Loading...
14080134 CITY OF CUPERTINO BUILDING PERMIT BUILDING ADDRESS: 10166 ENGLISH OAK WAY CONTRACTOR.IQV CONSTRUCTION PERMIT NO: 14080134 INC OWNER'S NAME: MCINTIRE LORRAINE E TRUSTEE 820 CHARCOT AVE DATE ISSUED:08/18/2014 OWNER'S PHONE: 4085591977 SAN JOSE,CA 95131 PHONE NO:(408)582-9200 ❑ LICENSED CONTRACTOR'S DECLARATION JOB DESCRIPTION:RESIDENTIAL COMMERCIAL ❑ CARPORT-TEAR OFF(E)SHAKE,INSTALL(N)CLASS A License Class Lie.# COMP ROOF SYSTEM(7 SQ'S) ContractorTg1J Date Z I hereby affirm that I am licensed under the provisions of Chapter 9 (commencing with Section 7000)of Division 3 of the Business&Professions Code and that my license is in full force and effect. I hereby affirm under penalty of perjury one of the following two declarations: I have and will maintain a certificate of consent to self-insure for Worker's Compensation,as provided for by Section 3700 of the Labor Code,for the performance of the work for which this permit is issued. Sq.Ft Floor Area: Valuation:$2166 I have and will maintain Worker's Compensation Insurance,as provided for by Section 3700 of the Labor Code,for the performance of the work for which this APN Number:34232140 00 Occupancy Type: permit is issued. APPLICANT CERTIFICATION I certify that I have read this application and state that the above information is PERMIT EXPIRES IF WORK IS NOT STARTED correct.I agree to comply with all city and county ordinances and state laws relating WITHIN OF PERMIT ISSUANCE OR to building construction,and hereby authorize representatives of this city to enter upon the above mentioned property for inspection purposes. (We)agree to save 180 DAY FR T CALLED INSPE TI N. indemnify and keep harmless the City of Cupertino against liabilities,judgments, costs,and expenses which may accrue against said City in consequence of the granting of this permit. Additionally,the applicant understands and will comply Issued by: Date: with all non-point source regu at ons per the Cupertino Municipal Code,Section 9 18. �j RE-ROOFS: Signature Date O All roofs shall be inspected prior to any roofing material being installed.If a roof is installed without first obtaining an ins ection,I agree to remove all new materials for inspection. ❑ OWNER-BUILDER DECLARATION5/_ / j4 Signature of Applicant: Date: I hereby affirm that I am exempt from the Contractor's License Law for one of the following two reasons: ALL ROOF COVERINGS TO BE CLASS"A"OR BETTER I,as owner of the property,or my employees with wages as their sole compensation, will do the work,and the structure is not intended or offered for sale(Sec.7044, Business&Professions Code) I,as owner of the property,am exclusively contracting with licensed contractors to HAZARDOUS MATERIALS DISCLOSURE construct the project(Sec.7044,Business&Professions Code). I have read the hazardous materials requirements under Chapter 6.95 of the California Health&Safety Code,Sections 25505,25533,and 25534. 1 will I hereby affirm under penalty of perjury one of the following three maintain compliance with the Cupertino Municipal Code,Chapter 9.12 and the declarations: Health&Safety Code,Section 25532(a)should I store or handle hazardous I have and will maintain a Certificate of Consent to self-insure for Worker's material. Additionally,should I use equipment or devices which emit hazardous Compensation,as provided for by Section 3700 of the Labor Code,for the air contaminants as defined by the Bay Area Air Quality Management District I performance of the work for which this permit is issued. will maintain compliance with the Cupertin Municipal Code,Chapter 9.12 and I have and will maintain Worker's Compensation Insurance,as provided for by the Health&Safety Code,Sections 25 O5, 533,and 25534. Section 3700 of the Labor Code,for the performance of the work for which this Owner or authorized agent: Date: permit is issued. If IV— I certify that in the performance of the work for which this permit is issued,I shall not employ any person in any manner so as to become subject to the Worker's Compensation laws of California. If,after making this certificate of exemption,I CONSTRUCTION LENDING AGENCY become subject to the Worker's Compensation provisions of the Labor Code,I must I hereby affirm that there is a construction lending agency for the performance of forthwith comply with such provisions or this permit shall be deemed revoked. work's for which this permit is issued(Sec.3097,Civ C) Lender's Name APPLICANT CERTIFICATION Lender's Address — I certify that I have read this application and state that the above information is correct.I agree to comply with all city and county ordinances and state laws relating to building construction,and hereby authorize representatives of this city to enter upon the above mentioned property for inspection purposes.(We)agree to save ARCHITECT'S DECLARATION indemnify and keep harmless the City of Cupertino against liabilities,judgments, costs,and expenses which may accrue against said City in consequence of the I understand my plans shall be used as public records. granting of this permit.Additionally,the applicant understands and will comply with all non-point source regulations per the Cupertino Municipal Code,Section Licensed Professional 9 18. Signature Date -------------- ' CATI a N COMMUNITY DEVELOPMENT DEPARTMENT• BUILDING DIVISION. 10300 TORRE AVENUE•CUPERTINO, CA 95014-3255 CUPERTINO. (408)777-3228• FAX(408)777-3333•buildinq@cupertino.orq ) ,10 PROJECT ADDRESS OWNER NAMF STREET ADDRESS CITY, STATE,ZIP FAX CONTACT NAME PHONF� E-MAIL tet, ' ;v C'SS Z(8 S'7 7 STREET ADDRESS CITY,STATE,ZIP FAX ❑ OWNER ❑ OWNER-BUILDER ❑ OWNER AGENT ❑ CONTRACTOR ❑CON PACTORAGENT ❑ ARCHITECT ❑EI:OINEL•R ❑ DEVELOPER ❑TENANT CONTRACTOR NAME LICENSE NUMBER LICENSE TYPE BUS.LIC.a—1 COMPANY NAME i E-MAIL �' w_t" �.'•a.._ .�... f'\GY. "I r: FAX STREET ADDRESS CITY,STATE,ZI PHONE ARCI-UTECT/ENGINEERNAME LICENSENUMBER BUS.LIC.a COMPANY NAME E-MAIL FAX STREET ADDRESS CITY,STATE,ZIP PHONE USE or ❑ SFD or Duplex ❑ Multi-Family Rr-- VALUATIO • STRUCTURE: El � EXISTINO ROOF TYPE: 'BUILT-UP ROOF ❑ASPHALT SHINGLES I�(WOOD SHAKES ❑WOOD SHINGLES VV ❑OTHER(SPECIFY) REMOVE/REPLACE ®YES IF NO, PLYWOOD ❑ w. ❑ PLYWD ❑ OSS PITCH: ROOF ❑NO 1 a LAYERS: THICICKFSs, ❑ 5/9" TYi'L•: ❑ CDX � 12 CLASS: A PROPOSED ROOF TYPE: BUILT-UP ROOF ❑ASPHALT SHINGLES .❑WOOD SHAKES ❑WOOD SHINGLES OTHER ICGGS itLPOitTrl ........... DESCRIPTION OF WORK c i>_bt.Gtf�t'_ �' c> / ,3 (:1 t 7 ^' fyiJ t 1 By my signature below,I certify to each of the following: -lam the property o\vner or authorized agent to act on the property owner's behalf. I have read this application and the information I have provides correct. I have read the Description of Work and verify it is accurate. I agree to comply\vith all applicable local ' ordinances and state laws relating t u nstruction. I authorize representatives of Cupertino to enter the above-iidentified property for inspection purposes. Signature of Applicant/Agent; ;" Date; SUPPLEMENTALI1,rFOn1ATION REQUIRED H $" rr ricti,us o>,z t t ? � '?� . e3k k Jff/ n}a�xs r Y t r 4'xZtIt rrr �y Horne If building is associated with a Hoe Owner's Association,provide letter ` , of approval from HOA. ❑,�`'q�' � GOUi`fI.R 4ts �- wL7a i �' =' �?-;.Y;14 ] "t`t�k,�^'3i, t)j•�e� s a BUITDII�CrPI.�l�lt$����� �' _Provide Plarming approval to verify if there any restrictions. �7'�vI"a} Provide copy of Manufacturer's Installation Specifications. LLZ r a p ❑�' �AIv ARD'��.k� 4�L�� � �I�I'II'.TDCI'T ` � Provide signed copy of Cupertino's Tear-Off Policy, ��v r ,.1�.-., ..-:.t. .',�,"fic3W5� {:.Lk'v�}:i{........ .�.. ]f•?A_4 c. 3J; Rer•oof4pp_2011.doc revised 03/1 G/11 CITY OF CUPERTINO FEE ESTIMATOR— BUILDING DIVISION ADDRESS: DATE: 08/11/2014 REVIEWED BY: Mendez APN: BP#: *VALUATION: 1$2,166 *PERMIT TYPE: Minor Building Permit PLAN CHECK TYPE: Re-roof PRIMARY SFD or Duplex PENTAMATION 1 SFDWLROO USE: PERMIT TYPE: WORK CARPORT-TEAR OFF E SHAKE INSTALL N CLASS A COMP ROOF SYSTEM 7 SQ'S SCOPE FEE II) ROOF AREA s.f. 1REROOFFRES 700 `u .' � vi��, - •. ,,'. ' °c'°.u. ✓/ rr3 ,\ :H y��fi''�rx>."5 k r,• ,..�"i / K w": ., 1'?tw Check1>le<.i irr?r€.'irr<c:r 1-11-;'€ i t.�i1�t3•i1nf'h>I�.siz> f3r�;�€ 1'larrrtf�Ir€,sr3. t3;i�,:t t�,� •.Ita,�;. NOTE:This estimate does not include fees due to other Departments(Le.Planning,Public Works,Fire,Sanitary Sewer District,School District,etc.). These ees are based on the prelimina information available and are only an estimate. Contact the De t or addn'1 info, FEE ITEMS(Fee Resolution 11-053 Eff 711113,) FEE QTY/FEE MISC ITEMS Plan Check bee: sappl, PC 1"4T Permit Fee: $119.00 .tiF2.iYt'zd€.'JZL3tZ 7_01X' Work Without Permit? 0 Yes (F) No $0.00 Travel Documewwion.rees: 'A Strong Motion Fee: 1BSEISMICR $0.50 Select an Administrative Item Bldg Stds Commission Fee: IBCBSC $1.00 �� s 3 bTAT�S $1 $0. TOTAL FEE: $1 20 50 0020.50 Revised: 07/08/2014 REROOF TEAR-OFF POLICY COMMUNITY DEVELOPMENT DEPARTMENT•BUILDING DIVISION ALBERT SALVADOR, P.E., C.B.O., BUILDING OFFICIAL 10300 TORRE AVENUE•CUPERTINO, CA 95014-3255 CUPERTINO (408)777-3228•FAX(408)777-3333•buildingCa.cupertino.org PROJECT ADDRESS 7PN# OWNERNAME (/ (!/ PHONE E-MAIL STREET ADDRESSCITY,STATE,ZIP FAX Q to 11) �oo CONTRACTOR NAME LIC ENSENUMBEWS2/ LICENSE TYPE BUS.LIC.# COMPANY NAME E-MAIL FAX STREET ADDRESS CITY,STATE,ZIP PHONE I UNDERSTAND AND AGREE TO THE FOLLOWING: 1. The re-roof project shall comply with all applicable provisions of the 2010 California Codes. 2. An inspection request can be scheduled up to one business day before the requested inspection date. Please schedule inspections online or call (408) 777-3228 from 7:30-3:30pm (Mon-Thurs) or 7:30- 2:30pm(Friday) to schedule inspection. For Tear-Off and Nailing Inspections,you must also call on the day of the inspection only after that phase of the work is completed. The building inspector will be available within one hour. The hours for this service are: 7:30-10:30am and 12:30-3:30 (Mon-Thurs) and 7:30-10:30am and 12:30-2:30 (Friday). Final Inspections will be given a two hour window. 3. Tear-Off Inspection is required. Any and all dry-rotted wood shall be replaced prior to this inspection. Unless new plywood roof sheathing is proposed throughout, all the nails/fasteners shall be either completely knocked-down or-removed prior to this inspection. 4. If plywood is installed, a plywood Nailing Inspection is required. 5. Roofing shall not be applied without first obtaining all prior inspection and written approvals from the building inspector. Any roofing which is applied without first obtaining an approved inspection will require the removal of all new material down to the sheathing so a proper inspection can be performed. 6. A Final Inspection and approval shall be obtained from the building inspector when the re-roofing is completed. To receive a final sign-off, the following items will be verified: a. Flat roofs shall have a minimum of'/4"per foot of slope and demonstrate there is no ponding. b. Listings from approved testing agencies for all pre-manufactured products used shall be available on-site to review at the time of the inspection. c. Proper spark arrestor installation,vents painted, gutter/downspouts installed, debris removed. 7. NOTE: If you call for a tear-off or plywood nailing inspection and the work is not complete,you will be charged a re-inspection fee. The re-inspection fee shall be paid before another inspection can be scheduled. By my signing below,I certify each of the following is true: I am the property owner or authorized agent to act on the property owner's behalf. I understand and agree to comply with the re-roof policy stated above. I also understand that smoke detectors and carbon monoxide.11ptectors are required to be installed in accordance with Sections R314 and R315 of the 2010 California ResidentialI , e. Signature of Applicant/Agent: ,"G Date: ReroofPolicy_2013.doc revised 10/20/13 August 11, 2014 City of Cupertino Building Department 10300 Torre Avenue Cupertino, CA 95014 Re: Westridge Country Club Homes Association Gentlemen: This office is the management company for the above homeowners association and the Board of Directors requests your assistance in obtaining a Permit for the installation of new roofs at this complex in Cupertino, CA 95014. Please be advised that IQV Construction, Inc. or Jim Lyons of Construction Services, Inc. will be obtaining the permits on behalf of the Board of Directors. Thank you for your anticipated cooperation. Sincerely, COMMUNITY MANAGEMENT SERVICES Pauline M. A. Moore, Senior Association Manager Westridge Country Club Homes Association cc: IQV CSI Board of Directors