Loading...
13-147 Cupertino Union School District, Second Amendment for Maintenance Improvement of Open Space Areas (see 91-111, 05-091, 16-168)NO Pa THIRD AMENDMENT TO EXTEND THE TERM OF THE AGREEMENT BETWEEN THE CITY OF CUPERTINO, CUPERTINO UNION SCHOOL DISTRICT AND CUPERTINO SCHOOLS PUBLIC FINANCING CORPORATION FOR MAINTENANCE AND IMPROVEMENT OF CERTAIN OPEN SPACE AREAS WITHIN CERTAIN SCHOOL SITES This Third Amendment to the Agreement between the City of Cupertino, a California municipal corporation ("City"), Cupertino Union School District and Cupertino Schools Public Financing Corporation (collectively referred to as the "Parties") is made and entered into this 4t' day of August 2016. RECITALS A. On April 15, 1991, the Parties entered into a twenty-five year agreement (hereinafter "Agreement") in which the City agreed to provide maintenance and improvement of designated school playfields within certain school sites in exchange for the use of those playfields by City residents and others for sports activities within the City of Cupertino. B. On December 14, 2005, the Parties entered into a First Amendment to the Agreement to, among other things, provide for an annual contribution by the Cupertino Union School District to help offset inflationary costs of the City's maintenance obligation. C. On September 24, 2013, the Parties entered into a Second Amendment to the Agreement to, among other things, change the open space ball field site originally allocated at Faria School to Collins School and establish additional requirements associated with this location change. Hereafter, the term "Agreement" collectively refers to the original Agreement, the First Amendment and the Second Amendment. D. The Parties desire to amend the Agreement again to extend the agreement six months. NOW, THEREFORE, it is mutually agreed by and between and undersigned parties as follows: 1. Paragraph Four of the Agreement is modified to read as follows: 4. DISTRICT PROHIBITED FROM SELLING DESIGNATED SCHOOL OPEN SPACE SITES: District shall not sell, convey, or otherwise dispose of the open space sites which are the subject of this agreement at the remaining schools through December 31, 2016 However, should District determine that it is necessary to reconfigure or otherwise change the utilization of Eaton School, it may do so upon reimbursement to City of amounts paid by City for said improvements to portions of the open space reclaimed by DISTRICT. Third Amendment to Agreement between City of Cupertino, Cupertino Union School District and Cupertino Schools Public Financing Corporation Page 1 2. Paragraph Fifteen of the Agreement is modified to read as follows: 15. TERM OF AGREEMENT. (a) This Agreement became effective upon the original execution thereof by all the parties. (b) The obligations set forth in Paragraph 3(b) of this Agreement shall continue to be in force notwithstanding the termination of other provisions of this Agreement pursuant to subparagraph (c), unless and until such obligations are modified or repealed pursuant to Paragraph 18. (c) This agreement shall terminate on December 31, 2016 3. Except as expressly modified herein, all other terms and covenants set forth in the Agreement shall remain the same and shall be in full force and effect. Attest: City of Cupertino I VIC sj?� f Grace Schmidt, City Clerk Cupertino Union School District G� David Brandt, City Manager keetO) 99 IAz -M T:4:' fz- Wendy Gudalewicz, Sup i endent eAVOLPH Cupertino Schools Public Facilities Financing Corporation Dana Drysdal , resident e-poSorV l�M Third Amendment to Agreement between City of Cupertino, Cupertino Union School District and Cupertino Schools Public Financing Corporation Page 2 Approved as to form: Randolph Hom, City Attorney Third Amendment to Agreement between City of Cupertino, Cupertino Union School District and Cupertino Schools Public Financing Corporation Page CUPERTINO October 14, 2013 OFFICE OF THE CITY CLERK CITY HALL 10300 TORRE AVENUE • CUPERTINO, CA 95014-3255 TELEPHONE: (408) 777-3223 • FAX: (408) 777-3366 WEBSITE: www.cupertino.org Cupertino Union School District 10301 Vista Drive Cupertino, CA 95014 Attn: Pam Mackey Re: 2nd Amendment to Agreement for Maintenance and Improvement of the Certain Open Space areas with Certain School Districts Dear Pam, Enclosed are two signed sets of the above stated agreement between the City of Cupertino, Cupertino Union School District, and Cupertino Schools Public Financing Corporation. As discussed, I am including the Public Financing Corp. copy for your distribution. If you have any questions or need additional information, please contact the Parks and Recreation department at 408-777-3120. Sincerely, Kirsten Squarcia Deputy City Clerk Enclosures cc: Parks & Recreation SECOND AMENDMENT TO AGREEMENT_ BETWEEN THE CITY OF CUPERTINO, : CUPERTINO UNION SCHOOL DISTRICT AND CUPERTINO SCHOOLS PUBLIC FINANCING.CORPORATIOlo1 FOR _MAINTENANCE AND IMPROVEMENT OF CERTAIN OPEN SPACE AREAS WITHIN CERTAIN SCHOOL SITES : This Second Amendment to the Agreement between.the City of Cupertino, a California municipal corporation ("City"), Cupertino Union .School District and Cupertino Schools Public Financing. Corporation (collectively referred to as the "Parties") for reference dated April 15,1991, is made and entered into this 24t" day of September, 2013.. RECITALS A. On April 15, 1991, the Parties entered into a twenty=five year agreement (hereinafter "A'greement") in which the City agreed to provide maintenance and improvement of designated school playfields within certain school sites in exchange for the use of those playfields by City residents and others for sports activities within the City of Cupertino.- On upertino:Ori -December 14, 2005, the Parties amended 'the .Agreement to provide for an annual contribution by. the Cupertino Union School District to help offset inflationary costs of the City's maintenance obligation. C.. The Parties desire .to amend the Agreement again to change the open space ball field site originally _ allocated at Faria School to Collins School . and establish additional requirements associated with this location. change. NOW, THEREFORE 9 it is mutually agreed by and between and undersigned parties as follows: 1. Paragraph-One of the Agreement is modified to read as follows: . 1. DEFINITIONS. (a) School Open Space Sites. There are attached to this Agreement and incorporated by reference herein certain exhibits, to which reference is made .in this Paragraph. These exhibits consist of site diagrams- (Exhibit IA) and a site. profile (Exhibit 2A) -of real property, encompassing an open space area within real property consisting of a school site of DISTRICT. For purposes of this Agreement, whenever reference is made to school open space sites,- such reference shall be construed 'to pertain -to the areas described in this Paragraph: Name of School Open- Space site Collins School Open Space site Eaton School open space site Faria School open space site Garden Gate school open space site Lincoln School open space site Regnart School open space-site Second Amendment to Agreement between City of Cupertino, Cupertino Union School District and Cupertino Schools Public Financing Corporation, continued Stevens Creek School open, space site Hyde School open space site Kennedy School open space site 2. Paragraph Six of the Agreement is amended -to read as follows-.. 6: CONSTRUCTION AND INSTALLATION OF IMPROVEMENTS AT SCHOOL SITES. '(a) Except as provided in Paragraph 6(d) CITY is empowered to undertake and shall be responsible for all activities relating to the construction and installation of the improvements to the various school open space sites in accordance with each adopted Master Plan, including preparation of plans and.'specifications, selection and payment of services of consultants, advertising and calling for bids for construction and. installation of the improvements, awarding construction contracts, supervision of ' construction and installation of the improvements, and payment of costs of such construction and installation.. No. contract for construction shall be -awarded unless and until DISTRICT shall have approved the plans and specifications therefore. No contract for construction of any building; as defined in Chapter 2 of Part 23 of Title. 2 of the Education Code, shall be awarded without the prior approval of the state Department of General Service, where required. (b) DISTRICT and CITY shall develop a schedule for site design and improvements no later than August 31, 1991: All work shall be completed by December 31, 1995. (c) The required date of completion of construction and installation of any improvement required pursuant to this Agreement shall be extended where and to the extent that delay is attributable to weather or circumstances beyond control of -CITY of any contractor constructing or installing improvements under the authority of CITY. (d) DISTRICT recognizes that the _ construction of Improvements pursuant to this Agreement may occur during times of the. year when its schools are in session. CITY will endeavor to schedule construction activities so as to cooperate with DISTRICT and will assure that adequate safety .precautions are in place. CITY shall consult with DISTRICT as to the scheduling and timing of construction of the improvements so as to minimize. any adverse impact such construction may have on the instructional.program of DISTRICT. (e) In June, 2013, the District was allowed to remove from service the Faria Elementary School ball field site in - order to construct additional classrooms. An. exchange, the District will, at its sole cost and expense, provide an in-kind replacement baseball field of equivalent design, size and quality, including but not limited . to, retaining walls, landscaping, separate irrigation, backstops, dugouts.and storage area at the southeast ' corner of open space adjacent to Collins Elementary School. The District will ensure completion of this facility no later than February 15, 2014. The " City will maintain the open space/fields at the remaining existing sites as well as the new field once it is constructed at Collins Elementary School. 3. The following Exhibits to the Agreement, are added to read as shown in the attachments to this Amendment: a. Exhibit "lA,"- Collins School Site Diagram and Site Profile b..Exhibit "2A"- . Faria School Site Diagram and Site Profile .4. Except as expressly modified- herein, all other terms and covenants set forth in the Agreement shall remain the same and shall be in full force and. effect'. [Signatures on following page] 2 Second Amendment to Agreement between City of Cupertino, Cupertino Union School District and Cupertino Schools Public Financing Corporation, continued ATTEST: CITY OF CUPERTINO By /o f �3 Grace Schmidt, City Clerk CT 22L--� A� David Brandt, City Manager CUPERTINO SCHOOLS PUBLIC FACILITIES FINANCING CORPORATION Dana Drysdale, sident 17 A P O SMFRM. Carol Korade, City Attorney APPROVED AS TO FORM: Mark W. Kelley, Dannis Woliver'4,Kel y Attorney for District i� Attachments: Exhibit "IA,"- Collins School Site Diagram and Site Profile Exhibit "2A"- Faria School Site Diagram and Site Profile 3 a i � 4, e,. , � s`•. \ tom.. � ''•�� AS►►/}1T 11411}1''RV}fir .�,._;�„ A� Preliminary Concept to .+�..+e.. Collins Elementary school Y - Cupertino, CA vtkw rAS)GN �..s w. Facility Collins Acreage (Turf) Current - 1.4 acres (240'x255') as of 02/.15/2014. :Fields, Existing Open play field' Youth Sports Permits, Existing None Fields, Proposed 1 - baseball game 1. - baseball/softball Practice Improvements; Proposed a) construct a little league field includin,- new backstop,. dugouts, new turf, skinned infield, and renovations to the irrigation system Amenities, Proposed: enclosed on -deck area NO) backstops/permanent backstops/portable bathroom facilities batting cage bike racks X 2 bleachers concession stand X (I) drinking fountain* X 1 electrical outlet *Multi -Sport Use Comments: A2 no durngsters Cost Estimate Rev: 09/10/2013 flagpole goal posts _ homerun fence phone (emergency) X (2) ,shaded dugouts X 1 skinned basepaths storage X trash cans' A) 2L(1) �tvater/quick coupler Exhibit IA A, 9S7` Exhibit 2A 11:;19C a g;9 9AiiA !,N CUP SP, TIN0, --A. 99414 61"013 O/V. no GnAe.S + A 3 P I I A L T + Ll PARK MC3 I 445 00BAnSAnTO A' i r F -1 r r r r i i I ti I r I ) L_-1 ' r - ----- - - - - -, 1 1 P., -1 r— -i f , l 1 ' L aFUTUR^ I (1 MOD. j I MOD, I I F� pRE I, I I_ - t 1 -CLSRM:- �' CLSFM. - -C RM: 1 , FUTURE -'r'� - -- J I li 1! i' MoD, I I I I I 1 RST RM, BLDG, PARTIAL SITE PLAN SCALE: V= 30' Exhibit 2A. L d Extension of thA concrete block wall and, walkway, dd Ff STLGRD, STLGRD. STLGRD. STLG A-59205 A-59205 A-59205 A-59: 2/93 2193 2/93. 2/93 1AAr- �ERG • �1T�CHZTECIS NEIN MODULAR CLASSROOM BUILDING AT 7 lv7,AR. '13 ePvS�itYn �tAnaorc� anc�ia.�alxo FARIA ELEMENTARY FOR z3 CUM -CON CANYONALrso.vrEro, c LtFrrdS�a 92-so9: - CUPERTINO UNION SCHOOL DISTRICT 949•afb.0649 �yL rg�.ci�t� t>�Em�13.cam �.Xh bit 2,A. SITE PROFILE Facility Faria Acreage (Turf) Previous = 8.81 acres (5,70.45'x 673.20'). As of 7/15/2013 reduced by 0,196 acres 90'x 95' . Current= 8.61 acres, Fields, Existing 2 -:soccer game 1 - baseball game 3 4 baseball practice Youth Sports Permits, 'Existing AYS4 - Region 35, CYSA Cupertino National Little League Fields, Proposed 1 - soccer game 1 - baseball game 1 - baseball/softball practice Improvements, Proposed a) turf and irrigate .58 acre south of existing turf; b) renovate existing.turf c) provide 6' jogging path around perimeter Amenities, Proposed: X (])^ backstops/permanent X_(1) backstops/portable X bathroom facilities* A) X batting cage B) X (1) bike racks* X (2) bleachers X concession stand'' X (1 drinking fountain* XXL electrical outlet *Multi -Sport Use X (1) enclosed on -deck area - flagpole X_goal pasts Y (11 ,homerun fence X . phone (emergency) * C) X 2. shaded dugouts X� (1) skinned basepaths X(J) storages (6'x8 & 8'x 10') X trash cans* i7) X 1 Nater/quick coupler Comments: A) Maybe modular, B) if space allows, C) must be enclosed in Cost Estimate Rev. 09/10/2013