Loading...
14090191 CITY OF CUPERTINO BUILDING PERMIT BUILDING ADDRESS: 10180 CARMEN RD CONTRACTOR:ROYAL KNIGHT PERMIT NO: 14090191 ROOFING CO INC OWNER'S NAME: RUNE JENSEN&CAROLINE LIM 4171 WILL ROGERS DR DATE ISSUED:09/29/2014 OWNER'S PHONE: 4082245785 SAN JOSE,CA 95117 PHONE NO:(408)241-7160 ❑ LICENSED CONTRACTOR'S DECLARATION JOB DESCRIPTION:RESIDENTIAL COMMERCIAL ❑ q �� 7 RE-ROOF 31 SQ-REMOVE SHAKES,CLASS A License Class �� I Lic.# 5f� Contracto dr I hereby affirm that I am lic49d under the provisions of Chapter 9 (commencing with Section 7000)of Division 3 of the Business&Professions Code and that my license is in full force and effect. I hereby affirm under penalty of perjury one of the following two declarations: I have and will maintain a certificate of consent to self-insure for Worker's Compensation,as provided for by Section 3700 of the Labor Code,for the performance of the work for which this permit is issued. Sq.Ft Floor Area: Valuation:$11000 tx I ave and will maintain Worker's Compensation Insurance,as provided for by Section 3700 of the Labor Code,for the performance of the work for which this APN Number:35709014 00 Occupancy Type: permit is issued. APPLICANT CERTIFICATION I certify that I have read this application and state that the above information is PERMIT EXPIRES IF WORK IS NOT STARTED correct.I agree to comply with all city and county ordinances and state laws relating WITHINIT�YS'�F P�IVIIT ISSUANCE OR to building construction,and hereby authorize representatives of this city to enter upon the above mentioned property for inspection purposes. (We)agree to save 180 DAYS M LAST CALLED INSPECTION. indemnify and keep harmless the City of Cupertino against liabilities,judgments, /� A costs,and expenses which may accrue against said City in consequence of the / l granting of this permit. Additionally,the applicant understands and will comply Issued by: Date: with all non-point source regulations per the Cupertino Municipal Code,Section 9 18 ��p ROOFS: Signatur 'C__!!;4)te < All roofs shall be inspected prior to anyy roofing material being installed.If a roof is installed without first obtaining an inspection,I agree to remove all new materials for inspection. ❑ OWNER-BUILDER DECLARATION 7 9 Signature of Applicant. I hereby affirm that I am exempt from the Contractor's License Law for one of the following two reasons: ALL ROOF COVERINGS T BE CLASS"A"OR BETTER I,as owner of the property,or my employees with wages as their sole compensation, will do the work,and the structure is not intended or offered for sale(Sec.7044, Business&Professions Code) I,as owner of the property,am exclusively contracting with licensed contractors to HAZARDOUS MATERIALS DISCLOSURE construct the project(Sec.7044,Business&Professions Code). I have read the hazardous materials requirements under Chapter 6.95 of the California Health&Safety Code,Sections 25505,25533,and 25534. 1 will I hereby affirm under penalty of perjury one of the following three maintain compliance with the Cupertino Municipal Code,Chapter 9.12 and the declarations: Health&Safety Code,Section 25532(a)should I store or handle hazardous I have and will maintain a Certificate of Consent to self-insure for Worker's material. Additionally,should I use equipment or devices which emit hazardous Compensation,as provided for by Section 3700 of the Labor Code,for the air contaminants as defined by the Bay Area Air Quality Management District I performance of the work for which this permit is issued. will maintain compliance with the Cupertino Municipal Code,Chapter 9.12 and I have and will maintain Worker's Compensation Insurance,as provided for by the Health&Safety Code,Sections 25505,25533,and 25534. Section 3700 of the Labor Code,for the performance of the work for which this Owner or authorized agent: e: permit is issued. I certify that in the performance of the work for which this permit is issued,I shall not employ any person in any manner so as to become subject to the Worker's Compensation laws of California. If,after making this certificate of exemption,I CONSTRUCTION LENDING AGENCY become subject to the Worker's Compensation provisions of the Labor Code,I must I hereby affirm that there is a construction lending agency for the performance of forthwith comply with such provisions or this permit shall be deemed revoked. work's for which this permit is issued(Sec.3097,Civ C) Lender's Name APPLICANT CERTIFICATION Lender's Address I certify that I have read this application and state that the above information is correct.I agree to comply with all city and county ordinances and state laws relating to building construction,and hereby authorize representatives of this city to enter upon the above mentioned property for inspection purposes.(We)agree to save ARCHITECT'S DECLARATION indemnify and keep harmless the City of Cupertino against liabilities,judgments, costs,and expenses which may accrue against said City in consequence of the I understand my plans shall be used as public records. granting of this permit.Additionally,the applicant understands and will comply with all non-point source regulations per the Cupertino Municipal Code,Section Licensed Professional 9 18. Signature Date REROOF PERMIT APPLICATION V COMMUNITY DEVELOPMENT DEPARTMENT•BUILDING DIVISION - 10300 TORRE AVENUE•CUPERTINO, CA 950143255 r .'(408)77773228• FAX 408 777-3333•buildingcu ertino.or V\O Ct tATWO (� q Q \ PROJECT ADDRESS /UAPN# S 5-7 /'� cjJ OWNER NAME ( o PHONE �SI E_ J �, STREET ADDRESS CITY,STATE,Z FAX CONTACT NAME PHONE E MAII STREET ADDRESS, CITY,STATE,ZIP FAX ❑ OWNER ❑OWNER-BUILDER ❑OWNEKAGENr ❑ CONTRACTOR ❑CONTRACTORAGENT ❑ ARCHITECT ❑ENGII-MER ❑ DEVIIAPEA ❑TENAA*r CONTRACTOR wim l?_ ,+v�r� IN ql LICEN LICE TYP q BUS. COMPANYNAME�O TfT - �J�1�/#rT 0FI� E y STREET ADDRES ILL DR/ C A ®J P I— !l 6 a ARCHITECT/ENGINEER NAME LICENSE NUMBER BUS. IC.# COMPANY NAME E-MAII, FAX STREET ADDRESS CITY,STATE,ZIP PHONE USE OF JK SFD or Duplex ❑ Multi-Family ROOF AREA: VALUAIloN: STRUCTURE: E3Commercial EXISTING ROOF TYPE:. ❑BUIIT-UP ROOF ❑ASPHALT SHINGLES 'WOOD SHAKES ❑WOOD SHINGLES ❑OTHER(SPECIFY) REMOVE/REPLACE JEYES IFNO, PLYWOOD 11 ''/i' ❑ PLYWD 11OSB PITCH: ROOF El NO #LAYERS: THICKNESS: ❑ 5/8" TYPE: ❑CDX :12 CLASS: A PROPOSED ROOF TYPE: ❑BUILT-UP ROOF ❑ASPHALT SHINGLES ❑WOOD SHAKES ❑WOOD SHINGLES ❑OTHER ICC-ES REPORT# DES OF WORK By my signature below,Icertify-to each of the following: I am the property owner or authorized agent to act on the property owner's behalf I have read this application and the information I haveprovided is correct. I have:read the Description of Work.and verify it is accurate. I agree to comply with all applicable local ordinances and state laws rel�tildffigs ion. I rize r ertmo,to enter the above-identified propperty for inspection purposes. Signature of ApplicandAger? Date: SUPPLENENTALMORMAnoNvgpD If building is associated with a Horne Owner's Association,provide letter v == WWI of approval from HOA. Provide Planning approval to verify if there any restrictions. Provide copy of Manufacturers Installation Specifications. Provide signed copy of Cupeitino's Tear-Off Policy. '- ReroofApp 2011.doc revised 03116/11 REROOF TEAR-OFF POLICY f COMMUNITY DEVELOPMENT DEPARTMENT-BUILDING DIVISION ALBERT SALVADOR, P.E.,C.B.O.,BUILDING OFFICIAL GUPERTINQ 10300 TORRE AVENUE-CUPERTINO,CA 95014-3255 (408) 777-3228-FAX(408)777-3333-building(d)cupertino.org PROJECT ADDRESS APN# OWNER NAME I PHONE E-MAIL STREET A DRE S C STATE,ZIP „ FAX CONTRACTOR NAME LICENSE LICENSETYPE BUS,Y6.,// COMPANYN ate STREET ADDRESS f71 dl CITY, ATE,ZIP /J �� /y PHOONE I UNDERSTAND AND AG E TO THE FOLLOWING: 1. The re-roof project shall comply with all applicable provisions of the 2013 California Codes. 2. An inspection request can be scheduled up to one business day before the requested inspection date. Please schedule inspections online or call (408) 777-3228 from 7:30-3:30pm(Mon-Thurs) or 7:30- 2:30pm (Friday) to schedule inspection. For Tear-Off and Nailing Inspections, you must also call on the day of the inspection only after that phase of the work is completed. The building inspector will be available within one hour. The hours for this service are: 7:30-10:30am and 12:30-3:30 (Mon-Thurs) and 7:30-10:30am and 12:30-2:30 (Friday). Final Inspections will be given a two hour window. 3. Tear-Off Inspection is required. Any and all dry-rotted wood shall be replaced prior to this inspection. Unless new plywood roof sheathing is proposed throughout, all the nails/fasteners shall be either completely knocked-down or removed prior to this inspection. 4. If plywood is installed, a plywood Nailing Inspection is required. 5. Roofing shall not be applied without first obtaining all prior inspection and written approvals from the building inspector. Any roofing which is applied without first obtaining an approved inspection will require the removal of all new material down to the sheathing so a proper inspection can be performed. 6. A Final Inspection and approval shall be obtained from the building inspector when the re-roofing is completed. To receive a final sign-off, the following items will be verified: a. Flat roofs shall have a minimum of I/"per foot of slope and demonstrate there is no ponding. b. Listings from approved testing agencies for all pre-manufactured products used shall be available on-site to review at the time of the inspection. c. Proper spark arrestor installation, vents painted, gutter/downspouts installed, debris removed. 7. NOTE: If you call for a tear-off or plywood nailing inspection and the work is not complete, you will be charged a re-inspection fee. The re-inspection fee shall be paid before another inspection can be scheduled. By my signing below, I certify each of the following is true: I am the property owner or authorized agent to act on the property owner's behalf. I understand and agree to comply with the re-roof policy stated above. I also understand that smoke detectors and carbon monoxide detectors are required to be installed in accordance with Sections R314 and R315 of the 2013 California Residen ial de. Signature of Applicant/Agent: Date: �prl ReroofPolicy_2014.doc revised 01/15114