14080123 CITY OF CUPERTINO BUILDING PERMIT
BUILDING ADDRESS: 10046 SPANISH OAK CT CONTRACTOR:IQV CONSTRUCTION PERMIT NO: 14080123
INC
OWNER'S NAME: YEUNG CHICK M&TANG GRACE KA SHUN 820 CHARCOT AVE DATE ISSUED:08/15/2014
OWNER'S PHONE: 4085591977 SAN JOSE,CA 95131 PHONE NO:(408)582-9200
❑ LICENSED CONTRACTOR'S DECLARATION JOB DESCRIPTION:RESIDENTIAL COMMERCIAL E]
CARPORT-TEAR OFF(E)SHAKE,INSTALL(N)CLASS A
License Classes p-C�-3� Lic.# 2 COMP ROOF SYSTEM(7 SQ'S)
Contractor Date �Chapter
I hereby affirm that I am licensed under the provisions of 9
(commencing with Section 7000)of Division 3 of the Business&Professions
Code and that my license is in full force and effect.
I hereby affirm under penalty of perjury one of the following two declarations:
I have and will maintain a certificate of consent to self-insure for Worker's
Compensation,as provided for by Section 3700 of the Labor Code,for the
performance of the work for which this permit is issued. Sq.Ft Floor Area: Valuation:$1858
I have and will maintain Worker's Compensation Insurance,as provided for by
Section 3700 of the Labor Code,for the performance of the work for which this APN Number:34232078.00 Occupancy Type:
permit is issued.
APPLICANT CERTIFICATION
I certify that I have read this application and state that the above information is PERMIT EXPI IF WORK IS NOT STARTED
correct.I agree to comply with all city and county ordinances and state laws relating WITHIN IWDAYS ERMIT ISSUANCE OR
to building construction,and hereby authorize representatives of this city to enter
upon the above mentioned property for inspection purposes. (We)agree to save 180 DAYS RO AST CALLED INSP CTI N.
indemnify and keep harmless the City of Cupertino against liabilities,judgments,
costs,and expenses which may accrue against said City in consequence of the Issued by: Date:
granting of this permit. Additionally,the applicant understands and will comply
with all non-point source regulations per the Cupertino Municipal Code,Section
9 18
RE-ROOFS:
Signature Date `� All roofs shall be inspected prior to any roofing material being installed.If a roof is
installed without first obtaining an insp tion,I agree to remove all new materials for
inspection.
❑ OWNER-BUILDER DECLARATION fL
Signature of Applicant: Date: 7
I hereby affirm that I am exempt from the Contractor's License Law for one of
the following two reasons: ALL ROOF C VERINGS TO BE CLASS"A"OR BETTER
I,as owner of the property,or my employees with wages as their sole compensation,
will do the work,and the structure is not intended or offered for sale(Sec.7044,
Business&Professions Code)
I,as owner of the property,am exclusively contracting with licensed contractors to HAZARDOUS MATERIALS DISCLOSURE
construct the project(Sec.7044,Business&Professions Code). I have read the hazardous materials requirements under Chapter 6.95 of the
California Health&Safety Code,Sections 25505,25533,and 25534. I will
I hereby affirm under penalty of perjury one of the following three maintain compliance with the Cupertino Municipal Code,Chapter 9.12 and the
declarations: Health&Safety Code,Section 25532(a)should I store or handle hazardous
I have and will maintain a Certificate of Consent to self-insure for Worker's material. Additionally,should I use equipment or devices which emit hazardous
Compensation,as provided for by Section 3700 of the Labor Code,for the air contaminants as defined by the Bay Area Air Quality Management District I
performance of the work for which this permit is issued. will maintain compliance with the Cupertino Municipal Code,Chapter 9.12 and
I have and will maintain Worker's Compensation Insurance,as provided for by the Health&Safety Code,Sections 25505 25 ,and 25534.
Section 3700 of the Labor Code,for the performance of the work for which this Owner or authorized agent: Date•
permit is issued.
I certify that in the performance of the work for which this permit is issued,I shall
not employ any person in any manner so as to become subject to the Worker's CONSTRUCTION LENDING AGENCY
Compensation laws of California. If,after making this certificate of exemption,I
become subject to the Worker's Compensation provisions of the Labor Code,I must I hereby affirm that there is a construction lending agency for the performance of
forthwith comply with such provisions or this permit shall be deemed revoked. work's for which this permit is issued(See.3097,Civ C.)
Lender's Name
APPLICANT CERTIFICATION Lender's Address
I certify that I have read this application and state that the above information is
correct.I agree to comply with all city and county ordinances and state laws relating
to building construction,and hereby authorize representatives of this city to enter
upon the above mentioned property for inspection purposes.(We)agree to save ARCHITECT'S DECLARATION
indemnify and keep harmless the City of Cupertino against liabilities,judgments,
costs,and expenses which may accrue against said City in consequence of the I understand my plans shall be used as public records.
granting of this permit.Additionally,the applicant understands and will comply
with all non-point source regulations per the Cupertino Municipal Code,Section Licensed Professional
9 18.
Signature Date
MIT-A PUCATION - -
COMMUNITY DEVELOPMENT DEPARTMENT• BUILDING DIVISION.
10300 TORRE AVENUE•CUPERTINO, CA 95014-3255 O�
CUPE12TlN0. (408)777-3228• FAX(408)777-3333•buildinglacupertino.orq
PROJECT ADDRESS
OWNERNAMP "A?,
`5-1J. /TY— E-T1AIL
STREET ADDRESS / CITY, STATE,ZIP FAX
CONTACT NAME PHONPf E-MAIL
STREET ADDRESS _ CITY,STATE,ZIP
FAX
❑ OWNER ❑ OWNER-BUILDER ❑ OWNER AGENT ❑ CONTRACTOR ❑CONTRACTOR AGENT ❑ ARCHITECT ❑ENGiNrrR ❑ DEVELOPER ❑TENANT
CONTRACTOR NAME LICENSE NUMBER LICENSE TYPE BUS.LIC.H--
COMPANY NAME E-MAIL FAX
STREET ADDRESS CITY,STATE,ZI {y�pTwp ��n
`S - �; Sc vii , c' �.i�A r [v U b �-
ARCHITECT/ENGINEERNAME LICENSENUMBER BUS.LIC.9
COMPANY NAME E-MAIL FAX
STREET ADDRESS CITY,STATE,ZIP PHONE
USE or , ElSFD or Duplex ❑ Multi-Family Rr'- VALUATION: X
STRUCTURE: ❑ Commercial
EXISTING ROOF TYPE: VBUILT-UP ROOF ❑ASPHALT SHINGLES WOOD SHAKES ❑WOOD SHINGLES ❑OTHER(SPECIFY)
Rr-MOVE/REPLACE EYES IF NO. PLYWOOD ❑ %" ❑ PLYWD ❑ OSB PITCH: ROOF
❑NO 0 LAYERS: THICKNESS• ❑ 5/8" TYPE: ❑ CDX —� 1 2 CLASS: A`
---
PROPOSED ROOF TYPE: BUILT-UP ROOF ❑ASPHALT SHINGLES .❑WOOD SHADES ❑WOOD SHINGLES �( OTHER
ICC_E RLPORP/j- - —
_�.
DESCRIPTION OF WORK:-� �- f i y
TIL-
Ovc1 //
C CII
By my signature below,T certify to each of the following: I am the property o\,,`ner or authorized agent to act on the property ommer's behalf. I have read this
application and the information I have providescorrect. I have read the Description of Work and verify it is accurate. I agree to comply with all applicable local
ordinances and state laws relating t9 u' nstruction. I authorize representatives of Cupertino to enter the above-iideentifieddpproperty for inspection purposes.
S ignature of ApplicanUAgent; Date: /( !^ /
SUPPLEMENTALII,rFORMATIONREQUIRED �"�`1��'��a,� I����;�1
' �w.�Ai�CT3Lt ¢ DNS 1H ti4 4'�Y�.� avy
—If building is associated with a Home Owner s Association,provide letter yfirh "01=07 GSI Ti01
of approval from HOA. {,rw'4 MW19
���nl�1TnL�.orl��
_Provide Plalming approval to verify if there any restrictions. 9 I WAWA �
n >�nrIIZEVI>W
_Provide copy of Manufacturer's Installation Specifications.ecifieati . , � i�•>
..� U.
_Provide signed copy of Cupertino's Tear-Off Policy. A.4 ,ap&OTLIER• i �� aM`;
Rel'oofdpp_2011.doc revised 03/16/11
CITY OF CUPERTINO
FEE ESTIMATOR—BUILDING DIVISION
ADDRESS: 10046 SPANISH OAK CT DATE: 08/1312014 REVIEWED BY: MELISSA
APN: 342 32 078 BP#: *VALUATION:
*PERMIT TYPE: Minor Building Permit PLAN CHECK TYPE: Re-roof
PRIMARY SFD or Duplex PENTAMATION 1 SFDWLROO
USE: PERMIT TYPE:
WORK CARPORT -TEAR OFF E SHAKE INSTALL N CLASS A COMP ROOF SYSTEM 7 SQ'S
SCOPE
FEE ID ROOF AREA
s.f.
1REROOFFRES 700
3aj,
?er_Jt. F'Lt?tz zc: I'llraii3. 'Irxrt C"dzrc'k z:>tec-1'l�ar C iecl
ee:
C?tiz<'# 4u'c ,>.It,r3, ()€i"'tee '/irt's?=Itas1?. 01h—r Ekcz Insp. Li
i°rsc h.Ir z.
NOTE:This estimate does not include fees due to other Departments(Le.Planning,Public Works,Fire,Sanitary Sewer District,School
District,etc.). Thesefees are based on the prelimina information available and are only an estimate. Contact the De t or addn'l info.
FEE ITEMS 6Fee Resolution 11-053 E . 7�f 11113) FEE QTY/FEE MISC ITEMS
I("'n Check Fee,:
suppl, (-,F ;r;
Permit Fee: $119.00
e'er^€axiZ Ft;t;' _T_
Work Without Permit? 0 Yes No $0.00
Strom Motion Fee: 1BSEISAHCR $0.50 Select an Administrative Item
Bldg Stds Commission Fee: 1BCBSC $1.00
,rN �0 �" $1 $0.00 , TOTAL FEE: $120.50
a�a
F1
20 50
Revised: 07/10/2014
REROOF TEAR-OFF POLICY
COMMUNITY DEVELOPMENT DEPARTMENT•BUILDING DIVISION
ALBERT SALVADOR, P.E.,C.B.O., BUILDING OFFICIAL
10300 TORRE AVENUE•CUPERTINO, CA 95014-3255
CUPERTINO
(408)777-3228•FAX(408)777-3333•buildingQ)cupertino.org
PROJECT ADDRESS APN#
OWNER NAME PHONE E-MAIL
STREET ADDRESS �({� CITY,STATE,ZIP FAX
lX �NAC i0A) 04 1
CONTRACTOR NAME LICENSE NUMBEPiJL l.r?�j`�11 LICE/N�SE TYPE BUS.LIC.#
COMPANY NAME E-MAIL FAX
STREET ADDRESS CITY,STATE,ZIP PHONE
I UNDERSTAND AND AGREE TO THE FOLLOWING:
1. The re-roof project shall comply with all applicable provisions of the 2010 California Codes.
2. An inspection request can be scheduled up to one business day before the requested inspection date.
Please schedule inspections online or call(408) 777-3228 from 7:30-3:30pm(Mon-Thurs) or 7:30-
2:30pm (Friday)to schedule inspection. For Tear-Off and Nailing Inspections,you must also call on the
day of the inspection only after that phase of the work is completed. The building inspector will be
available within one hour. The hours for this service are: 7:30-10:30am and 12:30-3:30 (Mon-Thurs)
and 7:30-10:30am and 12:30-2:30 (Friday). Final Inspections will be given a two hour window.
3. Tear-Off Inspection is required. Any and all dry-rotted wood shall be replaced prior to this inspection.
Unless new plywood roof sheathing is proposed throughout, all the nails/fasteners shall be either
completely knocked-down or-removed prior to this inspection.
4. If plywood is installed, a plywood Nailing Inspection is required.
5. Roofing shall not be applied without first obtaining all prior inspection and written approvals from the
building inspector. Any roofing which is applied without first obtaining an approved inspection will
require the removal of all new material down to the sheathing so a proper inspection can be performed.
6. A Final Inspection and approval shall be obtained from the building inspector when the re-roofing is
completed. To receive a final sign-off,the following items will be verified:
a. Flat roofs shall have a minimum of 1/4"per foot of slope and demonstrate there is no ponding.
b. Listings from approved testing agencies for all pre-manufactured products used shall be
available on-site to review at the time of the inspection.
c. Proper spark arrestor installation,vents painted, gutter/downspouts installed, debris removed.
7. NOTE: If you call for a tear-off or plywood nailing inspection and the work is not complete,you will be
charged a re-inspection fee. The re-inspection fee shall be paid before another inspection can be
scheduled.
By my signing below, I certify each of the following is true: I am the property owner or authorized agent to act on the
property owner's behalf. I understand and agree to comply with the re-roof policy stated above. I also understand that
smoke detectors and carbon monoxidd tectors are required to be installed in accordance with Sections R314 and R315 of
the 2010 California Residential e.
Signature of Applicant/Agent: Date: �� `/
ReroofPolicy_2013.doe revised 10/20/13
August 11, 2014
City of Cupertino
Building Department
10300 Torre Avenue
Cupertino, CA 95014
Re: Westridge Country Club Homes Association
Gentlemen:
This office is the management company for the above homeowners association and the
Board of Directors requests your assistance in obtaining a Permit for the installation of
new roofs at this complex in Cupertino, CA 95014.
Please be advised that IQV Construction, Inc. or Jim Lyons of Construction Services, Inc.
will be obtaining the permits on behalf of the Board of Directors.
Thank you for your anticipated cooperation.
Sincerely,
COMMUNITY MANAGEMENT SERVICES
Pauline M. A. Moore, Senior Association Manager
Westridge Country Club Homes Association
cc: IQV
CSI
Board of Directors