Loading...
CC Exhibit 06-02-2015 Item No. 18 Annual Report on the Pavement Management Program CC 6/2/2015 Item #18 EXHIBIT 2015 PAVEMENT MANAGEMENT PROGRAM CITY COUNCIL June 2, 2015 NETWORK STATISTICS Total Miles 139 Miles (2,914,740 SY) Residential 103 Miles (2,047,450 SY) Collector Streets 21 Miles (509,610 SY) Arterial Streets 15 Miles (357,680 SY) Distribution by Area (SY): Arterial 12.3% Collector 17.5% CResidential 1 CC 6/2/2015 Item #18 i NETWORK PCI TRENDS 100 1 - x u 95 v i—.. c c 90 i- 0 z 85 `— 82 c 0 �+ 80 - 77 __—___ 77 7G 78 78 L'.Arte%il 75 74 71 75 _..._. .. __.... 74 _..._.... ❑Collector 69 68 70 67 69 -- -- 67 C Residential a � 65 --64 61 C Netw0 rk PCI 60 60 � 59 SS so 2011 2012 2013 2014 2015 PCI OF 80 BY 2019 100 t 90 20 r74 77 SD 80 70 72 70 60 40 $0.6 $0.6 50.6 $06 30 20 $7.7 10 2c15 2016 2017 2018 2019 -Rehab �PM+Stop Gap u Deferred Maintenance Treated PCI 2 CC 6/2/2015 Item #18 STREET NETWORK CONDITION IN 2019 3.8% 0.9% 1001 90% 23.2% 16.3% 80°1 70% 60% 50°1 79.3% 40% 30% 20°1 10% 0% 11/30/2014 Recommended Budget($7M then 8.3M(,after 5 years Timely Preventative Maintenance Saves $ PCI r r tx�elir(it 4096 7QualityS�p�ending51 on Gocxiervation here— Fair ..,eliminates or dela k spending 56 to$10 Poor on rehabilitation or 4096 Drop in QuIlity , reconstruction ht Very Poor {� t Fatlt•d u 5 i0 i5 CC 6/2/2015 Item #18 Ll� ! c, BEFORE FTER I Representative of nearly 30 miles of Cupertino residential streets (PCI<50) QUESTIONS