Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
14020055 CITY OF CUPERTINO BUILDING PERMIT
BUILDING ADDRESS: 21324 DEXTER DR CONTRACTOR:HELIOFARM PERMIT NO: 14020055
OWNER'S NAME: KATHLEEN MCCULLOCH 1166 PIMENTO AVE DATE ISSUED:02/10/2014
OWNER'S PHONE: 4083152386 SUNNYVALE,CA 94087 PHONE NO:(408)507-4110
❑ LICENSED CONTRACTOR'S DECLARATION JOB DESCRIPTION:RESIDENTIAL ❑ COMMERCIAL 0
INSTALL PV SYSTEM ON ROOFTOP(12)MODULES,7.43
License Class C.—I 0 Lic.# 61 c VA KW
Contractor 1't--A.,I D s-14- Date 2.1 NO\`Li
I hereby affirm that I am licensed under the provisions of Chapter 9
(commencing with Section 7000)of Division 3 of the Business&Professions
Code and that my license is in full force and effect.
I hereby affirm under penalty of perjury one of the following two declarations:
I have and will maintain a certificate of consent to self-insure for Worker's
Compensation,as provided for by Section 3700 of the Labor Code,for the
erformance of the work for which this permit is issued. Sq.Ft Floor Area: Valuation:$27000
have and will maintain Worker's Compensation Insurance,as provided for by
Section 3700 of the Labor Code,for the performance of the work for which this -
APN Number:32641074 00 Occupancy Type:
permit is issued.
APPLICANT CERTIFICATION
I certify that I have read this application and state that the above information is PERM WORK IS NOT STARTED
correct.I agree to comply with all city and county ordinances and state laws relating WIT 180 DAYS OF ERMIT ISSUANCE OR
to building construction,and hereby authorize representatives of this city to enter
upon the above mentioned property for inspection purposes. (We)agree to save 180 DA S F M LAST CALLED INSPECTION.
indemnify and keep harmless the City of Cupertino against liabilities,judgments,
costs,and expenses which may accrue against said City in consequence of the /Q.J
granting of this permit. Additionally,the applicant understands and will comply Issued by: Date:
with all non-point source regulations per the Cupertino Municipal Code,Section
9 18.
1 RE-ROOFS:
Signature • Date 2-'\'O\ It\ All roofs shall be inspected prior to any roofing material being installed.If a roof is
installed without first obtaining an inspection,I agree to remove all new materials for
inspection.
0 OWNER-BUILDER DECLARATION
Signature of Applicant: Date:
I hereby affirm that I am exempt from the Contractor's License Law for one of
the following two reasons: ALL ROOF COVERINGS TO BE CLASS"A"OR BETTER
I,as owner of the property,or my employees with wages as their sole compensation,
will do the work,and the structure is not intended or offered for sale(Sec.7044,
Business&Professions Code)
I,as owner of the property,am exclusively contracting with licensed contractors to HAZARDOUS MATERIALS DISCLOSURE
construct the project(Sec.7044,Business&Professions Code). I have read the hazardous materials requirements under Chapter 6.95 of the
California Health&Safety Code,Sections 25505,25533,and 25534. I will
I hereby affirm under penalty of perjury one of the following three maintain compliance with the Cupertino Municipal Code,Chapter 9.12 and the
declarations: Health&Safety Code,Section 25532(a)should I store or handle hazardous
I have and will maintain a Certificate of Consent to self-insure for Worker's material. Additionally,should I use equipment or devices which emit hazardous
Compensation,as provided for by Section 3700 of the Labor Code,for the air contaminants as defined by the Bay Area Air Quality Management District I
performance of the work for which this permit is issued. will maintain compliance with the Cupertino Municipal Code,Chapter 9.12 and
I have and will maintain Worker's Compensation Insurance,as provided for by the Health&Safety Code,Sections 25505,2553 d 25534. ,
Section 3700 of the Labor Code,for the performance of the work for which this Owner or authorized agent: Date:`7—‘ ,4,114
permit is issued.
I certify that in the performance of the work for which this permit is issued,I shall
not employ any person in any manner so as to become subject to the Worker's
Compensation laws of California. If,after making this certificate of exemption,I CONSTRUCTION LENDING AGENCY
become subject to the Worker's Compensation provisions of the Labor Code,I must I hereby affirm that there is a construction lending agency for the performance of
forthwith comply with such provisions or this permit shall be deemed revoked. work's for which this permit is issued(Sec.3097,Civ C.)
Lender's Name
APPLICANT CERTIFICATION Lender's Address
I certify that I have read this application and state that the above information is
correct.I agree to comply with all city and county ordinances and state laws relating
to building construction,and hereby authorize representatives of this city to enter
upon the above mentioned property for inspection purposes.(We)agree to save ARCHITECT'S DECLARATION
indemnify and keep harmless the City of Cupertino against liabilities,judgments,
costs,and expenses which may accrue against said City in consequence of the I understand my plans shall be used as public records.
granting of this permit.Additionally,the applicant understands and will comply
with all non-point source regulations per the Cupertino Municipal Code,Section Licensed Professional
9 18.
Signature Date
ALTERNATIVE ENERGY PERMIT APPLICATION
AE
COMMUNITY DEVELOPMENT DEPARTMENT• BUILDING DIVISION
!I:I&9.15.,..„ 10300 TORRE AVENUE•CUPERTINO, CA 95014-3255 00�
CUPERTINO (408) 777-3228•FAX(408)777-3333•building aacupertino.orq
\ U�„2
PROJECT ADDRESS 21"2. 2.„`1 I �i1.—ic n \ v APN#
OWNER NAME �O�l 1 �C k)L"\p-0o1k2.4
�\'-- In PHO 0 D '\S Z�v E-MAIL
STREET ADDRESS1 3 2`�c -.gip ,_,., n - CITY,STATE,ZIP �� FAX
i[�f'�iyC� .� (' `L v P-C—�'-'1 WSJ O jLCO�\Lt A r�'
CONTACT NAME Y 0 l k \�f\ UCS J0� LA\1 0 E �\114i\
1'R 1W NPi`1 •( 0 1.1
STREET ADDR S CI Y,S TE,ZIP C,* FAX
1\bb V 'R - iia l� S%Iv1siNki.� o.140
❑ OWNER 0 OWNER-BUILDER ❑ OWNER AGENT ACTOR 0 CONTRACTOR AGENT 0 ARCHITECT ❑ENGINEER 0 DEVELOPERR 0 TENANT
CONTRq�TOR NAME �w LICENSE NUMBER LICENSE TYPE BUS.L �,J
. \ ‘1 A & kcal qbi s8`-t (_-1c) , � `
COMPA N E- IL FAX
STREET ADD SS C TY,STATE,ZIP PHONE
Ibb tM�.N1 a F v1.�►.��v rst-r' LA- �1 O �-1oS Sate- y\\ D
ARCHITECT/ENGINEER NAME LICENSE NUMBER BUS.LIC#
COMPANY NAME E-MAIL FAX
STREET ADDRESS CITY,STATE,ZIP PHONE
USE OF [ "SFD or Duplex ❑ Multi-Family PROJECT IN WILDLAND PROJECT IN
STRUCTURE,� 0 Commercial URBAN INTERFACE AREA 0 Yes y No FLOOD ZONE 0 Yes 0 No
CE‹.....-----......AR PANELS 0 ELECTRIC VEHICLE CHARGING STATION 0 SOLAR WATER HEATING ❑ OTHER:
FOR SOLAR PANELS: NUMBER OF PANELS/UNITS: if KILOWATTS: TOTAL VALUATION I00 O
DESCRIPTION OF WORK Q` ac?, "1 vis...` 3 2A- t-o' vA ( ki c ,- \
01,-) 'L`"•-k \-or-1 o„-SZ \o c... \ * S-vo r.-
r.. Eciviiii'in;:_-. - -By my signature below,I certify to each of the following: I am the property owner or authorized agent to act on the prop: owner's behal . I have read this
application and the information I have provided is correct. I have read the Description of Work and verify it is accurate. I=• -- . ...- :with all applicable local
ordinances and state laws relating to- ilding constructio . I authorizAti.resentatives of Cupertino to enter the above-identified property for inspection purposes.
Signature of Applicant/Agent: �` Date: Z\ \0\ \"
SUPPLEMENTAL INFORMA r , • 4 UIRED OFFICE USE ONLY
0 OVER-THE-COUNTER
a
r
❑- EXPRESS
W
V
0 STANDARD.
U
a L LARGE
a
Q'-MAJOR _
PVApp_2012.doc revised 06/20/12
CITY OF CUPERTINO
` ++, FEE ESTIMATOR-BUILDING DIVISION
ADDRESS: 20625 ALVES DR DATE: 02/10/2014 REVIEWED BY: MENDEZ
Y
tiaar�* APN: BP#: *VALUATION: $27,000
*PERMIT TYPE: Building Permit PLAN CHECK TYPE: Alteration / Repair
PRIMARY SFD or Duplex PENTAMATION SOLAR-RES
USE: p PERMIT TYPE: 4
WORK INSTALL PV SYSTEM ON ROOFTOP (12) MODULES, 7.43 KW
SCOPE
4
11,, 01a= t for, Plruh. Phil(C'Ircir r, I I lace.I,.an(;Pzs:cl:
11-cit. I'E>rnr;t Fi>r>•
Plumb. Pr mit hee:
(2 iter ,11c'c'n.Ir,l=. Other Plumb Insp. Othci F/cu.Inip.
A r, Irtv+:. F e Plumb. hrs). Tee: Isle(.Insp I e:
NOTE: This estimate does not include fees due to other Departments(i.e.Planning,Public Works,Fire,Sanitary Sewer District,School
District,etc). These fees are based on the preliminary information available and are only an estimate. Contact the Dept for addn'I info.
FEE ITEMS (Fee Resolution 11-053 Eft: 7/1/13) FEE QTY/FEE MISC ITEMS
Plan Check Fee: $0.00 1 # Alternative Energy System
Suppl. PC Fee: 0 Reg. 0 OT 0.0 hrs $0.00 $229.00. IPHOTOVRES Photovoltaic System 1
PME Plan Check: $0.00
Permit Fee: $0.00
Suppl. Insp. Feer Reg. 0 OT 0.0 hrs $0.00
PME Unit Fee: $0.00
PME Permit Fee: $0.00
rnnt;tr`?i tu,n Iax
4 di i//11 foai1L't.'I`1,,( 0
Work Without Permit? 0 Yes C) No $0.00
Advanced Planning Fee: $0.00 Select a Non-Residential
Building or Structure 0
7 <r}(rl!)c>c tart<rilation FeeS:
Strong Motion Fee: 1BSEISMICR $2.70 Select an Administrative Item
Bldg Stds Commission Fee: 1BCBSC $2.00
a
$4.70 $229.00 TOTAL FEE: $233.70
Revised: 01/15/2014
.
SHEET INDEX: NOTES: COVER SHEET
PROJECT ADDRESS: 21324 DEXTER DR.
1 . COVER SHEET CUPERTINO, CA 95014
2. SITE PLAN OWNER: ROBERT AND KATHLEEN McCULLOCH
3. ROOF PLAN 21324 DEXTER DR.
4. SINGLE LINE ELECTRICAL DRAWING CUPERTINO, CA 95014
408-315-2386
IV
PLANS PREPARED BY: ADITYA AGARWAL 1/$C ‘SI)
HELIOFARM ��
2p14
COMMUNITY DEVELOPMENT DEPARTMENT 1166 PIMENTO AVE., �8 �
� �
BUILDING DIVISION-CUPERTINO
APPROVED SUNNYVALE CA 94087
This set of plans and specifications MUST be kept at the (408) 507 4110
job site during construction. It is unlawful to make any
changes or alterations on same, or to deviate OPE OF WORK: THIS IS A 7.43 KW SOLAR ELECTRIC SYSTEM
therefrom, without approval from the Building Official.
The Stamping of this plan and specifications SHALL NOT INSTALLATION CONSISTING OF (12) SOLAR
be held to permit or to be an approval of the violation MODULES ON THE ROOF OF A PRE-EXISTING
of any prov iogs of Any City Ordinance or State Law. RESIDENCE.
BY ( 1 I THE SYSTEM IS GRID INTER-TIED VIA U L-
c R `� 4/4// LI TED I I VERTERS AND HAS NO
PERMIT No ILIf 5.� S M CRO N
BATTERIES OR UPS.
ALL SYSTEM COMPONENTS ARE SELECTED
AND SIZED IN ACCORDANCE WITH ARTICLE
S
690 OF THE 2011 NEC.
Yeo
CBE 114INSTALLER: HELIOFARM
A Z tO LICENSED ELECTRICAL CONTRACTOR
D #961584
I), _„vp- Er • ,_
•LONI. CONTACT: ADITYA A ' �., AL CUPERTINO
1166 PIMENTO AVE , Building Department
Otat--------------------:
$LpG. nFpT y Y SUNNYVALE CA 94tl 7:�or
a FEB 1 0 014
;, (408) 507 4110
REVIEWED FOR CODE COMPLIANCE
AV
Reviewed By jam''/ /AT
HELIOFARM PROPERTY OWNER PROJECT ADDRESS: SHEET
1166 Pimento Ave. COVER SHEET
HELIOFARm Sunnyvale CA 94087 ROBERT McCULLOCH 21324 DEXTER DRIVE Drawing by: Agarwal
(408) 507 4110 KATHLEEN McCULLOCH CUPERTINO, CA 95014 2/10/14 OF4SHEETS
, c,,. yik\\I
O
O Ni"‘ \
NORTH
MAIN ELECTRICAL
SERVICE LOCATED
ON EXTERNAL 3' 3'
WALL 1
UNDER EAVE 3T4"
f 1 1'.11'.11'.1 1'1 ° ►IelKi
��►�
11),11111 11►/11►1
•*
H H 5'4"
CUPERTINO
'` Building Department
P—B 1 0 2014
REVIEWED FOR CODE COMPLIANCE
Reviewed By ,5 ,. /% `'
HELIOFARM PROPERTY OWNER PROJECT ADDRESS: SHEET
2
HELIOEAR iv' 1166 Pimento Ave. SITE PLAN
Sunnyvale CA 94087 ROBERT McCULLOCH 21324 DEXTER DRIVE Drawing by: Agarwal
(408) 507 4110 KATHLEEN McCULLOCH CUPERTINO, CA 95014
2/10/14 OF 4 SHEETS
ROOF ATTACHMENT DETAIL PLAN VIEW SHOWING RAFTERS AND MOUNT POINTS
EPDM
,e: HANGERHEXNUT BOLT S%6'x 3 Y2'
i y
CAST BLOCK I.— i
E
QUICKMOUNT PV QUICKMOUNT
ALUMINUM COMP-SHINGLE STANDOFFS AND
FLASHING PLYWOOD FLASHINGS
SUPPORTING
PROSOLAR RAILS
1 support/11 sq.ft.
NOTES
1 . THIS IS A 7.43 KW SOLAR ELECTRIC SYSTEM USING (27) SOLAR
WORLD PHOTOVOLTAIC MODULES.
2. THIS SYSTEM IS GRID—INTERTIED VIA UL—LISTED ENPHASE `‘IIIIP4PIPP` ®--r ' 1�':-- a : v-ffarA--•
M250 60 2LL S23 MICROINVERTERS. 1 , O
3. THIS SYSTEM HAS NO UPS, NO BATTERIES. 'AA ►�i,� AdA.Pm I k 4.
Ii►��r►���!�w�►AAi�i► m�
4. THIS SYSTEM IS A ROOF MOUNTED SYSTEM ADDING A ROOF LOAD �_� VINE"
OF 2.65 LBS/SQ.FT. SYSTEM IS MOUNTED ON PROSOLAR
ALUMINUM RAILS MOUNTED ON TO ROOF RAFTERS USING rr.�_ A�A A .' MV— e—AML-----M7—A—k--
QUICKMOUNT SOLAR FLASHINGS. 4W4.
l
5. THERE IS A MINIMUM OF 1 SUPPORT PER 16 SQ FT OF PV ARRAY.
THE ROOF STRUCTURE CONSISTS OF COMP SHINGLE ON 5/8" PLY CUPERTINO
"� x6" �� �� 24" ';{ Building Department
ON 1 CROSS SHEATHING ON 2X6 RAFTERS, ON CENTER.
6. BUILDING IS 1 STORY RESIDENTIAL. 2"x6" RAFTERS 24 , ., t , 1 2014
CENTER with 1" x�_ 1::.,:i
CROSS-SHEATHIII VIEWED FOR CODE COMPLIANCE
Reviewed By jam^ ��
HELIOFARM PROPERTY OWNER PROJECT ADDRESS: SHEET
HELI FARM '
0 i 1166 Pimento Ave.
ROOF PLAN
Sunnyvale CA 94087 5NMZLH
Drawing byal CUPERTINO, CA 95014
2/10/14OF 4 SHEETS
NOTES
1. The PV source circuit is negatively grounded
(27) SOLARWORLD, Plus SW 275 Electrical meter
0
mono 275W-STC photovoltaic 2. Wire and Sizes are as indicated or larger.
modules with microinverters wired
in parallel 3. All equipment is bonded by mechanical means or by a grounding
conductor. Modules and racking system are grounded using WEEB's
For each module: 100A, 2 pole, (Wiley Electronic Equipment Bonding) and WEEB-Lugs.
Voc = 39.4 VDC main service breaker
Vmp = 31.0 VDC 4. The grounding electrode conductor shall be #8AWG copper ground
lsc = 9.58 A wire and bonded to the existing grounding electrode system.
Imp = 8.94A
— 5. The electrical Service panel will be clearly labeled with signage saying:
--0— Modules and racking system
_i_ grounded using WEEBs (Wiley THIS PANEL IS FED BY TWO SOURCES:
Electronic Equipment Grounding) Murray LC240L 1125 SOLAR PHOTOVOLTAIC SYSTEM ON PREMISES
and WEEB-Lugs.
_0— Load Center
_ Busbar rating 125A WARNING: ELECTRICAL SHOCK HAZARD, DO NOT TOUCH
TERMINALS. TERMINALS ON BOTH THE LINE AND LOAD
—� 40A, 2 pole SIDES MAY BE ENERGIZED IN THE OPEN POSITION
_Z— —7I— solar backfed circuit breaker
SOLAR CIRCUIT MAXIMUM CURRENT: 31.05 A
— — 40A +100A < 150A (120% Rule) SOLAR CIRCUIT OPERATING VOLTAGE: 240V
— HZ-
-171— --�-
-0- — �— (cont = (27) * 1.15A = 31.05 A
_ -- — 31.05 * 1.25 = 38.82 A
--0— — (240V AC)
(3)#10 THWN-2
—�I— --PI— (1) #8 Gnd
—F1— —[71-- in 3/4" EMT conduit
o Ia: 1i cr CUPER 3NO
` '`a/% Build�nq D9artmen�
s;
� ��
(27) Enphase M250-60-2LL-S23
Microinverters, 250W Max Output REVIEWED FOR CODE �;c}���=j-►aPvCE
Imax (each) = 0.9A AC, 240 VAC r(eviewed By _, -v 47 '
HELIOFARM PROPERTY OWNER PROJECT ADDRESS: SINGLE LINE DRAWING SHEET
4
1166 Pimento Ave.
' H E L.I FARM Sunnyvale CA 94087 ROBERT McCULLOCH 21324 DEXTER DRIVE Drawing by: Agarwal
(408) 507 4110 KATHLEEN McCULLOCH CUPERTINO, CA 95014
2/10/14 OF 4 SHEETS
- /
, ."f/�:.,,!'.'��. S�b�/ rua.,».
,..._..cam.
TUV Power controlled:
$ TOVNhelnlend Lowest measuring tolerance in industry 4, -
o•000OO ,,AA� n
2.
m
A
' Every component is tested to meet
3 times IEC requirements
RELIABLE O § - �.'
Designed to withstand heavy _..,.
accumulations of snow and ice
LOAD AD O
i
5400 Pa R
'''
Sunmodule Plus
Positive performance tolerance
-0/+5Wp� . �f�3.. A ,< :;.
4 4 ,tirt —, « ti ' : '',./
, . moi' ►14
C, 25 year linear performance warranty and J :e
10-year product warrantymrt
WARRANTY / 1 r- 1 0 i30,_f
'L' i ) "4�
REVIEWED . ,•'• ''.''7//�=tAN
G
4.
World-class qualityReviewed �, c; sa.gee sssas
•nMmwnL resistance
Fully-automated production lines and seamless monitoring of the process and materialove • `ytd' "'n .7.p
ensure the quality that the company sets as its benchmark for its sites worldwide.
1 el®
SolarWorld Plus-Sorting PERPCMWDE TESTED C
tAlSrnESISTANT
Plus-Sorting guarantees highest system efficiency.SolarWorld only delivers modules that ?HUTTOAALTNcmcmV.^. US
have greater than or equal to the nameplate rated power. �'-"` iii.1703
25 years linearperformanceguarantee and extension ofproduct warrantyto 10years soot'
E ,Q 14001
SolarWorld guarantees a maximum performance degression of 0.7%p.a.in the course of � rtified
25years,a significant added value compared to the two-phase warranties common in the
industry.In addition,SolarWorld is offering a product warranty,which has been extended
to 10 years
`in accordance with the applicable SolarWorld Limited Warranty at purchase.
www.solarworld.com/warranty ` - s
A
Pi
llllllB�.�
SOLAR t)RLD
MADE IN USA
solarworld.com We turn sunlie-' '!rto power.
SunmoduleYpius SW 275 mono
PERFORMA SCE UNDER STANDARD TEST CONDITIONS(STC)* PERFORMANCE AT 800 W/m2,NOCT,AM 1.5
Maximum p...— PDa: 275 Wp Maximum power PDU. 205.0 Wp
Open circuit..-,,",age V« 39.4 V Open circuit voltage V« 36.1 V
Maximum pa.,t,point voltage V.DD 31.0 V Maximum power point voltage V,.D 28.4 V
Short circuit ci.,,ent l,, 9.58 A Short circuit current IX 7.75 A
Maximum power point current
Irmo 8.94 A Maximum power point current ImDD 7.22 A
*SIC 1000 W/m',?ST,AM 1.5 Minor reduction in efficiency under partial load conditions at 25°C:at 200 W/m2,100%
1)Measuringto:cr-Ice(P,)traceable toTUVRheinland:+/-2%(TUVPower Controlled). (+/-2%)ofthe SIC efficiency(1000W/m2)isachieved.
COMPONENT MATERIALS
THERMAL Ci iARACTERISTICS __..
Cells per module 60
NOCT 46°C Cell type Mono crystalline
TCI„ 0.004%/K Cell dimensions 6.14 in x 6.14 in(156 mm x 156 mm)
TCCva -0.30%/K Front Tempered glass(EN 12150)
TC P,„,,,, -0.45%/K Frame Clear anodized aluminum
Operating temp-erature -40°C to 85°C weight 46.7 lbs(21.2 kg)
SYSTEM INTEGRATION PARAMETERS
I._ 1000 W/mz Maximum system voltage SC II 1000 V
Max.system voltage USA NEC 600 V
800 W/mz Maximum reverse current 16 A
— Number of bypass diodes 3
a 600 W/mz
"MINUL Design Loads* Two rail system 113 psf downward
64 psf upward
400 W/m2L. 170 psf downward
\ UL Design Loads* Three rail system 64 psf upward
200 W/m2 113 psf downward
�w \ IEC Design Loads' Two rail system 50 psf upward
100 W/m2
*Please refer to the Sunmodule installation instructions for the details associated with
these load cases.
Module voltage[V] V«
ADDITIONAL DATA
=x4 37.44(951) Power sorting' -0 Wp/+5 Wp
1-Box IP65
Ii...1_
Connector MC4
11.33(288) Module efficiency 16.40%
Fire rating(UL 790) Class C
• -r
•
0.6 15.3
IIIIIIIIIIIIIIIII
41.30(1050) VERSION 25 FRAME
• Compatible with both"Top-Down"
Version and"Bottom"mounting methods
.[
2.5 frame LlI 11
• lir Grounding Locations:
65.54(,675) —bottom -4corners ofthe frame
mounting -4 locations along the length of the
holes
module in the extended flanges
• 0 0 • S
0 0 0 0 O 6"fry.. ... .,_.... _ ......
• 1x4 , Independently created PAN files now available.
t - T 4.20(107)t
Ask your account manager for more information.
J—� —�II
39.41(1001)
1.22(31) YV
All units provided are imperial.SI units provided in parentheses.
SolarWorld AG r.-s: the right to make specification changes without notice. SW-01-6005US 08-2013
•
•
Enphase®Microinverters
En p hase® M250
. .. _ .. .. .. ...... ....... .... ..... .......
I
,«wu rawa wwceyY z<
4tYu�
3a�
C► -ERTI NO
i 8uiI' g Department
f
E°44
�,. REvIEWEI) POR UO•)E COMPLIANCE
i-teviewea E3 _J /2147;
The Enphase M250 Microinverter delivers increased energy harvest and reduces design and
installation complexity with its all-AC approach. With the M250, the DC circuit is isolated and insulated
from ground, so no Ground Electrode Conductor(GEC) is required for the microinverter.This
further simplifies installation, enhances safety, and saves on labor and materials costs.
The Enphase M250 integrates seamlessly with the Engage®Cable, the Envoy®Communications
Gateway", and Enlighten®, Enphase's monitoring and analysis software.
PRODUCTIVE SIMPLE RELIABLE
-Optimized for higher-power - No GEC needed for microinverter -4th-generation product
modules - No DC design or string calculation - More than 1 million hours of testing
- Maximizes energy production required and 3 million units shipped
- Minimizes impact of shading, -Easy installation with Engage - Industry-leading warranty, up to 25
dust, and debris Cable years
YOUR ENPHASE DISTRIBUTOR
? ta ® Soligent 8SOooLIGN97-www.soligent.net
C US
Enphase k'2J 3 Microinverter II DATA
INPUT DA ?C) M250-60-2LL-S22/S23/S24
T4" h Jy , F3 v - aka
0004a00000 errtG. 4!44:41,V
i qT 5.. .' k 2 - }--
,<.,...-:K-, t.. ...c-� „a4 ,,, AMA ... ,.n&Zc ...•.« _-..+-_.....5 '-" .«......;,..si.-.aca_.,3. -�, ,..�i.� •,.•.•^• ak•. ai,R,':
Maximum i::r;_: DC voltage 48 V
3" i. lk.'�,•,� .w�-`� ,T$,"`,lLl� `a, �.�Y r �ro�a�-�<,.--...� k, �,A.�-„ ,,.»....✓� .:,x..:- .r.... ,,a .•'--.- „ ,. i::F" ., ,.;,.,.. Y ,,,,.......,.v �,Dr- `,SF. b�a�'m''-.�'.:. z:. ,.. e ..y..-< �.. .....
Operating rr; a 16 V-48 V
�f f Max 91 2� ^ as
AMC
Max DC sr, circuit current 15 A
OUTPUT DATA A(AC) @208 VAC @240 VAC
«' .fix, Ng .. - .::-:2 ..e ;i v'° k u. ....... x...,. .a ....... .....: ....... .. Yr, 'Afi'„�,,,`z.,.,
Rated(continuous)output power 240 W 240 W
! ! , r'ft -a= a rtx m ! •f! ( t l !
x...i, . .: `Yd;�i, -.._. -_xi�e�K�...s._ „ r�..... , , .•,.s -5,. .....s W .• ,
Nominal vc :;ye/range 208 V/183-229 V 240 V/211-264 V
! fn1 l fF 3 MilM4 o **Maga; .1111414,0;:g04-.'so- �
tt Mt iAl,.
Extended fre uency range* 57-62.5 Hz 57-62.5 Hz
.>waM... .,, ..,«...,_.- 07-71,ar;,.,, 14 :,_.,....,m00 ,...:„..:;?-44_44:4,4-44,44.4444:444=:444.,,,,,.., uzM.,a,---
Maximum
.,.,.Maximum unis per 20 A branch circuit 24(three phase) 16(single phase)
, q a , °x'.' wg'z
EFFICIENC C
pf A
CEC weight—1 efficiency,208 VAC 96.0%
Static MPPT efficiency(weighted, reference EN50530) 99.4 %
y ,- : �-„— -,,,•_ azo44
y � z , - _ ,_- ._i
MECHANICAL DATA
�e�r iTratt r =0 s
Operating to nperature range(internal) -40°C to+85°C
• ' ::A4110.4;• e , ' ..ss �.:A
Weight 2.0 kg
acs' �,��=• �<�
t,
s
Enclosure environmental rating Outdoor-NEMA 6
FEATURES
it.•000 0,, 2. sx
Communication Power line
IE571:."Vig::Z;AVg*::;:MWnhfrVE`atgjt:'MVTTIMMrNMTA €4144114P
v..x...:';;,:,�..� M �..•::- ._-c�...m ...f> .,�' �.:.-.� ,,....'�gi,�,�
Monitoring Free lifetime monitoring via Enlighten software
f 3c O
i:11i4
xa q...:_ - 8 w...: `� t`.a<',..�-._.....__ a.»,.......
Frequency ranges can be extended beyond nominal if required by the utility
To learn more about Enphase Microinverter technology, enphase®
visit en ha . m tei E N E R G Y
©2013 Enphase Energy.All rights reserved.All trademarks or brands in this document are registered by their respective owner.
Classic Composition Mount I QMSC
THIS EDGE TOWARDS ` RACKING COMPONE::
2.50 ROOF RIDGE I t l II NOT INCLUDED
ea' l
1II
O II
I
II
�''- I Q
12.00 © I
1.50J `/
3.00
t O ITEM DESCRIPTION QTY.
NO.
6.00 1 FLASHING,12"X 12"X.050",5052,MILL _I 1
12.00 2 QBLOCK,CLASSIC,A360.1 CAST AL,MILL 1
3 HANGER BOLT,PLAIN CENTER,5/16"x 6",18-3 aS I 1
r C I ~ 4 WASHER,SEALING, 5/16"IDX 3/4"OD,EPDM BOA J SS 1
,�y, II 5 NUT,HEX,5/16-18,UNC-2B, 18-8 SS 2
E4 1 6 WASHER,FLAT,19/64"ID x 7/8"OD x 1/8" EPD:'. 1
1.30 7 WASHER,FENDER,5/16"IDX 1"OD,18-8 S 1
8 WASHER,SPLIT-LOCK,5/16"ID,18-8 SS 1
30 quick Mount? °
3.00
TITLE:
T QMSC: CLASSIC COME-I:%.1T!ON
MOUNT
AVAILABLE IN MILL,CLEAR ANODIZED,
AND BRONZE ANODIZED FINISHES. UDIMNLEENSIOSS OTHNSERWISEAREIN SPECIFIED:INCHES SIZE DRAWN BY: :::'.D I REV
TOLERANCES: ��......._..-���..
FRACTIONAL±1/8 A DATE: 7/23;c� 3
PROPRIETARY AND CONNDENIIAL TWO PLACE DECIMAL 1..18 -----_ .!
A WHOLEW�HOUTTHE WRITTENED PERMSSDRAWING
N OF QUIICCKAoUNTTPPVP55PROf QUICK MOW OIm41®. w'µYRBItoWCtN)N IN PART ORAS DO NOT SCALE DRAWING THREE PLACE DECIMAL±.125 SCALE:1:4 WEIGHT:i.2". !SHEETI OF I
5 1 4 3 I 2I
Lag pull-out(withdrawal)capacities(lbs)in typical lumber: ^ ,,.=,, :
Lag Bolt Specifications
Specific Gravity 5/16"shaft per 3"thread depth 5/16"shaft per 1"t: dept,I
Douglas Fir,Larch .50 798 266
Douglas Fir,South .46 705 235
Engelmann Spruce,Lodgepole Pine(MSR 1850 f&higher) .46 705 235
Hem,Fir .43 636 ,,//'�`� YY p�� 212-
Hem,Fir(North) .46 {t" CVrGRTINo ,u_
Southern Pine .55v= Y Suildinq D ,arfinen
Spruce,Pine,Fir .42 ,. 6 , I 205
Spruce,Pine,Fir(E of 2 million psi and higher grades of MSR and MEL) .50 L`,. 2`‘ ' 1 fl 2014 266
Sources:American Wood Council,NDS 2005,Table 11.2 A,113.2 A
Notes: REVIEWED FOR CODE COMPLIANCE
1)Thread must be embedded in a rafter or other structural roof member.
2)See NDSTable 115.1C for required edge distances. Reviewed By _...549-•
rwt Aro
Quick Mgt
RESPECT TH.,.-- : ;
BI 7.2.3-7 c on-2013,Rev 6
CIs6 L- Lit-npsition Mounting Instructions
Insta,.._.. ti- .;:t.z.i:_ is,easure,roofing bar,chalk line,stud finder,caulking gun,sealant compatiblewith roofing materials,
drill-,,—,,, sty, dr; or impact gun with 1/2"deep socket.
W' io ` :" ¢ducts are IT designed for and should NOT be used to anchor fall protection equipment.
3rd course
' 2nd course
y
� @ S:• Fes`, 1st course
Locate,c ._ . . of r31ters to be Carefully lift composition roof shingle with roofing Insert flashing between 1st and 2nd course.Slide
mounted. 3, of shir. les where bar,just above placement of mount.Remove nails up so top edge of flashing is at least 3/4"higher
mounts wi:;... as required.See "Proper Flashing Placement"on than the drip edge of the 3rd course and lower
next page. flashing edge is above the drip edge of 1st course.
Mark center for drilling.
; � J� 3rd course eliill
,C
xi
moo... � r
Using drill wit:. .,drill pilot hole into roof Clean off any sawdust,and fill hole with sealant Slide flashing into position. Prepare hanger bolt
and rafter,talc,, drill square to the roof. compatible with roofing materials. with hex nut and sealing washer. Insert into hole
Do not use mc_. rill guide.Drill should be and drive hanger bolt until QBlock stops rotating
'long style bit' :ft extension bit'to drill a easily.Do NOT over torque.
3"deep hole ir.,..
You are now ready for the rack of your
choice. Follow all the directions of
x
` %
the rack manufacturer as well as the
module manufacturer.
All roofing
manufacturers' written
u
's instructions must also be followed
�- � ,, by anyone modifying a roof system.
''' \•,%,,-','-- Please consult the'oof manufacturer's
specs and instructions prior to
%r touching the roof.
�. ,; Ott
Insert EPDM rubber washer over hanger bolt into Using the rack kit hardware, secure the racking
block. (L-foot) to the mount using torque specs from
racking manufacturer.If racking manufacturer does
BI 723-7 not specify torque setting,tighten to 13 ft.-lbs. Sep-2013,Rev 6
Reference and Tips
Flashing Placement
- ! M-- 4! n 'i A"
{car �x�n �
....,...41,....,...„ , ,ilif Ifilit100‘'S4 .*.''''L. .. ' .,;,': , ,.... f ,
MR 1
x
,x't47°x `
•
f,., -•• - . ''''''.., •a
Y
i' *643� _
..tui33, M V..,. 44. 3
cpib of
isti tf.'i.. j:�3 d'��g t3u�">9t;•�iC.L lx�:l*`t,�Y€�«.�iq°il P��s °,z'
Additional tips and information for installing mounts:
• See Classic Composition Mount install and Quick Tips videos on nail removal,bolt prep,a: f more at:
www.quickmountpv.com/support/videos.html
• It is not necessary or advisable to use nails or other fasteners to secure the perimeter of
the flashing.
• The Classic Composition Mount is made to work with standard and high-definition compos4:ion/
asphalt and wood shingle roofs with 5"to 5-5/8"courses.If the exposed surface of the cc=.
exceeds this measurement you may need to use our Classic Shake Mount instead.
• Depending on the season and climate,size and location of seal tabs,and quality of the shingles,
the seal tabs that adhere the shingle courses together may not effectively seal the shingles the
flashings.If this is the case,simply add several quarter-sized dab , . u .nufacture ant
or asphalt roofing cement,meeting ASTM D 4586 Type II,betw r-,-4114,v1:::--,ashing all f r�gfY3pmene.
above. I
• Mounts should not be installed in areas of the roof susceptible', _ = 4 miming:'Wader , r '..#1g
under the shingles can reach the bolt penetration. ;��VIEVv-. FoR GODS GUmPLIANGE
• Take care not to damage the roofing material while working on the rr1eggcng s • it '
and deforming the shingles in any way can shorten the lifespan of the roofing.The value C r'::he solar
array is directly affected by the condition of the roof it is attached to.
131 7.2.3-7 .Ser-2013,Rev 6
Quick I Mount PV4)
RESPECT THE ROOF
925-478-8269 • www.quickmountpv.com • info@quickmountpv.com
2700 Mitchell Dr.,Bldg 2 • Walnut Creek,CA 94598
©2013 by Quick Mount PV.All rights reserved.