13020009 & 12070221- MISC • TESTING
� CONSTRUCTION • INSPECTION
,'. TESTING SERVICES __ __ _. • _ ENGn�rEERrrrG --
Summary Report#4
August 5,2013
*Revised August 8,2013
Apple,Inc �CEI�ED
One Infinite Loop,Bldg 4
Cupertino,CA 95014
AUG 1 3 2013
Job No: J8986
Job Name: Apple IL4 Truck Dock Addition Name:
10700 North DeAnza
Cupertino,CA 95014
Permit#: 13020009
July 27,2013
Brian Prouty reported to Lany with Devcon Consiruction at the jobsite. Reviewed welder qualification papers for
Saluador Aquirre ID#1922. Observed welding performed by 1 welder using FCAVJ process with NR232 wire.
VJeldments observed consisted of fillets and flare bevel. Tacking only at roof level at lines X.5-V/19.6-19.
Collected copy of MTR's attached. Obtained(6)samples of high stxength bolts. 24,A325X 2x3/4"xl 3�4��X 3�4��bolts
installed.
Observed installation of 107,2"x 3/4"xl 3/<"x 3/<"A325 X(bearing-type,threads excluded)at lines X.5-V/19.6-19.
Work observed was,to the best of Brian's laiowledge,in conformance with approved plans, specifications and
applicable standards of workmanship.
*July 30,20I3
Thomas Anderson reported to Larry(Project Superintendent)with Devcon at the jobsite. Reviewed welde�-
qualification papers for Salvador Aguirre—ID#1922 3G and 4G position precast using FCAW fzlle��metal with
Lincoln NR232 E71 T-8 Innershield wires, and Arnold DelaCrzcz—ID#6829, 3G and 4G position with FCAW
process. Discussed scope of welding to be performed at roof Zevel at column at lines WI19, W/19.6, V.3/19, V.6/19,
V.3/19.6, and V.6/19.6. Complete joint penetration weldments top and bottom flange. Visually complete joint
penetration weldments are acceptable. Observed weldment on HSS braces and gusset plates as per detail 5302/16
SCBF connections and 5302#14 SCBF connection schedule for size and length of weldments at lines V.3%19, V.6/19,
V.3/19.6, and V.6/19.6, top gusset and SCBF HSS connection. Visually, weldments are acceptable as per detail
noted above.
Informed co�ztractor tlaaf.general detail 50.01/nzaterial#5 was out for floor metal decking to be I8 gage and
vented Decking on site is not vented as per details. Detail 53.02/I8 and S302/14 SCBF connection sclaedule was
out for HSS SxSxS/I6 colum�a to be welded with S/16"fillet weld around Due to gusset plate�aot being coped,
weldme�at cannot be all around Request RFI from co�itractor. Requested from welding con.tractor WPS for
welding,r�one o�asit�
Work observed was, to the best of Thomas'knowledge, in confo��mance with app��oved plans, spec f cations and
applicable standards of workmanship, except as noted.
2118 Rheem Drive;Pleasanton,CA 94588 • Phone(925)462-5151 • Fax(925)462-5183
4770 Duckhorn Drive, Sacra�:nento,CA 95834 • Phone(916)419-4747 • Fa�(916)419-4774
One Embarcadero Center, Suite 53�, San Francisco;CA 94111 • Phone(41�)438-�3�% • Fax(41�)�34-4747
246 30tv St., Suite 101,Qakland;CA 94601 • Phone(510)444-4747 • Fal(�10) 835-1825
.---..
• TESTING
• CONSTRUCTION • INSPECTION
TESTING SERVICES _ • ENGINEERING '-
Tuly 31,20I3
Thomas Anderson reported to Larry(Project S`uperintendent)with Devcon at the jobsite. Observed 2 Concord b•on
Wo��k(conh�acto�)welde��s on site performing complete joint penetration weldments at roof level at lines V/19,flare
bevel and fillet welds on HSS 4x4 header at lines X.S/19-19.6, roof fi�ame HSS 4x4 at lines X.5/19-19.6, and HSS
column extend above roof line at parapet wall 1 S`floor Zevel.
Obse�ved column to base plate and complete joint penetration fzllet welds at Zines V4/19 and V4/9. Note: At above
docatio�z,requesf.RFI on colum�z to base plate co�z�zection. Refer to report dated 7/30/13. Visually, weldments a�-e
acceptable as per AWS Dl.l clause 6.9 table 6.1.
Work observed was, to the best of Thomas'knowledge, in conformance with approved plans, specifications and
applicable standards of workmanship.
August l,2013
Thomas Anderson reported to Lar�y(Project Superintendent)with Devcon at the jobsite. Obse�ved 3 welders with
Conco��d b•on Work, 2 welding structural steel and 1 welding 18 gage rrzetal decking. Conb•actor has completed
structural steel welding with the exception on column at lines V/19.2. Co�zcrete enzbed�a.ot correct, off centered
Re-i�aspection is requi.red for HS,S SxSxS/I6 colunzn to new or corrected enzbed a�id HSS Sx5 brace frame to
gusseG Cont��actor has used torque wrench on%z"epoxied all-threaded rods, torqued to�0 ft.-Ibs. Also torque
wrench was used on 3/"anchor bolts, 90 ft.-lbs., 3x4"angle ledger has all been torgued. 18 gage metal decking is
periodic inspection required on decking. Welder quality certification foi•metal deck 18 gage puddle welds. Welde��
was Joseph Sanger IV—ID#1420923 expiring 12/2/14 using SMAW A7B process.
Wedge anchor installation at column at lines X.S/19.6 and 19. Contracto�•has installed Hilti KB-TZ 5/8"x6"
embedment depth of 3 5/8"(total of 12)per column base plate, overall total on(2)columns. (24)5/8"x6"Hilti KB-
TZ anchor installed as per manufacturer's specifications. Holes were cleaned with compressed air as per Hilti
specifications. S/8"x6"wedge anchors were torqued to 60 ft.-Ibs.
Wo��k observed was, to the best of Thomas'knowledge, in conformance with approved plans, specifications and
applicable standards ofworkmanship.
21�4 Rheem Drive; Suite A,Pleasanton,CA 94588 • Phone(925)462-5151 • Fax(925)462-�183
4770 Duckhorn Drive, Sacramento,CA 9�834 • �'� Phone(916}419-4747 • Fax(916)419-4774
One Embarcadero Center, Suite 535, San Francisco;CA 94111 � Phone(41�)438-?357 • Fax(41�)334-4747
246 3Qtl'St., Suite 101, Oakland;CA 94601 • Phone(510)444-4747 • Fax(�10) 835-1825
.
� �,� CONSTRUCTION • TESTING
• INSPECTION
_,. ; TESTING SERVICES .: ., ;,..- • ErrG�Exn�rG>��
Laboratory test results are enclosed if testing was done during the period covered by this repor�
Linzitatio�zs: These inspections were performed in accordance with requirements,but please note this report shall
not be relied upon by others,as acceptance or guarantee of the work. Even with diligent inspection techniques,the
contractor is e y liable for defects or failures to adhere to the code.
a 8/9/2013
Reviewed by natha Felts,P.E. Date
Associate Engineer
Technical Contact: Timotlty Casey,Se�a.iorE�agi�:eer(tcasey@cts-I.com)
Administrative Contact: Yolanda Deras(yderas@cts-l.co»a)
cc: Building Department—City of Cupertino
Contxactor—Devcon(email)
Steel Sub—Concord Iron Works(email)
CTS PM—Aaren McBride(email)
CTS Associate Engineer—Jonathan Felts(email)
RO
21 i4 Rlieenz Drive; Suite A,Pleasanton,CA 94588 • Fhone(925)462-5151 • Fax(92�)462-�183
4770 Duckhorn Drive, Sacramento,CA 95834 • Phone(916)419-4747 • Faa(916)419-4774
One Embarcadero Cenier, Su.ite�35, San Francisco;CA 94111 • Phone(41�)4�8-23�7 • Fax(41�)�34-4747
246 30�'St., Suite 101, Oakla.nd,CA 94601 • Phone(�10)444-4747 • Faa(�10) 835-1825
�
' � • TESTING
CONSTRUCTION • INSPECTION
� . _TES�?IATC SERVICE�:_.._ _-._�. __._.__ _ _.� _ ��irrEEFurrG �. : _ ���
�-�.,-`.=:_� __ .
Summary Report#5
August 12,2013
Apple,Inc _ �C�1���
One Infinite Loop,Bldg 4
Cupertino,CA 95014
AUG 2 1 ?.0 i3
Job No: J8986
Name:
Job Name: Apple IL,4 Truck Dock Addition -
10700 North DeAnza
Cupertino,CA 95014
Permit#: 13020009
August 7,2013
Mauricio Septimo reported to Arturo with Devcon at the jobsite. Observed placement of 5/8"epoxy-set bolts for the
HSS column base plates. Epoxy material: Simpson Set-XP. Inspected the depth(12"for the vertical bolts and 8"
for the horizontal at the stem wall). Holes were drilled to a diameter of 3/a". Holes were checked for cleanliness.
See RFI changes"SKl and SK2"provided by engineer Holly Schaubert.
Work observed was,to the best of Mauricio's knowledge,in conformance with approved plans,specifications and
applicable standards of workmanship.
August 8,2013
Robert Cortez reported to Larry Heredia with Devcon at the jobsite. Verified loading dock deck at infill. 18 gauge
decking. (3) '/z"studs used per visual inspection have 360 weld. 1 '/z"side seam welds between sheets. Verified
puddle welds at every low to beam below. Reference S3.01. Observed welding performed by Concord Steel
welder,Joe Singer ID#1420923 using SMAW process with E7010 rod. Also per RFI#031,repair to engineer HSS
Sx5 to 3/0"plate,jointed by 5/16"fillet weld correction completed as detailed in RFI. Per visual inspection,welds
are accepiable. Okay to install wire mesh before covering.
Work o�served was,to the best of Robert's knowledge,in conformance with approved plans,specifications and
applicable standards of worlananship.
2118 Rheem Drive,Pleasanton,CA 94588 • Phone(925)462-5151 • Fax(925)462-5183
4770 Duckhorn Drive,Sacramento,CA 95834 • Phone(916)419-4747 • Faac(916)419-4774
One Embarcadero Center, Suite 535, San Francisco,CA 94111 • Phone(415)438-2357 • Fax(41�}334-4747
246 3U"'St.,Suite 101,Oakland,CA 94601 • Plione(510}444-4747 • Fax(510) 835-1825
--_..
' • TESTING
CONSTRUCTION • INSPECTION
_. . ' :TESTING S : : -. __.. , _� . . . �,,� �
��..�5_.:'.:-- : • .. ENGIT�EERING �rt�..,_,�:..
Laboratory test results are enclosed if testing was done during the period covered by this report.
Limitations: These inspections were performed in accordance with requirements,but please note this report shall
not be relied upon by others,as acceptance or guarantee of the work. Even with diligent inspection techniques,the
contractor is solely lia 1 or defects or failures to adhere to the code.
8/13/2013
Reviewed Jonath elts,P.E. Date
Associat ngineer
Technical Contact: Timothy Casey,SeniorEngineer(tcasey@cts-l.com)
Administrative Contact: Yolanda Deras(yderas cr cts-I.com)
cc: Building Department—City of Cupertino
Contractor—Devcon(email)
Steel Sub—Concord Iron Works(email)
CTS PM—Aaren McBride(email)
CTS Associate Engineer—Jonathan Felts(email)
RO
2174 Rheem Drive, Suite A,Pleasanton,CA 94588 • Phone(925)462-5151 • Fax(925}462-5183
4770 Duckhorn Drive, Sacramento,CA 95834 • Phone(916)419-4747 • Fax(916)419-4774
One Embarcadero Center, Suite 535,San Francisco,CA 94111 • Phone(415)438-2357 • Fax(41�)334-4747
246 30`h St., Suite 101,Oakland,CA 94601 • Phone(510)444-4747 • Fax(510) 835-1825
� •
_ ��
��`' � ��
. V -
. � .:�, .. , . ..:_ .. _�: _ _' .._ �. _. -,...._, _ ...__
�.._ , ..--.. _. ;��
� o
- Job: APple IL-4�Cafe � ° JUL 1 � 20i3
•- _ ° Date:
� Concord Iron 1�Vorks, Inc. ,
Job#,13-35 - 1501 Loveridge. Rd., Bax 95, Piftsburg, �A ��o , Z
� _ (925)432-0936(Tel) (925)432-044q(Fax)� Date Req�tired: � � 4
� tJ.�v� P�,AT�,�n . . .
BoitsF'erASTMasnoted Io-Zo,5a-55,5�-Go,b2-�4. .
� � LeRgth .
Mark Quantity . Mate('lal Feet Inches
_ . . . }•
� �I;�CGQ'. Q"O'L'�.�
10.0 . 3��"� A325 X (�� 0 2 � a�t '��� �
� ►► � . 1 � 1 0 ,3I4 9qf 1 �
5 3�4�� A3p1 0 �'/4 �k W�a�r .
I(� � . o Z`�2 �4+ .
3 5Ig�} j.�3o1 -- a �3�� Z}
� o �`�4 �+ .
� I� O 53/4 �2+
n
� 2-7 5�S + Hit,�t IG�y_ Tz o (p .�q,�- ''�f a � �a.
� �
Please Provide Mi// Tesf Reports or�Cerfi�cate of Comp/iance Upon Delivery �
. P O R E C E I V E R
CONC�.DAIRON WORKS INC. PAGE: 1
' � ORDER #= 28848 000
ORDER DATE: 07/19/2013
----� -- - �: -:_: . _ _
,.�:: :. _ - . ._ - - _
_, �,,.- -' DATE WANTED. ��2 3/2 013
t , __..... BY: JOE
� JOB: .13-35
APPLE IL4 - CP1
, SHIP VIA: TRUCK
LOR001 Ship To:
LORD & SONS, INC. CONCORD IRON WORKS INC.
430 E. TRIMBLE ROAD 1501 LOVERIDGE RD. , #15
SAN JOSE CA 95131 PITTSBUF�G CA 94565
U/M Quantity Quantity Date
Line# Description Bin Ordered Received Received
10 3/4X02A325
EACH 100. �toD f3
3/4 X 0-2 ASTM A325 HS BOLT
20 3/4X013/4A325 3/4X013/4A325
'x EACfi 110. ��Z
`--'� 3/4 X 0-1 3/4 ASTM A325 BOLT
3 0 NONINVEN'I'ORY
EACH 210. ��
3/4 IiVY HEX NUT
40 3/4WASHER
EACH 210. 2�
3/4" ASTNI F844 WASHER ,
50 3/4X061/2A307
. EACH 5. v4�
�:
3/4 X 0-6 1/2 ASTM A307 BOLT
60 3/4X021/2A307
EACH 16. �_
3/4 X 0-2 1/2 ASTM A307 BOLT
70 3/4NUT �
EACH 21.
3/4" ASTM A5 63 EiEX N[T'i'
80 5/8X07A307
EACH 3. ��
5/8 X 0-7 ASTM A307 BOLT
_�
CONTINUED
P 0 R E C E I V E R
CONC�RD IRON WORKS INC. PAGE: 2
• � ORDER #: 28848 000
ORDER DATE: 07/19/2013
:. ,.� �� .. __. ._. _....:.
_.. __.__ ._ . ._:
- DATE NT�TED: 0 7 2 3 2 013.
� � BY: JOE
" JOB: 13-35
APPLE IL4 - CP1
SHIP VIA: TRUCK
LOR001 Ship To:
LORD & SONS, INC. CONCORD IRON WORKS INC.
430 E. TRIMBLE ROAD 1501 LOVERIDGE RD. , #15
SAN JOSE CA 95131 PITTSBURG CA 94565
U/M Quantity Quantity Date
Line# Description Bin Ordered Received Received
90 5/8X061/2A307 n �l •
EACH 7. � �/ � `� •
5/8 X 0-6 1/2 A307 BOLT
100 5/8X06A307
j �� EACH 14. �_
`�= 5/8 X 0-6 ASTM A307 BOLT
110 5/8NUT
EACH 24. �_
5/8" ASTM A563 HEX NUT
120 NONINVENTORY
EACH 1.
SALES TAX
For customer 1335
� ...�
, Freight: Invoiced 0.00
__.: _ - -_ ._.__:__, . � _:-�.:a _ __
�;.,._ '_
. O
` - ' �o�: Apple IL-4�Cafe � o JUL 1 � 20i3
. _ Date:
� Concord Iron Works, Inc. ,
Job#,13-35 - 1501 �overidge, Rd., 8ox 15, Pittsburg, GA
� (925)432-0936 (Teq (925)432-044q(Fax)� Date Req�Fired:W�D•����4
. � . �l.�v� P�.A-c Fo�,n - -
BoltsF'erASTMasnoted Io-Zo,5�-55,5�-Go,b2-�¢ .
� � Length .
Maric 4uantity . MBte�lal Feet inches
-.. � . �
� �t�lA Q�o;:LT�
�o� . 31�� A32s X (�� � z � a,:a '�1�s �
. ► ► o . � � � o i3�4 gq f 1 �
S 3�4�� A3a1 0 �'/q�. 4+ wla�r -
I� � ' � 0 2`t2. i 4+
3 5I���� Jk3o1 p (�3�,�- Z+
7 0 �`/4 �+ •
� �`'�' O 53�¢ t2+
a I �
-1 5�'b 4 Hil,tt IC-4_ Tz o (p � 'a a w.
4-+-
� �
� Please Provide Mill Tesf Reports or�Certi�cate of Compliance Upon Delivery �
� � *** PACKING LIST �`** Order# 01-00233197
3�
. � ' Nc. 01.23 LV 1-01-00233197 Order Date 07/19/2013
.. .�- ��""''-�astening&Construetion SolutEons
� � , .,. , � Page 1 of 2
;.._pho.ne: � __ = __
,� ,:: . _ ._ .. � ;:-.�-
�
1085 NORTH 7TH ST Fax:
Entered by: DONW01
BILLTO: Acct#: 15830 SHIP TO:
CONCORD IRON WORKS Contact: JOE 925-432-0136
- -- -1501 LOVERIDGE RD BOX 15 - - - —- - CONCORD IRON WORKS
1501 LOVERIDGE RD BOX 15 �
PITTSBURG, CA 94565-2812
PITTSBURG, CA 94565-2812
JOB: APPLE IL-4 CAFE Phone: 925-432-0136
LS REF: 1335CON ' . Fax: 925-432-0440
Customer PO#: 28848
Special I nstructions:
Freight F.O.B Ship Via Tcacking Number Req Ship Dafe
PREPAID L&S TRUCK 07/23/2013_
Order Qty Ship Qty B/O Qty Item#/Description U/M:
1 1 0 CERTS EA
CERTS MUST SHIP WITH MATERIAL Cust P/N#
100 100 0 ' 013007560200B EA
BLT ONLY,A325 3/410 X 2"IMP Cust P/N#
110 110 0 013007560175B EA
A325 BOLT,3/4 X 1-3/4"IMPORT Cust P/N#
210 210 0 20600756 EA
HVY 2H NUT,3/4-10 IMPORT 1M Cust P/N#
210 210 0 3240075 EA
F436 WASHER,3/4 IMPORT Cust P/N#
5 5 0 011007560650 EA
BOLT,3/4-10 X 6 1/2 200 Cust P/N#
16 16 0 011007560250 EA -
BOLT,3/4-10 X 2 1/2 450 Cust P/N#
21 21 0 20100756 EA
HEX NUT,3/4-10 PLN ASTM A563-A 1.5M Cust P/N#
3 3 0 011006260700. EA
BOLT,5/8-11 X 7 250 Cust P/N#
7 7 0 011006260650 • EA
BOLT,5/8-11 X 61/2 250 Cust P/N#
, ,,,�. r � � ROTO HAM HOR
_; _ . . : ., ��
WE�GE ANC
�:_. ... . : _ . SETTING TOOL
THIS ORDER IS ACCEPTED PER LORD&SONS TERMS AND CONDITIONS. Read terms on reverse side of form.
Boxes SIGNING PARTY: FORWARD THIS DOCUMENT TO RESPONSIBLE PARTY
Kegs/Ctns Received By: Print Name: Date R'cvd.
Pallets
Bundles �
�
� �----- *** PACKIN� LIST *�* Order# 01-00233197
. � -�;,�: 01.23 LV 1-01-00233197 Order Date 07/19/2013
-, .... .. .
� ,.���
'`FaSfening&Constructlon Solutions
' ._. _ .. � _,,. ._ _ _ Ph,_o.ne:._ ..- � �a r: Page 2 of 2
�� - .- _ _
1085 NORTH 7TH ST Fax:
Entered by: DONW01
� BILLTO: Acct#: 15830 SHIP TO:
CONCORD IRON WORKS Contact: JOE 925-432-0136
---.-- 1501 LOVERIDGE RD BOX 15 _ _ _. CONCORD IRON WORKS
1501 LOVERIDGE RD BOX 15
PITTSBURG, CA 94565-2812
1'ITTSBURG, CA 94565-2812
JOB: APPLE IL-4 CAFE Phone: 925-432-0136
LS REF: 1335CON Fax: 925-432-0440
Customer PO#: 28848
Special Instructions:
Freight F.O.B . Ship Via Tracking Number Req Ship Date
PREPAID L&S TRUCK d7/23/2013
Order Qty Ship Qty B/O Qty Item#!Description U/M:
14 14 0 011006260600 EA
BOLT,S/8-11 X 6 300 Cust P/N#
24 24 0 20100626 EA
. HEX NUT,5/8-11 PW ASTM A563-A 2.5M Cust P/N#
.� _ : _ _. � -: . � �:=� .:mN. ROTO H A M M E R
_ -
.. ��J� . � .. WE�GE ANCHOR
- . , _���._.�..:._. ��� - S ETT 1 N G TO O L.
THIS ORDER IS ACCEPTED PER LORD&SONS TERMS AND CONDITIONS. Read terms on reverse side of form.
Boxes SIGNING PARTY: FORWARD THIS DOCUMENT TO RESPONSIBLE PARTY
Kegs/Ctns Received By: Print Name: Date R'cvd.
Pallets
Bundles
. • ,.;�; "- - - - .
-',. - �: '
. -.
.: ,.:;�., - ..
- i�vc. �� _ _ -m-
e Fastening�Canstrucfion Solutions .
;�-7'
'�;. .
. {.
CERTIFICATE OF CONFORMANCE
TO: CONCORD IRON WORKS CUSTOMER
� pRDER NO. 28848
� JO� 13335
� LS ORDER NO. 01-00233197
ATTENTION: .
DESCRIPTION OF MATERIALS & SPECIFICATIONS
ITEM NO: � DESCRIPTION SPECIFICATION NOTES
1 H�EX BOLT 3/4-10 X 6-1/2 ASTM A307A
2 HEX BOLT 3/4-10 X 2-1/2 ASl"M A307A.
3 HEX NUT 3/4-10 ASTM A563A
4 HEX BOLT 578-11 X 7 ASTM A307A �
5 HEX BOLT 5/8-11 X 6-112 ASTM� A307A
6 HEX BOLT.�. 5/8=11 X 6-1/2 . ASTM A307A
7 HEX NUT 5/8-11 ASTM A563A
8 .
9 _ .
10
11 _
12
13
14
15
WE HEREBY.CERTIFY THAT THE ABOVE.D�SCRIBED PFcODUCT CONFORMS
TO THE SPECIFICATIONS LISTED �
Lord & Sons; Inc. � : Date
�� � � ����� �
San Jose
Sacram en to
- � _ 430 East Trimble Road . H2yl�vard _ �
San Josa, CA 95137
408/817-8900 Benicia.
� Fa;. 408/87 7-897 o Bellilower
I
'
, 'I .. I .. � ' .
�.3`_.����..__. .:._----- __ ._---.. _ �
i
,
. , -
, ,
,
' ����r� �� cCh�n�ca� �d ���rsi���. �:�����t�e� ��H[�.P�C� �H�1`�T
. '' � I ,
Tesf Dnte 2012/1/19 . Customer STELPAST INC. �aSt�A�IS.1IIdl1SCI1�S Z.tCl._
Purchnse Order No. PO 0 15148 Desc�ip�ion
ASTM A325 Hex Bol[ No,l 11,Wanli Road,Gangsh�n Aishict, ,
Ship Qudntity 34G50 PCS. 3ize 3/4-10 x2 ISO 9001 ICaohslung 82050,'Z'aiwen �, ,
Mnnufecturer Chaang Shin Lo�No. L1109023<4-1 ISO 17025 LAB Tel;+flB6-7-621-9909 PAX:+IIQ6-7-621-9904
�xnxnxr�h1flTlESIl1Tl COITI
SUrf�ce�'inlsli Plain I .
. I
1 1. ' i t`o o 'io 6 cl ical� o e ties- olL ' "
eiinl ' M i i V i 1 D ot L1109023h-1 � , , ,
llivision e o X 100 X.1000 X 100 X 1000 X�� rnde ASTM P1852 T� e 1
AISI= 32 15 70 30 35 5 Spec. Unil Result Avg.
Doll 5pec: �
�-- - hfl96S ?
Tensile ,
3M(il II Heat No.. 33 20 76 19 7 21 �I0100 Min. LBS. 49:144 . ,.
StAen th h9322 �
ProoF oac 2Q�00 ' . L 2II6 2IIb. . �
2fl.<4 .
• IIudness 34 Max HI�C " 30,7 29.55 �
. : i .
.� I .
. ���.r� • �
BOlt � A325 - ' .. j • . .
• . � � ;
� . .I ' . .
i �
� . � .
. • . . . I '
� '. I .
i. .
; . , .�
� . � , .
� � �
------------==----
-------------=-------------------------------- ,
Authorized Signature � �
" Mai�ager of Q.A. Dep�ulznent �
. ;
,
�
, ,
, �
. ; ,
� ;
;
�
. ;
. _. � �
. ;
: : : — `� _3�
: : , . . . �
_ _ . _ . _ � — �
_ __ � , _�, - _ �s
� C��.����h� ��.����e�� I����t���s L'�: �- � _ --
.�1o. �11 �'a�i�aad ,.Gaugshan'�'o�s�ip ,I�a4l�:siaa�g County 82D50 , 'I'ai�va.n�.O.G� t .
1�L: 88b-�-o`�i-99d�9 FAX:�4�6-7-6�1-99Q��' �-I�1-I�: al���.r cD�a�gs�:.c�ffi . I
f
���'i'��+'�C�'I`� �F`+ �T���C'I`T�l�
• _ _ � �A'Y'�: I . 20��/J19
�YOli.�I�T�: . P/�NO.: Q�-7�1�0...
C uS i OlN��: S'�LFA:S'I' . t ART 1�0.: I1�B30a'7502000CSK
�_S��'I'�Oi�i, �325 Struci-sxra!Bolf 3/4-10�2 I9qanufactu�e Da 2011/�2/19
C�+ITAi�t'i'ZT�.': 34.65Mpcs • 1V�ATE�tL�L: S�E 1OB33 � $EAT N�.3�rt818
S�PEC'T�IFICATIO l�rawi;No_ s''er[�iSl!'�+ �loZ.6-?003 C3�'NO.: � I,11U90?34-1
S��L�1VG Ps "�iSJASl�81�.18.2M �'�SH: ��-�d
� � � s I �' �
^nericai 2�aIysis . a o � �.b005% l�iin
fl.32--0.36°/ 0.70-1.00% 0.030/01�3ag fl.035/a 1VIaz O.1S-0.3�/a
�ctual resui_t 0.33% 0:76% 0.019% 0.007% fl?0% I 0.0021%
��NSI�NAL INSPECTI�N (MEASi7RE1�NT BY it�C�S ORNII4'1) . PPA.P ❑Y�S � �IO
S��ND,.�RD AL'TUAi•��STJLT J'U�G�1�+
�i��. CFt�R�CTE�STICS PrYA�. Pr�. l'��. I1^�--PI_
� I Appearanc� I I[�1 GK ❑ �'G . .
2 1blaridn5
� +A325 � I��� ❑ ��
3 � G�O/i���0�au;e 2A-Gfl ;2�-Nt3G� �OK ❑ IV�G
4 I i"/iajor Diame#er 0.7482 0.7353 0.74�3 a.7395 �'�� ❑ ��
5 Vlidih"�/I' 1.25a I 1.212 � i.23� i�:7 I�OI� ❑ t�G
6 y Widt�?�/C 1.443 1.353 1.420 1.d.14 0 d3$� ❑ l�IG :
7 �iead height 0.453 . 0.45� 0.�79 I �.�5� ��$� ❑ ��
°o Screw len�� 2.00 1.51 � 1.�9� I 1.969 �02� ❑ NG
- ❑O� ❑ TdG
9
�O3� ❑ 1�TG
10
11 I ❑ t"�� ❑ ��
❑O.� ❑ I��G
L
13: ❑O� ❑ PdG
. ❑OK ❑ 1�IG
14
0 OK ❑ NG
15
❑ OK . � N�
T5 •
❑ 0� ❑ I�G
17
1� � ❑OK ❑ 1�TG
❑ox ❑ rtG
19
2D �OK ❑ IVG
----�- -----...----- --- - -
------------- --
1�+CHANZC�.L PERFORMA:t�TCE 1�QUIltEMEl�i'T� 'I'EST SPECTIFiCAT'ION:A�TNi A3�5/04b
�T�. C'�A�2,aCI'ERI,STIC� . STrSiVI�ARI� �".CTUA?RESULT JUDGINlENT
1 � Core Hardness ffi2C 34 MA_X 28.d-3a.7 HRC �4K Q 1�� ,
2 �e�3ge Teus�e streng-� 40IOa I,BS Min 48965-49322 I,BS �Og . ❑ N�
3 Proo#load 2�400 I�BS 1l�Iin 28630-28537 LBS []OK � NG
¢. ; ;0 OK - 0 1�TG
-;;,�,ST.rrr���r r�sort O ox _ ❑ r��
' — —- - _ _ - ' r�.._....a.,,.�. AT(en T.a� nm r'n7 n�� .
i
- ;
�� 3 �
. .�
;.�,
, �
�.� .. __----.-----_ _ _. __..____.__ . ._.__ .. _____ -
. _ . .�
�
, ,
, ;
� �'� —��� �h � �r� ¢k n� ��- � r�.%�� �
c A� � CIIINA STCGL CORPORATION
. � �. � �E , � �� t�'R �-� �_E_ Yv �h,���1�eR��1��i�fi��s�t�L •
� � �' � l l� �� 11,ST Clil\J.A 1'I C(11 J_, ( CHUNG KANC 20ADI ftS]AO KANG,[(AOIISfONC(012) ,
Tn�unN, erPun�ic or ciuNn
c.nninsTse� ' ' ' TGL:(07)002—Illl rAX:(07)802-2511. (07)OO1-9927
D01;k-01 COMPANY REGISTRATION NUMB[R;.3041A176 0406 �
�l'��� i�9�s��;tdiT-�"i Pl�%,�� ���� DAR–CAftBON S"L'��L
So�U f0 CH I ANG SH 1 N FASTFJ�IERS i NDUSTR I ES LTD. � ������
� ���"a�s�' VK10958161 �� '° ' OOOB0190174.. �
C5C SPL-C 90D33 (Hcwc1—�) ����' 279092�F/+ J ������� J1Y87B1V '
�r�.a���r�
i seeG �`x»p?V! I .�"���1�El�
' suierinc�e�e qUG. 31. 2011 vc issuc on7d SEP. 01, 2011
�� �� � c�c nl i��. i rls��cT I oni. T/C oz �f�r��� i
�
q �.oa�.��� � IZ � �' ' �l��,� _ I `.
� C Mn P S Si u Ni Cr o.A1 i 1{� :�.
. �Tcu oia�e�c� �oTe �¢ncT � � l�CA1' 2-� 3 !
i No. y ]0 � I2�MARi(S � .
' 01 BJ4.8A. 01 99. 0 C01 3,03 3A1018 33 76 1 7 2 3 21 I
$1h0/F 02 � � 12, 07i7_H4.62 36 6'I "I 7 1 1 1
�
r0"fAL� 1 5. 11h I
i
i
� ,
I
, i i
_ � . I'
�
i
�
• �
I '
. ��� i
. ' '� � . . ' , '
I � I
i ' :
i _ . I. I
• . �
a�� � . , �
VOTL' � i �
- I •
i
.
� �tia�'iaJal��c�Fr�9�o • 1hi�i���I��R�'�'€�3�-a`X'� � �t�f�'-����-slt = '
•SURV�YOR `TD WE HEREDY CLRTIFY ThIAT MATERIAI, ➢ESGRIDED HERL-IN 1IAS DL-EN MAMUFACTURCD NdU i ���.��� �
TESTf_D W I TH SAT I SFACTORY RL•SULTS I 1J ACtORDMICk W I T1I Tli� REQU I REMCM OF Tl-U. i
ADUVE MATERI�I_ SPF.CIPICATIO)y I ;� �
, _ � . --- � � GLIILIIA�IUIIAC611,,NLYAJ.O(tClChl, UrpA4"ill�( �
• . � — . ,
� : �� - -�
. 5
. . ,��: _ _ . __ ..
_ �� . . .___
.aac�;�gE?sz�I�S'a'� C�erPCaT�I-(300a9{�2� � ,
: �.��7 ��T� ��.l�����,�, �����'��; � �����.'��,� � }
o�� Fi� n� �a.�,Lu �� �.��art��, ��:o��-%--����1�� �� . .
i��a-�..fl o r . i � Yva;a�ns
1aiw� $�10b; RO.C_ ,z�..00�-7-�905�01 ' �a��,
���l��-��� �� 1�����1���.
. ���t�d�a-��W��T�i� 2fl12fli,12 �u�;;���� C:��.Lr . ��������,'� = 2D.1�_0'7:12 .
���a�a���� ��ri��s F��,����. . � ��,��.��1��: 3�� 1_010'77%€}�3.
��ra�a��x��l�-�s�. 10��Ta������'��r�� C._.,���, Ca S�7g� U.S.�. ..'
�'�3�a���:��-���-��� I11121��1 ���Tia��'��.��I�� �0152-32�-L'vv
�����:�t�-a�b�- C�-12�n,in �a�4l�e 1�.'�� U= ipi?r='0
�������!a��_.�%���;�-�'�.1��T�s�a-H��B��f. � ��.���; 1: :l
��: 3/a-10�1-31� IJ�T� �'��a:F�-ci�P1� ����� ��� o �^� . •
�.���.�-��� C�C7 -L�UA.��"�'P�L,�T i L3.;J'�. . 1-���
�����.�: 27� �1��= 15,2�� . �� �����::,�z �• �y -
�a�����9��t��L���a��>A:5'1_�rj F1�7fl-� . _-- � _ .
. a
����-���y r..�����...��i���n�t�y T n3,�,} � ���-�-���r�a ��i�310.2.�>�...
�i�:as-�����a� . �p�r.���i�� � _������z-� �� �L�_
1-i���Di�(Go G��) . P.D 2� O,o�3� � �'nS� �� � � �
i-iio��(��o G��) . _ .D � 0,6fi73.. .. . �PA�� ° I �
�n-�a.d��;�T L;�. D.73�3��0.7"� 1i�.7^1?�0.7a�7 � � 0
Tor�17�� 1.SfiD— 1.75�J . 1_7.12� i.7I� g � �
�od T.;-,�,.� �O,i2��D.37� �_1'71 --0.778 � �
��' '�� � Q
17�-�L�.� . � 138 Rer 1.4�4� 1.470 .
Fody�Di� 0,72�--�.'7So � �':73�---0_7�f2 � ° a
��d r�3, ; 0.�55�O,�b3 . �_�'73 �0_�"70 � d 0
�crass F�.� �I2I2� 12�� . . �1 �� -�I 229 � ��
nc�oss Co��-� 1.3 03 � 1.�3 � I.3�6=-I�39v 8 0 .
��3T�is��'�-n����s,���al�z iP'!a�'I"���n�� . � ��ers����a�.�S 1.nil A3'7�--0� . -
- ������e���� ��s�s����m� ��pra��t - es�� � �� I���e
� . 29 � 2g 2a 29
- �r HL��s A• 1��Fo�e-2fl�1 '��--3�I-��C .� 2� � 2� 2� 3� 1� . 0
, 2.9 3a 2� 29 ��
1�7,5�0�1?7,���I127,1Od. .
Te�'_v S�Ln�� A_S'j?,�F"�t�u--2D11 � 120,0�0 Psi 3�n 5 0
- � L'1,S�D0 . �L5,7d� .
� ��� 0��Psi �� 0_D�7fl1 .O.OJO1 O.O��J3 5 0
�'ro��L�-� �'I`P�S FbD�-2��I (±n_ooa5) 0_'Q��D2� O;OO�J1
v' �� A�e���� ��S'TA�F7�B-2�Q� �i�ua1 ' � � . �'A���D o p .
'�'�� sa����s t��� e���� #rs#�.�ri����'��:.ffi���s �������� ���a�Ye
����;�_. _ , . �� .
�a���� . 1 Oa l
�,r�d�'��_�i -��.�.�'. �. s��l _ . ��i�:�3���'1-� ; Dr'�.�i'='•..
�� A��i�������r�������.i�_��c��a�������� (��}=="
�.������n�aa�-37�-i�� �. ������ i�:�.-r.��1a 3�� �
"�s����t ra���i��be r�x��l����na���t�:�si ie�r��#�a�fl�y t��n��n��j�t�'�.
. . . . � �
�d . . . ��� �� � � � l� �` �r � :� ��. 1�� �- :�- ,,�, ljl p� . ��ry �
� � I=� � Cl[CNA 51'GCL CU(tPOhA'f]ON
� . ��}��.�����,r�r,���y�w��.t�,� �� _
��S`� C���'��i�C�T� 1 C(llING IiANG R9All.fIuCAO IChPIG,I(h0115►U1�G(Ul�,
��. � ... ) ' C�
, 7'ti(IYAN, lZfl'UBC,IC.OP CIIINA ' �'`
- - 'fCL:(07)QUY-Illl nA%:(07)002-2G11� (07)fIOT-94�1 �r�' '�
110272-01� COAIPAAIY R1��I S'IitATION NUMB&R: �OA1A-175 0818 0 ;�
� -�-���n���r��.��1 i.�"�;�� DAR-CAItI)ON•�1`C�L � . �.�fi�.
rr�u HwA �l�us'rR I u. co.. �rn_ � ��, :
' �. � ��. .��� � ; i�b.��'���� 61D1'12D0272:
. . _J YU111�D'17�.2 .
CSG SPEG 10999 1�6DIf-I�:D: C:.�12/7A,.1dN:.H2/,f�B, . '�,�'�o�,� "�������r� . �
�' CR�.7�./.7B (HGNK1-1� � . • . fllvinlr�G uA 8!�'J�067J i;sr.tind�o���� JW8396 '
. - n .
��� • � • � �i,�kl�31� ���'�t J�y .
� . � . . • Sfl(PPTIIO pA1E JArL �i 1.2tli2 � 'r/c•;rssqe uATe, �J�FL 1�.201�. �
�a},. G5G JA I LJ.. I J�5PECT(QN. . . �• T/C 01 � .� . `�M"C,nh����� ' . . . �. �14���yy{{
. .'k
d'A'fJ"SY� ' 1 � l��iG • , '�''�` ,' 1 S • �
� �iutia� �tiin�le u�i��e � ��— II�AT �. � ' .'�':._�. C Mn n S Si ., P1i Cr {o A]� �. •fla` 'a�: b
. . � . , � � . ;.�: _;.- 2 . 2 . _ • ,� • — p
l��'�4.02 30:0 • .001. `� 4�,b8 1�(Rti7 — ;� ':•� 82 B'l. 1, 1 �. j�j It�htA�{�1 00
T0�'AL: ' E 8.OB . •i'.ti. .- ;I3T • . �
. ' . a' r :!t:.": . `` : ' `�- �
s �� �k� _- : �:�;r?.: yy ,,
.J, J ;I!l. 1 1
' . "r�. t.c'. ' i"�• `) . . . ..
. -'` '� � - �' �I1,1.19
_ - _ .�:- �tl�
• '� z: _ .�: �� ' `.;. �L � .
� - '''; � ;,t :- .,( • • _ '
k ;
• ' • ' � 1 + '` � a���
. , ,. `"` : . � '� .�_
; +; ' ; �. .j. �- d..Yi
. :,�`� � , "�;;`J-:��, �
� � .
. �
$ � - _
:��;.`=
� _ � �tl.�.1`�. ��
.�.
— .. �;. . ' .
� . .':14:,.',r. ' . . .- _
• ' � ,�;i. .
{. 1
�B4Y;9k1���''J.L'�,�� � Ib7��.�f�•�1�.�1�`E�°�5ifl�l'!li� ��.v'�'J�m�•• i�-�--'i�, e I
, � ,. . -��P�.�, .-..1t,Ir �`____,_'-
WE }UiRk�Y CG;R'r IT'1' 7JiAT MATTR I J�L llL'SCR I H�U 11[RE I FI.1{AS BICL1d MANUr-AC ftJntll nxp �'���,,,ev,�'J'�, ��,�� 1
�������a�- �Q 7G57Cp WITH 3ATI�FAGTORY R�.5UL7S IN ACCOnnA1�CZ WI-�li TH� RLf1UlT1Ji1.1USr (]r YHr LL'"�
nuov� r�tr�ruu sn�crr-ic�rior� .. �, :.. r� '
, • . o���w�.ua��ac¢n, uer�A�.u�adlce�6�errm u�r
,� . � � . r_ �
' � �
. •
• _ __ _ �1 � � �
��� _ � .�_ ___� --_ �� �
' � c���Ni..�rsx�Z?�`�'.�T F���� �
�QR ��..�1�?����i�'H�I�U'T�
' . - . . . . � A ��� I�� . �
. f. �j �
Rr.�1L�?tiY;�zi'rN��N_r:;A�T�1+i.'�—'.-:,�T�7��.R��J�"-RB^.fJ_LT� ���,': 2�JI�.E�1.7 b 1 f %i�'-��� �
(6r-'�> (�7�� � 't �`'
CIJST�AlS�:'+L S�L_F�_ST IT=Ti, Il'�T"JNfJ:i�'13fl43G3
/ n `
�.pR-I�� � . .. . . . . �. F�'F 7 ,). .
_F-O 1+1�J11€3�R: 0-152�7"
�'����
S:�i�i.L�i�Fi.�N?T�Li �5 .'T't.i,r���.9�'.Jn194?vr-OSeD� . A�'Gi.rJT�+iJ1+iB�N'li�i212'21;i�
(��. �T��{A19�-ZH#���'�) � (���s) . -
- - P_�p,�23A�:23HW-T�NI]T5
S �N: 3/A--16f3P � QPTIY:129.6iv�?� P_��T3�?Q;�-3H007�DC
(��) C�) C��)
��AP,gS+?�'G L�]:
(=1-��m�G) ?i+S-t-T,S
g i H.F7,p�L'_�*�l'�5: ��9��� '
S�'C GR1i�E:�Y:�-?G`Ha�K_ 5�'��:5�: s%�� �:^-�3'2�::�32�O�c�.t �
(����!) C�x'��) (�s) -
CY��TRY CQi��f3�TTi02�: . �
rl F.ly�7'(�v1�) � C% T�'y% !'E'/c S�lo .'�i% G'10 I �% + .
�
��:���, ojfl- Q o� :��� I a�� I � i I
I �
xFst,�T:(�T) ( a?S o:sa� .I o.e�l I �.004 c.io I I . J
t��ik��'�L PI�O_�T7BS: C�l,�,u a,) r�s.c��r-=.s L a�,�a �.���G
SU'..�A��AR�[�SS PRi7Ok T�Gr'�_L� TA�_'�R'T2�kY.AT540i. T�i.'nFR�TU'.:
Ct�C) (��.) (�) 'C
SPEC: �2o-3a �75 �,��89 I�i�55
:���- 34 ;✓"�, C7� , a� i �fi5 /
LOFV: 32 � _�75 � 90 �` ��� �
�VG: 97 _li� 98.5 5��� -
1�drL�GETC='�3 �A�TtiIE3S] S1/R1/�1—Sa;'?�a/�'4 S2'�21-C� �
AC�MA�;i 0 ST�U�TUP,E T�GRD;�;�H.
� � TFST�TG
SE'u"Tr.P.�D A��OSTTY �r?TFcE UN50UrIDl�aS . P�'7T'-"P��nT
(3.5 :OS . 0.5 0.� ' D:5 P"�S�
��ti+.�'',I�F,SI�QN h'S PER��1J1 S3 02.2 $�D 1�A�F T5IG�2��ESS
(R����.xs�B�ia:2?j c��) (�-r�) _.
���;s:��c: � �
{����) 23 30.a0-31.?3 1:E:[}>>1�:�;
FLSUZT: .
(����) � . O� 31.�5-.31�8 1=a'.38-.I�o`4&
_ . --- -. . .
t`��L.TEST,S T.^i ACCD�17�a'I`I�W�3 Ti]E.�l'iE�3I�D5 PR�SCRI'dID�T�.APPLIC'�'LE c�ST'�!SPr.C1F�CF`S'I021.
W��Y'�73AT3gL5:D:�A I5 A�•�RiJF'PE?IZ'�II�'.14TZON OF II�FORMATIO?�i FROYIDED BY T�Eh1ATEP.L�I, -
5L�'PI��K AhID OC�A TFSTIt7G LABOBAT�KY.
�. (F�t�'��ea '+�7;SY�11�+Fi{�7+� .�a��A�t1�I, 1�'�i�?������''�"'1����°'–°���ir'�.z�+—�.' . - � . � .
. MFG 3SD9�s�.1 C�II'sl"�TCATE NOe 043fl801Z?�{�.RQR�i
C�.1�`ISO�Q�t�.z'����s) .
�_ : . . - . L,N� YE OIt�IG �
, (��I�1�]R�OF Q,A.LAB'.I�iCztt At�t�MFu S'�1
, : . _ ..._.. : .. _._. . . . - . ..._ ._.. _ . �
: . _ . . -. � �-� � . _
. � . . . . .
� . �. : _ ._ � � ._ _ _ ._ _ �Is� .
� -- ��. . -_.. J � � � - _
. � �. �
, .
. � _ � �
� � . . _
�� . J
-�-� e, � -.,.�..�-� � � ,��- -f� —'-= �� ��
: - �',��� ��,v�.��>� ?��1�..�� °FH 1"� '',� �'y, �,' ���- .� - �
� �� `"� . �'
�����`:� �����'�i�d� s�_���:":����� '��►�'.���� �;��.5!,1�, -
. . . . Fr� �Y 4 r���
' •�-. ' . ' ' . . Q•'j�'��V�N� . ' . � � / .
. ' . . n ' ! .�t�,��.i.J�i 5;��'I ,5.�-�•�. '.i._�?�y�� . . . .
=��' u--��1�L �'ri�C. s-I'�t �`�.�.�1'-�G--�''J � ,
�_ JV70 . .J1-�L1'�f r��il..L � i��L7:�nti.l ^2. y3� .
r--�. F,S�i:�r �6, ,��".;�i
�-Js��v �j?r, `�_ vi�7'1e53�2i� u ��, W.},S�:ERSPLr?,;
� .. . i=- �:7A-C��
-' � " `L� . . . tc�n A n i:Pa �
. �. . ,_ 3I4 � a.3��3� P�� � I Ln v?D�J�?5�i
�� F/f.�'h.r`T��I;'.� LrJ-.�' �"" � ,/�
� h1C:,. }-;�,1 N�, I
� � � � � �R��� " �is�.`�'� I �.�-:��'90��-{�jfl �a � J Q�I�L�D-� v' I
� � , MSr_.�O?! . . - ` Fi ' I�v?t t.f�r:L I I
;� o,:,�n�� .�ST1:�1<$35 �' . �i� . . , 5�'
����.. �I�., :�� � ,� is�
� �riUP��I`1GN��� i�� � tJ� A;Ci IJ_=�R��IT�T CON�:3.,J����1 �
:. ��J�� �. � � �r � � � �
:�� � . �
'� . . ` ,I`�� '?v.e�7-21.�3 I . 2L�,-�_1_� � CK
�� D
, �� 9� �0.�13-3z�9 . I 3�.�3�.f f �� .
��� THiC�S . ' ,
__ � _� > . � 3:�9c:"__315: I 3.1-�'.:7 C�j�
� hPF"r�t�.Ai�u'�1� o- . -
� � .�.r� + ..r�„��;� o� �
�.. .. . .
�� ivi�ESU�Ft��]T 7'���;tJt;�`: 7�,��E�vY R.EJui�
��r'�f�C.S1 �Q�J�EJ 3 � �- �.,� T
- �' PRQPFRTICS S LnT�)AP,�l�F-T UE I I I
�� ' �t� 'ah�'nf� � . .g7? �L � �—�� � � + o
�, PA��'LG�3TR�S �
��,, ' :��.�:� I - I a i
x��s �
;�� 2. � . �. :�'�Z':.'35s� g� v3 � 4; I 7 =?3 £s '� ,I I ^�
� �
- �-IE��.4L E"�;'_rf��i IT �, �' � �
'� . .
;�i
C '1 ' ARIl P S . C }+%C f3i ��1 !1 1J I 1:! �
� . �-c '3� . . :''��, �L �' � -� � �.�. � =4' 1-�` .� .
"�,' �.� Q?l Q.b4. (7�Z7 (i:Dl 3', C:fr� �:�; �bo
;:�: l 1
. ..
�� �����
_ . _
. . � _. _ ,�
' ��^.H . � , ' �' 43 . ' J d4`�
�!:-lF.�� ��'�`�•� �. ��
�� s��� �� :�� � 4 �rn�.
�..� �l _ �,�,y ;�� c°
�I�T'E :� �.s, ��
. � � . � ���
. . : � � :� ..� 7�' .
:� - � � . . . - . _� _ �
e
� • TES ITNG
CONSTRUCTION • msrECTrorr
.�- ���'����<�,��,��a�.-- ,.- --�- .��—_ _,-=x,-.__-__ _ _�.NGINEERliVG -___ _---.� __ _�_�_-_....
_�.4.,..:_ ._Lt�_____ ,.,�. _ -. -
. .._._ __ _ � _r __ . _ .r-. _.
• • Summary Report#8
September 2,2013
Apple,Inc
One Infinite Loop,Bldg 4
Cupertino, CA 95014
Job No: J8986
RECEIVED
Job Name: Apple IL4 Truck Dock Addition
10700 North DeAnza S E P 1 .8 2013
Cupertino,CA 95014
Permit#: 13020009 Nalrie:
August 28,2013
' Lisa Marie Vossen reported to Larry Herdie with XL at the jobsite. Observed the application of sprayed fire
resistive material—brand Cafco—type 300:2 hour fire rating,deck= 1"W 12 x 19=7/8,W 14 x 22=7/8"3 x 3 x
'/4"= 1 3/16,5 x 5 x 3/8"= 1 3/8.Performed thickness tests,results attached. Sampled fireproofing for density tests:
size 4"x 12",(1)beam sample. Observed the application of spray-applied intumescent paint—type Cafco WB3.
Checked thicknesses for columns. Since specified thickness 280 mils. Work in progress,reinspection will happen
on 9/9/13. Pass or fail to be determined.
Work observed was,to the best of Lisa's knowledge,in conformance with approved plans,specifications and
applicable standards of workmanship.
August 30,2013
Jeff Buscheck picked up(1)fireproofing sample and(6)HS bolts from the jobsite.
Laboratory test results are enclosed if testing was done during the period covered by this report.
Limitations: These inspections were performed in accordance with requirements,but please note this report shall
, not be relied upon by others,as acceptarr�e or guarantee of the work. Even with diligent inspection techniques,the
contractor is solely li e or defects or failures to adhere to the code.
9/6/2013
Reviewed b ona elts,P.E. Date
Associate ngineer
Technical Contact: Timothy Casey,SeniorEngineer(tcasey@cts-l.com}
Administrative Contact: Yolanda Deras(yderas@cts-l.com)
cc: Building Department—City of Cupertino
Contractor—Devcon(email)
Steel Sub—Concord Iron Works(email)
CTS PM—Aaren McBride(email)
CTS Associate Engineer—Jonathan Felts(email) JC
21.1.£Rheem Drice,Pleasanton, CA 94558 • �a Phone(92�)462-57.51 • Fax(92S)4b2-5183
4770 Duckhorn Drive;Sacramento,CA 9�834 • Phon.�(916)41.9-4747 • Pax(916)419-4774
One Embarcadero Center,Suite 535,San Francisco, CA 94111 • Phane(415)43b-23_57 • Fax(4I�)334-4747
24Ci i0"'St.,Suite 101,Oakland,CA94601 • Phone(510}444-4747 • Fax(�3.0)835-1�2a"
.
. ,��.
."CESTY@�i� Iss�t=:���-.-
,- - - _
_ __. ,�y, _._,_,
_ _ _ _ —�. _: _ ... ..._ _ _ -
. ..a.. A�::-` ._Y- --� ::��
_.�---__,� ,- _ _ ._ ^�i��`� :--- _._. �5���,-�i.`::s.:
--
�
-$islGli�EE€tI•E4'� I.E:�I�ic..
�si��f:
��r°��r�e�r�i�� �`�����es� ���� S€��e�
Projec#tJarn� �i}�� �� S ~�L�.�- +.��s�._.. .Se�tx REc+ j.,.�" �E% �±e ;> �� `s
PYo)eeX LL+Ga1kGr1 � !!1 #tl� �.{�i M V, � �F-� �����d F �a.�'�`u i�z.�..` ;/,�"-:.� :.t--r�v.,,�""`. . ._. .... . .
CTS R8j7rSSersttat"tV8 '-�.��i � �i�i�S z�'l"
�! �—
j --y. �--�I _. .
. as . ra R.�f�6i�3�`l�fl��t"3E
,^�/��``; ' t s s 4 � T_� —� t.`C#���i5 �SciS'��i�. .
�..�iFiS �.S�S D;�
'.,,,��..,.' , �._..�. �.er--• S
� � Jaisfs{Ts€is.�es} 2 sefs c,f i
s � a s � `t i3sck's 'i�ef ci� `
� .?'� _ Fasr ioaa:�ser eavn.utwg Thzb.csa d Fix�itas[rtiw Tizst FacaUorss fem iieasurhig"E'hieknars a€�ez-Rss'rsiiue `�e:�r�i+sg Si r ..i,-;.^<a'1P.c` ��
� } 4samacis nn e.a..s...�a ed�e.:a • �dafertsls an Jah[n�evssec} -
��
�� Structure ��r Lacafion 1 2 3 4 5 5 7 8 9 ��3 i4 'f2 ��� � ��e�' � ����
�Y�� T'rt�k�ni� �'sc&(in; ��fi �
� � �� � � � r�
.�, � � € �v - � �+ � 1� � �; ;� �� �'� �_, { � '�� /�
�- '� ;; � � J
,:� � � '� �� �� �" �`1 :�� _3, �, �;£„ =;y �', , ��_ ____ .
�""� � � � � :�.7 '�j �`? Z.� ��} �!� '.�i, , � j1 ��
s , ' °;:�
�� �� '�v �r. J i�f L , gg� ? - -.f'�, `'"
�,,_,I � � lJ� �ti �� '�- ✓� �+�• n: b� �'j Y 'y=- �,, _�" � ^.
r f{�, 3 �`J����{Y .v°t' � �� i`� ��0 �y( �7 � �."R _1� .~iSG •�!t 1..-�... � '*;_
� �
���� �. i_V i i'��S-C � �� a3 (�`� i Z i Z .j`> y.� � '✓'j 2.�; ? ¢` � c� .
�
^;:yj y� , �;�'rc�•s� � n� ?" ;t' 7 �J �' � � �
`,.� � ! Qo::lc- {- . I.� j �:" ;�1 �.+ > �r� ��a �- f}C. .,�;. �. "%}
{,. dJ '�+i
� � `--�' - ' �'�t3; r` Z7 $3 �G!" `�v� �IS '_"��! L+� �`� t'�; ,�� �=j � �
��E �+ 2�;�Pa� �! ��i � � �7 f i.� � � �,�% �
c �fl_`> >1 ��� �
.: �j'}� D���:�t:�* ' � : a J �„-e
t'1-- ( E 2. � ��l �v �5? i�;Z- P�; '>� `t� "� � C�;.r ...
�`:." ,�. t�n_5t�' �a �'G1 �1 �j �ri �� f_t.� �r M�.- uS y�` A� `-- J:
`� � '} i9 � .- ,.. '
� E�cS'i .�'� �5� .� � W�. '3� "�' '�'f ,' =�'�- �j `�; '-�`•'
� J y
� � `_,
,`rf ;� �°�,`�`' Z�J #� Zl � Z�i ��i �r3 `�/ �� �.� `` �.'� �� � -,�`
rA'i f.7�`- � ':1� �l� ':L �'' �� "� ?,l ?� ar .:
( .� �1 :.-�' ?� �
r�. € 13�"P+"� � ��7 S f T? �� � ��f .`�i .�� f� ,�.✓f T� � '�.
"4�`' �'�� �� ��i �Z �5 S� � �. �;; ��;- .'�� �:� �i " ° �
._—�_jarne�ir��mrtlarc'�wifh ASTF.1 E605 � .
i^f i Yd�rk (�"�r�s �uas not fraspected and sarrtp#ed in a�cc+€darn�v�`��-�np-:�v�.:;�:�z. .,...� ._.__.
;_} Y.or'.t �vra5�^ Q xras not irtspected and sampled in a�se�an�+.�+��'i G�FY,���s��e�rs�..�� _,..,_.
f `
Y �
r" � � �,��,��—.
I`��'�j- t..� ��..
.��fiSJ�CiG°F ��_� �
_ _...._ ___.._
_... _.___ _ _
- a_ .,: �
I
`
�'' •T'�SS'f�t�� Ds:4:��e�o.:
_ - . s - -- _ - _ - -
_. _ ,. _
___ � _. .r �.i��� ;--�- _ ; -- DSA.AppI.itio_ _ ' _ - __v__ _ _. ._ -- _-
.�.,. �• . � .
- - — i`' ,�. ,� .�-,:�.- -....--_,�,_ - ` -
- �� 'E'HIG1hd�Ef€Tt�l� L:nA*:o.:
� ����:
�ir�prc�c��r�g "�����€��� ���� ����fc f
Project tdarne �� ��,.�"'��3� �."?'.;�JCy ,fob�10_ V�� Dafe �f.��j;f��
,
Fro�ecY Lncatiari ��"�'`,��. .:.�j�--+"": #� �"�''?�' ��`�'��.-t( C`3�=1 f�1,;'�tiv,•t T'��t�.:l�--.
CTS F�epreset�a�!e ���' �c ��S v L";'� S
�3 �
lY� f o S T �7 .
€ (t9ember Ty{�e
. r s � � � _ Golumr�s 2 se�s oi 12
Y 8
� - y...� \ � �EkR?S Z S0t5�{5
�
I . � �i1�5{�SIISSES� � �SL.�S Rf%
i
+t Ilecks 1 sef nf 4
� i t S � � <$yf���z for Tl,easud Tfiklmesa oi Firc-t2esisfive '�e��di�g ali rrzdmg5 ir:'It7E'
7iai IOCWoni iarYeesuliny�Yd¢e�,p{FI'Cdt�II�nm �
' c�,�ti,a.c:��on s.srn��ewurmc - Fs�atarisk an Jol�:i:s tTruscea#
Str�Cture Ffaat LacatiOn t 2 3 � 5 6 7 €� 9 10 11 i2 r�,vg. Spec.
�^^�, ��`� Thiek(ih) �ixsicK�n�
`
:. : v�t�Si �
�;
�..•° ,. -
,.--,,, t_,��t�'✓`: ! i-t t� � � � ,
�` i � .,, ..�
r:~`'�: �S� �„ `.,, ,,.--
1 Y e } �« �. ;�,� }'�
. v" ���,�}.'� J ��ts � �,' ;f�t/ ���
�{3�' 1 ts .,�`. '\ � ,�
� Y�.\ €1! `�, y ,-�
/-�"} �y1.�'••�.} .�hhC`�.�. r.., • .', . .
�,-,. °},�lS'iWb �",� ra'`"�`""' �` �`' t;
� �. � :� a
1;�:� � �� �,, >.L r.- � ,
� :�.�.� t .,,
4�..q_ �ws� �� -� �,, -�: � �y '' 4�
i
`�,- ,�, � � ��v — ` ; .� �
,`� �,-,- .. �,E. `
� � �;.,,•.f( �:���� •��i �: } �; v
� ",..-�""
�4. s'�
r��
�y �
�
'TeSs pe:f�mea in zc:erdar�z x�h f:��'!Td EE35 ..
�r 7
�,'' Wyar'K �„vras �u�s not irtspecYed and samp[ed ia accordasice wifh�-appraued pEans�nd�e�€ficafi�€�..
r L
{� V��tk #�m� �x�s aot .inspeeted aiaB sampted in a..cnrdanc���ith(?S�Ffii3-3pprou�p#azzs a�ae�s�asci€rca#i�rrs.
�
� /s hY�, ��.' �����'��j . �i -r s { �
, ��%���15TJ8C�Q� �$i8� .. .
E � �
: 3
,�'��^ • TESTING
CONSTRUCTION . irrsrECTioN
: : _....__.�r:,�:= '='E;ft�"`iTNEERTNG _,_,:�__,- -..._�-� ---
:.- .._.tiv. : TESTING-S��VIC-£�- _ __ _.,— .�_.y_—_
Summary Report#9
September 9,2013
Apple,Inc _ --
One Infinite Loop,Bldg 4
Cupertino,CA 95014 �cEI�D
Job No: J8986
Job Name: Apple II�}Truck Dock Addition
SEP 18 2013
10700 North DeAnza
Cupertino,CA 95014 Name: �
Permit#: 13020009
September 3,2013
Lisa Marie Vossen reported to the jobsite. Intumescent paint re-inspection on Sx5x3/8 columns at loading dock with
Cafco W B 3.Checked work in progress. Awaiting thickness specifications,preferably listed in mils,since that is
what the positector uses to test thiclaiess.
Work observed was,to the best of Lisa's lrnowledge,in conformance with approved plans,specifications and
applicable standards of workmanship.
Laboratory test results are enclosed if testing was done during the period covered by this report.
Limitations: These inspections were performed in accordance with requirements,but please note this report shall
not be relied upon by others,as acceptance or guarantee of the work. Even with diligent inspection techniques,the
contractor is solely li bl for defects or failures to adhere to the code.
9/12/2013
Reviewed yJona anFelts,P.E. Date
Associ e Engineer .
Technical Contact: Timothy Casey,SeniorEngineer(tcasey@cts-l.com)
Administrative Contact: Yolanda Deras(yderas'La�cts-1.com)
cc: Building Department—Ciry of Cupertino
Contractor—Devcon(email)
Steel Sub—Concord Iron Works(email)
CTS PM—Aaren McBride(email)
CTS Associate Engineer—Jonathan Felts(email) MH
2118 Rheem Drive,Pleasanton,CA 94588 • Phone(925)462-5151 • Fax(925)462-5183
4770 Duckhorn Drn-e,Sacramento,CA 95834 • `�9 Phone(916)419-4747 • FaY(916)419-4774
One Embarcadero Center, Suite 535, San Francisco,CA 94111 • Phone(415}438-2357 • Fax(41�)334-4747
246 30`�'St.,Suite 101,Oakland,CA 94601 • Phone(510)444-4747 • Fax(�10)835-1825
J
' • TESTING
CONSTRUCTION • INSPECTION
,:_._ ,,_` TESTING SERVICES • ErrGn�rEExrrrG
Summary Report#2
July 22,2013
Apple,Inc RECEI�TTEE�
One Infinite Loop,Bldg 4
Cupertino,CA 95014 JUL 2 9 2013
Job No: J8986
Na�e:
Job Name: Apple II�Truck Dock Addirion
10700 North DeAnza
Cupertino,CA 95014
Permit#: 13020009 �
July 13,2013
Edward Bindert reported to Larry with Devcon at the jobsite. Observed placement of concrete(mix no.3FOEG9C1,
28-day strength of 3000 psi,specified slump of 4f 1 inch, 18 total cubic yards placed)for truck dock addirion.
Monitored loads for mix no.,slump,temperature and time limit. Prepared cylinder test specimens sampled from
mixer chute.
Set 1
Slump 4.25
(�.) .
Mix temp. 83
�°F)
Air temp. 70
�°F)
Truck No. 7134
Location Loading
dock,1�lift
4 Per Set, 1 Set,4 Total
Observed placement of rebaz for walls of truck dock,reference 52.01 and S3.03. Ok for concrete placement.
Consolidation of concrete by mechanical vibrator.
VJork observed was,to the best of Edwazd's lmowledge,in conformance with approved plans,specifications and
applicable standards of worlananship
July 18,2013
Ramon Carrillo reported to Roy Pantle and Larry with Devcon at the jobsite. Reviewed welder qualification papers
for Arnold De La Cruz—ID#6829 and Alex Regitano—ID#0726. Observed welding performed in pro�-ess and
completed by(2)welders previously reported using E71T-8-H16 NR-232 wire. VJeldments observed consisted of
plate to plate 3/8"x4'/2"x9"welded to existing embed 5/8"xl2"xl'1"with 5/16"fillet weld on both sides at loadin�
dock 1,level4 addirion,reference 17/5301, 1/S201, 1/A2.01 and AB2#4. Platform total(10)plates welded.
WPS and mill certification obtained by Jonathon Felts(CTS engineer)and reviewed for conformance. Welders'
certifications on file.
2118 Rheem Drive,Pleasanton,CA 94588 • Phone(925)462-5151 • Fax(925)462-5183
4770 Duckhorn Drive,Sacramento,CA 95834 • Phone(916)419-4747 • Fax(916)419-4774
One Embarcadero Center,Suite 535,San Francisco,CA 94111 • Phone(415)438-23�7 � FaZ(41�)�34-4747
246 30�'St., Suite 101,Oal:land,CA 94601 • Phone(510)444-4747 • Fax(510) 835-1825
t
' `��~^~�` • TESTING
CONSTRUCTION • INSPECTION
- ' TESTING SERVICES • ENGINEERING
July 19,2013
Steve Corona picked up 4(6x12)cylinder samples from the jobsite.
Laboratory test resWts are enclosed if testing was done during the period covered by this report.
Limitations: These inspections were performed in accordance with requirements,but please note this report shall
not be relied upon by others,as acceptance or guarantee of the work. Even with diligent inspection techniques,the
contractor is sole ble for defects or failures to adhere to the code.
7/23/2013
Reviewed Jonathan Felts Date
Staff En ' eer
Technical Contact: Timothy Casey,SeniorEngineer(tcase�cts-I.com)
Administrative Contact: Yolanda Deras(yderus�a,cts-l.com)
cc: Building Department—City of G�xpertino
Contractor—Devcon(email)
Steel Sub—Concord Iron Works(email)
CTS PM—Aazen McBride(email)
CTS Staff Engineer—Jonathan Felts(email)
LH
2174 Kheem Drive, Suite A,Pleasaaiton,CA 94588 • Phane(925)462-5151 . Fax(925)462-5183
4770 Duckhonl Drive,Sacrainento,CA 95834 •�9 Phone(916)419-4747 . Fax(916)419-4774
One Embarcadero Center, Suite 535,San Francisco,Ca 94111 • Phone(415)438-23�7 • FaY(41�)334-4747
246 30`}' St.,Suite 101,Oakland,CA 94b01 • Phone(510)444-4747 • Fa�(510)835-1825
• TESTING
� CONSTRUCTION • INSPECTION
TESTING SERVICES • ErrGn.rEExn.rG
Summary Report#3 b�
July 29,2013 1�C�I��
Apple,�� A UG 0 7 2013
One Infinite Loop,Bldg 4
Cupertino,CA 95014 Na1x1�;
Job No: J8986
Job Name: Apple IL4 Truck Dock Addition
10700 North DeAnza
Cupertino,CA 95014
Permit#: 13020009
July 20,2013
Tim Cherrie reported to Lee with Devcon at the jobsite. Observed placement of'h"all thread for wall embeds at
lines W and V at loading bay. Embeds were at 15"on center. Epoay material used: Simpson Set XP22. Holes
were drilled to a depth of 6"and a diameter of'/2". Holes were checked for cleanliness. VJork at this location was
done as per RFI#026. (30)Total bolts placed.
VJork observed was,to the best of Tun's laiowledge,in conformance with approved plans,specifications and
applicable standards of worlananship
July 23,2013
Mark Eres reported to Tom with CIW at the shop. Reviewed welder qualification papers for Armando Cardona,ID
#2523,and Gerardo Vazquez,ID#8247. Observed weldi.ng performed in progress by(1)welder using FCAVJ
process with E70T-6 NR 305 wire. Weldments observed consisted of complete penetration and partial penetration
multi-pass and single pass fillet welds joini.ng column splices,gusset plate connections,knife plate and complete
penetration on gusset plate connections as per approved shop drawings. Columns Al2 and A13 are in progress.
Work observed was,to the best of Mark's knowledge,in conformance with approved plans,specifications and
a�plicable standards of workmanship.
July 24,2013
Mark Eres reported to Eric with CIW at the shop. Reviewed welder qualification papers for Armando Cardona,ID
#2523,Gemado Vazquez,ID#8247,Ficencio Vasquez,ID#6709,Brian Kelly,ID#2031,Norman Cruz,ID#4523,
Jose Vasquez,ID#5460,and Jesus Acosta,ID#0637. Observed welding performed in progress by(7)welders
using FCAW process with E71T-8 NR 232 and E74T-6 NR 305 wire. Weldments observed consisted of complete
and partial penetration single and multi-pass fillet welds to assorted beams with stiffener plate,connection plates,
columns to base plates,column splices,and knife plates and gusset plates. Columns have(4)eomplete penetration
splices each. See attached member checklists for piece numbers.
VJork observed was,to the best of Mark's l�owledge,in conformance with approved plans, specificarions and
applicable standards of workmanship.
2118 Rlleem Drive;Pleasanton,CA 94588 • Phone(925)462-5151 • Fax(925)462-�183
4770 Ducl:horn Drive, Sacramento,CA 95834 • Phone(916)419-4747 • Faa(916)419-4774
One Emharcadero Center, Suite 535,San Francisco;CA 94111 • Phone(415)�38-2>>7 • Faa(41�)334-4747
246 30`�'St., Suite 101,Oakland;CA 94641 • Phone(510}444-4747 • Faa(�10) 855-1825
• TESTING
. CONSTRUCTION . n.rsPECTiorr
_ TESTING SERVICES • ErrGn.rEEx�rG -
July 25,2013
Mark Eres reported to Eric with CIW at the shop. Reviewed welder qualification papers for Armando,Ficencio,
Brian,Norman,Jose,and Jesus.Observed welding performed in progress by(7)welders using FCAW process with
E71T-8 NR 232 and E70T-6 NR 305 wire.VJeldments observed consisted of complete and partial penetration single
and multi-pass fillet welds to HSS column splices with 4-6 complete penetrations per column,stiffener plate to
gusset plate,knife plate on columns,assorted beams with stiffener plate,connection plates,and beam splices per
shop drawings. See attached member checklists.
Work observed was,to the best of Mark's laiowledge,in conformance with approved plans,specifications and
applicable standards of worlananship.
Laboratory tesf results are enclosed if testing was done during the period covered by this repor�
Linzitations: These inspections were performed in accordance with requirements,but please note this report shall
not be relied upon by others,as acceptance or guarantee of the work. Even with diligent inspection techniques,the
contractor is solely liable for defects or failures to adhere to the code.
�'� 7/31/2013
Reviewed ona elts Date
Staff Engineer
Technical Contact: Timothy Casey,Senior Engii7eer(tcasey@cts-I.conz)
Administrative Contact: Yolanda Deras(yderas@cts-I.conz)
cc: Building Departme�t—City of Cupertino
Contractor—Devcon(email)
Steel Sub—Concord Iron Works(email)
CTS PM—Aaren McBzide(email)
CTS Staff Engineer—Jonathan Felts(email)
JC
2174 Rheem Drive; Suite A,Pleasanton,CA 94588 • Phone(925)462-5151 • Fax(925)462-5 I�3
4770 Ducl:horn Drive; Sacramento,CA 95834 • �q Phone(916)419-4747 • F�(916)419-4774
One Embarcadero Center,Suite 535, San Francisco;CA 9411 I • Phone(415)438-2357 • Faa(415)334-4747
246 30`l' St., Suite 101,Oakland,CA 94601 • Phone(SIO)444-4747 � F�(S10) 835-1825
1
•TEST(NG
CQI�ISTRUCTION " .iNSPECTIntG :' `.
TESTtI�G SERI�ICES •ENGINEERlNG
Member Check Lis#
Project: _l�1 �� �� �{t1t. S,% 5"r!�(� c�s P��t� 2353 J'?lc,�f�tLG c�
sd�rN s-F.
Job No.: �� Date: %—2�2 l 3
CTS Representafa�►e: {�'�/2�
—r
Member Member Weld Finat Ac�.
ID Description Type(sj '�' Rej. Insp. Remarks Date
�l'� .�6E� 3�,u���+ � fr-' ;' � �,� 3 .-r, 7 22 r�3
���i �J 2z3� 1 ii r�
�]�'L� �' ��ir,� � X
� `�� �� 5/.v�
i
�'t�� � . .
�03 Cg�
�J �2 ��
�P 33 7
� � � ��
�t���` � �j� 3 �R� S
�l� l /a '�z"t�L 'Z"`� s
��f�9 1� �� x�z � ��
�!' j`� l,/ �t -3 tr�
���� �� ���� �r �r �
�t�'35 �� i �i.� �_ r,
�n�� r
�����
�P d c
�� �
- 1 Z �i�'DS ,a 3��
!��'o �"1-�!� d '
- - '-'c�7 S. '�1'�
�I$.� , �. �, g , y 5.5/, �9 9.G, 5�,�.
.b.
--, �2 l3 �c�;�res
Inspector Signatuce Date � �'l5�1 pg 1of�
Q�1 E?CP,�1'1f2{�35
2118 Rheem Driue � Fleasantan,CA 94588 j Phane(925)462-5151 � Fax{925)�62-5183
4770 Duckhom Qrive,Suite f�{ �acramento,C�95834 � Phane(916)419-4747 � Fax{91�}419-4774
i
.
•TESTING
y,; �flNSTRUCT:I`ON •iNSPEGTtI�G ` ''
�-� TESTI;I�lG.SfRVIGES �ENGINEERING
Member Check List �
Project: f��!"'� ��"�`�+.��i, ���rff��,r-' t ��1�� �����
Job No_: ��� Date: �-�-���:t - %
CTS Re.presentative: tf����,�
�
11Aember Member Weld Finaf Acc.
ID ' Description Type(s) Acc. R�j. Insp.: Remarks Date
�� � .. L;� � �� -I�
:(��� �' �,
� - �.E'
��
�r� �
�� � � ,
�'2" �-- ys'
�3�� �
r.3.�z � �' '
��� �.�`
� ���� � f
�'�"� r�`
Y,�-� � .,.�` (
��� � �
��� � �
.��� ,�
t} L'j��.. �{� � :;��c �s'r��r� � �"�� c,�+�:.,�
�j� �1�.. '' �: r,,�' �5.���-e`� �3;r���7f� r�:.��-'
. , !�" 1 - t",._ ' �< ��
�- ���- f f� d� t3�'�+�J1r���"'c t,�si�3� t
��-,� �� � � �' - �-� �
�.= �a � �,...
� ��
� � �� � �
�� �_ � � "
� �
lnspector Signature Date p9�f
2118 Rheem:Drive ( Pleasanton,CA 945$8 � Phone(925)462-5151 � Fax{925�462-5163
4770 Duckhom Drive,Surte A( Sacramerrto;CA 95834 ( Fhune(916)419-4747 ) Fax(91fi)499-47�4
t
r
•TEBTItd�
,� -:. �.,`,CC:?.NSTRU CTl:�N .�NSi��C`TiNG
=�:�TE�STfN.� SERVIC.ES •ENGINEERfNG
Member Check List
Praject >������� `�` ��� '��'i �f�",�i'��r" �4i f�fi"C �(.��-�.}
Job No.: ��.r� Date: "��-"����
GTS Representative; ���
Member Member Weld Final Acc.
ID Description Type{sj Acc. Rej. Insp. Remarks Date
�� �' `� � f-:=��`t�
�-�� ���` � � ,
''-��� 1`� .�-� �
�'�..��" � '�" �''�
��� � i �
��� a�� r r �
� �� �
�� � �� � � / � ��°,;��4�� �l�',� e��'
�� --'.
r'�" �i�'�- <,� !� � 1�`'"� r�t;���.f".e:S.�
� ��.� ��- �.�° t� �''� z.�"e�.� } �-�����
�'.r� �� � 'o' `���/`,�
�1'�"' t��'''���
�
r'`�� ''"� -'�... �'.�
,,�` Inspector�ignature Date Pg`�of�
2'I 18 Rheem Drive ( Rleasanton,CA 94588 � Phane(925)4�2-5'15a � F�{925�462 5183
4770 Duckhom Drive,Suite A( �acramento,CA 95834 � Phone(91&)419-4747 � Fax j8i6}419-47?4
�
y ,
• - -- - •TEST{N�
s. ' ,,_: �`�I��T.�U�T�:�I�" �� .,INSPECTING
- �`T�Tf�I�C �S�RVi;�E� •EN�1'h1EERING
Member Check Lis#
Project ��°�� ���''��U�. `7b� r�i'7�r�� ���1't ,�:��,��
Job Mo.: � Date: ��"����
GTS Represenfative.: ��'� ��„�
Member Member Weld � Rej. {nsp. Remarks Finai Acc_
tD �escriRtion Type(s) Dafe .
� �t��-tl+l+t �� � � �, ''��s L� ,� �1'� L�s,''/t,� �l 2�rr3,
t. `'� � �
� ec� �'> �
� �7 �.� �� �
�LC� C�' �� �' �''
1 �t� �'
C',�� � �' ����' � �-.
�� �'`� �� �=��
� - ��� �= ,.�
� � � �� �
�,�, 1� �' �-`
r'��`� . t'� .f ,`.--
�� �� �
�� � � �
�' . P� .�,.�
�" -
��' �,� �' L
�� - (�'� �' U,-
� r ���
- �r- ��
_�.� .�
Inspectcr 5ignature Date Rg-2of�.
2118 R1�eee�i Drive � P3easartiton;CA 945�$ � .Phone�(925�4�2=515�.:�.Fax.�925�.462-5183
477a Quckhom Qrrve,Suite A} Sacrarr�enta,CA 95834 j Phone(916a 419-4747 � Fax(916)419-4774
�
�� ,
:�e�:;�•r���� i"��.�i�M,1;.�� �'��F��.:.��,i1���{,�1=:�?�;
� . 4:.l��iJ����1��� �'�9'9Ee,�.�i�'.�`I�.����'' 'Tf�.�J+:�'.�?�.� �F �T�t�C7dlki��`i„lA1,I,%��=�3�3
S- •
_.. `� ^� ,�+ Ff
I.�1��4.� ����f.���� a� a ��v5�-�G3,.�s,.�c��1 �..� 4���4 i�2,� � .;'��t
��5��{.��,-1 .��r�� �z°�����t��;�.:�������
Field Number: 4 Laboratory Compression Test
Project Name: Apple IL4 Truck DockAddition
Project No.: J8986 Sampled By: Eddie Bindert Report Date: 07/22/2013
Client: Apple Inc. Date of Sampling: 07/13/2013 Lab Log No.: 82283
Information provided by Field Technician
Mix#: 3FOEG9C1 Supplier: Central Contractor: JJ Albanese
Set: 1 of 1 Truck#: 7134 Desi n Stren th (psi : 3,000 @ 28 da s
Sample Material/Shape: Concrete C linders 6x12 T pe of Struct�re: Wall
Location: Onsite
Location for overall Truck loading dock wall , level 1
pour:
Location (1 st lift)truck loading dock wall , level 1
when sampled:
Concrete Quality Actual Req'ment Actual Req'ment Actual Req'ment
Mix Temperature(°F): 83 � 50-90 Slump(in.): 425 4+/-1 Unit Weight(pcfl: N/A N/A
Air Temperature(°F): 70 >40 Air Content(%): N!A N/A Time Sampled: 10:14 am N/A
Aggregate Size(in): N/A N/A Time Batched: 9:21 am N/A Time in Truck: 53 mins <90 Mins.
Information suppiied by Laboratory Technician
Date Received: 07/19/2013 Technician that received: JH
Test# Age of Dimensions(inch) XSection Ultimate Load Compressive Type of
� Test(Days) Date Technician Diameter Length Area(in2) (Ibs) Strength(psi) Fracture
A 7 07/20/13 TW 6.00 12.00 28.27 96,650 3,420 Type 3
B 28 08/10/13 6.00 12.00 28.27
C 28 08/10/13 6.00 12.00 28.27
D H
28 Day Avg.:
Remarks: L15
� � i `�.�� 1 �, �
r �
' ' -_'_ ` ,� f' � � "_ a ;�.,_�- _
j - o�izv2ois
Reviewed by:Andy Malone-Staff Engineer Date
ASTM Standards Used: Unless noted,material was sampled and tested in accordance with ASTM C172,C31,C143, C231 or C173, C470, C511,
C617,C1077,C1231,C1064,C138 and E4. Compressive strength tests perASTM C39.
F�actut'e Key: 1.Well-formed cones on both ends 3.Columnar vertical crackin throu h both ends 5.Side fractures at to or bottom
2.Well-fortned cone on one end 4.Dia onal fracture with no aackin throu h ends 6.Similar to T e 5 but end of linder is ointed
Testing was performed by qualified personnel in accordance with generelly accepted industry practice,material testing consultants procedures and the above reference standards. This report is
applicable only to the items listed herein. The tests perfortned and in this report are not intended to be considered as any guarantee or warranty of suitability for service or fitness of use of items
tested and it should not be relied on as such. The report has been prepared for the exGusive use of the client and any partial or whole reproduction without the consent of the client is prohibited.
• TESTING
CONSTRUCTION • 1NSPECTION
TESTING SERVICES -- • �rrG�Ex�,,G -
Summary Report#4
August 5,2013 � !,,cEI�E�
Apple,Inc
One Infuute Loop,Bldg 4 Au� � 7 z��3
Cupertino,CA 95014
Job No: J8986 Nam�:
�
Job Name: Apple 1L4 Truck Dock Addition
10700 North DeAnz.a
Cupertino,CA 95014
Permit#: 13020009
July 27,2013
Brian Prouty reported to Lany with Devcon Construction at the jobsite. Reviewed welder qualification papers for
Saluador Aquirre ID#1922. Observed welding performed by 1 welder using FCAW process with NR232 wire.
Weldments observed consisted of fillets and flare bevel. Tacldng only at roof level at lines X.5-V/19.6-19.
Collected copy of MTR's attached. Obtained(6)samples of high strength bolts. 24,A325X 2x3/4"xl '/<"x 3/4"bolts
installed.
Observed installation of 107,2"x 3/4"xl 3�4��X 3�4��A325 X(bearins type,threads excluded)at li.nes X.5-V/19.6-19.
VJork observed was,to the best of Brian's laiowledge,in conformance with approved plans,specifications and
applicable standards of worlananship.
Laboratory test results are enclosed if testing was done during the period covered by this report.
Limitatio�zs: These inspections were performed in accordance with requirements,but please note this report shall
not be relied upon by others,as acceptance or guarantee of the work. Even with diligent inspection techniques,the
contractor is sole ' le for defects or failures to adhere to the code.
8/2/2013
Review y Jona an Felts,P.E. Date
Associate Engineer
Technical Contact: Timothy Casey,Senior Engineer(tcasey@cts-Lcom)
Administrative Contact: Yolanda Deras(yderas@cts-Lconz)
cc: Building Depa.riment—City of Cupertino
Contractor—Devcon(email)
Steel Sub—Concord Iron VJorks(email)
CTS PM—Aazen McBride(email)
CTS Associate Engineer—Jonathan Felts(email)
RO
2118 Rheem Drive,Pleasanton,CA 94588 • Phone(925)462-5151 • Fax(925)462-5183
4770 Duckhorn Drive, Sacramento,CA 95834 • Phone(916)419-4747 • Fax(916)419-4774
One Embarcadero Center,Suite 535, San Fraucisco;CA 94111 • Phone(41�)438-2357 • Fax(415) 334-4747
246 30�'St., Suite 101,Oakland;CA 94601 • Phone(510)444-4747 • Faa(510) 835-1825
�' • TLSTING
CONSTRUCTION • INSPEC7'fON
: TE�T�G-SERVICES � _ --.__- . _ . _. ._ _:,�._. �ciNL�RiNc °'`` `
----- : _�. _
Summary Report#6
August 19,2013
Apple,Inc
One Infinite Loop,Bldg 4
C�pertino,CA 95014
Job No: J8986
Job Name: Apple IL4 Truck Dock Addition
10700 North DeAnza
C�pertino,CA 95014
Permit#: 13020009 �
, . �,
August 10,2013
Don Keller reported to Larry with Devcon at the jobsite. Observed placement of weight height concrete(mix no.
L691L2ES,28-day strength of 3,500 psi,specified slump of 4±1 inch, 18 total cubic yards placed)for 1s1 floor deck
at V-H/19-19.6. Monitored loads for mix no.,slump,temperature and time limit. Prepared cylinder test specimens
sampled from pump hopper.
Set 1 -
Slump 4
in.
Mix temp. 75
(°F
Air temp. 65
°F)
Truck No. 7134
Location V/19.2
� � �
4 Per Set, 1 Set,4 Total
Observed placement of WWF(4x4)W2.9xW2.9 for 15`floor deck at V-H/19-19.6. Reference RFI#037 for added
4x4-W29xW29.
Ventilation holes were drilled in bottom of deck at 6"on center(staggered)as directed.
Work observed was,to the best of Don's knowledge,in conformance with approved plans,specifications and
applicable standards of workmanship.
August 12,2013
Conner Hill picked up 4 cylinders at the jobsite.
2;1:i8 Rheem Drive,Pleasanton,CA 94588 � • , Phone(925)4E2-SI.51 • Fas(t)25)452-5183
4770 Duckhorn Drive,Sacramento,CA 95834 • Phone(91E>)�19-4747 • Fax(91b)419-4774
One Embarcadero Center,Suite 5i5,San Francisco,CA 9�111 • Phone(415)4�s�-23S7 • Fax(415)334-47�7
24�iC)°i St., Suite 1.01,Dakland,CA 94601 • I'hone(5"10}444-4747 • Fax(:>.1.0)835-14?�
s
�'�� CONSTRUCTION • TESTING
• INSPECTION
�_:,.__. _ :TESTING SERVICES _____.__ , _ _ .__. --_- .-------- _. - Err�xirrG -
Laboratory test results are enclosed if testing was done during the period covered by this report.
Limitations: These' ections were performed in accordance with requirements,but please note this report shall
not be relied upon o rs,as acceptance or guarantee of the work. Even with diligent inspection techniques,the
contractor is solel 'able or defects or failures to adhere to the code.
8/23/2013
Reviewed by na E. Date
Associate E ' eer
Technical Contact: Timothy Casey,SeniorEngineer(tcasey@cts-l.com)
Administrative Contact: Yolanda Deras(yderas@cts-I.corrz)
cc: Building Department—City of G�.pertino
Contractor—Devcon(email)
Steel Sub—Concord Iron Works(email)
CTS PM—Aaren McBride(email)
CTS Associate Engineer—Jonatha.n Felts(email)
JKB /"
2174 Rheem Drive, Suite A,Pleasanton,CA 94588 • Phone(925)462-5151 • Fax(925)4b2-5183
4770 Duckhorn Drive, Sacramento,CA 95834 • Phone(916)419-4747 • Fax(916)419-4774
One Embarcadero Center, Suite 535,San Francisco,CA 94111 • Phone(415}438-2357 • Fax(415}334-4747
246 30`�'St.,Suite 101,Oakland,CA 94601 • Phone(510)444-4747 • Fax(510) 835-1825
�
��. 4��'��°i".I'if:�r3 7�'��.v � i�� r`7'�t -.-.�rl�v 7 F� -�1'.+_t-`,ti'�`?'
� +s��Eti�����1��� �,r.Y���.�*i'[.:.I;,�C. �j.�_,�.�`;'.-`fJ'�� ��....:k�cl^ <.:4,5fir,�,`.�`J
;
:. ` � 1 f..,:��� ��Y F a � , � � .s L . . � _,t3. �
_ �i�d J"'S'=dCl ��, f J � 4 k-�:� '1J P � f�r.
_. __ -� � � ���_,_.__ -- - _.. __ �: _
� f�. >
7, .z. _ -. .. �c_n�c��:C3 `i�.:�-".4 ,{,�,��-=-.
'v:`�flfk�sr ....��`� ,t��1`�
Fiefd Number: 4 Laboratory Compression Test
Project Name: Apple IL4 Truck DockAddition
Project No.: J8986 Sampled By: Eddie Bindert Report Date: 08/12/2013
Client: Apple Inc. Date of Sampling: 07/13/2013 Lab Log No.: 82283
Information provided by Field Technician
Mix#: 3FOEG9C1 Suppfier: Central Contractor: JJ Albanese
Set: 1 of 1 Truck#: 7134 Desi n Strength (psi : 3,000 @ 28 days
Sample Material/Shape: Concrete Cylinders 6x12 Type of Structure: Wall
Location: Onsite
Location for overall Truck loading dock wall , level 1
pour.
Location (1 st lift)truck loading dock wall , level 1
when sampled:
Concrete QualitV Actual Req'ment Actual Req'ment Actual Req'ment
Mix Temperature(°F): 83 50-90 Slump(in.): 4.25 4+/-1 Unit Weight(pcfl: N/A N/A
Air Temperature(°F): 70 >4Q Air Content(%): N/A N!A Time Sampled: 10:14 am N/A
Aggregate Size(in): N/A N/A Time Batched: 9:21 am N/A Time in Truck: 53 mins <90 Mins.
Information supplied by Laboratory Technician
Date Received: 07/19/2013 Technician that received: JH
Test# Age of Dimensions(inch) X�ection Ultimate Load Compressive Type of
,� Test(Days) Date Technician Diameter Length Area{inZ) (�bs) Strength(psi) Fracture
A 7 07/20/13 TW 6.00 12.00 28.27 96,650 3,420 Type 3
B 28 08/10/13 TW 6.00 12.00 28.27 154,370 5,460 Type 3
C 28 08/10/13 TW 6.00 12.00 28.27 153,420 5,430 Type 3
D H
MEETS DESIGN STRENGTH
28 Day Avg.: 5,440
Remarks: L15
���
���
� 08/12/2013
Reviewed by.Stephen Stroup-Staff Engineer Date
ASTM Standards llsed: Unless noted, material was sampled and tested in accordance with ASTM C172,C31,C143,C231 or C173,C470,C511,
C617,C1077, C1231,C1064,C138 and E4.Compressive strength tests perASTM C39.
Fracture Key: 1.Well-fortned cones on both ends 3.Columnar vertical crackin throu h both ends 5.Side fractures at io or bottom
2.Well-formed cone on one end 4.Dia onal fracture with no crackin throu h ends 6.Similar to T e 5 but end of linder is ointed
Tesfing was performed by Quafified personnel in accordance with generally accepted industry prectice,material testing consultants procedures and the above reference standards. This report is
applicable only to the items listed herein. The tests performed and in this 2port are not intended to be considered as any guarantee or warranty of suitability tor service or Titness of use of items
tested and it should not be refied on as such. The report has been prePared for the exclusive use of the client and any partial or whole reproduction without the consent of the client is prohibited.
,
_�
' r----
r ~ CONSTRUCTION • INSPECTION
TESTIN'G SERVICES — — - • ENcirrEERn.rc - -
Summary Report#7 RECEI�TEI�
August 26,2013 �
SEP 0`4 2t��3
Apple,Inc
One Inf'inite Loop,Bldg 4 Name:
Cupertino,CA 95014
Job No: J8986
Job Name: Apple ILf1 Truck Dock Addition
10700 North DeAnza
Cupertino,CA 95014
Permit#: 13020009
August 19,2013
Ramon Carrillo reported to Superintendent Larry with Devcon at the jobsite. Reviewed welder qualification papers
for Joshua Pitts,ID#2362 and Daniel Barrio,ID#2465. Observed welding performed in progress by(2)welders
using E71T-211 0.035"wires. Weldments observed consisted of single pass fillet welds joining#10 gauge clip to
wide flange beam,w14x22 clips 6x4x10,6xl lx6 and 7x4x6 weldement with 1/8"fillet weld all around both sides at
roof level,at grid line V-W,V.6-W/19.5 and X.S. Reference S20.1,S301 #14. Work is in progress. Contractors
needs to provide mill certs and WPS.
Work observed was,to the best of Ramon's knowledge,in conformance with approved plans,specifications and
applicable standards of worlananship.
August 21,2013
Robert Cortez reported to Larry Heredia with Devcon at the jobsite. Observed welding performed by welder on file
using FCAW process with E71T-11 wire. Weldments observed consisted of 1/8"fillet welds between clip and
beam. Observed 10 GA clip at 16"on center and WF beams for framing,per detail 14 on 53.01. Per visual
inspection welds are acceptable.
Work observed was,to the best of Robert's knowledge,in conformance with approved plans,specifications and
applicable standards of workmanship.
2118 Rheem Drive,Pleasanton,CA 94588 • Phone(925)462-5151 • Fax(925)462-5183
4770 Duckhonl Drive; Sacramento,CA 95834 • Phone(916)419-4747 • Fax(916)419-4774
One Embarcadero Center,Suite 535,San Francisco,CA 94111 • Phone(415)438-23�7 • Fax(41�)334-4747
246 30t''St., Suite 101,Oakland,CA 94601 • Phone(510)444-4747 • Fax(510)835-1825
�
! .r'" • TESTING
.
CONSTRUCTI(3N • INSPECTION
' TESTiNG SERVICES _ _ .-,�_....-sn��n.,EExr-�G- •- -�
Laboratory test results are enclosed if testing was done during the period covered by this report.
Limitations: These inspections were performed in accordance with requirements,but please note this report shall
not be relied upon by others,as acceptance or guarantee of the work. Even with diligent inspection techniques,the
contractor is solel 'able f • e€cets�or failures to adhere to the code.
8/28/2013
Reviewed onathan ,P.E. Date
Associate gineer
Technical Contact: Timothy Casey,SeniorEngineer(tcasey@,cts-l.com)
Administrative Contact: Yolanda Deras(yderas@cts-l.com)
cc: Building Department—City of Cupertino
Contractor—Devcon(email)
Steel Sub—Concord Iron Works(email)
CTS PM—Aaren McBride(email)
CTS Associate Engineer—Jonaxhan Felts(email)
JKB
2174 Rheem Drive, Suite A,Pleasanton,CA 94588 • Phone(925)462-5151 • Fax(925)462-5183
4770 Duckhorn Drive, Sacrainento,CA 95834 • �p Phone(916)419-4747 • Fa�c(916)419-47%4
One Embarcadero Center, Suite 535, San Francisco;CA 94111 • Phone(415)438-23�� • Fax(41�)334-4747
%46 30°i St.,Suite 101,Oaklaad,CA 94601 • Phone(510)444-4747 • Fax(510) 835-182�
, �..-*^,�.'y..
~'' ;"i�f�:i,:1'ItfJF°i Y);.;:� `�' .t��; ,t_.rjr��..;=�(ltv�":'�.-��,`_'—.'��
' ��������T��� �.��:Y����;�:������, �� ..�-�� ���,.��«:: �.w�.7 ,�:,�
_. , _ -�.�__ :-�� -_- ��T�1'�:����'I��� _ --- - �- . _.� �. � >r � . f� _. �;.
��� J^���,�G� �•;3 rj�'�'2 LL a �� r�2,'> , ��;
- �Gk�- `1 �.��.f u�� , ,,.
',r�J4,�fdi��,���-1 .c���r�'i
Field Number: 4 Laboratory Compression Test
Project Name: Apple IL4 Truck DockAddition
Project No.: J8986 Sampled By: Don Keller Report Date: 08/19/2013
Client: Apple Inc. Date of Sampling: 08/10/2013 Lab Log No.: 83209
Information provided by Field Technician
Mix#: L691 L2E5 Supplier: Central Contractor: Devcon
Set: 1 of 1 Truck#: 7134 Desi n Stren th (psi : 3,500 @ 28 days
Sample Material/Shape: Concrete C linders 6x12 T pe of Structure: Deck
Location: Onsite
Location for overall V-W/19-19.6,first floor
pour:
Location V.2/19.2,first floor
when sampled:
Concrete QualitY Actual Req'ment Actual Req'ment Actual Req'ment
Mix Temperature(°F): 75 50-90 Slump(in.): 4 4 Unit Weight(pc�: N/A N/A
Air Temperature(°F): 65 >40 Air Content(%): N/A N/A Time Sampled: 9:00 am N/A
Aggregate Size(in): N/A N/A Time Batched: 7:35 am N/A Time in Truck: 85 mins <90 Mins.
Informatinn supplied by Laboratory Technician
Date Received: 08/12/2013 Technician that received: PC
Test# Age of Dimensions(inch) X�ection Ultimate Load Compressive Type of
� Test(Days) Date Technician Diameter Length Area(inZ) (Ibs) Strength(psi) Fracture
A 7 08/17/13 CL 6.00 12.00 28.27 97,040 3,430 Type 3
g 28 09/07l13 6.00 12.00 28.27
C 28 09/07/13 6.00 12.00 28.27
D H
28 Day Avg.:
Remarks: L15
,F �� !
� [ 4a I �
� '9 ;. �[ � € . � ;... _
�`���� �. s �.:.;'•.. 4�.,.1�,;�''._.....
. - � � i ` ' 08/19/2013
Reviewed by:Andy Malone-Staff Engineer Date
ASTM Standards Used: Unless noted,material was sampled and tested in accordance with ASTM C172,C31,C143,C231 or C173, C470, C511,
C617,C1077,C1231,C1064,C138 and E4.Compressive strength tests perASTM C39.
FraCtu�e Key: 1.Well-formed cones on both ends 3.Columnar vertical cradcin throu h both ends 5.Side fradures at to or boriom
2.Well-fortned cone on one end 4.Dia onal fracture with no crackin throu h ends 6.Similar to T e 5 but end of linder is ointed
7esting was pertormed by qualified personnel in accordance with generally accepted industry practice,material testing consultants procedures and the above reference standards. This report is
appficable only to the items listed herein. The tests pertortned and in this 2port are not infended to be considered as any guarantee or warranty of suitability for service or fifiess of use of items
tested and it should not be relied on as such. The report has been prepared for the exclusive use of the client and any partial or whole reproduction without the consent of the client is prohibited.
` • TESTING
CONSTRUCTION • INSPECTTON
TESTING SERVICES • �c�EExn•rc
Summary Report#1
July 15,2013
Apple,Inc
One Infinite Loop,Biag a RECEI�TED
Cupertino,CA 95014
Job No: J8986 J U L 2 4 �J 13
Job Name: Apple IL,4 Truck Dock Addition ]�Jame:
10700 North DeAnza
Cupertino,CA 95014
Permit#: 13020009
July 8,2013
Tony Perez reported to Larry Heredia with Devcon at the jobsite. Observed placement of#4 epoxy set dowels,for
storage room stem walls. Epoay material used: Simpson SET XP(expires 12/14). Holes drilled to a depth of 5 '/z"
and a 5/8"diameter. Holes checked for cleanliness. Observed the installation of(82)#4 horizontal dowels with a
90°angle at 12"embed and(125)#4 vertical dowels at 5 '/2"embed for 11"and 14"new concrete stem walls,as per
detail#8 on S3.03. Epoxied into existing concrete at infinite loop building#4-loading dock conversion to storage
room project. Worlananslup per general notes,ESR#2508 and manufactures published installation instructions.
Work observed was,to the best of Tony's knowledge,in conformance with approved plans, specifications and
applicable standards of workmanship.
July 11,2013
John Heine reported to Larry Heredia with Devcon at the jobsite. Observed placement of (23)#4,A615-60 dowels,
for loading dock infill wells. Epoxy material used: Simpson SET-XP(expires 12/14)ESR 2508. Holes drilled to a
depth of 5 %2"and a 5/8"diameter. Holes checked for cleanliness. Work completed per S3.03,detail7.
Work observed was,to the best of John's knowledge,in conformance with approved plans,specifications and
applicable standards of worlananship.
2118 Rheem Drive,Pleasanton,CA 94588 • Phone(925)462-5151 • Fax(925)462-5183
4770 Duckhorn Drice, Sacramento,CA 95834 • Phone(916)419-4747 • Fa�c(916)419-4774
One Embarcadero Center,Suite 535,San Francisco,CA 94111 • Phone(415)438-23�7 • Fax(41�)334-4747
246 30`h St., Suite 101,Oakland,CA 94601 • Phone(510)444-4747 • Fa,l(510) 835-1425
i
� �,r�..
y `� CONSTRUCTION • INSPECTION
TESTING SERVICES • ENGn.�EERn•rG
Laboratory test results are enclosed if testing was done during the period covered by this report.
Limitations: These inspections were performed in accordance with requirements,but please note this report shall
not be relied up n by others,as acceptance or guarantee of the work. Even with diligent inspection techniques,the
contractor is o ly liable for defects or failures to adhere to the code.
7/17/2013
Reviewed�b Felts Date
Staff Engin r
Technical Contact: Timothy Casey,SeniorEngineer(tcasey@,cts-l.conz)
Administrative Contact: Yolanda Deras(yderas�i cts-I.com)
cc: Building Department—City of Cupertino
Contractor—Devcon(email)
Steel Sub—Concord Iron Works(email)
CTS PM—Aaren McBride(email)
CTS Staff Engineer—Jonathan Felts(email)
LH
2174 Rheem Drive; Suite A,Pleasanton,CA 94588 • Pl�one(925)462-5151 • Fax(925)462-5183
4%70 Duckhorn Drive,Sacrainento,CA 95$34 • Phone(916)419-4747 • Fax(916)419-477�
One Embarcadero Center,Suite 535, San Francisco,CA 44ll 1 • Phone(415)438-23�7 • Fax(41�}334-4747
246 30`�'St., Suite 101,Oakland,CA 94601 • Phone(510)444-4747 • Fas(510) 835-1825
.
��� • TESTING
�` CONSTRUCTION • 1NSPECTION
� TESTING SERVICES • ENG�Ex�rG
�ummary Report�1�
Qc�ober 14,2013
Apple,Inc
One Infinite Loop,Bldg 4
Cupertino, CA 95014 �CEIVED
,�a��°: Jg9s6 OCT 2 3 2013
,Tob Name: Apple IL4 Truck Dock Addition
10700 North DeAnza Name:
Cupertino,CA 95014
Permit#: 13020009
E3etaber R,2013
Jared Byers reported to Lairy with Devcon at the jobsite. Qbserved placement of(30) %2"epoay set rehar dowels for
slab on�ade infill at lines X.5 per RFI#17R Epoxy material used:Hilti HY 200. Holes drilled to a depth of 12"
and a%2"diameter. Holes checked for cleanliness.
Work observed was,to the best of 7ared's l�owledge,in conformance with approved plans,specifications and
applicable standards of worlananship.
October 9,2013
Ben Shirley reported to Lany with Devcon at the jobsite. Observed placement of concrete(mix no.3FOEG9C1,28-
day sixength of 3000 psi,specified slump of 4�1 inch, 125 total cubic yards placed)for footing at loading dock
e�tension. Monitored loacis for m.ix no.,slump,temperature and time limit.�
Test 1
Slump 4
(�.)
Ivfix temp. 72
(°F)
Air temp. 68
�°F)
Truck No. 4
Location X.5/18
0 Per Set, 0 Set,0 Total
Note: Concrete was placed directly by chute and consolidaxed by mechanical vibrator. Clearances and cleanliness
were verified prior to placement and maintained throughout placement. Rebar was previously inspected. Samples
were obtained and tested in the field only rendering satisfactory field results. Due to the small quantity of concrete
actually placed and�ven the satisfactory history of this mix design,no cylinders were cast for compressive strength
testing. Placement was finished within 45 minutes from batch time and the concrete remained workable and plastic,
needing no additional water at any Lvne during placement. Fer hatch ticket material weights,the water/cement ratio
was weIl within the target_50 of the mix design.
2.1 I8 Rheem Drive;Fleasanton;CA 94588 • Phone(925)462-51�1 • Fax(925)462-�18�
4770 Duckhorn Drive, Sacramento;CA 9�834 • Phone(916)?19-4747 • Fa�(916)414-4774
Qne.Embarcadero Cenier, Suite 5�5, San Francisco;CA 9�'1"11 • Phone(415)438-23�7 • F�(415)334-474?
246 �0�St.; Suite I01, Oal;land;CA 9�601 � Phone(510)444-4;4% F Fa�(510) 835-I�25
• TESTI1�iG
` � CGNSTRUCTION . nasrEcriorT
,� ,� TESTINer SERVICES � ENGINEERING
Work observed was,to the best of Ben's knowledge,in conformance with approved plans,specifications and
applicable sta.ndards of worlananslv.p.
Labora�ary tesf results are enclosed if testing was done during the period eavered by this report.
.�ar�zitatians: These inspections were performed in accordance with requirements,but please note this report shall
not be relied upon by others, as acceptance or guarantee of the work. Even with diligent inspection techniques,the
contractor is solely liaU�le for defects or zailures to adhere to the code.
� ,
/;f
j� :;';'�" � 10/17/2013
Reviewed by 7�onat`�ra.`n Felts,P.B. Date
Associate E�i�ineer
Technical Contact: Tinzotliy Casey,Sen.ior ErrgiTa.eer(tca�e,}�a�ets-I.eom)
Adnunistrative Contact: Pola�zda I)eras(yderas(a�cts-I.co��z)
cc: Building Depariznent—City of Cupertina
Contractor—Devcon(email)
SteeI Sub—Concord Iron Works(email)
CTS PM—Aaren McBride(email)
CTS Associate Engineer—7onathan Feits(email)
LH
21%4 Rheem Dri��e; Suite A,Pleasanton,CA 9458& • �y Phone(92S)462-51�1 • Fax(925)462-�183
4770 Duckhorn Drive, Sacramento,CA 9�834 • Phoae(916)419-4747 • Fa.�(916)419-4%/4
One Embarcadero Center; Suite 53�, San Francisco;CA 94111 • Phone(41�)4�8-2357 • F�(41�)334-4747
2^6 30� St, Suite 101;Oal:la.nd;CA 94601 • P�o�e(510)c!4-4%47 • Fa_�(�10) 8��-1825
4
` • TESTING
/�� CONSTRUCTION • INSPECTION
TESTING SERVICES • ENGINEERiNG
Summary Report#11
RECEI�TED
September 23,2013
Apple,Inc 0 C T 0 2 2 013
One Infinite Loop,Bldg 4
Cupertino,CA 95014 �am�e
Job No: J8986
Job Name: Apple IL4 Truck Dock Addition
10700 North DeAnza
Cupertino,CA 95014
Permit#: 13020009
No�eld reports were made this week;however,we are enclosing laboratory test results.
Limitations: These inspections were performed in accordance with requirements,but please note this report shall
not be relied upon by others,as acceptance or guarantee of the work. Even with diligent inspection techniques,the
contractor is solel liable for defects or failures to adhere to the code.
� 9/27/2013
Reviewed by Jonathan F lts,P.E. Date
Associate Engineer
Technical Contact: Timothy Casey,SeniorEngineer(tcasey@cts-I.com)
Administrative Contact: Yolanda Deras(yderas�cts-I.com)
cc: Building Department—City of Cupertino
Contractor—Devcon(email)
Steel Sub—Concord Iron Works(email)
CTS PM—Aaren McBride(email)
CTS Associate Engineer—7onathan Felts(email)
2118 Rheem Drive;Pleasanton,CA 94588 • Phone(925)462-5151 • Fax(925)462-5183
4770 Duckhorn Drive, Sacramento,CA 9�834 • Phone(916)419-4747 • Fax(916)419-4774
Une Einbarcadero Center, Suite 535, San Francisco,CA 94111 • Phone(415)438-2357 • Fax(415)334-4747
246 30°i St.,Suite 101,Oakland,CA 94601 • Phone(510)444-4747 • Fax (510) 835-1�,2�
` � � CONSTRUCTION TESTING
INSPECTING
' TESTING SERVICES ENGINEERING
Laboratory: Pteasanton FASTENER TESTS � Date: Page: 1 of 2
Project: 114 Truck Dock Addition Lab Log No.: 84174-1 Place of Sampling: Jobsite
Lot No.: Unidentified Job No.: J8986 Date of Sampling: 7/27/2013
Sarnpled By: B.Proudy
BOLTS
HEAT# Unidentified ROCKWELL HARDNESS PROOF LTLTIMATE LOAD �SULTS
(I�C) LOAD(lbs.) (lbs.)
Size: 3/4"sc2"
1 30.7 29300 49200 Satisfactory
2 29.4 29300 47200 Satisfactory
3 30.6 28400 46400 Satisfactory
ASTM: A325 '
Requirements C34 Max 28400 40100
NUTS
HEAT# HB00564 ROCKWELL HARDNESS PROOF RESULTS
(HRC) LOAD(lbs.)
Size: 3/4"
1 312 58450 Satisfactory
2 29.0 58450 Satisfactory
3 26.8 58450 Satisfactory
ASTM A194
Requirements B84-C34max 58450
WASHERS
HEAT# Unidentified ROCKWE�HARDNESS RESLTLTS
Size: 3/4"
1 41.6 Satisfactory
2 38.9 Satisfactory
3 39S Satisfactory
ASTM F436
Requirements min38-ma�c45
Remarks: Items tested in accordance with AST'M A606.
Bolts meet the mechanical requirements of ASTM A325. Nuts meet the mechanical requirements of ASTM
A194. VJashers meet the mechanical requirements of ASTM F436.
Test Equipment: Tension:1NSTRON 1000 HDX
Hardness:Rocky DR Rockwell Hardness Tester
Construction Testing Services, Inc.
�
By:
Stephen Straup,Staff Ena neer
4770 Duckhorn Drive,Sacramento,CA 95834 � (916)419-4747 office � (916)419-4774 fax
2174 Rheem Drive,Suite A � Pleasanton,CA 94588 � (925)462-5151 office � (925)462-5183 Fax
' CONSTRUCTION TESTING
TESTING SERVICES INSPECTING
. ENGINEERING
Laboratory: t�teasanton T'+A�TE�R TESTS Date: " Page: 1 of 2
Project: I14 Truck Dock Addition Lab Log No.: 84174-2 Place of Sampling: Jobsite
Lot No.: Unidentified Job No.: J8986 Date of Sampling: 7/27/2013
Samp:ed-B�: B.P;oudy
BOLTS
ROCKWELL HARDNESS PROOF ULTIMATE LOAD
HEAT# HB00701 RESiTLTS
(HRC) LOAD(lbs.) (lbs.)
Size: 3/4"xl-3/4""
1 26.9 28400 47000 Satisfactory
2 25.8 28400 46000 Satisfactory
3 27.9 28400 46600 Satisfactory
AST'M: A325
Requirements C34 Max 28400 40100
NUTS
HEAT# HA00559 ROCKWELL HARDNESS PROOF RESULTS
(HRC) LOAD(lbs.)
Size: 3/4"
1 30.6 58450 Satisfactory
2 29.7 58450 Satisfactory
3 30.6 58450 Satisfactory
ASTM A194
Requirements B84-C34max 58450
� WASHERS
ROCKWELL HARDNESS
HEAT# B13534 �C� RESULTS
Size: 3/4"
1 40.7 Satisfactory
2 40.2 Satisfactory
3 41.6 Satisfactory
AST'M F436
Requirements min38-ma�c45
Remarks: Items tested in accordance with ASTM A606.
Bolts meet the mechanical requirements of ASTM A325. Nuts meet the mechanical requirements of ASTM
A194. VJashers meet the mechanical requirements of ASTM F436.
Test Equipment: Tension:INSTRON 1000 HDX
Hardness:Rocky DR Rockwell Hardness Tester
Construction Testing Services,Inc.
�
By:
Stephen Stroup,Staff Engineer
4770 Duckhorn Drive,Sacramento,CA 95834 � (916)419-4747 o�ce � (916)414-4774 fax
2174 Rheem Drive,Suite A � Pleasanton,CA 94588 � (925)462-5151 office � (925)462-5183 Fax
� ,��'^. �c."��rfr�rt ti�".�� ^.7:., j�rf'�".,vr�f^w�'h ¢ly^,.'a'4-,.
� � � � . . Y
- ����!����l��� ;�:�=f�r� � z}� {�=.47�_ Ft���I.�; �',�.SC�� i��5
� ������ .1��1������ ��rr J���.-.�U� °;r'.� ��'�2 L ���.s;��i,��.�. >�i"
��l ��:��.;x'��J 1 i.l.'q.::A '
.. -_ �s ,. _ .. . . '' .' --
�'`s . `'j�s ..—�� .i F�;. � .. . -:- ..
Fireproofing Density Test
Project Name: Apple IL4 Truck Dock Addition
Project No.: J8986 Sampled By: Lisa Vossen Report Date: 09/12/2013
Client: Apple Inc. Date of Sampling: 08/28/2013 Lab Log No.: 84195
Manufacturer: Isolatek Lot#: N/A Type: Cafco-300
� Low Density ❑ Medium Density ❑ High Density
Density Requirements: Individual: 15 pcf min. Average: 15 pcf min.
Calculated Average Final
Structure Type Floor Location Specimen Area Thickness Weight Density Pass/
(sq in.) (in) (Ibs) (pcfl Fail
Beam 1 Beam row east of 48 1 3/16 0.63 19 Pass
line V
Average Densify: I 19 I Pass I
Remarks:
a :.
' E � _,_� I i
: � ' , `:i ' { �, r
- - - � x .::�:_ . . ._
, .
' j � 09/'12/2013
Reviewed by:Andy Malone-Staff Engineer Date
ASTM Standards Used: Test performed in accordance with CBC Section 1701.10.3/4 and ASTM E6Q5 8.2
TesSng was performed by qualified personnel in accordance with generally accepted indusVy practice,material testing consultants procedures and the above reference standards. This report is
applicable only to the items fisted herein. The tests performed and in this report are not intended to be considered as any guarantee orwarranty of suitabiliry for service or fitness of use of items
tested and it should not be refied on as such. The report has been p2pared for the exGusive use of the client and any partial or whole reproduc6on without the consent of the client is prohibited.
� • TESTING
CONSTRUCTION • INSPECTION
TESTING SERVICES • ENG�rrEER�rrG
Summary Report#4 �cEI� '�.�
February 4,aoi3 MAY 2 g 2013
*Revised May 22,20I3
Harprop Ina N1111E':
Attn: Steve(email)
Job No: J8776
Job Name: 2B Fit Build Out
_ 2238•2 Homestead '
Cupertino,CA
Permit#: 12070221=
�ob,.,,.,...,� �n�z
�z ,
, .
, , �
�
*Please disregard previously issued report,• it was inadvertently submitted for this project and has been corrected
herein.
Limitations: These inspections were performed in accordance with requirements,but please note this report shall
not be relied upon by others,as acceptance or guarantee of the work. Even with diligent inspection techniques,the
contractor is solely liable for defects or failures to adhere to the code.
�
5/22/2013
Reviewed by Stephen S up Date
Staff Engineer
Technical Contact: Timothy Casey,SeniorEngineer(tcasey@cts-I.com)
Aduunistrative Contact: Yolanda Deras(yderas@cts-l.com)
cc: Building DeparCment—City of Cupertino
Architect—John Miller(email)
Structural Engineer—Hohbach—Lewin,Inc. (email)
CTS PM—David Zetterlund(email)
CTS StafFEngineer—Stephen Stroup(email)
RA
2118 Rheem Drive,Pleasanton.CA 94588 • Phone(925)462-5151 • Fax(925)462-5183
4770 Duckhorn Drive; Sacramento,CA 95834 • Phone(916)419-4747 • Fax(916}419-4774
One Embarcadero Center, Suite 535,San Francisca,CA 94111 . Phone(415)438-2357 . Fax(415)334-4747
246 30`�'St., Suite 101,Oakland,CA 94601 • Phone(510}444-4747 • Fa.Y(510)835-1825
/
ift
CONSTRUCTION
TESTING SERVICES
Summary Report #4
February 4, 2013
*Revised May 22, 2013
Harprop Inc.
Attn: Steve (email)
Job No: J8776
Job Name: 2B Fit Build Out
2238.2 Homestead
Cupertino, CA
Permit #: 12070221?'
TESTING
INSPECTION
ENGINEERING
'RECEIVED
MAY 2 g 2013
Name:
February �
�z , 2013
knowledge,
appheable standards
of wedEmaaship.
*Please disregard previously issued report; it was inadvertently submitted for this project and has been corrected
herein.
Limitations: These inspections were performed in accordance with requirements, but please note this report shall
not be relied upon by others, as acceptance or guarantee of the work. Even with diligent inspection techniques, the
contractor is solely liable for defects or failures to adhere to the code.
5/22/2013
Reviewed by Stephen S up Date
Staff Engineer
Technical Contact: Timothy Casey, Senior Engineer (tcasey@cts- 1. com)
Administrative Contact: Yolanda Deras (yderas@cts- I.com)
cc: Building Department — City of Cupertino
Architect — John Miller (email)
Structural Engineer — Hohbach — Lewin, Inc. (email)
CTS PM — David Zetterlund (email)
CTS Staff Engineer — Stephen Stroup (email)
RA
2118 Rheem Drive, Pleasanton. CA 94588 Phone (925) 462 -5151 • Fax (925) 462 -5183
4770 Duckhorn Drive, Sacramento, CA 95834 • Phone (916) 419 -4747 0 Fax (916) 419 -4774
One Embarcadero Center, Suite 535, San Francisco, CA 94111 . Phone (415) 438 -2357 • Fax (415) 334 -4747
246 30`x' St., Suite 101, Oakland, CA 94601 0 Phone (510) 444 -4747 0 Fax (510) 835 -1825