14030015 CITY OF CUPERTINO BUILDING PERMIT
BUILDING ADDRESS: 22608 LAZY OAK CT CONTRACTOR:IQV CONSTRUCTION PERMIT NO: 14030015
INC
OWNER'S NAME: WEN YANG JING AND JI JINYUN 820 CHARCOT AVE DATE ISSUED:03/10/2014
OWNER'S PHONE: 4084483080 SAN JOSE,CA 95131 PHONE NO:(408)582-9200
kf LICENSED CONTRACTOR'S DECLARATION JOB DESCRIPTION:RESIDENTIAL COMMERCIAL
REMOVE EXISTING BUILT UP ROOF AND INSTALL
License Class '�'c1 Lic.# � 2/ SECURE
ROCK AND 60 MI� CARLISLE ROOFING SYSTEM(560 SQ
Contractor Date Q —` FT).
I hereby affirm that I am licensed under the provisions of Chapter 9
(commencing with Section 7000)of Division 3 of the Business&Professions
Code and that my license is in full force and effect.
I hereby affirm under penalty of perjury one of the following two declarations:
I have and will maintain a certificate of consent to self-insure for Worker's
Compensation,as provided for by Section 3700 of the Labor Code,for the
p rformance of the work for which this permit is issued. Sq.Ft Floor Area: Valuation:$3800
I ave and will maintain Worker's Compensation Insurance,as provided for by
Section 3700 of the Labor Code,for the performance of the work for which this APN Number:34232002.00 Occupancy Type:
permit is issued.
APPLICANT CERTIFICATION
I certify that I have read this application and state that the above information is PERMIT EXPIRES IF WORK IS NOT STARTED
correct.I agree to comply with all city and county ordinances and state laws relating WITHIN 180 DAYS OF PERMIT ISSUANCE OR
to building construction,and hereby authorize representatives of this city to enter
upon the above mentioned property for inspection purposes. (We)agree to save 180 DAYS FR LLED INSPECTION.
indemnify and keep harmless the City of Cupertino against liabilities,judgments,
costs,and expenses which may accrue against said City in consequence of the
granting of this permit. Additionally,the applicant understands and will comply Iss ate:
with all non-point so rce regulations per the Cupertino Municipal Code,Section
9 18.
3 / RE-ROOFS:
Signature Date / All roofs shall be inspected prior to any roofing material being installed.If a roof is
installed without first obtaining an inspection,I agree to remove all new materials for
inspection.
❑ OWNER-BUILDER DECLARATION )'�_ j�!
Signature of Applicant• Date: ! l `f'
I hereby affirm that I am exempt from the Contractor's License Law for one of
the following two reasons: ALL ROOF COVERINGS TO BE CLASS"A"OR BETTER
I,as owner of the property,or my employees with wages as their sole compensation,
will do the work,and the structure is not intended or offered for sale(Sec.7044,
Business&Professions Code)
I,as owner of the property,am exclusively contracting with licensed contractors to HAZARDOUS MATERIALS DISCLOSURE
construct the project(Sec.7044,Business&Professions Code). I have read the hazardous materials requirements under Chapter 6.95 of the
California Health&Safety Code,Sections 25505,25533,and 25534. I will
I hereby affirm under penalty of perjury one of the following three maintain compliance with the Cupertino Municipal Code,Chapter 9.12 and the
declarations: Health&Safety Code,Section 25532(a)should I store or handle hazardous
I have and will maintain a Certificate of Consent to self-insure for Worker's material. Additionally,should I use equipment or devices which emit hazardous
Compensation,as provided for by Section 3700 of the Labor Code,for the air contaminants as defined by the Bay Area Air Quality Management District I
performance of the work for which this permit is issued. will maintain compliance with the Cup53
ertin Municipal Code,Chapter 9.12 and
I have and will maintain Worker's Compensation Insurance,as provided for by the Health&Safety Code,Sections 255 3,and 25534.
Section 3700 of the Labor Code,for the performance of the work for which this Owner or authorized agent: Date:,3�
permit is issued.
I certify that in the performance of the work for which this permit is issued,I shall
not employ any person in any manner so as to become subject to the Worker's
Compensation laws of California. If,after making this certificate of exemption,I CONSTRUCTION LENDING AGENCY
become subject to the Worker's Compensation provisions of the Labor Code,I must I hereby affirm that there is a construction lending agency for the performance of
forthwith comply with such provisions or this permit shall be deemed revoked. work's for which this permit is issued(Sec.3097,Civ C.)
Lender's Name
APPLICANT CERTIFICATION Lender's Address
I certify that I have read this application and state that the above information is
correct.I agree to comply with all city and county ordinances and state laws relating
to building construction,and hereby authorize representatives of this city to enter
upon the above mentioned property for inspection purposes.(We)agree to save ARCHITECT'S DECLARATION
indemnify and keep harmless the City of Cupertino against liabilities,judgments,
costs,and expenses which may accrue against said City in consequence of the I understand my plans shall be used as public records.
granting of this permit.Additionally,the applicant understands and will comply
with all non-point source regulations per the Cupertino Municipal Code,Section Licensed Professional
9 18.
Signature Date
REROOF PERMIT APPLICATION
COMMUNITY DEVELOPMENT DEPARTMENT•BUILDING DIVISION
10300 TORRE AVENUE•CUPERTINO, CA 95014-3255
(408)777-3228• FAX (408)777-3333•building cDcupertino.orq
CUPERTINO.
/.-7103 ,00/5—
PROJECT ADDRESS ���� 2 �Ql APN H t3 L1 2 OO
OWNERNAMF \/',/� /G„ PHo`/O AIL
k E-M
STREET ADDRESS V CITY, STATE,ZIP u FAX
CONTACT NAME E-MAIL
STREET ADDRESS CITY,STATE,ZIP FAX
❑ OWNER ❑ OWNER-BUILDER - ❑.OWNER AGENT ❑ CONTRACTOR ❑CONTRACTOR AGENT ❑ ARCHITECT ❑ENGrNEER ❑ DEVELOPER ❑TENANT
CONTRACTOR NAME LICENSE NUMBER LICENSE TYPE BUS.LIC.F
fUeC f'.'LJ r E "tl< < ' <'
COMPANY NAMEE-MAIL FAX
Lc +�
STREET ADDRESS 1 CITY,-STATE,ZI LA1 PHONE
ARCHITECT/ENGINEER NAME LICENSE NUMBER BUS.LIC.N
COMPANY NAME E-MAIL FAX
STREET ADDRESS CITY,STATE,ZIP PHONE
USE OF ❑ SFD or Duplex ❑ Multi-Family ROOFAREA: VALUATION:
STRUCTURE: ❑ Commercial L 7 / o
EXISTING ROOF TYPE: ,E, BUILT-UP ROOF ❑ASPHALT SHINGLES ❑Wool)SHAKES ❑WOOD SHINGLES ❑OTHER(SPECIFY)
REMOVE/REPLACE ®YES IF NO. PLYWOOD ❑ b" ❑ ! PLYWD ❑ OSB PITCH: / ROOF
El NO H LAYERS: THICKNESS: L] 5/8" TYPE: ElCDX r--:12 CLASS: A
PROPOSED ROOF TYPE: ❑BUILT-UP ROOF ❑ASPHALT SHINGLES ❑WOOD SHAKES ❑WOOD SHINGLES OTHER ICC-ES REPORT 0
DESCRIPTION OF WORKell Cr
-� f
,1
By my signature below,I certify to each of the following: I am the property owner or authorized agent to act on the property owner's behalf. I have read this
application and the information I have provided is correct. I have read the Description of Work and verify it is accurate. I agree to comply with all applicable local
ordinances and state laws relating toug construction. I authorize representatives of Cupertino to enter the above-identified property for inspection purposes.
'
7
Signature of Applicant/Agent: Date: L—
SUPPLEnIEN AL INFORMATION REQUIRED `` c: an.. A ,>.oircl Ust;o�lyn,> t
' s*�37 '�h'35•.Rlx �'f`fiT. .-v h4�HT'•QJ\` sqs+y�i+Ms"fA'A h�.yt�i, 1,�Fu.-+',�..�.�}'�,i t.�F "
—If building is associated with a Home Owners Association,provide letter r rLnt.cri>cIc xx1 E v �« k "�RovT' G sit rr z
.,. '{L ` h ° .+p--.'w2aar7�a.TrC-Yrs;r�,rp�`.at'�e t„^7
of approval from HOA. O,O DR TILE COU�i ILR f ❑4 BUILDING'TLAI.RE�IEV� S k'
<y," r3 �f4 r Sys x W �, y ��
—Provide Planning approval to verify if there any restrictions. ® narRcss r sk t 5 �'. 0 rL ZI.cPLANREVIr Wrr
9 T'H
Blot
{`M15KProvide copy of Manufacturer's Installation Specifications. ' P �H .iProvide signed copy of Cupertino's Tear-OffPolicy. rOTT31:Rw Ott 'rrG s
ReroofApp_201 1.doc revised 0311.6111.
REROOF TEAR-OFF POLICY
COMMUNITY DEVELOPMENT DEPARTMENT•BUILDING DIVISION
ALBERT SALVADOR, P.E., C.B.O., BUILDING OFFICIAL
10300 TORRE AVENUE•CUPERTINO,CA 95014-3255
CUPERTING (408)777-3228• FAX(408)777-3333•building a(�.cugertino.org n .7
PROJECT ADDRESS �f / f APN# 3 ,f (i/ Z /_ 00 'Z
v
OWNERNAME pn� P Q G 30g6 E-MAIL
STREET ADDRESS CITY, STATE,,ZIP D C FAX S C1/?C
CON7RACTORNAME, LI NSE NUMBERLICNSETYPE BUS.LIC.#
COMPANY N ' , E-MAIL FAX
01/
o.^JSINA A 49 11)6261-J04
STREET ADDRESS79;f
ITY S
( T ,zIP l__.
sc- n S� O I PHONE
I UNDERSTAND AND AGREE TO THE FOLLOWING:
1. The re-roof project shall comply with all applicable provisions of the 2010 California Codes.
2. An inspection request can be scheduled up to one business day before the requested inspection date.
Please call (408) 777-3228 from 7:30-3:30pm(Mon-Thurs) or 7:30-2:30pm(Friday) to schedule
inspection. For Tear-Off and Nailing Inspections,you must also call on the day of the inspection only
after that phase of the work is completed. The building inspector will be available within one hour.
Final Inspections will be given a two hour window.
3. Tear-Off Inspection is required. Any and all dry-rotted wood shall be replaced prior to this inspection.
Unless new plywood roof sheathing is proposed throughout, all the nails/fasteners shall be either
completely knocked-down or removed prior to this inspection.
4. If plywood is installed, a plywood Nailing Inspection is required.
5_. Roofing shall not be applied without first obtaining all prior inspection and written approvals from the
building inspector. Any roofing which is applied without first obtaining an approved inspection will
require the removal of all new material down to the sheathing so a proper inspection can be performed.
6. A Final Inspection and approval shall be obtained from the building inspector when the re-roofing is
completed. To receive a final sign-off, the following items will be verified:
a. Flat roofs shall have a minimum of I/4"per foot of slope and demonstrate there is no ponding.
b. Listings from approved testing agencies for all pre-manufactured products used shall be
available on-site to review at the time of the inspection.
c. Proper spark arrestor installation, vents painted, gutter/downspouts installed, debris removed.
7. NOTE: If'you call for a tear-off or plywood nailing inspection and the work is not complete,you will be
charged a re-inspection fee. The re-inspection fee shall be paid before another inspection can be
scheduled.
By my signing below,I certify each of the following is true: I am the property owner or authorized agent to act on the
property owner's behalf. I understand and agree to comply with the re-roof policy stated above. I also understand that
smoke detectors and carbon monoxide det tors are required to be installed in accordance with Sections R314 and R315 of
the 2010 California Residential Code. _
Signature of Applicant/Agent: Date: /
ReroofPolicy_2012.doc revised 10/7/12