14040173 CITY OF CUPERTINO BUILDING PERMIT
BUILDING ADDRESS: 10821 BARRINGTON BRIDGE CT CONTRACTOR:SUNVEST SOLAR PERMIT NO: 14040173
ELECTRIC INC
OWNER'S NAME: STEVEN KAWASHIMA 5278 JERUSALEM CT STE 11 DATE ISSUED:04/24/2014
OWNER'S PHONE: 4082556880 MODESTO,CA 95256 PHONE NO:(209)402-8366
LICENSED CONTRACTOR'S DECLARATION JOB DESCRIPTION:RESIDENTIAL COMMERCIAL
//�� �/� ADD(N)EV CHARING STATION IN GARAGE
License Class C "'/V Lich�.^^# 9 7 �3�
Contractor Sun O&J_+ Jd(6-4- u Date W-2 H-1 1
I hereby affirm that I am licensed under the provisions of Chapter 9
(commencing with Section 7000)of Division 3 of the Business&Professions
Code and that my license is in full force and effect.
I hereby affirm under penalty of perjury one of the following two declarations:
I have and will maintain a certificate of consent to self-insure for Worker's
Compensation,as provided for by Section 3700 of the Labor Code,for the
rformance of the work for which this permit is issued. Sq.Ft Floor Area: Valuation:$2000
ave and will maintain Worker's Compensation Insurance,as provided for by
Section 3700 of the Labor Code,for the performance of the work for which this APN Number:37522099 00 Occupancy Type:
permit is issued.
APPLICANT CERTIFICATION
I certify that I have read this application and state that the above information is PERMIT EXPIRES IF WORK IS NOT STARTED
correct.I agree to comply with all city and county ordinances and state laws relating WITHIN 180 DAY IT ISSUANCE OR
to building construction,and hereby authorize representatives of this city to enter
upon the above mentioned property for inspection purposes. (We)agree to save 180 DA. M LA ALLED INS;7,
ION
indemnify and keep harmless the City of Cupertino against liabilities,judgments,
costs,and expenses which may accrue against said City in consequence of the
granting of this permit. Additionally,the applicant understands and will comply su ate:
with all non-point source regulations per the Cupertino Municipal Code,Section
9 18.
RE-ROOFS:
Signature Date L4-Z,9-t1_/ All roofs shall be inspected prior to any roofing material being installed.If a roof is
installed without first obtaining an inspection,I agree to remove all new materials for
inspection.
❑ OWNER-BUILDER DECLARATION
Signature of Applicant: Date:
I hereby affirm that I am exempt from the Contractor's License Law for one of
the following two reasons: ALL ROOF COVERINGS TO BE CLASS"A"OR BETTER
I,as owner of the property,or my employees with wages as their sole compensation,
will do the work,and the structure is not intended or offered for sale(Sec.7044,
Business&Professions Code)
I,as owner of the property,am exclusively contracting with licensed contractors to HAZARDOUS MATERIALS DISCLOSURE
construct the project(Sec.7044,Business&Professions Code). I have read the hazardous materials requirements under Chapter 6.95 of the
California Health&Safety Code,Sections 25505,25533,and 25534. I will
I hereby affirm under penalty of perjury one of the following three maintain compliance with the Cupertino Municipal Code,Chapter 9.12 and the
declarations: Health&Safety Code,Section 25532(a)should I store or handle hazardous
I have and will maintain a Certificate of Consent to self-insure for Worker's material. Additionally,should I use equipment or devices which emit hazardous
Compensation,as provided for by Section 3700 of the Labor Code,for the air contaminants as defined by the Bay Area Air Quality Management District I
performance of the work for which this permit is issued. will maintain compliance with the Cupertino Municipal Code,Chapter 9.12 and
I have and will maintain Worker's Compensation Insurance,as provided for by the Health&Safety Code,Sections 25505,25533,and 25534.
Section 3700 of the Labor Code,for the performance of the work for which this G � ��Z y
Owner or authorized agent: Date:
permit is issued.
I certify that in the performance of the work for which this permit is issued,I shall
not employ any person in any manner so as to become subject to the Worker's
Compensation laws of California. If,after making this certificate of exemption,I CONSTRUCTION LENDING AGENCY
become subject to the Worker's Compensation provisions of the Labor Code,I must I hereby affirm that there is a construction lending agency for the performance of
forthwith comply with such provisions or this permit shall be deemed revoked. work's for which this permit is issued(Sec.3097,Civ C)
Lender's Name
APPLICANT CERTIFICATION Lender's Address
-
I certify that I have read this application and state that the above information is
correct.I agree to comply with all city and county ordinances and state laws relating
to building construction,and hereby authorize representatives of this city to enter
upon the above mentioned property for inspection purposes.(We)agree to save ARCHITECT'S DECLARATION
indemnify and keep harmless the City of Cupertino against liabilities,judgments,
costs,and expenses which may accrue against said City in consequence of the I understand my plans shall be used as public records.
granting of this permit.Additionally,the applicant understands and will comply
with all non-point source regulations per the Cupertino Municipal Code,Section Licensed Professional
9 18.
Signature Date
ALTERNATIVE ENERGY PERMIT APPLICATION
COMMUNITY DEVELOPMENT DEPARTMENT-BUILDING DIVISION '\
10300 TORRE AVENUE-CUPERTINO,CA 95014-3255 O
CUPERTINO (408)777-3228-FAX(408)777-3333-building(c cupertino.org t
PROJECT ADDRESS �O ( /�Qrr1n C+. APN# S �a i
OWNER NAME ►evevN /��W QS�1✓✓�a PHONE L(0'8
04-Z� �19a0 E-MAIL I J s 1�[ @ A c) corn
STREET ADDRESS , f CITY,STATE,ZI O Q Q FAX
/0 B Z I Q arrl ri Qn a !n o CA 9501 1
CONTACT NAME J O e O r `Q PHONE_ZO �� �� E-MAILS u r,V E�S L S d`Q� vka
J a J T i
STREETADDRES52-77 �� ^kAsa C4 1 STATE Od" �qp 95-396 FAX
13 OWNER ❑'JOWNER-BUILDER ❑ OWNER AGENT COCONTRACTOR ❑CONTRACTOR AGENT ❑ ARCHITECT ❑ENGINEER ❑ DEVELOPER 13 TENANT
CONTRA UNAME Q LICENSE NUMB S-3 O LICENSEe2 2 O
� S.LIC#
3 51 IL
COMPANYNAMFunve O)n r / Vedrl E-MAILF MAIL(A VtVf—S40)gx C
rnaj i' '
STREET ADDRESS ^� S3SPHO Z? �hv,c46w) --r � frQbD5�O Z
O q_Lq0 Z_Q 66
ARCHITECT/ENGINEER NAME LICENSE NUMBERBUS.LIC#
COMPANY NAME E-MAIL FAX
STREET ADDRESS CITY,STATE,ZIP PHONE
USE OF KSFD or Duplex ❑ Multi-Family PROJECT IN WILDLAND PROJECT IN
STRUCTURE: ❑ Commercial URBAN INTERFACE AREA ❑ Yes ZNO FLOOD ZONE ❑ Yes ❑ No
❑SOLAR PANELS ELECTRIC VEHICLE CHARGING STATION TO SOLAR WATER HEATING ❑ OTHER:
FOR SOLAR PANELS: NUMBER OF PANELS/UNITS: #KEI.OWATfS: - �O/��AA� TOTAL VALUATION: _ �
DESCRIPTION ION OF WORK ZTn 1 1 E jeeVj-j C y&c-k c ka m_--jS �rO� 1 ✓I
RECEIVED BY:
By my signature below,I certify to each of the following: I am the property owner or authorized agent to act s behalf. I have read this
application and the information I have provided is orrect. I have read the Description of Work and verify it is accurate. agree to comply with all applicable local
ordinances and state laws relating to 'din o c' I authorize representatives of Cupertino to enter the above(ide tified property for inspection purposes.
Signature of Applicant/Agent: Date: 6 L/
S PL M NTAL INFORMATION REQUIRED OFFICE USE ONLY
�w OVER-THE-COUNTER
t" ❑ EXPRESS
m
STANDARD
LARGE
a
❑ MAJOR
PVApp_2012.doc revised 06120112
CITY OF CUPERTINO
FEE ESTIMATOR-BUILDING DIVISION
ADDRESS: 10821 BARRINTON BRIDGE CT DATE: 04/24/2014 REVIEWED BY: MELISSA
APN: 375 22 099 BP#: *VALUATION: 1$2,000
PERMIT TYPE: Building Permit PLAN CHECK TYPE: Alteration / Repair
PRIMARY SFD or DuplexI- I PENTAMATION
USE: p PERMIT TYPE: SOLAR-RE
WORK ADD N EV CHARING STATION IN GARAGE
SCOPE
tac7a. Alayi(Awe k 1'/rw"I" 1'lao Che cA a'?
i.,,a. l' nri Fee Plunfi. Pc 'mit Fz : 1 r r t'�;:
CJtf'c W��ch.7`r�,
E3_L_
turf-. Ja sY, f ae: Plush_hasp. Fee:
NOTE:This estimate does not include fees due to other Departments(i.e.Planning,Public Works,Fire,Sanitary Sewer District,School
District,etc . These fees are based on the prelimina information available and are only an estimate. Contact the De t or addn'l info.
FEE ITEMS (Fee Resolution 11-053 Eff. 7/1/131 FEE QTY/FEE MISC ITEMS
Plan Check Fee: $0.00 0 # Alternative Energy System
Suppl. PC Fee: Reg. ® OT 0.0 Ins $0.00 $106.00 ICxRGSTA EV Charging Station
PME Plan Check: $0.00
Permit Fee: $0.00
Suppl. Insp. Fee: Reg. ® OT 0.0 1 hrs $0.00
PME Unit Fee: $0.00
PME Permit Fee: T-T7 $0.00
L-
(1,onvrllction 7-a :
Work Without Permit? ® Yes (E) No $0.00
Advanced Planning Fee. $0.00 Select a Non-Residential
Building or Structure 0
Strom Motion Fee: IBSEISMICR $0.50 Select an Administrative Item
Bldg Stds Commission Fee: 1BCBSC $1.00
g 11 11
' QTALS' ` $1.50 $106.00 TOTAL FEE: $107.50
��
Revised: 04101/2014
r
Level 2-Electric Vehicle Charging Station
EVB16(16A)-EVB30(30A)-EVB40(40A) V' 6 0
Installation Instructions
�.
RATINGS �� \ PK-93980-10-00-OA-M
Voltage i 120/208V 60Hz 3-phase Y(1-11-G/L2-G-120V,Li-L2—208V) Z
120/240V 60Hz Split-phase(Li-G/L2-G-12OV,Li-L2—24OV) / �y
Current I 16A(EVB16)-30A(EVB30)-40A(EVB40)
NOTE:Charging Station operates on 1201208V or 120/240V circuit only.Does not operate on 120V circuit.
C)
WARNINGS AND CAUTIONS: RR �C
• TO AVOID FIRE,SHOCK,OR DEATH;TURNOFF POWER AT CIRCUIT BREAKER OR FUSE ANIEST TT POR IS
BEFORE WIRING
• If the information in this instruction sheet is not followed exactly,SHOCK OR FIRE MAY RESULT CAUSI TY DAMAGE;'
PERSONAL INJURY OR DEATH.
• For outdoor installations,hard wire connection is required to maintain NEMA 4 weatherproof rating.
• Hard-wire installation and service must be performed by an electrician.
• IMPORTANT:Save these instructions for local electrical inspector's use and future reference.
NOTE:Unit operates on 208V or 240V circuit,it will not operate on 120V.
-• • Figure 1
OKeyhole(4)
tton(
Thank you for purchasing the Level 2 Electric Vehicle Charging Station.This installation sheet includes the
latest information at the time of printing.Leviton reserves the right to make changes to this product without Mounung
further notice.Changes or modifications to this product by other than an authorized service provider could Bracket
void the product warranty.If you have questions about the use of this product,contact your Customer f
Service Representative.Refer to the Customer Support section located In these instructions.
Important Notes to the Installer:
• The EVB40-SPT with top mounted plug is intended for flush mount applications where the electrical box
can be recessed into the wall,and for hard-wiring applications.
• The EVB40-SPT with bottom mounted plug is intended for plug-in solid wall applications where the
electrical box must be surface mounted on the wall.
• The EVB16 and EVB30 are only available with the top-mounted plug. Guide Guide
• Plug-in Charging Stations must be installed with the use of a Leviton Pre-wire Idt.For Installation of the EV816, Pin Blot Pin
use Leviton Installation Kit EVK02;for Installation of the EVB30 and EVB40,use Installation Kit EVK05. Panel wan stud
Read all instructions before installing the Mounting Bracket and Charging Station. Fastener
• Ensure that the correct template is used for installation,as several templates are available within the pre-wire $CAI"
mss' Figure 2
ug w yon
• Observe all governing codes and ordinances. Eve16.Eve30
• Be sure to leave these instructions with the consumer. and Eve40.sPr.
Important Notes to the Consumer:
• Ensure your Charging Station is installed by an electrician. ❑
• Keep these instructions with your User Guide for future reference.
Guide
• • • Pin Slat Release Tab
The Charging Station should be located in close proximity to the electric vehicle's parking location.The -
Charging Station must connect to the electric vehicle via a Charge Connector and Charge Connector Cord.
NOTE:The path from the Charging Station to the electric vehicle should be free from obstacles,and be
within the range of the Charge Connector Cord(19 foot standard length for EVB16,25 foot standard length
for EVB30,EVB40). Panel
The recommended mounting height of the Charging Station is not to exceed 48 inches,but not less than 42 F
inches from the floor to the top of the Charging Station.This provides convenient access and operation of upply�ug
the Charging Station,and meets ADA requirements for access.NOTE:The area surrounding the Charging IP•caamonE u SPTr~` -'' Wall Stud
Station enclosure should be free from obstruction.Recommended clearance around station:5 inches above
and 3-1/2 inches on either side. Figure 3
NOTE:The Plug-In Charging Station lliM be installed with a Leviton Pre-Wire tit(sold separately).Failure
to do so means the station no longer complies with its UL listing.The listing requires the station be removable i
without tools.Refer to Pre-Wire Kit instructions first If a mounting location has not been established.Ensure that
the correct template within the pre-wire kit is used,as several templates are available within the box.For EVB40 '
installation,ensure that the EVB40.5PT is used for flush mount installation,and the EVB40-SPT is used for ----1---
surface mounted installation. - Alternate i
1. Install Pre-Wire Kit.For EVB16,use Installation Kit EVK02;for EVB30 and EVB40 use Installation Kit Hang Holes
EVK05. ---r---u
2. Depress release tabs on the bottom of the Charging Station,and remove Charging Station Door by lifting t
upwards(see Figure 2).
3. Locate the four Mounting Buttons on the back of the Charging Station.Locate the Guide Pin Slot above
the Panel Fastener Screw(see Figure 1).
4.Align the Guide Pin Slot with the Guide Pin on the Mounting Bracket,and the four Mounting Buttons with
the four keyholes on the Mounting Bracket.
5. Once aligned,gently press the Charging Station onto the Mounting Bracket.
6. Allow the Charging Station to slowly slide down into place.Ensure all four Mounting Buttons are secured
in each keyhole on the Mounting Bracket before releasing the Charging Station.
7.Tighten the Panel Fastener Screw to secure the Charging Station to the Mounting Bracket(see Figure 2).
Proceed to POWER CHARGING STATION section.
Page 1 of 4
F. . ��
Gather the required tools and parts before starting installation.Be sure to follow manufacturer's instructions for use of any tools or parts used for this installation.
Tools:
• Drill with 3/16"bit • Stud finder • Level • Scratch awl
• Measuring tape • Wire cutterststrippers • Keyhole saw • Utility knife
• Pin-in Tom type 25 driver • Pliers • #3 Phillips screwdriver(for mounting bracket)
Additional Parts(not included):
• Copper electrical cable(see below for gauge) Conduit
• #14 wood mounting screws(2)-stud mount Strain relief(if applicable)
• Circuit Breaker-20A(EVBi 6)-40A(EVB30) 50A(EV840) H100-TB Hub(or engineering equivalent)
For Metal Stud Applications:
• Wall anchors capable of supporting a maximum allowable load of 200 lbs.
For Solid Wall Applications:
• Wall anchors capable of supporting a maximum allowable load of 200 lbs.
• Appropriate conduit and applicable mounting hardware.
NOTE:An alternate Hard-Wire Access opening is also located at the bottom of the Access Panel.When wiring from below,remove plug and gasket and place both
on top where Plug Assembly and Pre-installed Hub were removed(Figure 7).
WARNING:TO AVOID FIRE,SHOCK,OR DEATH;TURN OFF POWER AT CIRCUIT BREAKER OR FUSE AND TEST THAT POWER IS OFF BEFORE
WIRING!
CAUTION:USE THIS DEVICE WITH COPPER OR COPPER CLAD WIRE ONLY.
CAUTION:20A CIRCUIT BREAKER WITH MINIMUM 12AWG WIRE TO BE USED FOR EVBi 6-40A CIRCUIT BREAKER WITH MINIMUM 10AWG WIRE TO
BE USED FOR EVB30-50A CIRCUIT BREAKER WITH MINIMUM 8AWG WIRE TO BE USED FOR EVB40.
NOTE:Choosing to hard-wire the Charging Station requires the use of the alternate hang holes and appropriate mounting hardware See Figure 3 for alternate
hang hole locations.If mounting to a Leviton pedestal,please proceed using the mounting instructions provided within the Pedestal Head Assembly.
1. Depress release tabs on bottom of Enclosure and remove Enclosure Door by carefully lifting up and away from the Enclosure(see Figure 2).Use a Torx pin in
type 25 screwdriver to remove the Metal Hard-Wire Access Panel(with 4 screws).
IMPORTANT NOTE:Carefully remove the ribbon switch connector from printed circuit board assembly(PCBA)and the ground wire from the Hard-Wire
Access Panel before setting it aside(Figure 4).
2. Use snips and/or pliers to remove the Knockout located at the top of the Enclosure as shown in Figure S.NOTE:An alternate Hard-Wire Access opening is
also located at the bottom of the Access Panel shown in Figure 7.Loosen wire connectors and retain for Step 4.Remove pre-installed hub and disconnect
Plug Assembly,
3. Install the H100-TB Hub(Figure 6).Torque hub to 65 in-lbs.
4. Run dedicated circuits per the National Electric Code and local building codes.The circuit must reach the top of the Charging Station with an additional 15
inches of loose wire to terminate the connection on the inside of Charging Station.Feed conduit and wires through Knockout opening and secure conduit
to H100-TB Hub using proper conduit fitting.The use of a reducer may be required based on conduit fitting selected.Strip wire ends 3/4 inch and secure to
corresponding wires from toroid assembly and ground wire from terminal block with wire connectors as shown in Figure 6.
5. Reconnect ribbon switch connector into mating connector on PCBA and reconnect ground wire.Reinstall the Hard-Wire Access Panel(Figure 7)and close
enclosure door.
6. Restore power at circuit breaker.Installation is complete.Refer to Level 2-Electric Vehicle Charging Station User Guide for operation.
-- «lm:00W, maaa,maaom
Figure PowmaWP/Waa W.11-on m 6VB10.EVBq ata JEVB/gdPT Flgure5 ama
la dult antrnme
PCBA Cermeulor Gabon Wish ConMalx `' IA A dt whan lmblling N,a Charging
------ ShIlm ma Levlyn PedwtL
GremdWbaasmm01 `
i t t
--------- ------------ .1
y
,
PlugA—"y MEVa16,
� EVa�q dEVa6gdPT
-•P.4.d wHub
NWtMaA6 $4PKW
r -_-_-_ .._-_-_
rab_____r <j } nab EVaao.sPT
C hargs Cold Cor-dor Cobh
a
W a £ Remove Enclosure Door and HanFWire Access Panel Remove Knockout and Plug Assembly
Figure6 -Nroare Hub Figure?
--canaat -
NOTE:Enwrar0bm19wNehua Ww NpkWW Indom"conneemr
on PCBA w around are la ia•aNeuhad boor.moumMg Paget
,
a
Enwrooaa ".� o `•
rYnakw lMacl f >. f-- \
• --_ . ,. i
i Nub Aaaenahh(a WHIM ❑ }.......,O i
, �.Wmd(HaO Bgd1 •
ANamab � i •LIM2alaN Whba _______ __ _ _____
i_.._., � Pin llNgalbn
Hmd•Wiro •G—dGrow, Aaa�aanadMm 1 _
Aeeaw
i AnemtlMLaopO,_ i� ----- XeattaMQ;.0 Whe
__________________, Ip
ml
RUM"
Install Hard-Wire Hub.install ConduR and Wires(not Includes!) Reconnect ribbon switch connector,ground wire,and reinstall hard-wire access panel
.e . . IWIRIIANTIMI
.�.
Plug the Charging Station into the installed outlet(20A for EVB16,50A for Call our Customer Support Hotline at 855-5-PLUG-IN.PLEASE HAVE THE
EVB30 and EVB40)and replace the Enclosure Door.Upon plugging in the MODEL NUMBER AND SERIAL NUMBER AVAILABLE WHEN YOU CALL.
unit,a self-testing sequence will initiate.Please refer to the Level 2 User Guide These can be found on the label on the side of the Charging Station.
for a more detailed description.NOTE:DO NOT plug the Charge Connector if your call is made after business hours or on weekends,please send an
into the vehicle prior to the self-test;this may cause the Charging Station to e-mail with your name,telephone number,the unit's serial number,and a brief
go into Cold Load Pick-up,and delay charging.Refer to Level 2•Electric description of the problem to toyotaservice @ leviton.com.A Customer Service
Vehicle Charging Station User Guide for operation. Representative will call back during normal business hours.
Page 2 of 4
240VAC,10-L2 16A EVSE(Top Wiring Option) 208VAC,30-L2 16A EVSE(Top Wiring Option)
1214a AG,0 C Stall-
240,
falbn240
120VAC
Neutral � Nebr mer
INeu a
100VAC
Lain LauY
Lt I &nada L1 Service
mmnftw
„yn Pawl
B Breaker a
�aurp Grown
�y Lt black L1 Mack
Lt r has
Gronntl Mn Grown r
240VAC,10-L2 30A EVSE(Top Wiring Option) 208VAC,30-L2 30A EVSE(Top Wiring Option)
IM OVAL 19 ch yVgSt~ 12m108VAC 0a CheIVin06h0on
Lz u
zaovAc
1l0VAC
L2
Neutral Nebr IaWr
INeutral
110VAC
L. LOW
Lt I F 1 L1 Dame
In mw.BrMkar Bnalur
� GroarM �
L1 L1 bed
Lz tvklb - L0 whim
Grouna Iw Grouna ram
240VAC,10-L2 40A EVSE(Top Wiring Option) 208VAC,30-L2 40A EVSE(Top Wiring Option)
t]ORaOVAG to tNOWAC 0
� cnmitlnP awm u Chagirq s,enon
240 AL
120VIAC
Neutral 1 IMW �
I Neutral
120VAC
L1
LolA loom
I Perwl 11 Lt P.-I
B ealka
0 lekar a o
wound j p Ground < j'p
ym pi
m p�
Lt Lt bock
L4U wbNa
Graurld teen Ground rem
Page 3 of 4
EVR-GREENTM CHARGING STATION
PRE-WIRE KIT INSTALLATION INSTRUCTIONS , 3
Cat. No. EVK05-M �EV11111116
4A� ��//�� � PK-93765-10-00-OB-M
WARNINGS AND CAUTIONS: aF �� obz
• INSTALLATION AND SERVICE MUST BE PERFORMED BY AN ELECTRI��QQ @Ib�I Of\ °, �
• CONNECT TO A 120/208VAC,60HZ OR A 120/240VAC,60HZ DEDICATED BFTA CIR �I
• IMPORTANT:SAVE FOR LOCAL ELECTRICAL INSPECTOR'S USE. J! �0
• READ AND SAVE THESE INSTRUCTIONS FOR FUTURE REFERENCE. ��Ip
• IF THE INFORMATION IN THIS INSTRUCTION SHEET IS NOT FOLLOWED EXACTLY,AFI LEC40VL SHOCK MAY
RESULT CAUSING PROPERTY DAMAGE,PERSONAL INJURY OR DEATH. 0
F"I.Ter-TABOM r.n. ",To,n.- M To M M�5 K
Thank you for purchasing the Evr-GreenTM Charging Station Pre-Wire Gather the required tools and parts before starting installation.Be
Kit.This installation sheet includes the latest information at the time sure to follow manufacturer's instructions for use of any tools or parts
of printing.This pre-wire kit is intended for use with Cat No.EVB32, used for this installation.
EVB45,EVB55,EVB30 and EVB40-SPT.Two unique templates Toots:
are provided within this box.One template is intended for use in the . Drill • Stud finder
Installation of EVB55,EVB40,and EVB30 Plastic Charging Stations. . 3/16"Drill bit • #2 and#3 Phillips
The other template is intended for use with EVB45 and EVB32 Metal screwdriver
Charging Stations. ENSURE THAT THE CORRECT TEMPLATE . Measuring tape • Level
IS USED PRIOR TO BEGINNING INSTALLATION.For additional . Utility knife • Wire cutters/strippers
information on using this Pre-Wire Kit with other Leviton EVSE • Scratch awl • Keyhole saw
products,please visit leviton.com/evrgreen.Leviton reserves the Evr-Green Pre-Wire Kit(includes):
right to make changes to this product without further notice.Changes
or modifications to this product by other than an authorized service • NEMAreceptacle Electrical box
provider could void the product warranty.If you have questions about . Mountinngg bracket Safety cover
the use of this product,contact your customer service representative. Mounting hardware Mounting template
Refer to the Customer Support section located in this guide. Note:The safety cover will not be used in the Installation of the
Important Notes to the Installer: EV855,EVB40 or EVB30 applications.
• Read all instructions contained in these installation instructions Additional parts(not included):
before installing the pre-wire kit. Copper electrical cable Circuit breaker
• The installer is responsible for verifying that the wall structure/ (appropriate for circuit) 40A for 30A Charging Station,
surface will safely support a total load of 200 lbs. 50A for 40A Charging Station)
• Observe all governing codes and ordinances.
• Ensure the appropriate template is used for the installation.
• Be sure to leave these instructions with the consumer.
Important Notes to the Consumer:
• Keep these instructions with your owner's guide for future
reference.
• Ensure your pre-wire kit is installed properly by an electrician or Select a location that is suitable for mounting the Charging Station
service technician. based on the criteria presented in the MOUNTING LOCATION
e e section.The kit can be installed on both stud wall and solid wall
construction.For stud walls,it can be mounted to bare studs or walls
The Charging Station should be located in close proximity to the with drywall.
electric vehicle's parking location.The Charging Station must connect For metal stud or solid wall applications,you will need to procure
to the Electric Vehicle via a charge connector and cord.NOTE:The wall anchors for mounting bracket,capable of supporting a maximum
path from Charging Station to Electric Vehicle should be free from allowable load of 200 lbs.For solid wall applications you will also
obstacles,and be within the range of the EV cord(18 or 25 Feet need to procure a surface mount electrical box and appropriate wall
Standard Length). anchors.
The recommended mounting height of the Charging Station is not The kit contains components for cord connected charging stations.
to exceed 48 inches,but not less than 42 inches.This provides
convenient access and operation of the EVSE,and meets ADA
requirements for access.NOTE:The EVSE enclosure exceeds
the size of the mounting bracket.The area surrounding the EVSE
enclosure should be free from obstruction(see appropriate
mounting template for required clearance limits).
LIMITED 3YEAR WARRANTY AND EXCLUSIONS
Leviton warrants to the original consumer purchaser and not for the benefit of anyone else that this product at the time of its sale by Leviton is free of defects in materials
and workmanship under normal and proper use for three years from the purchase date.Leviton's only obligation is to correct such defects by repair or replacement,at its option,
if within such three year period the product is returned prepaid,with proof of purchase date,and a description of the problem to Leviton Mfg.Co.,Inc.201 North Service Road,
Melville,N.Y.11747.This warranty excludes and there is disclaimed liability for labor for removal of this product or reinstallation.This warranty is void if this product is installed
improperly or in an improper environment,overloaded,misused,opened,abused,or altered in any manner,or is not used under normal operating conditions or not in accordance
with any labels or instructions.There are no other or implied warranties of any kind,including merchantability and fitness for a particular purpose,but if any implied warranty
is required by the applicable jurisdiction,the duration of any such implied warranty,including merchantability and fitness for a particular purpose,is limited to three years.Leviton
is not liable for incidental,indirect,special,or consequential damages,including without limitation,damage to,or loss of use of,any equipment,lost sales or profits or
delay or failure to perform this warranty obligation.The remedies provided herein are the exclusive remedies under this warranty,whether based on contract,tort or otherwise.
For more information call 1-877338-7473 or visit www.loviton.com/evrgreen
Page 1 of 3
Two templates are provided to properly locate the mounting bracket 5. Remove the template.For wood studs,drill two 3/16"diameter
and receptacle wall box.Using the appropriate template and pilot holes,2-1/2"deep,as indicated for the mounting bracket.
following the instructions below will ensure proper installation. For metal studs,follow manufacturer's instructions for wall anchor
NOTE:The receptacle wall box and mounting bracket must share the installation.
same vertical wall stud(Figure 1 shows the correct Placement for 6. Secure the mounting bracket to the stud/wall using the two#14 x
EVB32,EV845,and EVB40-SPT Installation). 2-1/2"L
Figure 1 wood screws provided.Turn the"top"screw into the pilot hole and
drive in
EVB32,EVB45, until approximately 1/2"length remains.Hook the bracket onto the
EVB40-SPT screw using the keyhole slot.Secure in place by installing remaining
Installation Mounting—> screw and tightening first screw.
Shown bracket 7. Run an individual circuit as per the National Electric Code and local
building codes.Install the electrical box.For bare stud applications,
align the top of the electrical box with the mark on the stud.For
drywall applications,use keyhole saw to cut the drywall opening
12 48" for the electrical box.Position the face of the box flush with the
s stud face(for bare stud application)or flush to drywall(for drywall
application).Secure the electrical box to the stud with the screws
} provided.
Two gang The EVK05 series kit includes a NEMA 6-50 receptacle for cord-
electrical box connected charging stations.Wire terminals accept up to#4 AWG
copper or copper clad conductors.
WARNING:TO AVOID FIRE,SHOCK,OR DEATH TURN OFF
POWER
AT CIRCUIT BREAKER OR FUSE AND TEST THAT POWER IS
OFF BEFORE WIRING!
CAUTION:USE THIS DEVICE WITH COPPER OR COPPER
CLAD
Wall stud WIRE ONLY.
Drywall S. Remove insulation per"strip gage"on device.Connect the
receptacle to the electrical wiring as per Figure 3.
1. Locate a wall stud in the area in which the charging station will be Secure the receptacle to the electrical box using the screws
installed. provided.
2. Measure 48"up from the floor and place a mark horizontally NOTE:Receptacle ground opening must be on bottom(see
centered on the stud that will be used for mounting the bracket Figure 3).
and receptacle wall box. Figure 3
3. Position and affix the mounting template on the wall,aligning the EVB32,
positioning marks of the template with the mark(s)on the wall. EVB45, 240V 6-50R
Ensure the template is level before proceeding(see Figure 2). EVB40-SPT
4. Mark the bracket mounting hole locations and the mounting Installation
location for the electrical box.For bare studs,mark the location Shown G
for aligning the top of the electrical box.For studded walls with G
drywall,mark all four corners of electrical box location.
Figure 2 Center line
_- for wall stud Equipment
EVB32, -- Ground
EVB45, 4 4 EVlcos
EVB40-SPT mounting g. Turn on the circuit breaker at the main panel and test receptacle
Installation template
Shown to ensure power is present.
Pilot holes
for mounting 10.Install the safety cover using screws provided.NOTE:The
screws
hinged side of the safety cover will be at the bottom of the cover.
F EVKoS The safety cover can be locked using a padlock with a shackle
' bracket g diameter of 3/16"and height of 2-1/2",such as MasterLoce
Laminated Padlock No.7LJ*.
4a
'>Mounting
Cut out screws
for two
gang
electrical - 7)
box
r• `/Receptacle
Two gang '
electrical box
Wall stud - R
Safety cover
Drywall NOTE:The safety cover will not be used
In the EVB55,EVB40,and EV830 application
Page 2 of 3
, . a
1
For mounting to solid walls,such as concrete,brick,cinder block,etc., 4. Mark the mounting location for the receptacle electrical box.
additional materials will be required.You will need to procure anchors 5. Remove the template.Install wall anchors for bracket and
for the bracket suitable for the substrate to which it will be mounted. electrical box as per manufacturer's instructions.
Additionally,a surface mount electrical box,electrical conduit and 6. Secure the mounting bracket to the wall.Turn the"top"screw into
applicable mounting hardware will be required. the anchor and drive in until approximately 1/2"length remains.
NOTE: Hook the bracket onto the screw using the keyhole slot.Secure
• Solid Wall installation is NOT recommended for the EVB55, in place by installing remaining screw and tightening first screw.
EVB30. 7. Run an individual circuit as per the National Electric Code and local
• Solid Wall installation for the EVB40 requires Version EVB40-SPT. building codes(a 40A breaker is required for 30A Charging Stations,
• For Solid wall Installation of the EVB32 and EVB45,please see 50A breaker for 40A Charging Stations).Install the electrical box.
below instructions. Use appropriate wall anchors to mount surface electrical box in the
Installation: location indicated by the template.The EVK05 series kit includes
a NEMA 6-50 receptacle.Wire terminals accept up to#4 AWG
1. Locate the wall area in which the charging station will be copper or copper clad conductors.
installed. WARNING:TO AVOID FIRE,SHOCK,OR DEATH TURN OFF
2. Measure 48"up from the floor and place a mark on the wall. POWER
3. Position and affix the mounting template on the wall,aligning the AT CIRCUIT BREAKER OR FUSE AND TEST THAT POWER IS
positioning marks of the template with the mark(s)on the wall. OFF BEFORE WIRING!
Ensure the template is level before proceeding(see Figure 4). CAUTION:USE THIS DEVICE WITH COPPER OR COPPER CLAD
WIRE ONLY.
Figure 4 Solid Wall Installation
8. Remove insulation per"strip gage"on device.Connect the
receptacle
to the electrical wiring as per Figure 3.
4 Secure the receptacle to the electrical box using the screws
4 I EVK05 provided.
% templalt g NOTE:Receptacle ground opening must be on bottom(see
Location Figure 3).
I
mountin
for
wall 9. Turn on the circuit breaker at the main panel and test receptacle
I anchors to ensure power is present.
9 10.For EVB32,EVB45 and EVB40-SPT,Install the safety cover
mountlng using screws provided.
bracket
NOTE:The hinged side of the safety cover will be at the bottom
of the cover.The safety cover can be locked using a padlock
as" Mounting with a shackle diameter of 3/16"and height of 2-1/2",such as
screws Mastert-oce Laminated Padlock No.7LJ*.
*MasterLock is a registered trademark of Master Lock Company,
Location LLC.
for two gang �
electrical box '•. �/Receptacle
(surface mount)
Tgang
electriri cal box
(surface mount)
E='Setety Call our customer support hot line at 1-877-338-7473,24 hours a
cover day.If your call is made after business hours or on weekends,please
leave your name,telephone number and a brief description of the
problem.A Technical Service Representative will call back at the
earliest opportunity.
Many questions and answers can also be found in our knowledge
base community.Just go to leviton.com and click on the
Knowledgebase link,or go directly to hftp://communities.leviton.
com/community/knowledgebaseforu ms/evr-g reen.
0 2012 Leviton Mfg.Co.,Inc. Page 3 Of 3 PK-93765-10-00-OB-M
OW E 2 s
C�P( io G gS'b14 ' t►r�6N t3ru0lx Cain
�' ;����rq�c
r S
14 it yN0 S
S�o�►G�. 1 — Si�. h l e„n
; COMMUNITY
04 DIVISION-CUPE-RTINO`Z� � ` (�►'✓`f, D t"r� �aw�
BUILDIN
APPROVED
3 P0-0—sF U �w`01C KzrCQ E lJ}'p�Z��, This set'of plan ands ecifications MUST be kept at the
job site'duringconstruction. It is unlawful#o make any
bhang.;s or alterations on same,or to deviate:,
nSj-aU New
ther6from,,withgut approval from the Building Official.
V Ch p The stamping of this plan ands ecifications'SHALL NQT
be meld tope," it' aF royal of the violation.
C i of any rice or.State Law.:
cmc' _ la 0.
j �w�` ev DATA
Z�l
CO PERMIT rso, 0 �� 3
a
C�fi9�,
p
rme
• r"�'o�r � I l�� � c a ++
pU 3
RE ed6y 1.5Dt� SUlQP�4AIGL
- , � j Cr XS sL� N`�►�
Rf Giw�Q, °Yv* A'y1
J
, FICE A 5 C7r
wr6Ntn,� L
'�Ib$11 fbAt4aNGCCdA� �1Z1�� .:L� ,
tit
15bA� Su6PArl���t,ofn�i
rot' o4'�� uru, Lticllll(tiC Un( tS
ft wn5 < &aWlL
Zook MIN S U�c :rUf4 MKWd� fi&K�41, Sruu
k
i
do
t 1
,
to
61,
}
Gp eac �., �4 `` W1YfitUgU1
. O
Fo :co°� : D't.� Iq�►t1 ir1 N, f'1 {L tUZOS� 'l uJiC
,FkD
I tm'�,
, 1S
k,lr i4of-, -ate-LUit2
Lf
1