Loading...
ERC 04-03-2014 Community Development Department Cupertino, CA 95014 (408) 777-3308 0 APPROVED MINUTES OF THE MEETING OF THE ENVIRONMENTAL REVIEW COMMITTEE HELD ON April 3,2014 Committee Members: David Brandt Paul Brophy Timm Borden Piu Ghosh Committee Members absent: Barry Chang Aarti Shrivastava Staff present: George Schroeder APPROVAL OF MINUTES: March 20, 2014 ACTION: Approval of minutes from March 20, 2014 MOTION: David Brandt SECOND: Timm Borden ABSTAIN:none VOTE: 3-0-2 (Chang absent, Ghosh abstain) ORAL COMMUNICATIONS (Reserved for persons wishing to address the Committee on:issues that are not already included in the regular Order of Business) NEW ITEMS: 1. Application No.(s) DP-2014-02,ASA-2014-02,TM-2014-01,TR-2014-08,Z-2014-01 (EA-2014-01) Applicant: Tate Development(Foothill Auto Service&Detail, Inc) Location: 10121 N. Foothill Blvd Development Permit to allow the demolition of an abandoned automobile service station and construct six residential units, including five hive-work units with detached workspaces, along with associated site and off-site improvements; Architectural and Site Approval to allow the demolition of an abandoned automobile service station and construct six residential units, including five live-work units with detached workspaces,along with associated site and off-site improvements; Tentative Map to subdivide a .66 net acre parcel into six residential lots and one common area lot; Tree Removal Permit to allow the removal and replacement of five Monterey Pine trees; Rezoning of a .87 gross acre parcel from Planned Development General Commercial - P(CG) to Planned Development General Commercial and Residential-P(CG, Res). ❑ Hazardous Materials o The site's prior uses have caused. soil contamination and has been deemed a Hazard Materials site o The property has been undergoing clean up and is currently in a "case closure" status o The County's Department of Environmental Health and the Santa Clara Valley Water District will be overseeing the remaining remediation process and additional soils sampling and testing o Prior to any grading or demolition, reports must be submitted and approved to demonstrate that the project site poses no safety risk.to the future residents (a Health and Safety Plan, a Site Remediation Plan and a Site Management Plan) ❑ Trees/Landscaping 0 5 trees are to be removed and replaced with 55 trees planted on and off site o 35 shrubs will be planted along the perimeter to provide privacy screening o The trees will be removed after nesting season and replaced in accordance with the Tree Ordinance ❑ Archeological/Cultural o There will be a Stop Work Order in the construction documents should any artifacts be discovered on site ❑ Air Quality • Standard mitigating measures will be in place during construction to reduce dust • During demolition, asbestos will be removed per standard Hazardous Materials Handling requirements ❑ Water Quality o The project will need to meet the C3 requirements for storm water treatment • Noise o Standard mitigating measures will be in place.during construction o The new residences will have sound rated windows installed • Additional Discussion o The developer will need to pay park and school impact fees ACTION: Recommendation for approval of a Mitigated Negative Declaration for EA-2014-01 MOTION: David Brandt SECOND: Piu Ghosh NOES: none VOTE: 4-0-1 (Chang absent) OLD BUSINESS None Respectfully submitted, &�� q",u Beth Ebben Administrative Clerk G/planning/erc/actionminu tes040314