• Silicon Valley Express Lanes (SVEL) Program
• Project Background
• Project Update
• SVEL Implementation Plan
2
a■ abj 64 1 t
akligil
ALAMEC�A
.�, SAN FRi4N�M
COUNTY'
SAN MA�TEa BAY
C€IUIUT'f Led byACTC 049=lwow�
Palo Alto
7 Milpit '
ounta i n Logia I Highways
Vi ew Bunn ale 101 Express Lanes in Operation
Express Lanes Under Development
Santa Clara Future Express Lanes Authorized
Under Legislation
fo
San Jose
Cupertino
B7
Campbell A
N
101
Morgan Hill
� Gilroy CGMTV
� t.5
Morgan Hill, s
Gilroy
SR 8 5 Express L
��a
SILICON VALLEY EXPRESS LANES
PALO ALTO
�bM V fey
Wig.T8 KrEXPRESS SMEs
MOUNTAIN
VIEW .
^ � � 70V1D)ir-ccrConn-M-.lDF
. ±�>�
srm gAE b
R\
s�:jrAL£LAHA a&,M
O ! 2.5 s
CUPERTINO WP r� . Miles ^C
. � .
NlmE <
CAMPBELL
SARATOGA
Li
10s GATOS
�}
NOkGMNelU
4
Project Background 000-W
O�Oe,bn.
The project proposes to:
• Convert the existing high-occupancy vehicle (HOV) lanes on
SR 85 from U.S. 101 in South San Jose to U.S. 101 in
Mountain View to Express Lanes — about 24 miles of
conversion in each direction.
• Add a second Express Lane between SR 87 and I-280 — about
10 miles in each direction; and
• Add an auxiliary lane on northbound SR 85 between South
De Anza Boulevard and I-280.
Public comment period — Dec 30, 2013 — Feb 28, 2014
5
Project Update 000-OV
O�Oemn.
• Moving forward with environmental document.
• Nov. 6, 2014 — VTA Board to support project
incremental approach to implement single lane
conversion only and authorize General Manager to
execute a contract for a noise reduction study
along SR 85 .
• Noise Reduction Efforts:
• Phase 1 : Noise Reduction Study
• Phase 2: Noise Reduction Pilot Project
• Phase 3 : Noise Reduction Projects
6
Project Update 000-W
O�Oean.
• Spring 2015 — Caltrans
61-M to approve final
� environmental
document.
• 2015 — Phases 3 and 4
design to begin.
SVEL Implementation Plan
SILICON VALLEV
EXPRESS
PAIR)
ALTO
MILPITAS
Ia►� ,I r't1� I
S1'NN)'VM.a
SANTA d LAILA
S k
:IAN JC7±:1'.
UqLM[P35 1.L
LOS GKUOS
Freeways and Express Lancs
Phase 1(In Operafion) Fulure Phases-TRU a.N.
Phase 2 Freeways
Phase 3 HOV Lane to HOIV Lane
Phase 4 0 CannscWr
i
_.: 5 ��� MORGAN I32I.1.
1lilrx
1?t�ns.�s�ns�c