Loading...
12110120 - MISC . • 324 Earhart Way � Livermore CA 94551 �CEI�TED P 925.315.3151 Associates F 925.315.3152 Engineer�aboratories WWW,bskassociates.com MAR 2� 2013 Name: � � ���' O1 February 2013 Permit No. 12110120 BSK Job No. C13-010-60P , Mark Taylor YESCO 875 National Drive, Suite 107 . Sacramento, California 95834 Subject: Summary of Special Inspections and Material Testing Services aloft—New Illuxninated Community Art Monument 10165 N. De Anza Blvd. Cupertino, California (Period Covered: O1/15/2013) Special Inspections and Materials Testing Services were performed for the above referenced project. Enclosed is a summary of our field activity. We appreciate the opportunity to be of service to you. If you have any questions or comments,please contact our office. Respectfully submitted, SSK Associates / Tim driguez James Auser, P.E. Con uction Servi s Group Manager Senior Materials Engineer Distribution: City of Cupertino Building Department; Building Official An Employee-Owned Company • Analytical Testing • Construction Observation • Ecological Services • Engineering Geology Environmental Engineering • Geotechnicai Engineering • Materials Testing • Water Resources ! • SUMMARY REPORT Date: 01/15/2013 DSA File No.: Project No.: C13-010-60P App. No.: ASSOC11teS Project Name: aloft-New Illuminated Permit No.: 12110120 Enginee aboratories Location: 10165 N. De Anza Blvd., Cupertino Inspection Report for Structural Steel, Welding and Bolting Erector/Fabricator: NASCO Electric Sign Co., LLC Reported To: Inspection per�Shop Drawings ❑Structural Drawings Dated: Type of Inspection: Welding �✓ Shop Inspection❑Onsite❑Continuous❑Periodic❑After the fact ✓ Attachments Mill Certs P g� Lo ❑UT❑MT❑PT ❑ ❑Sam lin ✓ Material I.D. g ❑Job Caneelled(see notes)�Show up�hrs.) ❑Stand-by�hrs.) ❑Gorrective/Rework�hrs.) Certified Welders Identification Process S. Ott D4527983 ❑FCAW ❑� SMAW ❑Other: ❑ Wire/Electrodes ❑Refer to the attached list of welders. ❑✓ Number of welders today � ❑✓ Verified proper electrode storage Received❑✓ Mill Certifications❑✓ Reviewed Weld procedure❑✓ Qualifications❑✓ Verified Parameters/Preheat ❑Single Pass Fillet ❑MuIEi-Pass Fillet Penetration:�CJP❑PJP�Arc Spot 0 Seam❑ Sheaz Stud ❑Flare-Bevel Groove❑Direct Butt Splice❑Indirect Butt❑Rebar Grade No. ❑Embeds 0 HS Bolts Notes: Items inspected as complete:Tube Steel, Pipe sign frame ❑✓ Additional pages attached. 4 ❑Member Completion Record Attached ❑All non-compliance items were brought to the attention of at job site. ❑Final acceptance is pending written approval or corrective action as noted. ❑Show-up;❑Stand-by time;❑Job Cancelled;❑Job,Delayed;❑Re-inspection; Time: ProjedRegulatoryAgency:❑DSA ❑OSHPD Q✓ Other: Clty of Cup2rtin0 The work ❑✓ was Q was not inspeded in accordance with the regulatory agency approved documents. The work inspected❑✓ met Q did not meet the requirements of the regulatory agency approved documents,❑except as noted. Material sampling Q was❑was not Q✓ N/A performed in occoidance with the regulatory agency approved documents. Inspector: Ken Olsten Date: 01/15/2013 Received by: Date: