Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
14010135
CITY OF CUPERTINO BUILDING PERMIT BUILDING ADDRESS: 20833 DUNBAR DR CONTRACTOR:KATHURIA DEVINDER PERMIT NO: 14010135 OWNER'S NAME: CUPERTINO,CA 95014 PHONE NO: ❑ LICENSED CONTRACTOR'S DECLARATION JOB DESCRIPTION:RESIDENTIAL ❑ COMMERCIAL 0 INSTALL(N)EV CHARGING STATION IN GARAGE AREA License Class Lic.# Contractor Date I hereby affirm that I am licensed under the provisions of Chapter 9 (commencing with Section 7000)of Division 3 of the Business&Professions Code and that my license is in full force and effect. I hereby affirm under penalty of perjury one of the following two declarations: I have and will maintain a certificate of consent to self-insure for Worker's Compensation,as provided for by Section 3700 of the Labor Code,for the performance of the work for which this permit is issued. Sq.Ft Floor Area: Valuation:$1000 I have and will maintain Worker's Compensation Insurance,as provided for by Section 3700 of the Labor Code,for the performance of the work for which this APN Number:32630157 00 anc Occu Type: permit is issued. Occupancy APPLICANT CERTIFICATION I certify that I have read this application and state that the aboveinformation is PERMIT EXPIRES IF WORK IS NOT STARTED correct.I agree to comply with all city and county ordinances and state laws relating WITHIN 180 DAYS OF PERMIT ISSUANCE OR to building construction,and hereby authorize representatives of this city to enter upon the above mentioned property for inspection purposes. (We)agree to save 180 DAYS FR I I A • --. C LLED INSPECTION. indemnify and keep harmless.the City of Cupertino against liabilities,judgments, / r f /7 costs,and expenses which may accrue against said City in consequence of the ��_ granting of this permit. Additionally,the applicant understands and will comply Issue`' -- �/ Date: with all non-point source regulations per the Cupertino Municipal Code,Section 9 18. RE-ROOFS: Signature _Date All roofs shall be inspected prior to any roofing material being installed.If a roof is / installed without first obtaining an inspection,I agree to remove all new materials for �/J inspection. OWNER-BUILDER DECLARATION Signature of Applicant: Date: I hereby affirm that I am exempt from the Contractor's License Law for one of the following two reasons: ALL ROOF COVERINGS TO BE CLASS"A"OR BETTER I,as owner of the property,or my employees with wages as their sole compensation, will do the work,and the structure is not intended or offered for sale(Sec.7044, Business&Professions Code) KI,as owner of the property,am exclusively contracting with licensed contractors to HAZARDOUS MATERIALS DISCLOSURE construct the project(Sec.7044,Business&Professions Code). I have read the hazardous materials requirements under Chapter 6.95 of the California Health&Safety Code,Sections 25505,25533,and 25534. I will I hereby affirm under penalty of perjury one of the following three maintain compliance with the Cupertino Municipal Code,Chapter 9.12 and the declarations: Health&Safety Code,Section 25532(a)should I store or handle hazardous I have and will maintain a Certificate of Consent to self-insure for Worker's material. Additionally,should I use equipment or devices which emit hazardous Compensation,as provided for by Section 3700 of the Labor Code,for the air contaminants as defined by the Bay Area Air Quality Management District I performance of the work for which this permit is issued. will maintain compliance with the Cupertino Municipal Code,Chapter 9.12 and I have and will maintain Worker's Compensation Insurance,as provided for by the Health&Safety Code,Sections 25505, 3,and 25534. Section 3700 of the Labor Code,for the performance of the work for which this Owner or authorized agent: Date: I/z /i 47 permit is issued. 01` I certify that in the performance of the work for which this permit is issued,I shall not employ any person in any manner so.as.to-become subject to the Worker's Compensation laws of California. If,after making this certificate of exemption,I CONSTRUCTION LENDING AGENCY become subject to the Worker's Compensation provisions of the Labor Code,I must I hereby affirm that there is a construction lending agency for the performance of forthwith comply with such provisions or this permit shall be deemed revoked. work's for which this permit is issued(Sec.3097,Civ C.) Lender's Name APPLICANT CERTIFICATION Lender's Address I certify that I have read this application and state that the above information is correct.I agree to comply with all city and county ordinances and state laws relating to building construction,and hereby authorize representatives of this city to enter upon the above mentioned property for inspection purposes.(We)agree to save ARCHITECT'S DECLARATION indemnify and keep harmless the City of Cupertino against liabilities,judgments, costs,and expenses which may accrue against said City in consequence of the I understand my plans shall be used as public records. granting of this permit.Additionally,the applicant understands and will comply with all non-point source regulations per the Cupertino Municipal Code,Section Licensed Professional _ 9.18. j�}/j Signature6� Date /2-1(//11 tr• v 111 ALTERNATIVE ENERGY PERMIT APPLICATION !°1111& COMMUNITY DEVELOPMENT DEPARTMENT• BUILDING DIVISION 4,r \) \ 10300 TORRE AVENUE•CUPERTINO, CA 95014-3255 �� CUPERTINO (408)777-3228•FAX(408)777-3333•building a�cupertino.orq PROJECT ADDRESS go 6 3s )Uh\Y (3-r APN B 32_6 _2 0 ,�/ s__..../ OWNER NAME STREET ADDRESS © CITY, STATE,ZIP FAX 2 x'`33 Duh b�-�' i),- • Cure)--tr h o CONTACT NAME E-MAIL v� I STREET ADDRESS � CITY,STATE, ZIPI� O��a FAX OWNER 0 OWNER-BUILDER 0 OWNER AGENT 0 CONTRACTOR 0 CONTRACTOR AGENT 0 ARCHITECT 0 ENGINEER 0 DEVELOPER 0 TENANT CONTRACTOR NAME i lc N S El cC ;lt LICE E� tv�� g LICECI 0NSE2 a BUS.LIC# COMPANY NAME E-MAIL d- FAX STREET ADDRESS f 0 B 07L -73 D 57-7 CITY,STATE,ZIP San J owe.�A PHONE L/0 p - n.q^6/0 U ARCHITECT/ENGINEER NAME ( /LICENSE NUMBER BUS.LIC l# O L t COMPANY NAME E-MAIL FAX STREET ADDRESS CITY,STATE,ZIP PHONE USE OF y❑ SFD or Duplex 0 Multi-Family PROJECT IN WTLDLAND PROJECT IN STRUCTURE: 0 Commercial - URBAN INTERFACE AREA 0 Yes ‘p--No FLOOD ZONE 0 Yes ,®'No ❑SOLAR PANELS 1 ELECTRIC VEHICLE CHARGING STATION 0 SOLAR WATER HEATING 0 OTHER: FOR SOLAR PANELS: NUMBER OF PANELS/UNITS: 1 #KILOWATTS: r>O J-�4Q TOTAL VALUATION DESCRIPTION OF WORK IV ] i Ve14 EV c j (/z) v/e.)- 0-) y C _5-p_ =-®'.r - By my signature below,I certify to each of the following: I am the property owner or authorized agent to act on the p operty owner's behalf. I have read this application and the information I have rovided is correct. I have read the Description of Work and verify it is accurate. I agree to comply with all applicable local ordinances and state laws relating t -din construction. I authorize representatives of Cupertino to enter the abo a-ide tiifieed property for inspection purposes. Signature of Applicant/Agent: Date: 1 i I—I SUPPLEMENTAL INFORMATION REQUIRED OFFICE USE ONLY ?4:? ER-THE-COUNTER EXPRESS teU w 0 STANDARD. U Z. ❑ a • LARGE.P. MAJOR PVApp_2012.doc revised 06/20/12 CITY OF CUPERTINO v o FEE.ESTIMATOR—BUILDING DIVISION ADDRESS: 20833 DUNBAR DR DATE: 01/24/2014 REVIEWED BY: MELISSA .yx°a aS APN: 326 30.157 BP#: *VALUATION: $1,000 *PERMIT TYPE: Building Permit PLAN CHECK TYPE: Alteration/ Repair PRIMARY SFD or Duplex PENTAMATION SOLAR-RES USE: p PERMIT TYPE: 4 WORK INSTALL (N) EV CHARGING STATION IN GARAGE SCOPE 4 Mech.Plan Check 11.1111111 Plumb.Plan Check 1111M11 Elec..Plan Check .Meech.Permit Fee: Plumb.Permit Fee: Dec.Permit Fee: Other;ilech.Insp. - Other Plumb Insp. Other F/cc.Insp. Mach.Insp.Fee: Plumb.Insp.Fee: Elee.Insp.Fee: NOTE:This estimate does not include fees due to other Departments(i.e.Planning,Public Works,Fire,Sanitary Sewer District,School District,etc.). These fees are based on thepreliminary information available and are only an estimate. Contact the Dept for addn'l info. FEE ITEMS(Fee Resolution 11-053 Et: 7/1/13) FEE QTY/FEE MISC ITEMS Plan Check Fee: $0.00 1 # Alternative Energy System Suppl.PC Fee: 0 Reg. 0 OT • ;0.0 hrs $0.00 $106.00 1CHRGSTA EV Charging Station PME Plan Check: $0.00 Permit Fee: $0.00 Suppl. Insp.Fees Reg. 0 OT 0.0 hrs $0.00 PME Unit Fee: $0.00 PME Permit Fee: $0.00 Construction Tax: r---] Administrative Fee: Work Without Permit? ®Yes Q No , $0.00 0 Advanced Planning Fee: $0.00 Select a Non-Residential 0 Building or Structure Travel Documentation Fees:. Strong Motion Fee: 1BSEISMICR $0.50 Select an Administrative Item Bldg Stds Commission Fee: 1BCBSC $1.00 $1.50 $106.00 ti $107.50 Revised: 01/15/2014 / OWNER-BUILDER DISCLOSURE FORM COMMUNITY DEVELOPMENT DEPARTMENT•BUILDING DIVISION 10300 TORRE AVENUE•CUPERTINO,CA 95014-3255 CUPERTINO (408)777-3228• FAX(408)777-3333• buildino a(�cuoertino.orq Dear Property Owner(s): An application for a building permit has been submitted in your name listing yourself as the builder of the property improvements specified at: SITE ADDRESS DUO b Gtic APN / _ry 0 1 BP#C 4 O' O 13 OWNER NAME ADDRES 0 D` 9 DESCRIPTION OF WORK: kid Y)e" 1-4 �i/ C 1- .i—G,e y `Lk) ez 4-G We are providing you with an Owner-Builder Acknowledgment and Information Verification Form to make you aware of your responsibilities and possible risk you may incur by having this permit issued in your name as the Owner-Builder. We will not issue a building permit until you have read, initialed your understanding of each provision, signed,and returned this form to us at our official address indicated. An agent of the owner cannot execute this notice unless you, the property owner, obtain the prior approval of the permitting authority. OWNER'S ACKNOWLEDGMENT AND VERIFICATION OF INFORMATION (DIRECTIONS:Please read and initial each statement below to signify you understand or verify this information.) b/C1. I understand a frequent practice of unlicensed persons is to have the property owner obtain an "Owner- Builder"building permit that erroneously implies that the property owner is providing his or her own labor and material personally. I, as an Owner-Builder, may be held liable and subject to serious financial risk for any injuries sustained by an unlicensed person and his or her employees while working on my property. My homeowner's insurance may not provide coverage for those injuries. I am willfully acting as an Owner-Builder and am aware of the limits of my insurance coverage for injuries to workers on my property. ()k 2. I understand building permits are not required to be signed by property owners unless they are responsible for the construction and are not hiring a licensed Contractor to assume this responsibility. ')k3. I understand as an"Owner-Builder" I am the responsible party of record on the permit. I understand that I may protect myself from potential financial risk by hiring a licensed Contractor and having the permit filed in his or her name instead of my own. ()k 4. I understand Contractors are required by law to be licensed and bonded in California and to list their license numbers on permits and contracts. flk5. I understand if I employ or otherwise engage any persons, other than California licensed Contractors, and the total value of my construction is at least five hundred dollars ($500), including labor and materials, I may be considered an "employer"under state and federal law. tk 6. I understand if I am considered an "employer" under state and federal law, I must register with the state and federal government,withhold payroll taxes, provide workers' compensation disability insurance, and contribute to unemployment compensation for each "employee." I also understand my failure to abide by these laws may subject me to serious financial risk. tk 7. I understand under California Contractors' State License Law, an Owner-Builder who builds single-family residential structures cannot legally build them with the intent to offer them for sale, unless all work is performed by licensed subcontractors and the number of structures does not exceed four within any calendar year, or all of the work is performed under contract with a licensed general building Contractor. 4' 8. I understand as an Owner-Builder if I sell the property for which this permit is issued, I may be held liable for any financial or personal injuries sustained by any subsequent owner(s)that result from any latent construction defects in the workmanship or materials. Oia'nerBuilderFonn 2010.doc revised 04/14/10 1F ik 9. I understand I may obtain more information regarding my obligations as an "employer" from the Internal Revenue Service,the United States Small Business Administration,the California Department of Benefit Payments, and the California Division of Industrial Accidents. I also understand I may contact the California Contractors' State License Board (CSLB) at 1-800-321-CSLB (2752) or www.cslb.ca.gov for more information about licensed contractors. IDlc10. I am aware of and consent to an Owner-Builder building permit applied for in my name, and understand that I am the party legally and financially responsible for proposed construction activity at the site address listed above. kit I agree that, as the party legally and financially responsible for this proposed construction activity, I will abide by all applicable laws and requirements that govern Owner-Builders as well as employers. O)s12. I agree to notify the issuer of this form immediately of any additions, deletions, or changes to any of the information I have provided on this form. Licensed contractors are regulated by laws designed to protect the public. If you contract with someone who does not have a license,the Contractors'State License Board may be unable to assist you with.any financial loss you may sustain as a result of a complaint. Your only remedy against unlicensed Contractors may be in civil court. It is also important for you to understand that if an unlicensed Contractor or employee of that individual or firm is injured while working on your property, you may be held liable for damages. If you obtain a permit as Owner-Builder and wish to hire Contractors, you will be responsible for verifying whether or not those Contractors are properly licensed and the status of their workers'compensation insurance coverage. CONSTRUCTION LENDING AGENCY (DIRECTIONS:Please complete the following construction lending agency information.) I hereby affirm that there is a construction lending agency for the performance of the work for which this permit is issued (Sec 3097 Civ.) Lender Name: Lender Address: Before a building permit can be issued,this form must be completed and signed by the property owner and returned to the agency responsible for issuing the permit. Note:A copy of the property owner's driver's license, form notarization, or other verification acceptable to the city may be required to be presented when the permit is issued to verify the property owner's signature. Property Owner's Signature: Date: PE1 (NOTE: The following Authorization Form is required to be completed by the property owner only when designating an agent of the property owner to apply for a construction permit for the Owner-Builder). AUTHORIZATION OF AGENT TO ACT ON PROPERTY OWNER'S BEHALF Excluding the Notice to Property Owner,the execution of which I understand is my personal responsibility, I hereby authorize the following person(s)to act as my agent(s)to apply for, sign, and file the documents necessary to obtain an Owner-Builder Permit for my project. Scope of Construction Project(or Description of Work): Project Location or Address: Name of Authorized Agent: Tel No Address of Authorized Agent: I declare under penalty of perjury that I am the property owner for the address listed above and I personally filled out the above information and certify its accuracy. Note:A copy of the property owner's driver's license, form notarization, or other verification acceptable to the city may be required to be presented when the permit is issued to verify the property owner's signature. Property Owner's Signature: Date: OwnerBuilde1Form 2010.doc revised 04/14/10 \EZ/ Building Department 1® City Of Cupertino 10300 Torre Avenue I9SS Cupertino,CA 95014-3255 CUPERTINO Telephone: 408-777-3228 Fax: 408-777-3333 CONTRACTOR/SUBCONTRACTOR LIST JOB ADDRESS: 2_0 231 pun ay- PERMIT# ( q O I di 3S OWNER'S NAME: PHONE# GENERAL CONTRACTOR: -- So-�,,�� .— BUSINESS LICENSE#. ADDRESS: 2_0,11 Dtlr)b y CITY/ZIPCODE: *Our municipal code requires all businesses working in the city to have a City of Cupertino business license. NO BUILDING FINAL OR FINAL OCCUPANCY INSPECTION(S) WILL BE SCHEDULED UNTIL THE GENERAL CONTRACTOR AND ALL SUBCONTRACTORS HAVE OBTAINED A CITY OF CUPERTINO BUSINESS LICENSE. I am not using any subcontractors: Signature Date Please check applicable subcontractors and complete the following information: I/ SUBCONTRACTOR BUSINESS NAME BUSINESS LICENSE # Cabinets & Millwork ement Finishing Electrical / o ((e n E(ec-bi'c. 2- Excavation Excavation Fencing Flooring/Carpeting Linoleum/Wood Glass/Glazing Heating Insulation Landscaping Lathing Masonry Painting/Wallpaper Paving Plastering Plumbing Roofing Septic Tank Sheet Metal Sheet Rock Tile Owner/Contractor Signature Date COMMUNITY DEVELOPMENT DEPARTMENT ' ' , BUILDING DIVISION-CUPERTINO APPROVED This set of plans and specifications MUST be kept at the Job site during construction. It is unlawful to make any changes or alterations on same,or to deviate E I therefrom,without approval from the Building Official, panel I The stamping of this plan and specifications SHALL NOT 200A I 4 0,-{fir be held to permit • • os--•n approval of the violation If \1•1 of any p • ' o = an Ordinance or State Law. L1 N L2 G. f`f ,/ ' E _- ZK / 40A ') �) 40A b7i ✓, (7 EV Charging Dock ` _ _ _�Ce ' , Aerovironment PERMIT NO. jH 0101 ^ LAN 'Q/) ( /f Model EVSE-RS �S . 0 '-4 'Vie-; O'6j� °Or .;`y i C- 0 (:,••<" \\ GFP N (iitik it 4 11 -`ti 8-2 romex V • ampacity 40A • 200amp amp : A Gnd 10 ga. SR# 566922 (F- ) . approx 12ftii, • I b , . Customer Preeti Kathuria 20833 Dunbar Dr •Garage �� 11 PLOT Cupertino,CA, PLANS Project Date CHECKED By EV Charging Dock 1/22/13 FJ evse rs - charging dock : DATE /4Prepared by •♦— 40amp-240-volt �"`•�� J. Dollens 1 of 1 . PLANN DEPT. E liens JIectrie Corp. DA <<.„. Troubleshooting • Panel Upgrades • Solar Power Main Garage Door -s 408-929-6100 •fixmypower.com BLDG. D pT Mol V\�' tn7 V ejAcley JAN 24 201q :i - role- • EVSE Installation - Single Line Diagram Volts: I V I __ Raceway Type: Raceway Type: Amps: A Wire Type: Wire Type: Phase: fI' Line 1 Wire Size: .# Line 1 Wire Size: # /// Space: :::::::: : #/ G:::::: : :I#. Style: I 1 _ rr 40A Disconnect �. '-ii,y r' ' + , Electrical i xi "° Panel ---.' i R�1'' `VSE &//();/7` wL J 1 j0GF1> 9 s ',i).,),._A /I �%- r Sy ea a� -r., Linear Ft;J / s /4C,\____ � A B Existing FLA: I I Is Disconnect Require? YES NO. Proposed Added Load: 1 I If yes;Why' I If no,Why? New Total FLA: 1 I CUSTOMER INFORMATION ELECTRICAL CONTRACTOR stomer Name: EC Name: dress: Address: dress: Address: y: State: Zip: City: State: Zip: one 1: Phone 2: Phone 1: License Number: ., AglilLir aerovirormer; EVSE RS Installation and User Guide ,77 ., ., ,,,,..„4.,„ 0 /77 Vlf..1 , <4.--- -= .4 T0 r ll °n c0 5 c� ;_b - to ©2011 AeroVironment, Inc. All rights reserved / .�� O /jj V-4 , . 0 This guide is a reference for Municipalities inquiring about the use, installation and compliance of the AeroVironment EVSE-RS with the National Electric Code and Local Codes. AeroVironment, Inc. Model EVSE-RS Product and Installation Overview The EVSE-RS is a device which offers a simple and safe way of providing electricity to the on-board charger in an Electric Vehicle. NEC 625 Compliance • 625.2 Definitions. • Personnel Protection System:A system of personnel protection devices and constructional features that when used together provide protection against electric shock of personnel. • 625.5 Listed or Labeled: UL Listed 2594 • 625.9 Electric Vehicle Coupler: J1772 coupler SAE North American standard • 625.13 Electric Vehicle Supply Equipment: Permanently connected and fastened in • Place. No exposed live parts • 625.14 Rating: 30 amp output rating. Continuous load • 625.15 Markings: — (A) For Electric Vehicle Use Only(Denoted on EVSE-RS Label) — (B)Ventilation not required (Denoted on EVSE-RS Label) • 625.16 Means of Coupling: Conductive J1772 connector and EVT rated cable • 625.17 Cable: EVT rated cable extra heavy usage • 625.18 Interlock: Proximity switch de-energizes when unplugged • 625.19 Automatic De-Energization of Cable: Cable break away feature. • 625.21 Over current Protection:Shall be sized for continuous duty 125 %-40A Circuit Breaker • 625.22 Personnel Protection System: Proximity switch, GFI protection, Breakaway cable, Trouble annunciation light for faults and NEMA 3 Rain Tight enclosure. • 625.23 Disconnecting Means: For electric vehicle supply • equipment rated more than 60 amperes or more than 150 • volts to ground,the disconnecting means shall be provided • and installed in a readily accessible location. • 625.25 Loss of Primary Source: Contactor opens upon loss of power. INSTALLING THE EVSE-RS Specifications: • For use with Electric Vehicles • Ventilation not required • NEMA Type 3 Rain Tight enclosure •40 Amp. circuit breaker rating. Do NOT use a Class A circuit breaker with the EVSE-RS Charging Dock. Number of Freq Hz Voltage AC Current Operating Phases Amps Temp C fib` r,SYG�^�J ,/'[3 �``*`�MY f F➢ "'4.,E � (J x� CC Power Disconnect switch Charging Dock distribution (it applicable) panel Wall stud C— 0 0,0 i r VP m 14_ r77 (if „.„ /7_2 cz? Ty? INSTALLATION 1 1 . Choose wire entry location HOLE IN REAR OF HOLE ON UNDERSIDE OF CHARGING DOCK CHARGING DOCK 11111111111111111 (/.1.1614) II:'..--- %.\‘ =j r Ril 71 ,// /. c. la , '©øjiiJ Bottom View `1,111-1-1.-w Rear View 2. Attach the mounting plate Mounting plate _ c e O. Large hole for conduit utility wires u Small holes for Charging Dock mounting holes mounting plate to wall stud O Flat washer Lag bolt Wall stud 0 0 OOO� nunmm�wai o } nanmm�n ai 48' O / M/ Wall stud INSTALLATION 2 3. Attach the Charging Dock to the mounting plate a. Torque the screw to 40 in/lb. Upper mounting hole Flat washer Socket head screw 400*/ eli)( ,t/ _ � - 0 1 1 i 1 1 � w Vlib _ O: 0ii;, - \!— —! 4. Wire the Charging Dock a. Torque the terminal block screws to 20 in/lb. b. Torque the Grounding Strip screws to 20 in/lb. iiii•Nraimir, fi 40, it Yl ,, / i i a q nen G g '''.7.--'T r� _g 5v , \'\, Terminal Block a c�✓,i ,`� ,r,. ' ; :t a. now i t Ground Strip .;,..i �. 4 i� m _ G4ind ire efw owiki& Ln A0 ..-/'''/I. - r Qr ij 0 rTh 0 4 INSTALLATION r6 3 , , 0 5. Install the front cover #10 Torx screws—Torque 12in/Ib / ry oe--"-' ( i• _�{ 1 raftr0.113943ff 0 ,A V.V (1)Oji /-� 4 t t Removing the trim ring kt,c. ,,,,,.. , . ,,J4, ,..x. , N, , , ,, , Access hole Outer ring 6. Complete the installation 7 el o t. ' 111 1 0 k -------------- ((° 4 ,ti v. ,\\,0 oi 4.\\,,,, c, ..,.., st ../ INSTALLATION �2! til C`'� ?'f"�%1'Y�'?�, 9 *°r��s`-�AN i.ptag„ aS FRONT PANEL COMPONENTS POWER PRESENT The charging dock is receiving AC power. _ START READY TO CHARGEPress to begin a charge.The readyto f 7r--./'-' ----.-s-'....'''' \\\'''\ . POWER PRESENT and READY The charging dock1 charge or charging is paused. (f RrxorToate re o RT TO CHARGE lights must be on. J 11 TROUBLE O L VEHKLECONNECT® STOP The connector is properly Press to manually stop charging, connected to the vehicle port r ` The device will stop automatically or the charge Is complete, when it reaches full charge. ree VEHKLE CHARGING The vehide is being charged. \\, ,,:,*4k1,9 1 TROUBLE — \:.""'"=" There Is an error.Try removing the connector and inserting back Into the vehicle.If Trouble Indicator is still illuminated call CustomerASEV1Service7)at 7(877)2738 Nor �_ ii* GAS EV or i(877)664-2738 or visit Customer Service on the RELEASE BUTTON web at www.nissanusa.comlleaf. Press to release the Connector from the charging dock or the vehide port /77 4 C` r (' ^-, r' .vJ�Q. , ,TQ„ OPERATION 5 CHARGING THE VEHICLE r *al: ftis el ll 'y ! &i ! 0E IIIP ' VE ICfE CONNECTED® a insert connector firmly into the *ewemato=o .'*`: WART ChargingwOfbeyln ........L.„......._ vehicle charge port When ueoox+ec« ' automatically.When J fuuy inserted,the VE}IICtF vs.accwrera o charging begins.the (:ONNgdock fight on the .wauu o VEHICLE CHARGING fight charging dock wdi tliuminate. • '�y � will begin to bhnk There is no need to press START. VENUE CHARGING• !ngwill OMIT ' ;":..__; stop automatic* When the VEHICLE when complete. You can manually -.%,-1111111 CHARGING light stops 11-,74-i; blink an the chs er, atop charging bypresaing STOP, Ila. ` rig rg j When the READY TO CHARGE iia pass the button on the • \�•4J.` hght blinks,remove the connector _,..."11.11 connector to release. from the vehicle charge port.If , Pull to remove from you have pressed STOP,you can vehicle charge port. press START to resume charging. OPERATION 6