope Line from the Curb Line, Changes Associated with the Development of the Apple Campus and Potential Development Agreement in Policy 2- 35: Vallco Park North for a Project Located at the Area Bounded by East Homestead Road, North Tantau Avenue, I -280, North Wolfe Road Including Properties Located on the East Side of North Tantau Avenue. 10/17/2013 Resolution No. 13 -084 of the City Council of the City of Cupertino Approving a Development Permit to Allow the Demolition of Approximately 2.66 Million Square Feet of Existing Office, Research and Development Buildings and the Construction of 3.42 Million Square Feet of Office, Research and Development Buildings; 120,000 sq.ft. (1,000 Seat) Corporate Auditorium, 100,000 sq.ft. Corporate Fitness Center, and 25,000 sq.ft Valet Parking Reception Uses; 92,000 Square Feet of Utility Plants; and Associated Parking Facilities and Ancillary Buildings (Such as Security Reception Areas and Landscape Maintenance Buildings); Use Permit to Allow a Corporate Auditorium and Fitness Center at a New Office, Research and Development Campus; Architectural and Site Approval to Allow a New 2.82 Million Square Feet Office, Research and Development Building with 2,385 Basement Parking Spaces and a Cafeteria, a 5,870 Parking Space Structured Parking Facility with Attached Central Plant, a 1,000 Seat Corporate Auditorium, a Fitness Center, and Associated Site Improvements Including Access Tunnels, a Surface Parking Lot, Outdoor Dining and Recreational Facilities and Landscaping; Tree Removal Permit to Allow the Removal of Approximately 3,710 Trees, of which, Approximately 90 Trees Are Proposed to Be Transplanted, and Replacement with at Least 6,2000 Trees to Allow the Construction of an Office, Research and Development Campus for a Project Located at the Area Bounded by East Homestead Road, North Tantau Avenue, I -280, North Wolfe Road Including Properties Located on the East Side of North Tantau Avenue. • Exhibit DP -l. Mitigation Monitoring and Reporting Program (MMRP) • Exhibit DP -2. Conditions Of Approval - AB 900 Compliance 1 -5 sf- 3345921 Q ATTACHMENT I INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2 PROJECT 1 -6 sf- 3345921 Q DATE DOCUMENT Apple Campus 2 Project 10/17/2013 Resolution No. 13 -085 of the City Council of the City of Cupertino Approving the Subdivision of Approximately 176.2 Acres from 17 Lots into Five Lots, Located in the North Vallco Area, APNS 316 -06- 033, 316 -06 -038, 316 -06 -039, 316 -06 -045, 316 -06 -046, 316 -06 -048, 316 -06 -049, 316 -06 -050, 316 -06 -051, 316 -06 -052, 316 -06 -053, 316- 07 -044, 316 -07 -045, 316 -07 -046, 316 -09 -019, 316 -09 -027, 316 -09- 028, 316 -18 -025, 316 -18 -012, 316 -18 -026, 316 -18 -027 and 316 -18- 035. • Exhibit TM -1. Mitigation Monitoring and Reporting Program (MMRP) 10/17/2013 Resolution No. 13 -086: A Resolution of the City Council of the City of Cupertino Vacating a Portion of the Pruneridge Avenue Right -of -Way Between North Tantau Avenue and North Wolfe Road and Various Easements Bounded by North Wolfe Road, Homestead Road, North Tantau Avenue, and Highway 280, as Provided in Section 8320 et seq. of the Streets and Highways Code of the State of California. • Exhibit V -1. Legal Description For Street Vacation (Oct. 15, 2013) • Exhibit V -2. Kier & Wright, Plat to Accompany Legal Description For Street Vacation (Oct. 2013) • Exhibit V -3. Legal Description For Light And Air Easement Vacation • Exhibit V -4. Legal Description For Roadway Easement Vacation • Exhibit V -5. Legal Description For Roadway Easement Vacation • Exhibit V -6. Legal Description For Roadway Easement Vacation • Exhibit V -7. Legal Description For Street Easement Vacation • Exhibit V -8. Legal Description For Street Easement Vacation 1 -6 sf- 3345921 Q ATTACHMENT I INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2 PROJECT 1 -7 sf- 3345921 Q DATE DOCUMENT • Exhibit V -9. Legal Description For Public Utility Easement Vacation • Exhibit V -10. Legal Description For Public Utility Easement Vacation • Exhibit V -11. Legal Description For Public Utility Easement Vacation • Exhibit V -12. Legal Description For Public Utility Easement Vacation • Exhibit V -13. Legal Description For Public Utility Easement Vacation • Exhibit V -14. Legal Description For Public Utility Easement Vacation • Exhibit V -15. Legal Description For Light And Air Easement Vacation 10/17/2013 Resolution No. 13 -087: A Resolution of the City Council of the City of Cupertino Authorizing the Execution of a Purchase and Sale Agreement, and Authorizing the Sale of a Portion of Pruneridge Avenue, Subject to and upon the Terms and Conditions set forth in the Purchase and Sale Agreement. • Exhibit PSA. Purchase And Sale Agreement And Joint Escrow • Exhibit PSA -1. Legal Description for: Street Vacation (Oct. 15, 2013) • Exhibit PSA -l. Kier & Wright, Plat to Accompany Legal Description For Street Vacation (Oct. 2013) • Exhibit PSA -2. Deed. • Exhibit PSA -2a. Legal Description for Street Vacation (Oct. 15, 2013) • Exhibit PSA -2a. Kier & Wright, Plat to Accompany Legal Description for Street Vacation (Oct. 2013) 1 -7 sf- 3345921 Q ATTACHMENT I INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2 PROJECT DATE DOCUMENT 10/17/2013 Extension of Agreement for Consultation Services (C) Cal. Pub. Res. Code §21081 Findings: (D) Final EIR, including DEIR, & all other CEQA Documentation: DATE DOCUMENT 10/17/2013 Resolution No. 13 -082 of the City Council of the City of Cupertino Approving Certification of an Environmental Impact Report for the Apple Campus 2 Project; and Adoption of Findings and a Statement of Overriding Considerations, Mitigation Measures, and a Mitigation Monitoring and Reporting Program. (Not duplicated here) • Exhibit EA -1. California Environmental Quality Act Findings and Statement of Overriding Considerations for the Apple Campus 2 Project. (Not duplicated here) • Exhibit EA -2. Mitigation Monitoring and Reporting Program (MMRP). (Not duplicated here) (D) Final EIR, including DEIR, & all other CEQA Documentation: 1 -8 sf- 3345921 Q DATE DOCUMENT 06/06/2013 Public Review Draft Apple Campus 2 Project Environmental Impact Report, State Clearinghouse No. 2011082055 (June 2013) • Appendix A: Notice of Preparation and Scoping Letters • Appendix B: Transportation Impact Analysis • Appendix C: Noise Data • Appendix D: Greenhouse Gas Emissions Data • Appendix E: Air Quality Data • Appendix F: Cumulative Projects 1 -8 sf- 3345921 Q ATTACHMENT I INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2 PROJECT (F) Staff Reports in Chronological Order: DATE DOCUMENT 10/01/2013 • Appendix G: SB610 Water Supply Assessment • Appendix H: Student Generation/Enrollment Reports • Appendix I: Public Resources Code Chapter 6.5 09/23/2013 Final Apple Campus 2 Project EIR Response to Comments Document, State Clearinghouse No. 2011082055 (Sept. 2013) • Appendix A Comment Letters 10/08/2013 Memorandum from LSA Associates, Inc. to City of Cupertino re: Supplemental Text Revisions, Apple Campus 2 Project Final Environmental Impact Report (EIR) (Oct. 8, 2013) 10/01/2013 • Attachment A: Fehr & Peers Memo, October 4, 2013 • Attachment B: Assembly Bill 900 (Amended) 10/15/2013 Notice of Certification of Environmental Leadership Development Project Pursuant to California Public Resources Code Chapter 6.5 For the Apple Campus 2 Project, State Clearinghouse 9: 2011082055 (SB- 743 Notice) (F) Staff Reports in Chronological Order: 1 -9 sf- 3345921 Q DATE DOCUMENT 10/01/2013 Joint City Council and Planning Commission Study Session Staff Report, Oct. 1, 2013 • A - SS -1 Apple Campus 2 Project EIR Response to Comments Document, September 2013 • B - SS -2 Public Review Draft Apple Campus 2 Project Environmental Impact Report, June 2013 10/01/2013 Exhibit CC /PC 10 -01 -13 91 Fehr and Peers Transportation Impact Analysis, Joint City Council and Planning Commission Study Session regarding the Apple Campus 2 Final Environmental Impact Report, 1 -9 sf- 3345921 Q ATTACHMENT I INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2 PROJECT 1 -10 sf- 3345921 Q DATE DOCUMENT October 1, 2013 10/01/2013 Exhibit CC /PC 10 -01 -13 91 LSA Presentation Apple Campus 2 Final EIR, Joint City Council and Planning Commission Study Session regarding the Apple Campus 2 Final Environmental Impact Report, October 1, 2013 10/01/2013 Exhibit CC /PC 10 -01 -13 91 Written Communications, Joint City Council and Planning Commission Study Session regarding the Apple Campus 2 Final Environmental Impact Report, October 1, 2013 10/01/2013 Exhibit Dan Whisenhunt Apple Presentation, October 1, 2013 10/02/2013 Planning Commission Staff Report, Development of an office, research and development campus with associated ancillary uses (Oct. 2, 2013) • PC -1. Resolution No. 13 -6727 of the Planning Commission of the City of Cupertino Recommending Certification of an Environmental Impact Report for the Apple Campus 2 Project; And Recommending Adoption Of Findings and A Statement of Overriding Considerations, Mitigation Measures, And A Mitigation Monitoring and Reporting Program • Exhibit EA -1. California Environmental Quality Act Findings and Statement Of Overriding Considerations For The Apple Campus 2 Project • Exhibit EA -2. Mitigation Monitoring and Reporting Program (MMRP) • Exhibit EA -2a. Tree Replacement Worksheet • Exhibit EA -2b. Transportation Demand Management Program Expansion • PC -2. Resolution No. 6728 Of The Planning Commission Of the City Of Cupertino Recommending Approval Of A General Plan Amendment To Allow A Change In The Land Use Designation Of A 1.1 Acre Area From Parks And Open Space To Industrial / Residential To Be Reflected In The Land Use Map And Various Figures And Tables, The Elimination Of A Segment Of Pruneridge Avenue From Various References As A Minor Collector And Bike Lane To Reflect The Closure and 1 -10 sf- 3345921 Q ATTACHMENT I INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2 PROJECT 1 -11 sf- 3345921 Q DATE DOCUMENT Vacation Of This Segment Of The Street, The Potential Relocation Of Glendenning Barn From The Project Site And A Change In The Primary Building Bulk Setback For N. Tantau Avenue From 1.5 to I Slope Line From The Curb Line To A 1 To 1 Slope Line From The Curb Line, Changes Associated With The Development Of The Apple Campus And Potential Development Agreement In Policy 2 -35: Vallco Park North For A Project Located At The Area Bounded By East Homestead Road, North Tantau Avenue, I -280, North Wolfe Road Including Properties Located On The East Side Of North Tantau Avenue • PC -3. Resolution No. 6729 Of The Planning Commission Of The City Of Cupertino Recommending That The City Council Approve The Rezoning Of An Approximately 1.1 Acre Area From Park And Recreation (PR) To Planned Industrial Park (P(MP)) Located At APN 316 06 050 AND 316 06 051 o Exhibit Z. Ordinance No. 13- An Ordinance Of The Cupertino City Council Approving The Rezoning Of AN Approximately 1.1 Acre Area From Park And Recreation (PR) To Planned Industrial Park (P(MP)) Located At APN 316 06 050 AND 316 06 051 • Exhibit Z -1. Legal Description For Rezoning • Exhibit Z -2. Sandis, Zoning Plat Map Pruneridge Ave. At Ridgeview Court, Cupertino, CA (Sept. 23, 2013) • PC -4. Resolution No. 6732 Of The Planning Commission Of the City of Cupertino Recommending Approval To Subdivide Approximately 176.2 Acres From 17 Lots Into Five Lots, Located In The North Vallco Area, APNS 316 -06 -033, 316 -06- 038, 316 -06 -039, 316 -06 -045, 316 -06 -046, 316 -06 -048, 316- 06 -049, 316 -06 -050, 316 -06 -051, 316 -06 -052, 316 -06 -053, 316 -07 -044, 316 -07 -045, 316 -07 -046, 316 -09 -019, 316 -09 -027, 316 -09 -028, 316 -18 -025, 316 -18 -012, 316 -18 -026, 316 -18 -027 AND 316 -18 -0353 • PC -5. Resolution No .6731 Of The Planning Commission Of The City Of Cupertino Recommending Approval Of 1 -11 sf- 3345921 Q ATTACHMENT I INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2 PROJECT 1 -12 sf- 3345921 Q DATE DOCUMENT Development Permit To Allow The Demolition Of Approximately 2.66 Million Square Feet Of Existing Office, Research and Development Buildings And The Construction Of 3.42 Million Square Feet Of Office, Research and Development Buildings; 120,000 S.F. (1,000 SEAT) Corporate Auditorium, 100,000 S.F. Corporate Fitness Center, And 25,000 S.F. Valet Parking Reception Uses; 92,000 Square Feet Of Utility Plants; And Associated Parking Facilities And Ancillary Buildings (Such As Security Reception Areas And Landscape Maintenance Buildings); Use Permit To Allow A Corporate Auditorium And Fitness Center At A New Office, Research and Development Campus; Architectural And Site Approval To Allow A New 2.82 Million Square Feet Office, Research and Development Building With 2,385 Basement Parking Spaces And A Cafeteria, A 5,870 Parking Space Structured Parking Facility With Attached Central Plant, A 1,000 Seat Corporate Auditorium, A Fitness Center, And Associated Site Improvements Including Access Tunnels, A Surface Parking Lot, Outdoor Dining and Recreational Facilities And Landscaping; Tree Removal Permit To Allow The Removal Of Approximately 4,501 Trees, Of Which Approximately 90 Trees Are Proposed To Be Transplanted, And Replacement With At Least 6,200 Trees TO Allow The Construction Of An Office, Research And Development Campus For A Project Located At The Area Bounded By East Homestead Road, North Tantau Avenue, I -280, North Wolfe Road Including Properties Located On The East Side Of North Tantau Avenue • Exhibit DP -l. Mitigation Monitoring and Reporting Program • Exhibit DP -la. Tree Replacement Worksheet • Exhibit DP -lb. Transportation Demand Management Program Expansion • Exhibit DP -2. Conditions of Approval — AB 900 Compliance Apple Campus 2 Project • PC -6. Resolution No. 6730 Of The Planning Commission Of The City Of Cupertino Recommending That The City council Approve A Development Agreement For A 20 Year Term For 1 -12 sf- 3345921 Q ATTACHMENT I INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2 PROJECT 1 -13 sf- 3345921 Q DATE DOCUMENT The Development Of An Office, Research and Development Campus Located At The Area Bounded By East Homestead Road, North Tantau Avenue, I -280, North Wolfe Road Including Properties Located On The East Side Of North Tantau Avenue o Exhibit DA. Development Agreement Between City of Cupertino, a California municipal corporation and Apple, Inc., a California corporation • Exhibit DA -1. Real Property Description • Exhibit DA -lb. Project Site Diagram • Exhibit DA -lc. Tax Localization Plan • Exhibit DA -ld. General Plan Office Space Development Allocations • Exhibit DA -le. Campus Amenity Space • Exhibit DA- If. Impact Fees • Exhibit DA- Ig. Pruneridge Avenue Vacation • PC -7. Apple Campus 2 Project Description, Sept. 16, 2013 • PC -8 Plan Set. Sept. 16, 2013 • Apple Campus 2 Introduction, Sept. 16, 2013 • Apple Campus 2 Site Plan Part 1, Sept. 16, 2013. • Apple Campus 2 Site Plan Part 2, Sept. 16, 2013 • Apple Campus 2 Floor Plan Part 1, Sept. 16, 2013 • Apple Campus 2 Floor Plan Part 2, Sept. 16, 2013 • Apple Campus 2 Renderings, Sept. 16, 2013 • Apple Campus 2 Bicycle Plan, Sept. 16, 2013 1 -13 sf- 3345921 Q ATTACHMENT I INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2 PROJECT 1 -14 sf- 3345921 Q DATE DOCUMENT o Apple Campus 2 Development Area Allocation, Sept. 16, 2013 • PC -9. Redlines to Plan PC -8, Sept. 23, 2013 • PC -10. Joint City Council /Planning Commission Study Session Staff Report, Study Session for the Environmental Impact Report for the development of a new office, research and development campus (Oct. 1, 2013) • PC -11. Findings Revision 91 (October 1, 2013) to California Environmental Quality Act And Statement Of Overriding Considerations For The Apple Campus 2 Project • PC -12. Findings Revision 92 (October 1, 2013) to California Environmental Quality Act Findings And Statement Of Overriding Considerations For The Apple Campus 2 Project • PC -14. Memorandum from LSA Associates, Inc. to City of Cupertino re: Apple Campus 2 Project Draft Environmental Impact Report (EIR) — Late Comments Received after the 45- Day Comment Period (Sept. 18, 2013) 10/15/2012 City Council Staff Report, Development of an office, research and development campus with associated ancillary uses. (Oct 15, 2013) • CC -1. Resolution No. 13 -082 of the City Council of the City of Cupertino Approving Certification of an Environmental Impact Report for the Apple Campus Project 2; and Adoption of Findings of Findings and a Statement of Overriding Considerations, Mitigation Measures, and a Mitigation Monitoring and Reporting Program • Exhibit EA -1 — California Environmental Quality Act Findings and Statement of Overriding Considerations for the Apple Campus 2 Project • Exhibit EA -2 — Mitigation Monitoring and Reporting Program (MMRP) ■ Exhibit EA -2a — Tree Replacement Worksheet 1 -14 sf- 3345921 Q ATTACHMENT I INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2 PROJECT 1 -15 sf- 3345921 Q DATE DOCUMENT ■ Exhibit EA -2b — Transportation Demand Management Program Expansion • CC -2. Resolution No. 13 -083 of the City Council of the City of Cupertino Approving a General Plan Amendment to Allow a Change in the Land Use Designation of a 1.1 Acre Area From Parks and Open Space to Industrial / Residential to be to be Reflected in the Land Use Map and Various Figures and Tables, the Elimination of a Segment of Pruneridge Avenue from Various References as a Minor Collector and Bike Land to Reflect the Closure and Vacation of this Segment of the Street, the Potential Relocation of Glendenning Barn From the Project Site and a Change in the Primary Building Bulk Setback For N. Tantau Avenue from 1.5 to I Slope Line from the Curb Line to a 1 to 1 Slope Line from the Curb Line, Changes Associated with the Development of the Apple Campus and Potential Development Agreement in Policy 2 -35: Vallco Park North for a Project Located by the Area Bounded by East Homestead Road, North Tantau Avenue, I -280, North Wolfe Road Including Properties Located on the East Side of North Tantau Avenue • CC -3. Ordinance No. 13 -2113 An Ordinance of the Cupertino City Council Approving the Rezoning of an Approximately 1.1 Acre Area From Park and Recreation (PR) to Planned Industrial Park (P(MP)) Located at APN 316 06 050 and 316 06 051 • Exhibit Z -1 — Legal Description for Rezoning • Exhibit Z -2 — Sandis, Zoning Plat Map Pruneridge Avenue at Ridgeview Court, Cupertino, CA (Sept. 23, 2013) • CC -4. Resolution No. 13 -085 of the City Council of the City of Cupertino Approving the Subdivision of Approximately 176.2 Acres Form 17 Lots Into Five Lots, Located in the North Vallco Area, APNS 316 -06 -033, 316 -06 -038, 316 -06 -039, 316 -06 -045, 316 -06 -046, 316 -06 -048, 316 -06 -049, 316 -06 -050, 316 -06 -051, 316 -06 -052, 316 -06 -053, 316 -07 -044, 316 -07 -045, 316 -07 -046, 316 -09 -019, 316 -09 -027, 316 -09 -028, 316 -18 -025, 316 -18 -012, 1 -15 sf- 3345921 Q ATTACHMENT I INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2 PROJECT 1 -16 sf- 3345921 Q DATE DOCUMENT 316 -18 -026, 316 -18 -027 AND 316 -18 -035 o Exhibit TM -1. Mitigation Monitoring and Reporting Program (MMRP) • CC -5. Resolution NO. 13-084 Of The City Council Of The City Of Cupertino Approving A Development Permit To Allow The Demolition Of Approximately 2.66 Million Square Feet Of Existing Office, Research And Development Buildings And The Construction of 3.42 Million Square Feet Of Office Research And Development Buildings; 120,000 SQ.FT. (1,000 Seat) Corporate Auditorium, 100,000 Sq. Ft. Corporate Fitness Center, And 25,000 Sq. Ft. Valet Parking Reception Uses, 92,000 Square Feet of Utility Plants; And Associated Parking Facilities And Ancillary Buildings (Such As Security Reception Areas And Landscape Maintenance Buildings); Use Permit To Allow A Corporate Auditorium And Fitness Center At A New Office, Research And Development Campus; Architectural And Site Approval To Allow A new 2.82 Million Square Feet Office, Research And Development Building With 2,385 Basement Parking Spaces And A Cafeteria, 5,870 Parking Space Structured Parking Facility With Attached Central Plant, A 1,000 Seat Corporate Auditorium, A Fitness Center And Associated Site Improvements Including Access Tunnels, A Surface Parking Lot, Outdoor Dining And Recreational Facilities And Landscaping; Tree Removal Permit To Allow The Removal Of Approximately 4,501 Trees, Of Which, Approximately 90 Trees Are Proposed To Be Transplanted, And Replacement With At Least 6,200 Trees To Allow The Construction Of An Office, Research and Development Campus For A Project Located At The Area Bounded By East Homestead Road, North Tantau Avenue, , I -280, North Wolfe Road Including Properties Located On The East Side Of North Tantau Avenue • Exhibit DP -1. Mitigation Monitoring and Reporting Program (MMRP) • Exhibit DP -2. Conditions Of Approval - AB 900 Compliance Apple Campus 2 Project ■ Exhibit EA -2a. Tree Replacement Worksheet 1 -16 sf- 3345921 Q ATTACHMENT I INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2 PROJECT 1 -17 sf- 3345921 v2 DATE DOCUMENT ■ Exhibit EA -2b — Transportation Demand Management Program Expansion • CC -6. Ordinance No. 13 -2114 Ordinance of the City Council Of The City of Cupertino Repealing Ordinance No. 1702 And Approving A New Development Agreement By And Between The City Of Cupertino And Apple Inc. For The Development Of A New Corporate Campus o Exhibit DA -1. Development Agreement Between City of Cupertino, a California municipal corporation, and Apple, Inc., a California corporation • Exhibit DA -la. Legal Description of the Property • Exhibit DA -lb. Project Site Diagram • Exhibit DA -lc. Tax Localization Plan • Exhibit DA -1 d. General Plan Office Space Development Allocations • Exhibit DA -le. Campus Amenity Space • Exhibit DA- If. Impact Fees • Exhibit DA -lg. Pruneridge Avenue Vacation 10/02/2013 • CC -7. Planning Commission Staff Report, Development of an office, research and development campus with associated ancillary uses (Oct. 2, 2013) (attachments to the Planning Commission staff report are in italics) o PC -1. Resolution No. 13 -6727 of the Planning Commission of the City of Cupertino Recommending Certification of an Environmental Impact Report for the Apple Campus 2 Project; And Recommending Adoption Of Findings and A Statement of Overriding Considerations, Mitigation Measures, And A Mitigation Monitoring and Reporting Program 1 -17 sf- 3345921 v2 ATTACHMENT I INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2 PROJECT 1 -18 sf- 3345921 v2 DATE DOCUMENT • Exhibit EA -1. California Environmental Quality Act Findings and Statement Of Overriding Considerations For The Apple Campus 2 Project • Exhibit EA -2. Mitigation Monitoring and Reporting Program (MMRP) • Exhibit EA -2a. Tree Replacement Worksheet • Exhibit EA -2b. Transportation Demand Management Program Expansion o PC -2. Resolution No. 6728 Of The Planning Commission Of the City Of Cupertino Recommending Approval Of A General Plan Amendment To Allow A Change In The Land Use Designation Of A 1.1 Acre Area From Parks And Open Space To Industrial/ Residential To Be Reflected In The Land Use Map And Various Figures And Tables, The Elimination Of A Segment Of Pruneridge Avenue From Various References As A Minor Collector And Bike Lane To Reflect The Closure and Vacation Of This Segment Of The Street, The Potential Relocation Of Glendenning Barn From The Project Site And A Change In The Primary Building Bulk Setback For N. Tantau Avenue From 1.5 to I Slope Line From The Curb Line To A I To I Slope Line From The Curb Line, Changes Associated With The Development Of The Apple Campus And Potential Development Agreement In Policy 2 -35: Vallco Park North For A Project Located At The Area Bounded By East Homestead Road, North Tantau Avenue, I -280, North Wolfe Road Including Properties Located On The East Side Of North Tantau Avenue o PC -3. Resolution No. 6729 Of The Planning Commission Of The City Of Cupertino Recommending That The City Council Approve The Rezoning Of An Approximately 1.1 Acre Area From Park And Recreation (PR) To Planned Industrial Park (P(MP)) 1 -18 sf- 3345921 v2 ATTACHMENT I INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2 PROJECT 1 -19 sf- 3345921 v2 DATE DOCUMENT Located At APN 316 06 050 AND 316 06 051 ■ Exhibit Z. Ordinance No. 13- An Ordinance Of The Cupertino City Council Approving The Rezoning Of AN Approximately 1.1 Acre Area From Park And Recreation (PR) To Planned Industrial Park (P(MP)) Located At APN 316 06 050 AND 316 06 051 • Exhibit Z -1. Legal Description For Rezoning • Exhibit Z -2. Sandis, Zoning Plat Map Pruneridge Ave. At Ridgeview Court, Cupertino, CA (Sept. 23, 2013) • PC -4. Resolution No. 6732 Of The Planning Commission Of the City of Cupertino Recommending Approval To Subdivide Approximately 176.2 Acres From 17 Lots Into Five Lots, Located In The North Vallco Area, APNS 316 -06 -033, 316 -06 -038, 316 -06- 039, 316 -06 -045, 316 -06 -046, 316 -06 -048, 316 -06 -049, 316 -06 -050, 316 -06 -051, 316 -06 -052, 316 -06 -053, 316- 07 -044, 316 -07 -045, 316 -07 -046, 316 -09 -019, 316 -09- 027, 316 -09 -028, 316 -18 -025, 316 -18 -012, 316 -18 -026, 316-18-027 AND 316 -18 -0353 • PC -5. Resolution No. 6731 Of The Planning Commission Of The City Of Cupertino Recommending Approval Of Development Permit To Allow The Demolition Of Approximately 2.66 Million Square Feet Of Existing Office, Research and Development Buildings And The Construction Of 3.42 Million Square Feet Of Office, Research and Development Buildings; 120, 000 S.F. (1, 000 SEAT) Corporate Auditorium, 100, 000 S.F. Corporate Fitness Center, And 25, 000 S.F. Valet Parking Reception Uses; 92, 000 Square Feet Of Utility Plants; And Associated Parking Facilities And Ancillary Buildings (Such As Security Reception Areas And Landscape Maintenance Buildings); Use Permit To Allow A Corporate Auditorium And Fitness Center At A New Office, Research and Development Campus; 1 -19 sf- 3345921 v2 ATTACHMENT I INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2 PROJECT 1 -20 sf- 3345921 v2 DATE DOCUMENT Architectural And Site Approval To Allow A New 2.82 Million Square Feet Office, Research and Development Building With 2,385 Basement Parking Spaces And A Cafeteria, A 5,8 70 Parking Space Structured Parking Facility With Attached Central Plant, A 1, 000 Seat Corporate Auditorium, A Fitness Center, And Associated Site Improvements Including Access Tunnels, A Surface Parking Lot, Outdoor Dining and Recreational Facilities And Landscaping; Tree Removal Permit To Allow The Removal Of Approximately 4,501 Trees, Of Which Approximately 90 Trees Are Proposed To Be Transplanted, And Replacement With At Least 6,200 Trees TO Allow The Construction Of An Office, Research And Development Campus For A Project Located At The Area Bounded By East Homestead Road, North Tantau Avenue, I -280, North Wolfe Road Including Properties Located On The East Side Of North Tantau Avenue • Exhibit DP -1. Mitigation Monitoring and Reporting Program • Exhibit DP-1a. Tree Replacement Worksheet • Exhibit DP-1b. Transportation Demand Management Program Expansion • Exhibit DP -2. Conditions of Approval AB 900 Compliance Apple Campus 2 Project o PC -6. Resolution No. 6730 Of The Planning Commission Of The City Of Cupertino Recommending That The City council Approve A Development Agreement For A 20 Year Term For The Development Of An Office, Research and Development Campus Located At The Area Bounded By East Homestead Road, North Tantau Avenue, I -280, North Wolfe Road Including Properties Located On The East Side Of North Tantau Avenue ■ Exhibit DA. Development Agreement Between 1 -20 sf- 3345921 v2 ATTACHMENT I INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2 PROJECT 1 -21 sf- 3345921 v2 DATE DOCUMENT City of Cupertino, a California municipal corporation and Apple, Inc., a California corporation • Exhibit DA -1. Real Property Description • Exhibit DA-1b. Project Site Diagram • Exhibit DA-1c. Tax Localization Plan • Exhibit DA-1d. General Plan Office Space Development Allocations • Exhibit DA-le. Campus Amenity Space • Exhibit DA -If. Impact Fees • Exhibit DA-1g. Pruneridge Avenue Vacation • PC -7. Apple Campus 2 Project Description, Sept. 16, 2013 • PC -8 Plan Set. Sept. 16, 2013 • PC -9. Redlines to Plan PC -8, Sept. 23, 2013 • PC -10. Joint City Council /Planning Commission Study Session Staff Report, Study Session for the Environmental Impact Report for the development of a new office, research and development campus (Oct. 1, 2013) • PC -11. Findings Revision #1 (October 1, 2013) to California Environmental Quality Act And Statement Of Overriding Considerations For The Apple Campus 2 Project • PC -12. Findings Revision #2 (October 1, 2013) to California Environmental Quality Act Findings And Statement Of Overriding Considerations For The Apple Campus 2 Project 1 -21 sf- 3345921 v2 ATTACHMENT I INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2 PROJECT 1 -22 sf- 3345921 v2 DATE DOCUMENT o PC -14. Memorandum from LSA Associates, Inc. to City of Cupertino re: Apple Campus 2 Project Draft Environmental Impact Report (EIR) Late Comments Received after the 45 -Day Comment Period (Sept. 18, 2013) • CC -8. Final Planning Commission Resolutions (No. 6727, 6728, 6729, 6730, 6731 and 6732) • Resolution No. 13 -6727 Of The Planning Commission Of The City of Cupertino Recommending Certification Of An Environmental Impact Report For The Apple Campus 2 Project; And Recommending Adoption Of Findings And A Statement Of Overridings Considerations, Mitigation Measures, And A Mitigation Monitoring And Reporting Program (Oct. 2, 2013) • Exhibit EA -1. California Environmental Quality Act Findings and Statement of Overriding Considerations For The Apple Campus 2 Project • Exhibit EA -2. Mitigation Monitoring and Reporting Program (MMRP) • Exhibit EA -2a. Tree Replacement Worksheet • Exhibit EA -2b — Transportation Demand Management Program Expansion • Resolution No. 6728 Of The Planning Commission Of the City of Cupertino Recommending Approval Of A General Plan Amendment To Allow A Change In The Land Use Designation of a 1.1 Acre Area From Parks And Open Space to Industrial / Residential To Be Reflected In The Land Use Map And Various Figures And Tables, The Elimination Of A Segment Of Pruneridge Avenue From Various References As A Collector And Bike Lane To Reflect The Closure And Vacation Of This Segment Of The Street, The Potential Relocation Of Glendenning Barn From The Project Site And A Change In The Primary Building Bulk Setback 1 -22 sf- 3345921 v2 ATTACHMENT I INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2 PROJECT 1 -23 sf- 3345921 Q DATE DOCUMENT For N. Tantau Avenue From 1.5 To 1 Slope Line From The Curb Line TO A 1 TO 1 Slope Line From The Curb Line, Changes Associated With The Development Of The Apple Campus And Potential Development Agreement In Policy 2 -35: Vallco Park North For A Project Located At The Area Bounded By East Homestead Road, North Tantau Avenue, I -280, North Wolfe Road Including Properties Located On The East Side Of North Tantau Avenue (Oct. 2, 2013) o Resolution No. 6729 Of The Planning Commission Of The City Of Cupertino Recommending That The City Council Approve The Rezoning Of An Approximately 1.1 Acre Area From Park and Recreation (PR) To Planned 1.2 Industrial Park (P(MP)) Located AT APN 316 06 050 and 316 06 051 (Oct. 2, 2013) ■ Exhibit Z. Ordinance No. 13 -An Ordinance Of The Cupertino City Council Approving The Rezoning Of An Approximately 1.1 Acre Area From Park and Recreation (PR) To Planned Industrial Park (P(MP)) Located At APN 316 06 050 and 316 06 051 10/02/2013 o Resolution No. 6730 of the Planning Commission of the City of Cupertino Recommending That The City Council Approve A Development Agreement For a 20 Year Term For The Development Of An Office, Research and Development Campus Located At The Area Bounded By East Homestead Road, North Tantau Avenue, I -280, North Wolfe Road Including Properties Located on the East Side of North Tantau Avenue • Exhibit DA. Ordinance No. 13 -2114 Ordinance of the City Council of the City of Cupertino Repealing Ordinance No. 1702 and Approving a New a New Development Agreement By and Between the City of Cupertino and Apple Inc. For The Development of a New Corporate Campus • Exhibit DA -1. Development Agreement 1 -23 sf- 3345921 Q ATTACHMENT I INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2 PROJECT 1 -24 sf- 3345921 Q DATE DOCUMENT Between City of Cupertino, a California municipal corporation, and Apple, Inc., a California corporation • Exhibit DA -la. Legal Description of the Property • Exhibit DA -lb. Project Site Diagram • Exhibit DA -lc. Tax Localization Plan • Exhibit DA -ld. General Plan Office Space Development Allocations • Exhibit DA -le. Campus Amenity Space • Exhibit DA- If. Impact Fees • Exhibit DA -1g. Pruneridge Avenue Vacation 10/02/2013 o Resolution No.6731 of the Planning Commission of the City of Cupertino Recommending Approval of Development Permit To Allow The Demolition Of Approximately 2.66 Million Square Feet Of Existing Office, Research and Development Buildings And The Construction Of 3.42 Million Square Feet Of Office, Research and Development Buildings; 120,000 SQ.FT. (1,000 Seat) Corporate Auditorium, 100,000 SQ.FT. Corporate Fitness Center, and 25,000 SQ.FT. Valet Parking Reception Uses; 92,000 Square Feet of Utility Plants; And Associated Parking Facilities And Ancillary Buildings (Such As Security Reception Areas And Landscape Maintenance Buildings); Use Permit To Allow A Corporate Auditorium And Fitness Center At A New Office, Research And Development Campus; Architectural and Site Approval To Allow A New 2.82 Million Square Feet Office, Research And Development Building With 2,385 Basement Parking Spaces And A Cafeteria, A 5,870 Parking Space Structured Parking Facility With Attached Central Plant, A 1,000 Seat Corporate Auditorium, A Fitness Center, And 1 -24 sf- 3345921 Q ATTACHMENT I INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2 PROJECT 1 -25 sf- 3345921 Q DATE DOCUMENT Associated Site Improvements Including Access Tunnels, A Surface Parking Lot, Outdoor Dining and Recreational Facilities And Landscaping; Tree Removal Permit To Allow The Removal Of Approximately 4,501 Trees, Of Which, Approximately 90 Trees Are Proposed TO BE Transplanted, And Replacement With At Least 6,200 Trees To Allow The Construction Of An Office, Research and Development Campus For A Project Located At the Area Bounded By East Homestead Road, North Tantau Avenue, I -280, North Wolfe Road Including Properties Located On The East Side Of North Tantau Avenue (Oct. 2, 2013) • Exhibit DP -1. Mitigation Monitoring and Reporting Program (MMRP) • Exhibit EA -2a. Tree Replacement Worksheet • Exhibit EA -2b — Transportation Demand Management Program Expansion • Exhibit DP -2. Conditions of Approval - AB 900 Compliance Apple Campus 2 Project 10/02/2013 o Resolution No. 6732 Of The Planning Commission Of The City Of Cupertino Recommending Approval To Subdivide Approximately 176.2 Acres From 17 Lots Into Five Lots, Located In The North Vallco Area, APNS 316 -06 -033, 316 -06 -038, 316 -06 -039, 316 -06- 045, 316 -06 -046, 316 -06 -048, 316 -06 -049, 316 -06 -050, 316 -06 -051, 316 -06 -052, 316 -06 -053, 316 -07 -044, 316- 07 -045, 316 -07 -046, 316 -09 -019, 316 -09 -027, 316 -09- 028, 316 -18 -025, 316 -18 -012, 316 -18 -026, 316 -18 -027 AND 316 -18 -035 (Oct. 2, 2013) ■ Exhibit TM -1. Mitigation Monitoring and Reporting Program (MMRP) • CC -9. City of Cupertino Recommendation of Environmental Review Committee September 26, 2013 1 -25 sf- 3345921 Q ATTACHMENT I INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2 PROJECT 1 -26 sf- 3345921 Q DATE DOCUMENT • CC -10. Memorandum from LSA Associates, Inc. to City of Cupertino re: Supplemental Text Revisions, Apple Campus 2 Project Final Environmental Impact Report (EIR) (Oct. 8, 2013) • Attachment A: Fehr & Peers Memo, October 4, 2013 • Attachment B: Assembly Bill 900 (Amended) • CC -I 1. Findings Revision 93 (October 15, 2013) to California Environmental Quality Act Findings and Statement of Overriding Considerations for the Apple Campus 2 Project • CC -12. Comments Received Between September 20, 2013 and October 4, 2013 • CC -13. Memorandum from LSA Associates, Inc. Apple Campus 2 Project Final Environmental Impact Report (EIR) — Late Comments Received Between September 20 and October 4, 2013 (Oct. 8, 2013) • CC -14. Memorandum from Department of Community Development to City Council re: Memo Regarding Comments Not Related to the EIR (Oct. 8, 2013) 10/15/2012 City Council Staff Report, Adopt Resolution No. 13 -086, vacating a portion of Pruneridge Avenue, between Wolfe Road and Tantau Avenue, and various public easements; and Resolution No. 13 -087, authorizing the City Manager to execute a Purchase and Sale Agreement with Campus Holdings, Inc. (a subsidiary of Apple Inc.) for a portion of Pruneridge Avenue. (Oct. 15, 2013) • CC -1. Resolution No. 13 -086 A Resolution Of The City Council Of the City of Cupertino Vacating A Portion Of The City Pruneridge Avenue Right -Of -Way Between North Tantau Avenue And North Wolfe Road And Various Easements Bounded By North Wolfe Road, Homestead Road, North Tantau Avenue, And Highway 280, As Provided In Section 8320 Et. Seq. Of The Streets And Highways Code Of The State of California o Exhibit V -1. Legal Description For Pruneridge Avenue 1 -26 sf- 3345921 Q ATTACHMENT I INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2 PROJECT 1 -27 sf- 3345921 Q DATE DOCUMENT o Exhibit V -2. Sandis, Pruneridge Avenue Vacation Key Map, Cupertino, CA (Sept. 3, 2013) o Exhibit V -3. Legal Description For Light And Air Easement Vacation o Exhibit V -4. Legal Description For Roadway Easement Vacation o Exhibit V -5. Legal Description For Roadway Easement Vacation o Exhibit V -6. Legal Description For Roadway Easement Vacation o Exhibit V -7. Legal Description For Street Easement Vacation o Exhibit V -8. Legal Description For Street Easement Vacation o Exhibit V -9. Legal Description For Public Utility Easement Vacation o Exhibit V -10. Legal Description For Public Utility Easement Vacation o Exhibit V -11. Legal Description For Public Utility Easement Vacation o Exhibit V -12. Legal Description For Public Utility Easement Vacation o Exhibit V -13. Legal Description For Public Utility Easement Vacation o Exhibit V -14. Legal Description For Public Utility Easement Vacation o Exhibit V -15. Legal Description For Light And Air Easement Vacation 1 -27 sf- 3345921 Q ATTACHMENT I INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2 PROJECT 1 -28 sf- 3345921 Q DATE DOCUMENT • CC -2. Resolution No. 13 -087 A Resolution Of The City Council Of The City Of Cupertino Authorizing The Execution Of A Purchase And Sale Agreement, And Authorizing The Sale Of A Portion Of Pruneridge Avenue, Subject To And Upon The Terms And Conditions Set Forth In The Purchase And Sale Agreement o Exhibit PSA. Purchase And Sale Agreement And Joint Escrow Instructions • Exhibit PSA -1. Legal Description For Pruneridge Avenue • Exhibit PSA -2. Deed. • Exhibit PSA -2a. Legal Description For Pruneridge Avenue 10/15/2012 City Council Staff Report, Authorize the City Manager to enter into an Extension of Agreement for Consultation Services with Baz Industries, the successor in interest to ACI Holdings, Inc. (Oct. 15, 2013) • Extension of Agreement For Consultation Services • Agreement for Consultation Services 10/15/2013 EX- CC- 10 -15 -13 Item 9, Written Communication, City Council Meeting, October 15, 2013 10/15/2013 EX- CC -15 -13 Item 9 Staff Presentation Apple Campus 2, City Council Meeting, October 15, 2013 10/15/2013 Exhibit CC- 10 -15 -13 Item CC -10 Supplemental Text Revisions, Apple Campus 2 Project Final Environmental Impact (Oct. 8, 2013) 10/15/2013 EX- CC- 10 -15 -13 Item 10 CC -6 Development Agreement • Exhibit DA -1. Development Agreement Between City of Cupertino, a California municipal corporation, and Apple, Inc., a California corporation 1 -28 sf- 3345921 Q ATTACHMENT I INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2 PROJECT (G) Transcripts and Minutes of Hearings in Chronological Order: (H) Remainder of the Record a. DEIR References DATE DOCUMENT 09/08/2011 Transcript of the EIR Scoping Session Meeting (Sept. 8, 2011) 06/26/2013 Transcript of the DEIR Comment Meeting (June 26, 2013) 09/26/2013 Transcript of the Environmental Review Committee Meeting (Sept. 26, 2013) 10/01/2013 Approved Minutes Cupertino City Council Cupertino Planning Commission Special Meeting Tuesday October 1, 2013 Joint Meeting of Cupertino City Council and Cupertino Planning Commission 10/01/2013 Transcript of the Joint City Council /Planning Commission Study Session, Oct. 1, 2013 10/02/2013 Transcript of the Planning Commission Meeting (Oct. 2, 2013) 10/15/2013 Transcript of the City Council Meeting (Oct. 15, 2013) (H) Remainder of the Record a. DEIR References 1 -29 sf- 3345921 Q DATE DOCUMENT 00 /00 /0000 Notice of Completion and Environmental Document Transmittal 00 /00 /0000 Apple Campus 2 ITE Trip Generation 00 /00 /0000 California Code Regulations, Title 14, Sections 15064.4, Determining the Significance of Impacts from Greenhouse Gas Emissions (Cal. Code Regs. tit. 14, § 15064.4) 00 /00 /0000 California Code Regulations, Title 14, Sections 15064.7, Thresholds of Significance (Cal. Code Regs. tit. 14, § 15064.7) 00 /00 /0000 Cupertino Municipal Code Chapter 16.72: Recycling And Diversion of Construction and Demolition Waste http: / /www.amlegal.com /nxt/ ag teway.dll /California /cupertino /titlel6bu 1 -29 sf- 3345921 Q ATTACHMENT I INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2 PROJECT 1 -30 sf- 3345921 v2 DATE DOCUMENT ildingsandconstruction /chap... (last visited May 1, 2012) 00 /00 /0000 Undated document entitled "Traffic: Mitigation" 00/00/1951 Hertlein, L.G., Invertebrate Fossils and Fossil Localities in the San Francisco Bay Area, pp. 189-192 00/00/1951 Stirton, R. A., Prehistoric Land Mammals of the San Francisco Bay Region, in Geologic Guidebook of the San Francisco Bay Counties, History, Landscape, Geology, Fossils, Minerals, Industry, and Routes to Travel, Bulletin 165, pp. 177 -186 00/00/1961 U.S. Geological Survey, Cupertino Quadrangle 7.5' series Topographic Map 00/00/1974 Fredrickson, David A., Cultural Diversity in Early Central California: A View from the North Coast Ranges, The Journal of California Anthropology, (1)1:41 -53, Spring 1974 03/00/1974 U.S. Environmental Protection Agency, Information on Levels of Environmental Noise Requisite to Protect Public Health and Welfare with an Adequate Margin of Safety, htlp: / /www.nonoise.org /library /levels74 /levels74.htm (last visited May 3, 2012) 05/00/1974 Edwards, Rob, An Archaeological Reconnaissance of Calabazas Creek (from Lawrence Expressway to Wolfe Road) for the Santa Clara Valley Water District 07/01/1974 California Geological Survey, Special Studies Zones, Mindego Hill Quadrangle 07/01/1974 California Geological Survey, Special Studies Zones, Castle Rock Ridge Quadrangle 07/01/1974 California Geological Survey, Special Studies Zones, Cupertino Quadrangle 07/01/1974 California Geological Survey, Special Studies Zones, Palo Alto Quadrangle, Official Map, Effective July 1, 1974 03/00/1976 California Department of Parks and Recreation, California Inventory of 1 -30 sf- 3345921 v2 ATTACHMENT I INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2 PROJECT 1 -31 sf- 3345921 Q DATE DOCUMENT Historic Resources, p. 265 00/00/1979 Nilsen, T. H., Wright, R. H., et al., Relative Slope Stability and Land - use Planning in the San Francisco Bay Region, California, Geological Survey Professional Paper 944 00/00/1979 Helley, E.J, et al., Flatland Deposits of the San Francisco Bay Region, California - their geology and engineering properties, and their importance to comprehensive planning, California, Geological Survey Professional Paper 943 01/01/1982 California Geological Survey, Special Studies Zones, Milpitas, Revised Official Map, Effective Jan. 1, 1982 03/17/1982 Bay Area Air Quality Management District, Rules and Regulations, Regulation 7: Odorous Substances 00/00/1987 Connelly, AB 2588, Chaptered in the California Health and Safety Code Section 44300, et al., http: / /oehha.ca.gov /air /chronic_rels /HSC44300.htm (last visited 7/6/12) 00/00/1987 Bolt Beranek and Newman, Noise Control for Buildings and Manufacturing Plants, pp. 8 -5, 8 -7 & 8 -9 07/00/1987 Cartier, Robert, Cultural Resource Evaluation of the Calabasas Creek Flood Control Project in the Cities of Cupertino and Santa Clara, County of Santa Clara, for Santa Clara Valley Water District 96080- 87 -274 00/00/1988 U.S. Geological Survey, Landslides, Floods, and Marine Effects of the Storm of January 3 -5, 1982, in the San Francisco Bay Region, California, U.S. Geological Survey Professional Paper 1434 12/00/1988 California Department of Parks and Recreation, Five Views: An Ethnic Historic Site Survey for California 00/00/1991 Holland, D.C., Western Pond Turtles Clemmys marmorata as referenced in Jennings, M. R., and M. P. Hayes, Amphibian and reptile species of special concern in California, pp. 98 -103 (1994) 11/01/1991 California Geological Survey, Special Studies Zones, Los Gatos 1 -31 sf- 3345921 Q ATTACHMENT I INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2 PROJECT 1 -32 sf- 3345921 v2 DATE DOCUMENT Quadrangle, Revised Official Map, Nov. 1, 1991 05/01/1992 California Department of Parks and Recreation, California Points of Historical Interest, pp. 64 -67 00/00/1993 Hickman, J.C. (Ed.), The Jepson Manual, Higher Plants of California 00/00/1994 Holland, D.C., Western Pond Turtles Clemmys marmorata as referenced in Jennings, M. R., and M. P. Hayes, Amphibian and reptile species of special concern in California, p. 101 (1994) 05/00/1994 Bennyhoff, James A., and David A. Fredrickson, A Proposed Integrative Taxonomic Systems for Central California Archaeology (1969). In Toward A New Taxonomic Framework for Central California Archaeology: Essays by James A. Bennyhoff and David A. Fredrickson, Assembled and Edited by Richard E. Hughes, May 1994, pp. 15 -24 11/01/1994 Jennings, M. R., and M. P. Hayes, Amphibian and reptile species of special concern in California (1994) 00/00/1995 California Regional Water Quality Control Board, San Francisco Bay Region, San Francisco Bay Basin (Region 2) Water Quality Control Plan (Basin Plan) 00/00/1995 Milliken, Randall, A Time of Little Choice: The Disintegration of Tribal Culture in the San Francisco Bay Area 1769 -1810, p. 256 03/00/1995 California Department of Parks and Recreation, Instructions for Recording Historical Resources 00/00/1996 California Department of Conservation, Division of Mines and Geology, Update of Mineral Land Classification: Aggregate Materials in the South San Francisco Bay Production - Consumption Region, DMG Open File Report 96 -03 00/00/1996 California Office of Historic Preservation, California Historical Landmarks (1996) 03/00/1997 California Air Resources Board, Technical Support Document, Proposed Identification of Inorganic Lead as a Toxic Air Contaminant, Part A- Exposure Assessment, Stationary Source Division, March 1997 1 -32 sf- 3345921 v2 ATTACHMENT I INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2 PROJECT 1 -33 sf- 3345921 v2 DATE DOCUMENT 05/05/1997 Rauch, Alan F., EPOLLS: An Empirical Method for Predicting Surface Displacements Due to Liquefaction - Induced Lateral Spreading in Earthquakes, Dissertation submitted to the Faculty of the Virginia Polytechnic Institute and State University in partial fulfillment of the requirements for the degree in Doctor of Philosophy in Civil Engineering 00/00/1998 Harris, Cyril M, Handbook of Acoustical Measurements and Noise Control, pp. 2.6 -2.17 00/00/1998 Baker, Suzanne. 1998. Archaeological Survey, San Tomas Aquino /Saratoga Creeks Trail Project, Santa Clara County, California 00/00/1998 Joint Venture: Silicon Valley, The Joint Venture Way: Lessons for Regional Rejuvenation, Volume 1 00/00/1998 Joint Venture: Silicon Valley, The Joint Venture Way: Lessons for Regional Rejuvenation, Volume 2 00/00/1999 World Health Organization, Guidelines for Community Noise http: / /www.who.int /docstore /peh /noise /guidelines2.html (last visited May 3, 2012) 00/00/1999 Bass, Ronald E., Albert L Herson, and Kenneth M. Bogdan, CEQA Deskbook: A Step -by -Step Guide on how to Comply with the California Environmental Quality Act (Solano Press Book, 2nd Ed., 1999), p. 105 00/00/1999 Sacramento County, Department of Environmental Review and Assessment, Bollard and Brennan, Report of the Status of Rubberized Asphalt Traffic Noise Reduction in Sacramento County 00/00/1999 National Park Service, Guidelines for Evaluating and Documenting Rural Historic Landscapes, National Register Bulletin, Revised 1999 00/00/1999 California Office of Historic Preservation, California Register and National Register: A Comparison (for purposes of determining eligibility for the California Register) 09/00/1999 English, P., et al, Examining Associations Between Childhood Asthma and Traffic Flow Using a Geographic Information System, Environmental Health Perspectives 107(9):761 -767, September 1999 1 -33 sf- 3345921 v2 ATTACHMENT I INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2 PROJECT 1 -34 sf- 3345921 v2 DATE DOCUMENT 12/00/1999 Bay Area Air Quality Management District, BAAQMD CEQA Guidelines, Assessing the Air Quality Impacts of Projects and Plans 00/00/2000 United Nations Environment Programme, The Montreal Protocol on Substances that Deplete the Ozone Layer as adjusted and /or amended in London 1990, Copenhagen 1992, Vienna 1995, Montreal 1997, Beijing 1999 (2000) htlp://www.unep.org/ozone/Montreal- Protocol /Montreal- Protocol2000.shtmI (last visited Apr. 25, 2012) 00/00/2000 Transportation Research Board, Highway Capacity Manual 2000, Chapter 16, Signalized Intersections 00/00/2000 National Park Service, Guidelines for Evaluating and Registering Archaeological Properties, National Register Bulletin 00/00/2000 U.S. Geological Survey, Geological Map and Map Database of the Palo Alto 30' x 60' Quadrangle, California 00/00/2000 Santa Clara Valley Water District, Clean, Safe Creeks and Natural Flood Protection Plan, http: / /www.valleywater.or /g Programs /CleanSafeCreeksPlan.aspx (last visited June 4, 2012) 04/10/2000 American Planning Association, Policy Guide on Planning for Sustainability (Apr. 16, 2000) 10/00/2000 California Air Resources Board, Risk Reduction Plan to Reduce Particulate Matter Emissions from Diesel - Fueled Engines and Vehicles, Stationary Source Division and Mobile Source Control Division. October 2000 02/00/2001 Agency for Toxic Substances and Disease Registry, Toxic FAQs for Polychlorinated Biphenyls (Feb. 2001 05/23/2001 California Department of Parks and Recreation, California Office of Historic Preservation, Technical Assistance Series 91, Environmental Quality Act (CEQA) & Historical Resources 10/25/2001 California Regional Water Quality Control Board, San Francisco Bay Region, Order No 01 -114: Rescission of Site Cleanup Requirements Order No 96 -085 for the Property at 10900 North Wolfe Road, Cupertino, Santa Clara County 1 -34 sf- 3345921 v2 ATTACHMENT I INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2 PROJECT 1 -35 sf- 3345921 v2 DATE DOCUMENT 00/00/2002 California Geological Survey, Seismic Hazard Zones, Cupertino Quadrangle 2002b 00/00/2002 California Geological Survey, Note 36, California Geomorphic Provinces 2002a 00/00/2002 California Geological Survey, Seismic Hazard Zone Report for the Cupertino 7.5 Minute Quadrangle, Santa Clara County, California, Seismic Hazard Zone 068 00/00/2002 U.S. Environmental Protection Agency, 2002 Waterbody Report for Calabazas Creek, Updated on Nov. 14, 2011 02/13/2002 California Department of Health Service, A Summary of Cal /OSHA's Lead in Construction Standard, Title 8, California Code of Regulations, Section 1532.1 (Cal. Code Regs. tit. 8., § 1532.1) 02/26/2002 Santa Clara, County of, Fault Rupture Hazard Zones Map 08/00/2002 Delfino, R.J., Epidemiologic Evidence for Asthma and Exposure to Air Toxics: Linkages Between Occupational, Indoor, and Community Air Pollution Research, Environmental Health Perspectives, 110(4):573- 579, August 2002 09/23/2002 Santa Clara, County of, Santa Clara County Geologic Hazard Zones Map 12/00/2002 California Department of Transportation, Guide for the Preparation of Traffic Impact Studies 00/00/2003 Stebbins, R. C., A Field Guide to Western Amphibians and Reptiles (Houghton Mifflin, 3rd Ed. 2003) 03/17/2003 Santa Clara County, Ordinance No. , An Ordinance of the Board of Supervisors of the County of Santa Clara Repealing Division B 11 and Enacting a New Division BI I of the Santa Clara County Ordinance Code Pertaining to Health and Sanitation, Amending Title A18, Chapter One, Pertaining to the Department of Public Health, and Amending Title A33, Chapter VI, Pertaining to the Department of Environmental Health (Division B 11 Ordinance Changes) 06/00/2003 Santa Clara Valley Transportation Authority, 2003 Traffic Level of 1 -35 sf- 3345921 v2 ATTACHMENT I INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2 PROJECT 1 -36 sf- 3345921 v2 DATE DOCUMENT Service Analysis Guidelines, Adopted January 1995, Updated June 2003 06/19/2003 California Code of Regulations, Title 8, Section 5198, General Industry Safety Orders — Lead, as amended June 19, 2003 (Cal. Code Regs. tit. 8, § 5198 (2003) 08/00/2003 California Environmental Protection Agency, The Air Toxics Hot Spots Program Guidance Manual for Preparation of Health Risk Assessments. August 2003 08/00/2003 U.S. Department of Energy, 2003 Buildings Energy Databook (Aug. 2003) 09/00/2003 California Department of Fish and Game, Wildlife and Habitat Data Analysis Branch, List of California Terrestrial Natural Communities Recognized by the California Natural Diversity Data Base 10/20/2003 Association of Bay Area Governments, Dam Failure Inundation Hazard Map for Cupertino www.abag.ca.gov /c ig bin /pickdam.pi (last visited Nov. 13, 2011) 00/00/2004 Santa Clara Valley Water District, Lines of Equal Subsidence Map, Santa Clara Valley, North County, 1934 -1967 00/00/2004 Kim, J.J., et al., Traffic- Related Air Pollution Near Busy Roads: The East Bay Children's Respiratory Health Study, Am. J. Respir. Crit. Care Med. Vol 170. pp 520 -526, 2004 00/00/2004 Association of Bay Area Governments, ABAG Earthquake Shaking Scenario, Entire San Andreas (1906 Quake) — Magnitude 7.9 06/00/2004 Institute of Transportation Engineers, Trip Generation Handbook, An ITE Informational Report, 2nd Edition, Publication No. RP -028B 09/04/2004 Gauderman, W. J., The Effect of Air Pollution on Lung Development From 10 to 18 Years of Age, New England Journal of Medicine 351:11, pp. 1057 -1067 00/00/2005 Leidy, R.A., G.S. Becker, and B.N. Harvey, Historical distribution and current status of steelhead /rainbow trout (Oncorhynchus mykiss) in Streams of the San Francisco Estuary, California. 1 -36 sf- 3345921 v2 ATTACHMENT I INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2 PROJECT 1 -37 sf- 3345921 v2 DATE DOCUMENT 00/00/2005 Fellers, G. M., Rana draytonii Baird and Girard, 1852(b) California Red - Legged Frog, Amphibian Declines, The Conservation Status of United States Species, pp. 552 -554 00/00/2005 Doeker, Randi, Bird -safe Design Practices, Birds & Building Forum, www.birdsa,ndbuildings.org 00/00/2005 World Resources Institute, Navigating the Numbers Greenhouse Gas Data and International Climate Policy (2005) 04/00/2005 California Air Resources Board, Air Quality and Land Use Handbook: A Community Health Perspective, April 2005, www.arb.ca.gov/ch/la,nduse.htm 09/00/2005 City of Cupertino, Emergency Operations Plan, adopted by City Council Sept. 20, 2005 10/25/2005 United Nations Framework Convention on Climate Change, Inventories of anthropogenic emissions by sources and removals by sinks of greenhouse gases, Sixth compilation and synthesis of initial national communications from Parties not included in Annex I to the Convention (Oct. 25, 2005) 11/15/2005 City of Cupertino General Plan 2000 -2020, Adopted by the Cupertino City Council, November 15, 2005 00/00/2006 Erler & Kalinowski, Inc., Phase I Environmental Site Assessment and Subsurface Investigations Report, 10480 and 10500 Ridgeview Court, Cupertino, California, 2006d 00/00/2006 Erler & Kalinowski, Inc., Phase I Environmental Site Assessment and Subsurface Investigations Report, 10600 Ridgeview Court, Cupertino, California, 2006g 00/00/2006 California Climate Change Center, Our Changing Climate. Assessing the Risks to California (2006) 02/00/2006 California Regional Water Quality Control Board, San Francisco Bay Region, Fact Sheet, Status of Environmental Cleanup, 3800 Homestead Road, Santa Clara, Santa Clara County 03/00/2006 California Environmental Protection Agency, Climate Action Team 1 -37 sf- 3345921 v2 ATTACHMENT I INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2 PROJECT 1 -38 sf- 3345921 Q DATE DOCUMENT Report to Governor Schwarzenegger and the Legislature (Mar. 2006) 04/14/2006 Erler & Kalinowski, Inc., Phase I Environmental Site Assessment and Subsurface Investigations Report, 19310 and 19320 Pruneridge Avenue, Cupertino, California, 2006c 04/20/2006 Erler & Kalinowski, Inc., Phase I Environmental Site Assessment and Subsurface Investigations Report, 10501 North Tantau Avenue, Cupertino, California, 2006e 04/24/2006 Erler & Kalinowski, Inc., Phase I Environmental Site Assessment and Subsurface Investigations Report, 10435 North Tantau Avenue, Cupertino, California, 2006a 04/26/2006 Erler & Kalinowski, Inc., Phase I Environmental Site Assessment and Subsurface Investigations Report, 10555 Ridgeview Court, Cupertino, California, 2006f 05/00/2006 McConnell, R., et al., Traffic, Susceptibility, and Childhood Asthma, Environmental Health Perspectives, Vol. 114., No. 5, pp. 766 -772, 2006 05/00/2006 U.S. Department of Transportation, Federal Transit Administration, Transit Noise and Vibration Impact Assessment Final Report, Report No. FTA- VA -90- 1003 -06 05/12/2006 Erler & Kalinowski, Inc., Phase I Environmental Site Assessment and Subsurface Investigations Report, 10400 and 10450 Ridgeview Court, Cupertino, California, 2006b 06/06/2006 California Department of Toxic Substances Control, Interim Guidance Evaluation of School Sites with Potential Soil Contamination as a Result of Lead from Lead -Based Paint, Organochlorine Pesticides from Termiticides, and Polychlorinated Biphenyls from Electrical Transformers, Revised June 6, 2006, 2006b 06/08/2006 Erler & Kalinowski, Inc., Phase I Environmental Site Assessment and Subsurface Investigations Report, 19050 Pruneridge Avenue, Cupertino, California, 2006h 07/00/2006 Excerpts from Santa Clara Valley Water Resources Protection Collaborative, User's Manual, Guidelines and Standards for Land Use Near Streams, A Manual of Tools, Standards and Procedures to Protect 1 -38 sf- 3345921 Q ATTACHMENT I INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2 PROJECT 1 -39 sf- 3345921 Q DATE DOCUMENT Streams and Streamside Resources in Santa Clara County, August 2005, Revised July 2006 07/00/2006 Excerpts from Santa Clara Valley Water Resources Protection Collaborative, Guidelines & Standards for Land Use Near Streams: A Manual of Tools, Standards and Procedures to Protect Streams and Streamside Resources in Santa Clara County 07/00/2006 California Department of Water Resources, Progress on Incorporating Climate Change into Management of California's Water Resources, Technical Memorandum Report (July 2006) 00/00/2007 New York City Audubon, Bird Safe Building Guidelines 00/00/2007 U.S. Environmental Protection Agency, Air and Radiation: National Ambient Air Quality Standards (NAAQS), http: / /www.epa.gov /air /criteria.htmI (last visited 4/24/12) 00/00/2007 Milliken, Randall, Punctuated Culture Change in the San Francisco Bay Area, in California Prehistory, Colonization, Culture and Complexity, edited by Terry L. Jones and Kathryn A. Klar, pp. 116- 117 00/00/2007 Cupertino, City of, North Vallco Master Plan — Phase I 00/00/2007 Santa Clara, City of, City of Santa Clara, CA Zoning Map, Updated December 2007 00/00/2007 California Energy Commission, Inventory of California Greenhouse Gas Emissions and Sinks: 1990 to 2004, Staff Final Report (Dec. 2006) 00/00/2007 Intergovernmental Panel on Climate Change, Climate Change 2007: The Physical Science Basis, Summary for Policymakers 00/00/2007 United Nations Framework Convention on Climate Change, 2007 Greenhouse Gas Inventory Data http: / /unfccc.int/ghhg data /items /3800.php (last visited Apr. 30, 2012) 02/00/2007 Remy, Thomas, Moose, and Manley, Guide to the California Environmental Quality Act (Solano Press Books, 11th Ed.) 03/00/2007 Toronto, City of, Bird - Friendly Development Guidelines 1 -39 sf- 3345921 Q ATTACHMENT I INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2 PROJECT 1 -40 sf- 3345921 v2 DATE DOCUMENT 04/00/2007 Leidy, R. A., Ecology, Assemblage Structure, Distribution, and Status of Fishes in Streams Tributary to the San Francisco Estuary, California 04/24/2007 Erler & Kalinowski, Inc., Phase I Environmental Site Assessment and Subsurface Investigations Report, 10400 North Tantau Avenue, Cupertino, California, 2007a 04/24/2007 Erler & Kalinowski, Inc., Phase I Environmental Site Assessment and Subsurface Investigations Report, 10300 North Tantau Avenue, Cupertino, California, 2007b 06/00/2007 Meyer, Jack, and Jeffrey Rosenthal, Geoarchaeological Overview of the Nine Bay Area Counties in Caltrans District 4, p 8 08/00/2007 Bay Area Air Quality Management District, Toxic Air Contaminant Control Program Annual Report, Last Updated 10/4/2010 08/14/2007 Santa Clara, County of, 2007 Drainage Manual, Adopted August 14, 2007 10/00/2007 California Air Resources Board, Expanded List of Early Action Measures to Reduce Greenhouse Gas Emissions in California Recommended for Board Consideration (Oct. 2007) 10/25/2007 California Air Resources Board, ARB approves tripling of early action measures required under AB 32, News Release 07 -46 (Oct. 25, 2007) 12/13/2007 Santa Clara Valley Transportation Authority, Bicycle Technical Guidelines: A Guide for Local Agencies in the Planning, Design and Maintenance of Bicycle Facilities and Bicycle - Friendly Roadways, Adopted Sept. 2, 1999, Revision I Adopted Dec. 13, 2007 00/00/2008 San Jose, City of, Traffic Impact Analysis Handbook- Volume II- Policies and Guidelines 2008 00/00/2008 California Department of Forestry and Fire Protection, Very High Fire Hazard Severity Zones in LRA As Recommended by CAL FIRE, Map ID No. FHSZL_c43_Cupertino 00/00/2008 California Geological Survey, Guidelines for Evaluating and Mitigating Seismic Hazards in California, Special Publication 117A 1 -40 sf- 3345921 v2 ATTACHMENT I INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2 PROJECT 1 -41 sf- 3345921 v2 DATE DOCUMENT 00/00/2008 U.S. Geological Survey, Forecasting California's Earthquakes — What Can We Expect in the Next 30 Years 01/01/2008 Institute of Transportation Engineers, Trip Generation Handbook, An ITE Informational Report, 8th Edition, Land Use 210: Single - Family Detached Housing, pp. 289 -569 01/01/2008 Institute of Transportation Engineers, Trip Generation Handbook, An ITE Informational Report, 8th Edition, Land Use 310: Hotel, pp.570- 657 01/01/2008 Institute of Transportation Engineers, Trip Generation Handbook, An ITE Informational Report, 8th Edition, Land Use: 501 Military Base, pp. 922 -1132 01/01/2008 Institute of Transportation Engineers, Trip Generation Handbook, An ITE Informational Report, 8th Edition, Land Use: 710 General Office Building, pp. 1194 -1355 01/01/2008 Institute of Transportation Engineers, Trip Generation Handbook, An ITE Informational Report, 8th Edition, Land Use: 812 Building Materials and Lumber Store pp. 1356 -1743 01/01/2008 Institute of Transportation Engineers, Trip Generation Handbook, An ITE Informational Report, 8th Edition, Land Use: 911 Walk -In Bank, pp. 1744 -1922 03/00/2008 Sunnyvale, City of, City of Sunnyvale Zoning Map 03/18/2008 Santa Clara County, Operational Area Emergency Operations Plan 05/00/2008 California Regional Water Quality Control Board, San Francisco Bay Region, Screening for Environmental Concerns at Sites with Contaminated Soil and Groundwater, San Francisco Bay Region, Interim Final, November 2007 (as revised May 2008) 06/00/2008 Santa Clara Valley Transportation Authority, Santa Clara Countywide Bicycle Plan, 2008 Final Draft 06/00/2008 Association of Bay Area Governments, San Francisco Bay Area Housing Needs Plan 2007 -2014 1 -41 sf- 3345921 v2 ATTACHMENT I INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2 PROJECT 1 -42 sf- 3345921 Q DATE DOCUMENT 08/07/2008 California Department of Toxic Substances Control, Interim Guidance for Sampling Agricultural Properties (Third Revision) 12/00/2008 California Air Resources Board, Climate Change Scoping Plan: a framework for change (Dec. 2008) 12/16/2008 Sunnyvale, City of, 2010 Urban Water Management Plan, Appendix F, Water Resources Sub - element of the General Plan, 2008 Update, Adopted by City Council on Dec. 16, 2008 00/00/2009 Santa Clara Valley Transportation Authority, Valley Transportation Plan 2035 00/00/2009 San Francisco Public Utilities Commission, Water Utilities Climate Alliance http: / /www.wucaonline.org/html /about member agencies.html (last visited Apr. 30, 2012) 00/00/2009 Association of Bay Area Governments, Projections and Priorities 2009, Building Momentum, San Francisco Bay Area Population, Household, and Job Forecasts, pp. 118 -121 03/00/2009 Santa Clara Valley Transportation Authority, Transportation Impact Analysis Guidelines, Adopted March 2009 03/00/2009 Santa Clara Valley Transportation Authority, Transportation Impact Analysis Guidelines, Adopted May 1998, Updated March 2009 03/03/2009 Santa Clara, County of, Comprehensive County Expressway Planning Study 2008 Update, March 3, 2009 05/00/2009 California Energy Commission, The Future is Now: An Update on Climate Change Science, Impacts, and Response Options for California (May 2009) 07/00/2009 California Air Pollution Control Officers Association, Health Risk Assessment for Proposed Land Use Projects, CAPCOA Guidance Document, Approved for Release July 2009 10/14/2009 Letter from Bruce H. Wolfe, California Regional Water Quality Control Board, San Francisco Bay Region, to Larry Cowles, Apple, Inc. re: Approval of Remedial Action Completion Report, Addendum 1 -42 sf- 3345921 Q ATTACHMENT I INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2 PROJECT 1 -43 sf- 3345921 Q DATE DOCUMENT to Remedial Action Completion Report, and Second Addendum to Remedial Action Completion Report for the Former Tandem Computers Facility, 19333 Vallco Parkway, Cupertino, Santa Clara County 12/00/2009 Santa Clara Valley Water District, Calabazas Creek Flood Protection Project: Final Initial Study and Mitigated Negative Declaration (Project Number 26104001), prepared by Environmental Sciences Associates 12/00/2009 Milpitas, City of, 2009 Water Master Plan Update (Dec. 2009) 00/00/2010 U.S. Environmental Protection Agency, Press Release: EPA to Set Modest Pace for Greenhouse Gas Standards / Agency stresses flexibility and public input in developing cost - effective and protective GHG standards for largest emitters (Dec. 23, 2010) http: / /yosemite.epa. gov /opa /admpress.nsf /dOcf6618525 a9efb 852573 59 003fb69d /d2f038e9daed78.. (last visited Apr. 30, 2012) 00/00/2010 Santa Clara Valley Water District, Calabazas Creek Flood Protection Project Brochure 00/00/2010 U.S. Census Bureau, Profile of General Population and Housing Characteristics: 2010, 2010 Demographic Profile Data 00/00/2010 California Air Resources Board, California Clean Car Standards — Pavely, Assembly Bill 1493, http: / /arb.ca.gov /cc /ccros /ccros.htm (last visited Apr. 30, 2012) 00/00/2010 California Air Resources Board, Trends in California Greenhouse Gas Emissions for 2000 to 2008 — by Category as Defined in the Scoping Plan (May 28, 2010) 00/00/2010 CalRecycle, 2010 Estimated Solid Waste Generation Rates for Commercial Establishments http: / /www.calrecycle. ca. gov /wastechar /wastegenrates /C ommercial.ht m (last visited May 1, 2012) 01/00/2010 Bay Area Air Quality Management District, Air Toxics NSR Program Health Risk Screening Analysis Guidelines, January 2010 01/14/2010 Santa Clara Unified School District, Long Range Facilities Master Plan, Looking at School Facility Needs 2010 -2038, pp. 237, 293 -294 1 -43 sf- 3345921 Q ATTACHMENT I INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2 PROJECT 1 -44 sf- 3345921 Q DATE DOCUMENT 02/00/2010 Bay Area Air Quality Management District, Source Inventory of Bay Area GHG Emissions (Feb. 2010) 04/00/2010 Bay Area Economics, City of Cupertino Housing Element Update, 2007 -2014 04/10/2010 American Planning Association, Policy Guide on Surface Transportation (Apr. 10, 20 10) http: / /www.planning. org_/policy/guides /adopted /surfacetransportation.h tm (last visited May 1, 2012) 04/20/2010 Cupertino, City of, City Council Staff Report, Agenda Item No. 13, Consider authorizing staff to move forward with the Historic Preservation Policy and related General Plan Amendment, Application No. CP- 2007 -03, City of Cupertino, Citywide 07/12/2010 California Public Utilities Commission, & the Water Energy Team of the Climate Action Team (WetCat), Implementing a Public Goods Charge for Water (July 12, 20 10) 09/15/2010 Bay Area Air Quality Management District, Bay Area 2010 Clean Air Plan, Final Clean Air Plan — Volume 1, Adopted September 15, 2010 09/15/2010 Bay Area Air Quality Management District, Bay Area 2010 Clean Air Plan, Volume 2, Adopted September 15, 2010 09/28/2010 Stantec Consulting Corporation, Phase I Environmental Site Assessment, Hewlett- Packard Company Cupertino, North Campus, Cupertino, California, Buildings 42 through 48 09/30/2010 California Regional Water Quality Control Board, San Francisco Bay Region, Fourth Five Year Review, Intersil Inc. /Siemens Components Superfund Site, 10900 and 10950 North Tantau Road, Cupertino, Santa Clara County, California 11/03/2010 Erler & Kalinowski, Inc., Phase I Environmental Site Assessment and Results of Subsurface Investigations, 10590 -10596 and 10600 North Tantau Avenue, Cupertino, California, 2010 11/17/2010 Fehr & Peers, Saratoga, City of, Circulation and Scenic Highway Element Update, City of Saratoga, California, Background Report and Goals, Policies and Implementation Measures, Nov. 17, 2010 1 -44 sf- 3345921 Q ATTACHMENT I INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2 PROJECT 1 -45 sf- 3345921 v2 DATE DOCUMENT 00/00/2010 Santa Clara General Plan 2010 -2035 00/00/2011 CalRecycle, 2011 Solid Waste Characterization Database Waste Disposal Rates for Business Types http: / /www.calrecycle.ca.gov /wastechar /DispRate.htm (last visited May 1, 2012) 00/00/2011 Santa Clara Valley Water District, 2010 Urban Water Management Plan 00/00/2011 Santa Clara, City of, Santa Clara, Municipal Code Chapter 9. 10, Regulation of Noise and Vibration, htlp:// www .codepublishing.com /ca/santacl ara /frameless /index.pl ?path= ../html /SantaClara09 /Santa... (last visited May 3, 2012) 00/00/2011 San Francisco Planning Department, Standards for Bird -Safe Buildings, Adopted July 14, 2011 00/00/2011 Sunnyvale, City of, Community Vision - Citywide Goals (General Plan) 00/00/2011 Cupertino, City of, City of Cupertino Demographics 2011 00/00/2011 Allied Waste Services, Newby Island Resource Recovery Park, http:// www. alliedwastescco .com /facilities.cfm (last visited June 4, 2012) 00/00/2011 Apple Inc., Apple Reuse and Recycling Program, hLtp://www.gpple.com/recycling/gift-card/ (last visited June 4, 2012) 00/00/2011 California Department of Resources Recycling and Recovery, Waste Stream Information Profiles: Jurisdiction Profile for City of Cupertino. 00/00/2011 California Department of Resources Recycling and Recovery, California Waste Stream Profiles: Active Landfills Profile for Newby Island Sanitary Landfill (43 -AN -0003) 00/00/2011 California Gas and Electric Utilities, 2010 California Gas Report 2010 00/00/2011 California Department of Resources Recycling and Recovery, Solid Waste Characterization Database, Waste Disposal Rates for Business Types, http:Hcalrecycle.ca.gov /wastechar /Dis]2Rate.htm (last visited 1 -45 sf- 3345921 v2 ATTACHMENT I INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2 PROJECT 1 -46 sf- 3345921 Q DATE DOCUMENT June 4, 2012) 00/00/2011 California Water Service Company, 2010 Urban Water Management Plan, Los Altos Suburban District, Adopted June 2011 00/00/2011 California Water Service Company, Los Altos District, http: / /www.calwater.com /your_ district /index.php ?district =las (last visited June 4, 2012) 00/00/2011 Cupertino Municipal Code, Chapter 16.40.130 Fire Code http: / /www.amlegal .com /alpscripts /get- content.aspx (last visited June 4, 2012) 00/00/2011 Cupertino, City of, City of Cupertino Municipal Code, Chapter 16.72: Recycling and Diversion of Construction and Demolition Waste http: / /www.amlegal .com /alpscripts /get- content.aspx (last visited June 4, 2012) 00/00/2011 Cupertino, City of, Public Safety, Sheriffs Office, http : / /www.cupertino.org /index.aspx ?page =364 (last visited June 4, 2012) 00/00/2011 Fremont Union High School District, Concurrent Enrollment, http: / /www.fuhsd.org /concurrent (last visited June 4, 2012) 00/00/2011 Pacific Gas & Electric Company, Electric System, http: / /pge. com /mybusiness /edusafety/systemworks /electric/ (last visited June 4, 2012) 00/00/2011 San Jose, City of, Wastewater, San Jose /Santa Clara Water Pollution Control Plant, htlp: / /www.sanjoseca.gov /esd /wastewater /water- pollution- control- plant.aM (last visited June 4, 2012) 00/00/2011 Santa Clara County Fire Department, Department Information, http: / /www.sccfd.org/de]t inform ation.html (last visited June 4, 2012) 00/00/2011 Santa Clara Valley Water District, Calabazas Creek Capacity Improvement Project, hU:// www. valleywater. org/ CalabazasCreckCgpaciiylmprovement .aspx (last visited June 1, 2012) 00/00/2011 Sunnyvale Municipal Code, Title 16, Buildings and Construction, htlp:Hgcode.us/ codes /sunnyvale /view.php ?topic =16 &frames =on (last 1 -46 sf- 3345921 Q ATTACHMENT I INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2 PROJECT 1 -47 sf- 3345921 Q DATE DOCUMENT visited May 3, 2012) 00/00/2011 Sunnyvale Municipal Code, Title 19, section 19.42.030, Noise or Sound Level, htlp://gcode.us/ codes /sunnyvale /view.php ?topic =19 -4- 19_42- 19_42_030 &frames =on (last visited May 3, 2012) 00/00/2011 Association of Bay Area Governments, Bay Area Census, http: / /www.bayareacensus.ca.gov /cities /Cupertino.htm (last visited May 17, 2013) 00/00/2011 California, State of, E -5 Population and Housing Estimates for Cities, Counties, and the State, 2010 -2011, with 2010 Benchmark (2011b) 00/00/2011 California, State of, E -1 City /County Population Estimates with Annual Percent Change, January 1, 2010 and 2011 (2011 a) 00/00/2011 Santa Clara Valley Water District, Water Resources Protection Ordinance 00/00/2011 California Air Resources Board, Fact Sheets, last reviewed May 3, 2013, htlp:/ /www.a.rb.ca.gov/html /fslist.htm (last visited May 22, 2013) 00/00/2011 California Department of Transportation, California Scenic Highway Mapping System, www.dot.ca.gov /hg /LandArch /scenic highwUs/index.htm (last visited June 1, 2012) 00/00/2011 Cupertino Municipal Code, Title 19: Zoning, http: / /www.amlegal.com /alpscripts /get- content.aspx (last visited June 5, 2012) 00/00/2011 U.S. Department of Labor, Occupational Safety & Health Administration, Regulations, Standards 29 CFR, Occupational Noise Exposure 1910.95 http: / /www.osha.gov /pls/ oshaweb /owadisp.show_document ?p table =S TANDARDS &p_id =9735 (last visited May 3, 2012) 00/00/2011 Erler & Kalinowski, Inc, Site Investigation Report, 10900 North Wolfe Road, Cupertino, California, Buildings 42 through 48, 2011 a 00/00/2011 Erler & Kalinowski, Inc., Phase I Environmental Site Assessment and Results of Sub -Slab Soil Gas Sampling, 10670 and 10700 -10710 North 1 -47 sf- 3345921 Q ATTACHMENT I INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2 PROJECT 1 -48 sf- 3345921 v2 DATE DOCUMENT Tantau Avenue, Cupertino, California, 201 lb 00/00/2011 Cupertino Municipal Code, Chapter 19.60: General Commercial (CG) Zones, http: / /www.amlegal. com /alpscripts /get - content.aspx (last visited May 23, 2012) 00/00/2011 Cupertino Municipal Code, Chapter 10.48: Community Noise Control, http: / /www.amlegal .com /alpscripts /get- content.aspx (last visited Nov. 28, 2011) 00/00/2011 State Water Resources Control Board, Geotracker Environmental Database 00/00/2011 Environmental Data Resources Inc., The EDR Radius Map Report with GeoCheck, Apple Campus 2, 10900 North Wolfe Road, Cupertino, California, 95014, Inquiry Number 3176121.1s 00/00/2011 U.S. Geological Survey, EHP Quaternary Faults 00/00/2011 Association of Bay Area Governments, Earthquake and Hazards Program, Geologic Materials Shaking Amplification Maps 00/00/2011 Association of Bay Area Governments, Liquefaction Susceptibility Map 00/00/2011 Bay Area Air Quality Management District, BAAQMD Specified Speciation Profile for OFFROAD Diesel TOG, p. 88 03/21/2011 Federal Aviation Administration, Airport Facilities Data, Santa Clara County, Information Current as of 02/09/12 hLtp://www.faa.gov/aip2orts/aip2ort safety/aip2ortdata_5010 /menu /inde x.cfm (last visited Mar. 21, 2012) 03/22/2011 U.S. Geological Survey, Earthquake Hazards Program, 2008 National Seismic Hazard Maps - Fault Parameters, http:// geohazards. usgs .gov /cfusion/hazfaults_search /disp hf info.cfin? cfault id =1abcd (last visited Mar. 22, 2012) 04/01/2011 Muffly, Dave, Apple Campus 2 Consolidated Arborist Report 04/25/2011 Stantec Consulting Corporation, Sub - Surface Investigations, Hewlett - Packard Company, Cupertino North Campus, Buildings 42 through 48 1 -48 sf- 3345921 v2 ATTACHMENT I INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2 PROJECT 1 -49 sf- 3345921 v2 DATE DOCUMENT 04/28/2011 Stantec Consulting Corporation, Additional Sub - Surface Investigation, Hewlett- Packard Company, Cupertino North Campus, Buildings 42 through 48, 201 lb 05/00/2011 Bay Area Air Quality Management District, Recommended Methods for Screening and Modeling Local Risks and Hazards 05/00/2011 Bay Area Air Quality Management District, CEQA Air Quality Guidelines Updated May 2011 05/15/2011 California Department of Parks and Recreation, Office of Historic Preservation, Directory of Properties in the Historic Property Data File for Santa Clara County, p. 4 05/25/2011 Santa Clara County Airport Land -Use Commission, Comprehensive Land Use Plan Santa Clara County, Norman Y. Mineta, San Jose International Airport 05/31/2011 Fehr & Peers, Apple Campus 2 Draft Transportation Impact Analysis 06/00/2011 Santa Clara Valley Water District, 2010 Groundwater Quality Report 06/00/2011 California Water Service Company, 2010 Urban Water Management Plan Los Altos- Suburban District, Adopted June 2011 06/10/2011 Citizens For Responsible Equitable Environmental Development v. City of Chula Vista, 197 Cal.App.4th 327 (2011) 07/00/2011 Fehr & Peers, Apple Headquarters Campus Transportation Study 07/00/2011 Sunnyvale General Plan, Consolidated in 2011 07/11/2011 Unidocs, Who Regulates What in Santa Clara County, Page Updated on 7/11/2011 http: / /www.unidocs.org /members /whoregulateswhat.html (last visited Sept. 26, 2011) 07/14/2011 San Francisco Planning Department, Standards for Bird -Safe Buildings, Adopted by the San Francisco Planning Commission July 14, 2011 07/15/2011 Page and Turnbull, Inc., Historic Resource Evaluation, Glendenning Barn 1 -49 sf- 3345921 v2 ATTACHMENT I INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2 PROJECT 1 -50 sf- 3345921 v2 DATE DOCUMENT 07/27/2011 U.S. Environmental Protection Agency, Test Methods for Evaluating Solid Waste, Physical /Chemical Methods, SW -846, Last Updated July 27, 2011 http: / /www.epa.gov /epawaste /hazard /testmethods /index.htm (last visited Mar. 21, 2012) 08/09/2011 AC2 Application Form, Community Development Department, City of Cupertino 09/00/2011 California, State of, Monthly Labor Force Data for Cities and Census Designated Places (CDP), September 2011- Preliminary 09/08/2011 Agenda, City of Cupertino Community Development, Environmental Impact Report (EIR) Scoping Session, Thursday, September 8, 2011, htlp: // Cupertino. granicus.com /DocumentViewer.php ?file= cupertino_ff3 e7a33d27eOb185c6.. (last visited Sept. 25, 2013) 09/08/2011 Agenda, City of Cupertino, Environmental Impact Report (EIR) Scoping Session, September 8, 2011 09/08/2011 Final PowerPoint Presentation, City of Cupertino, Environmental Impact Report (EIR) Scoping Session, September 8, 2011 09/08/2011 LSA Associates, Scoping Session Slides, Environmental Impact Report (EIR) Scoping Session, September 8, 2011 09/16/2011 USDA Natural Resources Conservation Service, Soil Map — Santa Clara Area, California, Western Part (Apple Campus 2 Soil Map) 09/22/2011 California Geological Survey, Probabilistic Seismic Hazards, Peak Ground Acceleration, hLtp://www.conservafion.ca.gov/cgs/rghm/Tsha/Pages/Tga.aspX (last visited Sept. 22, 2011) 09/26/2011 Cupertino Municipal Code, Chapter 9.12, Hazardous Materials Storage, http : / /www.amlegal.com /alpscfipts /get - content.aspx (last visited Sept. 26, 2011) 10/00/2011 California Department of Fish and Wildlife, California Natural Diversity Data Base Computer Printout for Species Occurrences Within a 5 -mile Radius of the Project Site, Figure 999 prepared by LSA 1 -50 sf- 3345921 v2 ATTACHMENT I INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2 PROJECT 1 -51 sf- 3345921 v2 DATE DOCUMENT 10/00/2011 California Department of Toxic Substances Control, Final Guidance for the Evaluation and Mitigation of Subsurface Vapor Intrusion to Indoor Air (Vapor Intrusion Guidance) (Oct. 2011) 10/14/2011 California Native Plant Society, Electronic Inventory of Rare and Endangered Plants of California, http: / /www.rareplants.cnps.org /result.html ?adv =t &quad= 37122C 1:9 (last visited Oct. 14, 2011) 10/17/2011 United States Fish and Wildlife Service, Federal Endangered and Threatened Species That Occur in or may be affected by Projects in the Cupertino (428D) U.S.G.S. 7.5 Minute Quad, On -line Database. 10/27/2011 California Air Resources Board, California's Greenhouse Gas Inventory, Last Reviewed Oct. 27, 2011 http: / /www.arb.ca.gov /cc /inventory old /doc /doc.htm (May 1, 2012) 11/03/2011 Email from Gary Chao, to Adam Weinstein re: Requested Employee Data 11/04/2011 Memorandum from Deputy Chief Don Jarvis, to Caroline Park, LSA Associates, Inc., re: Apple Campus 2 Project Environmental Impact Report 11/07/2011 Letter from Richard Tanaka, Cupertino Sanitary District, to Caroline Park, LSA Associates, re: Apple Campus 2 Environmental Impact Report 11/09/2011 Letter from LSA Associates, Inc. to Santa Clara County Historical & Genealogical Society and Cupertino Historical Society re Apple Campus 2 11/10/2011 U.S. Geological Survey, Fault number 56, Monte Vista - Shannon fault zone, in Quaternary fault and fold database of the United States:, http: / /earthquakes.usgs.gov /re iog nal /qfaults (last visited Nov. 10, 2011) 11/10/2011 Western Regional Climate Center, General Climate Summary, San Jose, CA 11/12/2011 Letter from Cupertino Historical Society to LSA Associates, Inc., re: Apple Campus 2 1 -51 sf- 3345921 v2 ATTACHMENT I INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2 PROJECT 1 -52 sf- 3345921 v2 DATE DOCUMENT 11/14/2011 Memorandum from Caroline Park, Assistant Planner, LSA Associates, Inc., re: November 14, 2011 Telephone Conversation with Cheri Donnelly, Environmental Program Manager, Solid Waste and Stormwater. City of Cupertino Public Works Department, (408)- 777 -3242 11/14/2011 Letter from Bobbie Plough, Santa Clara Unified School District, to Caroline Park, LSA Associates, re: Apple Campus 2 Project EIR — Schools Input 11/16/2011 Email from Miguel R. Grey to Cheri Page, Baseline, Re: Emergency Operations Plan (EOP) Request 11/17/2011 Letter from Laurie Smith, County of Santa Clara, Office of the Sheriff, to Caroline Park, LSA Associates re: West Valley Patrol Division 11/18/2011 Memorandum from Don Jarvis, to Caroline Park, re: Apple Campus 2 Fire response '12/00/2011 California Air Resources Board, Trends in California Greenhouse Gas Emissions for 2000 to 2009 by Category as Defined in the Air Resources Board's 2008 Scoping Plan (Dec. 2011) 00/00/2012 U.S. Environmental Protection Agency, Inventory of U.S. Greenhouse Emissions and Sinks: 1990 — 2010, EPA 430 -R -12 -001 (Apr. 15, 2012) 00/00/2012 AEP, 2012 California Environmental Quality Act (CEQA) Statute and Guidelines p.7, htlp: / /Ieginfo.ca.gov/ (last updated Jan. 1, 2012) 00/00/2012 Cupertino Union School District, Possible School Repair Bond, http: / /www.edline.net /pa esg /CUpertino_Union_SD /About_ the District /Bond (last visited June 4, 2012) 00/00/2012 Fremont Union High School District, Bond Program, hLtp://www.fuhsd.org/BONDprogram (last visited June 4, 2012) 00/00/2012 Pacific Gas & Electric Company, Clean Energy Solutions, http: / /pge. com /mybusiness/ environment /pge /cleanenergy /index.shtml (last visited June 4, 2012) 00/00/2012 Santa Clara Unified School District, Bond Projects, htlp://www.santaclarausd.org/bondplqiqglLg_ft (last visited June 4, 1 -52 sf- 3345921 v2 ATTACHMENT I INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2 PROJECT 1 -53 sf- 3345921 v2 DATE DOCUMENT 2012) 00/00/2012 Santa Clara Valley Water District, Trails and Open Space Program http: / /www.valleywater.org/ Services /TrailsAndOpenSpace.aspx (last visited June 4, 2012) 00/00/2012 Cupertino, City of, Community Development Department, Building Division, Chapter 16.72: Recycling and Diversion of Construction and Demolition Waste, http://www.amlegal.com/alpscripts/get- content.aspx (last visited June 4, 2012) 00/00/2012 California Department of Education, California Public School Enrollment District Report: 2002 -03 District Enrollment by Grade Santa Clara Unified, Data as o£ 5/22/2006 3:43:02 PM 00/00/2012 Arup, MEP — Central Plants Energy and Equipment Summary (2012) 01/16/2012 Community Development Department, Personal communication with LSA Associates, Inc., January 16. (Table V.M -4) 01/23/2012 Letter from Two Very Concerned Citizens to Cupertino City Council re: Closure of Pruneridge 01/24/2012 Ghosh, Piu, Personal communication with LSA Associates, Inc., January 24 02/01/2012 Yarne & Associates, Inc, Apple Campus 2 Development Project SB610 Water Supply Assessment, Final February 1, 2012 02/02/2012 California Code of Regulations, Title 23, Section 66273.30, Standards for Universal Waste Handlers (Cal. Code Regs. tit. 23, § 66273.30) 02/07/2012 California Air Resources Board, Ambient Air Quality Standards, Table V.L -3) 03/08/2012 Letter from Richard Tanaka, Cupertino Sanitary District, to Piu Ghosh, City of Cupertino re: Application Comments 03/20/2012 California Health and Safety Code, Section 25500- 25520, htlp: / /www.leginfo. ca. gov /cgi_ bin/displaycode? section =hsc &group= 25001 -26000 &file = 25500 -25520 (last visited Mar. 20, 2012) 1 -53 sf- 3345921 v2 ATTACHMENT I INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2 PROJECT 1 -54 sf- 3345921 Q DATE DOCUMENT 03/20/2012 California Health and Safety Code, Section 25404- 25404.9, htlp: / /www.leginfo.ca. gov/cgii- bin /displUcode? section =hsc &group= 25001- 26000 &file= 25404- 25404.9 (last visited Mar. 20, 2012) 03/20/2012 California Code of Regulations, Title 8, Section 5192, Hazardous Waste Operations and Emergency Response (Cal. Code Regs. tit. 8, § 5192) http:// www.dir.ca.gov /Title8 /5192.html (last visited Mar. 20, 2012) 03/20/2012 California Code of Regulations, Title 8, Section 5208, Asbestos, (Cal. Code Regs. tit. 8, § 5208 http: / /weblinks.westlaw. com /result/default.aspx? action = Search &cfi d =1 &cnt= DOC &db= CA %2DADC &eq =sea.. (last visited Mar. 20, 2012) 03/20/2012 California Code of Regulations, Title 17, Section 93105, Asbestos Airborne Toxic Control Measure for Construction, Grading, Quarrying, and Surface Mining Operations (Cal. Code Regs. tit. 17, § 93105) htlp: / /www.arb.ca.gov /toxics /atcm /asb2atcm.htm (last visited Mar. 20, 2012) 03/20/2012 Email from Michael Balliet to Piu Ghosh re: comments on ASA Approval 03/20/2012 Email from Patrick Grant to City of Cupertino Planning Dept., treagankgpple.com re: Comment on Apple 2 updated plan 03/22/2012 Cupertino, City of, Community Development, Building, www.cLipertino.org/index.aspx?page=296, (last visited Mar. 22, 2012) 03/27/2012 Foster + Partners and Olin, Apple Campus 2, Draft Streetscape Strategy 03/28/2012 Letter from Roy Moleed, Valley Transportation Authority to Gary Chao, City of Cupertino re: Apple Campus 2 04/00/2012 Apple Campus 2, Waste Diversions Programs in Cupertino, Draft — April 2012 04/12/2012 Email from Adam Weinstein, LSA Associates, to Caroline Park re: FW: Draft School Reports — Apple Campus 2 1 -54 sf- 3345921 Q ATTACHMENT I INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2 PROJECT 1 -55 sf- 3345921 Q DATE DOCUMENT 04/12/2012 Letter from Peter Oppenheimer, SVP and Chief Financial Officer, Apple, Inc., to Aarti Shrivastava, City of Cupertino, re: Apple Campus 2 Project: Acknowledgement of Obligations under Public Resources Code § 21183(d), (e) and (f) 04/13/2012 Email from Adam Weinstein, LSA Associates, to Caroline Park, re: FW: LSA data table (Cupertino Union School District Capacity and Enrolment Data) 04/16/2012 Email from Steve Newgren to Manish Dalia re: Apple Campus 2 and Coordination with VTA (Apr. 16, 2012 10:29 AM PDT) 04/17/2012 Environmental Protection Agency, Table V.L -2 Reference (Table V.L- 2) Monitor Values Report, Santa Clara County, CO Pollutant, 2008- 2010, http: / /www.epa.gov /airdata (last visited Apr. 17, 2012) 04/17/2012 Environmental Protection Agency, Table V.L -2 Reference (Table V.L- 2) Monitor Values Report, Santa Clara County, NO2 Pollutant, 2008- 2010, http: / /www.epa.gov /airdata (last visited Apr. 17, 2012) 04/17/2012 Environmental Protection Agency, Table V.L -2 Reference (Table V.L- 2) Monitor Values Report, Santa Clara County, Ozone Pollutant, 2008- 2010, http: / /www.epa.gov /airdata (last visited Apr. 17, 2012) 04/17/2012 Environmental Protection Agency, Table V.L -2 Reference (Table V.L- 2) Monitor Values Report, Santa Clara County, PM 10 Pollutant, 2008- 2010, http: / /www.epa.gov /airdata (last visited Apr. 17, 2012) 04/17/2012 Environmental Protection Agency, Table V.L -2 Reference (Table V.L- 2) Monitor Values Report, Santa Clara County, PM2.5 Pollutant, 2008- 2010, http: / /www.epa.gov /airdata (last visited Apr. 17, 2012) 04/17/2012 Environmental Protection Agency, Table V.L -2 Reference (Table V.L- 2) Monitor Values Report, Santa Clara County, S02 Pollutant, 2009- 2010, http: / /www.epa.gov /airdata (last visited Apr. 17, 2012) 04/18/2012 Application for Environmental Leadership Development Project, Apple, Inc., April 18, 2012 04/24/2012 California Air Resources Board, ARB Fact Sheet: Air Pollution Sources, Effects and Control, page reviewed December 2, 2009, http:// www. arb. ca. gov /research/bealth /fs /fs2 /fs2.htm (last visited 1 -55 sf- 3345921 Q ATTACHMENT I INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2 PROJECT 1 -56 sf- 3345921 v2 DATE DOCUMENT 04/24/12) 05/00/2012 Bay Area Air Quality Management District, CEQA Air Quality Guidelines, Updated May 2012 05/00/2012 Schoolhouse Services, Apple Campus 2 School Impacts on the Cupertino Union School District, May 2012 (2012a) 05/00/2012 Schoolhouse Services, Apple Campus 2 School Impacts on the Fremont Union High School District, May 2012 (2012b) 05/04/2012 Email from Cathy Van Pernis to Caroline Park re: Data from SCUSDC (Santa Clara Unified School District Capacity and Enrollment Data) 05/07/2012 California Department of Transportation, Highway Design Manual, Chapter 1000: Bicycle Transportation Design, Topic 1001 - Introduction 05/16/2012 Bay Area Air Quality Management District, Summary and Analysis of Cupertino Air Monitoring Results, Updated May 16, 2012 05/18/2012 Letter from Gavin R. Keith, Preconstruction Director, DPR Skanska, a Joint Venture, to Terry Reagan, Apple, Inc. re: Apple Campus 2, Cupertino, CA, Prevailing & Union Wage Rate Comparison 05/18/2012 Letter from Neil Struthers, CEO, Santa Clara & Benito Counties Building & Construction Trades Council to Ken Alex, Governor's Office of Planning and Research re: Comments in Support of Apple Campus 2 Project AB 900 Application (SCH # 2011 082055) 05/21/2012 Letter from Robert Cartier, Archaeological Resource Management, to Aarti Shrivastava, City of Cupertino re: The New Apple Campus Construction 05/22/2012 Letter from Kitty Moore to Cupertino Planning Department 06/00/2012 LSA Associates, Apple Campus 2 Project EIR, V. Setting, Impacts and Mitigation Measures, C. Population, Employment, and Housing, Administrative Draft #1, p. 103 (Redline version) 06/00/2012 LSA Associates, Apple Campus 2 Project EIR, V. Setting, Impacts and Mitigation Measures, M. Public Services and Utilities, Administrative 1 -56 sf- 3345921 v2 ATTACHMENT I INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2 PROJECT 1 -57 sf- 3345921 Q DATE DOCUMENT Draft 91, p. 292 (Redline version) 06/00/2012 Governor's Certification Granting Judicial Streamlining For the Apple Campus 2 Project in the City of Cupertino Exhibits to Governor's Certification • Exhibit 1: Application for Environmental Leadership Development Project (Apr. 18, 2012) • Exhibit II: Transportation efficiency required by AB 900 • Exhibit III: Letter from Gavin R. Keith, DPR and Skanska, to Terry Reagan, Apple Campus 2, Cupertino, CA, Prevailing & Union Wage Rate Comparison • Exhibit IV: Letter from Lynn M. Terry, Air Resource Board, to Ken Alex, Office of Governor Edmund G. Brown Jr. re: AB 900 Certification • Exhibit V: Letter from Peter Oppenheimer, Apple, Inc., to Aarti Shrivastava, City of Cupertino, re: Apple Campus 2 Project: Acknowledgement of Obligations Under Public Resources Code § 21183(d), (e) and (f) 06/04/2012 Cupertino Municipal Code 19.124 Parking Regulation www.amlegal. com /alpscripts /get - content.aspx (last updated June 4, 2012) 06/04/2012 Santa Clara Valley Water District, Silicon Valley Advanced Water Purification Center, http:/ /www.valleMater.org/SVAWPC.aspx (last visited June 4, 2012) 06/05/2012 Cupertino, City of, Chapter 14.18: Protected Trees. Ordinance No. 07- 2003, http: / /www.amlegal .com /alpscripts /get- content.aspx (last visited June 5, 2012 06/08/2012 Letter from Beez Glendenning Jones to Mark Santoro, City of Cupertino 06/10/2012 Email from Blue to City of Cupertino Planning Department re: Cupertino Apple Campus 2 1 -57 sf- 3345921 Q ATTACHMENT I INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2 PROJECT 1 -58 sf- 3345921 v2 DATE DOCUMENT 06/14/2012 Letter from Lynn M. Terry, California Air Resources Board to Ken Alex Office of Governor Edmund G. Brown Jr. (June 14, 20 10) 06/14/2012 • Executive Order LP -12 -002 Relating to Determination of Any Net June Additional Greenhouse Gas Emissions Pursuant to Public Resources Code section 21183, subd.(c). • Attachment A Air Resource Board Staff Assessment of the Apple Campus 2 Application for Environmental Leadership Development Project • Attachment B Application for Environmental Leadership Development Project • Attachment C Net Zero Energy Strategy for Apple Campus 2 • Attachment D Statement of Construction Emissions and Participation in California's Direct Access Program 06/18/2012 Email from David McWalters to Santa Clara Neighbors for Responsible_ Developmentgyahoogroups .corn re: Re: [Santa — Clara _ Neighbors_ for Responsible_ Development] Apple's proposed new campus 06/20/2012 Santa Clara Valley Transportation Authority, CMP Monitoring and Conformance Report 2011 06/24/2012 Email from Susan Sievert to Mark Santoro, Orrin Mahoney, Gilbert Wong, Barry Chang re: I'm done with Apple's mind - boggling greed 06/26/2012 California Department of Transportation, Highway Design Manual, Chapter 1000: Bikeway Planning and Design, Topic 1001 — General Criteria 06/27/2012 Memorandum from Chad Mosley, re: Caroline Park, re: Apple 2 DEIR- Signal Preemption System Information Request 06/29/2012 Email from Darrel Lum to Amy Chan re: Apple Campus 2 06/30/2012 Willdan Financial Services with Urban Economics, Santa Clara Valley Habitat Plan Development Fee Nexus Study 1 -58 sf- 3345921 v2 ATTACHMENT I INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2 PROJECT 1 -59 sf- 3345921 Q DATE DOCUMENT 06/30/2012 Email from Jim Walker to Cupertino City Council re: Apple Campus 2 07/23/2012 Letter from Mark Leno, Joint Legislative Budget Committee, to Ken Alex, Governor's Office of Planning and Research, re: AB900 Certification 08/00/2012 Santa Clara, County of, Final Santa Clara Valley Habitat Plan 08/01/2012 Letter from Carl Guardino, Silicon Valley Leadership Group to City of Cupertino 08/14/2012 Email from Jim Dobbins to City Council re: New Apple Campus & Apple Buses 08/16/2012 Email from Kenneth Binder to Caroline Park re: Apple Campus 2 Project EIR Updated Information 09/04/2012 Email from Piu Ghosh to Adam Weinstein, Judith Malamut re Kao Lee Comment 10/00/2012 CH2M Hill, Draft Initial Study/Mitigated Negative Declaration for Wolfe Road Recycled Water Project, prepared for the City of Sunnyvale 10/26/2012 Email from Piu Ghosh to Adam Weinstein and Judith Malamut re Melissa Hippard Email Chain 10/29/2012 Arup North America Ltd., Apple Campus 2 Project Environmental Impact Report Lighting Technical Report - ISSUE 10/31/2012 OLIN, Memorandum to Peter Sokoloff, Foster + Partners, EIR Landscape Narrative 11/00/2012 WRA, Inc., Biological Resources Assessment, Apple Campus 2 Study Area, Cupertino, Santa Clara County 11/06/2012 Memo from OLIN to the City of Cupertino re: Adjustments to Response to the Review of the Consolidated Arborist Report per EIR Plan Revisions 11/09/2012 Arup, Apple Campus 2 Project Environmental Impact Report, Applicable Noise Requirements 1 -59 sf- 3345921 Q ATTACHMENT I INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2 PROJECT 1 -60 sf- 3345921 v2 DATE DOCUMENT 12/11/2012 Skansa and DPR, AC2 Construction Equipment Summary, 12/11/2012 Skansa and DPR, Apple Campus 2 Construction Equipment Summary 12/14/2012 Apple Inc, RE: AC2 Event Management & Parking 11/00/2012 Apple Inc., Apple Campus 2 Project Description, November 2012 11/09/2012 Arup, Apple Campus 2 Project Environmental Impact Report, Applicable Noise Requirements 11/21/2012 Letter from Habitat Conservation Now to City of Cupertino 12/14/2012 Apple Inc, RE: AC2 Event Management & Parking 00/00/2013 San Francisco Bay Conservation and Development Commission, San Francisco Bay Scenarios for Sea Level Rise Index Map http: / /www.bcdc.ca.gov/planning /climate change /index map.shtml (last visited May 17, 2013) 00/00/2013 California, State of, 2012 California Environmental Quality Act (CEQA) Statute and Guidelines, Section 15126.2(c), pp. 154 -55 00/00/2013 California, State of, 2012 California Environmental Quality Act (CEQA) Statute and Guidelines, Section 21068, p. 7 00/00/2013 Metropolitan Transportation Commission & Association of Bay Area Governments, Draft Plan Bay Area Released: Public Invited to Comment Online or at Public Hearings, hLtp://onebqyarea.org/regional- initiatives/pla,n-bay-area/draft-pla,n-bay-area.htmI (last visited June 3, 2013) 00/00/2013 Association of Bay Area Governments, Bay Area Census, http: / /www.bayareacensus.ca.gov /cities /Cupertino.htm (last visited June 1, 2012) 00/00/2013 Bay Area Air Quality Management District, Ambient Air Quality Standards and Bay Area Attainment Status, http: //hank.baagmd.gov/pin /air quality /ambient_ air _quality htm (last visited May 29, 2013) 00/00/2013 California, State of, 2012 California Quality Act (CEQA) Statute and 1 -60 sf- 3345921 v2 ATTACHMENT I INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2 PROJECT 1 -61 sf- 3345921 Q DATE DOCUMENT Guidelines, Section 15126.6 01/07/2013 Letter from Sohan Vichare to Aarti Shrivastava re: Scoping Comments 01/14/2013 Memorandum from Gary Black, Gicela Del Rio, Hexagon Transportation Consultants, Inc. to Dan Whiseenhunt & John Hillegass, Apple re: Results of the Traffic Simulation Analysis for the Construction Phase of the Proposed Apple Campus Project in the City of Cupertino 01/23/2013 Bench, Michael L., A Review of the Trees Recommended for Transplant at the Apple Campus 2 Project, Cupertino, California 02/13/2013 Apple Inc., Memorandum re: AC2 Event Parking 04/00/2013 Supplement to Application for Environmental, Leadership Development Project, Apple, Inc., April 2013 04/00/2013 Apple Inc., Apple Campus 2 Planned Development Permit 04/12/2013 AC2 Planned Development Permit (April 12, 2013) 04/12/2013 Questions regarding City and Apple edits on Revised Admin 91B [for Apple], April 12 Questions from LSA, Apr. 12, 2013 04/12/2013 Memo from Manish Dalia, Arup, Wolfgang Wagener, Foster + Partners, Peter Sokoloff, Foster + Partners re: AC2 Campus - EIR Modifications — Grading [AM NOTE: Needs to follow 4/12/2013 Qs from LSA], Apr. 15, 2013 04/12/2013 Arup, P -4.10, Revision 6, Apple Campus 2, Proposed Grading Plan North, Apr. 15, 2013 04/12/2013 Arup, P -4.11, Revision 6, Apple Campus 2, Proposed Grading Plan South, Apr. 15, 2013 04/12/2013 Arup, P -4.20, Revision 3, Apple Campus 2, Street Improvements, Apr. 15, 2013 04/12/2013 Arup, P -4.21, Revision 3, Apple Campus 2, Street Improvements, Apr. 15, 2013 04/12/2013 Arup, P -4.22, Revision 6, Apple Campus 2, Street Improvements, Apr. 1 -61 sf- 3345921 Q ATTACHMENT I INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2 PROJECT 1 -62 sf- 3345921 Q DATE DOCUMENT 15, 2013 04/12/2013 Arup, P -4.23, Revision 6, Apple Campus 2, Street Improvements, Apr. 15, 2013 04/12/2013 Arup, P -4.24, Revision 6, Apple Campus 2, Street Improvements, Apr. 15, 2013 04/12/2013 Arup, P -4.25, Revision 6, Apple Campus 2, Street Improvements and Structural Sections, Apr. 15, 2013 04/12/2013 Arup, P -4.30, Revision 6, Apple Campus 2, Proposed Storm Water Control Plan, North, Apr. 15, 2013 04/12/2013 Arup, P -4.31, Revision 6, Apple Campus 2, Proposed Storm Water Control Plan South, Apr. 15, 2013 04/12/2013 Arup, P -4.32, Revision 2, Apple Campus 2, Stormwater Quality BMP Typical Details, Apr. 15, 2013 04/12/2013 Arup, P -6.10, Revision 6, Apple Campus 2, Proposed Site Utility Plan North, Apr. 15, 2013 04/12/2013 Arup, P -6.11, Revision 6, Apple Campus 2, Proposed Site Utility Plan South, Apr. 15, 2013 04/12/2013 EIR Alternative Diagrams 04/12/2013 Recycled Water Routing, Potential Connections 04/12/2013 Foster + Partners, P.1 -13, Revision 5, Proposed Conceptual Site Plan, Aug. 9, 2011 04/12/2013 Foster + Partners, P1.19, Revision 1, Bicycle and Pedestrian Perimeter Experience, Feb. 29, 2012 04/12/2013 Foster + Partners, P1.26, Revision 4, Site Circulation Plan, Aug. 9, 2011, Aug. 9, 2011 04/12/2013 Foster + Partners, P1.40, Revision 6, Proposed Site Plan North, Aug. 9, 2011 04/12/2013 Foster + Partners, P1.41, Revision 6, Proposed Site Plan South, Aug. 9, 1 -62 sf- 3345921 Q ATTACHMENT I INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2 PROJECT 1 -63 sf- 3345921 Q DATE DOCUMENT 2011 04/12/2013 Foster + Partners, P -8.01, Revision 6, Proposed Main Building Level 1 Plan, Aug. 9, 2011 04/12/2013 Foster + Partners, P- 10.01, Revision 5, Proposed Main Building Sections Restaurant, Feb. 24, 2011 04/12/2013 Foster + Partners, P- 10.03, Revision 5, Proposed Main Building Section Typical Office, Aug. 9, 2011 04/12/2013 Foster + Partners, P- 11.01, Revision 5, Proposed Parking Structure Level BO & O1 Plan, Aug. 9, 2011 04/12/2013 Foster + Partners, P- 13.00, Revision 5, Proposed Parking Structure Section NS — Building D, Aug. 9, 2011 04/12/2013 Foster + Partners, P- 14.00, Revision 5, Proposed Central Plant, Nov. 1, 2012 04/12/2013 Foster + Partners, P- 17.00, Revision 5, Corporate Auditorium Level 01 Plan, Aug. 9, 2011 04/12/2013 Foster + Partners, P- 20.00, Revision 5, Corporate Fitness Center Level 02 Plan, Aug. 9, 2011 04/12/2013 Foster + Partners, P- 21.00, Revision 5, Corporate Fitness Center Sections, Aug. 9, 2011 04/12/2013 Foster + Partners, P- 30.00, Revision 1, Proposed Phase 2 Development, Nov. 1, 2011 04/12/2013 Foster + Partners, P- 30.01, Revision 1, Proposed Phase 2 Development, Nov. 1, 2011 04/12/2013 Olin, P1.23, Revision 4, Existing and Proposed Trees, Apr. 5, 2013 04/12/2013 Olin, P -2.00, Revision 3, Proposed Site Sections, Apr. 5, 2013 04/12/2013 Olin, P -2.01, Revision 4, Proposed Site Sections, Apr. 5, 2013 04/12/2013 Olin, P -7.10, Revision 4, Landscape Plan —North, Apr. 5, 2013 1 -63 sf- 3345921 Q ATTACHMENT I INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2 PROJECT 1 -64 sf- 3345921 Q DATE DOCUMENT 04/12/2013 Olin, P -7.11, Revision 4, Landscape — South, Apr. 5, 2013 04/12/2013 DPR and Skanska, Apple Campus 2, Phase 2: Fence Installation Logistics During Construction, February 2014, Feb. 27, 2013 04/22/2013 Letter from James C. Fowler, Assistant Secretary, Apple, Inc., to Kurt Karperos, Assistant Chef, California Air Resources Board, re: AB 900 Supplemental Information / Net Zero Energy Strategy (Apple Campus 2 — SCH 9 2011082055) 04/29/2013 Letter from Richard W. Corey, Air Resources Board, to Ken Alex, Office of Governor Edmond G. Brown, Jr., re: AB 900 Certification 04/30/2013 Arup, Apple Campus 2 Geotechnical Interpretive Report, Issue 3 05/02/2013 Email from Ken Tang to applecampus2(c gpple.com, Wing Tang re: Response to Apple Campus 2 and Submittal 6 05/03/2013 Supplement to Application for Environmental, Leadership Development Project, Apple, Inc., April 2013 (signed) 05/08/2013 Letter from Ken Alex, Governor's Office of Planning and Research, to James C. Fowler, Assistant Secretary, Apple, Inc., re: AB 900 Certification 05/09/2013 Letter from Dolly Sandoval, to City Councilmembers re: Apple Campus 2 05/16/2013 Letter from David Jamieson, Kimco Realty, to Orrin Mahoney, City of Cupertino re: Support for Apple Campus 2 05/24/2013 Letter from Scott Morgan, Governor's Office of Planning and Research, to James C. Fowler, Assistant Secretary, Apple, Inc., re: AB900 Certification 05/29/2013 Bench, Michael L., A review of the Consolidated Arborist Report For The Apple Campus 2 Project, Cupertino, CA 05/29/2013 Letter from Peter Pau, Sand Hill Property Company to Orrin Mahoney, City of Cupertino re: Sand Hill Property Company's Support of Apple Campus 2 1 -64 sf- 3345921 Q ATTACHMENT I INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2 PROJECT b. Other, including AB 900, Proposal Documents & Late Comments DATE DOCUMENT 05/31/2013 Fehr & Peers, Final Apple Campus 2 Draft Transportation Impact Analysis 05/31/2013 SCI Consulting Group, 2013 - Personal Communication with LSA 00 /00 /0000 (Apple — School Impacts in Cupertino) (Apple — School Impacts in Santa Clara Unified) 05/31/2013 Letter from Matthew Mahood, San Jose Silicon Valley Chamber of Commerce to Orrin Mahoney, City of Cupertino re: Apple Campus 2 06/03/2013 Apple Campus 2 Project Environmental Impact Report (EIR) 04/21/2011 Administrative Record, SCH 9 20110 82055, DEIR Reference Materials Index (Updated 6 -3 -2013) 06/03/2013 Apple Campus 2 Project Environmental Impact Report (EIR) Administrative Record SCH 9 20110 82055 Comments Received After the DEIR Scoping Period (Updated 6 -3 -2013) b. Other, including AB 900, Proposal Documents & Late Comments 1 -65 sf- 3345921 Q DATE DOCUMENT 00 /00 /0000 Traffic: Mitigation, Suggestions: Predetermine acceptable traffic level Establish Trip Cap Penalty Monitor Result of Apple Transportation Demand Management 00 /00 /0000 Email from Jenna Browning to Jill Bicknell, Chad Mosley, Grant Schlereth re: SCVURPPP / Apple Campus stormwater discussion 04/06/2011 Email from Gary Chao to Aarti Shrivastava, Kelly Kline, Albert Salvador, Timm Borden re: Action Items from Apple's meeting (Apr. 06, 20112:31:29 PM PDT) 04/21/2011 Email from Albert Salvador to Gary Chao RE: Fees (Apr. 21, 2011 5:13:47 PM PDT) • City of Cupertino Fee Estimator — Building Division (Apr. 21. 2011) (Fee Estimate - Apple Campus.pdf) 1 -65 sf- 3345921 Q ATTACHMENT I INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2 PROJECT 1 -66 sf- 3345921 Q DATE DOCUMENT 04/21/2011 Email from Gary Chao to Aarti Shrivastava re: FW: Fees (Apr. 21, 2011 5:21:56 PM PDT) • City of Cupertino Fee Estimator — Building Division (Apr. 21, 2011) (Fee Estimate - Apple Campus.pdf) 04/21/2011 Email from Gary Chao to Aarti Shrivastava re: Fee estimates for Apple Campus (Apr. 21, 20115:31:40 PM PDT) • City of Cupertino Fee Estimator — Building Division (Apr. 21, 2011) ( Fee Estimate - Apple Campus.pdf) • Apple Fees (Apple Fees.xls) • Staff Time Log (Staff Time Log.xls) 05/01/2011 Email from Kermit Cuff to Manish Dalia, David Stillman, Newgren, Steve RE: Apple Campus 2 and Coordination with VTA (May 01, 2012 11:56:08 AM PDT) 05/05/2011 Email from Gary Chao to Aarti Shrivastava, Albert Salvador re: Apple FeesAS.xls (May 05, 2011 3:12:18 PM PDT) ) • Apple Fees (Apple FeesAS.xls) 05/05/2011 Email from Albert Salvador to Gary Chao, Aarti Shrivastava RE: Apple FeesAS.xls (May 05, 20115:13:41 PM PDT) 05/17/2011 Email from Piu Ghosh to Aarti Shrivastava, Gary Chao re: Update - Apple campus /properties owned north of 280 in North Vallco (May 17, 2011 11:29:00 AM PDT) • Property Report (Report(1).csv) 05/26/2011 Email from Gary Chao to Aarti Shrivastava re: Apple — height (May 26, 2011 8:39:01 PM PDT) 05/31/2011 Email from Gary Chao to Aarti Shrivastava re: Apple — height (May 31, 2011 10:48:17 AM PDT) 06/15/2011 Email from Gary Chao to Aarti Shrivastava to FW: Bldg Fees - Apple - REVISED 6.15.1 Lxlsx (June 15, 20115:15:47 PM PDT) 1 -66 sf- 3345921 Q ATTACHMENT I INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2 PROJECT 1 -67 sf- 3345921 Q DATE DOCUMENT • Preliminary Estimate of Public Works Department Fees for the Apple Campus 2 Project (Apple Campus 2 - Public Works Planning Application Estimate.xls) 07/11/2011 Email from Piu Ghosh to jnoorikkierwright.com re: City of Cupertino's Protected Trees (July 11, 20115:00:00 PM PDT) 07/12/2011 Email from Don Young to Gary Chao Re: Kick -off meeting (July 12, 2011 10:41:45 AM PDT) 07/12/2011 Email from Piu Ghosh to jnoorikkierwright.com re: FW: City of Cupertino's Protected Trees (July 12, 2011 9:09:00 AM PDT) 07/13/2011 Arup, Meeting Minutes, Apple Innovation Campus 08/03/2011 Email from Gary Chao to Adam Weinstein Discussion items for Wednesday August 3, 2011 (July 28, 20114:29:35 PM PDT) 08/03/2011 Email from Adam Weinstein to Aarti Shrivastava, Kelly Kline, Gary Chao, Piu Ghosh, David Stillman, tre�anggpple.com, wwagener @fosterandpartners.com, don @dryoungassociates.com, dgold @mofo.com, mimwalle(c raofo.com re: Apple EIR -- agenda for 10:30 call (Aug. 03, 2011 10:07:37 AM PDT) • Apple 2 Campus EIR (LSA Job# COC1101) Contact List (Revised 8 -3 -11) (8 -3 -11 CONTACTS.pdf) 08/09/2011 Apple Campus 2, August 09, 2011, Planned Development Permit, Introduction 08/09/2011 Apple Campus 2, August 09, 2011, Planned Development Permit, Site Plan, Landscaping 08/09/2011 Apple Campus 2, August 09, 2011, Planned Development Permit, Floor Plan Cross Section 08/09/2011 Apple Campus 2, August 09, 2011, Planned Development Permit, Renderings 08/12/2011 Email from Rick Kitson to City Council re: Apple Talking Points v5 8- 11 -2011 final. docx (Aug. 12, 2011 12:18:10 PM PDT) 1 -67 sf- 3345921 Q ATTACHMENT I INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2 PROJECT 1 -68 sf- 3345921 Q DATE DOCUMENT • Apple Talking Points v5, Aug. 12, 2011 (Apple Talking Points v5 8 -11 -2011 final.docx) 08/16/2011 Email from Gary Chao to Piu Ghosh, Aarti Shrivastava re: Follow up items for Apple project review (Aug. 16, 2011 11:25:23 AM PDT) 08/17/2011 Email from Adam Weinstein to Aarti Shrivastava, Kelly Kline, Gary Chao, Piu Ghosh, David Stillman, treagan(c gpple.com, wwagener @fosterandpartners.com, don @dryoungassociates.com, dgoldkmofo.com, mimwalle(dr mofo.com, jfowlerkEple.com, Gary Baum, eric(2morleybros.com, mguberma (2fosterandpartners.com re: Apple EIR -- agenda for 10:30 call (August 17, 2011 10:00:01 AM PDT) 08/23/2011 Email from Piu Ghosh to Aarti Shrivastva, Gary Chao RE: DA description (Aug. 23, 2011 3:10:01 PM PDT) 08/25/2011 Email from Rick Kitson to City Council re: Apple Talking Points v7 8- 25-1 l.docx (Aug. 25, 2011 11:57:23 AM PDT) • Apple Talking Points v7 (Aug. 25, 2011) (Apple Talking Points v7 8 -25 -1 l.docx) 08/26/2011 Legal Notice of Environmental Impact Report Scoping Meeting for the Apple Campus 2 Project (notices, mailing labels, covers) 08/30/2011 Arup, Meeting Minutes, Apple Campus 2 08/30/2011 Email from Adam Weinstein to Gary Chao re: Apple EIR -- agenda for 8/31 call (Aug. 30, 20112:54:3 0 PM PDT) • Apple Campus 2 EIR August 17, 2011 (Bi- weekly Conference Call) Meeting Summary (8 -17 -11 Meeting Summary.doc) 08/31/2011 Email from Adam Weinstein to Aarti Shrivastava, Gary Chao, Piu Ghosh, David Stillman, tre(2gpple.com, wwagener @fosterandpartners.com, don(2dryoungassociates.com, dgoldc�r�,mofo.com, mimwallec�r�,mofo.com, jfowler(24pple.com, Gary Baum, eric(,morleybros.com, mgubermakfosterandpartners.com, Rick Kitson, psokolof (c�r�fosterandpartners.com re: Apple EIR -- agenda for 10:30 call (August 31, 2011 10:01:28 AM PDT) 1 -68 sf- 3345921 Q ATTACHMENT I INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2 PROJECT 1 -69 sf- 3345921 Q DATE DOCUMENT • Apple Campus 2 EIR August 17, 2011 (Bi- weekly Conference Call) Meeting Summary (8 -17 -11 Meeting Summary.pdf) 09/01/2011 Email from Manish Dalia to Chad Mosle, Timm Borden, David Stillman, Glenn Goepfert RE: Apple Campus 2 and DPW - Planning Application and Traffic - Meeting Minutes (Sept. 01, 20114:32:49 PM PDT) • Arup, Introduction to Apple Innovation Campus Meeting Minutes, Aug. 30, 2011 (2011 -08 -30 Cupertino Public Works -Apple Meeting Minutes - Draft.pdf) 09/02/2011 Email from Wolfgang Wagener to Piu Ghosh re: FW: Project clarification (Sept. 02, 20118:38:21 PM PDT) 09/02/2011 Email from Timm Borden to Manish Dalia, Chad Mosley, David Stillman, Glenn Goepfert RE: Apple Campus 2 and DPW - Planning Application and Traffic - Meeting Minutes (Sept. 02, 2011 7:50:00 AM PDT) 09/12/2011 Email from Albert Salvador to Gary Chao, David Stillman re: FW: Campus - Minutes for SCCFD Meeting #1 (Sept. 12, 20119:10:22 AM PDT) 09/13/2011 Email from Timm Borden to Glenn Goepfert, Chad Mosley, David Stillman re: Fwd: Apple Campus 2 and DPW - Planning Application and Traffic - Meeting Minutesc (Sept. 13, 2011 10:33:05 PM PDT) 09/14/2011 Email from Manish Dalia to Timm Borden, Chad Mosley, David Stillman, Glenn Goepfert RE: Apple Campus 2 and DPW - Planning Application and Traffic - Meeting Minutes (Sept. 14, 2011 7:46:15 AM PDT) • Arup, Meeting Minutes (Aug. 30, 2011) (2011 -08 -30 Cupertino Public Works -Apple Meeting Minutes - Final.pdf) 09/15/2011 Email from Aarti Shrivastava to Caroline Park, Adam Weinstein RE: next Apple EIR conference call (Sept. 15, 20115:12:37 PM PDT 09/16/2011 Email from Chad Mosley to Timm Borden FW: agenda for the special 1 -69 sf- 3345921 Q ATTACHMENT I INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2 PROJECT 1 -70 sf- 3345921 Q DATE DOCUMENT pre - hearing meeting (Sept. 16, 2011 8:09:18 AM PDT) • Memo from Community Development Department re: Special Pre - hearing Review Meeting of Tuesday, September 20, 2011 (Sept. 7, 2011) (special ph 09 -20- 11. doc) 09/16/2011 Email from Adam Weinstein to Aarti Shrivastava, Gary Chao, Piu Ghosh, David Stillman, treagang,apple.com, wwagener @fosterandpartners.com, dongdryoungassociates.com, dgold @mofo.com, mimwallec�r�,mofo.com, jfowler @apple.com, Gary Baum, erickmorleybros.com, mgubermakfosterandpartners.com, Rick Kitson, psokolof (a�fosterandpartners.com RE: next Apple EIR conference call (Sept. 16, 2011 12:34:55 PM PDT) 09/19/2011 Email from Nichol Bowersox to Piu Ghosh, Chad Mosley re: FW: Apple's Innovation Campus in Cupertino - Sanitary Sewer (Sept. 19, 20113:19:44 PM PDT) • Arup, Meeting Minutes (Aug. 3, 2011) (2011 -08 -03 Cupertino Sanitary Sewer District -Apple Meeting Minutes - Final.pdf) 09/19/2011 Email from Chad Mosley to David Stillman, Glenn Goepfert, Timm Borden re: Apple - General Conditions • Apple Campus 2 General Conditions Administered By The Public Works Dept. (Pre - Hearing General Conditions.doc) 09/19/2011 Email from Timm Borden to Chad Mosley Re: Apple - General Conditions (Sept. 19, 2011 11:25:28 PM PDT) 09/26/2011 Email from Timm Borden to Chad Mosley FW: Apple field (Sept. 26, 2011 12:31:00 PM PDT) 09/27/2011 Arup, Meeting Minutes, Apple Campus 2 09/28/2011 Email from Judith Malamut to Aarti Shrivastava, Gary Chao, Piu Ghosh, David Stillman, tre(2apple.com, wwagener @fosterandpartners.com, don @dryoungassociates.com, dgold @mofo.com, mimwalle @mofo.com,jfowler @apple.com, Gary Baum, eric @morleybros.com, mgubermakfosterandpartners.com, Rick Kitson, psokolof (a�fosterandpartners.com re: Next Apple EIR 1 -70 sf- 3345921 Q ATTACHMENT I INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2 PROJECT 1 -71 sf- 3345921 Q DATE DOCUMENT conference call (Sept. 28, 2011 10:19:28 AM PDT) 10/02/2011 Email from Manish Dalia to Chad Mosley, Timm Borden, David Stillman, Glenn Goepfert, Grant McInnes, Jim Daisa, Joseph McCue, Peter Sokoloff, Marc Guberman, jmc rg athc�r�,fosterandpartners.com, wwa eg nergfosterandpartners.com, Piu Ghosh RE: Apple Campus 2 and DPW (Date: Sunday, October 02, 2011 8:04:37 PM PDT) • Arup, Apple Campus 2 and DPW Coordination Meeting Minutes, Sept. 27, 2011 (2011 -09 -27 Cupertino Public Works -Apple Meeting Minutes - DRAFT.pdf) 10/03/2011 Email from Manish Dalia to Timm Borden RE: Apple Campus 2 and DPW (Oct. 03, 2011 12:59:39 PM PDT) 10/03/2011 Email from Manish Dalia to Timm Borden RE: Apple Campus 2 and DPW (Oct. 03, 2011 12:59:39 PM PDT) 10/05/2011 Email from Chad Mosley to Timm Borden re: Streamside permit (Oct. 05, 2011 3:01:00 PM PDT) 10/06/2011 Email from Chad Mosley to Cheri Donnell RE: Guidelines and Standards for developing property adjacent to a creeky (Oct. 05, 2011 3:05:00 PM PDT) 10/10/2011 Email from Manish Dalia to Chad Mosley, Timm Borden, David Stillman, Glenn Goepfert, Grant McInnes, Jim Daisa, Marc Guberman Piu Ghosh re: Apple Campus 2 and Cupertino Department of Public Works - Final Meeting Minutes (Oct. 10, 2011 12:11:07 PM PDT) • Arup, Apple Campus 2 and DPW Coordination Meeting Minutes, Sept. 27, 2011 (2011 -09 -27 Cupertino Public Works -Apple Meeting Minutes - Final.pdf) 10/12/2011 Email from Adam Weinstein to Wolfgang Wagener, Aarti Shrivastava, Gary Chao, Piu Ghosh, David Stillman, tre�anggpple.com, dongdrungassociates.com, dgoldgmofo.com, mimwalle @mofo.com, jfowler @apple.com, Gary Baum,eric @morleybros.com, Marc Guberman, Rick Kitson, Peter Sokoloff re: Apple EIR conference call (October 12, 2011 10:02:34 AM PDT) 1 -71 sf- 3345921 Q ATTACHMENT I INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2 PROJECT 1 -72 sf- 3345921 Q DATE DOCUMENT 10/17/2011 Email from Chad Mosley to Manish Dalia, Timm Borden, David Stillman, Glenn Goepfert, Grant McInnes, Peter Sokoloff ( psokolof (cr�,fosterandpartners.com) RE: Apple Campus 2 and DPW (Oct. 17, 20113:46:06 PM PDT) 10/18/2011 Email from Timm Borden to david.tuckergsanjoseca.gov re: Apple Water (October 18, 20112:29:00 PM PDT) 10/25/2011 Email from David Tucker to Timm Borden RE: Apple Water (Oct. 25, 201111:05:01 AM PDT) 10/25/2011 Email from Adam Weinstein to Gary Chao re: 10/26/11 Apple EIR conf. call (Oct. 25, 2011 8:43:28 PM PDT) 10/26/2011 Email from Adam Weinstein to Wolfgang Wagener, Aarti Shrivastava, Gary Chao, Piu Ghosh, David Stillman, tre�anggpple.com, don(,daoungassociates.com, dgold2mofo.com, mimwalle @mofo.com, jfowlerggpple.com, Gary Baum, eric(,morleybros.com, Marc Guberman, Rick Kitson, Peter Sokoloff re: Apple EIR Conference Call (Oct. 26, 2011 10:02:28 AM PDT) • Apple Campus 2 EIR: Information Needs (as of October 26, 2011) (10 -26 -11 Information Needs.xls) 10/27/2011 Email from Manish Dalia to Timm Borden re: FW: Apple Campus 2 and SBWR - Preliminary Water Demand Assessment (Oct. 27, 2011 2:46:13 PM PDT) • Civil — Water Demand Assessment Water Demand Scenarios (Apple Campus 2 - Water Demand Assessment.pdf) 10/27/2011 Email from Terry Reagan to Gary Chao re: Requested Employee Data (Oct. 27, 20114:07: 10 PM PDT) 10/28/2011 Email from Timm Borden to Chad Mosley FW: Apple Campus 2 and SBWR - Preliminary Water Demand Assessment (Oct. 28, 2011 2:23:43 PM PDT) • Civil — Water Demand Assessment Water Demand Scenarios (Apple Campus 2 - Water Demand Assessment.pdf) 1 -72 sf- 3345921 Q ATTACHMENT I INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2 PROJECT 1 -73 sf- 3345921 Q DATE DOCUMENT 11/01/2011 Email from Don Young to Gary Chao Re: Requested Employee Data (Nov. 01, 20114:11:43 PM PDT) 11/02/2011 Email from Terry Reagan to Gary Chao Re: Requested Employee Data (Nov. 02, 20119:06:21 PM PDT) 11/02/2011 Email from Chad Mosley to Piu Ghosh, Aarti Shrivastava re, Calabazas Creek Plans (Nov. 02, 2011 8:00:16 AM PDT) 11/04/2011 Apple Campus 2, November 4, 2011, Planning Revision, Update to Planned Development Permit Submitted 09 August 2011, Introduction 11/04/2011 Apple Campus 2, November 4, 2011, Planning Revision, Update to Planned Development Permit Submitted 09 August 2011, Site Plan 11/04/2011 Apple Campus 2, November 4, 2011, Planning Revision, Update to Planned Development Permit Submitted 09 August 2011, Floor Plans 11/04/2011 Apple Campus 2, November 4, 2011, Planning Revision, Update to Planned Development Permit Submitted 09 August 2011, Renderings 11/06/2011 Email from Manish Dalia to Chad Moslsey re: Apple Campus 2 Meeting (Nov. 06, 20114:31:30 PM PDT) 11/07/2011 Email from Chad Mosley to Timm Borden, Glenn Goepfert, David Stillman re: FW: Apple Campus 2 Meeting (Nov. 07, 2011 7:24:57 AM PDT) 11/15/2011 Email from Manish Dalia to Chad Mosley, Timm Borden, David Stillman, Glenn Goepfert, Piu Ghosh, Phil Carter re: Apple Campus 2 and DPW 11/17/2011 Email from Gary Chao to Adam Weinstein re: Jobs Housing Nexus study (Nov. 17, 2011 11:46:08 AM PDT) • Agenda Item No. 8, Consider adopting a resolution Resolution No 07 109 approving housing mitigation fees continued from June 5 2007 (June 19, 2007) (Housing Mitigation fees.pdf) • Keyser Marston Associates, Inc., Jobs Housing Nexus Update (Oct. 2004) (Final JH Nexus Report.pdf) 1 -73 sf- 3345921 Q ATTACHMENT I INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2 PROJECT 1 -74 sf- 3345921 Q DATE DOCUMENT 11/17/2011 Email from Gary Chao to Aarti Shrivastva, Gary Baum re: FW: Event Usage (Nov. 17, 2011 8:38:19 AM PDT) 11/17/2011 Email from Gary Chao to Adam Weinstein re: Jobs Housing Nexus study (Nov. 17, 2011 11:46:07 AM PDT) • Agenda Item No. 8, Consider adopting a resolution Resolution No 07 109 approving housing mitigation fees continued from June 5 2007 (June 19, 2007) (Housing Mitigation fees.pdf) (Housing Mitigation fees.pdf) • Keyser Marston Associates, Inc., Jobs Housing Nexus Update (Oct. 2004) (Final JH Nexus Report.pdf) 11/21/2011 Email from Aarti Shrivastava to Aarti Shrivastava, Gary Baum RE: FW: Requested Employee Data (Nov. 21, 20114:40:26 PM PDT) 12/02/2011 Email from Piu Ghosh to usha.chatwani @valleywater.org, Sue Tippets re: November 30, 2011 meeting between City of Cupertino and Water District (December 02, 20113:00:21 PM PDT) 12/05/2011 Email from Gary Chao to Timm Borden, Aarti Shrivastava re: Smart Board Concept (Dec. 05, 20112:48:02 PM PDT) 12/07/2011 Email from Adam Weinstein to Wolfgang Wagener, Aarti Shrivastava, Gary Chao, Piu Ghosh, David Stillman, tre�anggpple.com, don @dryoungassociates.com, dgoldkmofo.com, mimwalle @mofo.com, jfowler @apple.com, Gary Baum, eric @morleybros.com, Marc Guberman, Rick Kitson, Peter Sokoloff re: Apple EIR Conference Call -- 10:30 a.m. (Dec. 07, 2011 10:01:16 AM PDT) 12/09/2011 Email from Gary Chao to Piu Ghosh, Aarti Shrivastava RE: Height & Mechanical Equipment (Dec. 09, 20114:13:08 PM PDT) 12/20/2011 Email from Piu Ghosh to: Aarti Shrivastava, Timm Borden, Chad Mosley, Gary Chao, David Stillman re: FW: Campus Masterplan Review With City of Cupertino (Dec. 20, 2011 5:04:48 PM PDT) 12/20/2011 Email from Piu Ghosh to Aarti Shrivastava, Timm Borden, Chad Mosley, Gary Chao, David Stillman re: FW: Campus Masterplan Review With City of Cupertino (Dec. 20, 20115:04:48 PM PDT) 1 -74 sf- 3345921 Q ATTACHMENT I INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2 PROJECT 1 -75 sf- 3345921 v2 DATE DOCUMENT 12/22/2011 Email from Piu Ghosh to Terry Reagan, Don Young, Wolfgang Wagener re: Second Submittal Comment Letter (December 22, 2011 1:31:26 PM PDT) • Letter from City of Cupertino to Apple, Inc. re: Preliminary Comments Letter (Dec. 21, 2011) (Apple Campus 2 Incomplete Letter 12- 22- 11.pdf) 12/23/2011 Email from Don Young to Timm Borden Re: Wolfe Access (Dec. 23, 2011 10:57:32 AM PDT) 12/23/2011 Email from Don Young to Gary Chao Re: New driveway consideration (Dec. 23, 20115:13:58 PM PDT) 12/27/2011 Email from Hossein Ashktorab to Bill Tuttle, Bob Wilson, Chris de Groot, Curtis Lam, David Tucker, Eric Hansen, George Belhumeur, Jim Craig, Jim Fiedler, Jo Zientek, John Stufflebean, Lorrie Gervin, Mansour Nasser, Mary Hoang, Nichol Bowersox, Pam John, Richard Tanaka, Ron Richardson, Steve Machida, Timm Borden, Tom Salzano, Tom Smegal, Beth Redmond re: Draft letters of intent and Apple Inc Information (Dec. 27, 2011 1:43:58 PM PDT) • Draft Letter of Intent to Bureau of Reclamation (Oct. 13, 2011) (Letter of Intent to Fund Northern Regional Connector.doc) • Draft Letter of Intent to Bureau of Reclamation (Jan. 10, 2012) (DRAFT Letter of Intent - SCVWD.DOCX) 01/04/2012 Email from Gary Chao to Timm Borden, David Stillman re: FW: Apple: Citizens for East Shore Parks v. California State Lands: New CEQA case re existing conditions Baseline (January 04, 2012 4:05:25 PM PDT) • Citizens For East Shore Parks v. California State Lands Commission, No. A129896 (Cal. Ct. App filed Dec. 30, 2011) (2011 East Bay Parks Baseline Case.pdf) 01/04/2012 Email from Hossein Ashktorab to Bill Tuttle, Bob Wilson, Chris de Groot, Curtis Lam, David Tucker, Eric Hansen, George Belhumeur, James O'Brien, Jim Craig, Jim Fiedler, Jo Zientek, John Stufflebean, Lorrie Gervin, Mansour Nasser, Mary Hoang, Nichol Bowersox, Pam 1 -75 sf- 3345921 v2 ATTACHMENT I INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2 PROJECT 1 -76 sf- 3345921 Q DATE DOCUMENT John, Richard Tanaka, Ron Richardson, Steve Machida, Timm Borden, Tom Salzano, Tom Smegal, Toni Vye, Val Conzet re: Tomorrow's meeting- agenda and the Notes (Date: Wednesday, January 04, 2012 5:24:19 PM PDT) • Draft Meeting Notes, Regional Recycled Water Team Meeting, Dec. 22, 2011 (RRWT Meeting Notes - Draft December 22 201 Ldoc) • Meeting Agenda, Regional Recycled Water Intertie (RRWI) Meeting, Jan. 5, 2012 (1 -5 -12 meeting- agenda RRWLdoc) 01/09/2012 Email from Michael Bench to Piu Ghosh to Apple Campus 2 (Jan. 09, 2012 2:35:56 PM PDT) 01/14/2012 Email from Franziska Church to Piu Ghosh RE: Parking requirement (Jan. 14, 2013 5:11:15 PM PDT) 01/17/2012 Apple Campus 2, Development Plan Update, January 17, 2012 01/18/2012 Email from Jaclyn Winkel to Piu Ghosh re: Comments on the Apple Campus 2 proposed plans (Jan. 18, 2012 3:28:52 PM PDT) 01/18/2012 Email from Jaclyn Winkel to Piu Ghosh re: Comments on the Apple Campus 2 proposed plans (Jan. 18, 2012 3:29 PM PDT) 01/18/2012 Email from Adam Weinstein to Aarti Shrivastava, Gary Chao, Piu Ghosh, David Stillman, treagan @apple.com, jfowlerkUple.com, wwagener @fosterandpartner.com, Peter Sokoloff, don @dryoungassociates.com, dgoldkmofo.com, mimwalle @mofo.com, Judith Malamut, Franziska Church, Jane Bierstedt, Rick Kitson, Gary Baum, Eric Morley, Foulkes @apple.com, Scott D. Pinsky re: Apple Campus 2 EIR -- Biweekly Call 10:30 a.m. (Jan. 18, 2012 10:02:29 AM PDT) 01/25/2012 Email from Traci Caton to Aarti Shrivastava re: Hamptons Apts are COMPLETELY in SCUSD 01/25/2012 Email from Megan King RE: SBWR WaterSMART 2012 Application (Jan. 25, 2012 4:25:34 PM PDT) • Grant Application Package (SBWR WaterSMART 2012 1 -76 sf- 3345921 Q ATTACHMENT I INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2 PROJECT 1 -77 sf- 3345921 Q DATE DOCUMENT Application Compressed.pdf) 01/25/2012 Email from Nichol Bowersox to Chad Mosley Re: Apple Campus 2 - Relocation Options (Jan. 25, 2012 4:40:24 PM PDT) 01/26/2012 Email from Mark Linder to Aarti Shrivastava, Gary Baum, Timm Borden re: RE: Barn (Jan. 26, 2012 4:29:16 PM PDT) 01/26/2012 Email from Albert Salvador to Eric Borchers RE: Campus Parking Structure Code Question (Jan. 26, 2012 2:01:33 PM PDT) 01/31/2012 Email from Gary Chao to Aarti Shrivastava Re: How about this for the SCVWD? (Jan. 31, 2012 7:37:14 AM PDT) 01/31/2012 Email from Piu Ghosh to Sue Tippets, Usha Chatwani re: Apple Campus 2 - proposed relocation of SCVWD easements (Jan. 31, 2012 10:09:35 AM PDT) 02/01/2012 Email from Adam Weinstein to Aarti Shrivastava, Gary Chao, Piu Ghosh, David Stillman, treagan@apple.com, jfowlerggpple.com, wwagener @fosterandpartner.com, Peter Sokoloff, don @dryoungassociates.com, dgoldgmofo.com, mimwalle @mofo.com, Judith Malamut, Franziska Church, Jane Bierstedt, Rick Kitson, Gary Baum, Eric Morley, Foulkes @apple.com, Scott D. Pinsky, Chad Mosley re: Apple Campus 2 EIR -- Biweekly Call 10:30 a.m. (February 01, 2012 10:02:42 AM PDT) 02/01/2012 Email from Adam Weinstein to Aarti Shrivastava, Gary Chao, Piu Ghosh, David Stillman, treagan@apple.com, jfowlerggpple.com, wwagener @fosterandpartner.com, Peter Sokoloff, don @dryoungassociates.com, dgoldkmofo.com, mimwallegmofo.com, Judith Malamut, Franziska Church, Jane Bierstedt, Rick Kitson, Gary Baum, Eric Morley, Foulkes @apple.com, Scott D. Pinsky, Chad Mosley re: Apple Campus 2 EIR -- Biweekly Call 10:30 a.m. (Feb. 01, 2012 10:02:42 AM PDT) 02/06/2012 Email from Aarti Shrivastava to Timm Borden, Adam Weinstein, Judith Malamut, Gary Baum, Gary Chao, Piu Ghosh, Chad Mosley, David Stillman RE: Apple EIR schedule (Feb. 06, 2012 5:48:48 PM ) • DRAFT Schedule for Apple Campus 2 Project EIR (Revised 2/06/2012) ( 1 -77 sf- 3345921 Q ATTACHMENT I INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2 PROJECT 1 -78 sf- 3345921 Q DATE DOCUMENT AppleEIRschedule020612andAltentrystaffcopy .xlsx) • DRAFT Schedule for Apple Campus 2 Project EIR (Revised 2/06/2012) ( AppleEIRschedule020612andAltentry .xlsx) 02/06/2012 Email from Orrin Mahoney to David Knapp, Timm Borden, Aarti Shrivastava, Carol Korade, Rick Kitson, Mark Linder re: Apple campus vs Pentagon (Feb. 06, 2012 9:43:46 PM PDT) • A Size Comparison (June 9, 2011) ( Size compare.pdf) 02/08/2012 Email from Adam Weinstein to Aarti Shrivastava, Gary Chao, Piu Ghosh, David Stillman, treagan @apple.com, jfowlerkgpple.com, wwa eng ergfosterandpartner.com, Peter Sokoloff, don @dryoungassociates.com, dgoldkmofo.com, mimwalle @mofo.com, Judith Malamut, Franziska Church, Jane Bierstedt, Rick Kitson, Gary Baum, Eric Morley, Foulkes @apple.com, Scott D. Pinsky, Chad Mosley re: RE: Apple Campus 2 EIR -- Biweekly Call 10:30 a.m. (Wed., February 08, 2012 3:20:22 PM • Apple Campus 2 EIR, February 1, 2012 (Bi- weekly Conference Call) Meeting Summary (2 -1 -12 Meeting Summary.pdf) 02/14/2012 Email from Piu Ghosh to Don Young, Terry Reagan re: Comment Letter (Feb. 14, 2012 1:53:44 PM PDT) • Letter from City of Cupertino to Apple, Inc. re: Preliminary Comment Letter (Feb. 14, 2012) (Apple Campus 2 Comment Letter 2- 14- 12.pdf) 02/15/2012 Email from Aarti Shrivastava to Gary Baum, Gary Cha, David Stillman, Chad Mosley, Timm Borden re: FW: Apple RE: Draft Schedule for tomorrow's discussion (Feb. 15, 2012 2:00:23 PM PDT) 02/15/2012 Email from Aarti Shrivastava to Adam Weinstein, Gary Baum, Piu Ghosh re: Revised Schedule - please review (Feb. 15, 2012 6:21:20 PM PDT) • DRAFT Schedule for Apple Campus 2 Project EIR (Revised 2/16/2012) (Revised EIR Schedule 021612.xlsx) 1 -78 sf- 3345921 Q ATTACHMENT I INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2 PROJECT 1 -79 sf- 3345921 Q DATE DOCUMENT 02/16/2012 Email from Aarti Shrivastava to Gary Baum, Adam Weinstein, Judith Malamut, Timm Borden, Piu Ghosh, Gary Chao, Chad Mosley, David Stillman re: Revised EIR schedule for Apple (Feb. 16, 2012 10:44:10 AM PDT) • DRAFT Schedule for Apple Campus 2 Project EIR (Revised 2/16/2012) (Revised EIR Schedule 021612.xlsx ) 02/21/2012 Email from Gary Chao to Piu Ghosh, Aarti Shrivastava Re: number of sets for RC2A Prototype (Feb. 21, 2012 10:17:12 PM PDT) 02/24/2012 Email from Aarti Shrivastava to David Woo re: Assessment comparisons (Feb. 24, 2012 11:52:45 AM PDT) • Apple Assessment (Oct. 11, 2013) (Apple Assessment.xls) 03/01/2012 Email from Gary Chao to Adam Weinstein, Piu Ghosh, Aarti Shrivastava, Chad Mosley, Timm Borden re: Revised construction logistics plan (Mar. 01, 2012 4:51:27 PM PDT) 03/05/2012 Email from Peter Sokoloff to Piu Ghosh re: Follow -up Traffic meeting (Mar. 05, 2012 3:13:59 PM PDT) 03/06/2012 Email from Adam Weinstein To: Gary Chao, Piu Ghosh, David Stillman, jfowler @apple.com, Peter Sokoloff, dgoldkmofo.com, mimwalle @mofo.com, Judith Malamut, Franziska Church, Jane Bierstedt, Rick Kitson, Gary Baum, Eric Morley, Foulkes @apple.com, Scott D. Pinsky, Chad Mosley, Timm Borden, JJeffers(c rofo.com, dwhisenhunt @apple.com, Aarti Shrivastava, diana.fazely @gmail.com, David Brandt, wwagener @fosterandpartners.com, soki @fosterandpartners.com, william.baura arg dnergarup.com, Michael.iswaltc�r�gM.com RE: Apple EIR -- Weekly Team Meeting 3/7 (March 06, 2013 3:17:44 PM PDT) 03/08/2012 Letter from Richard Tanaka to Piu Ghosh 03/11/2012 Email from John Brazil to Mark Santoro re: Proposed Apple Campus - provide housing and great for transit/walking/biking connections (Mar. 11, 2012 5:32:39 PM PDT) 03/12/2012 Email from Gary Chao to Chad Mosley RE: Apple Building /grading/relocation of utilities and other permits (Mar. 12, 1 -79 sf- 3345921 Q ATTACHMENT I INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2 PROJECT 1 -80 sf- 3345921 Q DATE DOCUMENT 2012 3:38:16 PM PDT) 03/12/2012 Email from Chad Mosley to Piu Ghosh, Gary Chao, Albert Salvador, David Stillman, Larry Squarcia RE: Apple building/grading /relocation of utilities and other permits (Mar. 12, 2012 4:11:09 PM PDT) 03/12/2012 Email from Timm Borden to David Stillman, Aarti Shrivastava, Gary Chao, Piu Ghosh re: FW: Proposed Apple Campus - provide housing and great for transit / walking / biking connections 03/12/2012 Email from Piu Ghosh to Peter Sokoloff RE: Follow -up Traffic meeting (March 12, 2012 11:48:30 AM PDT) 03/12/2012 Email from Gary Chao to Chad Mosley RE: Apple building/grading /relocation of utilities and other permits (Mar. 12, 2012 3:38:16 PM PDT) 03/12/2012 Email from Chad Mosley to Piu Ghosh, Gary Chao, Albert Salvador, David Stillman, Larry Squarcia RE: Apple building/grading /relocation of utilities and other permits (Mar. 12, 2012 4:11:00 PM PDT) 03/12/2012 Email from Chad Mosley to Piu Ghosh, Gary Chao, Albert Salvador, David Stillman, Larry Squarcia RE: Apple building/grading /relocation of utilities and other permits (Mar. 12, 2012 4:11:09 PM PDT) 03/15/2012 Email from Timm Borden to Aarti Shrivastava, Gary Baum, Gary Chao, Chad Mosley, Piu Ghosh re: Apple Campus Recycled Water (Mar. 15, 2012 12:51:20 PM PDT) 03/15/2012 Email from Mike Foulkes to Timm Borden Re: Apple Situation Room (Mar. 15, 2012 11:55:23 AM PDT) 03/16/2012 Email from Adam Weinstein to Aarti Shrivastava RE: Apple Campus Recycled Water (March 16, 2012 9:01:32 AM PDT) 03/20/2012 Email from Piu Ghosh to Adam Weinstein, Judith Malamut, Eric Morley, Donald R. Young, Terry Reagan RE: FW: Comments on ASA Approval 03/20/2012 Email from Patrick Grant to City of Cupertino Planning Dept., trreagan(c gpple.com re, Comment on Apple 2 updated plan 1 -80 sf- 3345921 Q ATTACHMENT I INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2 PROJECT 1 -81 sf- 3345921 v2 DATE DOCUMENT 03/20/2012 Email from Aarti to Timm Borden re: Google and Mountain View May Pursue "Personal Rapid Transit" To Solve Commute Congestion California Planning & Development Report (Mar. 20, 2012 4:37:40 PM PDT) 03/22/2012 Email from Aarti Shrivastava to Timm Borden, David Stillman, Chad Mosley re: FW: Comment on Apple 2 updated plan (Mar. 22, 2012 9:35:50 AM PDT) 03/23/2012 Email from Cupertino Patch to Timm Borden re: Apple at Core of Conflict of Interest with Councilmember and more from Cupertino Patch (Mar. 23, 2012 12:14:35 PM PDT) 03/26/2012 Email from Wolfgang Wagener to Piu Ghosh RE: Development Area Analysis (Mar. 26, 2012 8:31:48 PM PDT) • Arup, Pedestrian and Bicycle Surveys on Pruneridge Avenue (Mar. 26, 2012) (20120326—Pruneridge Pedestrian and Bicyclists memo.pdf) 03/26/2012 Email from Wolfgang Wagener to Piu Ghosh RE: Development Area Analysis (Mar. 26, 2012 8:31:48 PM PDT) • Arup, Pedestrian and Bicycle Surveys on Pruneridge Avenue (Mar. 26, 2012) (20120326—Pruneridge Pedestrian and Bicyclists memo.pdf) 03/27/2012 Email from Wolfgang Wagener to Piu Ghosh, Peter Sokoloff, Donkdaoungassociates.com Re: Additional needs from Nelson Nygaard (Mar. 27, 2012 3:04:05 PM PDT) • Draft Employee Traffic Distribution (120327—Perimeter Condition_ employee distribution.pdf) 03/27/2012 Email from Wolfgang Wagener to Piu Ghosh, Peter Sokoloff, Donkdaoungassociates.com Re: Additional needs from Nelson Nygaard (Mar. 27, 2012 3:04:05 PM PDT) • Draft Employee Traffic Distribution (120327—Perimeter Condition_ employee distribution.pdf) 03/28/2012 Email from Chad Mosley to Piu Ghosh, Aarti Shrivastava Gary Chao 1 -81 sf- 3345921 v2 ATTACHMENT I INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2 PROJECT 1 -82 sf- 3345921 Q DATE DOCUMENT re: FW: Question regarding Newby Island Landfill capture of biogas (Mar. 28, 2012 1:40:00 PM PDT) 03/28/2012 Letter from Roy Molseed, Santa Clara Valley Transportation Authority to Gary Chao, City of Cupertino re: Apple Campus 2 03/30/2012 Email from Chad Mosley to Timm Borden re: FW: Title documentation for Apple Campus 2 (Mar. 30, 2012 8:35:13 AM PDT) 03/31/2012 Email from David Stillman to Rick Kitson RE: Roadshow -- I -280 road final -- Wolfe Rd. S. to 280 N. Lane Confusion (Mar. 21, 2012 9:05:21 AM PDT) 04/02/2012 Email from Peter Sokoloff to Piu Ghosh re: FW: Reply to Arborist's comments (Apr. 02, 2012 6:06:30 PM PDT) • Olin Memorandum to City of Cupertino Response to the Review of the Consolidated Arborist Report (Apr. 2, 2012) (120402_ ResponsetoArboristC omments_REVISED.pdf) 04/03/2012 Email from Miles Imwalle to Piu Ghosh CONFIDENTIAL: Environ back up data (Date: Tuesday, April 03, 2012 2:34:00 PM PDT) • Back -up data for Environ's GHG analysis (CaIEEMod Input and Results Files.zip) • Apple — Baseline — 2005 Santa Clara County, Annual (Apr. 2, 2012) (Baseline 2005 - Apple - Results.xls) • Baseline 2005 Apple (Baseline 2005 - Apple.xls) • HP - Baseline — 2005, Santa Clara County, Annual (Apr. 2, 2012) (Baseline 2005 - HP - Results.xls) • Baseline 2005 HP (Baseline 2005 - HP.xls) • Apple - Baseline — 2011 Santa Clara County, Annual (Apr. 2. 2012) (Baseline 2011 - Apple - Results.xls) • Baseline 2011 Apple (Baseline 2011 - Apple.xls) 1 -82 sf- 3345921 Q ATTACHMENT I INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2 PROJECT 1 -83 sf- 3345921 Q DATE DOCUMENT • HP - Baseline — 2011 Santa Clara County, Annual (Mar. 23, 2012) (Baseline 2011 - HP - Results.xls) • Baseline 2011 HP (Baseline 2011 - HP.xls) • Apple - Project - 2016 - Electric Vehicles Santa Clara County, Annual (Apr. 2, 2012) (Project 2016 - 300 Electric Vehicle - Results.xls) • Project 2016 — 300 Electric Vehicles (Project 2016 - 300 Electric Vehicle.xls) • Apple - Project— 2016 Santa Clara County, Annual (Apr. 2, 2012) (Project 2016 - Results.xls) • Project 2016 (Project 2016.xls) • Apple - Project - 2017 - Electric Vehicles Santa Clara County, Annual (Apr. 2, 2012) (Project 2017 - 300 Electric Vehicle - Results.xls) • Project 2017 — 300 Electric Vehicle (Project 2017 - 300 Electric Vehicle.xls) • Apple - Project— 2017 Santa Clara County, Annual (Apr. 2, 2012) (Project 2017 - Results.pdf) • Project 2017 (Project 2017.xls) • Apple - Project - 2018 - Electric Vehicles Santa Clara County, Annual (Apr. 2, 2012) (Project 2018 - 300 Electric Vehicle - Results.pdf) • Project 2018 — 300 Electric vehicles) (Project 2018 - 300 Electric Vehicle.xls) • Apple - Project — 2018 Santa Clara County, Annual (Apr. 2, 2012) (Project 2018 - Results.pdf) o Project 2018 (Project 2018.xls) • Apple - Project - 2019 - Electric Vehicles Santa Clara County, Annual (Apr. 2, 2012) (Project 2019 - 1 -83 sf- 3345921 Q ATTACHMENT I INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2 PROJECT 1 -84 sf- 3345921 Q DATE DOCUMENT 300 Electric Vehicle - Results.xls) • Project 2019 — 300 Electric Vehicle (Project 2019 - 300 Electric Vehicle.xls) • Apple - Project— 2019 Santa Clara County, Annual (Apr. 2, 2012) (Project 2019 - Results.xls) • Project 2019 (Project 2019.xls) • Apple - Project - 2020 - Electric Vehicles Santa Clara County, Annual (Apr. 2, 2012) (Project 2020 - 300 Electric Vehicle - Results.xls) • Project 2020 — 300 Electric Vehicle (Project 2020 - 300 Electric Vehicle.xls) • Apple - Project— 2020 Santa Clara County, Annual (Apr. 2, 2012) (Project 2020 - Results.xls) • Project 2020 (Project 2020.xls) 04/04/2012 Email from Wolfgang Wagener to Piu Ghosh, Adam Weinstein re: Apple ADEIR 92 - Waste Diversion and Central Plant (Apr. 04, 2012 9:24:24 PM PDT) • Apple Campus 2 Waste Diversion Programs in Cupertino • DRAFT - -- April 2012 (Apple Campus 2 Waste Diversion.pdf) • MEP — Central Plant Energy and Equipment Summary (04042012 Central Plant EIR Information - REDUCED PV.pdf) 04/04/2012 Email from Aarti Shrivastava to Timm Borden, Chad Mosley, David Stillman re: FW: Pruneridge Ave. -- Bike and Ped Counts (Apr. 04, 2012 8:32:12 PM PDT) 04/04/2012 Email from David Stillman to Manish Dalia, Timm Borden RE: Apple Campus 2 - Caltrans Coordination (Apr. 04, 2012 3:49:00 PM PDT) 04/05/2012 Email from Manish Dalia to David Stillman, Timm Borden RE: Apple 1 -84 sf- 3345921 Q ATTACHMENT I INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2 PROJECT 1 -85 sf- 3345921 Q DATE DOCUMENT Campus 2 - Caltrans Coordination (Apr. 05, 2012 8:45:06 AM PDT) • Street Improvements, P -4.2, Revision 2 (Feb. 29, 2012) (Tantau Street Cross Sections - Planning Application 02-29 - 12.pdf) • Tantau Bridge with landscaped median (Tantau Bridge with landscaped median.pdf) 04/06/2012 Email from Aarti Shrivastava to Gary Baum, Timm Borden re: FW: Map requested — Confidential (Apr. 06, 2012 12:56:12 PM PDT) • Map (Map.pdf) 04/06/2012 Email from Piu Ghosh to Timm Borden, Chad Mosley, David Stillman, Gary Chao re: FW: Apple EIR Schedule 04052012staf£xlsx (Apr. 06, 2012 4:27:04 PM PDT) • DRAFT Schedule for Apple Campus 2 Project EIR (Revised 3/5/2012) (Apple EIR Schedule 04052012staff.xlsx) 04/11/2012 Email from Adam Weinstein Aarti Shrivastava, Gary Chao, Piu Ghosh, David Stillman, tre�anggpple.com, jfowlerggpple.com, wwa eg ner(,fosterandpartner.com, Peter Sokoloff, don @dryoungassociates.com, dgoldgmofo.com, mimwalle @mofo.com, Judith Malamut, Franziska Church, Jane Bierstedt, Rick Kitson, Gary Baum, Eric Morley, Foulkes @apple.com, Scott D. Pinsky, Chad Mosley, Traci Caton, Timm Borden re: Apple Campus 2 EIR -- Biweekly Call 10:30 a.m. (Apr. 11, 2012 10:06:11 AM PDT) 04/11/2012 Email from Adam Weinstein to Aarti Shrivastava, Gary Chao, Piu Ghosh, David Stillman, treagankUple.com, jfowler(c gpple.com, wwa enger c�r�,fosterandpartner.com, Peter Sokoloff, don @dryoungassociates.com, dgold(,mofo.com, mimwalle @mofo.com, Judith Malamu, Franziska Church, Jane Bierstedt, Rick Kitson, Gary Baum, Eric Morley, Foulkes @apple.com, Scott D. Pinsky, Chad Mosley, Traci Caton, Timm Borden re: Apple Campus 2 EIR -- Biweekly Call 10:30 a.m. (Apr. 11, 2012 10:06:11 AM PDT) 1 -85 sf- 3345921 Q ATTACHMENT I INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2 PROJECT 1 -86 sf- 3345921 v2 DATE DOCUMENT 04/12/2012 Email from Piu Ghosh to David Stillman re: Bike Lane on Vallco Pkway (Apr. 12, 2013 10:05:00 AM PDT) 04/12/2012 Letter from Peter Oppenheimer, Apple, Inc. to Aarti Shrivastava, City of Cupertino Re: Apple Campus 2 Project: Acknowledgement of Obligations under Public Resources Code§ 21183(d), (e) and (f) 04/15/2012 Email from Piu Ghosh to Timm Borden RE: Apple Campus 2 - City/VTA Coordination (Apr. 15, 2013 9:24:16 AM PDT) 04/16/2012 Email from Steve Newgren to David Stillman re: Line 81 Bus Stops Near Vallco Area (Apr. 16, 2012 10:43:17 AM PDT) 04/19/2012 Email from Miles Imwalle to Aarti Shrivastava, Gary Baum re: Updated Project Description (Apr. 19, 2012 11:25:43 AM PDT) • Apple Campus 2 Project Description, April 2012 (120417_ Project Description_ City_Application _ v9.pdf) 04/24/2012 Email from Wolfgang Wagener to Gary Chao, Piu Ghosh, Adam Weinstein, Aarti Shrivastava re: FW: EIR - Light Pollution (Apr. 24, 2012 1:44:47 PM PDT) 04/24/2012 Email from Peter Sokoloff to Gary Chao, Piu Ghosh re: Alternative Auditorium service tunnel curb cut location (Apr. 24, 2012 1:44:50 PM PDT) • Potential Auditorium Service Entry (120424 potential auditorium entry.pdf) 04/26/2012 Email from Wolfgang Wagener re: AC2 TDM description (April 26, 2012 8:02:47 AM PDT) • Apple I Existing TDM Programs 12012 (Apple TDM April 2012.pdf) 05/01/2012 Email from David Stillman to Kermit Cuff RE: Apple Campus 2 and Coordination with VTA (May 01, 2012 9:34:31 AM PDT) 05/01/2012 Email from Aarti Shrivastava to Timm Borden re: Fwd: AC2: Proposed agenda for Wednesday's meeting (May 01, 2012 1:42:49 PM PDT) 1 -86 sf- 3345921 v2 ATTACHMENT I INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2 PROJECT 1 -87 sf- 3345921 Q DATE DOCUMENT 05/01/2012 Apple Otreach, May 2012 and March 2013 05/03/2012 Email from Rick Kitson to City Council re: 4- 28 -12: NY times article (May 03, 2012 11:12:34 PM PDT) • Charles Duhigg and David Kocieniewki, How Apple Sidesteps Billions in Tares, The New York Times, Apr. 28, 2012, http: / /www.nytimes.com /2012 /04 /29/business /apples- tax- strategy- aims -at -low- tax - states -an.. (last visited May 2, 2012) (apples- tax - strategy -.pdf) 05/03/2012 Email from Aarti Shrivastava to Piu Ghosh, Gary Chao, Timm Borden re: FW: AB 900 Application (May 03, 2012 1:03:16 PM PDT) • Apple, Application for Environmental Leadership Development Project, April 18, 2012 (Final AB900_Application.pdf) 05/09/2012 Email from Manish Dalia to Timm Borden, David Stillman re: Apple Campus 2 and Caltrans - Draft Meeting Minutes (May 09, 2012 1:54:27 PM PDT) • Arup, Meeting Minutes (May 3, 2012) (Draft - 2012-05 - 07_C altrans_and_Apple_Campus_2_- _Meeting_Minutes.pdf ) 05/09/2012 Email from Michael Bench to Piu Ghosh Re: Coast Redwoods at the Apple Campus site (May 09, 2012 5:42:48 PM PDT) 05/09/2012 Email from Michael Bench to Piu Ghosh Re: Coast Redwoods at the Apple Campus site (May 09, 2012 5:52:25 PM PDT) 05/09/2012 Email from Michael Bench to Piu Ghosh Re: Coast Redwoods at the Apple Campus site (May 09, 2012 5:57:18 PM PDT) 05/09/2012 Email from Manish Dalia to David Stillman, Timm Borden RE: Apple Campus 2 and Caltrans - Draft Meeting Minutes (May 09, 2012 7:49:14 PM PDT) 05/14/2012 Email from Piu Ghosh to Timm Borden, Aarti Shrivastava re: Things to discuss with Apple (May 14, 2012 10:13:06 AM PDT) 1 -87 sf- 3345921 Q ATTACHMENT I INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2 PROJECT 1 -88 sf- 3345921 Q DATE DOCUMENT 05/15/2012 Email from Cheri Donnelly to Adam Weinstein RE: recycling rate in Cupertino (May 15, 2012 1:14:22 PM PDT) • City of Cupertino, City Council Staff Report, Ordinance amending Chapter 6.24 (Garbage and Recycling Collection and Disposal) of the Cupertino Municipal Code to address "Mandatory Recycling" requirements (AB 341) for multi- family and commercial business recycling (May 1, 2012) (Document Cupertino's 75 percent Diversion Goal.5 -1 -12 Council Mtg.pdf) 05/16/2012 Email from Adam Weinstein to Aarti Shrivastava, Gary Chao, Piu Ghosh, David Stillman, treagan@apple.com, jfowlerggpple.com, wwagener @fosterandpartner.com, Peter Sokoloff, donc�r�,daoungassociates.com, dgoldgmofo.com, mimwalle @mofo.com, Judith Malamut, Franziska Church, Jane Bierstedt, Rick Kitson, Gary Baum, Eric Morley, Foulkes @apple.com, Scott D. Pinsky, Chad Mosley, Traci Caton, Timm Borden RE: Apple Campus 2 EIR -- Weekly Call 10:30 a.m. Wed. (May 16, 2012 9:58:53 AM PDT) 05/16/2012 Email from Adam Weinstein to Aarti Shrivastava, Gary Chao, Piu Ghosh, David Stillman, treagangUple.com, jfowler(c gpple.com, wwa engerc�r�,fosterandpartner.com, Peter Sokoloff, dongdrungassociates.com, dgoldgmofo.com, mimwalle(,mofo.com, Judith Malamut, Franziska Church, Jane Bierstedt, Rick Kitson, Gary Baum, Eric Morley, Foulkes(c gpple.com, Scott D. Pinsky, Chad Mosley, Traci Caton, Timm Borden re: RE: Apple Campus 2 EIR -- Weekly Call 10:30 a.m. Wed. (May 16, 2012 9:58:53 AM PDT) 05/20/2012 Email from Nichol Bowersox to Chad Mosley re: FW: Apple Campus 2 and Sanitary Sewer (May 20, 2012 3:10:15 PM PDT) 05/21/2012 Letter from Robert Cartier, Archaeological Resource Management, to Aarti Shrivastava, City of Cupertino re: New Apple Campus Construction 05/22/2012 Email from William Baumgardner to Adam Weinstein, Peter Sokoloff RE: Apple VISSIM analysis (May 22, 2012 8:24:16 PM PDT) 1 -88 sf- 3345921 Q ATTACHMENT I INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2 PROJECT 1 -89 sf- 3345921 Q DATE DOCUMENT 05/22/2012 Letter from Kitty Moore to Cupertino Planning Department 05/22/2012 Email from Aarti Shrivastava to Piu Ghosh, Timm Borden, Gary Baum, Gary Chao, David Stillman, Chad Mosley re, Fwd: Apple Campus 2 effect on Westwood Oaks (May 22, 2012 6:41:54 AM PDT) 05/22/2012 Email from Piu Ghosh to Gary Chao, Chad Mosley re: FW: Apple VISSIM analysis meeting Tuesday May 22nd 1:30pm (May 22, 2012 7:34:47 AM PDT) 05/22/2012 Email from Aarti Shrivastava to Amy Chan, Rick Kitson re: Apple Outreach Brochure (May 22, 2012 4:14:38 PM PDT) • Apple Campus 2 Brochure (AppleOutreachBrochure.pdf) 05/23/2012 Email from Adam Weinstein to Aarti Shrivastava, Gary Chao, Piu Ghosh, David Stillman, treagan @apple.com, jfowlerggpple.com, wwa eng ergfosterandpartner.com, Peter Sokoloff, don @dryoungassociates.com, dgoldkmofo.com, mimwalle @mofo.com, Judith Malamut, Franziska Church, Jane Bierstedt, Rick Kitson, Gary Baum, Eric Morley, Foulkes @apple.com, Scott D. Pinsky, Chad Mosley, Traci Caton, Timm Borden RE: Apple Campus 2 EIR -- Weekly Call 10:30 a.m. Wed. (May 23, 2012 10:03:59 AM PDT) 05/23/2012 Email from Adam Weinstein to Aarti Shrivastava, Gary Chao, Piu Ghosh, David Stillman, treagan@apple.com, jfowlerggpple.com, wwa engerc�r�,fosterandpartner.com, Peter Sokoloff, don(,daoungassociates.com, dgoldkmofo.com, mimwalle(c rofo.com, Judith Malamut, Franziska Church, Jane Bierstedt, Rick Kitson, Gary Baum, Eric Morley, FoulkeskUple.com, Scott D. Pinsky, Chad Mosley, Traci Caton, Timm Borden RE: Apple Campus 2 EIR -- Weekly Call 10:30 a.m. Wed. (May 23, 2012 10:03:59 AM PDT) 05/25/2012 Apple Campus 2, May 25, 2012, Planned Development Permit, Introduction 05/25/2012 Apple Campus 2, May 25, 2012, Planned Development Permit, Site Plan Submittal 05/25/2012 Apple Campus 2, May 25, 2012, Planned Development Permit, Floor 1 -89 sf- 3345921 Q ATTACHMENT I INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2 PROJECT 1 -90 sf- 3345921 Q DATE DOCUMENT Plan Part 1 05/25/2012 Apple Campus 2, May 25, 2012, Planned Development Permit, Floor Plan Part 2 05/25/2012 Apple Campus 2, May 25, 2012, Planned Development Permit, Renderings 05/29/2012 Email from Peter Sokoloff to David Stillman re: FW: Fehr & Peers VISSIM Review Memo/Model (May 29, 2012 2:39:57 PM PDT) • Arup Memorandum to Foster + Partners re; AC2 VISSIM Analysis Review (May 29, 2012) (2012 05 29 Arup Review of FP VISSIM Model.pdf) 05/29/2012 Email from Amy Chan to Aarti Shrivastava, Gary Baum, Timm Borden, Carol Korade re: Tree Removal (May 29, 2012 7:25:22 PM PDT) 05/30/2012 Email from Piu Ghosh to Wolfgang Wagener re: Sound wall locations (May 03, 2012 4:55:00 PM PDT) 05/30/2012 Email from Adam Weinstein to Aarti Shrivastava, Gary Chao, Piu Ghosh, David Stillman, treagan@apple.com, jfowler(c gpple.com, wwa engerc�r�,fosterandpartner.com, Peter Sokoloff, don(,daoungassociates.com, dgoldkmofo.com, mimwallec�r�,mofo.com, Judith Malamut, Franziska Church, Jane Bierstedt, Rick Kitson, Gary Baum, Eric Morley, Foulkes @apple.com, Scott D. Pinsky, Chad Mosley, Traci Caton, Timm Borden RE: Apple Campus 2 EIR -- Weekly Call 10:30 a.m. Wed (May 30, 2012 10:09:13 AM PDT) 05/30/2012 Email from Aarti Shrivastava to Amy Chan RE: Tree Removal (May 30, 2012 8:52:59 AM PDT) 05/30/20/12 Email from Adam Weinstein to Aarti Shrivastava, Gary Chao, Piu Ghosh, David Stillman, treagan@apple.com, jfowlerggpple.com, wwa eg ner(,fosterandpartner.com, Peter Sokoloff, donc�r�,daoungassociates.com, dgoldc�r�,mofo.com, mimwalle @mofo.com, Judith Malamut, Franziska Church, Jane Bierstedt, Rick Kitson, Gary Baum, Eric Morley, Foulkes @apple.com, Scott D. Pinsky, Chad Mosley, Traci Caton, Timm Borden RE: Apple Campus 2 EIR -- Weekly Call 10:30 a.m. Wed. (May 30, 2012 1 -90 sf- 3345921 Q ATTACHMENT I INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2 PROJECT 1 -91 sf- 3345921 Q DATE DOCUMENT 10:09:13 AM PDT) 06/05/2012 Email from Aarti Shrivastava to Gary Baum to Piu Ghosh re: FW: Police Protection Services Generated by Apple (June 05, 2012 8:37:06 AM PDT) 06/06/2012 Email from Adam Weinstein to Aarti Shrivastava, Gary Chao, Piu Ghosh, David Stillman, treagan @apple.com, jfowlergppple.com, wwagener @fosterandpartner.com, Peter Sokoloff, don @dryoungassociates.com, dgoldc�r�,mofo.com, mimwallegraofo.com, Judith Malamut, Franziska Church, Jane Bierstedt, Rick Kitson, Gary Baum, Eric Morley, Foulkesggpple.com, Scott D. Pinsky, Chad Mosley, Timm Borden, lynnjohnsonggpple.com RE: Apple Campus 2 EIR -- Weekly Call 10:30 a.m. Wed. (June 06, 2012 10:21:54 AM PDT) 06/08/2012 Letter from Beez Glendenning Jones to Mark Santoro 06/11/2012 Email from Stephen Buckley to Whom It May Concern 06/12/2012 Email from Blue to City of Cupertino re: Planning Department Cupertino: Apple Campus 2 06/13/2012 Email from Piu Ghosh to Peter Sokoloff RE: Updated Project Description (June 13, 2012 9:18:59 AM PDT) 06/13/2012 Email from Adam Weinstein to Aarti Shrivastava, Gary Chao, Piu Ghosh, David Stillman, treagan @apple.com, jfowlerk4pple.com, wwa eg ner(,fosterandpartner.com, Peter Sokoloff, don @dryoungassociates.com, dgoldc�r�,mofo.com, mimwalle @mofo.com, Judith Malamut, Franziska Church, Jane Bierstedt, Rick Kitson, Gary Baum, Eric Morley, Foulkes @apple.com, Scott D. Pinsky, Chad Mosley, Timm Borden, lynnjohnsonggpple.com RE: Apple Campus 2 EIR -- Weekly Call 10:30 a.m. Wed. (June 13, 2012 10:12:52 AM PDT) 06/13/2012 Email from Adam Weinstein to Aarti Shrivastava, Gary Chao, Piu Ghosh, David Stillman, treagan2ople.com, jfowler2ople.com, wwagener @fosterandpartner.com, Peter Sokoloff, don @dryoungassociates.com, dgold(,mofo.com, mimwalle @mofo.com, Judith Malamut, Franziska Church, Jane Bierstedt, Rick Kitson, Gary Baum, Eric Morley, Foulkeskgpple.com, Scott D. Pinsky, Chad Mosley, Timm Borden, 1 -91 sf- 3345921 Q ATTACHMENT I INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2 PROJECT 1 -92 sf- 3345921 Q DATE DOCUMENT lynnjohnsonkgpple.com RE: Apple Campus 2 EIR -- Weekly Call 10:30 a.m. Wed. (June 13, 2012 10:12:52 AM PDT) 06/14/2012 Email from Adam Weinstein to Aarti Shrivastava, Piu Ghosh, Gary Baum re, Apple EIR -- Toxic Air Contaminants (June 14, 2012 4:07:22 PM PDT) 06/14/2012 Email from David Muffly to Piu Ghosh re: Confusion Regarding Protected Tree Designation (June 14, 2012 5:40:54 AM PDT) 06/14/2012 Email from Mick Bench to Piu Ghosh Re: Confusion Regarding Protected Tree Designation (June 14, 2012 7:33:39 AM PDT) 06/14/2012 Email from David Muffly to Piu Ghosh Re: Confusion Regarding Protected Tree Designation (June 14, 2012 11:08:46 AM PDT) 06/19/2012 Email from Piu Ghosh to Adam Weinstein re: FW: [Santa — Clara _ Neighbors_ for Responsible—Development] Apple's proposed new campus 06/20/2012 Email from Piu Ghosh to David Muffly re: Meet on HP campus re: memorial tree (June 20, 2012 11:56:00 AM PDT) 06/20/2012 Email from Adam Weinstetin to: Aarti Shrivastava, Gary Chao, Piu Ghosh, David Stillman, treagan @apple.com, jfowler(c gpple.com, wwagener @fosterandpartner.com, Peter Sokoloff, don @dryoungassociates.com, dgoldkmofo.com, mimwalle @mofo.com, Judith Malamut, Franziska Church, Jane Bierstedt, Rick Kitson, Gary Baum, Eric Morley, Foulkes @apple.com, Scott D. Pinsky, Chad Mosley, Timm Borden, lynnjohnsonkgpple.com RE: Apple Campus 2 EIR -- Weekly Call 10:30 a.m. TODAY (June 20, 2012 10:01:19 AM PDT) 06/20/2012 Email from Piu Ghosh to: Aarti Shrivastava, Gary Baum, Timm Borden, Adam Weinstein, Judy Malamut re: New Schedule (June 20, 2012 2:01:57 PM PDT) • DRAFT Schedule for Apple Campus 2 Project EIR (Revised 6/20/2012) (Apple EIR Schedule 06202012_TIA review.xlsx) 06/22/2012 Email from Piu Ghosh to Dave Muffly, Peter Sokoloff, Wolfgang Wagener re: Irrigation in project area (June 22, 2012 12:11:00 PM 1 -92 sf- 3345921 Q ATTACHMENT I INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2 PROJECT 1 -93 sf- 3345921 Q DATE DOCUMENT PDT) 06/25/2012 Email from Piu Ghosh to Adam Weinstein, Judith Malamut re: FW: I'm done with Apple's mind - boggling greed 06/25/2012 Email from Piu Ghosh to Peter Sokoloff, Dave Muffly, Wolfgang Wa RE: Irrigation in project area (June 25, 2012 8:52:55 PM PDT) 06/26/2012 Email from Piu Ghosh to Paul Cebrowski RE: Irrigation in project area (June 26, 2012 12:13:59 PM PDT) 06/28/2012 Email from Miles Imwalle to Aarti Shrivastava re: JOINT DEFENSE AGREEMENT -- On -Site Trees (June 28, 2012 8:03:25 AM PDT) 06/29/2012 Email from Timm Borden to David Stillman, Chad Mosley re: Sunnyvale Birdland - Apple Feedback (June 19, 2012 8:40:29 AM PDT) • Email from dmcwl2 @juno.com to: Santa Clara Neighbors for Responsible_Developmentgy ahoogroups.com Re: [Santa_ Clara_ Neighbors_ for Responsible_ Development] Apple's proposed new campus (June 18, 2012 4:07 PM PDT) (FW Santa_ Clara_ Neighbors — for Responsible_ Development Apple's proposed new campus.msg) • Email from Michael Belef to: Santa Clara Neighbors for Responsible DevelopmentLy ahoogroups.com Re: [Santa _ Clara _ Neighbors _ for Responsible_ Development] Apple's proposed new campus (June 18, 2012 11:33 AM PDT) ((FW Santa_Clara_Neighbors_for Responsible_ Development Apple's proposed new campus.msg) • Email from Tappan Merrick to: City Council; Cupertino City Manager's Office re: Apple's proposed new campus (June 18, 2012 10:29 AM PDT) ((FW Apple's proposed new campus.msg) 06/30/2012 Email from Jim Walker citycouncilgcupertino.org re: Apple Campus 2 1 -93 sf- 3345921 Q ATTACHMENT I INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2 PROJECT 1 -94 sf- 3345921 Q DATE DOCUMENT 07/02/2012 Email from David Stillman to Timm Borden re: FW: AC2 - Wolfe Road Analysis (July 02, 2012 8:04:05 PM PDT) • Arup, Wolfe Rd 3rd Lane Option (Wolfe.pdf) 07/03/2012 Email from Jill Bicknell to Cheri Donnelly Re: Clarification on Apple street widening adjacent to Apple campus (July 03, 2012 2:17:31 PM PDT) 07/09/2012 Email from Donna Austin to Mark Santoro, Amy Chan 07/09/2012 Email from Aarti Shrivastava to Piu Ghosh, Gary Baum, Timm Borden re: FW: Apple Campus 2 (July 09, 2012 11:22:25 AM PDT) • Community Benefits NOT associated with any pending project or as a condition of approval to any project (Community Benefits.pdf) • Housing; Mitigation (Housing- Mitigation docx.pdf) 07/11/2012 Email from Adam Weinstein to Aarti Shrivastava, Gary Chao, Piu Ghosh, David Stillman, treagan@apple.com, jfowler(c gpple.com, wwagener @fosterandpartner.com, Peter Sokoloff, dongdrungassociates.com, dgoldgmofo.com, mimwalle(,mofo.com, Judith Malamut, Franziska Church, Jane Bierstedt, Rick Kitson, Gary Baum, Eric Morley, Foulkes @apple.com, Scott D. Pinsky, Chad Mosley, Timm Borden, lynnjohnson(c gpple.com RE: Apple EIR -- Weekly Call 7/11 @10:30 a.m. (July 11, 2012 10:28:36 AM PDT) 07/11/2012 Email from Aarti Shrivastava to Piu Ghosh, Gary Baum, Scott Pinsky, Timm Borden, David Stillman, Chad Mosley re: The opportunity that Apple is missing to build a better neighborhood I Better! Cities & Towns Online (July 11, 2012 11:17:23 AM PDT) 07/12/2012 Email from Timm Borden to Timm Borden re: Apple KLIV podcast (July 12, 2012 3:54:30 PM PDT) 07/13/2012 Email from Amy Chan to jfowlerggpple.com re: Review of the analysis from Keyser Marston (July 13, 2012 5:22:59 PM PDT) • Memorandum from City Manager to Apple, Inc. re: 1 -94 sf- 3345921 Q ATTACHMENT I INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2 PROJECT 1 -95 sf- 3345921 Q DATE DOCUMENT Assumptions of Draft Fiscal Impact analysis of Apple (July 13, 2012) (Apple Fiscal Analysis 7- 12- 12.doc) 07/18/2012 Email from mbelef(a�comcast.net [Santa_Clara_Neighbors_ for Responsible—Development] Apple's proposed new campus 07/19/2012 Email from Aarti Shrivastava to James Fowler RE: AC2 (July 19, 2012 8:49:18 AM PDT) 07/23/2012 Email from Manish Dalia to Chad Mosley, Steven Smith, Steven O, TACg @pge.com, PL02 @pge.com, DRMR2pge.com RE: PG &E /DPW /Apple Campus 2 (July 23, 2012 6:14:22 PM PDT) • Arup, City of Cupertino Public Works Plan Review Meeting Minutes (July 19, 2012) (2012 07 19 AC2 and DPW Plan Review Minutes.pdf) 07/25/2012 Email from Aarti Shrivastava to Piu Ghosh, Adam Weinstein re: FW: Biking Considerations at Apple Campus (Wed. July 25, 2012 3:22:06 PM PDT) 07/25/2012 Email from Adam Weinstein To: Aarti Shrivastava, Gary Chao, Piu Ghosh, David Stillman, treagan@apple.com, jfowlerggpple.com, wwagener @fosterandpartner.com, Peter Sokoloff, don @dryoungassociates.com, dgoldgmofo.com, mimwalle @mofo.com, Judith Malamut, Franziska Church, Jane Bierstedt, Rick Kitson, Gary Baum, Eric Morley, Foulkes @apple.com, Scott D. Pinsky, Chad Mosley, Timm Borden, Jeffers, Jennifer R. RE: Apple EIR -- Weekly Call 7/25 @10:30 a.m. (July 25, 2012 10:04:12 AM PDT) 07/27/2012 Email from Piu Ghosh to Adam Weinstein, Franziska Church re: Parking (July 27, 2012 11:12:00 AM PDT) 07/27/2012 Email from Piu Ghosh to Aarti Shrivastava re: Parking (July 27, 2012 11:14:16 AM PDT) 08/01/2012 Email from Piu Ghosh to Adam Weinstein FW: Apple Campus 2 08/01/2012 Email from Piu Ghosh to Adam Weinstein, Judith Malamut re: FW: Apple Campus 2 Comment Letter (Aug. 01, 2012 10:18 AM PDT) 1 -95 sf- 3345921 Q ATTACHMENT I INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2 PROJECT 1 -96 sf- 3345921 Q DATE DOCUMENT 08/01/2012 Email from Adam Weinstein to: Aarti Shrivastava, Gary Chao, Piu Ghosh, David Stillman, treagan @apple.com, jfowlerggpple.com, wwagener @fosterandpartner.com, Peter Sokoloff, don @dryoungassociates.com, dgoldgmofo.com, mimwalle @mofo.com, Judith Malamut, Franziska Church, Jane Bierstedt, Rick Kitson, Gary Baum, Eric Morley, Foulkes @apple.com, Scott D. Pinsky, Chad Mosley, Timm Borden, Jeffers, Jennifer R. RE: Apple EIR -- Weekly Call 8/1 @10:30 a.m. (Aug. 01, 2012 10:07:45 AM PDT) 08/07/2012 Email from Ryan Roman To: Service Center, Carmen Lynaugh, Chad Mosley, Cheri Donnelly, David Stillman, Gail Seeds, Herman Loman, Joanne Johnson, Kevin Rieden, Lauren Tacke, Mike Vandeveer, Ryan Roman, Tiffanie Cardenas, Timm Borden, Katy Jensen re: Apple EIR Public Comment Process (Aug. 07, 2012 9:35:22 AM PDT) 08/08/2012 Email from Wolfgang Wagener to Aarti Shrivastava, Piu Ghosh re: Today's AC2 Review (Aug. 08, 2013 7:45:29 AM PDT) 08/08/2012 Email from Rick Kitson to Aarti Shrivastava, Gary Baum re: FW: FW: Apple bus using Birdland neighborhood as parking lot (Aug. 08, 2013 8:37 AM PDT) 08/15/2012 Email from Piu Ghosh to Adam Weinstein to Judith Malamut re: FW: New Apple Campus & Apple Buses (Aug. 15, 2012 9:04 AM PDT) 08/17/2012 Email from Chad Mosley to Piu Ghosh, David Stillman re: Apple - Wolfe Rd ped/bike wishlist (Aug. 17, 2012 9:41:51 AM PDT) • Wolfe Road Pedestrian and Bicycle Improvement Wish List (Wolfe Road Pedestrian and Bicycle improvement wish list for Apple.doc) 08/17/2012 Email from Piu Ghosh to Aarti Shrivastava re: FW: Apple - Wolfe Rd ped/bike wishlist (Aug. 17, 2012 10:26:48 AM PDT) • Wolfe Road Pedestrian and Bicycle Improvement Wish List (Wolfe Road Pedestrian and Bicycle improvement wish list for Apple.doc) 08/21/2012 Email from Aarti Shrivastava to Timm Borden, David Stillman, Chad Mosley re: FW: Apple Campus 2 (Aug. 21, 2012 4:49:26 PM PDT) 1 -96 sf- 3345921 Q ATTACHMENT I INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2 PROJECT 1 -97 sf- 3345921 Q DATE DOCUMENT • Cool Cities Comments on Bike Use around the Apple 2 Campus July 17, 2012 (Apple Campus Memo -Bike Plan drafted 7- 12- 12.pdf ) 08/30/2012 Email from Aarti Shrivastava to Amy Chan re: FW: Main Street Vallco Parkway alternative (Aug. 30, 2012 5:53:39 PM PDT) • Main Street Vallco Parkway Options, Alternative 5 (image003.png) 08/31/2012 Email from Piu Ghosh to Franziska Church, Adam Weinstein RE: Main Street Vallco Parkway alternative (Aug. 31, 2012 11:39:00 AM PDT) 08/31/2012 Email from Darrel Lum to Amy Chan, Timm Borden re: Vacation of Pruneridge Avenue (Aug. 31, 2012 8:56:39 AM PDT) • Vacation of Pruneridge Avenue (Vacation of Pruneridge Avenue.pdf) 09/04/2012 Email from Piu Ghosh to Adam Weinstein, Judith Malamut (Sept. 04, 2012 2:25 PM PDT) 09/20/2012 Email from Piu Ghosh to Adam Weinstein, Judith Malamut re: FW: Rubberized AC (Sept. 20, 2012 2:04:31 PM PDT 09/20/2012 Email from Manish Dalia to Chad Mosley RE: Apple Campus 2 and DPW coordination - 3rd Thursday (Sept. 20, 2012 11:13:42 AM PDT) 09/20/2012 Email from Piu Ghosh to David Stillman re: FW: Rubberized AC (Sept. 20, 2012 4:58:04 PM PDT) 09/24/2012 Email from David Stillman to Piu Ghosh FW: Bus shelters (Sept. 24, 2012 7:56:00 AM PDT) 09/24/2012 Email from Piu Ghosh to Aarti Shrivastava, Gary Baum re: Fwd: Bus shelters (September 24, 2012 8:15:25 AM (Sept. 24, 2012 8:15:25 AM PDT) 10/03/2012 Email from Manish Dalia to Chad Mosley RE: Apple Campus 2 and DPW coordination - Report/Narrative feedback (Oct. 03, 2012 1:33:05 PM PDT) 1 -97 sf- 3345921 Q ATTACHMENT I INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2 PROJECT 1 -98 sf- 3345921 Q DATE DOCUMENT 10/04/2012 Email from Manish Dalia to Chad Mosley re: AC2 - Hamptons Stormwater (Oct. 04, 2012 8:58 AM PDT) 10/04/2012 Email from Manish Dalia to Chad Mosley re: AC2 - Hamptons Stormwater 10/16/2012 Email from Chad Mosley to Piu Ghosh RE: Storm Drain issue — Apple (Oct. 16, 2012 4:30:54 PM PDT) 10/25/2012 Email from Timm Borden to Piu Ghosh, David Stillman RE: Right of way acquisition language (Oct. 25, 2012 3:26:35 PM PDT) 10/25/2012 Email from Piu Ghosh to Aarti Shrivastava, Gary Baum, Timm Borden, David Stillman re, Items of discussion re: Apple EIR and project 10252012 (Oct. 25, 2012 2:44:16 PM PDT) • Outstanding Issues for Discussion for the Apple EIR/Prcject (Items of discussion 10252012.docx) 10/25/2012 Email from Piu Ghosh to Aarti Shrivastava, Gary Baum re: Items of discussion 10252012 (Oct. 25, 2012 4:03:39 PM PDT) • Outstanding Issues for Discussion for the Apple EIR/Proj ect (Items of discussion 10252012.docx) 10/26/2012 Email from Piu Ghosh to Adam Weinstein, Judith Malamut re: FW: Apple 2 campus (Oct. 26, 2012 11:31 AM PDT) 10/29/2012 Email from Kermit Cuff to David Stillman re: VTA & Pruneridge closure (Oct. 29, 2012 11:32:18 AM PDT) 10/29/2012 Email from Aarti Shrivastava to David Brandt re: Apple building permit schedule (Oct. 29, 2012 1:20:26 PM PDT) 10/30/2012 Email from Dan Whisenhunt to David Brandt, Aarti Shrivastava, Albert Salvador, Piu Ghosh, Timm Borden, David Stillman, Chad Mosley, Wolfgang Wagener, Peter Sokoloff, Saran Oki, Steven Carter, Mike Leondi, Rob Westover, Jim Fowler, Dana Pesce, Gary Baum re: Apple Campus 2 (Oct. 30, 2012 11:08:18 AM PDT) • Apple Campus 2 Permit Timeline Summary (121026 permit summary—V3.pdf) 1 -98 sf- 3345921 Q ATTACHMENT I INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2 PROJECT 1 -99 sf- 3345921 Q DATE DOCUMENT 11/01/2012 Apple Campus 2, Project Description, November 2012 11/01/2012 Apple Campus 2, Planned Development Permit, November 2012, Introduction 11/01/2012 Apple Campus 2, Planned Development Permit, November 2012, Plan Submittal Part 1 11/01/2012 Apple Campus 2, Planned Development Permit, November 2012, Plan Submittal Plan 2 11/01/2012 Apple Campus 2, Planned Development Permit, November 2012, Floor Plan Part 1 11/01/2012 Apple Campus 2, Planned Development Permit, November 2012, Floor Plan Part 2 11/01/2012 Apple Campus 2, Planned Development Permit, November 2012, Renderings 11/02/2012 Email from Charlie to Piu Ghosh re: Apple Campus 2 (Nov. 02, 2012 9:17 AM PDT) 11/10/2012 Email from Piu Ghosh to Michael Bench, Aarti Shrivastava re: Fwd: Tree list - Apple Campus (Nov. 16, 2012 5:34:41 PM PDT) • Tree Removal Plan North, No. L1.43, Revision 0, Nov. 6, 2012 (Tree Removals.pdf) • Table 2 — Tree Removals Associated with Transplanting of Existing Trees (Removal List - PhlCityPermit.pdf) 11/13/2012 Letter from Cay C. Goude, U.S. Fish & Wildlife Service and Scott Wilson, California Department of Fish and Game to John Doughty, City of East Palo Alto, Terrence Grindall, City of Newark, Hanson Hom, City of Sunnyvale, Steven McHarris, City of Milipitas, Kevin Riley, City of Santa Clara, Jeff Schwob, City of Fremont, Aarti Shrivastava, City of Cupertino, Randy Tsuda, City of Mountain View, Curtis Williams, City of Palo Alto re: Streamlining Mitigation for Impacts to Biological Resources 11/15/2012 Email from Piu Ghosh to Michael Bench re: Tree Transplant Memo 1 -99 sf- 3345921 Q ATTACHMENT I INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2 PROJECT 1 -100 sf- 3345921 Q DATE DOCUMENT and Dwgs (Nov. 15, 2012 11:00:00 AM PDT) • Table 1 — Existing Trees to be Transplanted (I 21114—Table 1_ ExistingTreesToBeTransplanted .pdf) • Tree Relocation Plan North, No. L1.41, Revision 0, Nov. 6, 2012 ( 121114_ TreeRelocationPlans_11xI7.pdf) • Memorandum from Olin to City of Cupertino re: Adjustments to Response to the Review of the Consolidated Arborist Report per EIR Plan Revisions (Nov. 14, 2012) (121114_ ResponsetoArboristC omments_EIRReissue_Adde ndum.pdf) 11/21/2012 Email from Rick Kitson to Barry Chang, Gilbert Wong, Mark Santoro, Orrin Mahoney re: Latest Apple Plans Posted to Web (Nov. 21, 2012 1:46:05 PM PDT) • Apple Messages v10 November 21, 2012 (Apple Talking Points v10 20121121.docx) 11/27/2012 Email from James Fowler to Cupertino City Manager's Office, Aarti Shrivastava re: AC2 (Nov. 27, 2012 6:38:32 PM PDT) 11/27/2012 Email from Rick Kitson to Department Heads re: Apple Talking Points v1I 20121127.docx (Nov. 27, 2012 2:47:43 PM PDT) • Apple Messages vl l November 27, 2012 (Redline) (Apple Talking Points v1I 20121127.docx) 12/05/2012 Email from Manish Dalia to Chad Mosley RE: Apple f (Dec. 05, 2012 1:14 PM PDT) 12/05/2012 Email from Piu Ghosh to Michael Bench RE: Apple Trees (Dec. 05, 2012 7:21:48 PM PDT) 12/07/2012 Email from Piu Ghosh to Aarti Shrivastava, Gary Barum re: New AC2 Schedule (Dec. 07, 2012 9:39:20 AM PDT) • DRAFT Schedule for Apple Campus 2 Project EIR (Revised 12/6/12) (Apple EIR Schedule- 8.pdf) 1 -100 sf- 3345921 Q ATTACHMENT I INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2 PROJECT 1 -101 sf- 3345921 Q DATE DOCUMENT 12/11/2012 Email from Chad Mosley to Manish Dalia RE: Apple Campus 2 Coordination (Dec. 11, 2012 5:18:22 PM PDT) 12/19/2012 Email from Aarti Shrivastava to Miles Imwalle re: FW: Correction! (Dec. 19, 2012 2:56:04 PM PDT) 12/19/2012 Email from Aarti Shrivastava to Judith Malamut, Gary Baum, Timm Borden re: Schedule after meeting 121912 (Dec. 19, 2012 4:00:18 PM PDT) • DRAFT Schedule for Apple Campus 2 Project EIR (Revised 12/19/12) (AppleSchedulel21912.xls) 12/20/2012 Email from Aarti Shrivastava to Miles Imwalle re: Schedule (Dec. 20, 2012 11:52:04 AM PDT) • DRAFT Schedule for Apple Campus 2 Project EIR (Revised 12/19/12) (AppleSchedulel21912.pdf) 12/20/2012 Email from Dan Whisenhunt to Miles Imwalle Re: Schedule (Dec. 20, 2012 12:25:31 PM PDT) 12/20/2012 Email from James Fowler to Dan Whisenhunt Re: Schedule (Dec. 20, 2012 1:10:57 PM PDT) 12/21/2012 Email from David Brandt to Aarti Shrivastava, Gary Baum re: Apple Development Agreement (Dec. 21, 2012 3:50:48 PM PDT) 12/23/2012 Email from Gary Chao to Timm Borden, Adam Weinstein, Aarti Shrivastava RE: Apple new driveway consideration (December 23, 2011 12:14:54 PM PDT) 01/02/2013 Email from Jennifer Jeffers to Adam Weinstein RE: Apple EIR -- Weekly Meetings, etc (Jan. 02, 2013 3:12:20 PM PDT) 01/02/2013 Email from Adam Weinstein to: Gary Chao, Piu Ghosh, David Stillman, jfowler @apple.com, wwagener @fosterandpartner.com, Peter Sokoloff, dgold @mofo.com, mimwalle @mofo.com, Judith Malamut, Franziska Church, Jane Bierstedt, Rick Kitson, Gary Baum, Eric Morley, Foulkes @apple.com, Scott D. Pinsky, Chad Mosley, Timm Borden, JJeffersc�r�,mofo.com, dwhisenhunt @apple.com, Aarti Shrivastava, diana.fazely gmail.com, David Brandt re: Apple EIR -- 1 -101 sf- 3345921 Q ATTACHMENT I INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2 PROJECT 1 -102 sf- 3345921 Q DATE DOCUMENT Weekly Meetings, etc. (Jan. 02, 2013 1:18:40 PM PDT) 01/03/2013 Email from Colin Burgett to Aarti Shrivastava Re: Coordinating Nelson\Nygaard Memo with TIA and EIR for Apple Campus 2 (Jan. 03, 2013 9:20:17 PM PDT) 01/03/2013 Email from Adam Weinstein to Gary Chao, Piu Ghosh, David Stillman, jfowlerggpple.com, wwa eng erc�r�,fosterandpartner.com, Peter Sokoloff, dgold @mofo.com, mimwalle @mofo.com, Judith Malamut, Franziska Church, Jane Bierstedt, Rick Kitson, Gary Baum, Eric Morley, Foulkes @apple.com, Scott D. Pinsky, Chad Mosley, Timm Borden, JJeffers(c rofo.com, dwhisenhunt @apple.com, Aarti Shrivastava, diana.fazely@gmail.com, David Brandt RE: Apple EIR -- Weekly Meetings, etc. (Jan. 03, 2013 8:28:19 AM PDT) 01/03/2013 Email from Adam Weinstein to: Gary Chao, Piu Ghosh, David Stillman, jfowler @apple.com, wwagener @fosterandpartner.com, Peter Sokoloff, dgold @mofo.com, mimwalle @mofo.com, Judith Malamut, Franziska Church, Jane Bierstedt, Rick Kitson, Gary Baum, Eric Morley, Foulkes @apple.com, Scott D. Pinsky, Chad Mosley, Timm Borden, JJeffers(c rofo.com, dwhisenhunt @apple.com, Aarti Shrivastava, diana.fazely @gmail.com, David Brandt RE: Apple EIR -- Weekly Meetings, etc. (January 03, 2013 8:28:19 AM PDT) 01/03/2013 Email from Timm Borden to David Brandt Re: barn maintenance (Jan. 03, 2013 12:11:53 PM PDT) 01/04/2013 Email from Aarti Shrivastava to David Brandt RE: Apple Development Agreement (Jan. 04, 2013 11:32:59 AM • Apple Guarantee of Sales Tax - DA (Apple Sales Tax.xls) 01/09/2013 Email from Adam Weinstein to Gary Chao, Piu Ghosh, David Stillman, jfowler @apple.com, wwagener (,fosterandpartner.com, Peter Sokoloff, dgold @mofo.com, mimwalle @mofo.com, Judith Malamut, Franziska Church, Jane Bierstedt, Rick Kitson, Gary Baum, Eric Morley, Foulkesggpple.com, Scott D. Pinsky, Chad Mosley, Timm Borden, JJeffersgmofo.com, dwhisenhuntggpple.com, Aarti Shrivastava, diana.fazelyg gm ail. com, David Brandt RE: Apple EIR -- Weekly Team Meeting 1 /10 (Jan. 09, 2013 12:05:14 PM PDT) 01/09/2013 Email from Adam Weinstein to: Gary Chao, Piu Ghosh, David 1 -102 sf- 3345921 Q ATTACHMENT I INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2 PROJECT 1 -103 sf- 3345921 Q DATE DOCUMENT Stillman, jfowler @apple.com, wwagener @fosterandpartner.com, Peter Sokoloff, dgold @mofo.com, mimwalle @mofo.com, Judith Malamut, Franziska Church, Jane Bierstedt, Rick Kitson, Gary Baum, Eric Morley, Foulkes @apple.com, Scott D. Pinsky, Chad Mosley, Timm Borden, JJeffers(,mofo.com, dwhisenhunt @apple.com, Aarti Shrivastava, diana.fazely @gmail.com, David Brandt re: RE: Apple EIR -- Weekly Team Meeting 1 /10 (Jan. 09, 2013 12:05:13 PM PDT) 01/10/2013 Email from Piu Ghosh to Adam Weinstein RE: rubberized asphalt (Jan. 10, 2013 9:00:00 AM PDT) 01/10/2013 Email from Timm Borden to Aarti Shrivastava, David Brandt, Gary Baum re: Bicycle Pedestrian Commission — Apple (Jan. 10, 2013 10:25:42 AM PDT) 01/10/2013 Email from Timm Borden to David Brandt, Aarti Shrivastava, Gary Baum RE: Bicycle Pedestrian Commission — Apple (Jan. 10, 2013 10:44:06 AM PDT) 01/10/2013 Email from Timm Borden to David Stillman re: FW: Bicycle Pedestrian Commission — Apple (Jan. 10, 2013 11:21:20 AM PDT) 01/14/2013 Email from Sohan Vichare to Aarti Shrivastava 01/15/2013 Email from David Stillman to Manish Dalia re: City comments on AC2 offsite roadway improvements (Jan. 15, 2013 7:47:50 AM PDT) 01/15/2013 Email from Ryan Kauffman to Adam Weinstein Re: Question re. AC2 Transit (Jan. 15, 2013 8:39:05 AM PDT) 01/15/2013 Email from Piu Ghosh to Aarti Shrivastava RE: Parking requirement (Jan. 15, 2013 9:16:47 AM PDT) 01/15/2013 Email from Franziska Church to Piu Ghosh RE: Parking requirement (Jan. 15, 2013 11:37:35 AM PDT) 01/16/2013 Email from Adam Weinstein to Aarti Shrivastava, Judith Malamut, Gary Baum, Timm Borden, David Stillman, Chad Mosley, Piu Ghosh, £churchc�r�,fehrandpeers.com, J.Bierstedt@fehrandpeers.com, spinsky@earthlink.net re: Apple EIR -- Internal Mtg at 10:30 (Jan. 16, 2013 9:04:48 AM PDT) 1 -103 sf- 3345921 Q ATTACHMENT I INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2 PROJECT 1 -104 sf- 3345921 Q DATE DOCUMENT 01/16/2013 Email from Adam Weinstein to Gary Chao, Piu Ghosh, David Stillman, jfowler @apple.com, Peter Sokoloff, dgoldgmofo.com, mimwalle(,mofo.com, Judith Malamut, Franziska Church, Jane Bierstedt, Rick Kitson, Gary Baum, Eric Morley, Foulkes @apple.com, Scott D. Pinsky, Chad Mosley, Timm Borden, JJeffersgraofo.com, dwhisenhuntggpple.com, Aarti Shrivastava, diana.fazely @gmail.com, David Brandt, wwa eg ner(2fosterandpartners.com, sokic�r�,fosterandpartners.com RE: Apple EIR -- Weekly Team Meeting 1/17 (Jan. 16, 2013 12:01:02 PM PDT) 01/16/2013 Email from Adam Weinstein To: Gary Chao, Piu Ghosh, David Stillman, jfowler @apple.com, Peter Sokoloff, dgold(,mofo.com, mimwalle @mofo.com, Judith Malamut, Franziska Church, Jane Bierstedt, Rick Kitson, Gary Baum, Eric Morley, Foulkes @apple.com, Scott D. Pinsky, Chad Mosley, Timm Borden, JJeffersc�r�,mofo.com, dwhisenhunt @apple.com, Aarti Shrivastava, diana.fazely @gmail.com, David Brandt, wwagener @fosterandpartners.com, soki(,fosterandpartners.com RE: Apple EIR -- Weekly Team Meeting 1/17 (January 16, 2013 12:01:02 PM PDT) 01/18/2013 Email from Steve Newgren to David Stillman re: Bus Shelters at Apple Campus (Jan. 18, 2013 1:36:47 PM PDT) 01/23/2013 Email from Adam Weinstein to Aarti Shrivastava, Judith Malamut, Gary Baum, Timm Borden, David Stillman, Chad Mosley, Piu Ghosh, £church @fehrandpeers.com, J.Bierstedtgfehrandpeers.com, spinsky@earthlink.net RE: Apple EIR -- Internal Mtg at 10:30 (Jan. 23, 2013 9:52:48 AM PDT) 01/23/2013 Email from Adam Weinstein to Gary Chao, Piu Ghosh, David Stillman, jfowler @apple.com, Peter Sokoloff, dgold(2mofo.com, mimwalle @mofo.com, Judith Malamut, Franziska Church, Jane Bierstedt, Rick Kitson, Gary Baum, Eric Morley, Foulkes @apple.com, Scott D. Pinsky, Chad Mosley, Timm Borden, JJeffersc�r�,mofo.com, dwhisenhunt @apple.com, Aarti Shrivastava, diana.fazely @gmail.com, David Brandt, wwagener @fosterandpartners.com, sokigfosterandpartners.com RE: Apple EIR -- Weekly Team Meeting 1/24 (Jan. 23, 2013 12:32:01 PM PDT) • Apple Campus 2 EIR January 17, 2013 (Weekly Conference Call) Meeting Summary (1 -17 -13 LSA Meeting 1 -104 sf- 3345921 Q ATTACHMENT I INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2 PROJECT 1 -105 sf- 3345921 Q DATE DOCUMENT Summary.doc.pdf) 01/23/2013 Email from Adam Weinstein to: Aarti Shrivastava, Judith Malamut, Gary Baum, Timm Borden, David Stillman, Chad Mosley, Piu Ghosh,£church @fehrandpeers.com, J.Bierstedt @fehrandpeers.com, spinsk@earthlink.net RE: Apple EIR -- Internal Mtg at 10:30 (Jan. 23, 2013 9:52:48 AM PDT) 01/23/2013 Email from Timm Borden to David Stillman, Chad Mosley re: Fwd: Apple EIR -- Internal Mtg at 10:30 (Jan. 23, 2013 1:05:08 PM PDT) 01/24/2013 Email from Adam Weinstein To: Gary Chao, Piu Ghosh, David Stillman, jfowler @apple.com, Peter Sokoloff, dgoldc�r�,mofo.com, mimwalle @mofo.com, Judith Malamut, Franziska Church, Jane Bierstedt, Rick Kitson, Gary Baum, Eric Morley, Foulkes @apple.com, Scott D. Pinsky, Chad Mosley, Timm Borden, JJeffers(,mofo.com, dwhisenhunt @apple.com, Aarti Shrivastava, diana.fazely @gmail.com, David Brandt, wwagener @fosterandpartners.com, soki @fosterandpartners.com, william.baum arg dner(a MM.com RE: Apple EIR -- Weekly Team Meeting 1/24 (January 24, 2013 6:39:13 PM PDT) • Apple Campus 2 EIR January 24, 2013 (Weekly Conference Call) Meeting Summary (1 -24 -13 LSA Meeting Summary.pdf) 01/28/2013 Email from Meg Thomas to Mick Bench re: Dead, Diseased and Dying Trees (Jan. 28, 2013 11:10:41 AM PDT) • Tree Removal Plan South, No. L1.44, Revision 0, Dec. 4, 2012 (L1.44_TreeRemovalSouth_Diseased- DeadOnly_ 121205- REV.pdf) • Tree Removal Plan North, No. L1.43, Revision 0, Dec. 4, 2012 (L1.43_TreeRemovalNorth_Diseased- DeadOnly_121205.pdf) 01/28/2013 Email from Timm Borden to David Stillman, Chad Mosley RE: Apple EIR -- Internal Mtg at 10:30 (Jan. 28, 2013 11:32:56 AM PDT) 01/29/2013 Email from Carmen Lynaugh to Timm Borden re: interesting article regarding Apple campus built (Jan. 29, 2013 10:12:14 AM PDT) 1 -105 sf- 3345921 Q ATTACHMENT I INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2 PROJECT 1 -106 sf- 3345921 Q DATE DOCUMENT 01/30/2013 Email from Adam Weinstein to: Gary Chao, Piu Ghosh, David Stillman, jfowler @apple.com, Peter Sokoloff, dgoldgmofo.com, mimwalle @mofo.com, Judith Malamut, Franziska Church, Jane Bierstedt, Rick Kitson, Gary Baum, Eric Morley, Foulkes @apple.com, Scott D. Pinsky, Chad Mosley, Timm Borden, JJeffersgraofo.com, dwhisenhunt @apple.com, Aarti Shrivastava, diana.fazely @gmail.com, David Brandt, wwagener @fosterandpartners.com, soki @fosterandpartners.com, william.baura arg dner( gM.com RE: Apple EIR -- Weekly Team Meeting 1/31 (January 30, 2013 12:07:11 PM PDT) • Apple Campus 2 EIR January 24, 2013 (Weekly Conference Call) Meeting Summary (Revised January 30, 2013) (1 -24 -13 LSA Meeting Summary - Revised.pdf) 01/31/2013 Email from Adam Weinstein To: Gary Chao, Piu Ghosh, David Stillman, jfowler @apple.com, Peter Sokoloff, dgoldc�r�,mofo.com, mimwalle @mofo.com, Judith Malamut, Franziska Church, Jane Bierstedt, Rick Kitson, Gary Baum, Eric Morley, Foulkes @apple.com, Scott D. Pinsky, Chad Mosley, Timm Borden, JJeffersgraofo.com, dwhisenhunt @apple.com, Aarti Shrivastava, diana.fazely @gmail.com, David Brandt, wwagener @fosterandpartners.com, soki @fosterandpartners.com, william.baum arg dner(a gM.com RE: Apple EIR -- Weekly Team Meeting 1/31 (January 31, 2013 10:57:51 AM PDT) (Outstanding list of issues Apple 30 Jan 2013.docx) • Ongoing Outstanding list of issues re: AC2 Note: Some are items that have previously been identified and new items that have been identified as a result of changes to the plans with the November 2012 submittal. (Jan. 30, 2013) (Outstanding list of issues Apple 30 Jan 2013.docx) 02/02/2013 Email from Piu Ghosh to Aarti Shrivastava, Timm Borden, Gary Baum re: FW: Discuss City's changes to the Draft EIR (Feb. 02, 2012 9:18:55 AM PDT) 02/04/2013 Email from Piu Ghosh to Meg Thomas re: FW: Fwd: Dead, Diseased and Dying Trees (Feb. 04, 2013 11:44:30 AM PDT) • Tree Removal Plan North, No. L1.43, Revision 0, Nov. 6, 2012 (1141 -L 143_TRN- REM - North.pdf) 1 -106 sf- 3345921 Q ATTACHMENT I INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2 PROJECT 1 -107 sf- 3345921 Q DATE DOCUMENT • Tree Removal Plan South, No. L1.44, Revision 0, Nov. 6, 2012 (1141- L144_TRN- REM- South.pdf) 02/05/2013 Email from Grant Schlereth to Jill Bicknell, Chad Mosley RE: SCVURPPP / Apple Campus stormwater discussion (Feb. 05, 2013 1:49:40 PM PDT) • Arup, Discussion of proposed stormwater treatment strategy for Apple Campus with SCVURPPP Meeting Minutes (Jan. 24, 2013) (130124_ SCVURPPP—C3—Draft Meeting Minutes.docx) 02/06/2013 Email from Franziska Church to Piu Ghosh re: Auditorium Parking (Feb. 06, 2013 3:55:03 PM PDT) • Auditorium Parking worksheet (Auditorium Parking_rev.xlsx) 02/06/2013 Email from Aarti Shrivastava to Franziska Church, Piu Ghosh RE: Auditorium Parking (Feb. 06, 2013 6:07:09 PM PDT) 02/06/2013 Email from Adam Weinstein to: Gary Chao, Piu Ghosh, David Stillman, jfowler @apple.com, Peter Sokoloff, dgoldkmofo.com, mimwalle @mofo.com, Judith Malamut, Franziska Church, Jane Bierstedt, Rick Kitson, Gary Baum, Eric Morley, Foulkes @apple.com, Scott D. Pinsky, Chad Mosley, Timm Borden, JJeffersc�r�,mofo.com, dwhisenhunt @apple.com, Aarti Shrivastava, diana.fazely @gmail.com, David Brandt, wwagener @fosterandpartners.com, soki @fosterandpartners.com, william.baumgardnerkarup.com, Michael.iswalt@gM.com Apple EIR -- Weekly Team Meeting 2/7 (Feb. 06, 2013 12:06:05 PM PDT) • Apple Campus 2 EIR January 31, 2013 (Weekly Conference Call) Meeting Summary — Revised February 6, 2013 (1 -31 -13 LSA Meeting Summary REV.pdf) 02/06/2013 Email from Adam Weinstein to: Aarti Shrivastava, Judith Malamut, Gary Baum, Timm Borden, David Stillman, Chad Mosley, Piu Ghosh, f church @fehrandpeers.com, J.Bierstedt @fehrandpeers.com, spinsk@earthlink.net re: Apple EIR -- Internal Mtg at 10:30 (Feb. 06, 2013 9:25:19 AM PDT) 1 -107 sf- 3345921 Q ATTACHMENT I INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2 PROJECT 1 -108 sf- 3345921 Q DATE DOCUMENT 02/07/2013 Email from Piu Ghosh to Aarti Shrivastava RE: Fwd: Dead, Diseased and Dying Trees (Feb. 07, 2013 7:41:22 AM PDT) 02/08/2013 Email from Meg Thomas to Piu Ghosh, Mick Bench re: Apple Tree Transplants (Feb. 08, 2013 4:47:46 PM PDT) • Tree Relocation Plan North No. L1.41, Revision 0, Nov. 6, 2012 (130208_ TransplantDwgs_City.pdf) • Table 1 — Existing Trees to be Transplanted (Feb. 8, 2013) (130208_ TransplantSchedule.pdf ) 02/10/2013 Email from Adam Weinstein to: Gary Chao, Piu Ghosh, David Stillman, jfowler @apple.com, Peter Sokoloff, dgoldkmofo.com, mimwalle @mofo.com, Judith Malamut, Franziska Church, Jane Bierstedt, Rick Kitson, Gary Baum, Eric Morley, Foulkes @apple.com, Scott D. Pinsky, Chad Mosley, Timm Borden, JJeffersc�r�,mofo.com, dwhisenhunt @apple.com, Aarti Shrivastava, diana.fazely @gmail.com, David Brandt, wwagener @fosterandpartners.com, soki @fosterandpartners.com, william.baum ard�ner(a MM.com, Michael.iswalt(a gM.com RE: Apple EIR -- Weekly Team Meeting 2/7 (February 10, 2013 8:21:20 PM PDT) • Apple Campus 2 EIR February 7, 2013 (Weekly Conference Call) Meeting Summary (2 -7 -13 LSA Meeting Summary.pdf) 02/11/2013 Email from Franziska Church to David Stillman RE: Apple: Bike Lanes on Wolfe Road (Feb. 11, 2013 9:54:50 AM PDT) 02/11/2013 Email from David Heslop to Chad Mosley, David Stillman re: Apple 2C offsite bedding and backfill materials (Feb. 11, 2013 3:07:33 PM PDT) 02/12/2013 Email from Meg Thomas to Michael Bench Re: Tree 9 1459 (Feb. 12, 2013 9:37:03 AM PDT) 02/12/2013 Email from Meg Thomas to Piu Ghosh Re: Tree 9 1459 (Feb. 12, 2013 10:03:17 AM PDT) 02/13/2013 Email from Adam Weinstein to: Gary Chao, Piu Ghosh, David Stillman, jfowler apple.com, Peter Sokoloff, d old mofo.com, 1 -108 sf- 3345921 Q ATTACHMENT I INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2 PROJECT 1 -109 sf- 3345921 Q DATE DOCUMENT mimwalle @mofo.com, Judith Malamut, Franziska Church, Jane Bierstedt, Rick Kitson, Gary Baum, Eric Morley, Foulkes @apple.com, Scott D. Pinsky, Chad Mosley, Timm Borden, JJeffers(,mofo.com, dwhisenhunt @apple.com, Aarti Shrivastava, diana.fazely @gmail.com, David Brandt, wwagener @fosterandpartners.com, soki @fosterandpartners.com, william.baura ard�ner(a gM.com, Michael.iswalt( gaM.com RE: Apple EIR -- Weekly Team Meeting 2/13 (Feb. 13, 2013 8:35:44 AM PDT) 02/13/2013 Email from Adam Weinstein to: Aarti Shrivastava, Judith Malamut, Gary Baum, Timm Borden, David Stillman, Chad Mosley, Piu Ghosh, f church @fehrandpeers.com, J.Bierstedt @fehrandpeers.com, spinsky@earthlink.net re: Apple EIR -- Internal Mtg at 10:30 (Feb. 13, 2013 8:47:21 AM PDT) 02/13/2013 Email from Adam Weinstein To: Gary Chao, Piu Ghosh, David Stillman, jfowler @apple.com, Peter Sokoloff, dgold(,mofo.com, mimwalle @mofo.com, Judith Malamut, Franziska Church, Jane Bierstedt, Rick Kitson, Gary Baum, Eric Morley, Foulkes @apple.com, Scott D. Pinsky, Chad Mosley, Timm Borden, JJeffers(c rofo.com, dwhisenhunt @apple.com, Aarti Shrivastava, diana.fazely @gmail.com, David Brandt, wwagener @fosterandpartners.com, soki @fosterandpartners.com, william.baura arg dner(a gM.com, Michael.iswalt(a gM.com RE: Apple EIR -- Weekly Team Meeting 2/13 (Feb. 13, 2013 8:35:44 AM PDT) 02/13/2013 Email from Adam Weinstein to Aarti Shrivastava, Judith Malamut, Gary Baum, Timm Borden, David Stillman, Chad Mosley, Piu Ghosh, f church @fehrandpeers.com, J.Bierstedt @fehrandpeers.com, spinsky@earthlink.net re: Apple EIR -- Internal Mtg at 10:30 (Feb. 13, 2013 8:47:21 AM PDT) 02/15/2013 Email from Meg Thomas to Piu Ghosh Re: Couple of items (Feb. 15, 2013 5:29:05 PM PDT) 02/18/2013 Email from Meg Thomas to Piu Ghosh Re: Couple of items (Feb. 18, 2013 4:26:52 PM PDT) • Side Boxing /Round Ball Transplant Trees (Side Boxing impact on adjacent trees.xlsx) 02/19/2013 Email from Ryan Kauffman to Aarti Shrivastava, Piu Ghosh re: 1 -109 sf- 3345921 Q ATTACHMENT I INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2 PROJECT 1 -110 sf- 3345921 Q DATE DOCUMENT Additional Background Points — TDM (Feb. 19, 2013 9:14:10 AM PDT) 02/19/2013 Email from Rob Westover to Chad Mosley, David Stillman AC2 - Notes from 1/21/13 Off -Site Utility Relocation /Public Works Meeting (Feb. 19, 2013 9:42:22 PM PDT) • Apple Campus 2 — Off- - -Site Utility Relocation Meeting with Cupertino Department of Public Works January 21, 2013 (AC2 Offsite Utility Relocation Meeting 2013_01_21.pdf) • Traffic Operations Analysis for the Proposed Lane Closures During Utilities Trenching January 21, 2013 (Figure 5 - Recommended Lane Closures.pdf) • Hexagon Transportation Consultants Memorandum to DPR re: Traffic Operations Analysis With the Proposed Lane Closures along Wolfe Road and the Closure of Pruneridge Avenue (Feb. 12, 2013) (LOS Analysis w Pruneridge Closure 021213.pdf) 02/19/2013 Email from Chad Mosley to David Heslop, David Stillman RE: Apple 2C offsite bedding and backfill materials (Feb. 19, 2013 5:34:47 PM PDT) 02/21/2013 Email from Adam Weinstein to: Gary Chao, Piu Ghosh, David Stillman, jfowler @apple.com, Peter Sokoloff, dgoldkmofo.com, mimwalle @mofo.com, Judith Malamut, Franziska Church, Jane Bierstedt, Rick Kitson, Gary Baum, Eric Morley, Foulkes @apple.com, Scott D. Pinsky, Chad Mosley, Timm Borden, JJeffers(,mofo.com, dwhisenhunt @apple.com, Aarti Shrivastava, diana.fazely @gmail.com, David Brandt, wwagener @fosterandpartners.com, soki @fosterandpartners.com, william.baum ard�nergarup.com, Michael.iswaltkarup.com re: Apple EIR -- Weekly Team Meeting 2/21 (Feb. 21, 2013 10:21:16 AM PDT) 02/21/2013 Email from Adam Weinstein To: Gary Chao, Piu Ghosh, David Stillman, jfowler @apple.com, Peter Sokoloff, dgoldkmofo.com, mimwalle @mofo.com, Judith Malamut, Franziska Church, Jane Bierstedt, Rick Kitson, Gary Baum, Eric Morley, Foulkes @apple.com, Scott D. Pinsky, Chad Mosley, Timm Borden, JJeffers mofo.com, 1 -110 sf- 3345921 Q ATTACHMENT I INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2 PROJECT 1 -111 sf- 3345921 Q DATE DOCUMENT dwhisenhunt @apple.com, Aarti Shrivastava, diana.fazely @gmail.com, David Brandt, wwagener @fosterandpartners.com, soki @fosterandpartners.com, william.baumgardner(a gM.com, Michael.iswaltc�r�gM.com re: Apple EIR -- Weekly Team Meeting 2/21 (Feb. 21, 2013 10:21:16 AM PDT) 02/25/2013 Email from Manish Dalia to Chad Mosley RE: AC2 - Package 91 Coordination (Feb. 25, 2013 9:39:16 AM PDT) 02/25/2013 Email from Piu Ghosh to Aarti Shrivastava, Stephen Rose, Gary Chao RE: Enhanced bus shelter (Feb. 25, 2013 9:27:20 AM PDT) 02/26/2013 Email from Rob Westover to Chad Mosley re: Re: AC2 - Meeting on Tuesday 2/26 (Feb. 26, 2013 9:19:03 AM PDT) 02/26/2013 Email from Dan Whisenhunt to Piu Ghosh Re: Visitor Parking (Feb. 26, 2013 6:49:14 PM PDT) 02/27/2013 Email from Piu Ghosh to Franziska Church to re: FW: Employees at SE corner of Pruneridge and N. Tantau (Feb. 27, 2013 1:17:05 PM PDT) 02/27/2013 Email from Manish Dalia to Chad Mosley re: RE: AC2 /DPW - Package 91 Coordination - Utility providers (Feb. 27, 2013 1:51:59 PM PDT) 02/27/2013 Email from Adam Weinstein to Gary Chao, Piu Ghosh, David Stillman, jfowler @apple.com, Peter Sokoloff, dgold @mofo.com, mimwalle2mofo.co, Judith Malamut, Franziska Church, Jane Bierstedt, Rick Kitson, Gary Baum, Eric Morley, Foulkes @apple.com, Scott D. Pinsky, Chad Mosley, Timm Borden, JJeffers @mofo.com, dwhisenhunt @apple.com, Aarti Shrivastava, diana.fazely @gmail.com, David Brandt, wwagenerkfosterandpartners.com, soki @fosterandpartners.com, william.baura ard�ner(a gM.com, Michael.iswalt(a gM.com re: RE: Apple EIR -- Weekly Team Meeting 2/28 (Feb. 27, 2013 6:49:42 PM PDT) 02/27/2013 Email from Manish Dalia to Steve.NewgrengVTA.Org, Kermit.CuffkVTA.Org re: AC2 - VTA /City Meeting (Feb. 27, 2013 12:56:23 PM PDT) 1 -111 sf- 3345921 Q ATTACHMENT I INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2 PROJECT 1 -112 sf- 3345921 Q DATE DOCUMENT 02/27/2013 Email from Piu Ghosh to Franziska Church, Adam Weinstein re: FW: Employees at SE corner of Pruneridge and N. Tantau (Feb. 27, 2013 5:34:46 PM PDT) 02/27/2013 Email from Adam Weinstein to: Gary Chao, Piu Ghosh, David Stillman, jfowler @apple.com, Peter Sokoloff, dgoldkmofo.com, mimwalle @mofo.com, Judith Malamut, Franziska Church, Jane Bierstedt, Rick Kitson, Gary Baum, Eric Morley, Foulkes @apple.com, Scott D. Pinsky, Chad Mosley, Timm Borden, JJeffersc�r�,mofo.com, dwhisenhunt @apple.com, Aarti Shrivastava, diana.fazely @gmail.com, David Brandt, wwagener @fosterandpartners.com, soki @fosterandpartners.com, william.baumgardner( gnM.com, Michael.iswalt(a gM.com RE: Apple EIR -- Weekly Team Meeting 2/28 (Feb. 27, 2013 6:49:43 PM PDT) 02/28/2013 Email from Adam Weinstein to Gary Chao, Piu Ghosh, David Stillman, jfowler @apple.com, Peter Sokoloff, dgold(,mofo.com, mimwalle @mofo.com, Judith Malamut, Franziska Church, Jane Bierstedt, Rick Kitson, Gary Baum, Eric Morley, Foulkes @apple.com, Scott D. Pinsky, Chad Mosley, Timm Borden, JJeffersc�r�,mofo.com, dwhisenhunt @apple.com, Aarti Shrivastava ,diana.fazely @gmail.com, David Brandt, wwagener @fosterandpartners.com, soki(,fosterandpartners.com, william.baumgardnerkarup.com, Michael.iswaltc�r�,arup.com RE: Apple EIR -- Weekly Team Meeting 2/28 (Feb. 28, 2013 11:00:00 AM PDT) 02/28/2013 Email from Piu Ghosh to Adam Weinstein re: FW: Apple Possible Agenda Items for tomorrow (Feb. 28, 2013 9:24:33 AM PDT 02/28/2013 Email from Adam Weinstein to: Gary Chao, Piu Ghosh, David Stillman, jfowler @apple.com, Peter Sokoloff, dgoldgmofo.com, mimwalle @mofo.com, Judith Malamut, Franziska Church, Jane Bierstedt, Rick Kitson, Gary Baum, Eric Morley, Foulkes @apple.com, Scott D. Pinsky, Chad Mosley, Timm Borden, JJeffers(c rofo.com, dwhisenhunt @apple.com, Aarti Shrivastava, diana.fazely @gmail.com, David Brandt, wwagener @fosterandpartners.com, soki @fosterandpartners.com, william.baum arg dner( gRM.com, Michael.iswalt(a gM.com RE: Apple EIR -- Weekly Team Meeting 2/28 (Feb. 28, 2013 11:00:00 AM PDT) 03/02/2013 Email from Adam Weinstein to bploughgscusd.net re: Apple Campus 1 -112 sf- 3345921 Q ATTACHMENT I INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2 PROJECT 1 -113 sf- 3345921 v2 DATE DOCUMENT 2 EIR -- Student Generation (May 02, 2013 9:40:13 AM PDT) • SCUSD Excerpt ( SCUSD Excerpt 5- 2- 13.doc) 03/05/2013 Email from John Noori to Chad Mosley, Manish Dalia RE: AC2 - Survey Hard Copy (Mar. 05, 2013 8:34 AM PDT) 03/05/2013 Email from John Noori to Chad Mosley, Manish Dalia RE: AC2 - Survey Hard Copy (Mar. 05, 2013 8:16 AM PDT) 03/05/2013 Email from Chad Mosley to John Noon RE: AC2 - Survey Hard Copy (Mar. 05, 2013 8:42:23 AM PDT) 03/06/2013 Email from Adam Weinstein To: Gary Chao, Piu Ghosh, David Stillman, jfowler @apple.com, Peter Sokoloff, dgoldgmofo.com, mimwalle @mofo.com, Judith Malamut, Franziska Church, Jane Bierstedt, Rick Kitson, Gary Baum, Eric Morley, Foulkes @apple.com, Scott D. Pinsky, Chad Mosley, Timm Borden, JJeffers(c rofo.com, dwhisenhunt @apple.com, Aarti Shrivastava, diana.fazely @gmail.com, David Brandt, wwagener @fosterandpartners.com, soki @fosterandpartners.com, william.baumgardner(a gM.com, Michael.iswaltc�r�gM.com RE: Apple EIR -- Weekly Team Meeting 3/7 (March 06, 2013 3:17:44 PM PDT) 03/07/2013 Email from Wolfgang Wagener to: Aarti Shrivastava, Piu Ghosh, dwhisenhunt @apple.com, Saran Oki re: Permit Fee Areas (Mar. 07, 2013 10:22:36 PM PDT) • Area Breakdown Worksheet (130306—Area Breakdown.xls) 03/12/2013 Email from Wolfgang Wagener to Aarti Shrivastava re: AC2 Design Review (Mar. 12, 2013 4:35:58 PM PDT) 03/13/2013 Email from Adam Weinstein to: Gary Chao, Piu Ghosh, David Stillman, jfowler @apple.com, Peter Sokoloff, dgoldgmofo.com, mimwalle @mofo.com, Judith Malamut, Franziska Church, Jane Bierstedt, Rick Kitson, Gary Baum, Eric Morley, Foulkes @apple.com, Scott D. Pinsky, Chad Mosley, Timm Borden, JJeffersgraofo.com, dwhisenhunt @apple.com, Aarti Shrivastava, diana.fazely @gmail.com, David Brandt, wwagener @fosterandpartners.com, soki fosterandpartners.com, william.baum ardner aru .com, 1 -113 sf- 3345921 v2 ATTACHMENT I INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2 PROJECT 1 -114 sf- 3345921 Q DATE DOCUMENT Michael.iswalt( gaM.com RE: Apple EIR -- Weekly Team Meeting 3/14 (Mar. 13, 2013 5:57:11 PM PDT) 03/13/2013 Email from Adam Weinstein To: Gary Chao, Piu Ghosh, David Stillman, jfowler @apple.com, Peter Sokoloff, dgoldc�r�,mofo.com, mimwalle @mofo.com, Judith Malamut, Franziska Church, Jane Bierstedt, Rick Kitson, Gary Baum, Eric Morley, Foulkes @apple.com, Scott D. Pinsky, Chad Mosley, Timm Borden, JJeffers(,mofo.com, dwhisenhunt @apple.com, Aarti Shrivastava, diana.fazely @gmail.com, David Brandt, wwagener @fosterandpartners.com, soki @fosterandpartners.com, william.baura ard�ner(a gM.com, Michael.iswalt( gaM.com RE: Apple EIR -- Weekly Team Meeting 3/14 (Mar. 13, 2013 5:57:10 PM PDT) 03/19/2013 Email from Manish Dalia to Chad Mosley, Mike Mills, Rob Westover RE: AC2 /DPW - Package 91 Coordination - Abandon Utilities In Place (Mar. 19, 2013 9:21 AM PDT) 03/19/2013 Email from Manish Dalia to Michael Smith, Devi Prasanna RE: AC2 - Cal Water Coordination Meeting 03/19/2013 Email from Manish Dalia to Chad Mosley, Mike Mills, Rob Westover RE: AC2 /DPW - Package 91 Coordination - Abandon Utilities In Place (Mar. 19, 2013 9:21:34 AM PDT) 03/20/2013 Email from Aarti Shrivastava to Gary Chao, Gary Baum, Piu Ghosh, Timm Borden, Chad Mosley (Fwd: Roadshow -- I -280 roadfinal -- Wolfe Rd. S. to 280 N. Lane Confusion PDT) 03/20/2013 Email from Adam Weinstein To: Aarti Shrivastava, Judith Malamut, Gary Baum, Timm Borden, David Stillman, Chad Mosley, Piu Ghosh, £church @fehrandpeers.com, J.Bierstedt @fehrandpeers.com, spinsky@earthlink.net re: Apple EIR -- Internal Mtg at 9:30a (Mar. 20, 2013 8:37:26 AM PDT) 04/01/2013 Apple Campus 2, Project Description, April 2013 04/01/2013 Apple Campus 2, Planned Development Permit, April 2013, Introduction 04/01/2013 Apple Campus 2, Planned Development Permit, April 2013, Site Plan Part 1 1 -114 sf- 3345921 Q ATTACHMENT I INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2 PROJECT 1 -115 sf- 3345921 Q DATE DOCUMENT 04/01/2013 Apple Campus 2, Planned Development Permit, April 2013, Site Plan Part 2 04/01/2013 Apple Campus 2, Planned Development Permit, April 2013, Floor Plan Part 1 04/01/2013 Apple Campus 2, Planned Development Permit, April 2013, Floor Plan Part 2 04/01/2013 Apple Campus 2, Planned Development Permit, April 2013, Renderings 04/01/2013 Apple Campus 2, Planned Development Permit, April 2013, Bicycle Plan 04/01/2013 Email from Chad Mosley to Saran Oki RE: Vallco Parkway (Apr. 01, 2013 11:33:43 AM PDT) 04/03/2013 Email from Chad Mosley to Piu Ghosh to RE: Storm Drain Capacity (Apr. 03, 2013 7:30:41 AM PDT) 04/03/2013 Email from Piu Ghosh to Chad Mosley RE: Storm Drain Capacity (Apr. 03, 2013 10:28:13 AM PDT) 04/03/2013 Email from Adam Weinstein to: Gary Chao, Piu Ghosh, David Stillman, jfowler @apple.com, Peter Sokoloff, dgold(,mofo.com, mimwalle @mofo.com, Judith Malamut, Franziska Church, Jane Bierstedt, Rick Kitson, Gary Baum, Eric Morley, Foulkes @apple.com, Scott D. Pinsky, Chad Mosley, Timm Borden, JJeffers(c rofo.com, dwhisenhunt @apple.com, Aarti Shrivastava, diana.fazely @gmail.com, David Brandt, wwagener @fosterandpartners.com, soki @fosterandpartners.com, william.baum arg dner(a gM.com, Michael.iswalt(a gM.com RE: Apple EIR -- Weekly Team Meeting 4/4 at 1:30p (Apr. 03, 2013 5:26:20 PM PDT • Apple Campus 2 ADEIR -- Open Issues List (San Francisco - AC2 ADEIR Open Issues Matrix- 3269897.xls) 04/04/2013 Email from Piu Ghosh to Albert Salvador re: Bldg Fees - Apple - EFF 4 1 13.xlsx (Apr. 04, 2013 1:25:00 PM PDT) • Building Plan Check and Permit Fee Estimate for New 1 -115 sf- 3345921 Q ATTACHMENT I INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2 PROJECT 1 -116 sf- 3345921 Q DATE DOCUMENT Campus Buildings 2/20/12 (Bldg Fees - Apple - EFF 4 1 13.xlsx) 04/04/2013 Email from Timm Borden to Orrin Mahoney re: Fwd: Article on Apple campus (Apr. 04, 2013 11:26:05 AM PDT) 04/04/2013 Email from Manish Dalia To: Smith, Michael, Ouyang, Elissa, Prasanna, Devi, Wilson, Christopher, Mike Mills, Rob Westover, Ian Cunningham, Tommy Bishop, Grant Schlereth RE: AC2 - Cal Water Coordination Meeting (April 04, 2013 12:25:20 PM PDT) • Arup, Design and Construction Meeting Minutes, Apr. 3, 2013 (2013 -04 -03 Cal Water -Apple Campus 2- Meeting Minutes.pdf) 04/05/2013 Email from Adam Weinstein To: Gary Chao, Piu Ghosh, David Stillman, jfowler @apple.com, Peter Sokoloff, dgoldgmofo.com, mimwalle @mofo.com, Judith Malamut, Franziska Church, Jane Bierstedt, Rick Kitson, Gary Baum, Eric Morley, Foulkes @apple.com, Scott D. Pinsky, Chad Mosley, Timm Borden, JJeffersgraofo.com, dwhisenhunt @apple.com, Aarti Shrivastava, diana.fazely @gmail.com, David Brandt, wwagener @fosterandpartners.com, soki @fosterandpartners.com, william.baum ard�nergarup.com, Michael.iswalt(,arup.com RE: Apple EIR -- Weekly Team Meeting 4/4 at 1:30p (Apr. 05, 2013 1:38:59 PM PDT) • Apple Campus 2 EIR April 4, 2013 (Weekly Conference Call) Meeting Summary (4 -4 -13 LSA Meeting Summary.pdf) 04/09/2013 Email from Piu Ghosh to Saran Oki RE: Technical Meeting (Apr. 09, 2013 9:09:00 AM PDT) 04/10/2013 Email from Manish Dalia to Chad Mosley, David Stillman RE: AC2 /DPW - Package #1 Coordination and Wolfe Widening (Apr. 10, 2013 12:31:57 PM PDT) 04/10/2013 Email from Piu Ghosh to Meg Thomas, Michael Bench re: Tree Removal for Round Balling (Apr. 10, 2013 10:07:00 AM PDT) 04/10/2013 Email from Steve Newgren to Manish Dalia, Piu Ghosh, Smith, Ying, Littlehales, Jody RE: Apple Campus 2 - CityNTA Coordination (Apr. 1 -116 sf- 3345921 Q ATTACHMENT I INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2 PROJECT 1 -117 sf- 3345921 Q DATE DOCUMENT 10, 2013 2:04:31 PM PDT) 04/10/2013 Email from Franziska Church to David Stillman RE: Tantau design (Apr. 10, 2013 3:26:03 PM PDT) 04/11/2013 Email from Chad Mosley to Manish Dalia, David Stillman RE: AC2 /DPW - Package 91 Coordination and Wolfe Widening (Apr. 11, 2013 4:41:51 PM PDT) 04/12/2013 Email from Piu Ghosh to Timm Borden re: FW: Apple Campus 2 - CityNTA Coordination (Apr. 12, 2013 9:58:59 AM PDT) 04/12/2013 Email from Manish Dalia to Piu Ghosh RE: Apple Campus 2 - CityNTA Coordination (Apr. 12, 2013 9:27:49 AM PDT) 04/15/2013 Email from Timm Borden to Piu Ghosh RE: Apple Campus 2 - CityNTA Coordination (Apr. 15, 2013 9:07:38 AM PDT) 04/15/2013 Email from Piu Ghosh to Aarti Shrivastava RE: Replacement Tree list (Apr. 15, 2013 11:35:00 AM PDT) 04/15/2013 Email from Timm Borden to Piu Ghosh RE: Apple Campus 2 - CityNTA Coordination (Apr. 15, 2013 9:07:38 AM PDT) 04/17/2013 Email from Adam Weinstein to: Gary Chao, Piu Ghosh, David Stillman, jfowler @apple.com, Peter Sokoloff, dgoldkmofo.com, mimwalle @mofo.com, Judith Malamut, Franziska Church, Jane Bierstedt, Rick Kitson, Gary Baum, Eric Morley, Foulkes @apple.com, Scott D. Pinsky, Chad Mosley, Timm Borden, JJeffersc�r�,mofo.com, dwhisenhunt @apple.com, Aarti Shrivastava, diana.fazely @gmail.com, David Brandt, wwagener @fosterandpartners.com, soki @fosterandpartners.com, william.baumgardner( gnM.com, Michael.iswaltgarup.com RE: Apple EIR -- Weekly Team Meeting 4/17 at 2:30p (Apr. 17, 2013 11:51:58 AM PDT) 04/17/2013 Email from Adam Weinstein To: Gary Chao, Piu Ghosh, David Stillman, jfowler @apple.com, Peter Sokoloff, dgold(,mofo.com, mimwalle @mofo.com, Judith Malamut, Franziska Church, Jane Bierstedt, Rick Kitson, Gary Baum, Eric Morley, Foulkes @apple.com, Scott D. Pinsky, Chad Mosley, Timm Borden, JJeffers(c rofo.com, dwhisenhunt @apple.com, Aarti Shrivastava, diana.fazely @gmail.com, David Brandt, wwagener @fosterandpartners.com, soki fosterandpartners.com, william.baum ardner aru .comet 1 -117 sf- 3345921 Q ATTACHMENT I INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2 PROJECT 1 -118 sf- 3345921 Q DATE DOCUMENT Michael.iswalt( gaM.com RE: Apple EIR -- Weekly Team Meeting 4/17 at 2:30p (Apr. 17, 2013 11:51:58 AM PDT) 04/19/2013 Email from Manish Dalia to Chad Mosley, David Stillman RE: AC2 - Package 91 Permitting and Wolfe Widening (Apr. 19, 2013 5:15:13 PM PDT) • Wolfe Widening Coordination Sketch (Mar. 18, 2013) 04/19/2013 Email from Adam Weinstein To: Gary Chao, Piu Ghosh, David Stillman, jfowler @apple.com, Peter Sokoloff, dgoldkmofo.com, mimwalle @mofo.com, Judith Malamut, Franziska Church, Jane Bierstedt, Rick Kitson, Gary Baum, Eric Morley, Foulkes @apple.com, Scott D. Pinsky, Chad Mosley, Timm Borden, JJeffersc�r�,mofo.com, dwhisenhunt @apple.com, Aarti Shrivastava, diana.fazely @gmail.com, David Brandt, wwagener @fosterandpartners.com, soki @fosterandpartners.com, william.baumgardner( gnM.com, Michael.iswalt(a gM.com RE: Apple EIR -- Weekly Team Meeting 4/17 at 2:30p (Apr. 19, 2013 4:51:46 PM PDT) • Apple Campus 2 EIR April 4, 2013 (Weekly Conference Call) Meeting Summary (4 -4 -13 LSA Meeting Summary - Revised.pdf) • Apple Campus 2 EIR April 17, 2013 (Weekly Conference Call) Meeting Summary (4 -17 -13 LSA Meeting Summary.pdf) 04/20/2013 Email from Piu Ghosh to Adam Weinstein RE: Apple EIR -- barn relocation discussion (Apr. 30, 2013 2:13:00 PM PDT) 04/20/2013 Email from Piu Ghosh to Meg Thomas re: Replacement Tree list (Apr. 02, 2013 5:01:00 PM PDT) 04/21/2013 Email from James Fowler to Adam Weinstein re: Fwd: Apple EIR -- Weekly Team Meeting 4/17 at 2:30p (Apr. 21, 2013 9:29:50 AM PDT) • LSA Associates, Inc. Apple Campus 2 EIR, April 4, 2013 (Weekly Conference Call) Meeting Summary (4 -4 -13 LSA Meeting Summary - Revised.pdf) 1 -118 sf- 3345921 Q ATTACHMENT I INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2 PROJECT 1 -119 sf- 3345921 Q DATE DOCUMENT • LSA Associates, Inc. Apple Campus 2 EIR April 17, 2013 (Weekly Conference Call) Meeting Summary (4 -17 -13 LSA Meeting Summary.pdf) 04/22/2013 Email from Michael Bench to Piu Ghosh Re: Apple Campus 2 (Apr. 22, 2013 12:34:32 PM PDT) • Transplant Appraisals worksheet (Apple C 2 Transplant Appraisals.xls) • Transplant Trees worksheet (Apple Campus 2 Transplant Trees.xls) 04/22/2013 Email from Piu Ghosh to Adam Weinstein RE: Apple EIR -- Minutes from Weekly Team Meeting 4/17 at 2:30p (Apr. 22, 2013 1:42:00 PM PDT) 04/23/2013 Email from Miles Imwalle to Adam Weinstein Re: Apple EIR -- misc. follow -up questions (Apr. 23, 2013 10:17:29 AM PDT) 04/23/2013 Email from Miles Imwalle to Adam Weinstein Re: Apple EIR -- misc. follow -up questions (Apr. 23, 2013 10:17:29 AM PDT) 04/23/2013 Email from Piu Ghosh to Michael Bench RE: Apple Campus 2 (Apr. 23, 2013 2:36:00 PM PDT) 04/24/2013 Email from David Stillman to Marsh Dalia, Chad Mosley RE: AC2 - Package #1 Permitting and Wolfe Widening (Apr. 24, 2013 8:03:00 AM PDT) 04/26/2013 Email from Chad Mosley to Grant Schereth RE: Wolfe Road Widening C.3 Requirements (Apr. 26, 2013 2:55:52 PM PDT) 04/26/2013 Email from Grant Schlereth to Chad Mosley RE: Road Widening - C.3 Requirements (Apr. 26, 2013 5:36:09 PM PDT) 05/00/2013 Economic and Fiscal Impacts Generated by Apple in Cupertino — Current Facilities and Apple Campus 2, prepared for Apple, Inc., by Keyser Martson Associates 1 -119 sf- 3345921 Q ATTACHMENT I INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2 PROJECT 1 -120 sf- 3345921 Q DATE DOCUMENT 05/00/2013 Keyser Marston Associates, Economic and Fiscal Impacts Generated by Apple in Cupertino — Current Facilities and Apple Campus 2, Prepared for Apple 05/01/2013 Email from Meg Thomas to Piu Ghosh Re: 89 or 90 transplant trees? (May 01, 2013 5:56:16 PM PDT) 05/01/2013 Email from Manish Dalia to David Stillman, Chad Mosley RE: AC2 - Package 91 Permitting and Wolfe Widening (May 01, 2013 9:17:30 AM PDT) • Street Improvements P -4.20, Revision 3, Apr. 15, 2013 (P- 4.20.pdf) 05/01/2013 Email from Piu Ghosh to David Stillman re: List of outstanding items - April 11 (May 01, 2013 11:15:35 AM PDT) 05/01/2013 Email from Piu Ghosh to: Adam Weinstein, Franziska Church, Jane Bierstedt, Judith Malamut Oudith.malamut @lsa- assoc.com) re: FW: Draft Agenda for Thursday's Apple meeting (May 01, 2013 5:15:00 PM PDT) 05/01//2013 Email from Adam Weinstein to: Gary Chao, Piu Ghosh, David Stillman, jfowler @apple.com, Peter Sokoloff, dgoldc�r�,mofo.com, mimwalle @mofo.com, Judith Malamut, Franziska Church, Jane Bierstedt, Rick Kitson, Gary Baum, Eric Morley, Foulkes @apple.com, Scott D. Pinsky, Chad Mosley, Timm Borden, JJeffersgraofo.com, dwhisenhunt @apple.com, Aarti Shrivastava, diana.fazely @gmail.com, David Brandt, wwagener @fosterandpartners.com, soki @fosterandpartners.com, william.baura ard�ner(a gM.com, Michael.iswalt(a gM.com RE: Apple EIR -- Weekly Team Meeting 5/2 at 2:00p (May 01, 2013 5:27:11 PM PDT) 05/01/2013 Email from Adam Weinstein To: Gary Chao, Piu Ghosh, David Stillman, jfowler @apple.com, Peter Sokoloff, dgoldc�r�,mofo.com, mimwalle @mofo.com, Judith Malamut, Franziska Church, Jane Bierstedt, Rick Kitson, Gary Baum, Eric Morley, Foulkes @apple.com, Scott D. Pinsky, Chad Mosley, Timm Borden, JJeffersgraofo.com, dwhisenhunt @apple.com, Aarti Shrivastava, diana.fazely @gmail.com, David Brandt, wwagener @fosterandpartners.com, soki @fosterandpartners.com, william.baum ard�ner(a gM.com, Michael.iswalt aru .com RE: Apple EIR -- Weekly Team Meeting 1 -120 sf- 3345921 Q ATTACHMENT I INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2 PROJECT 1 -121 sf- 3345921 Q DATE DOCUMENT 5/2 at 2:00p (May 01, 2013 5:27:11 PM PDT) 05/02/2013 Email from Rob Westover to Chad Mosley re: AC2 - Pruneridge Avenue Closure Request • Letter from DPR Skanska to City of Cupertino re: Apple Campus 2 Memorandum of Understanding Pruneridge Avenue Closure Request (May 2, 2013) ( Prunridge Closure Letter 2013_05_02.pdf) 05/03/2013 Email from Meg Thomas to Piu Ghosh Re: Tree Transplant Final Locations (May 03, 2013 4:24:38 PM PDT) • Planting Plan Canopy Trees, No. LP 1.05, Revision 0, Apr. 12, 2013 (130501_LP105 NETransplantEnlargement.pdf) 05/03/2013 Email from Piu Ghosh to David Stillman re: FW: Satellite Parking Facility (May 03, 2013 10:25:22 AM PDT) 05/06/2013 Email from Gilbert Wong to David Brandt, Timm Borden, Aarti Shrivastava, Carol Atwood, Carol Korade, Amy Chan, Gilbert Wong re: Fwd: Sale of Pruneridge Avenue (May 06, 2013 9:07:58 AM PDT) • Vacation of Pruneridge Avenue (Vacation of Pruneridge Avenue.pdf) • Sale of Pruneridge Avenue, Revised 5/7/13 (Sale of Pruneridge Avenue - Revised 5- 7- 13.pdf) 05/09/2013 Letter from Dolly Sandoval to City Councilmembers 05/09/2013 Email from Piu Ghosh to Saran Oki (soki @FosterandPartners.com), Wolfgang Wagener, , Dan Whisenhunt (dwhisenhuntggpple.com) re: Outstanding list of issues Apple 9 May 2013.docx (May 09, 2013 4:41:27 PM PDT) • Ongoing /Outstanding project review items re: AC2 Note: Some are items that have previously been identified and new items that have been identified as a result of changes to the plans with the April 2013 submittal and ongoing discussions (Apr. 12, 2013) (Outstanding list of issues Apple 9 May 2013.docx) 1 -121 sf- 3345921 Q ATTACHMENT I INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2 PROJECT 1 -122 sf- 3345921 Q DATE DOCUMENT 05/13/2013 Email from Chad Mosley to David Stillman re: FW: AC2 - Pruneridge Avenue Closure Request (May 13, 2013 8:47:27 AM PDT) • Letter from DPR Skanska to City of Cupertino re: Apple Campus 2 Memorandum of Understanding Pruneridge Avenue Closure Request (May 2, 2013) 05/13/2013 Email from Piu Ghosh to Wolfgang Wagener, Dan Whisenhunt, Meg Thomas re: Trees (May 13, 2013 4:46:22 PM PDT) 05/13/2013 Email form Piu Ghosh to Wolfgang Wagener, Dan Whisenhunt, Meg Thomas RE: Trees (May 13, 2013 4:50:48 PM PDT) 05/14/2013 Email from Timm Borden to Timm Borden, Aarti Shrivastava RE: park values (May 14, 2013 11:37:19 AM PDT) 05/14/2013 Email from Piu Ghosh to Adam Weinstein re: FW: Suggested Agenda for Meeting with Apple (May 14, 2013 5:44:00 PM PDT) 05/15/2013 Email from Timm Borden to Kristina Alfaro Re: park values (May 15, 2013 2:18:07 PM PDT) 05/15/2013 Email from Adam Weinstein To: Gary Chao, Piu Ghosh, David Stillman, jfowler @apple.com, Peter Sokoloff, dgoldkmofo.com, mimwalle @mofo.com, Judith Malamut, Franziska Church, Jane Bierstedt, Rick Kitson, Gary Baum, Eric Morley, Foulkes @apple.com, Scott D. Pinsky, Chad Mosley, Timm Borden, JJeffers(c rofo.com, dwhisenhunt @apple.com, Aarti Shrivastava, diana.fazely @gmail.com, David Brandt, wwagener @fosterandpartners.com, soki @fosterandpartners.com, william.baumgardnerkarup.com, Michael.iswaltc�r�,arup.com RE: Apple EIR -- Team Meeting 5115 at 2:00p (May 15, 2013 8:30:54 AM PDT) 05/15/2013 Email from Adam Weinstein to: Gary Chao, Piu Ghosh, David Stillman, jfowler @apple.com, Peter Sokoloff, dgold(,mofo.com, mimwalle @mofo.com, Judith Malamut, Franziska Church, Jane Bierstedt, Rick Kitson, Gary Baum, Eric Morley, Foulkes @apple.com, Scott D. Pinsky, Chad Mosley, Timm Borden, JJeffersc�r�,mofo.com, dwhisenhunt @apple.com, Aarti Shrivastava, diana.fazely @gmail.com, David Brandt, wwagener @fosterandpartners.com, soki @fosterandpartners.com, william.baumgardnerkarup.com, Michael.iswalt@gM.com .com RE: Apple EIR -- Team Meeting 5115 at 1 -122 sf- 3345921 Q ATTACHMENT I INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2 PROJECT 1 -123 sf- 3345921 Q DATE DOCUMENT 2:00p (May 15, 2013 8:30:54 AM PDT) 05/15/2013 Email from Timm Borden to Kristina Alfaro Re: park values (May 15, 2013 3:25:41 PM PDT) 05/16/2013 Letter from David Jamieson to Orrin Mahoney re: Support for Apple Campus 2 05/16/2013 Email from Manish Dalia to Chad Mosley RE: AC2 - Pruneridge Avenue Closure Request (May 16, 2013 12:38:48 PM PDT) 05/16/2013 Email from Chad Mosley to Manish Dalia RE: AC2 - Pruneridge Avenue Closure Request (May 16, 2013 4:34:28 PM PDT) 05/16/2013 Email from Aarti Shrivastava to: Gary Baum, Carol Korade, Timm Borden re: FW: Letter in Support of Apple II Campus (May 16, 2013 1:42:37 PM PDT) • Letter from David Jamieson to City of Cupertino re: Support for Apple Campus 2 (Document.pdf) 05/20/2013 Email from Timm Borden to Aarti Shrivastava, David Brandt, Gary Baum, Gary Chao, Piu Ghosh, Stephen Rose, Chad Mosley, David Stillman RE: Main St (May 20, 2013 10:02:36 AM PDT) 05/20/2013 Email from Piu Ghosh to Meg Thomas RE: 89 or 90 transplant trees? (May 02, 2013 9:29:55 AM PDT) 05/23/2013 Email from Dan Whisenhunt to Piu Ghosh Re: Logistics - needs for EIR (May 23, 2013 7:02:44 PM PDT) 05/23/2013 Email from Piu Ghosh to Aarti Shrivastava re: Batch Plant for Concrete Mixing (May 23, 2013 10:09:00 AM PDT) 05/23/2013 Email from Dan Whisenhunt to Piu Ghosh re: Logistics (May 23, 2013 4:01:52 PM PDT) 05/24/2013 Email from Piu Ghosh to Cody Bennett RE: Apple Campus 2 Sound Wall (May 24, 2013 12:13:06 PM PDT) 05/24/2013 Email from Apple Campus 2 to: Orrin Mahoney, Gilbert Wong, Barry 1 -123 sf- 3345921 Q ATTACHMENT I INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2 PROJECT 1 -124 sf- 3345921 Q DATE DOCUMENT Chang, Mark Santoro re: Apple Campus 2 Community Outreach Update (May 24, 2013 4:48:21 PM PDT) • Picture of Apple Campus 2 (AC2- Community Outreach Update.png) 05/29/2013 AB900Index 05/29/2013 Letter from Peter Pau to Orrin Mahoney re: Sand Hill Property Company's Support of Apple Campus 2 05/29/2013 Email from Timothy Cusseaux to Manish Dalia, Steven Smith re: RE: AC2 - Pruneridge Avenue Traffic Closure (May 29, 2013 12:57:50 PM PDT) 05/30/2013 Email from Piu Ghosh to Adam Weinstein, Judith Malamut FW: Response to Apple Campus 2 and Submittal 6 05/30/2013 Letter from Ken Alex, Governor's Office of Planning and Research, to Planning Department, City of Cupertino re: Apple Campus, AB 900 Proj ect 05/31/2013 Letter from Matthew Mahood, San Jose Silicon Valley Chamber of Commerce to Orrin Mahoney, City of Cupertino 06/04/2013 Email from Piu Ghosh to Adam Weinstein, Judith Malamut, Franziska Church, Jane Bierstedt re: DEIR - Correction!! (June 04, 2013 4:04:00 PM PDT) • LSA Associates, Inc., Apple Campus 2 Project EIR, V. Setting. Impacts and Mitigation Measures 1. Transportation and Circulation, June 2013, p. 418 (Apple Campus 2 Project EIR Public Review 430.pdf) 06/04/2013 Email from Piu Ghosh to Dan Whisenhunt re: DEIR Notice - On site (June 04, 2013 5:00:00 PM PDT) • Notice of Availability of Draft Environmental Impact Report 1 -124 sf- 3345921 Q ATTACHMENT I INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2 PROJECT 1 -125 sf- 3345921 Q DATE DOCUMENT 06/05/2013 Email from Piu Ghosh to Adam Weinstein, Judith Malamut re: ABAG Regional Clearinghouse (June 05, 2013 12:48:00 PM PDT) 06/05/2013 Email from Piu Ghosh to Dan Whisenhunt, Gary Baum re: Dedication vs. Easement (June 05, 2013 2:16:00 PM PDT) 06/05/2013 Email from William Baumgardner to David Stillman, Franziska Church re: [PHISHING]: RE: SCI 280 Wolfe Rd. - Metering Rates (June 05, 2012 9:35:58 AM PDT) 06/06/2013 Email from Rick Kitson to City Council re: Apple DEIR Update (June 06, 2013 2:46:05 PM PDT) • News Release, Draft Environmental Impact Report for the Proposed Apple Campus 2 released for public comment (June 6, 2013) (Cupertino DEIR for Apple Campus 2 6 -6- 13.docx) • Apple Messages v13 June 5, 2013 (Apple Talking Points v14 20130606.docx) 06/06/2013 Email from David Stillman to Joy Bhattacharya RE: Draft Recommendation Report (June 06, 2013 2:30:48 PM PDT) 06/06/2013 Email from David Brandt to All of City of Cupertino Users / Council Members re: Draft Environmental Impact Report (EIR) for the proposed Apple Campus 2 Project (June 06, 2013 11:47:37 AM PDT) 06/06/2013 Email from Rick Kitson to Public Information Officer re: Draft Environmental Impact Report for the Proposed Apple Campus 2 released for public comment (June 06, 2013 11:41:47 AM PDT) 06/06/2013 Email from Apple Campus 2 to Orrin Mahoney, Gilbert Wong, Barry Chang, Mark Santoro re: We Support Apple Campus 2 (June 06, 2013 10:30:54 AM PDT) • Letter from Apple to City of Cupertino (June 3, 2013) (AC2- Supporters and Map.pdf) 06/10/2013 Email from Aarti Shrivastava to David Brandt, Timm Borden, Judith.Malamutklsa- assoc.com, Adam Weinstein, Piu Ghosh, Ellen J. Garber, Scott D. Pinsky re: Apple meeting (June 10, 2013 2:03:19 PM 1 -125 sf- 3345921 Q ATTACHMENT I INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2 PROJECT 1 -126 sf- 3345921 Q DATE DOCUMENT PDT) 06/11/2013 Email from Apple Campus 2 to Orrin Mahoney, Gilbert Wong, Barry Chang, Mark Santoro re: Apple Campus 2 Community Update (June 11, 2013 9:39:01 AM PDT) 06/11/2013 Letter from Dan Whisenhunt to Aarti Shrivastava 06/12/2013 Chart, Piu /Aarti /David S. /David B. Emails, BIOLOGICAL RESOURCES 06/13/2013 Email from Piu Ghosh to Aarti Shrivastava, Gary Baum, David Brandt, Timm Borden re: Apple latest schedule — Confidential (June 13, 2013 10:24:29 AM PDT) • DRAFT Schedule for Apple Campus 2 Project EIR (Revised 05/21/13) (AppleSchedule061313.pdf) 06/13/2013 Letter to Neighbor from Peter Oppenheimer 06/14/2013 Email from Piu Ghosh to Dan Whisenhunt re: Temporary Power /Site prep (June 14, 2013 3:31:00 PM PDT) 06/14/2013 Email from Adam Weinstein to Gary Chao, Piu Ghosh, David Stillman, jfowler @apple.com, Peter Sokoloff, dgoldkmofo.com, mimwalle @mofo.com, Judith Malamut, Franziska Church, Jane Bierstedt, Rick Kitson, Gary Baum, Eric Morley, Foulkes @apple.com, Scott D. Pinsky, Chad Mosley, Timm Borden, JJeffersc�r�,mofo.com, dwhisenhuntkople.com, Aarti Shrivastava, diana.fazely@gmail.com, David Brandt, wwa eg nergfosterandpartners.com, soki @fosterandpartners.com, william.baumgardner(c gM.com, Michael.iswalt(a gM.com, lynnjohnsonggpple.co, Garbergsmwlaw.com re: Apple EIR -- Team Meeting 6/12 (June 14, 2013 4:30:33 PM PDT) • Apple Campus 2 EIR, June 12, 2013 (Weekly Conference Call), Meeting Summary ( 6 -12 -13 LSA Meeting Summary.pdf) 06/17/2013 Email from Rick Kitson to David Brandt re: FW: Apple Campus 2 Commenting Process activity (June 17, 2013 1:53:12 PM PDT) 1 -126 sf- 3345921 Q ATTACHMENT I INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2 PROJECT 1 -127 sf- 3345921 Q DATE DOCUMENT 06/17/2013 Email from Gary Baum to Timm Borden Re: CalTrans (June 17, 2013 12:31:44 PM PDT) 06/17/2013 Index of Chad Mosley / Timm Borden's Emails 06/18/2013 Email from Terry Bowen to James Fowler, Robertson, Jesse G @DOT, Finney, Jean@DOT, Alm, Erik @DOT, einar acunakdot.ca.gov, Timm Borden, william.baumgardner @ arup.com, Franziska Church, Nick Saleh, (Lance.D.Hall(, dot. ca.gov), Lester_S_Lee @dot.ca.gov, Philip Cox (pcox @dot.ca.gov), David Salladay, Saleh, Nick @DOT, Grant Schlere@ Cox, Phillip @DOT, Ramiel Gutierrez RE: CT /Cupertino /Apple: IGR CEQA Coordination for Apple Campus 2 (June 18, 2013 4:32:27 PM PDT) • Agenda, Apple Campus 2 Caltrans /City of Cupertino /Apple Intergovernmental Review /CEQA Coordination, June 24: 10:30 -12 Caltrans District 4, 111 Grand Ave, Oakland Conference Room 13 -220 (Tamalpais Room) (Agenda 6- 2013 CT Cupertino Apple IGR CEQA C oordinati on. doc. docx) 06/19/2013 Email from Franziska Church to Piu Ghosh re: RE: MMRP - Apple Campus 2 (June 19, 2013 10:20:12 AM PDT) 06/19/2013 Email from Adam Weinstein to Gary Chao, Piu Ghosh, David Stillman, jfowlerggpple.com, Peter Sokoloff, dgoldc�r�,mofo.com, mimwallegmofo.com, Judith Malamut, Franziska Church, Jane Biersted, Rick Kitson, Gary Baum, Eric Morley, Foulkes @apple.com, Scott D. Pinsky, Chad Mosley, Timm Borden, JJeffersgraofo.com, dwhisenhuntggpple.com, Aarti Shrivastava, diana.fazely @gmail.com, David Brandt, wwagener2fosterandpartners.com, soki @fosterandpartners.com, william.baum arg dnergarup.com, Michael.iswalt @arup.com, lynnjohnson(cr Eple.com, Garberc�r�,smwlaw.com re: RE: Apple EIR -- Team Meeting 6/20 (June 19, 2013 5:45:04 PM PDT) 06/20/2013 Email from Adam Weinstein to Gary Chao, Piu Ghosh, David Stillman, jfowler(c gpple.com, Peter Sokoloff, dgold(,mofo.com, mimwallec�r�,mofo.com, Judith Malamut, Franziska Church, Jane Bierstedt, Rick Kitson, Gary Baum, Eric Morley, Foulkesggpple.com„ Scott D. Pinsky, Chad Mosley, Timm Borden, JJeffers(,mofo.com, dwhisenhunt @apple.com, Aarti Shrivastava, 1 -127 sf- 3345921 Q ATTACHMENT I INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2 PROJECT 1 -128 sf- 3345921 Q DATE DOCUMENT diana.fazely @gmail.com, David Brandt, wwagener @fosterandpartners.com, soki c�r�,fosterandpartners.com, william.baumgardnerk M.com, Michael.iswaltkarup.com, lynnjohnsonggpple.com, Garberc�r�,smwlaw.com re: RE: Apple EIR -- Team Meeting 6/20 (June 20, 2013 12:23:15 PM PDT) 06/20/2013 Email from Kent Steffens to Timm Borden re: Wolfe Road Traffic Counts (June 20, 2013 5:14:44 PM PDT) • City of Sunnyvale, Division of Transportation and Traffic, Weekly Event Counts (Wolfe traffic counts.pdf) 06/20/2013 Email from Adam Weinstein to Gary Chao, Piu Ghosh, David Stillman, jfowlerggpple.com, Peter Sokoloff, dgoldc�r�,mofo.com, mimwallegraofo.com„ Judith Malamut, Franziska Church, Jane Bierstedt, Rick Kitson, Gary Baum, Eric Morley, Foulkes @apple.com, Scott D. Pinsky, Chad Mosley, Timm Borden, Jefferskmofo.com, dwhisenhuntggpple.com, Aarti Shrivastava, diana.fazelyg mail.com, David Brandt, wwagener2fosterandpartners.com, sokigfosterandpartners.com, william.baum arg dner(a Mm.com, Michael.iswalt @arup.com, lynnjohnsonggpple.com, Garberc�r�,smwlaw.com RE: Apple EIR -- Team Meeting 6/20 (June 20, 2013 12:23:15 PM PDT) 06/20/2013 Email from Terry Bowen to Timm Borden, Franziska Church, FW: VTA- County - Cupertino -Apple Campus 2 CEQA Coordination (June 20, 2013 10:40:51 AM PT) • DRAFT AGENDA Apple Campus 2 SCVTA /SC County Road Department/City of Cupertino /Apple CEQA Coordination Time /date TBD ( Draft Agenda VTA- County- Cupertino -Apple CEQA Coordination.docx) 06/21/2013 Email from Manish Dalia to Chad Mosley, David Stillman RE: AC2 - Pruneridge Avenue Traffic Closure (June 21, 2013 1:30:42 PM PDT) 06/21/2013 Email from Franziska Church to Ellen J. Garber re: Administrative Draft Responses (June 21, 2013 2:26:20 PM PDT) • Administrative Draft Responses to Comments — Apple Questions from City of Sunnyvale (06/19/2013) (20130621 AdminDraft -City of Sunnyvale Apple 1 -128 sf- 3345921 Q ATTACHMENT I INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2 PROJECT 1 -129 sf- 3345921 Q DATE DOCUMENT Questions &Responses.docx) 06/24/2013 Email from Piu Ghosh to Timm Borden RE: I need EIR schedule stuff... Leaving for Oakland in 10 minutes!— (June 24, 2013 9:17:00 AM PDT) 06/24/2013 Email from Dawn Cameron to Erika McCulloch, Terry Bowen, James Fowler, £churchgfehrandpeers.com, Swierk, Robert, Timm Borden, dwhisenhuntkgpple.com, foulkes(c gpple.com RE: VTA- County- Cupertino -Apple Campus 2 CEQA Coordination (June 24, 2013 4:37:33 PM PDT) 06/24/2013 Email from Piu Ghosh to Timm Borden RE: I need EIR schedule stuff... Leaving for Oakland in 10 minutes!— (June 24, 2013 9:17:14 AM PDT) 06/24/2013 Email from Aarti Shrivastava to Timm Borden; Katy Jensen re: Apple Project (June 24, 2013 8:34:17 AM PDT) 06/25/2013 Email from Adam Weinstein to Piu Ghosh RE: Photo metric study (June 25, 2013 3:49:57 PM PDT) 06/25/2013 Email from Michael Stamp to Timm Borden, Gary Baum Re: Appraisals for Street Projects /Apple (June 25, 2013 4:56:26 PM PDT) 06/25/2013 Email from Franziska Church to Timm Borden, Erika McCulloch, Terry Bowen, James Fowler, dwhisenhuntkgpple.com, foulkesggpple.com, Scott Pinsky (spinskygearthlink.net), David Stillman RE: VTA - County - Cupertino -Apple Campus 2 CEQA Coordination (June 25, 2013 10:17:02 AM PDT) 06/26/2013 Email from Franziska Church to Swierk, Robert, Cameron, Dawn, Erika McCulloch, Terry Bowen, James Fowler, Timm Borden, dwhisenhunt @apple.com, foulkes(c gpple.com RE: VTA- County- Cupertino -Apple Campus 2 CEQACoordination (June 26, 2013 1:33:01 PM PDT) • Fehr & Peers, Percent Apple Employees by Travel Zone B (June 2013) (Apple_ Employee_ Zone_B.pdf) • Fehr & Peers, Percent Apple Employees by Travel Zone A (June 2013) (Apple_ Employee_ Zone_A.pdf) 1 -129 sf- 3345921 Q ATTACHMENT I INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2 PROJECT 1 -130 sf- 3345921 Q DATE DOCUMENT 06/26/2013 Email from Franziska Church to Timm Borden, David Stillman RE: VTA- County - Cupertino -Apple Campus 2 CEQA Coordination (June 26, 2013 11:27:51 AM PDT) • Fehr & Peers, Percent Apple Employees by Travel Zone B (June 2013) (Apple_ Employee_ Zone_B.pdf) • Fehr & Peers, Percent Apple Employees by Travel Zone A (June 2013) (Apple_ Employee_ Zone_A.pdf) 06/26/2013 Email from David Stillman to ksteffens (,ci.sunnyvale.ca.us re: Homestead Road median (June 26, 2013 9:50:31 AM PDT) 06/27/2013 Email from James Fowler to Franziska Church re: Sunnyvale (June 27, 2013 6:31:17 PM PDT) 06/27/2013 Email from Franziska Church to Jack Witthaus, ksteffensgci.sunnyyale.ca.us, re: Apple Campus Trip Distribution (June 27, 2013 1:07:47 PM PDT) • Fehr & Peers, Percent Apple Employees by Travel Zone B (June 2013) (Apple_ Employee_ Zone_B.pdf) • Fehr & Peers, Percent Apple Employees by Travel Zone A (June 2013) (Apple_ Employee_ Zone_A.pdf) 06/27/2013 Email from Ryan Roman to Timm Borden re: FW: Some online reporting of Apple Campus 2 meeting (June 27, 2013 12:04:54 PM PDT) 06/27/2013 Email from Gary Baum to Aarti Shrivastava, Piu Ghosh, Chad Mosley, David Brand, David Stillman, Timm Borden, Rick Kitson re: Apple E- mails for the Month of June (June 27, 2013 11:02:33 AM PDT) 06/30/2013 Email from Gilbert Wong to Carol Korade re: Fwd: [Santa _Clara_ Neighbors_ for Responsible_ Development] Apple II Campus meeting last night (June 30, 2013 8:47:06 AM PDT) 07/00/2013 July AB900 Emails Index 07/01/2013 Email from Aarti Shrivastava to Keith Murphy RE: Where is the city's web site link for development projects? (July 01, 2013 8:44:23 AM 1 -130 sf- 3345921 Q ATTACHMENT I INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2 PROJECT 1 -131 sf- 3345921 Q DATE DOCUMENT PDT) 07/01/2013 Email from Piu Ghosh to Aarti Shrivastava re: Architectural Details for Apple Campus 2 Phase Ia. buildings (July 01, 2013 4:09:00 PM PDT) 07/02/2013 Email from Jesse Robertson to Fransiska Church re: Apple Campus 2 TIA (July 02, 2013 6:15:02 AM PDT) 07/02/2013 Email from Piu Ghosh to Wolfgang Wagener, Dan Whisenhunt re: Architectural Details for Apple Campus 2 Phase I a. buildings (July 02, 2013 9:19:00 AM PDT) 07/02/2013 Email from Thorisa Yap to Aarti Shrivastava re: Fw: [McBB] Apple 2 fortress - comment period (July 02, 2013 11:59:21 AM PDT) 07/02/2013 Email from Piu Ghosh to Aarti Shrivastava re: Items for Council - Apple Community Meeting for EIR comments (July 02, 2013 12:16:00 PM PDT) 07/03/2013 Email from Robert Swierk to Erika McCulloch, Terry Bowen, James Fowler, Franziska Church, Timm, Borden, dwhisenhunt @apple.com, foulkesggpple.com, David Stillman RE: VTA- County- Cupertino- Apple Campus 2 CEQA Coordination (July 03, 2013 5:53:14 PM PDT) 07/03/2013 Email from Dan Collen to Robert Swierk Re: VTA- County - Cupertino- Apple Campus 2 CEQA Coordination (July 03, 2013 6:34:35 PM PDT) 07/03/2013 Email from Piu Ghosh to Timm Borden re: FW: Apple DEIR -- Conditions of Approval (July 03, 2013 1:18:19 PM PDT) • Conditions of Approval Apple Campus 2 Project Draft EIR (Conditions of Approval.doc) 07/03/2013 Email from Judith Malamut to Piu Ghosh re: FW: Apple - Air Intake Noise? (July 03, 2013 1:41:22 PM PDT) 07/03/2013 Email from Aarti Shrivastava to David Brandt re: FW: Items for Council - Apple Campus 2 — Public Meeting for EIR (July 03, 2013 3:32:09 PM PDT) 07/03/2013 Email from Piu Ghosh to Dan Whisenhunt RE: Architectural Details for Apple Campus 2 Phase la. buildings (July 03, 2013 4:38:52 PM 1 -131 sf- 3345921 Q ATTACHMENT I INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2 PROJECT 1 -132 sf- 3345921 Q DATE DOCUMENT PDT) 07/03/2013 Email from Robert Kim to Rick Kitson, Michelle Combs, Nidhi Mathu, Peter Coglianese, Rei Delgado, Robert Kim re: FYI: (July 05, 2013 11:40:00 AM PDT) 07/03/2013 Email from Aarti Shrivastava to David Brandt re: FW: Items for Council - Apple Campus 2 — Public Meeting for EIR (July 03, 2013 3:32:09 PM PDT) 07/05/2013 Email from Dawn Cameron to Timm Borden re: Caltrans contact for Apple DEIR (July 05, 2013 3:09:12 PM PDT) 07/05/2013 Email from Piu Ghosh to Andrew Miner Re: Pretty Pictures (July 05, 2013 12:31:54 PM PDT) 07/08/2013 Email from Robert Cunningham to David Stillman, timmbkcupertino.org, Franziska Church re: Question about intersection impacts in Apple 2 TIA (July 08, 2013 2:59:49 PM PDT) 07/09/2013 Email from Franziska Church to David Stillman re: FW: Question about intersection impacts in Apple 2 TIA (July 09, 2013 7:55:43 AM PDT) 07/09/2013 Email from Piu Ghosh to David Stillman, Gary Baum re: Draft Conditions/Mitigation Measures from the City of Santa Clara — Advice (July 09, 2013 10:42:07 AM PDT) 07/09/2013 Email from Timm Borden to Aarti Shrivastva, Piu Ghosh, David Stillman, Gary Baum re: RE: Draft Conditions/Mitigation Measures from the City of Santa Clara — Advice (July 09, 2013 11:02:05 AM PDT) 07/09/2013 Email from Piu Ghosh to Aarti Shrivastava, David Stillman, Gary Baum RE: Draft Conditions/Mitigation Measures from the City of Santa Clara — Advice (July 09, 2013 11:02:34 AM PDT) 07/09/2013 Email from Piu Ghosh to David Stillman, Gary Baum re: Draft Conditions/Mitigation Measures from the City of Santa Clara — Advice (July 09, 2013 10:42:07 AM PDT) 07/09/2013 Email from David Stillman to Aki Hond, Aarti Shrivastava, Gary Chao, George Schroeder re: RE: Traffic Analysis GPU (July 09, 2013 1 -132 sf- 3345921 Q ATTACHMENT I INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2 PROJECT 1 -133 sf- 3345921 Q DATE DOCUMENT 1:01:30 PM PDT) 07/09/2013 Email from Rick Kitson Aarti Shrivastava, Gary Baum, David Brandt re: FW: Apple Campus 2 Commenting Process activity report, Thursday, June 6 to Sunday, July 7, 2013 (July 09, 2013 2:50:48 PM PDT) 07/10/2013 Email from Manish Dalia to Chad Mosley re: AC2 - Wolfe Road Widening and Pruneridge Streetscape Workshop (July 10, 2013 4:05:51 PM PDT) 07/11/2013 Email from Chad Mosley to Mike Rohde RE: VTA Route 182 (July 11, 2013 8:13:20 AM PDT) 07/11/2013 Email from Adam Weinstein to Gary Chao, Piu Ghosh, David Stillman, jfowlerkgpple.com, Peter Sokoloff, dgoldgmofo.com, mimwalle @mofo.com, Judith Malamut, Franziska Church, Jane Bierstedt, Rick Kitson, Gary Baum, Eric Morley, Foulkes @apple.com, Scott D. Pinsky, Chad Mosley, Timm Borden, JJeffers(,mofo.com, dwhisenhunt @apple.com, Aarti Shrivastava, diana.fazely @gmail.com, David Brandt, wwa eg ner(,fosterandpartners.com, soki @fosterandpartners.com, william.baum arg dner(a 4m.com, Michael.iswalt @arup.com, lynnjohnsonkUple.com, Garbergsmwlaw.com RE: Apple EIR -- Team Meeting 7/11 (July 11, 2013 10:16:31 AM PDT) 07/11/2013 Email from Piu Ghosh to Steve Lynch RE: Meeting with Cupertino (July 11, 2013 11:54:00 AM PDT) 07/11/2013 Email from Rick Kitson to Karen Guerin, David Brandt re: Apple Comments (July 11, 2013 4:45:00 PM PDT) 07/12/2013 Email from Franziska Church to David Stillman re: Wolfe Bus Stop (July 12, 2013 8:21:58 AM PDT) 07/12/2013 Email from David Stillman to Yang Smith re: Fair share spreadsheet (July 12, 2013 4:09:00 PM PDT) • Cupertino's Freeway Volumes (20130312_cupertino I -280 Volumes- F &P.xls) 07/12/2013 Email from Steve Lynch to Piu Ghosh RE: Meeting with Cupertino 1 -133 sf- 3345921 Q ATTACHMENT I INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2 PROJECT 1 -134 sf- 3345921 Q DATE DOCUMENT (July 12, 2013 10:49:34 AM PDT) 07/12/2013 Email from Brendan Lahiff to David Brandt Re: Steve Reed's vehicles (July 12, 2013 6:28:17 PM PDT) 07/14/2013 Email from Grant Schereth to Chad Mosley re: AC2 H &H Report and DD Addendum Review (July 14, 2013 11:19:06 AM PDT) 07/15/2013 Email from Robert Kim to Andrea Sanders, Donna Henriques, Ryan Roman, Kirsten Squarcia, Marianna Khienkina, Karen B. Guerin, Brittany Carey, Julia Kinst, Grace Schmidt, Liz Nunez, Chylene Osborne, Tiffanie Cardenas, Nidhi Mathur, Robert Kim, Mary Redwine, Lisa Atwood, Rei Delgado, Peter Coglianese, Rick Kitson, Piu Ghosh re: Apple Campus 2 Commenting Process activity report, Thursday, June 6 to Sunday, July 14, 2013 (July 15, 2013 9:55:42 AM PDT) 07/16/2013 Email from Nidhi Mathur to Ellen J. Garber, Gary Baum, Rick Kitson re: online comments after July 22 (July 16, 2013 4:40:09 PM PDT) 07/16/2013 Email from David Stillman to Chad Mosley re: Requested info re: properties (July 16, 2013 4:45:43 PM PDT) 07/17/2013 Email from Chad Mosley to dwhisenhuntggpple.com re: Appendix H exhibits (July 17, 2013 7:46:58 AM PDT) • Fehr & Peers, City of Cupertino, Homestead Road & De Anza Boulevard, Sunnyvale — Saratoga Road, Mitigation Conceptual Plan 07/17/2013 Email from Piu Ghosh to Adam Weinstein re: City's Agenda Items for Apple meeting 7/18/2013 (July 17, 2013 12:14:00 PM PDT) 07/17/2013 Email from Adam Weinstein to Gary Chao, Piu Ghosh, David Stillman, jfowlerggpple.com, Peter Sokoloff, dgoldc�r�,mofo.com, mimwalle @mofo.com, Judith Malamut, Franziska Church, Jane Bierstedt, Rick Kitson, Gary Baum, Eric Morley,Foulkesggpple.com, Scott D. Pinsky, Chad Mosley, Timm Borden, JJeffers @mofo.com,dwhisenhunt @apple.com, Aarti Shrivastava, diana.fazely @gmail.com, David Brandt, wwagener @fosterandpartners.com, soki c�r�,fosterandpartners.com, william.baumgardnergarup.com, Michael.iswalt @arup.com, lynnjohnsonggpple.com, Garber smwlaw.com RE: Apple EIR -- 1 -134 sf- 3345921 Q ATTACHMENT I INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2 PROJECT 1 -135 sf- 3345921 Q DATE DOCUMENT Team Meeting 7/18 (July 17, 2013 6:05:11 PM PDT) 07/18/2013 Email from Dan Whisenhunt to Chad Mosley Re: Appendix H exhibits Re: Appendix H exhibits (July 18, 2013 9:04:57 AM PDT) 07/18/2013 Email from Piu Ghosh to Nidhi Mathur, Aarti Shrivastava, Rick Kitson RE: online comments after July 22 (July 18, 2013 9:42:00 AM PDT) 07/18/2013 Email from Gary Chao to Aarti Shrivastava, Piu Ghosh FW: Apple EIR Report and Cupertino Village (July 18, 2013 11:13:41 AM PDT) 07/18/2013 Email from Keith Murphy to City Council re: New construction in rear of Apple parking lot, adjacent to Calabazas Creek (July 18, 2013 1:22:51 PM PDT) 07/18/2013 Email from Timm Borden to Aarti, Ellen J. Garber, Carol Korade, David Brandt re: RE: Permit list - DRAFT.docx (July 18, 2013 1:56:03 PM PDT) 07/18/2013 Email from Adam Weinstein to Aarti Shrivastava to Piu Ghosh re: Apple EIR — alternatives (July 18, 2013 3:43:27 PM PDT) • Apple Campus 2 Project EIR Technical Studies Needed to Approve Project Alternatives (Alternatives -Tech Reports Needed. doc) 07/19/2013 Email from Gilbert Wong to David Brandt, Carol Korade, Aarti Shrivastava, Timm Borden re: Fwd: New construction in rear of Apple parking lot, adjacent to Calabazas Creek (July 19, 2013 9:08:41 PM PDT) 07/19/2013 Email from Piu Ghosh to Adam Weinstein re: FW: Permit list - DRAFT.docx (July 19, 2013 10:33:00 AM PDT) 07/19/2013 Email from Aarti Shrivastava to Piu Ghosh, Adam Weinstein RE: Permit list - DRAFT.docx (July 19, 2013 12:09:34 PM PDT) 07/19/2013 Email from Dan Whisenhunt, Apple, Inc., to Orrin Mahoney, Gilbert Wong, Barry Chang, Mark Santoro re: Apple Campus 2 (July 19, 2013 3:23:41 PM PDT) • Letter from Apple Inc. to the City of Cupertino (July 19, 1 -135 sf- 3345921 Q ATTACHMENT I INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2 PROJECT 1 -136 sf- 3345921 Q DATE DOCUMENT 2013) 07/19/2013 Email from Apple Campus 2 to Orrin Mahoney, Gilbert Wong, Barry Chang, Mark Santoro re: FW: Apple Campus 2 (July 19, 2013 3:22 PM PDT) • Letter from Apple Inc. to the City of Cupertino (July 19, 2013) 07/19/2013 Letter from Dan Whisenhunt to Rick Kitson 07/22/2013 Email from Franziska Church to David Stillman re: SCB /Calvert (July 22, 2013 8:08:52 AM PDT) • Stevens Creek Graphic (SJ11_ 1272_ AppleCampus2 _GraphicsStevensCreek .p df) 07/22/2013 Email from Robert Kim to Andrea Sanders, Donna Henriques, Ryan Roman, Kirsten Squarcia, Marianna Khienkina, Karen B. Guerin, Brittany Carey, Julia Kinst, Grace Schmidt, Liz Nunez, Chylene Osborne, Tiffanie Cardenas, Nidhi Mathur, Robert Kim, Mary Redwine, Lisa Atwood, Rei Delgado, Peter Coglianese, Rick Kitson, Piu Ghosh re: Public Commenting: Ahh, I remember when... (July 22, 2013 10:08:10 AM PDT) 07/22/2013 Email from Beth Ebben to Piu Ghosh re: FW: Apple Campus 2 re: FW: Apple Campus 2 (July 22, 2013 10:45:33 AM) • Letter from Apple Inc. to the City of Cupertino (July 19, 2013) 07/22/2013 Email from Christina Uribe to Piu Ghosh, Aarti Shrivastava re: City of Sunnyvale Comments on the Draft EIR for the Apple 2 Campus (July 22, 2013 11:16:52 AM PDT) • City of Sunnyvale Comment Letter (July 22, 2013) (COS Comments to Apple 2 DEIR 7- 22- 13.pdf) 07/22/2013 Email from Roy Molseed to Aarti Shrivastava, applecampus2 re: Apple Campus 2 Draft EIR (July 22, 2013 3:39:52 PM PDT) 1 -136 sf- 3345921 Q ATTACHMENT I INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2 PROJECT 1 -137 sf- 3345921 Q DATE DOCUMENT • Santa Clara Valley Transportation Authority Comment Letter (July 22, 2013) (CU1102_apple2_DEIR_7-22- 13.pdf) 07/22/2013 Email from Payal Bhagat to Piu Ghosh, Aarti Shrivastava re: Apple Campus 2 Project DEIR - Comments from City of Santa Clara (July 22, 2013 4:20:16 PM PDT) • City of Santa Clara Comment Letter (July 19, 2013) (City of Santa Clara Comments on DEIR for Apple Campus 2 Proj ect.pdf) 07/22/2013 Email from Jesse Robertson to Roy Molseed, Aarti Shrivastava, applecampus2 re: Caltrans comments for the Apple Campus 2 Draft EIR (July 22, 2013 4:58:59 PM PDT) • Caltran Comment Letter (July 22, 2013) (Apple Campus 2 DEIR Letter 22JUL2013.pdf) 07/22/2013 Email from Dawn Cameron to applecampus2, Timm Borden, Aarti Shrivastava, Piu Ghosh re: County of Santa Clara Comments on Apple Campus 2 DEIR (July 22, 2013 5:14:15 PM PDT) • County of Santa Clara Comment Letter (July 22, 2013) 07/22/2013 Email from Piu Ghosh to Dawn Cameron RE: County of Santa Clara Comments on Apple Campus 2 DEIR (July 22, 2013 5:20:00 PM PDT) 07/22/2013 Email from Rick Kitson to Rick Kitson re: Apple Campus 2 Proceeds to Next Phase of Environmental Review re: Apple Campus 2 Proceeds to Next Phase of Environmental Review (July 22, 2013 5:30:00 PM PDT) 07/22/2013 Email from Andrew Crabtree re: Emailing: CSJ_ Comments—Apple _2_Campus_DEIR.pdf (July 22, 2013 5:35:16 PM PDT) • City of San Jose Comment Letter (July 22, 2013) (C SJ_ Comments _Apple_2_Campus_DEIR.pdf) 07/22/2013 Email from Robert Kim to Andrea Sanders, Donna Henriques, Ryan Roman, Kirsten Squarcia, Marianna Khienkina, Karen B. Guerin, 1 -137 sf- 3345921 Q ATTACHMENT I INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2 PROJECT 1 -138 sf- 3345921 Q DATE DOCUMENT Brittany Carey, Julia Kins, Grace Schmidt, Liz Nunez, Chylene Osborne, Tiffanie Cardenas, Nidhi Mathur, Robert Kim, Mary Redwine, Lisa Atwood, Rei Delgado, Peter Coglianese, Rick Kitson, Piu Ghosh re: Apple Campus 2 Commenting Process activity report, Thursday, June 6 to Sunday, July 21, 2013 (Date: Monday, July 22, 2013 5:40:33 PM PDT) 07/22/2013 Email from Karen Guerin to Apple Campus 2 re: FW: Apple Campus 2 (Apple Campus 2- Updated List of Supporters & Map 071913.pdf) • Letter from Apple, Inc. to City of Cupertino (July 19, 2013) 07/22/2013 Comment letter (Letter ID 3) 07/23/2013 Email from Franziska Church to David Stillman re: Wolfe Rd Transit Stop (July 23, 2013 10:24:49 AM PDT) • Fehr & Peers, City of Cupertino Option I N. Wolfe Road — Bus Duckout Mitigation Conceptual Plan (Wolfe Rd -Bus Duckout A.pdf) • Fehr & Peers, City of Cupertino Option 1 N. Wolfe Road — Bus Duckout Mitigation Conceptual Plan (Wolfe Rd -Bus Duckout B.pdf) 07/23/2013 Email from David Stillman to Chad Mosley FW: Wolfe layover bus stop (July 23, 2013 4:31:45 PM PDT) • Santa Clara Valley Transportation Authority, Bus Parallel Pull -In & Pull -Out Figure 24 (INOUTALL.pdf) 07/23/2013 Email from Andrew Miner to Piu Ghosh Re: City of Sunnyvale Comments on the Draft EIR for the Apple 2 Campus re: July 23, 2013 8:04:18 AM PDT) 07/23/2013 Email from Piu Ghosh to Andrew Miner RE: City of Sunnyvale Comments on the Draft EIR for the Apple 2 Campus (July 23, 2013 9:03:00 AM PDT) 07/23/2013 Email from Piu Ghosh to Timm Borden, Aarti Shrivastava, David Stillman re: FW: Emailing: CSJ Comments_ Apple _2_Campus_DEIR.pdf (July 23, 2013 9:09:17 1 -138 sf- 3345921 Q ATTACHMENT I INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2 PROJECT 1 -139 sf- 3345921 Q DATE DOCUMENT AM PDT) • City of San Jose Comment Letter (July 22, 2013) 07/23/2013 Email from Piu Ghosh to Andrew Crabtree re: RE: Emailing: CSJ_ Comments—Apple _2_Campus_DEIR.pdf (July 23, 2013 9:18:00 AM PDT) 07/23/2013 Email from Beth Ebben to Piu Ghosh, Nidhi Mathur re: FW: Apple Campus 2- DEIR_JPB Comments (July 23, 2013 9:43:28 AM PDT) • Peninsula Corridor Joint Power Board Comment Letter (July 22, 2013) 07/23/2013 Email from Beth Ebben to Piu Ghosh, Nidhi Mathur re: FW: Apple EIR comments (July 23, 2013 9:44:30 AM PDT) 07/23/2013 Email from Piu Ghosh to Andrew Miner RE: Cupertino Village (July 23, 2013 10:12:00 AM PDT) 07/23/2013 Email from Keith Murphy to Gary Chao re: Fwd: New construction in rear of Apple parking lot, adjacent to Calabazas Creek (July 23, 2013 10:40:05 AM PDT) 07/23/2013 Email from J Feng to City Council re: Support of Apple Campus II (July 23, 2013 1:09 AM PDT) (Letter ID e- 13 -07 -23 -001) 07/23/2013 Email from Dolf Payer to City Council re: Apple 2 Campus (July 23, 2013 2:52 PM PDT) (Letter ID e- 13 -07 -23 -002) 07/23/2013 Comment letter from Sonja Cook (Letter ID 500157) 07/24/2013 Email from Franziska Church to David Stillman re: TRAFFIX Queue (July 24, 2013 2:32:50 PM PDT) 07/24/2013 Email from Franziska Church to David Stillman RE: Intersection counts (July 24, 2013 3:57:20 PM PDT) 07/24/2013 Email from Nidhi Mathur to Adam. Weinstein(,lsa- assoc. com, Gary Baum, Ellen J. Garber, Aarti Shrivastava, Piu Ghosh, Rick Kitson re: Apple Campus 2 Public Comments Full Data Export (July 24, 2013 1 -139 sf- 3345921 Q ATTACHMENT I INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2 PROJECT 1 -140 sf- 3345921 Q DATE DOCUMENT 9:27:11 AM PDT) 07/24/2013 Email from Nidhi Mathur to Adam Weinstein, Rick Kitson, Aarti Shrivastava, Piu Ghosh RE: Apple Campus 2 Public Comments Full Data Export (July 24, 2013 10:05:37 AM PDT) 07/24/2013 Comment letter from Tyler Courtney (Letter ID 500158) 07/24/2013 Email from Georgyne Purcell to City Council re: Apple Campus 2 (July 23, 2013 8:51 PM PDT) (Letter ID e- 13 -07 -24 -002 PDT) 07/24/2013 Email from Theresa to City Council re: Apple Campus 2 (July 23,2013 9:36 PM PDT) (Letter ID e- 13 -07 -24 -001) 07/25/2013 Email from Piu Ghosh to Adam Weinstein RE: Apple EIR -- Team Meeting 7/25 (July 25, 2013 10:06:00 AM PDT) 07/25/2013 Email from Adam Weinstein to Gary Chao, Piu Ghosh, David Stillman, jfowler @apple.com, Peter Sokoloff, dgold(,mofo.com, mimwallec�r�,mofo.com, Judith Malamut, Franziska Church, Jane Bierstedt, Rick Kitson, Gary Baum, Eric Morley, Foulkes @apple.com, Scott D. Pinsky, Chad Mosley, Timm Borden, JJeffersgraofo.com, dwhisenhuntkgpple.com, Aarti Shrivastava, diana.fazely @gmail.com, David Brandt, wwa eng ergfosterandpartners.com, sokigfosterandpartners.com, william.baura arg dnerggrup.com, Michael.iswaltc�r�,arup.com, lynnjohnsonggpple.com, Garberksmwlaw.com RE: Apple EIR -- Team Meeting 7/25 (July 25, 2013 11:50:34 AM PDT) 07/25/2013 Comment letter from Sang Lam (Letter ID 500159) 07/25/2013 Comment letter from Rahul Agrawal (Letter ID 500160) 07/26/2013 Comment letter from Rajani Gudi (Letter ID 500161) 07/26/2013 Memo from Richard Berkson, Ashleigh Kanat, to Gary M. Baum, re: EPS Peer Review of KMA's Draft Report: Economic and Fiscal Impacts Generated by Apple in Cupertino CONFIDENTIAL — AC2 Economic / Fiscal Impact Report, EPS 9131019 07/26/2013 Email from Rick Kitson to David Brandt re: FW: Apple Campus 2 Commenting Process activity report, Thursday, June 6 to Monday, July 1 -140 sf- 3345921 Q ATTACHMENT I INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2 PROJECT 1 -141 sf- 3345921 Q DATE DOCUMENT 22, 2013, 5:30PM (July 26, 2013 10:34:04 AM PDT) 07/29/2013 Email from Manish Dalia to Chad Mosley re: AC2 - Wolfe /Homestead Intersection Boundary (July 29, 2013 1:54:47 PM PDT) 07/29/2013 Email from: Chuck Worley to City council re: Apple Campus 2 (July 26, 2013 11:23 PM PDT) (Letter ID e- 13 -07 -29 -001) 07/30/2013 Email from Rick Kitson to Jennifer Garnett re: RE: Accepted: Invitation: Cupertino /Sunnyvale PIO check -in (July 30, 2013 9:22:00 AM PDT) 07/30/2013 Email from Adam Weinstein to Gary Chao, Piu Ghosh, David Stillman, jfowlerggpple.com, Peter Sokoloff, dgoldgmofo.com, mimwalle @mofo.com, Judith Malamut, Franziska Church, Jane Bierstedt, Rick Kitson, Gary Baum, Eric Morley, Foulkes @apple.com, Scott D. Pinsky, Chad Mosley, Timm Borden, JJeffers(,mofo.com, dwhisenhunt @apple.com, Aarti Shrivastava, diana.fazely @gmail.com, David Brandt, wwagener2fosterandpartners.com sokic�r�,fosterandpartners.com, william.baum arg dnerc�r�MM.com, Michael.iswalt(ab,arup.com, lynnjohnson(c gpple.com, Garberc�r�,smwlaw.com re: Apple EIR -- Team Meeting 8/1 (July 30, 2013 10:49:10 AM PDT) 07/30/2013 Email from Adam Weinstein to Aarti Shrivastava, Piu Ghosh, Gary Baum, Garbergsmwlaw.com re: Apple DEIR -- enumerated comments (rough draft) (July 30, 2013 5:03:34 PM PDT) 07/30/2013 Comment letter from Jon Ramos (Letter Id 500163) 07/30/2013 Comment letter from Admas Zewdie (Letter ID 500162) 07/30/2013 Email from dhsiao_98 @yahoo.com to City Council re: Support Apple 2 (July 30, 2013 1:07 PM PDT) (Letter ID e- 13 -07 -30 -001) 07/30/2013 Email from: Chris Schultz to City Council re: I support the Apple Campus (July 30, 2013 12:40 PM PDT) (Letter ID e- 13 -07 -30 -002) 07/31/2013 Email from Chad Mosley to Manish Dalia RE: AC2 - Wolfe /Homestead Intersection Boundary (July 31, 2013 7:26:06 AM PDT) 1 -141 sf- 3345921 Q ATTACHMENT I INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2 PROJECT 1 -142 sf- 3345921 Q DATE DOCUMENT 07/31/2013 Email from Amy Taylor to Timm Borden, David Stillman, Chad Mosley re: Cupertino 7/31 - Meeting Notes (July 31, 2013 9:56:56 PM PDT) 07/31/2013 Email from Rick Kitson to Karen Guerin, David Brandt re: FW: Apple Campus 2 Commenting Process activity report, Thursday, June 6 to Sunday, July 28, 2013 (July 31, 2013 3:22:00 PM PDT) 07/31/2013 Email from Rick Kitson to Robert Kim re: RE: Apple Campus 2 Commenting Process activity report, Thursday, June 6 to Sunday, July 28, 2013 (July 31, 2013 3:22:00 PM PDT) 07/31/2013 Email from Piu Ghosh to Adam Weinstein FW: Apple: Suggested Agenda for Thursday's Meeting (July 31, 2013 4:31:00 PM PDT) 07/31/2013 Email from Adam Weinstein to Gary Chao, Piu Ghosh, David Stillman, jfowler @apple.com, Peter Sokoloff, dgold(,mofo.com, mimwalle @mofo.com, Judith Malamut, Franziska Church, Jane Bierstedt, Rick Kitson, Gary Baum, Eric Morley, Foulkes @apple.com, Scott D. Pinsky, Chad Mosley, Timm Borden, JJeffers(c rofo.com, dwhisenhunt @apple.com, Aarti Shrivastava, diana.fazely @gmail.com, David Brandt, wwa eng ergfosterandpartners.com, sokikfosterandpartners.com, william.baumgardnerkarup.com, Michael.iswalt @arup.com, lynnjohnsonggpple.com, Garbergsmwlaw.com re: RE: Apple EIR -- Team Meeting 8/1 (July 31, 2013 4:58:03 PM PDT) 07/31/2013 Email from Diane A Nguyen to City Council re: I support APPLE 2 Campus (July 30, 2013 10:29 PM PDT) (Letter ID e- 13 -07 -31 -001) 08/01/2013 Comment letter from Jon Ramos (Letter ID 500164) 08/01/2013 Comment letter from John Davies (Letter ID 500165) 08/01/2013 Email from Amy Taylor to David Stillman, Chad Mosley, Aarti Shrivastava re: AC2 Protected Intersection — Tantau and Stevens Creek (MIT L -M) (Aug. 01, 2013 1:23:26 AM PDT) • Revised Intersection Graphic (revised - intersection.pdf) • California Department of Transportation, Complete Intersections: A Guide to Reconstructing Intersections and 1 -142 sf- 3345921 Q ATTACHMENT I INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2 PROJECT 1 -143 sf- 3345921 Q DATE DOCUMENT Interchanges for Bicyclists and Pedestrians, Title Page (2010) (www. dot. ca. gov_hq_traffops _survey _pedestrian _ Complete - Intersections -A- Guide -to- Reconstructing- Intersections- and- Interchanges- for - Bicyclists - and - Pedestirans.pdf) • California Department of Transportation, Complete Intersections: A Guide to Reconstructing Intersections and Interchanges for Bicyclists and Pedestrians, Figure 3.1 Issues Associated with Signalized Intersections, Complete Intersections p. 22 (2010) (2013-08-01signalized- intersection- problems.pdf) • California Department of Transportation, Complete Intersections: A Guide to Reconstructing Intersections and Interchanges for Bicyclists and Pedestrians, Figure 3.2 Common Intersection Treatments for Pedestrians, p. 25 (2010) ( 2013- 08- 01_signalized- intersection- protected.pdf) • Protected Intersection Graphic (protected - intersection.pdf)) 08/01/2013 Email from David Stillman to Amy Taylor, Chad Mosley, Aarti Shrivastava re: RE: AC2 protected intersection - Tantau and Stevens Creek (MIT L -M) (Aug. 01, 2013 9:20:39 AM PDT) • California Department of Transportation, Complete Intersections: A Guide to Reconstructing Intersections and Interchanges for Bicyclists and Pedestrians, Table 3.1 Treatments for Signalized Intersections, p. 23, Figure 3.2 Common Intersection Treatments for Pedestrians, p. 25 (2010) (Complete Intersections.pdf) 08/01/2013 Email from Franziska Church to Amy Taylor, Dan Whisenhunt re: Introduction (Aug. 01, 2013 9:32:23 AM PDT) 08/01/2013 Email from David Stillman to Piu Ghosh re: FW: Cupertino 7/31 — Meeting Notes (Aug. 01, 2013 10:36:00 AM PDT) 08/01/2013 Email from Amy Taylor to David Stillman, Chad Mosley, Aarti Shrivastava re: Apple De Anza / Homestead Take Exhibit Update (Aug. 01, 2013 11:01:16 PM PDT) 1 -143 sf- 3345921 Q ATTACHMENT I INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2 PROJECT 1 -144 sf- 3345921 Q DATE DOCUMENT 08/01/2013 Email from David Stillman to Ying Smith re Freeway segment volumes needed (Aug. 01, 2013 4:18:00 PM PDT) 08/01/2013 Email Aarti Shrivastava to Gilbert Wong re: FW: New construction in rear of Apple parking lot, adjacent to Calabazas Creek (August 01, 2013 11:17:33 AM PDT) 08/02/2013 Email from Chad Mosley to Amy Taylor, David Stillman, Aarti Shrivastava RE: Apple De Anza / Homestead Take Exhibit Update (Aug. 02, 2013 8:19:21 AM PDT) 08/02/2013 Email from Amy Taylor to Chad Mosley, David Stillman, Aarti Shrivastava re: Wolf Rd. Bus stop revision (Aug. August 02, 2013 10:18:29 AM PDT) • Santa Clara Valley Transportation Authority, Typical Bus Duckout, Figure 22 (Dukout70.pdf) • Public Utility Easement Graphic (MIT_K.pdf) ) 08/02/2013 Email from David Stillman to Piu Ghosh re: FW: Freeway segment volumes needed (Aug. 02, 2013 10:51:04 AM PDT) 08/02/2013 Email from Chad Mosley to Steve Newgren re: FW: Wolf Rd. Bus stop revision (Aug. 02, 2013 11:02:16 AM PDT) • Santa Clara Valley Transportation Authority, Typical Bus Duckout, Figure 22 (Dukout70.pdf) • Public Utility Easement Graphic (MIT_K.pdf) 08/02/2013 Email from David Stillman to Piu Ghosh re: FW: Freeway segment volumes needed (Aug. 02, 2013 1:50:53 PM PDT) 08/02/2013 Email from Ken Olcott to Sara Doi, David Stillman, Chad Mosley re: RE: AC2 protected intersection - Tantau and Stevens Creek (MIT L -M) (Aug. 02, 2013 5:11:12 PM PDT) 08/03/2013 Email from Amy Taylor to David Stillman, David Mosley RE: Cupertino 7/31 - Meeting Notes - Revised Comments (Aug. 03, 2013 5:16:27 PM PDT) 1 -144 sf- 3345921 Q ATTACHMENT I INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2 PROJECT 1 -145 sf- 3345921 Q DATE DOCUMENT • Email from Amy Taylor to Chad Mosley; David Stillman; Aarti Shrivastava re: Wolf Rd. Bus stop revision (Aug. 02, 2013 10:20 AM PDT) (Wolf Rd. Bus stop revision.msg) • Santa Clara Valley Transportation Authority, Typical Bus Duckout, Figure 22 (Dukout70.pdf) • Public Utility Easement Graphic (MIT_K.pdf) ) • PG &E Graphic (DeAnza.Homestead PGE Asbuilt.pdf) • Sandis, Grading and Utility Plan, Apple MIT Intersection L- M: Tantau Avenue, San Jose, California, Sheet C -3.0 (July 19, 2013) (C- 3.0_GRAD_MIT -L- M.pdf) • Sandis, Grading and Utility Plan, Apple MIT Intersection A North Saratoga Sunnyvale Road at Homestead Road, Cupertino, California, Sheet C -3.0 (July 19, 2013) (C- 3.0_GRAD_MIT- A.pdf) 08/05/2013 Email from Amy Taylor to David Stillman, Chad Mosley re: Cupertino 7/31 — Meeting Notes — Revised Comment (Aug. 05, 2013 4:28:00 PM PDT) • Email from Flores, Osvaldo OCFlk]2ge.com to Sara Doi; Nate Dickinson' re: RE: potential vault adjustment (Aug. 05, 2013 9:53 AM PDT) (RE potential vault adjustment.msg) • Sandis, Grading and Utility Plan, Apple MIT Intersection A North Saratoga Sunnyvale Road at Homestead Road, Cupertino, California, Sheet C -3.0 (July 19, 2013) (C- 3.0_GRAD- MITA.PDF) • Sandis, Intersection Mitigation A (Aug. 5, 2013) (2013-08 - 05_MIT- A.PDF) 08/05/2013 Email from Piu Ghosh to Julia Kinst re: FW: Apple EIR -- scope/budget augment (Aug. 05, 2013 9:12:55 AM PDT) • Letter from LSA Associates to City of Cupertino re: Amendment 5 to Apple Campus 2 Project Environmental 1 -145 sf- 3345921 Q ATTACHMENT I INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2 PROJECT 1 -146 sf- 3345921 v2 DATE DOCUMENT Impact Report (EIR) Scope of Work and Budget (July 19, 2013) (7 -19 -13 Con Mod 95 LTR.pdf) 08/05/2013 Email from Piu Ghosh to Dan Whisenhunt RE: EIR notification signage (Aug. 05, 2013 11:17:00 AM PDT) 08/05/2013 Email from Chad Mosley to Amy Taylor re: FW: Wolf Rd. Bus stop revision (August 05, 2013 2:43:35 PM PDT) 08/05/2013 Email from Piu Ghosh to Meg Thomas, Dan Whisenhunt, Dave Muffly re: FW: Tree Transplant Scope (Aug. 05, 2013 2013 3:13:08 PM PDT) • Michael Bench, Protection During Demolition and Under Boxing of Transplant Trees Apple Campus 2 Cupertino, California (Apple C 2 8- 13.doc) 08/05/2013 Comment letter from David Lofgren (Letter ID 500166) 08/05/2013 Letter from Habitat Conservation Now to City of Cupertino (Nov. 21, 2012) (Letter ID s- 13 -08 -05 -002) 08/05/2011 Letter from Shani Kleinhaus, Santa Clara Valley Audubon Society to City of Cupertino re: DEIR for Apple Campus 2 (July 19, 2013) (Letter ID s- 13 -08 -05 -001) 08/06/2013 Email from Piu Ghosh to Michael Bench RE: Apple Campus 2 (Aug. 06, 2013 9:19:00 AM PDT) 08/06/2013 Email from Rick Kitson to Robert Kim re: RE: Apple Campus 2 Commenting Process activity report, Thursday June 6 to Sunday, July 28, 2013 (Aug. 06, 2013 10:10 AM PDT) 08/07/2013 Email from Keith Murphy to Cupertino City Manager's Office re: Fwd: New construction in Apple parking lot: new follow up questions (Aug. 07, 2013 10:42:34 AM PDT) Email from Keithddl527(,aol.com to Gary Chao Re: New construction in Apple parking lot: new follow up questions (Aug. 06, 2013 11:16 AM PDT) 08/07/2013 Email from Piu Ghosh to Adam Weinstein, Aarti Shrivastava, Gary Baum, Timm Borden, David Stillman, Chad Mosley, f churchkfehrandpeers.com, J. Bierstedt(,fehrandpeers.com, 1 -146 sf- 3345921 v2 ATTACHMENT I INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2 PROJECT 1 -147 sf- 3345921 Q DATE DOCUMENT spinskykearthlink.net, Garberksmwlaw.com, Judith Malamut re: RE: Apple EIR -- Internal Mtg at 10:30a - Admin. Draft Responses (Aug. 07, 2013 12:29:00 PM PDT) 08/07/2013 Email from Piu Ghosh to Aarti Shrivastava, Gary Baum, Timm Borden, David Stillman, Chad Mosley re: RE: Apple EIR -- Internal Mtg at 10:30a - Admin. Draft Responses (Aug. 07, 2013 1:46:50 PM PDT) 08/07/2013 Email from Rick Kitson to Karen B. Guerin re: Items: Apple Campus 2 Commenting Process activity report, Thursday June 6 to Sunday, August 4, 2013 (Aug. 07, 2013 07:02 PM PDT) 08/08/2013 Email from Piu Ghosh to Dan Whisenhunt re: Re: Apple bus using Birdland neighborhood as parking lot (Aug. 08, 2013 9:32:25 PM PDT) 08/08/2013 Email from Gary Chao to Keith Murphy re: RE: New construction in Apple parking lot: new follow up questions (Aug. 08, 2013 1:21:37 PM PDT) • City of Cupertino Building Permit No. 13040053 (MX- M 1100_20130808_114331.pdf) 08/08/2013 Email from Piu Ghosh re: Kirsten Squarcia re: RE: Petition for Reconsideration.docx (Aug. 08, 2013 1:07:00 PM PDT) 08/08/2013 Email from David Brandt to Keith Murphy re: Re: New construction in Apple parking lot: new follow up questions (Aug. 08, 2013 11:05:46 AM PDT) 08/08/2013 Letter from Susan Valenta, Gilroy Chamber of Commerce to City Council (Letter ID s- 13 -08 -08 -001) 08/08/2013 Email from Feiyan to City Council re: Support Apple Campus 2 (Oct. 07, 2013 7:58 PM PDT) (Letter ID e- 13 -10 -08 -002) 08/08/2013 Email from Ravi Savanur to City Council re: Apple campus 2 (Oct. 01, 2013 11:23 AM PDT) (Letter ID e- 13 -10 -08 -003) 08/08/2013 Email from Gordon Lee to City Council re: Support Apple Campus 2 (Oct. 07, 2013 5:15 PM PDT) (Letter ID e- 13 -10 -08 -004) 1 -147 sf- 3345921 Q ATTACHMENT I INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2 PROJECT 1 -148 sf- 3345921 Q DATE DOCUMENT 08/08/2013 Email from Karl Sanford to City Council re: Apple 2 Campus (Oct. 08, 2013 7:07 AM PDT) (Letter ID e- 13 -10 -08 -005) 08/09/2013 Email from David Brandt to Keith Murphy re: Re: New construction in Apple parking lot: new follow up questions (Aug. August 09, 2013 10:10:17 AM PDT) 08/09/2013 Email from Robert Shackelford to Chad Mosley RE: Cost Estimates for off -site (Aug. 09, 2013 12:06:03 PM PDT) 08/09/2013 Email from Ying Smith to David Stillman re: RE: Freeway segment volumes needed (Aug. 09, 2013 1:29:09 PM PDT) 08/10/2013 Email from Keith Murphy to David Brandt re: Re: New construction in Apple parking lot: new follow up questions (Aug. 9, 2013, 4:57:14 PM PDT) 08/12/2013 Email from David Stillman to Timm Borden re: Fair share update (Aug. 12, 2013 10:59:34 AM PDT) 08/12/2013 Email from Julia Kinst to Piu Ghosh re: RE: Postcard for Apple meetings (Aug. 12, 2013 12:16:55 PM PDT) 08/12/2013 Email from Keith Murphy to David Brandt re: A request for review of an administrative determination is requested in writing (Aug. 12, 2013 12:18:38 PM PDT) 08/12/2013 Email from Rick Kitson to Robert Kim re: RE: Apple Campus 2 Commenting Process activity report, Thursday, June 6 to Sunday, August 11, 2011 (Aug. 12, 2013 4:40 PM PDT) 08/12/2013 Email from Said Mohammed to City Council re: I Said Mohammed living in Cupertino registering my full support for Apple Campus 2. (Aug. 11, 2013 11:20 AM PDT) (Letter ID e- 13 -08 -12 -001) 08/13/2013 Email from Michael Bench to Meg Thomas Re: Draft Tree Protection Narrative and Details (Aug. 13, 2013 11:14:38 AM PDT) 08/14/2013 Email from Adam Weinstein to Gary Chao, Piu Ghos, David Stillman, jfowlerggpple.com, Peter Sokoloff, dgold(,mofo.com, mimwallegmofo.com, Judith Malamut, Franziska Church, Jane Bierstedt, Rick Kitson, Gary Baum, Eric Morley, Foulkes apple.com, 1 -148 sf- 3345921 Q ATTACHMENT I INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2 PROJECT 1 -149 sf- 3345921 Q DATE DOCUMENT Scott D. Pinsky, Chad Mosley, Timm Borden, Heffers(,mofo.com, dwhisenhunt @apple.com, Aarti Shrivastava, diana.fazelyggmail.com, David Brandt, wwagenerkfosterandpartners.com, sokigfosterandpartners.com, william.baura ard�ner(a Mm.com, Michael.iswalt(&arup.com, lynnjohnson(cr Uple.com, Garberc�r�,smwlaw.com re: RE: Apple EIR -- Team Meeting 8/15 (Wednesday, Aug. 14, 2013 8:40:23 PM PDT) 08/14/2013 Email from Adam Weinstein to Piu Ghosh re: RE: Draft EIR — distribution (Aug. 14, 2013 8:51:08 AM PDT) 08/14/2013 Email from Piu Ghosh to Adam Weinstein re: RE: Draft EIR — distribution (Aug. 14, 2013 9:42:00 AM PDT) 08/14/2013 Email from Franziska Church to Piu Ghosh, Adam Weinstein RE: Status (Aug. 14, 2013 2:14:54 PM PDT) 08/14/2013 Email from Adam Weinstein to Franziska Church, Piu Ghosh re: RE: Status (Aug. 14, 2013 2:21:20 PM PDT) 08/14/2013 Email from Piu Ghosh to Aarti Shrivastava, Gary Baum re: Emailing: Consolidated comments - 8- 14- 13.pdf (Aug. 14, 2013 3:38:28 PM PDT) • Agency Comments to DEIR (Aug. 4, 2013) (Consolidated comments - 8- 14- 13.pdf) 08/15/2013 Email from David Stillman to Franziska Church re: Vallco Parkway (August 15, 2013 1:53 PM PDT) 08/15/2013 Email from Piu Ghosh to Laura Shipman re: RE: citywide postcard (Aug. 15, 2013 8:59:28 PM PDT) 08/16/2013 Email from Wolfgang Wagener to Aarti Shrivastava, Piu Ghosh re: Planning Update (Aug. 16, 2013 8:14:18 PM PDT) 08/19/2013 Comment letter from Francesco Ferretti (Letter ID 500167) 08/19/2013 Email from Francesco Ferretti to City Council re: Apple Campus 2 (Aug. 19, 2013 8:45 AM PDT) (Letter ID e- 13 -08 -19 -001) 08/19/2013 Email from Amy Taylor to Chad Mosley re: RE: Wolf Bus stop 1 -149 sf- 3345921 Q ATTACHMENT I INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2 PROJECT 1 -150 sf- 3345921 Q DATE DOCUMENT updates (Aug. 19, 2013 9:05:42 AM PDT) • First American Title Insurance Company, Preliminary Report, 10989, 10905,10827, 10883, 10435, 11111 and 10751 North Wolfe Road, Cupertino, CA (Nov. 7, 2011) (Preliminary Report - NCAL.PDF) • ALTA Graphic (ALTA- Model.pdf) 08/19/2013 Email from Franziska Church to Piu Ghosh, David Stillman re: Ramp - Metering (Aug. 19, 2013 9:29:11 AM PDT) 08/19/2013 Email from Robert Kim to David Brandt, Andrea Sanders, Donna Henriques, Ryan Roman, Kirsten Squarcia, Marianna Khienkina, Karen B. Guerin, Brittany Carey, Julia Kinst, Grace Schmidt, Liz Nunez, Chylene Osborne, Tiffanie Cardenas, Nidhi Mathur, Robert Kim, Mary Redwin, Lisa Atwood, Rei Delgado, Peter Coglianese, Rick Kitson, Piu Ghosh re: Apple Campus 2 Commenting Process activity report, Thursday, June 6 to Sunday, August 18, 2013 (Aug. 19, 2013 9:38:15 AM PDT) 08/19/2013 Email from Albert Salvador to Michelle Wendler RE: Monday Meeting Agenda (Aug. 19, 2013 9:38:17 AM PDT) • Letter from Pan- Pacific Mechanical to City of Cupertino re: Request for Modification of Code for Parking Garage Drains (Aug. 16, 2013) ( Cupertino RFM Justification.pdf) 08/19/2013 Email from Diana Navarro to Chad Mosley RE: Encroachment Permit (Aug. 19, 2013 11:11:46 AM PDT) • North Tantau Avenue Utility Plan, No. C -UR- 1603 -T, Revision 0 (Feb. 25, 2013) (POTHOLE MARKUPS.pdf) • Granite Potholing Plan (Potholing Plan.pdf) 08/19/2013 Email from Meg Thomas to Mick Bench, Piu Ghosh re: Review of Final Tree Protection Plans (Aug. 19, 2013 5:07:15 PM PDT) • Tree Protection Narrative (Tree Protection Narrative 130819.docx) 1 -150 sf- 3345921 Q ATTACHMENT I INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2 PROJECT 1 -151 sf- 3345921 Q DATE DOCUMENT • Details - Tree Protection, No L1.90, Revision (Jan. 25, 2013) ( 130819- L190TreeProtectionDetails.pdf) 08/20/2013 Email from David Brandt to Gilbert Wong, Carol Korade, Gilbert Wong re: RE: Small Business Development in Cupertino (Aug. 20, 2013 9:23:00 AM PDT) 08/20/2013 Email from Simon Vuong to Sean Hatch re: RE: Sound Wall Apple 2 Campus (Aug. 20, 2013 9:47:49 AM PDT) 08/20/2013 Email from Piu Ghosh to Saran Oki, dwhisenhuntkUple.com re: RE: Planned Development Permit - August 2013 (Aug. 20, 2013 10:07:00 AM PDT) 08/20/2013 Email from Piu Ghoshto Saran Oki re: Lighting standards for off -site glare (Aug. 20, 2013 12:56:00 PM PDT) 08/20/2013 Email from Aarti Shrivastava to Grace Schmidt re: Schedule (Aug. 20, 2013 5:05:06 PM PDT) 08/20/2013 Email from Piu Ghosh to Aarti Shrivastava Re: Apple EIR -- Team Meeting 8/29 (Aug. 30, 2013 8:01:43 AM PDT) 08/21/2013 Email from Adam Weinstein to Gary Chao, Piu Ghosh, David Stillman, jfowlerggpple.com, Peter Sokoloff, dgoldgmofo.com, mimwallegmofo.com, Judith Malamut, Franziska Church, Jane Bierstedt, Rick Kitson, Gary Baum, Eric Morley, Foulkes @apple.com, Scott D. Pinsky, Chad Mosley, Timm Borden, JJeffers(,mofo.com, dwhisenhuntggpple.com, Aarti Shrivastava, diana.fazely @gmail.com, David Brandt, wwagener2fosterandpartners.com, sokigfosterandpartners.com, william.baum arg dner(a MM.com, Michael.iswalt @arup.com, lynnjohnson(c gpple.com, Garberc�r�,smwlaw.com re: RE: Apple EIR -- Team Meeting 8/22 (Aug. 21, 2013 4:26:04 PM PDT) 08/21/2013 Email from Chad Mosley to Dan Whisenhunt re: RE: Wolf Bus stop updates (Aug. 21, 2013 5:26:53 PM PDT) 08/22/2013 Email from Nichol Bowersox re: FW: Wolfe / Homestead / Pruneridge (Aug. 22, 2013 8:41:34 AM PDT) • V &A Technical Memorandum to Cupertino Sanitary 1 -151 sf- 3345921 Q ATTACHMENT I INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2 PROJECT 1 -152 sf- 3345921 Q DATE DOCUMENT District and County Sanitation District 2 -3 re Cupertino Sanitary District — Pruneridge Trunk Sewer Rerouting Project: Capacity Analysis for a 10 -Year, 24 -Hour Rainfall Event (August 20, 2013, (Revision 1 of July 12, 2013 Technical Memorandum)) (12 -0139 CSD Pruneridge Rerouting TM Revl.pdf) 08/22/2013 Email from Jon Hagwood to Chad Mosley re: AC -2 Encroachment Permit for Potholing (Aug. 22, 2013 2:31:45 PM PDT) 08/22/2013 Email from Wolfgang Wagener to Piu Ghosh, Saran Oki, Aarti Shrivastava, dwhisenhuntggpple.com re: RE: Planned Development Permit - August 2013 (Aug. 22, 2013 8:40:34 PM PDT) 08/23/2013 Comment letter from Holly Lofgren (Letter ID 500168) 08/23/2013 Email from Manish Dalia to Chad Mosley re: AC2 - Wolfe /Pruneridge Utility Comments (Aug. 23, 2013 10:01:42 AM PDT) 08/23/2013 Email from Karen Guerin to Piu Ghosh, Chad Mosley, David Brandt, David Stillman, Gary Baum, Timm Borden, Ellen J. Garber, Aarti Shrivastava re: RE: Meet re: Admin RTC APPLE - Comments due to LSA by 8/28 (August 23, 2013 10:22:49 AM PDT) 08/23/2013 Email from Karen Guerin to Aarti Shrivastava, David Brandt, Gary Baum, Timm Borden, Adam Weinstein, Judith.Malamutc�r�,lsa- assoc.com, Franziska Church, Ian Barnes, Jane Bierstedt, Piu Ghosh, Ellen J. Garber, David Stillman, James Fowler, Dan Whisenhunt, Eric Morley re: RE: Dry run of study session (August 23, 2013 11:30:41 AM PDT) 8/24/2013 Email from David Brandt to Karen Guerin Re: Dry run of study session (Aug. 24, 2013 9:28:01 AM PDT) 08/26/2013 Email from hongyi wang to City Council re: Support Apple Campus (Aug. 24, 2013 7:44 AM PDT) (Letter ID e- 13 -08 -26 -001) 08/27/2013 Comment letter from Maria Teiwes (Letter ID 500169) 08/27/2013 Email from Molholm Tyler to Joanne Johnson, Chad Mosley re: RE: REVISED FILES (Aug. 27, 2013 9:52:15 AM PDT) 1 -152 sf- 3345921 Q ATTACHMENT I INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2 PROJECT 1 -153 sf- 3345921 Q DATE DOCUMENT • Wolfe Sanitary Sewer Relocation Plan and Profile, No. C- UR- 2101 -W -SS, Rev. 0 (Jan. 10, 2013) (WOLFE - INTERSECTION.PDF) • Wolfe Sanitary Sewer Relocation Plan and Profile, No. C- UR- 2101 -W -SS, Rev. 0 (Jan. 10, 2013) (WOLFE - Typical CLOSURE.PDF) 08/27/2013 Email from Ying Smith to David Stillman re: Project Development Study (PSR -PSD) (Aug. 27, 2013 10:08:28 AM PDT) 08/27/2013 Email from Robert Shackelford to David Stillman RE: City of Cupertino - Scope information (Aug. 27, 2013 12:44:30 PM PDT) 08/27/2013 Email from Diana Navarro to Chad Mosley re: Encroachment Permit August 27, 2013 12:45:52 PM PDT) 08/27/2013 Email from Ryan Roman to Grace Schmidt, Katy Jensen, Chad Mosley re: RE: FYI - changes to upcoming council agenda item dates (Aug. 27, 2013 4:04:16 PM PDT) 08/28/2013 Email from Dan Whisenhunt to Chad Mosley Re: AC2 - Technical Letter on Storm Drainage Design (Aug. 28, 2013 9:47:28 AM PDT) 08/28/2013 Email from Adam Weinstein to Piu Ghosh RE: (Aug. 28, 2013 8:38:02 AM PDT) 08/28/2013 Email from Aarti Shrivastava to David Stillman RE: Project Development Study (PSR -PSD) (Aug. 28, 2013 8:53:31 AM PDT) 08/28/2013 Email from Rick Kitson to Martyah Epich Serratos re: VPN access to Piu Ghosh (Aug. 28, 2013 9:37 AM PDT) 08/28/2013 Email from Franziska Church to David Stillman RE: Apple Delay Calculation.xlsx (Aug. 28, 2013 10:01:07 AM PDT) • Apple Delay Calculation Worksheet (Copy of Apple Delay Calculation - Expanded.xlsx) 08/28/2013 Email from Piu Ghosh to Kelly Cattaneo RE: Demo Permit - Apple Campus 2 (Aug. 28, 2013 3:53:00 PM PDT) 1 -153 sf- 3345921 Q ATTACHMENT I INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2 PROJECT 1 -154 sf- 3345921 Q DATE DOCUMENT 08/28/2013 Email from Piu Ghosh to Kristen Squarcia RE: Legal Ad for Planning Commission Dates (Aug. 28, 2013 5:33:00 PM PDT) 08/29/2013 Email from Adam Weinstein to Gary Chao, Piu Ghosh, David Stillman, jfowler @apple.com, Peter Sokoloff, dgoldc�r�,mofo.com, mimwallegraofo.co, Judith Malamu, Franziska Church, Jane Bierstedt, Rick Kitson, Gary Baum, Eric Morley, Foulkes @apple.com, Scott D. Pinsky, Chad Mosley, Timm Borden, JJeffers(,mofo.com, dwhisenhunt @apple.com, Aarti Shrivastava, diana.fazely @gmail.com, David Brandt, wwa eg nergfosterandpartners.com, soki @fosterandpartners.com, william.baum arg dnergarup.com, Michael.iswalt @arup.com, lynnjohnsonkUple.com, Garbergsmwlaw.com RE: Apple EIR -- Team Meeting 8/29 (Aug. 29, 2013 9:28:23 AM PDT) 08/29/2013 Email from Kristen Squarcia to Piu Ghosh RE: Legal Ad for Planning Commission Dates (Aug. 29, 2013 9:36:38 AM PDT) 08/29/2013 Email from Rick Kitson to Peter Cogllanese re: Apple Study Session Drawings (Aug. 29, 2013 3:11 PM) 08/29/2013 Email from Rick Kitson to Peter Cogllanese re: apple meeting CAD drawings (Aug. 29, 2013 5:26 PM PDT) 08/30/2013 Email from David Stillman to Piu Ghosh, Adam Weinstein, Ellen J. Garber RE: Emailing: 4- TextRevisions tb DSPG 8- 29.doc (Aug. 30, 2013 8:23:34 AM PDT) 08/30/2013 Email from David Stillman to Timm Borden RE: Emailing: 4- TextRevisions tb DSPG 8- 29.doc (Aug. 30, 2013 8:25:19 AM PDT) 08/30/2013 Email from David Stillman to Robert Shackelford RE: Cupertino Agreement (Aug. 30, 2013 8:28:45 AM PDT) 08/30/2013 Email from Piu Ghosh to Grace Schmidt RE: Question on estimate cost of legal ad (Aug. 30, 2013 9:18:00 AM PDT) 08/30/2013 Email from Piu Ghosh to Julia Kinst FW: Apple EIR -- Scope /Budget Augment (Aug. 30, 2013 3:20:00 PM PDT) • Letter from LSA Associates, Inc. to City of Cupertino re: Amendment I to Apple Campus 2 Project Environmental 1 -154 sf- 3345921 Q ATTACHMENT I INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2 PROJECT 1 -155 sf- 3345921 v2 DATE DOCUMENT Impact Report (EIR) Scope of Work and Budget (Feb. 27, 2012) (2 -27 -12 Con Mod Chao LTR.pdf) 08/30/2013 Email from Piu Ghosh to Josh Fronen, Chad Mosley RE: Tantau Layout (Aug. 30, 2013 3:15:00 PM PDT) 08/30/2013 Email from Piu Ghosh to Julia Kinst FW: Invoice for LSA Budget Augment (Date: Friday, Aug. 30, 2013 3:21:00 PM PDT) • Letter from Fehr & Peers to LSA Associates, Inc. re: Re: Additional Services for the Transportation Impact Analysis (TIA) for the Proposed Apple Campus 2 in Cupertino, California (Feb. 21, 2012) (20120221_AppleC ampus2AddOn.pdf) 08/30/2013 Email from Piu Ghosh to Julia Kinst FW: Apple EIR Authorization (Aug. 30, 2013 3:22:00 PM PDT) • LSA Associates, Inc. Contract Modification (Feb. 1, 2013) (2 -1 -2013 Con Mod 4 Form.pdf) • Letter from LSA Associates, Inc. to City of Cupertino re: Amendment 3 to Apple Campus 2 Project Environmental Impact Report (EIR) Scope of Work and Budget (July 25, 2012) (7 -25 -12 Con Mod #3.pdf) • Letter from LSA Associates, Inc. to City of Cupertino re: Amendment 4 to Apple Campus 2 Project Environmental Impact Report (EIR) Scope of Work and Budget (Dec. 12, 2012) (12 -12 -12 Con Mod 94 LTR.pdf) • Table 1: Contract Modification 4 Cost Estimate (12 -12 -12 Augment 4- Budget.pdf)) 08/30/2013 Email from Piu Ghosh to Adam Weinstein RE: Apple -- PC Study Session attendance (Aug. 30, 2013 4:22:22 PM PDT) 08/31/2013 Email from Piu Ghosh to Aarti Shrivastava Re: Question on estimate cost of legal ad (August 31, 2013 12:22:40 PM PDT) 09/00/2013 • City of Cupertino, City Council Staff Report — Amended, Set a public hearing and adopt a resolution related to the 1 -155 sf- 3345921 v2 ATTACHMENT I INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2 PROJECT 1 -156 sf- 3345921 Q DATE DOCUMENT City's intent to vacate Finch Avenue, between Stevens Creek Boulevard and Vallco Parkway (Mar. 30, 2012) (STAFF REPORT - (Amended) Notice of Intent to V.pdf) 09/00/2013 • Kier & Wright, Pruneridge Area Exhibit, Apple Campus 2 (Revised Mar. 11, 2013) (A130311- Pruneridge Take.pdf) 09/00/2013 • Fehr & Peers, I -280 SB On -Ramp Option 2 Lawrence Expressway & Calvert Drive Conceptual Plan (Administrative Draft 1272 -C onceptualOnRamp- OPT.pdf) 09/00/2013 • Memorandum from Piu Ghosh to City Council members and Planning Commission members re: Apple Campus 2 meetings (Sept. 23, 2013) (apple docs memo.pdf) 09/00/2013 • Joint City Council / Planning commission Study Session Staff Report (Oct. 1, 2013) (Final Study Session Staff Report DP- 2011- 04.pdf) 09/00/2013 • Attachment A Amended Resolution No. 12 -A Resolution Of The City Council Of The City Of Cupertino Declaring Its Intention To Order Vacation Of A Portion Of Finch Ave As Provided In Section 8320 Et Seqq. Of The Streets And Highways Code Of The State Of California, Fixing Time And Place For Public Hearing And Providing For Notice Thereof (RESOLUTION - (Amended) Notice of Intent to Vac.pdf) 09/00/2013 • Attachment A Amended Resolution No. 13 -A Resolution of the City of Cupertino Declaring Its Intention To Order Vacation Of A Portion Of Pruneridge Ave As Provided In Section 8320 Et Seq. Of The Streets And Highways Code Of The State Of California, Fixing Time And Place For Public Hearing And Providing For Notice Thereof (RESOLUTION - Notice of Intent to Vacate - Prun.pdf) 09/00/2013 • City of Cupertino City Council Staff Report — Amended, Set a public hearing and adopt a resolution related to the City's intent to vacate Pruneridge Avenue, between Wolfe Road and Tantau Avenue (Sept. 17, 2013) (STAFF REPORT - Notice of Intent to Vacate - P.pdf) 1 -156 sf- 3345921 Q ATTACHMENT I INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2 PROJECT 1 -157 sf- 3345921 Q DATE DOCUMENT 09/01/2013 Apple Campus 2, Project Description, September 2013 09/01/2013 Apple Campus 2, Planned Development Permit, September 2013, Introduction 09/01/2013 Apple Campus 2, Planned Development Permit, September 2013, Site Plan Part 1 09/01/2013 Apple Campus 2, Planned Development Permit, September 2013, Site Plan Part 2 09/01/2013 Apple Campus 2, Planned Development Permit, September 2013, Floor Plan Part 1 09/01/2013 Apple Campus 2, Planned Development Permit, September 2013, Floor Plan Part 2 09/01/2013 Apple Campus 2, Planned Development Permit, September 2013, Renderings 09/01/2013 Apple Campus 2, Planned Development Permit, September 2013, Bicycle Plan 09/01/2013 Apple Campus 2, Planned Development Permit, September 2013, Development Area Allocation Submittal 09/04/2013 Email from Chad Mosley to Piu Ghosh RE: AC2 - Development Application Date? (Sept. 04, 2013 9:38:50 AM PDT) 09/04/2013 Email from Chad Mosley to Michelle Wendler RE: AC2 Parking Structure (Sept. 04, 2013 7:31:06 AM PDT) 09/04/2013 Email from Adam Weinstein To: Gary Chao; Piu Ghosh; David Stillman; jfowler @apple.com; Peter Sokoloff, dgold(,mofo.com; mimwalle @mofo.com; Judith Malamut; Franziska Church; Jane Bierstedt; Rick Kitson; Gary Baum; Eric Morley; Foulkes @apple.com; Scott D. Pinsky; Chad Mosley; Timm Borden; JJeffers(c raofo.com; dwhisenhunt @apple.com; Aarti Shrivastava; diana.fazely @gmail.com; David Brandt; wwagener @fosterandpartners.com; 1 -157 sf- 3345921 Q ATTACHMENT I INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2 PROJECT 1 -158 sf- 3345921 Q DATE DOCUMENT soki @fosterandpartners.com; william.baura arg dnerkarup.com; Michael.iswalt @arup.com; lynnjohnson @apple.com; Garber @smwlaw.com; JRamizakbwslaw.com RE: Apple EIR -- Team Meeting 9/5 (Sept. 04, 2013 7:07:42 PM PDT) 09/04/2013 Email from Aarti Shrivastava to Grace Schmidt, Beth Ebben RE: Notice of Determination (Sept. 04, 2013 5:41:10 PM PDT) 09/04/2013 Email from Dan Whisenhunt to Chad Mosley Re: Pruneridge Plat and Legal (Sept. 04, 2013 5:47:03 PM PDT) • Exhibit A Legal Description for Pruneridge Avenue (EXHIBIT A Pruneridge Vac Legal.pdf) • Exhibit A, Pruneridge Avenue Vacation Key map, Cupertino, CA (Pruneridge_Plat.pdf) 09/04/2013 Email from Dan Whisenhunt to Chad Mosley Re: Pruneridge Plat and Legal (Sept. 04, 2013 1:59:04 PM PDT) • Pruneridge land purchase exhibit I- Layout 1 ( Pruneridge land purchase exhibit I- Layoutl.pdf) 09/04/2013 Email from Chad Mosley to Dan Whisenhunt RE: Pruneridge Plat and Legal (Sept. 04, 2013 2:22:00 PM PDT) 09/04/2013 Email from Chad Mosley to Dan Whisenhunt RE: Pruneridge Plat and Legal (Sept. 04, 2013 8:03:09 AM PDT) 09/04/2013 Email from Chad Mosley to Diana Navarro RE: Working Hours At Night (Sept. 04, 2013 3:16:18 PM PDT) 09/05/2013 Email from Grant Schlereth to David Stillman re: AC2 Package IA Crosswalk discussion (Sept. 05, 2013 6:05:56 PM PDT) • Wolfe & AC2 Signal Sketch MFS small (Sept. 5, 2013) (20130905 Wolfe & AC2 Signal Sketch MFS small.pdf) 09/05/2013 Email from Molholm, Tyler to Joanne Johnson re: Changes to TC plan - Permit 96198 (Sept. 05, 2013 12:51:20 PM PDT) • Wolfe — Intersection (WOLFE - INTERSECTION.pdf) 1 -158 sf- 3345921 Q ATTACHMENT I INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2 PROJECT 1 -159 sf- 3345921 Q DATE DOCUMENT 09/05/2013 Email from Chad Mosley to David Stillman re: FW: Package IA Discussion Items (1 of 1) (Sept. 05, 2013 4:48:49 PM PDT) • Alternative Bus stop location options MFS REV 2 small (Sept. 5, 2013) (20130905 Alternative Bus stop location options MFS REV 2 smalll.pdf) 09/05/2013 Email from Angela Tsui to David Brandt, Orrin Mahoney, Gilbert Wong re: Fwd: Introduction to Skanska USA (Sept. 05, 2013 9:53:21 PM PDT) 09/05/2013 Email from Aarti Shrivastava To: "Adam Weinstein "; Piu Ghosh; David Stillman; jfowler @apple.com; dgold @mofo.com; mimwallegmofo.com; Judith Malamut; Franziska Church; Jane Bierstedt; Rick Kitson; Gary Baum; Eric Morley; Foulkeskuple.com; Scott D. Pinsky; Chad Mosley; Timm Borden; JJeffers @mofo.com; dwhisenhuntkople.com; diana.fazely @gmail.com; David Brandt; wwagener @fosterandpartners.com; soki c�r�,fosterandpartners.com; william.baumgardner @arup.com; Michael.iswalt @arup.com; lynnjohnson @apple.com; Garbergsmwlaw.com; JRamiza @bwslaw.com; Carol Korade (carolakoradekgmail.com) re: Meetings (Sept. 05, 2013 6:22:15 PM PDT) 09/05/2013 Email from Grant Schlereth to Chad Mosley re: Package IA Discussion Items (2 of 2) (Sept. 05, 2013 3:26:59 PM PDT) (20130905 Wolfe & AC2 Signal Sketch MFS small.pdf) • Wolfe & AC2 Signal Sketch MFS small (Sept. 5, 2013) (20130905 Wolfe & AC2 Signal Sketch MFS small.pdf) 09/05/2013 Email from ken olcott to Chad Mosley Re: Pruneridge Plat and Description (Sept. 05, 2013 10:31:06 AM PDT) 09/05/2013 Email from Amy Taylor to Chad Mosley RE: Pruneridge Plat and Legal (Sept. 05, 2013 5:38:58 PM PDT) • Exhibit A Legal Description for Pruneridge Avenue (201309051728.pdf) 09/05/2013 Email from Amy Taylor to Chad Mosley, Dan Whisenhunt RE: Pruneridge Plat and Legal (Sept. 05, 2013 3:41:27 PM PDT) 1 -159 sf- 3345921 Q ATTACHMENT I INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2 PROJECT 1 -160 sf- 3345921 Q DATE DOCUMENT • Pruneridge Avenue Vacation Cupertino, CA, Sheet 1 (PRUNERIDGE l.pdf) • Pruneridge Avenue Vacation Cupertino, CA, Sheet 2 (PRUNERIDGE 2.pdf) • Pruneridge Avenue Vacation Cupertino, CA, Sheet 3 (PRUNERIDGE 3.pdf) • Pruneridge Avenue Vacation Cupertino, CA, Sheet 4 (PRUNERIDGE 4.pdf) • Exhibit A Legal Description For Pruneridge Avenue (201309051516.pdf) 09/05/2013 Email from Chad Mosley to Dan Whisenhunt RE: Pruneridge Plat and Legal (Sept. 05, 2013 9:50:54 AM PDT) • Exhibit A Legal Description For Pruneridge Avenue (redline) (MX- M1100- 20130905- 120332.pdf) 09/05/2013 Email from Eric Butte to City Council re: Support the Apple 2 Campus (Aug. 16, 2013 10:49 AM PDT) (Letter ID e- 13 -09 -05 -001) 09/06/2013 Email from Molholm, Tyler to Joanne Johnson re: Additional Changes to TC plan - Permit 96198 (Sept. 06, 2013 9:06:59 AM PDT) • Wolfe — Intersection (Sept. 13, 2013) (WOLFE - INTERSECTIONB - 9- 13- 2013.pdf) 09/06/2013 Email from Piu Ghosh to Meg Thomas re: FW: Replacement Tree list (Sept. 06, 2013 4:20:00 PM PDT) • Tree Replacement Worksheet (Apr. 2013) (TreeReplacementWorksheet April2013.xlsx) 09/06/2013 Email from Kirsten Squarcia to Piu Ghosh re: FW: SJMN Legal Rates / Specifications (Sept. 06, 2013 1:26:53 PM PDT) 09/06/2013 Email from Timm Borden to Ryan Roman Re: Adding an Item to 9/17 - Don Burnett Bridge, Approve Grant Deed to Transfer ROW to Caltrans (Sept. 06, 2013 9:39:56 AM PDT) 1 -160 sf- 3345921 Q ATTACHMENT I INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2 PROJECT 1 -161 sf- 3345921 Q DATE DOCUMENT 09/06/2013 Email from Piu Ghosh to David Stillman, Chad Mosley RE: Package IA Discussion Items (1 of 1) (Sept. 06, 2013 9:00:21 AM PDT) 09/06/2013 Email from Meg Thomas to Piu Ghosh Re: Replacement Tree list (Sept. 06, 2013 4:20:06 PM PDT) 09/06/2013 Email from Manish Dalia to Steve Newgren, Kermit Cuff RE: Apple Campus 2 - City/VTA Coordination (Sept. 05, 2013 7:03:46 AM PDT) 09/07/2013 Comment letter from veysel mutlu (Letter ID 500170) 09/09/2013 Email from Andrew Chafer to Chad Mosley re: AC2 Easement Vacations (Sept. 09, 2013 9:09:09 AM PDT) • Exhibit A Legal Description For Public Utility Easement Vacation (23 -7582 OR 607.pdf) • Exhibit A Legal Description For Public Utility Easement Vacation (28 -489 M 13.pdf) • Exhibit A Legal Description For Public Utility Easement Vacation (52 -7582 OR 607.pdf) • Exhibit A Legal Description For Public Utility Easement Vacation (53 -8049 OR 100.pdf) • Exhibit A Legal Description For Light and Air Easement Vacation (58- 13789966.pdf) • Exhibit A Legal Description For Street Easement Vacation (76 -7631 OR 644.pdf) • Exhibit A Legal Description For Street Easement Vacation (77 -7631 OR 645.pdf) • Exhibit A Legal Description For Public Utility Easement Vacation (82 -7757 OR 626.pdf) • Exhibit A Legal Description For Roadway Easement Vacation (83- 14826068.pdf) • Exhibit A Legal Description For Roadway Easement 1 -161 sf- 3345921 Q ATTACHMENT I INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2 PROJECT 1 -162 sf- 3345921 Q DATE DOCUMENT Vacation (85- 14826070.pdf) • Exhibit A Legal Description For Roadway Easement Vacation (87- 14826072.pdf) • First American Title Insurance Company, Preliminary Report for 19050 Pruneridge Avenue; 10300, 10400, 10435, 10501, 10590, 10670, 10700, 10955 North Tantau Avenue; 10955 and 19111 Pruneridge Avenue; 10400, 10500, 10555 and 10600 Ridgeview Court, Cupertino, CA (Mar. 13, 2012) (Order No NCS- 492192- SC.pdf) • Exhibit A Legal Description For Public Utility Easement Vacation (7 -7757 OR 626.pdf) • Exhibit A Legal Description For Public Utility Easement Vacation (10 -7582 OR 607.pdf) • Exhibit A Legal Description For Public Utility Easement Vacation (19 -8069 OR 646.pdf) 09/09/2013 Email from David Stillman to Timm Borden re: FW: 280 I/C Final Conceptual Alternative Analysis Study (Sept. 09, 2013 9:25:38 AM PDT) • URS, Interstate 280 /Wolfe Road Interchange Improvement Project Conceptual Alternative Analysis Study (Sept. 5, 2013) (280 -Wolfe Final CAA.pdf) 09/09/2013 Email from Aarti Shrivastava to David Brandt re: FW: special meeting of the Planning Commission (Sept. 09, 2013 9:53:34 AM PDT) 09/09/2013 Email from David Brandt to Karen Guerin re: Fwd: Concerned Citizens of Cupertino Response to Draft Environmental Impact Report for Apple Campus 2 (Sept. 09, 2013 10:46:58 PM PDT) 09/09/2013 Email from David Brandt to Rick Kitson re: Fwd: Concerned Citizens of Cupertino Response to Draft Environmental Impact Report for Apple Campus 2 (Sept. 09, 2013 10:44:53 PM PDT) 09/09/2013 Email from Rick Kitson to City Council re: Link restored: Resent: Concerned Citizens of Cupertino Response to Draft Environmental 1 -162 sf- 3345921 Q ATTACHMENT I INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2 PROJECT 1 -163 sf- 3345921 Q DATE DOCUMENT Impact Report for Apple Campus 2 (Sept. 09, 2013 2:44:00 PM PDT) 09/09/2013 Email from Karen Guerin To: David Brandt; Aarti Shrivastava; Piu Ghosh; Scott D. Pinsky; Timm Borden; Rick Kitson; Ellen J. Garber; stamp @stamplaw.us; Carol Korade; Ramiza, Gerald J.; Ben Stock; Chip Eady Lunch for Apple DA Meeting (Sept. 09, 2013 4:45:47 PM PDT) • Lebou Menu (Lebou Menu.pdf) 09/09/2013 Email from Chad Mosley to Amy Taylor, Andrew Chafer re: more redlines of plats and legals (Sept. 09, 2013 3:03:21 PM PDT) • Exhibit A Legal Description For Public Utility Easement Vacation (redline) (MX -M 1100_20130909_171514.pdf) 09/09/2013 Email from Dan Whisenhunt to Adam Weinstein Re: Apple EIR -- visual simulation (Sept. 09, 2013 10:13:09 AM PDT) 09/09/2013 Email from Rick Kitson to Aarti Shrivastava, Piu Ghosh RE: Meeting times (Sept. 09, 2013 2:29:00 PM PDT) 09/09/2013 Email from Andrew Chafer to Chad Mosley, Amy Taylor RE: more redlines of plats and legals (Sept. 09, 2013 3:43:21 PM PDT) • Exhibit A Legal Description For Light And Air Easement Vacation (58- 13789966.pdf) • Exhibit A Legal Description For Street Easement Vacation (76 -7631 OR 644.pdf) • Exhibit A Legal Description For Street Easement Vacation (77 -7631 OR 645.pdf) • Exhibit A Legal Description For Public Utility Easement Vacation (82 -7757 OR 626.pdf) • Exhibit A Legal Description For Roadway Easement Vacation (83- 14826068.pdf) • Exhibit A Legal Description For Roadway Easement Vacation (85- 14826070.pdf) 1 -163 sf- 3345921 Q ATTACHMENT I INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2 PROJECT 1 -164 sf- 3345921 Q DATE DOCUMENT • Exhibit A Legal Description For Roadway Easement Vacation (87- 14826072.pdf) • Exhibit A Legal Description For Public Utilities Easement Vacation (07 -7757 OR 626.pdf) • Exhibit A Legal Description For Public Utilities Easement Vacation (10 -7582 OR 607.pdf) • Exhibit A Legal Description For Public Utilities Easement Vacation (19 -8069 OR 646.pdf) • Exhibit A Legal Description For Public Utilities Easement Vacation (23 -7582 OR 607.pdf) • Exhibit A Legal Description For Public Utilities Easement Vacation (28 -489 M 13.pdf) • Exhibit A Legal Description For Public Utilities Easement Vacation (52 -7582 OR 607.pdf) • Exhibit A Legal Description For Public Utilities Easement Vacation (53 -8049 OR 100.pdf) 09/09/2013 Email from Kristen Squarcia to Piu Ghosh, Aarti Shrivastava RE: PFR noticing (Sept. 09, 2013 2:53:46 PM PDT) 09/09/2013 Email from Piu Ghosh to Wolfgang Wagener, Dan Whisenhunt RE: Plans (Sept. 09, 2013 12:12:00 PM PDT) 09/09/2013 Email from Rick Kitson to David Brandt RE: Resent: Concerned Citizens of Cupertino Response to Draft Environmental Impact Report for Apple Campus 2 (Sept. 09, 2013 12:06:00 PM PDT) 09/09/2013 Email from Beth Ebben to Piu Ghosh RE: special agenda of the ERC (Sept. 09, 2013 4:45:02 PM PDT) 09/10/2013 Letter from Dan Whisenhunt to Aarti Shrivasta 09/10/2013 Email from Piu Ghosh to Julia Kinst re: Post card Apple — final (Sept. 10, 2013 4:26:00 PM PDT) 1 -164 sf- 3345921 Q ATTACHMENT I INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2 PROJECT 1 -165 sf- 3345921 v2 DATE DOCUMENT • City of Cupertino Courtesy Notice Apple Campus 2 (AC2 Final meetings & FEIR.pdf) 09/10/2013 Email from Apple Campus 2 to Aarti Shrivastava re: Apple Campus 2 (Sept. 10, 2013 3:46:37 PM PDT) • Letter from Apple to City (Sept. 10, 2013) (Apple Campus 2 Community Outreach and Engagement Overview 091013.pdf) 09/10/2013 Email from Piu Ghosh to Julia Kinst, Aarti Shrivastava re: Apple courtesy postcard (Sept. 10, 2013 5:45:05 PM PDT) • City of Cupertino Courtesy Notice Apple Campus 2 (AC2 Final meetings & FEIR.pdf) 09/10/2013 Email from Piu Ghosh to Julia Kinst, Aarti Shrivastava re: Courier Ad - Apple meetings (Sept. 10, 2013 5:42:00 PM PDT) • City of Cupertino Courtesy Notice Apple Campus 2 (Apple Study Session Courier Notice.pdf) 09/10/2013 Email from Aarti Shrivastava to: Ellen J. Garber; Gerald J. Ramiza; Edsell (Chip) M. Eady, Jr.; Benjamin L. Stock; Gary Baum; Diana Fazely; Timm Borden; Chad Mosley; Ryan Roman re: Font (Sept. 10, 2013 11:05:28 PM PDT) 09/10/2013 Email from Rick Kitson to David Brandt re: FW: Concerned Citizens of Cupertino Response to Draft Environmental Impact Report for Apple Campus 2 (Sept. 10, 2013 8:21:00 AM PDT) 09/10/2013 Email from Piu Ghosh to Nidhi Mathur RE: Concerned Citizens of Cupertino Response to Draft Environmental Impact Report for Apple Campus 2 (Sept. 10, 2013 9:47:00 AM PDT) 09/10/2013 Email from Julia Kinst to Piu Ghosh RE: Display ad in Courier for Oct 1 joint SS (Sept. 10, 2013 3:31:54 PM PDT) 09/10/2013 Email from Aarti Shrivastava To: "Adam Weinstein "; Piu Ghosh; David Stillman; jfowler @apple.com; dgold @mofo.com; mimwallegmofo.com; Judith Malamut; Franziska Church; Jane Bierstedt; Rick Kitson; Gary Baum; Eric Morley; Foulkesg apple. com; 1 -165 sf- 3345921 v2 ATTACHMENT I INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2 PROJECT 1 -166 sf- 3345921 Q DATE DOCUMENT Scott D. Pinsky; Chad Mosley; Timm Borden; JJeffers @mofo.com; dwhisenhuntggpple.com; diana.fazely @gmail.com; David Brandt; wwagener @fosterandpartners.com; william.baumgardner(cr gRM.com; lynnjohnson @apple.com; Garber @smwlaw.com; JRamiza @bwslaw.com; stamp @stamplaw.us; "Stock, Benjamin L. "; "Edsell M Eady Jr "; David Woo; Grace Schmidt; Julia Kinst; Beth Ebben Re: Draft Apple schedule (Sept. 10, 2013 4:43:45 PM PDT) • Apple Project Schedule — 9/9/13 (Apple Schedule09O9 l 3 .xlsx) 09/10/2013 Email from Beth Ebben to Julia Kinst, Piu Ghosh re: RE: Post card Apple — final (Sept. 10, 2013 5:26:31 PM PDT) 09/10/2013 Email from Meg Thomas to Piu Ghosh Re: Replacement Tree list (Sept. 10, 2013 8:26:03 AM PDT • Tree Replacement Worksheet (TreeReplacementWorksheet 130910.xlsx; TreeReplacementWorksheet 130910.pdf) 09/10/2013 Email from Franziska Church to Piu Ghosh RE: Widening of N. Tantau (Sept. 10, 2013 3:36:17 PM PDT) 09/10/2013 Email from Meg Thomas to Mick Bench, Piu Ghosh re: Wolfe Road Median Trees (Sept. 10, 2013 8:33:12 AM PDT) 09/11/2013 Email from Rick Kitson to Darrel Lum RE: Concerned Citizens of Cupertino Response to Draft Environmental Impact Report for Apple Campus 2 (Sept. 11, 2013 2:31:52 PM PDT) 09/11/2013 Email from Adam Weinstein to Piu Ghosh RE: Dust Control (Sept. 11, 2013 7:25:32 PM PDT) 09/11/2013 Email from Aarti Shrivasta To: Aarti Shrivastava; "Adam Weinstein "; Piu Ghosh; David Stillman; jfowler @apple.com; dgoldkmofo.com; mimwalle @mofo.com; Judith Malamut; Franziska Church; Jane Bierstedt; Rick Kitson; Gary Baum; Eric Morley; Foulkes @apple.com; Scott D. Pinsky; Chad Mosley; Timm Borden; JJeffers(c raofo.com; dwhisenhunt @apple.com; diana.fazely @gmail.com; David Brandt; wwa eg nergfosterandpartners.com; william.baumgardner @arup.com; lynnjohnson @apple.com; Garber @smwlaw.com; JRamiza bwslaw.com; stamp@ stamplaw.us; "Stock, Benjamin L. "; 1 -166 sf- 3345921 Q ATTACHMENT I INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2 PROJECT 1 -167 sf- 3345921 Q DATE DOCUMENT "Edsell M Eady Jr "; David Woo; Grace Schmidt; Julia Kinst; Beth Ebben RE: Draft Apple schedule (Sept. 11, 2013 10:26:38 AM PDT) • Apple Project Schedule — 9/10/13 (Apple Schedule091013 revised.xlsx ) 09/11/2013 Email from Piu Ghosh to Aarti Shrivastava; Beth Ebben; Grace Schmidt; Julia Kinst RE: legal ad for the 10/2 PC meeting (Sept. 11, 2013 9:27:00 AM PDT) 09/11/2013 Email from Piu Ghosh To: Aarti Shrivastava; Beth Ebben; Grace Schmidt; Julia Kinst RE: legal ad for the 10/2 PC meeting (Sept. 11, 2013 9:27:14 AM PDT) 09/11/2013 Email from Rick Kitson to David Brandt, Grace Schmidt RE: Oct 8 and Oct 16 possible Council meetings (Sept. 11, 2013 8:33:00 AM PDT) 09/11/2013 Email from Julia Kinst to Aarti Shrivastava, Piu Ghosh re: AC2 Ads and Postcard Confirmation (Sept. 11, 2013 8:38:42 AM PDT) 09/11/2013 Email from Michael Bench to Piu Ghosh re: Apple Campus 2 Nursery Stock (Sept. 11, 2013 8:29:13 PM PDT) • Bench, Michael. A Brief Review of the Nursery Stock Replacement Trees For the Apple Campus 2 Project Cupertino, California (Sept. 13, 2013) (Apple C2 Nursery Stock 9- 13.doc) 09/11/2013 Email from Michael Bench to Piu Ghosh re: Apple Campus 2 Nursery Trees — Revised (Sept. 11, 2013 9:07:56 PM PDT) • Bench, Michael. A Brief Review of the Nursery Stock Replacement Trees For the Apple Campus 2 Project Cupertino, California (Sept. 13, 2013) (Apple C2 Nursery Stock 9- 13.doc 09/11/2013 Email from Adam Weinstein to: Gary Chao; Piu Ghosh; David Stillman; jfowler @apple.com; Peter Sokoloff, dgoldkmofo.com; mimwalle @mofo.com; Judith Malamut; Franziska Church; Jane Bierstedt; Rick Kitson; Gary Baum; Eric Morley; Foulkes @apple.com; Scott D. Pinsky; Chad Mosley; Timm Borden; JJefferskmofo.com; dwhisenhunt @apple.com; Aarti Shrivastava; diana.fazely @gmail.com; 1 -167 sf- 3345921 Q ATTACHMENT I INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2 PROJECT 1 -168 sf- 3345921 Q DATE DOCUMENT David Brandt; wwagener @fosterandpartners.com; soki @fosterandpartners.com; william.baum arg dnergarup.com; Michael.iswalt @arup.com; lynnjohnson @apple.com; Garber @smwlaw.com; JRamizac�r�,bwslaw.com Apple EIR -- Team Meeting 9/12 (Sept. 11, 2013 8:17:42 AM PDT) 09/11/2013 Email from David Stillman to Chad Mosley re: COA (Sept. 11, 2013 4:25:00 PM PDT) 09/11/2013 Email from Chad Mosley to Amy Taylor re: FW: Administrative Draft - SCB /Calvert (Sept. 11, 2013 10:25:21 AM PDT) • City of Cupertino, Calvert Drive — Stevens Creek Boulevard to Southbound I -280 On -Ramp Mitigation Conceptual Plan (Administrative Draft StevensCreek SB280- 20130909.pdf) 09/11/2013 Email from David Stillman to Timm Borden, Piu Ghosh, Aarti Shrivastava re: FW: Apple fair -share (Sept. 11, 2013 4:58:47 PM PDT) 09/11/2013 Email from Grace Schmidt to Aarti Shrivastava, David Brandt re: FW: Mark's Oct vacation (Sept. 11, 2013 11:52:01 AM PDT) 09/11/2013 Email from Piu Ghosh to Meg Thomas re: FW: Tree Replacement Table (Sept. 11, 2013 6:16:00 PM PDT) 09/11/2013 Email from Rick Kitson to Andrea Sanders re: FW: USB Pen drives re: (Sept. 11, 2013 7:47:00 AM PDT) 09/11/2013 Email from Beth Ebben to Piu Ghosh re: mailings (Sept. 11, 2013 2:23:20 PM PDT) 09/11/2013 Email from Julia Kinst to Piu Ghosh, Aarti Shrivastava RE: AC2 Ads and Postcard Confirmation (Sept. 11, 2013 9:35:34 AM PDT) 09/11/2013 Email from Franziska Church to Adam Weinstein, Piu Ghosh RE: Specific Criteria for the Construction of Additional Parking (Sept. 11, 2013 3:17:03 PM PDT) 09/11/2013 Email from Chad Mosley to Robert Shackelford re: Two more estimates for Apple (Sept. 11, 2013 1:24:50 PM PDT) 1 -168 sf- 3345921 Q ATTACHMENT I INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2 PROJECT 1 -169 sf- 3345921 v2 DATE DOCUMENT • Sandis, AC2 OFFSITE Mitigations, Mitigation Q1 - Lawerance at Calvert and I -280 on -ramp (Sept. 11, 2013) (Estimate QI - Calvert + 280 onramp.pdf) • Sandis, AC2 OFFSITE Mitigations, Mitigation NI - Stevens Creek at Calvert — Alternative (Sept. 11, 2013) (Estimate N1 - SC free Rturn.pdf) 09/12/2013 Email from Mark Santoro to Grace Schmidt Re: SAVE THE DATE - Continuation of Apple Campus 2 hearing if needed (Sept. 12, 2013 2:42:29 PM PDT) 09/12/2013 Email from Robert Shackelford to Chad Mosley RE: Two more estimates for Apple (Sept. 12, 2013 4:54:50 PM PDT) • Harris & Associates, Peer Review of Cost Estimate for 2 Revised Improvements (dated 9/11/13) related to future Apple Campus mitigations (Sept. 12, 2013) (Peer review 2 letter to Cupertino 9- 12- 13.pdf) 09/12/2013 Email from Sylvia Mendez to Piu Ghosh re: AC2 (Sept. 12, 2013 1:57:52 PM PDT) • Plan Review Stop Report (Sept. 12, 2013) (tmpsylvia 9332.pdf) • Apple Campus 2 Parking Structure - Foundation (https://mbc.box.com/s/8bnmOcjumiej3ubuhi4b) 09/12/2013 Email from 09/22/2013 from Julia Kent to Finance re: ACH Payments from Apple Anticipated (Sept. 12, 2013 7:46:43 AM PDT) 09/12/2013 Email from Timm Borden to David Stillman re: Caltrans (Sept. 12, 2013 7:27:21 AM PDT) 09/12/2013 Email from Piu Ghosh to Nidhi Mathur re: FW: Apple Campus 2 (Sept. 12, 2013 11:10:00 AM PDT) • Letter from Apple to City of Cupertino (Sept. 10, 2013) (Apple Campus 2 Community Outreach and Engagement Overview 091013.pdf) 1 -169 sf- 3345921 v2 ATTACHMENT I INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2 PROJECT 1 -170 sf- 3345921 Q DATE DOCUMENT 09/12/2013 Email from Piu Ghosh to Aarti Shrivastava, Gary Baum re: Permit Issuance Dates .xls (Sept. 12, 2013 1:46:40 PM PDT) • Permit Issuance Dates — Updated 09/12/13 (Permit Issuance Dates .xls) 09/12/2013 Email from Chad Mosley to Timm Borden re: Pruneridge Vacation Plat and Legal - In Fee portion (Sept. 12, 2013 10:25:43 AM PDT) • Exhibit A Legal Description For Pruneridge Avenue (Exhibit A - Pruneridge Avenue Vacation Legal Description.pdf) • Exhibit B Pruneridge Avenue Vacation Key Map Cupertino, CA (Exhibit B - Pruneridge Ave Vacation Plat.pdf) 09/12/2013 Email from Piu Ghosh to Nidhi Mathur, Rick Kitson RE: Apple Campus 2 — Question (Sept. 12, 2013 1:05:00 PM PDT) 09/12/2013 Email from Vikram Kowshik to City Council re: Apple Campus 2 (Sept. 12, 2013 2:53 PM PDT) (Letter ID e- 13 -09 -12 -001) 09/12/2013 Email from Piu Ghosh to Wolfgang Wagener RE: Draft submittal (Sept. 12, 2013 3:58:00 PM PDT) 09/13/2013 Email from Terry Bowen To: Eric Alm (erik alm @dot.ca.gov); jean — finney @dot.ca.gov; Taubeneck, Lee @DOT; Timm Borden; David Stillman; Dan Whisenhunt; Jim Fowler; Amy Taylor re: Apple Campus 2 (Sept. 13, 2013 5:20:35 PM PDT) • Agenda, Apple Campus 2 Caltrans /City of Cupertino /Apple, Intergovernmental Review /CEQA Coordination, Sept. 16, 2013, 11:00, Caltrans District 4, 111 Grand Ave, Oakland, 15th Floor, Conference Room 15 -220 (Agenda 9 -16 -2013 CT Cupertino Apple IGR CEQA Coordination.doc) 09/13/2013 Email from Timm Borden to Chad Mosley re: FW: Pruneridge vacation legal ad - Courier okay? (Sept. 13, 2013 8:51:07 AM PDT) 09/13/2013 Email from Chad Mosley to David Stillman re: FW: Two more estimates for Apple (Sept. 13, 2013 7:52:45 AM PDT) 1 -170 sf- 3345921 Q ATTACHMENT I INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2 PROJECT 1 -171 sf- 3345921 Q DATE DOCUMENT • Harris & Associates, Peer Review of Cost Estimate for 2 Revised Improvements (dated 9/11/13) Related to Future Apple Campus Mitigations (Sept. 12, 2012) (Peer review 2 letter to Cupertino 9- 12- 13.pdf) • Sandis, AC2 Offsite Mitigations, Mitigation Q I - Lawerance at Calvert and I -280 on -ramp (Sept. 11, 2012) (Estimate Q1 - Calvert + 280 onramp.pdf) • Sandis, AC2 Offsite Mitigations, Mitigation N1 - Stevens Creek at Calvert — Alternative (Sept. 11, 2013) (Estimate N1 - SC free Rturn.pdf) 09/13/2013 Email from Chad Mosley to Ian Cunningham RE: AC2 - Grading Permit — Requirements (Sept. 13, 2013 10:56:58 AM PDT) 09/13/2013 Email from Timm Borden to Grace Schmidt RE: Pruneridge vacation hearing on Oct 15 - legal ad (Sept. 13, 2013 9:25:44 AM PDT) 09/13/2013 Email from Timm Borden to Aarti Shrivastava Re: Pruneridge vacation legal ad - Courier okay? (Sept. 13, 2013 12:16:26 AM PDT) 09/13/2013 Email from Saran Oki to Piu Ghosh re: RE: September Planned Development Permit (Sept. 13, 2013 3:15:30 PM PDT) 09/13/2013 Email from Piu Ghosh to Saran Oki RE: September Planned Development Permit (Sept. 13, 2013 2:56:24 PM PDT) 09/13/2013 Email from Chad Mosley to Roger Lee RE: Tantau Avenue at Hwy 280 (Sept. 13, 2013 2:40:55 PM PDT) 09/14/2013 Email from Judith Malamut to Adam Weinstein Re: Comments received after close of the EIR public review period (Sept. 14, 2013 8:42:14 AM PDT) 09/15/2013 Email from Rick Kitson to applecampus2 re: FW: Concerned Citizens of Cupertino Response to Draft Environmental Impact Report for Apple Campus 2 (Sept. 15, 2013 7:28:00 PM PDT) 09/16/2013 Email from Beth Ebben to Planning Dept. re: agendas /notices to go out this week (Sept. 16, 2013 9:03:40 AM PDT) 1 -171 sf- 3345921 Q ATTACHMENT I INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2 PROJECT 1 -172 sf- 3345921 Q DATE DOCUMENT • City of Cupertino Notice Of Cancellation Cupertino Administrative Hearing Committee (Sept. 19, 2013) (Cancel Sept2613.doc) • City of Cupertino, Notice Of cancellation Cupertino Planning Commission (Sept. 19, 2013) (CANCEL Sept2413.doc) • City of Cupertino, Agenda of the Special Meeting of the Environmental Review Committee, EOC Room — Thursday, September 26, 2013 — 9:30 a.m. (Sept. 26, 2013) (Sp Agenda 09- 26- 13.doc) • Legal Notice of Special Public Hearing Before the Planning Commission of the City of Cupertino, California, on October 2, 2013 (Sept. 20, 2013) (09- 17- 13legal Merc.doc) 09/16/2013 Email from Piu Ghosh to Adam Weinstein, Ellen J. Garber re: Bus Duck out for rerouting of Route 81 (Sept. 16, 2013 4:20:23 PM PDT) 09/16/2013 Email from Chad Mosley to Timm Borden re: encroachment permit with insurance requirements (Sept. 16, 2013 7:43:26 AM PDT) • Department of Public Works Encroachment Permit Application Form (Encroachment Permit Application.pdf) 09/16/2013 Email from Ryan Roman to Aarti Shrivasta re: FW: Pruneridge vacation hearing on Oct 15 - legal ad (Sept. 16, 2013 4:51:57 PM PDT) 09/16/2013 Email from Chad Mosley to David Stillman re: FW: Vallco- Striping Changes (Sept. 16, 2013 3:03:06 PM PDT) • Biking Stripe Removed, Vallco Parkway 09/09/13 (20130909 Biking Stripe Removed.pdf) • Crosswalk Perimeter Road, Vallco Parkway 09/09/13 (20130909 Crosswalk Perimeter Road.pdf) 09/16/2013 Email from Erik @DOTTo: Taubeneck, Lee @DOT; Finney, Jean@DOT; Saleh, Nick @DOT; Seriani, David D @DOT; El- Tawansy, Dina @DOT; Timm Borden; David Stillman; "Terry @gray - bowen.com "; "dwhisenhunt apple.com "; "j fowler apple. com "; 1 -172 sf- 3345921 Q ATTACHMENT I INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2 PROJECT 1 -173 sf- 3345921 Q DATE DOCUMENT Naseer, Amjad @DOT; kolcott @sandis.net; ata lorksandis.net Re: Apple Campus 2 - mitigation project development process issues (Sept. 16, 2013 2:26:33 PM PDT) • Apple Campus 2 Caltrans / City of Cupertino / Apple Intergovernmental Review / CEQA Coordination Sign -In Sheet (Sept. 16, 2013) (Apple Campus- Caltrans meet sign in 091613.pdf) 09/16/2013 Email from Chad Mosley to Timm Borden RE: encroachment permit with insurance requirements (Sept. 16, 2013 8:24:08 AM PDT) • Draft Improvement Agreement Template (July 18, 2013) (Improvement Agreement Template - PW Director Approval Draft 7- 18- 13.doc) 09/16/2013 Email from Nidhi Mathur to Piu Ghosh re: RE: How many people on the interested parties a -list> (Sept. 16, 2013 3:05:38 PM PDT) 09/16/2013 Email from Piu Ghosh to Meg Thomas, Mick Bench, Dave Muffly RE: Review of Wolfe Road Median Trees (Sept. 16, 2013 9:02:16 AM PDT) 09/16/2013 Email from Meg Thomas to Piu Ghosh, Dave Muffly re: Review of Wolfe Road Median Trees (Sept. 16, 2013 8:53:54 AM PDT) 09/16/2013 Email from Piu Ghosh to Aarti Shrivastava re: Study Session - Offsite Improvements (Sept. 16, 2013 5:16:14 PM PDT) • Joint City Council / Planning Commission Study Session Staff Report (Oct. 1, 2013) (Study Session Staff Report - PGLSAASPG091413tb (2).docx) 09/16/2013 Email from Chad Mosley to Piu Ghosh re: Vesting Tentative Map Conditions (Sept. 16, 2013 2:45:55 PM PDT) • Vesting Tentative Map Conditions (redline) (Conditions of Approval - Vesting Tentative Map.doc) 09/17/2013 Email from Piu Ghosh to Adam Weinstein to Judith Malamut re: FW: September Planned Development Permit (Sept. 17, 2013 10:48:00 AM PDT) 1 -173 sf- 3345921 Q ATTACHMENT I INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2 PROJECT 1 -174 sf- 3345921 v2 DATE DOCUMENT 09/17/2013 Email from Chad Mosley to David Stillman re: FW: Vallco Configuration - Main Street (Sept. 17, 2013 2:49:14 PM PDT) 09/17/2013 Email from Dan Whisenhunt to Aarti Shrivastava re: Fwd: City of Cupertino Invoices -Apple Campus 2 (Sept. 17, 2013 6:53:43 PM PDT) • Invoice (Sept. 5, 2013) (Apple Invoice - Planning, 9 -5- 13.pdf) • Invoice (Sept. 4. 2013) (Apple Invoice- Building, 9 -4- 13.pdf) 09/17/2013 Email from David Stillman to Amy Taylor re: I -280 cost estimate (Sept. 17, 2013 2:02:40 PM PDT) • I -280 from Google Earth (Redline) (280 El Monte_Magdelena.pdf) 09/17/2013 Email from Julia Kinst to Piu Ghosh, Aarti Shrivastava re: LSA Contract (Sept. 17, 2013 5:48:06 PM PDT) • Agreement between the City of Cupertino and LSA Associates, Inc. for Consultant Services for Preparation of the Environmental Impact Report for the Apple Campus 2 Project (July 8, 2011) (11 -073 LSA Associates, Consultant Services, Apple Campus 2 Project.pdf) 09/17/2013 Email from Adam Weinstein to Piu Ghosh Re: Apple -- Response to Comments Doc (Sept. 17, 2013 5:27:11 PM PDT) 09/17/2013 Email from Aarti Shrivastava to Grace Schmidt, Beth Ebben, Julia Kinst, Piu Ghosh, City Clerk RE: Apple schedule (Sept. 17, 2013 9:03:12 AM PDT) 09/17/2013 Email from Aarti Shrivastava To: Aarti Shrivastava; "Adam Weinstein "; Piu Ghosh; David Stillman; Judith Malamut; Franziska Church; Jane Bierstedt; Gary Baum; Scott D. Pinsky; Chad Mosley; Timm Borden; diana.fazely @gmail.com; David Brandt; Garber @smwlaw.com; JRamiza @bwslaw.com; stamp @stamplaw.us; "Stock, Benjamin L. "; "Edsell M Eady Jr "; David Woo; Grace Schmidt; Julia Kinst; Beth Ebben; Susan Bloch; jfowler @apple.com; d old mofo.com; mimwalle mofo.com; dwhisenhunt a le.com 1 -174 sf- 3345921 v2 ATTACHMENT I INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2 PROJECT 1 -175 sf- 3345921 Q DATE DOCUMENT RE: Draft Apple schedule (Sept. 17, 2013 7:14:14 PM PDT) • Apple Project Schedule — 9/17/13 (Apple Schedule091713 revised.xlsx) 09/17/2013 Email from Amy Taylor to David Stillman RE: I -280 cost estimate (Sept. 17, 2013 6:10:29 PM PDT) • Sandis, AC2 I -280 HOV Lane Reconfiguration, El Monte Rd south 280 pass Magdalena (Sept. 17, 2013) (280 —HOV Cost Estimate.pdf) 09/17/2013 Email from Amy Taylor to David Stillman RE: I -280 cost estimate (Sept. 17, 2013 6:10:29 PM PDT) • Sandis, AC2 I -280 HOV Lane Reconfiguration, El Monte Rd south 280 pass Magdalena (Sept. 17, 2013) (280 —HOV Cost Estimate.pdf) 09/17/2013 Email from Grace Schmidt to Aarti Shrivastava, Julia Kinst RE: Number of City staff /consultants and Apple consultants for Oct 1, 2 and 15 meetings (Sept. 17, 2013 2:23:15 PM PDT) 09/17/2013 Email from Simon Vuong to Aarti Shrivastava RE: Tentative Map reso (Sept. 17, 2013 3:53:31 PM PDT) • Resolution No. 6722 of the Planning Commission of the City of Cupertino Recommending Approval to Subdivid a .96 Gross Arrew Lot into Four Lots: One Lot is for a Private Road Totaling 13,075 Square Feet, and the Remaining Three Lots Range in Size From 8,051 TO 9,448 Square Feet to be Developed as Single - Family Homes, Located at 20840 Mclellan Rd, APN 359 -20 -031 (TM- 2012 -03) (TM- 2012 -03 res.doc) 09/17/2013 Email from Timm Borden to Aarti Shrivastava, Piu Ghosh, David Stillman RE: Vallco condition (Sept. 17, 2013 5:16:59 PM PDT) 09/17/2013 Email from Aarti Shrivastava to Timm Borden, Chad Mosley RE: VTM Reso 09/17/2013 Email from Nidhi Mathur to Susan Oki RE: Web friendly plans (Sept. 1 -175 sf- 3345921 Q ATTACHMENT I INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2 PROJECT 1 -176 sf- 3345921 Q DATE DOCUMENT 17, 2013 10:01:35 AM PDT) 09/17/2013 Email from Aarti Shrivastava to Simon Vuong re: Tentative Map reso (Sept. 17, 2013 3:39:49 PM PDT) 09/17/2013 Email from Timm Borden to Chad Mosley re: The vacations stay Don consent calendar step one (Sept. 17, 2013 10:44:23 PM PDT) 09/17/2013 Email from David Stillman to Piu Ghosh re: Vallco condition (Sept. 17, 2013 5:00:27 PM PDT) 09/17/2013 Email from Chad Mosley to Timm Borden re: Vallco Configuration - Main Street (Sept. 17, 2013 7:46:37 AM PDT) 09/17/2013 Email from Darrel Lum to Rick Kitson re: Concerned Citizens of Cupertino Response to Draft Environmental Impact Report for Apple Campus 2 (Sept. 11, 2013 2:51 PM PDT) (Letter ID e- 13 -09 -17 -001) 09/18/2013 Email from Piu Ghosh to Beth Ebben re: AC 2 Public Hearing Notice (Sept. 18, 2013 5:38:21 PM PDT) • Notice of Public Hearing, Cupertino Planning Commission, Oct. 2, 2013 (apple campus 2.doc) 09/18/2013 Email from Beth Ebben to Piu Ghosh, Aarti Shrivastava re: FW: legal ad REVISED!! (Sept. 18, 2013 10:48:57 AM PDT) • Legal Notice of Special Public Hearing Before The Planning Commission of the City of Cupertino, California on October 2, 2013, at 5:00 p.m. (CUPERTINO 4974568.pdf) 09/18/2013 Email from Beth Ebben to Piu Ghosh, Aarti Shrivastava re: FW: legal ad REVISED!! (Sept. 18, 2013 10:48:57 AM PDT) • Legal Notice of Special Public Hearing Before the Planning Commission of the City of Cupertino, California on October 2, 2013, at 5:00 p.m. (CUPERTINO 4974568.pdf) 09/18/2013 Email from Piu Ghosh to Aarti Shrivastava re: FW: Notice Signs (Sept. 18, 2013 5:47:10 PM PDT) 1 -176 sf- 3345921 Q ATTACHMENT I INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2 PROJECT 1 -177 sf- 3345921 Q DATE DOCUMENT 09/18/2013 Email from David Stillman to Alm, Erik @DOT re: FW: Your question about 280 btw/Magdalena and El Monte (Sept. 18, 2013 1:24:00 PM PDT) 09/18/2013 Email from Grant Schlereth to Chad Mosley, David Stillman re: NB Wolfe Lane Shift Follow Up (Sept. 18, 2013 9:05:23 PM PDT) • California MUTCD 2012 manual, pp. 1030, 1037 (Jan. 13, 2012) (Pages from CAMUTCD2012.pdf) 09/18/2013 Email from Dan Whisenhunt to Piu Ghosh re: Notice Signs (Sept. 18, 2013 5:18:58 PM PDT) 09/18/2013 Email from Grace Schmidt to Chad Mosley re: Pruneridge vacation notice and legal ad (Sept. 18, 2013 2:40:27 PM PDT) • Notice of Public Hearing Intent to Vacate (Sept. 17, 2013) (Notice to vacate Pruneridge.docx ) • City of Cupertino Notice of Public Hearing Vacation of a Portion of the Pruneridge Avenue Right -Of -Way and Various Easements Bounded by North Wolfe Road, Homestead Road, North Tantau Avenue, and Highway 280 (Sept. 17, 2013) ( Pruneridge Ave. vacation Res. 13- 078.docx) 09/18/2013 Email from Piu Ghosh to John Roach RE: AC2 Planning Drawings (Sept. 18, 2013 12:21:00 PM PDT) 09/18/2013 Email from Rick Kitson to Nidhi Mathur Re: Apple Campus 2 (Sept. 18, 2013 2:27:43 PM PDT) 09/18/2013 Email from Adam Weinstein to: Gary Chao; Piu Ghosh; David Stillman; jfowler @apple.com; Peter Sokoloff, dgold(,mofo.com; mimwalle @mofo.com; Judith Malamut; Franziska Church; Jane Bierstedt; Rick Kitson; Gary Baum; Eric Morley; Foulkes @apple.com; Scott D. Pinsky; Chad Mosley; Timm Borden; JJeffersc�r�,mofo.com; dwhisenhunt @apple.com; Aarti Shrivastava; diana.fazely @gmail.com; David Brandt; wwagener @fosterandpartners.com; soki @fosterandpartners.com; william.baura arg dnergarup.com; Michael.iswalt @arup.com; lynnjohnson @apple.com; Garber smwlaw.com; JRamiza@ b wslaw.com RE: Apple EIR -- Team 1 -177 sf- 3345921 Q ATTACHMENT I INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2 PROJECT 1 -178 sf- 3345921 Q DATE DOCUMENT Meeting Rescheduled to 9/18 @3:00p (Sept. 18, 2013 2:06:19 PM PDT) 09/18/2013 Email from Adam Weinstein to Piu Ghosh, Nidhi Mathur RE: Comments collected to date (Sept. 18, 2013 8:17:29 AM PDT) 09/18/2013 Email from Beth Ebben to Piu Ghosh RE: Extension of the Scoping Period (Sept. 18, 2013 12:24:48 PM PDT) • City of Cupertino, Notice of Preparation of a Draft Environmental Impact Report for the Proposed Apple Campus 2 Project (NOP -LSA Edits (2).doc) 09/18/2013 Email from Amy Taylor to David Stillman RE: I -280 cost estimate (Sept. 18, 2013 10:05:09 AM PDT) 09/18/2013 Email from Amy Taylor to David Stillman RE: I -280 cost estimate (Sept. 18, 2013 10:02:11 AM PDT) • Sandis, AC2 I -280 HOV Lane Reconfiguration, El Monte Rd south 280 pass Magdalena (Sept. 18, 2013) (Copy of 280_HOV Cost Estimate.pdf) 09/18/2013 Email from Grace Schmidt to Beth Edden RE: legal ad REVISED!! (Sept. 18, 2013 5:22:12 PM PDT) 09/18/2013 Email from Wolfgang Wagener to Piu Ghosh Re: Planning Drawing 4.25 edit (Sept. 18, 2013 9:07:58 AM PDT) 09/18/2013 Email from Aarti Shrivastava to Timm Borden, David Stillman, Piu Ghosh RE: Vallco condition (Sept. 18, 2013 1:46:03 PM PDT) 09/18/2013 Email from Dan Whisenhunt to Aarti Shrivastava Re: Wording for Signs (Sept. 18, 2013 1:51:08 PM PDT) 09/18/2013 Email from Piu Ghosh to Beth Ebben re: Sp Agenda 09- 26- 13.doc (Sept. 18, 2013 5:25:23 PM PDT) • City of Cupertino Agenda of the Special Meeting of the Environmental Review Committee, Sept. 26, 2013 (Sp Agenda 09- 26- 13.doc) 1 -178 sf- 3345921 Q ATTACHMENT I INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2 PROJECT 1 -179 sf- 3345921 Q DATE DOCUMENT 09/19/2013 Email from Beth Ebben to Piu Ghosh re: 9/26 ERC (Sept. 19, 2013 11:10:36 AM PDT) 09/19/2013 Email from Chad Mosley to David Stillman re: Calvert Stevens Creek - Cost Estimates (Sept. 19, 2013 12:12:35 PM PDT) • Sandis, AC2 OFFSITE Mitigations, Mitigation N - Stevens Creek at Calvert (Sept. 11, 2013) (Estimate N1 - SC free Rturn.pdf) • Sandis, AC2 Offsite Mitigations, Mitigation N1 - Stevens Creek at Calvert — Alternative (Sept. 11, 2013) (Estimate N - SC original Rturn.pdf) 09/19/2013 Email from Aarti Shrivastava to Piu Ghosh re: FW: special agenda for the 9/26 ERC (Sept. 19, 2013 8:45:03 AM PDT) • City of Cupertino, Agenda of the Special Meeting of the Environmental Review Committee, Sept. 26, 2013 (Sp Agenda 09- 26- 13.doc) 09/19/2013 Email from Chad Mosley To: Aarti Shrivastava; Piu Ghosh; David Stillman; Timm Borden re: Pruneridge Vacation Plat and Legal for Exhibits (Sept. 19, 2013 5:26:50 PM PDT) • Legal Description For Pruneridge Avenue ( Pruneridge Vacation Plat and Legal.pdf) 09/19/2013 Email from Piu Ghosh to Beth Ebben Re: AC 2 Public Hearing Notice (Sept. 19, 2013 8:49:31 AM PDT) 09/19/2013 Email from Andrew Chafer to Chad Mosley, Amy Taylor RE: AC2 - Number of Existing Lots? (Sept. 19, 2013 2:43:14 PM PDT) 09/19/2013 Email from Manish Dalia to Chad Mosley RE: AC2 - Wolfe Joint Trench Coordination (Sept. 19, 2013 10:08:06 AM PDT) 09/19/2013 Email from Judith Malamut to Piu Ghosh, Adam Weinstein RE: Apple EIR -- late comments memo (Sept. 19, 2013 10:19:20 AM PDT) 09/19/2013 Email from Adam Weinstein to Piu Ghosh RE: Apple EIR -- scope/budget augment (Sept. 19, 2013 10:18:02 AM PDT) 1 -179 sf- 3345921 Q ATTACHMENT I INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2 PROJECT 1 -180 sf- 3345921 Q DATE DOCUMENT 09/19/2013 Email from Chad Mosley to Amy Taylor RE: Apple Exhibits (Sept. 19, 2013 5:27:47 PM PDT) 09/19/2013 Email from Dan Whisenhunt to Aarti Shrivastava Re: City of Cupertino Invoices -Apple Campus 2 (Sept. 19, 2013 7:01:09 AM PDT) 9/19/2013 Email from Amy Taylor to Piu Ghosh Re: Property Description (Sept. 19, 2013 1:21:52 PM PDT) 09/19/2013 Email from Amy Taylor to Piu Ghosh, Chad Mosley, Dan Whisenhunt RE: Property Description (Sept. 19, 2013 12:32:05 PM PDT) • LSA, Figure IV -2, Apple Campus 2 EIR, Zoning Designations (May 31, 2013) (201309191207.pdf) 09/19/2013 Email from Aarti Shrivastava to Chad Mosley RE: Pruneridge Vacation Plat and Legal for Exhibits (Sept. 19, 2013 6:18:05 PM PDT) 09/19/2013 Email from Dan Whisenhunt to David Stillman Re: Stevens Creek/Calvert mitigation TRANS -9 (Sept. 19, 2013 4:38:14 PM PDT) 09/19/2013 Email from Chad Mosley to Grant Schlereth RE: SWMP Process (Sept. 19, 2013 7:30:49 AM PDT) 09/19/2013 Email from Grant Schlereth to Chad Mosley RE: SWMP Process (Sept. 19, 2013 12:36:02 PM PDT) 09/19/2013 Email from Piu Ghosh to Chad Mosley RE: Vesting Tentative Map COA (Sept. 19, 2013 3:09:27 PM PDT) 09/19/2013 Email from Beth Ebben to Aarti Shrivastava, Barry Chang, David Brandt, Don Sun, Timm Borden re: special agenda for the 9/26 ERC (Sept. 19, 2013 8:05:17 AM PDT) • City of Cupertino, Agenda of the Special Meeting of the Environmental Review Committee, Sept. 26, 2013 (Sp Agenda 09- 26- 13.doc) 09/19/2013 Email from Chad Mosley to Amy Taylor re: Found - Park Exhibit (Sept. 19, 2013 2:40:56 PM PDT) • Exhibit A, Zoning Plat Map Pruneridge Ave. at Ridgeview 1 -180 sf- 3345921 Q ATTACHMENT I INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2 PROJECT 1 -181 sf- 3345921 Q DATE DOCUMENT Ct., Cupertino, CA (AC2 - park area.pdf) 09/20/2013 Comment letter from Tina lee (Letter ID 500171) 09/20/2013 Comment letter from Bryan Dockter (Letter ID 500172) 09/20/2013 Email from Aarti Shrivastava to: David Brandt; Gary Baum; Garber @smwlaw.com; Ramiza, Gerald J.; stamp @stamplaw.us; Timm Borden; Piu Ghosh; David Stillman; Chad Mosley; "Adam Weinstein "; Judith Malamut re: Packets for Study Session and Planning Commission (Sept. 20, 2013 10:26:16 AM PDT) 09/20/2013 Email from Aarti Shrivastava To: David Brandt; Gary Baum; Garber @smwlaw.com; Ramiza, Gerald J.; stamp @stamplaw.us; Timm Borden; Piu Ghosh; David Stillman; Chad Mosley; "Adam Weinstein "; Judith Malamut re: Packets for Study Session and Planning Commission (Sept. 20, 2013 10:26:16 AM PDT) 09/20/2013 Email from Beth Ebben to: "Dwhisenhunt @ apple. com "brumm@ apple. com"; jnoorikkierwri hg t.com re: public hearing notice (Sept. 20, 2013 9:58:21 AM PDT) • City of Cupertino Notice of Public Hearing (apple campus 2.doc) 09/20/2013 Email from Wolfgang Wagener to Aarti Shrivastava Re: AC2 Parking Numbers (Sept. 20, 2013 7:20:01 PM PDT) 09/20/2013 Email from Amy Taylor to Chad Mosley RE: Apple Exhibits (Sept. 20, 2013 3:08:52 PM PDT) • Real Property Description (CampusLegal.docx) 09/20/2013 Email from Timm Borden to Chad Mosley RE: Right of way acquisition (Sept. 20, 2013 9:35:39 AM PDT) 09/20/2013 Email from Adam Weinstein to Aarti Shrivastava, Piu Ghosh RE: Trail location (Sept. 20, 2013 11:17:59 AM PDT) 09/20/2013 Email from Beth Ebben to City Council, Alan Takahashi, Don Sun, Margaret Gong, Paul Brophy, Winnie Lee re: study /reference materials for the Apple Campus 2 meetings (Sept. 20, 2013 10:36:30 AM PDT) 1 -181 sf- 3345921 Q ATTACHMENT I INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2 PROJECT 1 -182 sf- 3345921 Q DATE DOCUMENT 09/21/2013 Email from Piu Ghosh to Grace Schmidt, Kristen Squarcia re: Agenda Manager (Sept. 21, 2013 11:18:00 AM PDT) 09/21/2013 Email from Piu Ghosh to Adam Weinstein, Judith Malamut re: Draft EIR (Sept. 21, 2013 11:20:00 AM PDT) 09/21/2013 Email from Piu Ghosh to Aarti Shrivastava RE: PC report (Sept. 21, 2013 11:15:00 AM PDT) 09/22/2013 Comment letter from Jim Dobbins (Letter ID 500173) 09/22/2013 Email from Piu Ghosh to Aarti Shrivastava re: Keyser Marsten Report (Sept. 22, 2013 10:55:23 AM PDT) • Keyser Marston Associates, Economic and Fiscal Impacts Generated by Apple in Cupertino — Current Facilities and Apple Campus 2 (May 2013) (Keyser Marston Report - Economic Impact of Apple in Cupertino May 2013.pdf) 09/22/2013 Email from Piu Ghosh to Timm Borden RE: VTM Street Improvement Permit Conditions (Sept. 22, 2013 10:59:24 PM PDT) 09/22/2013 Email from David Stillman to Timm Borden, Piu Ghosh, Aarti Shrivastava RE: VTM Street Improvement Permit Conditions (Sept. 22, 2013 6:27:20 PM PDT) • Vesting Tentative Map Conditions (Redline) (VTM- Street Improvement Agreement Requirements 9 -2 Ldoc) 09/22/2013 Email from Chad Mosley to Timm Borden RE: VTM Street Improvement Permit Conditions (Sept. 22, 2013 3:05:58 PM PDT) 09/23/2013 Email from Piu Ghosh to Aarti Shrivastava re: FW: Apple EIR -- late comments memo (Sept. 23, 2013 3:53:27 PM PDT) • LSA Associates Memorandum to City of Cupertino re: Apple Campus 2 Project Draft Environmental Impact Report (EIR) — Late Comments Received after the 45 -Day Comment Period (Sept. 18, 2013) (9 -18 -13 Late Comments Memo to City.pdf) 09/23/2013 Email from Dirk Mattern to Piu Ghosh re: Fwd: Fire Department 1 -182 sf- 3345921 Q ATTACHMENT I INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2 PROJECT 1 -183 sf- 3345921 Q DATE DOCUMENT Review of Apple Campus 2 (Sept. 23, 2013 9:29:24 AM PDT) 09/23/2013 Email from Andrew Chafer to Piu Ghosh re: Park Zoning (Sept. 23, 2013 3:09:41 PM PDT) • Exhibit A Legal Description For Rezoning (EXHIBIT A PARK ZONING.pdf) • Exhibit B Zoning Plat Map Pruneridge Ave at Ridgeview Court, Cupertino, CA (EXHIBIT B PARK ZONING.pdf) 09/23/2013 Email from Beth Ebben to Piu Ghosh, Grace Schmidt, Kirsten Squarcia RE: Agenda Manager (Sept. 23, 2013 10:49:44 AM PDT) 09/23/2013 Email from Aarti Shrivastava to Marjorie Estavillo RE: Apple Campus 2 (Sept. 23, 2013 2:02:07 PM PDT) 09/23/2013 Email from Piu Ghosh To: Beth Ebben; Aarti Shrivastava; Julia Kinst RE: County Filing of Availability of Final EIR? (Sept. 23, 2013 8:59:00 AM PDT) 09/23/2013 Email from Grant Schlereth to Chad Mosley, David Stillman RE: NB Wolfe Lane Shift Follow Up (Sept. 23, 2013 4:39:10 PM PDT) 09/23/2013 Email from Grace Schmidt to Piu Ghosh RE: October 1 agenda (Sept. 23, 2013 4:27:05 PM PDT) 09/23/2013 Email from Chad Mosley to Andrew Chafer, Piu Ghosh RE: Park Zoning (Sept. 23, 2013 3:43:03 PM PDT) • Exhibit Z -1, Legal Description For Rezoning (Redline) (MX -M 1100_20130923_175554.pdf) 09/23/2013 Email from Andrew Chafer to Chad Mosley RE: Park Zoning (Sept. 23, 2013 4:18:45 PM PDT) • Exhibit Z -1 Legal Description For Rezoning (EXHIBIT Z- I .pdf) • Exhibit Z -2, Zoning Plat Map Pruneridge Ave at Ridgeview Ct, Cupertino, CA (EXHIBIT Z- 2.pdf) 1 -183 sf- 3345921 Q ATTACHMENT I INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2 PROJECT 1 -184 sf- 3345921 Q DATE DOCUMENT 09/23/2013 Email from Grace Schmidt to Kevin Rieden RE: Posting notice of Pruneridge vacation (Sept. 23, 2013 5:28:58 PM PDT) 09/23/2013 Email from Piu Ghosh to Adam Weinstein RE: RTC Docs — ETA (Sept. 23, 2013 4:39:00 PM PDT) 09/23/2013 Email from Adam Weinstein to Julia Kinst, Nidhi Mathur RE: Why is Chapter II missing in the TOC of the RTC? (Sept. 23, 2013 3:38:30 PM PDT) • Table of Contents (Sept. 23, 2013) (00- Cover -TOC i.pdf) 09/23/2013 Email from Timm Borden to Piu Ghosh re: Revised VTM requirements update per Master COA (Sept. 23, 2013 11:42:06 AM PDT) • Vesting Tentative Map Conditions (VTM- Street Improvement Agreement Requirements 9 -23 clean.doc) 09/23/2013 Email from clerkgcupertino.org to Piu Ghosh re: Your agenda item "Joint City Council and Planning Commission Study Session regarding the Apple Campus 2 Final Environmental Impact Report" has been fully approved (Sept. 23, 2013 7:05:00 PM PDT) 09/23/2013 Email from Piu Ghosh to Chad Mosley re: Zoning PC Reso with Zoning Ordinance" (Sept. 23, 2013 3:31:10 PM PDT) • Attachment PC -4, Resolution No. 6729 of the Planning Commission of the city of Cupertino Recommending that the City Council Approve the Rezoning of an Approximately 1.1 Acre Area from Park and Recreation (PR) to Planned Industrial Park (P(MP)) Located at APN 316 06 050 and 316 06 051 (Z- 2011 -03 PC RES.docx) 09/24/2013 Email from Robert Kim To: David Brandt; Andrea Sanders; Donna Henriques; Ryan Roman; Kirsten Squarcia; Marianna Khienkina; Karen B. Guerin; Brittany Carey; Julia Kinst; Grace Schmidt; Liz Nunez; Chylene Osborne; Tiffanie Cardenas; Nidhi Mathur; Robert Kim; Mary Redwine; Lisa Atwood; Rei Delgado; Peter Coglianese; Rick Kitson; Piu Ghosh re: Apple Campus 2 Commenting Process activity report, Thursday, June 6 to Sunday, September 22, 2013 (Sept. 24, 2013 11:32:18 AM PDT) 1 -184 sf- 3345921 Q ATTACHMENT I INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2 PROJECT 1 -185 sf- 3345921 Q DATE DOCUMENT 09/24/2013 Email from Adam Weinstein to Piu Ghosh re: calls /meetings this week (Sept. 24, 2013 12:06:29 PM PDT) 09/24/2013 Email from Beth Ebben to: Adam Weinstein; Judith Malamut; Franziska Church; Jane Bierstedt; Ian Barnes; Gary Baum; "Ellen J. Garber "; Ramiza, Gerald J.; "Stock, Benjamin L. "; Edsell M Eady Jr; "Richard Berkson "; Rick Kitson re: electronic packet for the 10/2/2013 PC meeting (Sept. 24, 2013 8:14:31 PM PDT) 09/24/2013 Email from Dirk Mattern to Piu Ghosh re: Fwd: Fire Department Review of Apple Campus 2 (Sept. 24, 2013 9:44:58 AM PDT) • Apple Campus 2 conditions of approval (Apple Campus 2 conditions of approval.docx) 09/24/2013 Email from Piu Ghosh to Chad Mosley RE: COA's (Sept. 24, 2013 8:33:12 AM PDT) 09/24/2013 Email from Timm Borden to Piu Ghosh RE: Conditions of Approval - Final 9 -24 (Sept. 24, 2013 2:46:54 PM PDT) • Additional Master COA comments (Additional Master COA comments.docx) 09/24/2013 Email from Judith Malamut to Piu Ghosh RE: Late comments response memo (Sept. 24, 2013 9:39:41 AM PDT) • LSA Memorandum to City re: Apple Campus 2 Project Draft Environmental Impact Report (EIR) — Late Comments Received after the 45 -Day Comment Period (Sept. 20, 2013) ( 9 -20 -13 Late Comments Memo to City.doc; 9 -20 -13 Late Comments Memo to City.pdf) 09/24/2013 Email from Grace Schmidt to David Brandt RE: PC Staff RPT (Apple) (Sept. 24, 2013 8:20:53 AM PDT) 09/24/2013 Email from David Stillman to Grant Schlereth; Chad Mosley re: RE: RE: NB Wolfe Lane Shift Follow Up (Sept. 24, 2013 8:48:38 PM PDT) 09/24/2013 Email from David Stillman To: Grant Schlereth; Chad Mosley RE: RE: NB Wolfe Lane Shift Follow Up (Sept. 24, 2013 8:48:38 PM PDT) 1 -185 sf- 3345921 Q ATTACHMENT I INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2 PROJECT 1 -186 sf- 3345921 Q DATE DOCUMENT 09/24/2013 Email from Grant Schlereth to David Stillman, Chad Mosley RE: RE: NB Wolfe Lane Shift Follow Up (Sept. 24, 2013 6:38:03 PM PDT) • Caltrans, Highway Design Manual, Ch. 4 Ref (May 7, 2012) (Caltrans HDM Ch. 4 Re£pdf) 09/24/2013 Email from David Stillman to Grant Schlereth, Chad Mosley RE: RE: NB Wolfe Lane Shift Follow Up (Sept. 24, 2013 2:22:01 PM PDT) 09/24/2013 Email Robertson, Jesse G @DOT to David Stillman re: Apple Campus 2 FEIR (Sept. 24, 2013 9:57:15 AM PDT) 09/24/2013 Email from Chad Mosley to Grant Schlereth RE: Wolfe Road Irrigation (Sept. 24, 2013 8:25:34 AM PDT) 09/24/2013 Email from Grant Schlereth to Chad Mosley, David Stillman RE: RE: NB Wolfe Lane Shift Follow Up (Sept. 24, 2013 9:30:38 AM PDT) • Caltrans, Highway Design Manual 2012, pp. 400 -28, 400- 29 (May 7, 2012) (Caltrans HDM Ch. 4 Ref.pdf) 09/25/2013 Email from Piu Ghosh to Nidhi Mathur re: For the website (Sept. 25, 2013 10:07:00 AM PDT) • EPS Peer Review of KMA's Draft Report: Economic and Fiscal Impacts Generated by Apple in Cupertino (July 26, 2013) (131019mm_KMA peer review 2013- 07- 26.pdf) 09/25/2013 Email from Aarti Shrivastava to Piu Ghosh re: FW: Technical needs for Study Session (Sept. 25, 2013 3:47:36 PM PDT) 09/25/2013 Email from Piu Ghosh to: "Francisco Navarro "; Aarti Shrivastava; Chris Grimmer (cgrimmerggpple.com) RE: AC2 Parking Structure Mockup review notes (Sept. 25, 2013 9:27:00 AM PDT) 09/25/2013 Email from Chad Mosley to Piu Ghosh, Dan Whisenhunt RE: Intent to Vacate (Sept. 25, 2013 2:52:03 PM PDT) 09/25/2013 Email from Judith Malamut to: Aarti Shrivastava; Piu Ghosh; Adam Weinstein; Franziska Church; Timm Borden; Jane Bierstedt; Ian Barnes; David Stillman; Chad Mosley; Gary Baum; Ellen J. Garber; Ramiza, Gerald J.; Stock, Benjamin L.; Edsell M Eady Jr; David Woo; 1 -186 sf- 3345921 Q ATTACHMENT I INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2 PROJECT 1 -187 sf- 3345921 Q DATE DOCUMENT Richard Berkson; Julia Kinst; Rick Kitson; Nidhi Mathur; Peter Coglianese; Rei Delgado; Robert Kim; Beth Ebben; Marianna Khienkina; Karen B. Guerin; Grace Schmidt RE: PC packet loaded in Agenda Manager (PC -8 Plan Set, September 16, 2013 PDT) 09/25/2013 Email from Nidhi Mathur to Beth Ebben, Piu Ghosh RE: public notices & cover letters (Sept. 25, 2013 8:48:55 AM PDT) 09/25/2013 Email from Peter Coglianese To: Aarti Shrivastava; "Ian Barnes "; Franziska Church; Jane Bierstedt RE: Technical needs for Study Session (Sept. 25, 2013 3:53:12 PM PDT) 09/25/2013 Email from Aarti Shrivastava to Nidhi Mathur, Piu Ghosh RE: Website updates (Sept. 25, 2013 11:56:47 AM PDT) 09/25/2013 Email from Aarti Shrivastava to Gilbert Wong RE: Cupertino: Apple Camus 2 Project Update (Sept. 25, 2013 11:51:35 AM PDT) 09/25/2013 Email from David Brandt to Aarti Shrivastava re: Couple of thoughts (Sept. 15, 2013 9:54:17 AM PDT) 09/25/2013 Email from Amar Guptato City Council re: Apple Campus 2 (Sept. 24, 2013 5:17 PM PDT) (Letter ID e- 13 -09 -25 -002) 09/25/2013 Email from albert liu to City Council re Apple Campus 2 (Sept. 24, 2013 5:12 PM PDT) (Letter ID e- 13 -09 -25 -001) 09/26/2013 Email from Akshay Suggula to City Council re Apple Campus 2 (Sept. 25, 2013 9:48 PM PDT) (Letter ID e- 13 -09 -26 -003) 09/26/2013 Email from Antonio Ibanez to City Council re: apple office in Cupertino (Sept. 25, 2013 8:41 PM PDT) (Letter ID e- 13 -09 -26 -002) 09/26/2013 Email from annwoo(,comcast.net to City Council re Apple Campus 2 (Sept. 25, 2013 6:27 PM PDT) (Letter ID e- 13 -09 -26 -001) 09/26/2013 Email from Jessica Epstein to City Council re: Comment on Apple Campus 2 (Sept. 26, 2013 9:31 AM PDT) (Letter ID e- 13 -09 -26 -004) 09/26/2013 Email from Grant Schlereth to Steve Newgren, Kermit Cuff re: AC2 Wolfe Road Widening VTA bus shelter locations (Sept. 26, 2013 11:43:10 AM PDT) 1 -187 sf- 3345921 Q ATTACHMENT I INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2 PROJECT 1 -188 sf- 3345921 Q DATE DOCUMENT • VTA bus shelter layout Wolfe (VTA bus shelter layout Wolfe .pdf) 09/26/2013 Email from Mark Summers to Chad Mosley re: Campus - Wolfe & Pruneridge - Existing Lighting Information (Sept. 26, 2013 11:20:24 AM PDT) 09/26/2013 Email from Rick Kitson to: dwhisenhunt(c gpple.com re: Fwd: Apple bus in Birdland again (Sept. 26, 2013 10:51:21 AM PDT) • Apple bus 9 -24 -13 (Apple bus 9_24_13.jpeg) • Apple bus close up 9 -24 -13 (Apple bus close up 9_24_13.jpg) 09/26/2013 Email from Rick Kitson to Jennifer Garnett Re: Apple bus in Birdland again (Sept. 26, 2013 10:55:10 AM PDT) 09/26/2013 Email from David Stillman to Ian Cunningham RE: Package 1 - Traffic Control Plan (Sept. 26, 2013 1:06:51 PM PDT) 09/26/2013 Email from Aarti Shrivastava to Wolfgang Wagener Re: Tunnel Fire Apparatus Access (Sept. 26, 2013 9:42:46 PM PDT) 09/26/2013 Email from Wolfgang Wagener to Chad Mosley, Piu Ghosh re: Tunnel Fire Apparatus Access (Sept. 26, 2013 9:31:08 PM PDT) 09/26/2013 Email from Timm Borden to Chad Mosley re: Quitclaim deed (Sept. 26, 2013 5:01:49 PM PDT) 09/26/2013 Email from Piu Ghosh to Nidhi Matthur re: For the website (Sept. 25, 2013 10:02:00 AM PDT) • Keyser Martson Associates, Economics and Fiscal Impacts Generated by Apple in Cupertino — Current Facilities and Apple Campus 2 (May 2013) (Keyser Marston Report - Economic Impact of Apple in Cupertino May 2013.pdf) 09/26/2013 Email from Francisco Navarro to: Piu Ghosh; Aarti Shrivastava; Chris Grimmer (cgrimmer(c gpple.com) RE: AC2 Parking Structure Mockup review notes. (Sept. 25, 2013 8:00:40 AM PDT) 1 -188 sf- 3345921 Q ATTACHMENT I INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2 PROJECT 1 -189 sf- 3345921 Q DATE DOCUMENT • Moch up review 09 -17 -13 Minutes (Mock up review 09 -17- 13 Minutes.pdf) 09/26/2013 Agenda of the Special Meeting of the Environmental Review Committee 09/27/2013 Email from Andrew Park to City Council re: Formal support for Apple Campus 2 (Sept. 26, 2013 2:32 PM PDT) (Letter ID e- 13 -09 -27 -002) 09/27/2013 Email from Carol Wong to City Council re: support for Apple Campus 2 (Sept. 26, 2013 2:36 PM PDT) (Letter ID e- 13 -09 -27 -001) 09/27/2013 Email from Diana Loredo to City Council re: Apple campus 2. Yes we want it! (Sept. 26, 2013 4:40 PM PDT) (Letter ID e- 13 -09 -27 -007) 09/27/2013 Email from Chuck Worley to City Council re: Apple Campus 2 (Sept. 26, 2013 4:30 PM PDT) (Letter ID e- 13 -09 -27 -006) 09/27/2013 Email from Betsy Eskeldson to City Council re: Apple Building (Sept. 26, 2013 4:20 PM PDT) (Letter ID e- 13 -09 -27 -005) 09/27/2013 Email from Alex Pashintsev to City Council re: Fwd: Apple Campus 2 (Sept. 25, 2013 3:51 PM PDT) (Letter ID e- 13 -09 -27 -004) 09/27/2013 Email from ingbudge(,aol.com to City Council re: support to Apple campus (Sept. 26, 2013 3:17 PM PDT) (Letter ID e- 13 -09 -27 -003) 09/27/2013 Email from Jessica Epstein to City Council re: Comment on Apple Campus 2 (Sept. 26, 2013 9:31 AM PDT) (Letter ID _e- 2013- 09 -27- 008) 09/27/2013 Comment letter from Robert Neff (Letter ID 500174) 09/27/2013 Comment letter from paulette Altmaier (Letter ID 500175) 09/27/2013 Comment letter from Susan Dole (Letter ID 500176) 09/27/2013 Email from Dan Whisenhunt to: City Council; book.sun @gmail.com; pauldbrophy @yahoo.com; margiegong @icloud.com; alantcLipg mail.com; Aarti Shrivastava; David Brandt; Piu Ghosh re: Apple Campus 2 (Sept. 27, 2013 6:01:54 PM PDT) 1 -189 sf- 3345921 Q ATTACHMENT I INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2 PROJECT 1 -190 sf- 3345921 Q DATE DOCUMENT • Apple Campus 2 PC CC pkg (Apple Campus 2 PC CC pkg- 1 .pdf) 09/27/2013 Email from Peter Coglianese To: Rick Kitson; Grace Schmidt; Julia Kinst; Aarti Shrivastava; Thomas Walters; Jason Bisely; Ron Bullock; Piu Ghosh; Timm Borden re: Oct. 1 Apple Campus 2 Study Session: Room Layout Revision 93D (Sept. 27, 2013 5:06:43 PM PDT) • Apple 2 Community Meeting 10 -1 -13 Rev3D (Apple 2 Community Meeting 10 -1 -13 Rev3D.pdf) 09/27/2013 Email from Ian Cunningham to Chad Mosley re: PKG 1 — Submittals (Sept. 27, 2013 9:43:24 AM PDT) 09/27/2013 Email from Eleanor Dwyer to Chad Mosley re: Storm Water Management Plan - 1858 - File Transfer (Sept. 27, 2013 10:32:50 AM PDT) • Transmittal — 02742 (Transmittal - 02742.pdf) • Foster + Partners, Apple Campus 2, Storm Water Management Plan SWMP Draft 1 I September 23, 2013 09/27/2013 Email from Adam Weinstein to Piu Ghosh RE: Apple EIR -- scope/budget augment (Sept. 27, 2013 12:08:39 PM PDT) 09/27/2013 Email from Darrel Lum to: Orrin Mahoney; Gilbert Wong; Barry Chang; Mark Santoro; Rod Sinks re: September 17th Oral Communications: Thank You (Sept. 17, 2013 8:39:23 PM PDT) 09/29/2013 Email from Gilbert Wong to: Gilbert Wong; David Brandt; Carol Korade; Aarti Shrivastava; Gary Chao; Piu Ghosh; Timm Borden; Rick Kitson; Carol Atwood re: Fwd: Proposed Apple Campus (Sept. 29, 2013 9:52:10 PM PDT) 09/29/2013 Comment letter (Letter ID 500177) 09/30/2013 Email from Ari Katz to City Council re: My Support for Apple Campus 2 (Sept. 29, 2013 3:58 PM PDT) (Letter ID e- 13 -09 -30 -010.) 09/30/2013 Email from Lyn Faust to Lyn Faust re: Poposed Apple Campus (Sept. 29, 2013 11:18 AM PDT) (Letter ID e- 13 -09 -30 -009) 1 -190 sf- 3345921 Q ATTACHMENT I INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2 PROJECT 1 -191 sf- 3345921 Q DATE DOCUMENT 09/30/2013 Email from Robert Kim to: David Brandt; Andrea Sanders; Donna Henriques; Ryan Roman; Kirsten Squarcia; Marianna Khienkina; Karen B. Guerin; Brittany Carey; Julia Kinst; Grace Schmidt; Liz Nunez; Chylene Osborne; Tiffanie Cardenas; Nidhi Mathur; Robert Kim; Mary Redwine; Lisa Atwood; Rei Delgado; Peter Coglianese; Rick Kitson; Piu Ghosh re: Apple Campus 2 Commenting Process activity report, Thursday, June 6 to Sunday, September 29, 2013 (Sept. 30, 2013 9:40:17 AM PDT) 09/30/2013 Email from Timm Borden to Chad Mosley re: apple construction management trees (Sept. 30, 2013 2:01:06 PM PDT) 09/30/2013 Email from Piu Ghosh to Aarti Shrivastava re: Apple Presentation (Sept. 30, 2013 3:41:00 AM PDT) 09/30/2013 Email from Darrel Lum to: Orrin Mahoney; Gilbert Wong; Barry Chang; Mark Santoro; Rod Sinks; Don Sun; Paul Brophy; Winnie Lee; City Council; City of Cupertino Planning Dept. Planning Commission/City Council Study Session on Apple Campus 2 (Sept. 30, 2013 11:45:26 PM PDT) • Section 3.5 Tax Consulting Agreement ( Sales Tax Agreement @PC -CC 2013.pdf) • Fiscal Impact Analysis (Fiscal Impact Analysis PC- CC.pdf) • Mitigation: Traffic (Mitigation - Traffic @PC -CC 2013.pdf) • Mitigation: Housing (Mitigation- Housing PC- CC.pdf) • Community Benefits As condition of approval to project (Community Benefits -As Condition of Approval PC- CC.pdf) • Community Benefits Provided by Other Companies NOT as a condition of approval to any project (Community Benefits -Not As Condition of Approval @PC -CC 2013.pdf) 09/30/2013 Email from Darrel Lum to: Orrin Mahoney; Gilbert Wong; Barry Chang; Mark Santoro; Rod Sinks; Don Sun; Paul Brophy; Winnie Lee; City Council; City of Cupertino Planning Dept. re: Planning Commission /City Council Study Session on Apple Campus 2 (Sept. 1 -191 sf- 3345921 Q ATTACHMENT I INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2 PROJECT 1 -192 sf- 3345921 Q DATE DOCUMENT 30, 2013 11:42:06 PM PDT) • Section 3.5 Tax Consulting Agreement (Sales Tax Agreement @PC -CC 2013.pdf) • Fiscal Impact Analysis (Fiscal Impact Analysis PC- CC.pdf) • Mitigation: Traffic (Mitigation - Traffic @PC -CC 2013.pdf) • Mitigation: Housing (Mitigation- Housing PC- CC.pdf) • Community Benefits As condition of approval to project (Community Benefits -As Condition of Approval PC- CC.pdf) • Community Benefits Provided by Other Companies NOT as a condition of approval to any project (Community Benefits -Not As Condition of Approval @PC -CC 2013.pdf) 09/30/2013 Email from Piu Ghosh to David Stillman RE: Apple 2 project and Bike lanes on Tantau (Sept. 30, 2013 12:22:36 PM PDT) 09/30/2013 Email from Piu Ghosh to David Stillman RE: Apple 2 project and Bike lanes on Tantau (Sept. 30, 2013 12:22:00 PM PDT) 09/30/2013 Email from Chad Mosley to Timm Borden RE: apple construction management trees (Sept. 30, 2013 3:11:02 PM PDT) 09/30/2013 Email from Piu Ghosh to Grace Schmidt RE: Apple consultants who will speak at Oct 1 meeting (Sept. 30, 2013 11:04:00 AM PDT) 09/30/2013 Email from Nidhi Mathur to Beth Ebben RE: apple's latest brochure (Sept. 30, 2013 2:52:27 PM PDT) 09/30/2013 Email from Piu Ghosh to Adam Weinstein, Aarti Shrivastava RE: PC Hearing (Sept. 30, 2013 6:41:27 PM PDT) 09/30/2013 Email from Grace Schmidt to Nidhi Mathur, Beth Ebben, Piu Ghosh RE: Staff Report Links 09/30/2013 Email from Nidhi Mathur to Piu Ghosh, Beth Ebben, Grace Schmidt RE: Staff Report Links (Sept. 30, 2013 11:13:28 AM PDT) 1 -192 sf- 3345921 Q ATTACHMENT I INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2 PROJECT 1 -193 sf- 3345921 Q DATE DOCUMENT • Plan Set 9 -16 -2013 (PS 9- 16- 2013.docx) 09/30/2013 Email from David Stillman to Timm Borden RE: wolfe stuff (Sept. 30, 2013 3:39:16 PM PDT) 09/30/2013 Email from Timm Borden to David Stillman Re: wolfe stuff (Sept. 30, 2013 2:47:09 PM PDT) 09/30/2013 Email from David Stillman to Timm Borden RE: wolfe stuff (Sept. 30, 2013 3:04:40 PM PDT) 09/30/2013 Email from Nidhi Mathur to Beth Ebben, Grace Schmdit, Piu Ghosh re: Staff Report Links (Sept. 30, 2013 10:57:00 AM PDT) • SS -1 — SS -2 (SSI- SS2.docx) 09/30/2013 Email from Barbara Chang to City Council re: I support Apple Campus 2 (Sept. 28, 2013 7:44 AM PDT) (Letter ID e- 13 -09 -30 -008) 09/30/2013 Email from Balakrishnan Thyagarajan to City Council re: Support of Apple Campus 2 (Sept. 27, 2013 10:28 PM PDT) (Letter ID e- 13 -09- 30 -007) 09/30/2013 Email from Bill Liu to City Council re: Apple Campus II (Sept. 27, 2013 2:04 PM PDT) (Letter ID e- 13 -09 -30 -006) 09/30/2013 Email from Balaram Nair to City Council re: Support for Apple Campus 2 (Sept. 27, 2013 12:35 PM PDT) (Letter ID e- 13 -09 -30 -005) 09/30/2013 Email from Debbie Bergantz to City Council re: Apple 2 (Sept. 27, 2013 11:13 AM PDT) (Letter ID e- 13 -09 -30 -004) 09/30/2013 Email from David Eberhardt to City Council re: Apple Campus (Sept. 27, 2013 9:23 AM PDT) (Letter ID e- 13 -09 -30 -003. PDT) 09/30/2013 Email from Carlos McEvilly to City Council re: Apple Campus (Sept. 27, 2013 9:00 AM PDT) (Letter ID e- 13 -09 -30 -002) 09/30/2013 Email from David Kopels to City Council re: Apple Campus 2 (Sept. 27, 2013 3:17 AM PDT) (Letter ID e- 13 -09 -30 -001) 09/30/2013 Email from Sam Ashknaz to City Council re: Campus 2 (Sept. 30, 2013 1 -193 sf- 3345921 Q ATTACHMENT I INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2 PROJECT 1 -194 sf- 3345921 Q DATE DOCUMENT 12:59 PM PDT) (Letter ID e- 13 -09 -30 -012) 09/30/2013 Email from Donna Austin to City Council re: Apple Campus 2 (Sept. 30, 2013 12:20 PM PDT) (Letter ID e- 13 -09 -30 -011) 09/30/2013 Email from Robert Neff to David Stillman re: Fwd: Apple 2 project and Bike lanes on Tantau (Sept. 27, 2013 10:50 AM PDT) (Letter ID e- 13-09-30 -014) 09/30/2013 Email from Doug Warmke to City Council re: I Like Apple Campus 2 (Sept. 30, 2013 2:07 PM PDT) (Letter ID e- 13 -09 -30 -013) 09/30/2013 Email from brian ong to Orrin Mahoney re: Apple and The City of Cupertino (Sept. 30, 2013 12:05 PM PDT) (Letter ID e- 13 -09 -30 -016) 09/30/2013 Email from George Crosby to City Council re: Apple campus (Sept. 30, 2013 2:18 PM PDT) (Letter ID e- 13 -09 -30 -015) 09/30/2013 Email from Darci Hodder to City Council re: Apple (Sept. 30, 2013 4:46 PM PDT) (Letter ID e- 13 -09 -30 -021) 09/30/2013 Email from Liling Wang to City Council (Sept. 30, 2013 4:23 PM PDT) (Letter ID e- 13 -09 -30 -020) 09/30/2013 Email from Grace Nadolny to City Council re: Apple 2 campus support (Sept. 30, 2013 4:18 PM PDT) (Letter ID e- 13 -09 -30 -019) 09/30/2013 Email from John Zirelli to City Council re: Apple Campus 2 Support (Sept. 30, 2013 3:24 PM PDT) (Letter ID e- 13 -09 -30 -018) 09/30/2013 Email from Edward Hirshfield to City Council re: Apple Campus 2 (Sept. 30, 2013 3:45 PM PDT) (Letter ID e- 13 -09 -30 -017) 10/01/2013 Email from Jason Tsai to City Council re: Apple Campus 2 (Oct. 01, 2013 10:19 AM PDT) (Letter ID e- 13 -10 -01 -021) 10/01/2013 Email from Chrstie Lafrance to City Council re: support for Apple Campus 2 (Oct. 1, 2013 10:24 AM PDT) (Letter ID e- 13 -10 -01 -020) 10/01/2013 Email from Willow Hopkins to City Council re: Apple Campus 2 (Oct. 1, 2013 10:27 AM PDT) (Letter ID e- 13 -10 -01 -019) 10/01/2013 Email from Lana to City Council re: Apple complex (Oct. 1, 2013 1 -194 sf- 3345921 Q ATTACHMENT I INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2 PROJECT 1 -195 sf- 3345921 Q DATE DOCUMENT 10:41 AM PDT) (Letter ID e- 13 -10 -01 -018) 10/01/2013 Email from Judy Gaffney to City Council re: Apple (Oct. 1, 2013 10:17 AM PDT) (Letter ID e- 13 -10 -01 -017) 10/01/2013 Email from Uparkar Bhushan to City Council re: Support for apple campus (Oct. 01, 2013 10:14 AM PDT) (Letter ID e- 13 -10 -01 -016) 10/01/2013 Email from Char Marshall to City Council (Oct. 1, 2013 10:09 AM PDT) (Letter ID e- 13 -10 -01 -015 PDT) 10/01/2013 Email from sfarella @aol.com to City Council re: Apple 2 (Oct. 01, 2013 9:53 AM PDT) (Letter ID e- 13 -10 -01 -014) 10/01/2013 Email from Nancy Gabriel to City Council re: I support the Apple Campus II (Oct. 1, 2013 9:41 AM PDT) (Letter ID e- 13 -10 -01 -013) 10/01/2013 Email from Jun Nishimura to City Council re: Supporting Apple in Cupertino (Oct. 1, 2013 9:40 AM PDT) (Letter ID e- 13 -10 -01 -012) 10/01/2013 Email from Arushi to City Council re: Apple campus (Oct. 1, 2013 9:43 AM PDT) (Letter ID e- 13 -10 -01 -011) 10/01/2013 Email from Brad Meyer to City Council re: Apple 2 Campus Support (Oct. 1, 2013 9:28 AM PDT) (Letter ID e- 13 -10 -01 -010) 10/01/2013 Email from Darrel Lum to Orrin Mahoney; Gilbert Wong; Barry Chang; Mark Santoro; Rod Sinks; Don Sun; Paul Brophy; Winnie Lee; City Council; City of Cupertino Planning Dept. re: Planning Commission/City Council Study Session on Apple Campus 2 (Sept. 30, 2013 11:42 PM PDT) (Letter ID e- 13 -10 -01 -009) 10/01/2013 Email from CJRE to City Council re: Apple's new building (Oct. 01, 2013 9:24 AM PDT) (Letter IDe- 13 -10 -01 -008) 10/01/2013 Email from Fan, Ching to City Council re:I support the apple campus and we should expedite the process to make it happen - from the Cupertino resident. (Oct. 01, 2013 9:22 AM PDT) 10/01/2013 Email from Nancy Neibel to City Council re: Apple Campus 2 (Oct. 01, 2013 9:17 AM PDT) (Letter ID e- 13 -10 -01 -006) 10/01/2013 Email from Shankar T to City Council re: Support for Apple Campus 2 1 -195 sf- 3345921 Q ATTACHMENT I INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2 PROJECT 1 -196 sf- 3345921 Q DATE DOCUMENT (Oct. 01, 2013 9:15 AM PDT) (Letter ID e- 13 -10 -01 -005) 10/01/2013 Email from Gopakumar Pillai to City Council re: Support for Apple Campus 2 (Sept. 30, 2013 5:13 PM PDT) (Letter ID e- 13 -10 -01 -004) 10/01/2013 Email from henry zoellner to City Council re: Support....... yes (Sept. 30, 2013 7:29 PM PDT) (Letter ID e- 13 -10 -01 -003) 10/01/2013 Email from: GuntlyDuffyFamily @comcast.net to City Council re: Apple Campus Support (Sept. 30, 2013 9:53 PM PDT) (Letter ID e -13- 10 -01 -002) 10/01/2013 Email from Dolf Payer to City Council re: Apple 2 Campus (Oct. 01, 2013 5:42 AM PDT) (Letter ID e- 13 -10 -01 -001) 10/01/2013 Email from Rich Altmaier to City Council re: Supporting the new Apple Campus (Oct. 01, 2013 1:58 PM PDT) (Letter ID e- 13- 10 -01- 027) 10/01/2013 Email from John & Helen Trollman to City Council re: Apple Campus (Oct. 01, 2013 2:27 PM PDT) (Letter ID e- 13 -10 -01 -026) 10/01/2013 Email from Mary Spagnol to City Council re: Apple 2 Campus (Oct. 01, 2013 2:48 PM PDT) (Letter ID e- 13- 10- 01 -02) 10/01/2013 Email from Lever Wang to City Council re: Support of Apple campus 2 (Oct. 1, 2013 3:48 PM PDT) (Letter ID e- 13 -10 -01 -024) 10/01/2013 Email from Naeem Zafar to City Council re: support for Apple Campus project (Oct. 01, 2013 11:49 AM PDT) (Letter ID e- 13 -10 -01 -023) 10/01/2013 Email from David Li to City Council (Oct. 1, 2013 12:08 PM PDT) (Letter ID e- 13 -10 -01 -022) 10/01/2013 Comment letter from Moustafa Moustafa (Letter ID 500178) 10/01/2013 Email from Roy Molseed to Aarti Shrivastava re: Apple Campus 2 Final EIR (Oct. 01, 2013 4:02:59 PM PDT) • Letter from Santa Clara Valley Transportation Authority to City of Cupertino re: Final EIR for Apple Campus 2 (Oct. 1, 2013) (CU1102_apple2_FEIR.pdf) 1 -196 sf- 3345921 Q ATTACHMENT I INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2 PROJECT 1 -197 sf- 3345921 Q DATE DOCUMENT 10/01/2013 Email from David Brandt to Mike Foulkes re: Fwd: Planning Commission/City Council Study Session on Apple Campus 2 (Oct. 01, 2013 9:52:28 AM PDT) • Section 3.5 Tax Consulting Agreement (Sales Tax Agreement @PC -CC 2013.pdf) • Fiscal Impact Analysis (Fiscal Impact Analysis PC- CC.pdf) • Excerpted from Concerned Citizens of Cupertino Response to the Draft Environmental Impact Report for Apple Campus 2: Mitigation: Traffic (Mitigation - Traffic @PC -CC 2013.pdf) • Mitigation: Housing (Mitigation- Housing PC- CC.pdf) • Community Benefits As condition of approval to project (Community Benefits -As Condition of Approval PC- CC.pdf) • Updated Excerpt from Concerned Citizens of Cupertino Response to the Draft Environmental Impact Report for Apple Campus 2: Community Benefits Provided by Other Companies NOT as a condition of approval to any project (Community Benefits -Not As Condition of Approval @PC - CC 2013.pdf) 10/01/2013 Email from Rick Kitson to Aarti Shrivastava; Piu Ghosh; Timm Borden; Chad Mosley; David Stillman; Ryan Roman; Julia Kinst; Karen B. Guerin; David Brandt; 'Gary Baum'; 'Diana Fazely' re: Wednesday Apple email collection (Oct. 01, 2013 9:20 AM PDT) 10/01/2013 Email from Grant Schlereth to David Stillman, Chad Mosley re: NB Wolfe Widening Options (Oct. 01, 2013 12:06:23 PM PDT) • N. Wolfe Road Utilities General Arrangement Sheet, No. C- P1A -UT -102, Revision 2 (Sept. 3, 2013) (NB Wolfe Widening Options REVl.pdf) • Caltrans, Highway Design Manual, p. 200 -11 (July 24, 2009) (Pages from chp0200.pdf)) 1 -197 sf- 3345921 Q ATTACHMENT I INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2 PROJECT 1 -198 sf- 3345921 Q DATE DOCUMENT 10/01/2013 Agenda Packet for the Joint City Council and Planning Commission Study Session regarding the Apple Campus 2 Final Environmental Impact Report, October 1, 2013 10/02/2013 Email from Roy Molseed to Aarti Shrivastava re: Apple Campus 2 Final EIR (Oct. 01, 2013 4:03 PM PDT) (Letter ID e- 13- 10- 02 -004a) 10/02/2013 Email from Cynthia Smyth to City Council re: Apple 2 support (Oct. 2, 2013 10:04 AM PDT) (Letter ID e- 13 -10 -02 -003) 10/02/2013 Email from Lidia Blair to City Council re: Lidia Blair Business owner and a proud neighbor (Oct. 02, 2013 10:22 AM PDT) (Letter ID e -13- 10-02 -002) 10/02/2013 Email from Ben Hsu to City Council re: Apple Campus 2 (Oct. 02, 2013 12:09 AM PDT) (Letter ID e- 13 -10 -02 -001) 10/02/2013 Email from Bill Cooper to City Council re: Apple 2 Support (Oct. 02, 2013 2:15 PM PDT) (Letter ID e- 13 -10 -02 -009) 10/02/2013 Email from Sissy Wood to winnieleedds @yahoo.com; Aarti Shrivastava; davekgcuperrino.org re: Comments for Agenda Item No. 8 -- Public Hearing Apple Campus 2 Development (Oct. 02, 2013 12:31 PM PDT) (Letter ID e- 13- 10- 02 -008a) 10/02/2013 Email from Grace Abercrombie to City Council re: Support for Apple Campus 2 (Oct. 02, 2013 1:18 PM PDT) (Letter ID e- 13 -10 -02 -007) 10/02/2013 Email from David Richards to City Council re: New Apple Campus (Oct. 02, 2013 11:03 AM PDT) (Letter ID e- 13 -10 -02 -006) 10/02/2013 Email from David Nilsson to City Council re: Support for Apple Campus 2 (Oct. 02, 2013 11:07 AM PDT) (Letter ID e- 13 -10 -02 -005) 10/02/2013 Email from Bruce Capron to City Council re: New Apple Facility (Oct. 02, 2013 3:45 PM PDT) (Letter ID e- 13 -10 -02 -010.) 10/02/2013 Agenda Packet for the Special Planning Commission Meeting, October 2, 2013 10/02/2013 Email from Chad Mosley to Timm Borden; "Grant Schlereth (grant.schlereth arup.com) "; Rob Westover; Tom Bishop; Chad 1 -198 sf- 3345921 Q ATTACHMENT I INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2 PROJECT 1 -199 sf- 3345921 Q DATE DOCUMENT Mosley re: FW: AC2 Grading Permit Package 10/02/2013 Email from Sissy Wood to Cupertino City Manager's Office re: Comments for Agenda Item No. 8 -- Public Hearing Apple Campus 2 Development (Oct. 02, 2013 12:42:52 PM PDT) • Letter from Gideon Kracov to Planning Commission, City of Cupertino re: Comments For Agenda Item No. 8 — Public Hearing Apple Campus 2 Development [Final Environmental Impact Report & Application No(s): ASA- 2011-14, DA- 2011 -01, DP 2011 -04, GPA- 2011 -03, TM- 2011-03, TR- 2011 -39, U- 2011 -11, Z- 2011 -03 (EA -2011- 12)] (Oct. 2, 2013) (USWW CommentLetter Apple PlanningCommission 2.pdf) 10/02/2013 Email from Chad Mosley to Timm Borden re: FW: Contact information for 4LEAF, Inc. (re: potential PW inspector for Apple project) (October 02, 2013 1:15:22 PM PDT) • Burlingame, City of, 4LEAF Project Descriptions (4LEAF Project Descriptions.pdf) 10/02/2013 Email from Grace Schmidt to Chad Mosley re: List of utilities noticed regarding Pruneridge vacation (Oct. 02, 2013 3:15:25 PM PDT) • Contacts for Utility Companies (Utility Companies to Contact for Vacations.xlsx) 10/02/2013 Email from Piu Ghosh to Grace Schmidt, Kirsten Squarcia re: LSA - 10 -1 -13 Study Session Slides.ppt (Oct. 02, 2013 11:35:00 AM PDT) • LSA Associates, Inc., Study Session Apple Campus 2 Project Final EIR (Oct. 1, 2013) ( LSA - 10 -1 -13 Study Session Slides.ppt) 10/02/2013 Email from Chad Mosley to Aarti Shrivastava, Piu Ghosh re: Outside Agency Exhibits (Oct. 02, 2013 4:53:15 PM PDT) • Sandis, AC2 OFFSITE Mitigations, Mitigation P - Lawerance at Stevens Creek (Oct. 7, 2013) ( AC2 Offsite Mitigations P- N -N1 -Q Cost Estimates.pdf 1 -199 sf- 3345921 Q ATTACHMENT I INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2 PROJECT 1 -200 sf- 3345921 Q DATE DOCUMENT • Sandis, AC2 OFFSITE Mitigations, Mitigation N1 - Stevens Creek at Calvert — Alternative (Sept. 11, 2013) (Estimate N1 - SC free Rturn.pdf) • Sandis, AC2 OFFSITE Mitigations, Mitigation Q1 - Lawerance at Calvert and I -280 on -ramp (Sept. 11, 2013) (Estimate Q1 - Calvert + 280 onramp.pdf) 10/02/2013 Email from Kirsten Squarcia to "book.sun @gmail.com "; "pauldbrophy@ yahoo. com "; "margiegong @sbcglobal.net "; "winnieleedds @yahoo.com "; "at- kt @sbcglobal.net "; alan.takahashic�r�,cobham.com re: Planning Commission: additional comments Sept 20 — 3 pm Oct 2 (Oct. 02, 2013 3:52:42 PM PDT) 10/02/2013 Email from Piu Ghosh to Jane Bierstedt RE: Apple Study Session -- LSA Slides (Oct. 02, 2013 3:30:00 PM PDT) 10/02/2013 Email from Chad Mosley to Mark Summers RE: Campus - Wolfe & Pruneridge - Existing Lighting Information (Oct. 02, 2013 12:00:07 PM PDT) 10/02/2013 Email from Nidhi Mathur to Piu Ghosh re: RE: Comments from Website 9/20 - 10 /1 (Oct. 02, 2013 3:01:07 PM PDT) 10/02/2013 Email from Piu Ghosh to Grace Schmidt, Aarti Shrivastava, Gary Baum re: Consultant PowerPoint presentations (Oct. 02, 2013 11:32:00 AM PDT) 10/02/2013 Email from Grace Schmidt to MN, Mercury News RE: Cupertino legal ads heads -up (Oct. 02, 2013 10:10:58 AM PDT) 10/02/2013 Email from Grace Schmidt to Ryan Roman, Chad Mosley RE: List of utilities noticed regarding Pruneridge vacation (Oct. 02, 2013 4:14:04 PM PDT) 10/02/2013 Email from Aarti Shrivastava to Grace Schmidt, David Brandt RE: Packet for Oct 15 (Oct. 02, 2013 10:10:39 AM PDT) 10/02/2013 Email from Adam Weinstein to Piu Ghosh Re: Presentation (Oct. 02, 2013 3:05:07 PM PDT) 10/02/2013 Email from Aarti Shrivastava to Peter Coglianese; Rick Kitson; Grace 1 -200 sf- 3345921 Q ATTACHMENT I INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2 PROJECT 1 -201 sf- 3345921 Q DATE DOCUMENT Schmidt; Gary Baum RE: Voting/Timer System Update (Oct. 02, 2013 10:12:52 AM PDT) 10/02/2013 Email from David Stillman to Grant Schlereth RE: Wolfe Road (Oct. 02, 2013 9:54:10 AM PDT) 10/03/2013 Email from Edith Sandoval to Piu Ghosh re: AC2- PC/ CC Package (Oct. 03, 2013 9:42:55 AM PDT) 10/03/2013 Email from Beth Ebben to Piu Ghosh, Aarti Shrivastava re: desk items from last night (Oct. 03, 2013 10:56:09 AM PDT) 10/03/2013 Email from Piu Ghosh to Nidhi Mathur; David Stillman; Aarti Shrivastava; Gary Baum; Timm Borden; Chad Mosley; Ellen J. Garber (Garber @smwlaw.com); Adam Weinstein; Judith Malamut Oudith.malamut @lsa- assoc.com); Jane Bierstedt; Franziska Church re: FW: Apple Campus 2 (Oct. 03, 2013 5:54:00 PM PDT) 10/03/2013 Email from Piu Ghosh to: Nidhi Mathur; David Stillman; Aarti Shrivastava; Gary Baum; Timm Borden; Chad Mosley; Ellen J. Garber (Garber @smwlaw.com); Adam Weinstein; Judith Malamut Oudith.malamut @lsa- assoc.com); Jane Bierstedt; Franziska Church re FW: Apple Campus 2 (Oct. 03, 2013 5:54:00 PM PDT) 10/03/2013 Email from Piu Ghosh to Nidhi Mathur; Aarti Shrivastava; Timm Borden; Gary Baum; Ellen J. Garber (Garber @smwlaw.com); David Stillman; Chad Mosley; Adam Weinstein; Judith Malamut Oudith.malamut @lsa- assoc.com); Jane Bierstedt; Franziska Church re: FW: Bike lane plans for Tantau in Apple 2 documents (Oct. 03, 2013 5:56:12 PM PDT) 10/03/2013 Email from Nidhi Mathur to diana.fazely @gmail.com; Piu Ghosh; Rick Kitson re: off next week (Oct. 03, 2013 12:12:46 PM PDT) 10/03/2013 Email from Grace Schmidt to Mercury News (legalskmercMnews.com) re: Public Hearing Apple Campus 2 - Oct 15 (to be published 10/5) (Oct. 03, 2013 9:40:16 AM PDT) • City of Cupertino Notice of Public Hearing Apple Campus 2, Oct. 15, 2013 (Public Hearing Apple Campus 2 - Oct 15.docx PDT) 1 -201 sf- 3345921 Q ATTACHMENT I INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2 PROJECT 1 -202 sf- 3345921 Q DATE DOCUMENT 10/03/2013 Email from Aarti Shrivastava to "Adam Weinstein "; Gary Chao; Piu Ghosh; David Stillman; jfowler @apple.com; Peter Sokoloff, dgold @mofo.com; mimwalle @mofo.com; Judith Malamut; Franziska Church; Jane Bierstedt; Rick Kitson; Gary Baum; Eric Morley; Foulkes @apple.com; Scott D. Pinsky; Chad Mosley; Timm Borden; JJeffers(c rofo.com; dwhisenhunt @apple.com; diana.fazely @gmail.com; David Brandt; wwa eg nerc�r�,fosterandpartners.com; soki @fosterandpartners.com; william.baumgardner @arup.com; Michael.iswalt(cr�gm.com; lynnjohnson @apple.com; Garber @smwlaw.com; JRamizagbwslaw.com RE: Apple EIR -- Team Meeting 9/12 (Oct. 03, 2013 12:32:32 PM PDT) 10/03/2013 Email from Grace Schmidt to Piu Ghosh, Aarti Shrivastava RE: Oct 15 legal ad and notices DONE (Oct. 03, 2013 5:57:09 PM PDT) 10/04/2013 Email from carbone.cupertinokgmail.com to City Council re: Apple Campus 2 (Oct. 03, 2013 4:57 PM PDT) (Letter ID e- 13 -10 -04 -002) 10/03/2013 Email from Kevin Eggleston to City Council re Apple Campus 2 (Oct. 02, 2013 5:16 PM PDT) (Letter ID e- 13 -10 -03 -001) 10/03/2013 Email from Bryan Ruli to City Council re: Apple Campus 2 (Oct. 3, 2013 4:55 AM PDT) (Letter ID e- 13 -10 -03 -002) 10/03/2013 Email from Charles Liggett to City Council re: Apple Campus 2 (Oct. 2, 2013 6:33 PM PDT) (Letter ID e- 13 -10 -03 -003) 10/03/2013 Email from Dan Karraker to City Council re: Apple campus — a ringing endorsement (Oct. 02, 2013 5:45 PM PDT) (Letter ID e- 13 -10 -03 -004) 10/03/2013 Email from Beth Ebben to Piu Ghosh, Aarti Shrivastava re: speaker cards (Oct. 03, 2013 12:18:21 PM PDT) 10/04/2013 Email from fukumal489c�r�,comcast.net to City Council re: Apple Campus 2 (Oct. 4, 2013 9:13 AM PDT) (Letter ID e- 13 -10 -04 -004) 10/04/2013 Email from g7m5gririgg(cjuno.com to re: Apple Campus 2 (Oct. 3, 2013 2:34 PM PDT) (Letter ID e- 13 -10 -04 -003) 10/04/2013 Email from carbone.cupertino @ gmail.com to City Council re: Apple Campus 2 (Letter ID e- 13 -10 -04 -002) 1 -202 sf- 3345921 Q ATTACHMENT I INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2 PROJECT 1 -203 sf- 3345921 Q DATE DOCUMENT 10/04/2013 Email from Debbie Richmond to City Council re: Apple 2 Campus (Oct. 3, 2013 8:40 PM PDT) (Letter ID e- 13 -10 -04 -001) 10/04/2013 Email from Robert Stern to City Council re: Support for Apple Campus 2 (Oct. 4, 2013 11:19 AM PDT) (Letter ID e- 13 -10 -04 -006) 10/04/2013 Email from Alp to City Council re: Complete Support of Apple Campus 2 (Oct. 4, 2013 11:19 AM PDT) (Letter ID e- 13 -10 -04 -005) 10/04/2013 Email from Robert Neff to City of Cupertino Planning Department re: Bike lane plans for Tantau in Apple 2 documents (Letter ID e- 13 -10- 04 -008) 10/04/2013 Email from Eleanor Selfridge -Field to City of Cupertino Planning Department re: Apple Campus 2 (Oct. 2, 2013 10:45 PM PDT) (Letter ID e- 13 -10 -04 -007 10/04/2013 Email from Jesse G Robertson @DOT to Timm Borden, David Stillman re: Apple Campus 2 FEIR letter (SCH 92011082055) (Letter ID x -13- 10- 04 -01) 10/04/2013 Email from Roy Molseed to Aarti Shrivastava re: Apple Campus 2 Final EIR • Letter from Santa Clara Valley Transportation Authority to City of Cupertino (Oct. 1, 2013) (Letter ID s- 13- 10- 04 -02) 10/04/2013 Email from Ellen Kolstee to City Council re: Support for the Apple 2 Campus (Oct. 4, 2013 11:55 AM PDT) (Letter ID e- 13 -10 -04 -010) 10/04/2013 Email from ro erg carlc�r�,att.net to City Council re: Yes on Apple (Oct. 4, 2013 12:00 PM PDT) (Letter ID e- 13 -10 -04 -009) 10/04/2013 Email from Ronald Moore to City Council re: apple campus 2 (Oct. 4, 2013 2:41 PM PDT) (Letter ID e- 13 -10 -04 -011) 10/04/2013 Email from Dan Hauer to City Council re: Apple Campus 2 (Oct. 4, 2013 3:11 PM PDT) (Letter ID e- 13 -10 -04 -012) 10/04/2013 Email from Peter Coglianese to Piu Ghosh re: Another Public Comment Email... (Oct. 04, 2013 2:52:33 PM PDT) 1 -203 sf- 3345921 Q ATTACHMENT I INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2 PROJECT 1 -204 sf- 3345921 Q DATE DOCUMENT • Email from Ronald Moore to City Council re: apple campus 2 (Oct. 04, 2013 2:41 PM PDT) (e- 13- 10- 04- 01l.pdf) 10/04/2013 Email from Peter Coglianese to Piu Ghosh re: Another Public Comment... (Oct. 04, 2013 3:13:53 PM PDT) • Email from Dan Hauer to City Council re: Apple Campus 2 (Oct. 04, 2013 3:11 PM) (e- 13- 10- 04- 012.pdf) 10/04/2013 Email from Robertson, Jesse G @DOT to Timm Borden; David Stillman; Swierk, Robert re: Apple Campus 2 FEIR letter (SCH 92011082055) (Oct. 04, 2013 6:38:02 AM PDT) • Letter from California Department of Transportation to City Council re: Apple Campus 2 — Final Environmental Impact Report (Oct. 3, 2013) (Apple Campus 2 FEIR Letter 030CT2013.pdf) 10/04/2013 Email from Timm Borden to Piu Ghosh re: FW: Cupertino Village - Southerly Wolfe Road Driveway (Oct. 04, 2013 9:28:04 AM PDT) 10/04/2013 Email from Piu Ghosh to Peter Coglianese re: FW: more apple campus postings (Oct. 04, 2013 2:19:00 PM PDT) • Apple Campus 2 brochure (apple campus brochure l.pdf) 10/04/2013 Email from Beth Ebben to Peter Coglianese re: more apple campus posting (Oct. 04, 2013 2:27:27 PM PDT) • Apple Campus 2 brochure (apple campus replacement 2.pdf) 10/04/2013 Email from Beth Ebben to Nidhi Mathur re: more apple campus postings (Oct. 04, 2013 1:25:50 PM PDT) • Apple Campus 2 Brochure (apple campus brochure replacmt.pdf) • Apple Campus 2 Brochure (apple campus brochure l.pdf) • Apple Campus 2 Brochure (apple campus brochure 2.pdf) 1 -204 sf- 3345921 Q ATTACHMENT I INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2 PROJECT 1 -205 sf- 3345921 Q DATE DOCUMENT 10/04/2013 Email from Piu Ghosh to Peter Coglianese RE: For the website (Oct. 04, 2013 1:56:00 PM PDT) 10/04/2013 Email from Peter Coglianese to Beth Ebben RE: more apple campus posting (Oct. 04, 2013 2:33:38 PM PDT) 10/04/2013 Email from Peter Coglianese to Piu Ghosh RE: more apple campus postings (Oct. 04, 2013 2:31:32 PM PDT) 10/04/2013 Email from David Stillman to Dan Whisenhunt re: Tantau bridge at Calabazas Creek (Oct. 04, 2013 8:57:00 AM PDT) 10/04/2013 Email from Peter Coglianese to Piu Ghosh re: Two New Processed Emails... (Oct. 04, 2013 2:38:32 PM PDT) • Email from Roger Carr to City Council re: Yes on Apple (Oct. 04, 2013 12:00 PM PDT) (e- 13 -10-04-009.pdf) • Email from Ellen Kolstee to City Council re: Support for the Apple 2 Campus (Oct. 04, 2013 11:55 AM PDT) (Letter ID e- 13- 10- 04- 010.pdf) 10/05/2013 Email from Timm Borden to David Stillman re: FW: Apple Campus 2 (Oct. 05, 2013 2:41:56 PM PDT) 10/06/2013 Email from David Brandt to aartiskcupertino.org re: FW: bike ped access (Oct. 06, 2013 10:35:00 PM PDT) 10/06/2013 Comment letter from Stanislav Napalkov (Letter ID 500179) 10/07/2013 Email from Robert Kim to David Brandt; Andrea Sanders; Donna Henriques; Ryan Roman; Kirsten Squarcia; Marianna Khienkina; Karen B. Guerin; Brittany Carey; Julia Kinst; Grace Schmidt; Liz Nunez; Chylene Osborne; Tiffanie Cardenas; Nidhi Mathur; Robert Kim; Mary Redwine; Lisa Atwood; Rei Delgado; Peter Coglianese; Rick Kitson; Piu Ghosh re: Apple Campus 2 Commenting Process activity report, Thursday, June 6 to Sunday, October 6, 2013 (Oct. 07, 2013 11:28:45 AM PDT) 10/07/2013 Email from Judith Malamut to David Stillman; Piu Ghosh; Adam Weinstein; Ellen J. Garber RE: Apple Campus 2 (Oct. 07, 2013 10:26:23 AM PDT) 1 -205 sf- 3345921 Q ATTACHMENT I INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2 PROJECT 1 -206 sf- 3345921 Q DATE DOCUMENT 10/07/2013 Email from Dan Whisenhunt to Chad Mosley Re: MCI facilities in Pruneridge (Oct. 07, 2013 1:32:23 PM PDT) 10/07/2013 Email from Wolfgang Wagener to David Stillman Re: Tantau drawings (Oct. 07, 2013 2:00:24 PM PDT) 10/07/2013 Email from Fariba Nej at to City Council re: Apple campus #2 (Oct. 07, 2013 3:44 PM PDT) (Letter ID e- 13 -10 -07 -005) 10/07/2013 Email from Urmil to City Council re: 2 apple camp (Oct. 04, 2013 10:08 PM PDT)) (Letter ID e- 13 -10 -07 -004) 10/07/2013 Email from rooshabh varaiya to City Council (Oct. 04, 2013 11:09 PM PDT) (Letter ID e- 13 -10 -07 -003) 10/07/2013 Email from Gilbert Wong to David Brandt, Carol Korade re: Fwd: bike ped access (Oct. 6, 2013 9:19 PM PDT) (Letter ID e- 13 -10 -07 -002) 10/07/2013 Email from Cupertino 9235 to City Council re: Apple (Oct. 4, 2013 3:57 PM PDT) (Letter ID e- 13 -10 -07 -001) 10/08/2013 Email from Chad Mosley to Manish Dalia RE: AC2 - VTA Bus stop Wolfe /SCB (Oct. 08, 2013 1 :37:13 PM PDT)0 10/08/2013 Email from Ian Barnes to Piu Ghosh re: RE: F &P Power point and videos from Oct 1 (Oct. 08, 2013 4:21:30 PM PDT) • Fehr & Peers, Transportation Impact Analysis Slides (Transportation Slides_TZ5.pptx) 10/08/2013 Email from Chad Mosley to Saran Oki re: tantau exhibit limits (Oct. 08, 2013 9:45:04 AM PDT) • Untitled Graphic (MX -M 1100_20131008_115801.pdf) 10/09/2013 FY 12 -13 Annual Report C.15 — Exempted and Conditionally Exempted Discharges Permittee Name: (June 7, 2013) (Cupertino - Part 1 and Part 2 forms for SWMPs 10.9.13.doc) 10/09/2013 Sample Inspection and Maintenance Logs (Sample Inspection and Maintenance Logs 10.9.13.pdf) 1 -206 sf- 3345921 Q ATTACHMENT I INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2 PROJECT 1 -207 sf- 3345921 Q DATE DOCUMENT 10/09/2013 Email from Ian Barnes to Chad Mosley re: Apple Campus 2 - PM Vallco Simulation Videos (Oct. 09, 2013 8:38:12 AM PDT) 10/09/2013 Email from Grace Schmidt to Rick Kitson, Nidhi Mathur re: Apple Presentations and Videos for the website record (Oct. 09, 2013 10:56:57 AM PDT) 10/09/2013 Email from Piu Ghosh to Grace Schmidt; Kirsten Squarcia; Aarti Shrivastava re: Attachment 10 (Oct. 09, 2013 9:01:53 AM PDT) • Letter from LSA Associates, Inc. to City of Cupertino re: Supplemental Text Revisions, Apple Campus 2 Project Final Environmental Impact Report (EIR) (Oct. 8, 2013) (Attachment CC- IO.pdf) 10/09/2013 Email from Piu Ghosh to Laura D Lee re: Block Group 4 (Oct. 09, 2013 2:58:00 PM PDT) 10/09/2013 Email from Adam Weinstein To: Gary Chao; Piu Ghosh; David Stillman; jfowler @apple.com; Peter Sokoloff, dgoldgmofo.com; mimwalle @mofo.com; Judith Malamut; Franziska Church; Jane Bierstedt; Rick Kitson; Gary Baum; Eric Morley; Foulkes @apple.com; Scott D. Pinsky; Chad Mosley; Timm Borden; JJeffersgraofo.com; dwhisenhunt @apple.com; Aarti Shrivastava; diana.fazely @gmail.com; David Brandt; wwagener @fosterandpartners.com; soki @fosterandpartners.com; william.baura ard�nergarup.com; Michael.iswalt @arup.com; lynnjohnson @apple.com; Garber @smwlaw.com; JRamizac�r�,bwslaw.com RE: Apple EIR -- Team Meeting 10 /10 @2:OOp (Oct. 09, 2013 9:40:01 PM PDT) 10/09/2013 Email from Grace Schmidt to Piu Ghosh; Kirsten Squarcia; Aarti Shrivastava RE: Attachment 10 (Oct. 09, 2013 9:27:03 AM PDT) 10/09/2013 Email from Gene Barry to Chad Mosley re: RE: Meeting? (Oct. 09, 2013 3:51:16 PM PDT) 10/09/2013 Email from Piu Ghosh to Grace Schmidt, Kirsten Squarcia RE: Packet (Oct. 09, 2013 8:26:31 AM PDT) 10/09/2013 Email from Ian Cunningham to David Stillman RE: Sunnyvale permit for utility work (Oct. 09, 2013 1:37:58 PM PDT) 1 -207 sf- 3345921 Q ATTACHMENT I INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2 PROJECT 1 -208 sf- 3345921 Q DATE DOCUMENT 10/09/2013 Email from Frank Mangini to City Council re: Apple Campus 2 (Oct. 09, 2013 08:01 AM PDT) (Letter ID e- 13 -10 -09 -008) 10/09/2013 Email from Vivian Wang to City Council re: Support for Apple's new campus (Oct. 09, 2013 9:18 AM PDT) (Letter ID e- 13 -10 -09 -007) 10/09/2013 Email from Sam Ashknaz to City Council re: In Support of Campus2 (Oct. 09, 2013 9:26 AM PDT) (Letter ID e- 13 -10 -09 -006) 10/09/2013 Email from Steve Hicks to City Council re: Apple Campus 2 (Oct. 09, 2013 10:41 AM PDT) (e- 13 -10 -09 -005 PDT) 10/09/2013 Email from gen Caro to City Council re: Support of Apple Campus 2 (Oct. 09, 2013 10:43 AM PDT) (Letter ID e- 13 -10 -09 -004) 10/09/2013 Email from Svetlana Kokoshvili to City Council re: Apple Campus (Oct. 09, 2013 11:35 AM PDT) (Letter ID e- 13 -10 -09 -003) 10/09/2013 Email from Alice Lin to City Council re: Support Apple Campus 2 (Oct. 09, 2013 12:57 PM PDT) (Letter ID e- 13 -10 -09 -002) 10/09/2013 Email from Geoff Flavell to City Council re: Apple Campus 2 (Oct. 09, 2013 1:11 PM PDT) (Letter ID e- 13 -10 -09 -001) 10/09/2013 Email from Becky Amans to City Council re: Apple Campus 2 (Oct. 08, 2013 7:23 PM PDT) (Letter ID e- 13 -10 -09 -009) 10/09/2013 Email from Sandra and Don to City Council re: Looking forward to Apple campus 2 (Oct. 08, 2013 4:58 PM PDT) (Letter ID e- 13- 10 -09- 010) 10/09/2013 Comment letter (Letter ID 500180) 10/10/2013 Email from Vikram Kowshik to City Council re: Apple Campus 2 (Oct. 10, 2013 3:07 PM PDT) (Letter ID _e- 13 -10 -10 -010) 10/10/2013 Email from Herbert McKaye to City Council re: Oct. 15 Public Meeting (Oct. 10, 2013 3:27 PM PDT) (e- 13 -10 -10 -009 PDT) 10/10/2013 Email from Suzanne Dabadghav to City Council re: Apple Campus 2 (Oct. 10, 2013 1:27 PM PDT) (Letter ID e- 13 -10 -10 -008) 1 -208 sf- 3345921 Q ATTACHMENT I INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2 PROJECT 1 -209 sf- 3345921 Q DATE DOCUMENT 10/10/2013 Email from James Wang to City Council re: I support Apple's Campu2 Construction (Oct. 10, 2013 11:25 AM PDT) (Letter ID e -13- 10-10 -007 PDT) 10/10/2013 Email from Gangadhar Gadepalli to Apple Campus 2; City Council re: Apple Campus 2 (Oct. 10, 2013 10:35 AM PDT) (Letter ID e- 13 -10- 10 -006) 10/10/2013 Email from Gangadhar Gadepalli to Apple Campus 2; City Council re: Oct. 10, 2013 10:35 AM PDT) (Letter ID e- 13 -10 -10 -005) 10/10/2013 Email from Julie Rose to City Council re: Support Apple 2 Campus (Oct. 09, 2013 4:29 PM PDT) (Letter ID s- 13 -10 -10 -001) 10/10/2013 Email from AnneNgkaol.com to foulkeskEple.com to City Campus re: Fwd: Apple Campus 2 (Oct. 10, 2013 09:08 AM PDT) (Letter ID e- 13-10-10 -004) 10/10/2013 Email from Biren Shah to City Council re: email to support Apple Campus 2 (Oct. 1, 2013 11:17 AM PDT) 10/10/2013 Email from Ruthcmo to City Council re: Apple Campus 2 (Oct. 10, 2013 7:51 AM PDT) 10/10/2013 Email from William Mo to City Council re: Apple campus 2 (Oct. 09, 2013 4:34 PM PDT) (Letter ID e- 13 -10 -10 -001) 10/10/2013 Comment letter (Letter ID 50018 1) 10/10/2013 Email from Vikram Kowshik to City Council re: Apple Campus 2 (Oct. 10, 2013 3:07 PM PDT) 10/10/2013 Email from Andrew Chafer to Chad Mosley, Piu Ghosh re: AC2 Park Zoning (Oct. 10, 2013 2:27:40 PM PDT) • Exhibit Z -2, Zoning Plat Map Pruneridge Ave. at Ridgeview Court, Cupertino, CA (213103LEGAL-PLAT- PR-Rv- Court- EX.pdf) • Exhibit Z -2, Zoning Plat Map Pruneridge Ave at Ridgeview Court, Cupertino, CA (213103LEGAL- PLAT- PR -Rv- Court.pdf) 1 -209 sf- 3345921 Q ATTACHMENT I INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2 PROJECT 1 -210 sf- 3345921 Q DATE DOCUMENT 10/10/2013 Email from Michael Bench to Piu Ghosh re: Apple Campus 2 Short Report (Oct. 10, 2013 5:03:57 PM PDT) • Michael Bench, Under Piping of Transplant Trees Apple Campus 2 Cupertino, California (Oct. 2, 2013) (Apple C 2 Transplants, 10- 13.doc) 10/10/2013 Email from Ryan Arnaya to Chad Mosley re: Pruneridge Ave Vacation (Oct. 10, 2013 3:55:07 PM PDT) • Exhibit A, Legal Description For: Street Vacation (Oct. 10, 2013) (A131010 - Pruneridge Vacation - Signed.pdf) 10/10/2013 Email from Chad Mosley to Andrew Chafer, Piu Ghosh RE: AC2 Park Zoning (Oct. 10, 2013 3:09:58 PM PDT) 10/10/2013 Email from Chad Mosley to Ryan Amaya RE: Pruneridge Ave Vacation (Oct. 10, 2013 4:04:06 PM PDT) 10/11/2013 Email from Rick Kitson to Peter Coglianese re: Apple Campus 2 Comments Update (Oct. 11, 2013 1:14:10 PM PDT) 10/11/2013 Email from Piu Ghosh to Aart Shrivastava re: Dates per your request (Oct. 11, 2013 9:19:00 AM PDT) 10/11/2013 Email from Aarti Shrivastava to David Brandt re: FW: Dates per your request (Oct. 11, 2013 9:31:54 AM PDT) 10/11/2013 Email from Piu Ghosh to Julia Kinst RE: Apple EIR -- scope/budget augment (Oct. 11, 2013 9:11:00 AM PDT) 10/11/2013 Email from Albert Salvador to Gilbert Wong re: Questions from Gilbert (Oct. 11, 2013 8:55:45 AM PDT) 10/11/2013 Comment letter from Jeffrey Wurtz (Letter ID 500182) 10/11/2013 Comment letter from Vanaja Jagini (Letter ID 500183) 10/11/2013 Email from Rick Kitson to Peter Coglianese re: Apple Campus 2 Comments Update (Oct. 11, 2013 1:14:10 PM PDT) 10/11/2013 Email from Adam Weinstein to: Aarti Shrivastava; Gary Baum; Timm 1 -210 sf- 3345921 Q ATTACHMENT I INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2 PROJECT 1 -211 sf- 3345921 Q DATE DOCUMENT Borden; David Stillman; Chad Mosley; Piu Ghosh; £church @fehrandpeers.com; J.Bierstedt @fehrandpeers.com; spinsky @earthlink.net; Garberksmwlaw.com; Judith Malamut; JRamizac�r�,bwslaw.com re: Apple EIR -- Internal Mtg at 11:00a today (Oct. 11, 2013 11:06:42 AM PDT) 10/13/2013 Comment letter from Eric Kothe (Letter ID 500184) 10/13/2013 Comment letter from Elizabeth Eppel (Letter ID 500185) 10/13/2013 Comment letter from Gladys Koke (Letter ID 500186) 10/13/2013 Email from Gilbert Wong to Gilbert Wong, David Brandt, Carol Korade re: FYI (Oct. 13, 2013 10:38:29 PM) • Troy, Wolverton, Apple's spaceship is landing in the wrong place, San Jose Mercury News htlp://www.mercganews.com/troy- wolverton/ci 243 02684 /wolverton- apples- spaceship -is- landing wrong - place#, (last visited Oct. 19, 2013 10/13/2013 Email from Gilbert Wong to Liao Ben re: Chinese students visit Apple (Oct. 13, 2013 11:47:25 AM PDT) 10/14/2013 Email from Meenu to City Council re: Apple campus (Oct. 14, 2013 4:59 PM PDT) (Letter ID e- 13 -10 -14 -108) 10/14/2013 Email from james leahy to City Council re: Apple Campus 2 (Oct. 14, 2013 4:53 PM PDT) (Letter ID e- 13 -10 -14 -107) 10/14/2013 Email from Nancy Neibel to City Council re: We support Apple 2 Campus (Oct. 14, 2013 4:48 PM PDT) (Letter ID e- 13 -10 -14 -106) 10/14/2013 Email from Kathleen Elliott to City Council re: Apple Campus 2 (Oct. 14, 2013 4:33 PM PDT) (Letter ID e- 13 -10 -14 -105) 10/14/2013 Email from Pat Dentinger to City Council re: Please Approve Construction of Apple Computer's "Spaceship" (Oct. 14, 2013 3:16 PM PDT) (Letter ID e-13-10-14-104) 10/14/2013 Email from Bvitro 1 204gaol.com to City Council re: The Spaceship (Oct. 04, 2013 4:25 PM PDT) (Letter ID e- 13 -10 -14 -103) 1 -211 sf- 3345921 Q ATTACHMENT I INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2 PROJECT 1 -212 sf- 3345921 Q DATE DOCUMENT 10/14/2013 Email from Peter Hirsch to City Council re: Apple campus 2 (Oct. 14, 2013 4:15 PM PDT) (Letter ID e- 13 -10 -14 -102) 10/14/2013 Email from Ping Guo to City Council re: Supporting Apple Campus 2 (Oct. 14, 2013 3:59 PM PDT) (Letter ID e- 13 -10 -14 -101) 10/14/2013 Email from RBalack(,comcast.net to City Council re: Apple Campus 2 (Oct. 14, 2013 3:54 PM PDT) (Letter ID e- 13 -10 -14 -100) 10/14/2013 Email from Raj Patel to City Council re: I support Apple Campus 2 (Oct. 14, 2013 3:43 PM PDT) (Letter ID e- 13 -10 -14 -099) 10/14/2013 Email from Mandeep Chadha to City Council re: Support for Apple Campus 2 (Oct. 14, 2013 3:19 PM PDT) (Letter ID e- 13 -10 -14 -098) 10/14/2013 Email from Qiwen Zhao to City Council re: Support Apple Campus 2 project (Oct. 14, 2013 3:26 PM PDT) (Letter ID e- 13 -10 -14 -096) 10/14/2013 Email from Peter Duggan to City Council re: Support for Apple's New Campus (Oct. 14, 2013 3:36 PM PDT) (Letter ID _e- 13 -10 -14 -097) 10/14/2013 Email from Naren Suria to City Council re: Yes to campus 2 (Oct. 14, 2013 PM PDT) (Letter ID e- 13 -10 -14 -095) 10/14/2013 Email from Debanjan Chakraborty to City Council re: Feedback/ Comment on planned new Apple Campus (Oct. 14, 2013 2:55 PM PDT) (Letter ID e- 13 -10 -14 -094) 10/14/2013 Email from Martin Janousek to City Council re: New Apple Campus (Oct. 14, 2013 2:52 PM PDT) 10/14/2013 Email from Thorisa Yap to City Council (Oct. 14, 2013 2:51 PM PDT) (Letter ID e- 13 -10 -14 -092) 10/14/2013 Email from kitekorimp.com to City Council re: comments on Apple Campus 2 development (Oct. 14, 2013 2:50 PM PDT) (Letter ID e -13- 10-14 -091) 10/14/2013 Email from Michael Gor to City Council re: Apple Campus (Oct. 14, 2013 2:19 PM PDT) (Letter ID e- 13 -10 -14 -090) 10/14/2013 Email from Verma to City Council re: Apple campus 2 (Oct. 14, 2013 1 -212 sf- 3345921 Q ATTACHMENT I INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2 PROJECT 1 -213 sf- 3345921 Q DATE DOCUMENT 2:39 PM PDT) (Letter ID e- 13 -10 -14 -089) 10/14/2013 Email from Verma to City Council re: Apple Campus 2 (Oct. 14, 2013 2:39 PM PDT) (Letter ID e- 13 -10 -14 -088) 10/14/2013 Email from Sam Ashknaz to City Council re: FW: Support for Apple Campus 2 (Oct. 14, 2013 2:02 PM PDT) (Letter ID e- 13 -10 -14 -087) 10/14/2013 Email from Linda Wells to City Council re: New Apple Campus (Oct. 14, 2013 12:55 PM PDT) (Letter ID e- 13 -10 -14 -074) 10/14/2013 Email from Steve Busby to City Council re: Apple Campus (Oct. 14, 2013 12:55 PM PDT) (Letter ID e- 13 -10 -14 -073) 10/14/2013 Email from Sunil Nethisinghe to City Council re: Iconic Apple Campus (Oct. 14, 2013 1:08 PM PDT) (Letter ID e- 13 -10 -14 -072) 10/14/2013 Email from: marylourobson @comcast.net to City Council re: Apple Campus (Oct. 14, 2013 1:11 PM PDT) (Letter ID e- 13 -10 -14 -071) 10/14/2013 Email from Mark Shih to City Council re: I Support Apple Campus 2 (Oct. 14, 2013 12:03 PM PDT) (Letter ID e- 13 -10 -14 -070) 10/14/2013 Email from Meir Statman to City Council re: I live in Cupertino and support the Apple campus (Oct. 14, 2013 12:00 PM PDT) (Letter ID e- 13-10-14 -069) 12/14/2013 Email from James Ahern to City Council re: Apple Campus 2 (Oct. 14, 2013 11:38 AM PDT) (Letter ID e- 13 -10 -14 -068) 12/14/2013 Email from Larry Dean to City Council re: Apple Campus (Oct. 14, 2013 11:22 AM PDT) (Letter ID e- 13 -10 -14 -067) 12/14/2013 Email from Kent Harris to City Council re: Apple Campus 2 (Oct. 14, 2013 9:27 AM PDT) (Letter ID e- 13 -10 -14 -066) 12/14/2013 Email from Kelly Crosby to City Council re: Support of Apple Campus 2 (Oct. 14, 2013 7:53 AM PDT) 12/14/2013 Email from Kathy Nolan to City Council re: Apple Campus 2 (Oct. 14, 2013 7:24 AM PDT) (Letter ID e- 13 -10 -14 -064) 10/14/2013 Email from Craig Slayter to City Council re: Cupertino Resident 1 -213 sf- 3345921 Q ATTACHMENT I INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2 PROJECT 1 -214 sf- 3345921 Q DATE DOCUMENT Supporting the Apple Campus (Oct. 14, 2013 7:11 AM PDT) (Letter ID e- 13 -10 -14 -063) 10/14/2013 Email from Jenny Fu to City Council re: Support apple campus 2 (Oct. 14, 2013 12:29 AM PDT) 10/14/2013 Email from Philip Levine to City Council re: New Apple Campus (Oct. 13, 2013 11:25 PM PDT) (Letter ID e- 13 -10 -14 -061) 10/14/2013 Email from Krishan Chellakarai to City Council re: Apple Campus 2 (Oct. 13, 2013 10:07 PM PDT) (Letter ID e- 13 -10 -14 -060) 10/14/2013 Email from Robert Ponce to applecampus2kgpple.com City Council re: Apple Campus 2 traffic problems in the Wolfe Road areas (Oct. 13, 2013 9:53 PM PDT) (Letter ID e- 13 -10 -14 -059) 10/14/2013 Email from Debjit Sarkar to City Council re: Our Support for Apple Campus 2 (Oct. 13, 2013 5:48 PM PDT) (Letter ID e- 13 -10 -14 -0)58) 10/14/2013 Email from matthew.c.hallggmail.com to City Council re: Apple Campus 2 (Oct. 13, 2013 5:02 PM PDT) (Letter ID e- 13 -10 -14 -057) 10/14/2013 Email from matthew.c.hall @gmail.com to City Council re: Apple Campus 2 (Oct. 13, 2013 5:02 PM PDT) (Letter ID e- 13 -10 -14 -056) 10/14/2013 Email from Marieann Shovlin to City Council re: Apple Campus 2 Support (Oct. 13, 2013 1:33 PM PDT) (Letter ID e- 13 -10 -14 -055) 10/14/2013 Email from nfinarcuskaol.com to City Council re: Apple Campus (Oct. 13, 2013 11:44 AM) (Letter ID e- 13 -10 -14 -054) 10/14/2013 Email from Lynn Puccinelli to City Council re: Support for Apple Campus 2 (Oct. 13, 2013 11:16 AM PDT) (Letter ID e- 13 -10 -14 -053) 10/14/2013 Email from fanetti(,comcast.net to City Council re: Apple Campus 2 (Oct. 13, 2013 9:25 AM PDT) (Letter ID e- 13 -10 -14 -052) 10/14/2013 Email from Wade Worsham to City Council re: New Apple Campus (Oct. 13, 2013 9:18 AM PDT) (Letter ID e- 13 -10 -14 -051) 10/14/2013 Email from Patrick Law to City Council re: To support Apple Campus 2 (Oct. 13, 2013 5:18 AM PDT) (Letter ID e- 13 -10 -14 -050) 1 -214 sf- 3345921 Q ATTACHMENT I INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2 PROJECT 1 -215 sf- 3345921 Q DATE DOCUMENT 10/14/2013 Email from awissinkkyahoo.com to City Council re: support for Apple Campus 2 (Oct. 12, 2013 10:32 PM PDT) (Letter ID e- 13 -10- 14 -049) 10/14/2013 Email from Suzanne Chin -Sang to City Council re: Apple Campus 2 (Oct. 12, 2013 10:10 PM PDT) (Letter ID e- 13 -10 -14 -048) 10/14/2013 Email from Alan Tan to City Council re: support for Apple 2 building (Oct. 12, 2013 9:49 PM PDT) (Letter ID e- 13 -10 -14 -047) 10/14/2013 Email from Paulin Chen to City Council re: Support building Apple Campus 2 @ Cupertino (Oct. 12, 2013 7:54 PM) (Letter ID e- 13 -10- 14 -046) 10/14/2013 Email from John James to City Council re: Apple Campus (Oct. 12, 2013 7:28 PM PDT) (Letter ID e- 13 -10 -14 -045) 10/14/2013 Email from Brett Ryan to City Council re: Support Apple Campus 2 (Oct. 12, 2013 5:40 PM PDT) (Letter ID e- 13 -10 -14 -044) 10/14/2013 Email from Joanie to City Council re: Apple campus (Oct. 12, 2013 4:51 PM PDT) (Letter ID e- 13 -10 -14 -043) 10/14/2013 Email from Christine to City Council re: Apple2 Campus (Oct. 14, 2013 1:50 PM PDT) (Letter ID e- 13 -10 -14 -086) 10/14/2013 Email from Leon Chen to City Council re: Apple Campus 2 (Oct. 14, 013 12:05 PM PDT) (Letter ID e- 13 -10 -14 -085) 10/14/2013 Email from Jose Payne to City Council re: Apple Campus 2 (Oct. 14, 2013 12:06 PM PDT) (Letter ID e- 13 -10 -14 -084) 10/14/2013 Email from Deepna Nishar to City Council re: Support for Apple Campus 2 (Oct. 14, 2013 12:13 PM PDT) (Letter ID e- 13 -10 -14 -083) 10/14/2013 Email from Voyle R McFarland to City Council (Oct. 14, 2013 12:20 PM PDT) (Letter ID e- 13 -10 -14 -082) 10/14/2013 Email from Victor Hung to City Council re: Apple camp 2 (Oct. 14, 2013 12:25 PM PDT) (Letter ID e- 13 -10 -14 -081) 10/14/2013 Email from Liling Wang to City Council re; Yes on Apple Campus 2 1 -215 sf- 3345921 Q ATTACHMENT I INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2 PROJECT 1 -216 sf- 3345921 Q DATE DOCUMENT (Oct. 14, 2013 PM PDT) (Letter ID e- 13 -10 -14 -080) 10/14/2013 Email from Patrick Gannon to City Council re: Apple 2 Campus (Oct. 14, 2013 12:35 PM PDT) (Letter ID e- 13 -10 -14 -079) 10/14/2013 Email from Majid Babazadeh to City Council re: Apple 2 Support (Oct. 14, 2013 12:36 PM PDT) (Letter ID e- 13 -10 -14 -078) 10/14/2013 Email from Kathy Matulewicz to City Council re: Approval of Apple 2 Campus (Oct. 12, 2013 4:28 PM PDT) (Letter ID e- 13 -10 -14 -042) 10/14/2013 Email from John to City Council re: Support Apple Campus 2 (Oct. 11, 2013 4:12 PM PDT) (Letter ID e- 13 -10 -14 -041) 10/14/2013 Email from Kai Wiedman to City Council re: Apple Campus 2 (Oct. 12, 2013 3:58 PM PDT) (Letter ID e- 13 -10 -14 -040) 10/14/2013 Email from fennhortongsbcglobal.net to City Council (Oct .12, 2013 2:11 PM PDT) (Letter ID e- 13 -10 -14 -039) 10/14/2013 Email from Joan Trampenau to City Council re: Apple Campus 2 (Oct. 12, 2013 1:34 PM PDT) (Letter ID e- 13 -10 -14 -038) 10/14/2013 Email from Su Chen to City Council re: Support For Apple Campus 2 (Oct. 12, 2013 12:26 PM PDT) (Letter ID e- 13 -10 -14 -037) 10/14/2013 Email from John Michalka to City Council re: Apple Campus 2 (Oct. 12, 2013 12:00 PM PDT) (Letter ID e- 13 -10 -14 -036) 10/14/2013 Email from Kim Stocklmier to City Council re: Apple Campus 2 (Oct. 12, 2013 11:25 AM PDT) (Letter ID e- 13 -10 -14 -035) 10/14/2013 Email from John R. Berthold to City Council re: Support for Apple HQ (Oct. 12, 2013 11:23 AM PDT) (Letter ID e- 13 -10 -14 -034) 10/14/2013 Email from lichong hu to City Council re: Support for Apple Campus 2 in Cupertino (Oct. 12, 2013 10:18 AM PDT) (Letter ID e- 13- 10 -14- 033) 10/14/2013 Email from Jesse Shiah to City Council re: Support Apple Campus 2 project (Oct. 12, 2013 10:09 AM PDT) (Letter ID e- 13 -10 -14 -032) 10/14/2013 Email from Dennis Los to City Council re: Proposed Apple Campus 2 1 -216 sf- 3345921 Q ATTACHMENT I INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2 PROJECT 1 -217 sf- 3345921 Q DATE DOCUMENT (Oct. 12, 2013 9:57 AM PDT) (Letter ID e- 13 -10 -14 -031) 10/14/2013 Email from Jennifer to City Council re: Apple Campus (Oct. 11, 2013 11:02 PM PDT) (Letter ID e- 13 -10 -14 -030) 10/14/2013 Email from Ray Pastorino to City Council re: Apple Campus 2 (Oct. 11, 2013 10:50 PM PDT) (Letter ID e- 13 -10 -14 -029) 10/14/2013 Email from Zhang Ying to City Council re: support for apple campus 2 (Oct. 11, 2013 10:17 PM PDT) (Letter ID e- 13 -10 -14 -028) 10/14/2013 Email from Arch Chil to City Council re: support for Apple campus 2 (Oct .11, 2013 8:37 PM PDT) (Letter ID e- 13 -10 -14 -027) 10/14/2013 Email from jhc95014kyahoo.com to City Council re: Apple Campus 2 (Oct. 11, 2013 8:37 PM PDT) (Letter ID e- 13 -10 -14 -026) 10/14/2013 Email from jhc95014gyahoo.com to City Council re: Apple Campus 2 (Oct. 11, 2013 8:37 PM PDT) (Letter ID e- 13 -10 -14 -025) 10/14/2013 ail from jhc95014 @yahoo.com to City Council re: Apple Campus 2 (Oct. 11, 2013 8:37 PM PDT) (Letter ID e- 13 -10 -14 -024) 10/14/2013 Email from Steve Leu to City Council re: Apple campus 2 (Oct. 11, 2013 8:08 PM PDT) (Letter ID e- 13 -10 -14 -023) 10/14/2013 Email from Dsalt9718gaol.com to City Council re: Fwd: Apple Campus 2 (Oct. 11, 2013 6:56 PM PDT) (Letter ID e- 13 -10 -14 -022) 10/14/2013 Email from Walter Li to City Council re: Support Apple Campus 2 project (Oct. 11, 2013 6:31 PM PDT) (Letter ID e- 13 -10 -14 -021) 10/14/2013 Email from Mike Sosna SOS Productions to Barbara Goldman re: Apple Campus 2 (Oct. 11, 2013 6:01 PM PDT) (Letter ID e- 13- 10 -14- 020) 10/14/2013 Email from Barbara Goldman to City Council re: Apple Campus 2 (Oct. 11, 2013 5:37 PM PDT) (Letter ID e- 13 -10 -14 -019) 10/14/2013 Email from Jen Hong to City Council re: Support Apple campus 2 (Oct. 11, 2013 5:30 PM PDT) (Letter ID e- 13 -10 -14 -018) 10/14/2013 Email from: Amsmiker @aol.com to City Council re: Apple Campus 2 1 -217 sf- 3345921 Q ATTACHMENT I INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2 PROJECT 1 -218 sf- 3345921 Q DATE DOCUMENT (Oct. 11, 2013 4:52 PM PDT) 10/14/2013 Email from Teresa Odom to City Council re: Support for Apple Campus 2 (Oct. 11, 2013 4:38 PM PDT) (Letter ID e- 13 -10 -14 -016) 10/14/2013 Email from Greg Hurley to City Council re: Apple campus 2 (Oct. 11, 2013 4:33 PM PDT) (Letter ID e- 13 -10 -14 -015) 10/14/2013 Email from John & Helen Trollman to City Council re: Apple Campus (Oct. 11, 2013 4:18 PM PDT) (Letter ID e- 13 -10 -14 -014) 10/14/2013 Email from Babu Jain to City Council re: support for Apple campus (Oct. 11, 2013 3:41 PM PDT) (Letter ID e- 13 -10 -14 -013) 10/14/2013 Email from JeffA Ronne to City Council re: apple campus 2 (Oct. 11, 2013 3:22 PM PDT) (Letter ID e- 13 -10 -14 -012) 10/14/2013 Email from arun kumar to City Council re: Oct 15th city council meeting (Oct. 11, 2013 2:26 PM PDT) (Letter ID e- 13 -10 -14 -011) 10/14/2013 Email from Raymond Lancon to City Council re: Cupertino: Contact the City (Oct. 11, 2013 2:22 PM PDT) (Letter ID e- 13 -10 -14 -010) 10/14/2013 Email from Jared Porter to City Council re: In Support of Apple's New Headquarters (Oct. 11, 2013 2:22 PM PDT) (Letter ID e- 13 -10 -14 -009) 10/14/2013 Email from Linda Aronson to City Council re: Apple Campus 2 (Oct. 11, 2013 1:51 PM PDT) (Letter ID e- 13 -10 -14 -008) 10/14/2013 Email from Edith Kwok to City Council re: Support of Apple Campus 2 (Oct. 11, 2013 1:43 PM PDT) (Letter ID e- 13 -10 -14 -007) 10/14/2013 Email from Jamshed Doctor to City Council re: Fwd: Apple Campus 2 in Cupertino (Oct. 11, 2013 12:36 PM PDT) 10/14/2013 Email from jerry.danggyahoo.com to City Council re: I support Apple new campus with Cupertino (Oct. 11, 2013 12:03 PM PDT) (Letter ID e- 13 -10 -14 -005) 10/14/2013 Email from jerry.danggyahoo.com to City Council re: I support Apple new campus with Cupertino (Oct. 11, 2013 12:03 PM PDT) (Letter ID e- 13 -10 -14 -004) 1 -218 sf- 3345921 Q ATTACHMENT I INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2 PROJECT 1 -219 sf- 3345921 Q DATE DOCUMENT 10/14/2013 Email from Jewel Chang to City Council re: Apple campus (Oct. 11, 2013 11:56 AM PDT) (Letter ID e- 13 -10 -14 -003) 10/14/2013 Email from Jamshed Doctor to City Council re: Apple Campus 2 in Cupertino (Oct. 11, 2013 11:36 AM PDT) (Letter ID e- 13 -10 -14 -002) 10/14/2013 Email from Kent Harris to City Council re: Apple Campus 2 (Oct. 14, 2013 9:27 AM PDT) (Letter ID e- 13 -10 -14 -001) 10/14/2013 Email from Brooke Rahn to City Council re: Apple 2 Campus (Oct. 12, 2013 7:11 AM PDT) (Letter ID e- 13 -10 -14 -000) 10/14/2013 Email from Wesley Embry to City Council re: Please approve Ample Campus 2 (Oct. 14, 2013 12:52 PM PDT) (Letter ID e- 13 -10 -14 -077) 10/14/2013 Email from James Duran to City Council re: Apple Campus 2 (Oct. 14, 2013 12:52 PM PDT) (Letter ID e- 13 -10 -14 -076) 10/14/2013 Email from kucera.jirikgmail.com to City Council re: Apple campus 2 (Oct. 14, 2013 12:53 PM PDT) (Letter ID e- 13 -10 -14 -075) 10/14/2013 Comment letter from Xiaofei Wang (Letter ID 500187) 10/14/2013 Comment letter from Sally Everett - Beaupre (Letter ID 500188) 10/14/2013 Email from Robert Kim to: David Brandt; Andrea Sanders; Donna Henriques; Ryan Roman; Kirsten Squarcia; Marianna Khienkina; Karen B. Guerin; Brittany Carey; Julia Kinst; Grace Schmidt; Liz Nunez; Chylene Osborne; Tiffanie Cardenas; Nidhi Mathur; Robert Kim; Mary Redwine; Lisa Atwood; Rei Delgado; Peter Coglianese; Rick Kitson; Piu Ghosh re: Apple Campus 2 Commenting Process activity report, Thursday, June 6 to Sunday, October 13, 2013 (Oct. 14, 2013 2:21:37 PM PDT) 10/14/2013 Email from Ian Barnes to David Stillman re: Apple Trip Distribution Graphic Calculation (Oct. 14, 2013 11:28:37 AM PDT) 10/14/2013 Email from Marlana Telfer to Grace Schmdit re: AT &T Response to "Vacation of a Portion of Pruneridge Avenue" (Oct. 14, 2013 5:18:57 PM PDT) • Letter from AT &T to City of Cupertino re: Request for 1 -219 sf- 3345921 Q ATTACHMENT I INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2 PROJECT 1 -220 sf- 3345921 Q DATE DOCUMENT Street Vacation Approval for a portion of Pruneridge Avenue, between N Wolfe Road and N Tantau Avenue, Cupertino, CA. APN: 316 -06- 037,050,051,048,049,045 & 033; APN: 316 -07 -044, 046 & 045 (Oct. 14, 2013) (AT&T Pruneridge Abandonment Response Letter.pdf) 10/14/2013 Email from Franziska Church to David Stillman re: FW: Apple Trip Distribution Graphic Calculation (Oct. 14, 2013 1:33:12 PM PDT) 10/14/2013 Email from Rick Kitson to Peter Coglianese re: FW: Bloomberg Television Request (Oct. 14, 2013 5:23:00 PM PDT) 10/14/2013 Email Jane Bierstedt to Piu Ghosh re: FW: PPT (Oct. 14, 2013 2:33:33 PM PDT) • Graphic (image002.png) • Graphic (Graphic for MitigationMeasuresWHITE2.png) 10/14/2013 Email from Beth Ebben to Planning Dept. re: FW: Recommendations for Main Street Project (Oct. 14, 2013 8:16:22 AM PDT) 10/14/2013 Email from Rick Kitson to Orrin Mahoney re: Press Conference? (Oct. 14, 2013 5:51:21 PM PDT) 10/14/2013 Email from Franziska Church to Ian Barnes, David Stillman RE: Apple Trip Distribution Graphic Calculation (Oct. 14, 2013 11:31:09 AM PDT) 10/14/2013 Email from Grace Schmidt to Marlena B Telfer re: RE: AT &T Response to "Vacation of a Portion of Pruneridge Avenue" (Oct. 14, 2013 5:28:37 PM) 10/14/2013 Email from Piu Ghosh to Adam Weinstein RE: City Council presentation tomorrow (Oct. 14, 2013 4:18:00 PM PDT) 10/14/2013 Email from Timm Borden to Chad Mosley RE: Further breakdown of the $50M (Oct. 14, 2013 4:11:37 PM PDT) 10/14/2013 Email from Timm Borden to David Stillman re: lane summary (Oct. 14, 2013 8:51:47 PM PDT) 1 -220 sf- 3345921 Q ATTACHMENT I INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2 PROJECT 1 -221 sf- 3345921 Q DATE DOCUMENT 10/15/2013 Email from deastkyahoo.com to City Council re; Apple Campus 2 (Oct. 15, 2013 4:45 PM PDT) (Letter ID e- 13 -10 -15 -128) 10/15/2013 Email from Steve Andrews to City Council re: Apple (Oct. 15, 2013 5:12 PM PDT) (Letter ID e- 13 -10 -15 -127) 10/15/2013 Email from deast7kahoo.com to City Council re: Apple Campus 2 (Oct. 15, 2013 4:56 PM PDT) (Letter ID e- 13 -10 -15 -126) 10/15/2013 Email from Catherine Chen to City Council re: Support for Apple Campus 2 Project (Oct. 15, 2013 4:15 PM PDT) (Letter ID e- 13- 10 -15- 125) 10/15/2013 Email from Susan Hubbart to City Council re: I support Apple Campus 2 (Oct. 15, 2013 4:32 PM PDT) (Letter ID e- 13 -10 -15 -124) 10/15/2013 Email from Kamvy Tseung to City Council re: Apple campus 2 (Oct. 15, 2013 4:00 PM PDT) (Letter ID e- 13 -10 -15 -123) 10/15/2013 Email from Roshan Gidwani to City Council re: Support for Apple Campus 2 (Oct. 15, 2013 3:44 PM PDT) (Letter ID e- 13 -10 -15 -123) 10/15/2013 Email from SK Min to citycouncilkcupertino.org re: supporting Apple Campus 2 (Oct. 15, 2013 3:21 PM PDT) (Letter ID e- 13 -10 -15 -121) 10/15/2013 Email from Maria Streeby to City Council re: Apple Campus 2 (Oct. 15, 2013 3:11 PM PDT) (Letter ID e- 13 -10 -15 -120) 10/15/2013 Email from Shing - Shwang Yao to City Council re: Apple (Oct. 15, 2013 3:01 PM PDT) (Letter ID e- 13 -10 -15 -119) 10/15/2013 Email from Richard Nebel to City Council re; apple campus 2 (Oct. 15, 2013 2:58 PM PDT) (Letter ID e- 13 -10 -15 -118) 10/15/2013 Email from Violet Dawson to City Council re: Apple's new campus (Oct. 15, 2013 2:54 PM PDT) (Letter ID e- 13 -10 -15 -118) 10/15/2013 Email from Valerie Cregan to City Council re: Apple Campus (Oct. 15, 2013 2:10 PM PDT) (Letter ID e- 13 -10 -15 -116) 10/15/2013 Email from Adolfas Melinauskas to City Council re: Apple 2 Campus (Oct. 15, 2013 2:32 PM PDT) (Letter ID e- 13 -10 -15 -115) 1 -221 sf- 3345921 Q ATTACHMENT I INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2 PROJECT 1 -222 sf- 3345921 Q DATE DOCUMENT 10/15/2013 Email from Dana Anderson to City Council re: Vote No on new Apple Campus (Oct. 15, 2013 2:15 PM PDT) (Letter ID e- 13 -10 -15 -114) 10/15/2013 Email from Eva Fettchenhauer to City Council re: Apple Campus 2 (Oct. 15, 2013 2:07 PM PDT) (Letter ID e- 13 -10 -15 -113) 10/15/2013 Email from Marie Lin to City Council re: Apple Campus 2 (Oct. 15, 2013 12:07 PM PDT) (Letter ID e- 13 -10 -15 -112) 10/15/2013 Email from Penny to City Council re: Apple Campus (Oct. 15, 2013 12:11 PM PDT) (Letter ID e- 13 -10 -15 -111) 10/15/2013 Email from Samir Gehani to City Council re: Formal support of Apple Campus 2 (Oct. 15, 2012 12:12 PM PDT) (Letter ID e- 13 -10 -15 -110) 10/15/2013 Email from Steve Elich to City Council re: Apple Campus (Oct. 15, 2013 12:31 PM PDT) (Letter ID e- 13 -10 -15 -109) 10/15/2013 Email from Annop Tiwari, HCL America to City Council re: Apple Campus 2 plan (Oct. 15, 2013 12:34 PM PDT) (Letter ID e- 13- 10 -15- 108) 10/15/2013 Email from Jim Walker to City Council re: Apple Campus 2 — Support (Oct. 15, 2013 12:36 PM PDT) (Letter ID e- 13 -10 -15 -107) 10/15/2013 Email from Sam Ashknaz to City Council re: Apple Campus 2 (Oct. 15, 2013 1:02 PM PDT) (Letter ID e- 13 -10 -15 -106) 10/15/2013 Email from Paolo Sacchetto to Barry Chang re: Please approve Apple Campus 2 (Oct. 15, 2013 12:41 PM PDT) (Letter ID e- 13 -10 -15 -107) 10/15/2013 Email from picksnomosskaol.com to City Council re: Apple (Oct. 15, 2013 1:36 PM PDT) (Letter ID e- 13 -10 -15 -104) 10/15/2013 Email from Sheldon Orton to City Council re: Apple Campus 2 support (Oct. 15, 2013 11:50 AM PDT) (Letter ID e- 13 -10 -15 -103) 10/15/2013 Email from Udayak101cr�gmail.com to City Council re: I support Apple Campus 2 (Oct. 15, 2013 11:34 AM PDT) (Letter ID e- 13 -10- 15 -102) 10/15/2013 Email from Syed W. Hussain to City Council re: In Support of Apple Computer Campus 2 (Oct. 15, 2013 10:51 AM PDT) (Letter ID e -13- 1 -222 sf- 3345921 Q ATTACHMENT I INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2 PROJECT 1 -223 sf- 3345921 Q DATE DOCUMENT 10 -15 -101) 10/15/2013 Email from Teresa Do to City Council re: Apple Campus 2 (Oct. 15, 2013 11:00 AM PDT) (Letter ID e- 13 -10 -15 -100) 10/15/2013 Email from Victor Malik to City Council re: Support for Apple Campus 2 (Oct. 15, 2013 11:05 AM PDT) (Letter ID e- 13 -10 -15 -099) 10/15/2013 Email from Yvonne to City Council re: Support apple campus (Oct. 15, 2013 11:08 AM PDT) (Letter ID e- 13 -10 -15 -098) 10/15/2013 Email from Vikas Sud (3P) to City Council re: Support for Apple Complex in Cupertino (Oct. 15, 2013 11:11 AM PDT) (Letter ID e -13- 10-15 -096) 10/15/2013 Email from Sridar Pootheri to City Council re: Supporting Apple Campus 2 (Oct. 15, 2013 11:21 AM PDT) (Letter ID e- 13 -10 -15 -096) 10/15/2013 Email from Gopher to City Council re: Apple Campus 2 (Oct. 15, 2013 11:23 AM PDT) (Letter ID e- 13 -10 -15 -095) 10/15/2013 Email from Sam Nazhand to City Council re: Apple Campus 2 (Oct. 15, 2013 10:42 AM PDT) (Letter ID e- 13 -10 -15 -094) 10/15/2013 Email from Reilly Vince to City Council re: support (Oct. 15, 2013 10:37 AM PDT) (Letter ID e- 13 -10 -15 -093) 10/15/2013 Email from Tom Sherman to City Council re: I support the Apple Campus (Oct. 15, 2013 10:37 AM PDT) (Letter ID e- 13 -10 -15 -092) 10/15/2013 Email from Tom DeFranco to City Council re: Apple's New Campus (Oct. 15, 2013 10:28 AM PDT) (Letter ID e- 13 -10 -15 -091) 10/15/2013 Email from Jamie Rose to City Council re: Support for Apple Campus 2 (Oct. 15, 2013 9:38 AM PDT) (Letter ID e- 13 -10 -15 -090) 10/15/2013 Email from Liling Wang to Barry Chang re: Yes on Apple Campus 2 (Oct. 15, 2013 9:58 AM PDT) (Letter ID e- 13 -10 -15 -089) 10/15/2013 Email from Charlie Innis to City Council re: Approval of Apple Campus 2 (Oct. 15, 2013 10:08 AM PDT) (Letter ID e- 13 -10 -15 -088) 10/15/2013 Email from Gary Ettinger to City Council re: Support for Apple 1 -223 sf- 3345921 Q ATTACHMENT I INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2 PROJECT 1 -224 sf- 3345921 Q DATE DOCUMENT Campus 2 (Oct. 15, 2013 10:11 AM PDT) (Letter ID e- 13 -10 -15 -087) 10/15/2013 Email from Rattenhalli Sudesh to City Council re: Apple Campus 2 support (Oct. 15, 2013 10:12 AM PDT) (Letter ID e- 13 -10 -15 -086) 10/15/2013 Email from Yogi Chugh to City Council re: Apple Campus 2 (Oct. 15, 2013 10:16 AM PDT) (Letter ID e- 13 -10 -15 -085) 10/15/2013 Email from taysigcomcast.net to City Council re: City Council re: Apple 2 (Oct. 15, 2013 10:19 AM PDT) (Letter ID e- 13 -10 -15 -084) 10/15/2013 Email from Steve Baron to City Council re: Apple Campus 2 (Oct. 15, 2013 10:20 AM PDT) (Letter ID e- 13 -10 -15 -083) 10/15/2013 Email from Marlana B Telfer to Grace Schmidt re: AT &T Response to "Vacation of a Portion of Pruneridge Avenue" (Oct. 14, 2013 5:19 PM PDT) (Letter ID e- 13- 10- 15 -082a) 10/15/2013 Email from Marcia Stein, PHR to Barry Chang re: I support the Apple Campus 2 (Oct. 15, 2013 9:10 AM PDT) (Letter ID e- 13 -10 -15 -081) 10/15/2013 Email from James Duran to Barry Chang re: Apple Campus 2 (Oct. 14, 2013 11:59 PM PDT) (Letter ID e- 13 -10 -15 -080) 10/15/2013 Email from Barry Chang to Voyle R McFarland re: (Oct. 14, 2013 11:27 PM PDT) (Letter ID e- 13 -10 -15 -079) 10/15/2013 Email from Barry Chang to Liling Wang re: Yes on Apple Campus 2 (Oct. 14, 2013 11:25 PM PDT) (Letter ID e- 13 -10 -15 -078) 10/15/2013 Email from Barry Chang to Patrick Gannon re: Apple 2 Campus (Oct. 14, 2013 11:25 PM PDT) (Letter ID e- 13 -10 -15 -077) 10/15/2013 Email from Frank F.C. Lee to City Council re: Apple Campus 2 (Oct. 14, 2013 11:24 PM PDT) (Letter ID e- 13 -10 -15 -076) 10/15/2013 Email from Barry Chang to Majid Babazadeh re: Apple 2 Support (Oct. 14, 2013 11:23 PM PDT) (Letter ID e- 13 -10 -15 -075) 10/15/2013 Email from Richard Lowenthal to Barry Chang re: Comments in favor of Apple Campus 2 (Oct. 14, 2013 11:23 PM PDT) (Letter ID e- 13 -10- 15 -074) 1 -224 sf- 3345921 Q ATTACHMENT I INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2 PROJECT 1 -225 sf- 3345921 Q DATE DOCUMENT 10/15/2013 Email from Barry Chang to wesembryk mail.com re: Please Approve Apple Campus 2 (Oct. 14, 2013 11:19 PM PDT) (Letter ID e- 13 -10- 15 -073) 10/15/2013 Email from Barry Chang to James Duran re: Apple Campus 2 (Oct. 14, 2013 11:18 PM PDT) (Letter ID e- 13 -10 -15 -072) 10/15/2013 Email from Barry Chang to kucera.jiriggmail.com re: Apple Campus 2 (Oct. 14, 2013 11:18 PM PDT) (Letter ID e- 13 -10 -15 -071) 10/15/2013 Email from Barry Chang to Linda Wells re: New Apple Campus (Oct. 14, 2013 11:17 PM PDT) (Letter ID e- 13 -10 -15 -070) 10/15/2013 Email from Patricia Fairchild to Barry Chang re: We Support The Apple Campus 2 (Oct. 14, 2013 11:11 PM PDT) (Letter ID e- 13 -10- 15 -069) 10/15/2013 Email from Barry Chang to Steve Busby re: Apple Campus (Oct. 14, 2013 11:11 PM PDT) (Letter ID e- 13 -10 -15 -068) 10/15/2013 Email from Barry Chang to RBalackkcomcast.net re: Apple Campus 2 (Oct. 14, 2013 11:07 PM PDT) 10/15/2013 Email from Naren Suria to Barry Chang re: Yes to campus 2 (Oct. 14, 2013 11:04 PM PDT) (Letter ID e- 13 -10 -15 -066) 10/15/2013 Email from Barry Chang to Kathleen Barbara -Keen re: Apple Campus (Oct. 14, 2013 11:04 PM PDT) (Letter ID e- 13 -10 -15 -065) 10/15/2013 Email from Barry Chang to Nancy Yan re: We Support Apple Campus 2 (Oct. 14, 2013 11:02 PM PDT) (Letter ID e- 13 -10 -15 -064) 10/15/2013 Email from Barry Chang to Larry Stovall re: Apple Campus (Oct. 14, 2013 11:00 PM PDT) 10/15/2013 Email from Barry Chang to Paolo Sacchetto re: Please approve Apple Campus 2 (Oct. 14, 2013 10:59 PM PDT) (Letter ID e- 13 -10 -15 -062) 10/15/2013 Email from Barry Chang to Phyllis Pei re: Support for Apple Campus 2 (Oct. 14, 2013 10:58 PM PDT) (Letter ID e- 13 -10 -15 -061) 10/15/2013 Email from Richard Lowenthal to City Council re: Comments in favor of Apple Campus 2 (Oct. 14, 2013 9:53 PM PDT) (Letter ID e- 13 -10- 1 -225 sf- 3345921 Q ATTACHMENT I INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2 PROJECT 1 -226 sf- 3345921 Q DATE DOCUMENT 15 -042a) 10/15/2013 Email from Larry Stovall to City Council re: Apple Campus (Oct. 14, 2013 10:57 PM PDT) (Letter ID e- 13 -10 -15 -060) 10/15/2013 Email from Barry Chang to Marcia Stein, PHR re: I support the Apple Campus 2 (Oct. 14, 2013 10:57 PM PDT) (Letter ID e- 13 -10 -15 -059) 10/15/2013 Email from Barry Chang to Raj Patel re: I support Apple Campus 2 (Oct. 14, 2013 10:49 PM PDT) (Letter ID e- 13 -10 -15 -058) 10/15/2013 Email from Raj Patel to Barry Chang re: I Support Apple Campus 2 (Oct. 14, 2013 10:46 PM PDT) (Letter ID e- 13 -10 -15 -057) 10/15/2013 Email from Barry Chang to Richard Lowenthal re: Comments in favor of Apple Campus 2 (Oct. 14, 2013 10:35 PM PDT) (Letter ID e- 13 -10- 15 -056) 10/15/2013 Email from Barry Chang to John James re: Apple Campus (Oct. 14, 2013 10:32 PM PDT) (Letter ID e- 13 -10 -15 -055) 10/15/2013 Email from Barry Chang to Sunil Nethisinghe re: Iconic Apple Campus (Oct. 14, 2013 10:30 PM PDT) (Letter ID e- 13 -10 -15 -054) 10/15/2013 Email from Barry Chang to mMlourobsonc�r�,comcast.net re: Apple Campus (Oct. 14, 2013 10:27 PM PDT) (Letter ID e- 13 -10 -15 -053) 10/15/2013 Email from Barry Chang to Kathleen Mossotti re: Apple Complex (Oct. 14, 2013 10:24 PM PDT) (Letter ID e- 13 -10 -15 -052) 10/15/2013 Email from Marcia Stein, PHR to City Council re: I support the Apple Campus 2 (Oct. 14, 2013 10:18 PM PDT) (Letter ID e- 13 -10 -15 -051) 10/15/2013 Email from Barry Chang to Peter Hirsch re: Apple Campus 2 (Oct. 14, 2013 9:38 PM PDT) (Letter ID e- 13 -10 -15 -030) 10/15/2013 Email from Barry Chang to Ping Guo re: Supporting Apple Campus 2 (Oct. 14, 2013 9:39 PM PDT) (Letter ID e- 13 -10 -15 -031) 10/15/2013 Email from Barry Chang to Rbalackgcomcast.net re: Apple Campus 2 (Oct. 14, 2013 9:40 PM PDT) (Letter ID e- 13 -10 -15 -032) 10/15/2013 Email from Barry Chang to Raj Patel re: I support Apple Campus 2 1 -226 sf- 3345921 Q ATTACHMENT I INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2 PROJECT 1 -227 sf- 3345921 Q DATE DOCUMENT (Oct. 14, 2013 9:41 PM PDT) (Letter ID e- 13 -10 -15 -033) 10/15/2013 Email from Barry Chang to Peter Duggan re: Support for Apple's New Campus (Oct. 14, 2013 9:41 PM PDT) (Letter ID e- 13 -10 -15 -034) 10/15/2013 Email from Barry Chang to Maribel Andonian re: Apple Campus (Oct. 14, 2013 9:47 PM PDT) (Letter ID e- 13 -10 -15 -035) 10/15/2013 Email from Barry Chang to Naren Suria re: Yes to campus 2 (Oct. 14, 2013 9:47 PM PDT) (Letter ID e- 13 -10 -15 -036) 10/15/2013 Email from Kathleen Mossotti re: Apple Complex (Oct. 14, 2013 9:48 PM PDT) (Letter ID e- 13 -10 -15 -037) 10/15/2013 Email from Barry Chang to Qiwen Zhao re: Support Apple Campus 2 Project (Oct. 14, 2013 9:48 PM PDT) (Letter ID e- 13 -10 -15 -039) 10/15/2013 Email from Barry Chang to Mandeep Chadha re: Support for Apple Campus 2 (Oct. 14, 2013 9:49 PM PDT) (e- 13 -10 -15 -039) 10/15/2013 Email from Paolo Sacchetto re: Please approve Apple Campus 2 (Oct. 14, 2013 9:51 PM PDT) (Letter ID e- 13 -10 -15 -040) 10/15/2013 Email from Phyllis Pei to City Council re; Support for Apple Campus 2 (Oct. 14, 2013 9:51 PM PDT) (Letter ID e- 13 -10 -15 -041) 10/15/2013 Email from Peter L Duggan to Barry Chang re: Support for Apple's New Campus (Oct. 14, 2013 9:52 PM PDT) (Letter ID e- 13- 10 -15- 043) 10/15/2013 Email from Barry Chang to Pat Dentinger re: Please Approve Construction of Apple Computer's "Spaceship" (Oct. 14, 2013 9:54 PM PDT) (Letter ID e-13-10-15-044) 10/15/2013 Email from Barry Chang to Debanjan Chakraborty re: Feedback / Comment on planned new Apple Campus (Oct. 14, 9:59 PM PDT) (Letter ID e- 13 -10 -15 -045) 10/15/2013 Email from Barry Chang to Martin Janousek re: New Apple Campus (Oct. 14, 2013 10:00 PM PDT) (Letter ID e- 13 -10 -15 -046) 10/15/2013 Email from Barry Chang to kitegorimp.com re: comments on Apple Campus 2 development (Oct. 14, 2013 10:08 PM PDT) (Letter ID e- 1 -227 sf- 3345921 Q ATTACHMENT I INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2 PROJECT 1 -228 sf- 3345921 Q DATE DOCUMENT 13 -10 -15 -047) 10/15/2013 Email from Barry Chang to Verma re: Apple campus 2 (Oct. 14, 2013 10:14 PM PDT) (Letter ID e- 13 -10 -15 -048) 10/15/2013 Email from Barry Chang to Michael Gor re: Apple campus (Oct. 14, 2013 10:15 PM PDT) (Letter ID e- 13 -10 -15 -049) 10/15/2013 Email from Barry Chang to Sam Ashknaz re: FW: Support for Apple Campus 2 (Oct. 14, 2013 10:16 PM PDT) (Letter ID e- 13 -10 -15 -050) 10/15/2013 Email from Barry Chang to Kathleen Elliott re: Apple Campus 2 (Oct. 14, 2013 9:36 PM PDT) (Letter ID e- 13 -10 -15 -029) 10/15/2013 Email from Barry Chang to Meenu re: Apple campus (Oct. 14, 2013 9:34 PM PDT) (Letter ID e- 13 -10 -15 -028) 10/15/2013 Email from Barry Chang to ringo chao; Karen B. Guerin re: support for Apple Campus 2 (Oct. 14, 2013 9:31 PM PDT) (Letter ID e- 13- 10 -15- 027) 10/15/2013 Email from Barry Chang to Nancy Neibel re: We support Apple 2 Campus (Oct. 14, 2013 9:30 PM PDT) (Letter ID e- 13 -10 -15 -026) 10/15/2013 Email from Barry Chang to Kathleen Barbara -Keen re: Apple Campus (Oct. 14, 2013 9:27 PM PDT) (Letter ID e- 13 -10 -15 -025) 10/15/2013 Email from Barry Chang to Patricia Fairchild re: We Support the Apple Campus 2 (Oct. 14, 2013 9:27 PM PDT) (Letter ID e- 13 -10 -15 -024) 10/15/2013 Email from Kathleen Barbera -Keen to City Council re: Apple Campus (Oct. 14, 2013 9:27 PM PDT) (Letter ID e- 13 -10 -15 -023) 10/15/2013 Email from Barry Chang to Leo Levinson re: I support construction of Apple Campus 2 in Cupertino (Oct. 14, 2013 9:26 PM PDT) (Letter ID e- 13 -10 -15 -022) 10/15/2013 Email from Barry Chang to Su Chen re: Support for Apple Campus 2 (Oct. 14, 2013 9:25 PM PDT) (Letter ID e- 13 -10 -15 -021) 10/15/2013 Email from Barry Chang to Lynn.Huang(cr�,k° p.org re: I am in support of the plans for the new apple campus (Oct. 14, 2013 9:21 PM PDT) (Letter ID e- 13 -10 -15 -020) 1 -228 sf- 3345921 Q ATTACHMENT I INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2 PROJECT 1 -229 sf- 3345921 Q DATE DOCUMENT 10/15/2013 Email from Barry Chang to Nancy Yan re: We support Apple Campus 2 (Oct. 14, 2013 9:20 PM PDT) (Letter ID e- 13 -10 -15 -019) 10/15/2013 Email from Leo Levinson to City Council re: I support construction of Apple Campus 2 in Cupertino (Oct. 14, 2013 9:19 PM PDT) (Letter ID e- 13 -10 -15 -018) 10/15/2013 Email from Barry Chang to nessgitrenw.com re: Apple Campus (Oct. 14, 2013 9:18 PM PDT) (Letter ID e- 13 -10 -15 -017) 10/15/2013 Email from Barry Chang to Mina Taheri re: Apple campus support (Oct. 14, 2013 9:18 PM PDT) (Letter ID e- 13 -10 -15 -016) 10/15/2013 Email from Barry Chang to jkhosla re: support Apple Campus (Oct. 14, 2013 9:17 PM PDT) (Letter ID e- 13 -10 -15 -015) 10/15/2013 Email from Barry Chang to james leahy re: Apple Campus 2 (Oct. 14, 2013 9:16 PM PDT) (Letter ID e- 13 -10 -15 -014) 10/15/2013 Email from Barry Chang to ming zhu re: FW: Apple Campus 2 (Oct. 14, 2013 9:15 PM PDT) (Letter ID e- 13 -10 -15 -013) 10/15/2013 Email from Ming Zhu to City Council re: Fw: Apple Campus 2 (Oct. 14, 2013 9:01 PM PDT) 10/15/2013 Email from jkhosla to City Council re: support Apple Campus (Oct. 14, 2013 7:56 PM PDT) (Letter ID e- 13 -10 -15 -011) 10/15/2013 Email from Mina Taheri to City Council re: Apple Campus Support (Oct. 14, 2013 7:25 PM PDT) (Letter ID e- 13 -10 -15 -010) 10/15/2013 Email from nessgitrenew.com to City Council re: Apple Campus (Oct. 14, 2013 7:07 PM PDT) (Letter ID e- 13 -10 -15 -009) 10/15/2013 Email from Maribel Andonian to City Council re: Apple campus (Oct. 14, 2013 7:03 PM PDT) (Letter ID e- 13 -10 -15 -008) 10/15/2013 Email from ringo chao to City Council re: support for Apple Campus 2 (Oct. 14, 2013 6:33 PM PDT) (Letter ID e- 13 -10 -15 -007) 10/15/2013 Email from Nancy Yan to City Council re: We support Apple campus 2 (Oct. 14, 2013 5:48 PM PDT) (Letter ID e- 13 -10 -15 -006) 1 -229 sf- 3345921 Q ATTACHMENT I INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2 PROJECT 1 -230 sf- 3345921 Q DATE DOCUMENT 10/15/2013 Email from Lynn.Huangkkkp.org to City Council re: I am in support of the plans for the new apple campus (Oct. 14, 2013 5:41 PM PDT) (Letter ID e- 13 -10 -15 -005) 10/15/2013 Email from Patricia Fairchild to City Council re: We Support The Apple Campus 2 (Oct. 14, 2013 5:10 PM PDT) (Letter ID e- 13- 10 -15- 004) 10/15/2013 Email from Meenu to City Council re: Apple campus (Oct. 14, 2013 4:59 PM PDT) (Letter ID e- 13 -10 -15 -003) 10/15/2013 Email from James Leahy to City Council re: Apple Campus 2 (Oct. 14, 2013 4:53 PM PDT) (Letter ID e- 13 -10 -15 -002) 10/15/2013 Email from Nancy Neibel to City Council re: We support Apple 2 campus (Oct. 14, 2013 4:48 PM PDT) (Letter ID e- 13 -10 -15 -001) 10/15/2013 Comment letter from Robert Neff (Letter ID 500189) 10/15/2013 Comment letter from David Poeschel (Letter ID 500190) 10/15/2013 Comment letter from Jeff Shen (Letter ID 500191) 10/15/2013 Comment letter from David Poeschel (Letter ID 500192) 10/15/2013 Email from Chad Mosley to Piu Ghosh re: DA- Ig (Oct. 15, 2013 8:45:01 AM PDT) • Exhibit DA -Ig Legal Description For: Street Vacation (Exhibit DA- Ig - Pruneridge Ave Vacation.pdf) 10/15/2013 Email from Orrin Mahoney to Aarti Shrivastava, David Brandt re: New traffic plan from the Apple2 campus? (Oct. 15, 2013 11:06:19 AM PDT) 10/15/2013 Email from Shane Barber to Chad Mosley re: Pruneridge Ave Vacation (Oct. 15, 2013 8:03:06 AM PDT) • Exhibit "_" Legal Description For: Street Vacation (Oct. 14, 2012) (A131015 - Pruneridge Vacation - Signed.pdf) 10/15/2013 Email from Ian Cunningham to David Stillman re: Sunnyvale permit 1 -230 sf- 3345921 Q ATTACHMENT I INDEX TO ADMINISTRATIVE RECORD FOR THE APPLE CAMPUS 2 PROJECT 1 -231 sf- 3345921 Q DATE DOCUMENT for utility work (Oct. 15, 2013 10:18:31 AM PDT) 10/15/2013 Email from David Stillman to Timm Borden re: VTA Route 81 (Oct. 15, 2013 9:45:46 AM PDT) 10/15/2013 Street Descriptions for Wolfe Road, Homestead Road, Tantau Avenue, Vallco Parkway 10/15/2013 Agenda Packet, Cupertino City Council, Regular Adjourned Meeting, 10350 Torre Avenue, Community Hall Council Chamber, Tuesday, October 15, 2013, 5:00 PM 10/17/2013 Letter from City of Cupertino to Gideon Kracov re: Development of an office, research and development campus with associated ancillary uses 1 -231 sf- 3345921 Q