Loading...
CC Exhibit 05-05-15 Item No. 9 Fiscal Year 2015-16 Fee Schedule CC 5-5- 15 Item #9 AN la eeting May 5,Zo15 .n �" •%; ...... ->:" * .,*. r s. Y ria � ■ What is a fee? ■ Fees for City Services ■ Fee Development ■ New 'or Revised Fees ■ How Do We Compare? Fee Study 1 5/5/2015 A "user fee" is: A fee or rate charged to an individual or group that receives a private benefit from services provided by the City. Public Works— Engineering Design and Inspection Services -• - - Community Development—Planning Current Planning and Mid and Long Range Planning -. - - Community Development—Building General Building,Construction Plan Check and Building Code Enforcement 2 5/5/2015 .,. _>y..N�. z•,,;,.,..� $ ;._� .mod,. _.s -.Y ..wa... e, �.- � � e-1 � ' �. LI G-P-tKI 3.o%Estimated 3.o%Estimated 3.o%Estimated 2.5%Cost of Labor Cost Labor Cost Labor Cost Living Increase Increase Increase 3.o%Estimated 3.o%Estimated 3.o%Estimated 2.6%Cost of Labor Cost Labor Cost Labor Cost Living Increase Increase Increase 2.4%Cost of 2.4%Cost of 2.4%Cost of Living,plus 2.o% Living,plus 2.4%Cost of Living,plus 2.0% for increased 7.28%for Living for increased costs costs increased costs 2.4%Cost of 2.4%Cost of 2.4%Cost of. ps Living 2. %Cost of Livin LivingLivin 2.0% No Chane No Chane No Chane No Change 3.5%Cost of 3.5%Cost of Minimal Chane 3.5%Cost of Living LivingLivin u WEMB­"� ■ Schedule A Based on CPI and Schedules B-D based on Labor Costs 0.k.(E rid 67 Schedule A $50,000 CPI-2.5% Schedule B $65,610 Labor-3% Schedule C $51,000 Labor-3% Schedule D $64,140 Labor-3% Total All $230,750 3 5/5/2015 ■ Electrical Vehicle Charging Station — New to Schedules ■ ChargePoint charging station on Rodriguez Avenue ■ Plan Resubmittal Fee - New ■ Plan submittals in excess of two ■ Housing Mitigation Fee - Revised ■ Updated as a result of the 'Nexus Study, Housing Mitigation Fees and Procedural Manual Updates' • &W@ • In2014,City Council approved the same approach as Sunnyvale. CPI CPI for If Labor, VariesYear • year then based to Year between on labor fee study cost, else CPI for year in between stud 4 5/5/2015 ■ FSPC recommends every 7 years with anticipated costs of$200,000 ■ Last Fee Study was in Feb 2007 ■ Last comprehensive Fee.Study was completed in 2003-04 ■ Fee Study RFP released — end of May 2015 ■ Selection of consultant —July 2015 ■ Contract in place and study commences — August 2015 ■ Final Study released —with FY 2015-16 Mid- Year Budget process 5 r 5/5/2015 ... ...: ... L� A a � N Questions? 6