Loading...
15050111-cert of complianceCERTIFICATE OF COMPLIANCE CF1R-ALT 02-E Alterations to Space Conditioning Systems (formerly CF -1R -ALT -HVAC) / 570-5-0/// (Page 1 of 3 ) I Project Name: 10500 Prepared: 2015-05-19 A. General Information CF111-ALT 02 is applicable to multiple space conditioning systems contained within a single dwelling unit. When multiple dwelling units must be documented, use one CF1R-ALT 02 document for each dwelling unit. 01 Project Name 10500 OAKVILLE/WILSON 02 Date Prepared 2015-05-19 03 Project Location 10500 OAKVILLE AVE 04 Building Type Single family 05 CA City Cupertino 06 Dwelling Unit Name 10500 OAKVILLE/WILSON 07 Zip Code 9501408 Dwelling Unit Conditioned 1700 .. �c L r r' Y• Floor Area (ft2) SC System SC System ,. ` CFA served ' yL r refrigerant Number of space conditioning gym. wL 09 Climate Zone ,j .:}, 4 10 (SC) systems in this dwelling 1 °ducted ¢ containing .- Nlnstalhrig more than 40 unit. entirely new B. Space Conditioning (SC) System'lnformation 01 02 03 04 il. 05 i. 06 07 , ;, 08 09 10 k s the SC-'--"�liistalling a .. �c L r Y• SC System SC System ,. ` CFA served •..,system a yL r refrigerant ..: f �` g•�n Installinew SC gym. wL i`^>`... ,a. Instalhng f^'xvjn InstaNing Identification or Location or Area by this SC °ducted ¢ containing system Nlnstalhrig more than 40 entirely new entirely new Name Served System (ft2) system? component? components? feet of ducts? duct system? SC system? Alteration Type System 1 Location 1 1700 Yes Yes Yes Yes No No Altered space conditioning system C. Extension of Existing Duct System, Greater Than 40 Feet (Section150.2(b)1Diib) This section does not apply to this project. Registration Number: 215-A0133074A-000000000-0000 Registration Date/Time: 2015-05-19 09:17:09 HERS Provider: CaICERTS CA Building Energy Efficiency Standards - 2013 Residential Compliance Report Version: 2014-03-31 Report Generated: 2015-05-19 09:17:10 Schema Version: 0S55SDD CERTIFICATE OF COMPLIANCE CF1R-ALT 02-E Alterations to Space Conditioning Systems (formerly CF -1R -ALT -HVAC) (Page 2 of 3 ) D. Altered Space Conditioning System (Sections 150.2(b)1E and F) 01 02 03 04 05 06 07 08 09 10 11 12 Heating Cooling System Heating Altered Heating Minimum Altered Cooling Minimum Required New or Identification System Heating Efficiency Efficiency Cooling Cooling Efficiency Efficiency Thermostat Replaced New Duct or Name Type Components Type Value System Type Components Type Value Type Duct Length R -Value System 1 Central gas Gas furnace AFUE 0.8 Central split All new cooling SEER 14 Setback Greater than R-6 furnace AHU AC 40 feet components Required Documentation: CF211-MCH-01-E - Space Conditioning Systems Ducts and Fans -Duct insulation requirement for new plenums: R6. CF2R-MCH-20-H & CF313-MCH-20-1­1— Duct Leakage testing,required when heating or cooling components are installed in ducted systems, or when more than 40 ft of duct length is replaced. -Leakage rate compliance: 515%, or 510% leakage to outside, or seal all accessible leaks. CF211-MCH-25-1­1 & CF3R-MCH-25-H Refrigerant Charge Verification required when refrigerant containing components are installed or altered (applicable in CZ 2, 8-15). CF2RCF3R-MCH-23 & CF3R-MCH-23 Air Flow a 300 CFM/ton required when MCH-25.is-required. Exceptions: -Duct systems registered with HERS provider as previously sealed are exempt from MCH -20 Duct Leakage Testing requirements -Heating-only systems and Air Handler/Furnace changes do, not require verification of Air Flow MCH-23,';or Refrigerant -Charge MECH 25 -Existing dud systems constructed, insulated or sealed with asbestos are exempt from MCH -20 Duct,Le'akage Testing requirements. E. Entirely New or Complete Replacement Duct System, wlth or % ithout`Equipment Changeout'(Sections 150 2(4)1Dn6'and%150.2(b)1E, F) This section does not apply to this project. F. Entirely New or Complete Replacement Space Conditioning System (Section 150.2(b)1C) This section does not apply to this project. Registration Number: 215-A0133074A-000000000-0000 Registration Date/Time 2015-05-19 09:17:09 HERS Provider: CaICERTS CA Building Energy Efficiency Standards - 2013 Residential Compliance Report Version: 2014-03-31 Report Generated: 2015-05-19 09:17:10 Schema Version: 0.555SDD CERTIFICATE OF COMPLIANCE CF111-ALT 02-E Alterations to Space Conditioning Systems (formerly CF -1R -ALT HVAC) (Page 3 of 3 ) Documentation Author's Declaration Statement 1.1 certify that this Certificate of Compliance documentation is accurate and complete. Documentation Author Name: Documentation Author Signature: ��� Phelps, Dale Company: Signature Date: A & H HEATING & AIR CONDITIONING SERVICE INC 2015-05-19 09:17:09 Address: CEA/ HERS Certification Identification (if applicable): 770 CHESTNUT STREET City/State/Zip: Phone: SAN JOSE CA 95110 (408) 279-0722 Responsible Person's Declaration statement';. I certify the following under penalty of perjury, under the, laws, of the State of California: 1. The information provided on.this Certificate of Compliance is true and correct. 2. lam eligible under Division 3 iif'#tie'eusiness'and Professions Code to accept responsibility for the building design or system design identified on this Certificate of Compliance (responsible designer). _-: 3. That the energy features and performance specifications, materials components, and manufactured devices for the building design,or system design identified on this Certificate of Compliance conform to the requirements of Title 24, Part 1 and Part 6 of the California' Code of Regulations. 4. The building design features or system design features'identified ori this Certificate'of Compliance are consistent with the information provided on other applicable compliance documents, worksheets, to withthls building permit application. calculations, plans and specifications submitted the enforcement agency for;approval` :. 5. 1 will ensure that a registered copy of this'Certificate of Compliance shall 6e'made available with the Building permit(s). issued for the -building, and',made available`to:the_enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of Compliance is required to be included with the; documentation the .builder provides to the building owner at occupancy. Responsible Designer Name: _-' ible Designer Signature. Responsible �� Phelps, Dale Company: Date Signed: A & H HEATING & AIR CONDITIONING SERVICE INC 2015-05-19 09:17:09 Address: License: 770 CHESTNUT STREET 304472 City/State/Zip: Phone: SAN JOSE CA 95110 (408) 279-0722 Digitally signed by CaICERTS. This digital signature is provided in order to secure the content of this registered document and in noway implies Registration Provider responsibility for the accuracy of the information. Registration Number: 215-A0133074A-000000000-0000 Registration Date/Time: 2015-05-19 09:17:09 HERS Provider: CaICERTS _CA Building Energy Efficiency Standards - 2013 Residential Compliance Report Version: 2014-03-31 Report Generated: 2015-05-19 09:17:10 Schema Version: 0.555SDD CERTIFICATE OF INSTALLATION CF2R-MCH-01-E Space Conditioning Systems, Ducts, and Fans (Page 1 of 7 ) Project Name: 10500 OAKVILLE/WILSON Enforcement Agency: City of Cupertino Permit Number: 15050111 Dwelling Address: 10500 OAKVILLE AVE City: Cupertino Zip Code: 95014 A. General Information 01 Dwelling Unit Name 10500 OAKVILLE/WILSON 02 Climate Zone 4 06 Dwelling Unit Conditioned Floor Area 08� MCH-01b Prescriptive Alterations -Space Conditioning Systems Ducts and Fans01 Number of space conditioning (SC) 03 (ft2) 1700 04 systems being altered in this dwelling 1 Installing SC System unit. by this SC 05 Certificate of Compliance Type y� Prescriptive alterations (CF1R-ALT) 06 Method used to calculate HVAC loads NotApplicableliquipmentChangeout 07 Calculated dwelling unit Sensible Th is field or section is not applicable 08 Calculated Dwelling Unit Heating Load This field or section is not applicable system Cooling Load (Btuh) ��- --- �- - -e entirely new ( Btuh) Name Served (ft2) system? component? components? ducts? B. Space Conditioning (SC) System information �• n �,� { ��� r �• .�,.. �'`� * ;, ,- .M 01 02 03 04 #05 " 06 07 08� MCH-01b Prescriptive Alterations -Space Conditioning Systems Ducts and Fans01 10 CFA served Is the SC Installing a Installing SC System SC System by this SC B. Space Conditioning (SC) System information �• n �,� { ��� r �• .�,.. �'`� * ;, ,- .M 01 02 03 04 #05 " 06 07 08� " 09 10 CFA served Is the SC Installing a Installing SC System SC System by this SC system a refrigerant Installing new SC Installing more entirely Installing Identification or Location or Area System ducted containing system than 40 feet of new duct entirely new Name Served (ft2) system? component? components? ducts? system? SC system? Alteration Type Altered space System 1 Location 1 1700 Yes Yes Yes Yes No No conditioning system Registration Number: 215-A0133074A-M0100002B-0000 Registration Date/Time: 2015-05-2108:05:57 HERS Provider: CaICERTS CA Building Energy Efficiency Standards - 2013 Residential Compliance Report Version: 2014-05-13 Report Generated: 2015-05-21 07:34:07 Schema Version: 0.555SDD CERTIFICATE OF INSTALLATION CF2R-MCH-01-E Space Conditioning Systems, Ducts, and Fans (Page 2 of 7 ) C. Space Conditioning (SC) System Alterations Compliance Information 01 02 03 04 05 06 07 08 09 10 11 12 13 Rated Heating Capacity, Name HeatingEfficiency Type. Value Manufacturer Model Number number Output (BTUH) i Central,Fan TUD2B080A9V3V System 1 AFUE Q.8 ° Integrated F i 14 46 64000 Heating k x ro.P Cooling New or (CFI) System Altered Heating Minimum Altered Cooling Minimum Required Replaced New Ventilation Identification Heating Heating Efficiency Efficiency Cooling Cooling Efficiency Efficiency Thermostat Duct Duct System or Name System Type Component Type Value System Type Component Type Value Type Length R -Value Status Central gas as Central new Not a CFI System 1 furnace fur ace ,': AFUE 0.8 split AC Colol' g SEER 14 Setback GT40Ft R6 system AHU components D. Installed Heating Equipmentinformation _ 01 02 J - -.v.03 04 05 06 07 System Identification or _ Heating Efficiency; :-:A - :.., Heating _Un�t i .......mac •: S .. Heating Unit ; "Heating -Unit -serial Rated Heating Capacity, Name HeatingEfficiency Type. Value Manufacturer Model Number number Output (BTUH) i TUD2B080A9V3V System 1 AFUE Q.8 ° z TRANS • F i 14 46 64000 i k x ro.P Notes: Registration Number: 215-A0133074A-M0100602B-0000 Registration Date/Time: 2015-05-21 08:05:57 HERS Provider: CaICERTS CA Building Energy Efficiency Standards - 2013 Residential Compliance Report Version: 2014-05-13 Report Generated: 2015-05-21 07:34:07 Schema Version: 0.555SDD CERTIFICATE OF INSTALLATION CF2R-MCH-01-E Space Conditioning Systems, Ducts, and Fans (Page 3 of 7 ) E. Installed Cooling Equipment information: 01 02 03 04 05 06 07 08 Condenser or Package Unit Condenser or Condenser or Condenser or System Rated Cooling Condenser Rated System Identification Cooling Efficiency Cooling Efficiency Package Unit Package Unit Package Unit Capacity at Design Nominal Capacity or Name Type Value Manufacturer Model Number Serial Number Conditions (BTUH) (ton) System 1 SEER 14 TRANE 4TTR40443L000 150723EKAF 43000 3.5 Notes: H. Installed Air Filter Device Information This section does not apply to this project. 1. Air Filter Device Requirements This section does not apply to this project. Registration Number: 215-A0133074A-M0100002B-0000 Registration Date/Time: 2015-05-21 08:05:57 HERS Provider: CaICERTS CA Building Energy Efficiency Standards - 2013 Residential Compliance Report Version: 2014-05-13 Report Generated: 2015-05-21 07:34:07 Schema Version: 0.555SDD CERTIFICATE OF INSTALLATION CF2R-MCH-01-E Space Conditioning Systems, Ducts, and Fans (Page 4 of 7 ) J. HERS Verification Requirements 01' 02 03 04 05 06 07 08 09 10 MCH2O MCH21 MCH22 MCH23 MCH25 MCH28 Exemption from Minimum Exemption R -Value for AHU Fan AHU SC System SC System From Duct Duct Ducts In Ducts Located Efficacy Airflow Identification or Location or Area Leakage Leakage Conditioned In Cond Space (W per Rate (dm Refrigerant Return Duct Design Name Served Requirements Test Space Verification cfm) pertain) Charge Table 150.0 -Cor D b(,'isting duct system is System 1 Location 1 J insulated or No , -: ,r Not No No No No No sealed with applicable asbestos {rv} = Registration Number: 215-A0133074A-M0100002B-0000 �S Registration Date/Time: 2015-05-2108:05:57 HERS Provider: CalCERTS CA Building Energy Efficiency Standards - 2013 Residential Compliance Report Version: 2014-05-13 Report Generated: 2015-05-21 07:34:07 Schema Version: 0.555SDD CERTIFICATE OF INSTALLATION CF2R-MCH-01-E Space Conditioning Systems, Ducts, and Fans (Page 5 of 7 ) K. Space Conditioning Systems, Ducts and Fans Mandatory Requirements and Additional Measures Note: Additional mandatory requirements from Section 150.0 that are not listed here may be applicable to some systems. These requirements may be applicable to only newly installed equipment or portions of the system that are altered. Existing equipment may be exempt from these requirements. Heating Equipment 01 Equipment Efficiency: All heating equipment must meet the minimum efficiency requirements of Section 110.1 and Section 110.2(a) and the Appliance Efficiency Regulations. 02 Controls: All unitary heating systems, including heat pumps, must be controlled by a setback thermostat. These thermostats must be capable of allowing the occupant to program the temperature set points for at least four different periods in 24 hours. See Sections 150.0(1), 110.2(b). 03 Sizing: Heating load calculations must be done on portions of the building served by new heating systems to prevent inadvertent undersizing or oversizing. See sections 150.0(h)1 and 2). 04 Furnace Temperature Rise: Central forced -air. heating -furnace installations must be configured to operate at or below the furnace manufacturer's maximum inlet -to -outlet temperature rise specification. See Section 150:0(h)4. 05 Standby Losses and Pilot Lights: Fan -type cL,-ntraf furnaces may no%have a continuously burning pilot light`: Section 110.5;and Section `1fi0.2(d). Cooling Equipment -. .=, Equipment Efficiency: All cooling equipment must`meet the minimum efficiency'require ments;of5ectior 110.1 and Section 110;2(a) and the Appliance Efficiency 06 Regulations. 07 Refrigerant Line Insulation: All refrigerant line insulation in split system air conditioners and heat pumps must meet the R -value and protection requirements of Section 150.0(j)2 and 3, and Section 150.0(m)9. 08 Condensing Unit Location: Condensing units shall not be placed within five (5) feet of a dryer vent outlet. See Section 150.0(h)3A. 09 Sizing: Cooling load calculations must be done on portions of the building served by new cooling systems to prevent inadvertent undersizing or oversizing. See Section 150.0(h)1 and 2. Air Distribution System Ducts, Plenums and Fans 10 Insulation: In all cases, unless ducts are enclosed entirely in directly conditioned space, the minimum duct insulation value is R-6. Note that higher values may be required by the prescriptive or performance requirements. See Section 150.0(m)1. S Registration Number: 215-A0133074A-M0100002B-0000 CA Building Energy Efficiency Standards - 2013 Residential Compliance Registration Date/Time Report Version: 2014-05-13 Schema Version: 0.555SDD 2015-05-21 08:05:57 HERS Provider: CaICERTS Report Generated: 2015-05-21 07:34:07 CERTIFICATE OF INSTALLATION CF2R-MCH-01-E Space Conditioning Systems, Ducts, and Fans (Page 6 of 7 ) K. Space Conditioning Systems, Ducts and Fans Mandatory Requirements and Additional Measures Note: Additional mandatory requirements from Section 150.0 that are not listed here may be applicable to some systems. These requirements may be applicable to only newly installed equipment or portions of the system that are altered. Existing equipment may be exempt from these requirements. Connections and Closures: All installed air -distribution system ducts and plenums must be, sealed and insulated to meet the requirements of CMC Sections 601.0, 11 602.0, 603.0, 604.0, 605.0 and ANSI/SMACNA-006-2006: Supply -air and return -air ducts and plenums must be insulated to a minimum installed level of R-6.0 or enclosed entirely in directly conditioned space as confirmed through field verification and diagnostic testing in accordance with the requirements of Reference Residential Appendix RA3.1.4.3.8. Heat Pump Thermostat 12 A thermostat shall be installed that meets the requirements of Section 110.2(b) and Section 110.2(c). 13 The thermostat shall be installed in accordance with the manufacturers published installation specifications 14 First stage of heating shall be assigned to beat pump heating. 1s Second stage back up heating shall be set to come on'oiily when the indoor set. temperature cannot be met The responsible person signature on this compliance.documidnt affirm`" at all applicable reguiiremments #his table have been r`• ' Registration Number: 215-A0133074A-M0100002B-0000 CA Building Energy Efficiency Standards - 2013 Residential Compliance Registration Date/Time: 2015-05-21 08:05:57 Report Version: 2014-05-13 Schema Version: 0.555SDD HERS Provider: CaICERTS Report Generated: 2015-05-21 07:34:07 6 CERTIFICATE OF INSTALLATION CF2R-MCH-01-E Space Conditioning Systems, Ducts, and Fans (Page 7 of 7 ) Documentation Author's Declaration Statement 1.1 certify that this Certificate of Installation documentation is accurate and complete. Documentation Author Name: Documentation Author Signature: Kirksey, Diana -Nana cJCirL Company: Signature Date: DuctTesters, Inc. 2015-05-19 13:48:33 Address: CEA/ HERS Certification Identification (if applicable): 118SElm Ave City/State/Zip: Phone: Ripon CA 95366 1209-579-5000 Responsible Person's Declaration statement I certify the following under penalty of perjury, under the laws of the State of California: 1. The information provided on this Certificate of Installation is true and correct. 2. 1 am eligible under Division 3 of the -Business and Professibns^Code in the applicable classification to accept responsibility for the system design, construction, or installation of features, materials, components, or manufactured devices for the scope of work -identified on this Certificate of Installation, and attest to the declarations in this statement (responsible builder/installer), otherwise I am an authorized representative of the responsible builder/Installer, 3. The constructed or installed features, materials, components or manufactured,devices (the: instaliation).identified on this Certificate of Installation,conforms;to all:applicable codes and regulations, and the installation conforms to the requirements given on the plans and specifications approved ;ty the enforcement agency. 4. 1 reviewed a copy of the Certificate of.Compliance approved by the`enforcement agency that ldentifies the specific regwrementsfor-the stype of construction or installation identified on this Certificate of _. - Installation, and I have ensured that the requirements thatapply to the construction or installation have been met. -- - _. ; r S. I will ensure that a registered copy of this Certificate of Installation shall be posted or made available with` the building permif(sj issued forthe building and made;a'vailable to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of Installation is required to be included`with the`documentation the b6iIderp ovides 1'o the building owner at occupancy. Responsible Builder/Installer Name: Responsible Builder/Installer Signature: Phelps, Dale Company Name: (Installing Subcontractor or General Contractor or Builder/Owner) Position With Company (Title): A & H HEATING & AIR CONDITIONING SERVICE INC RMO Address: CSLB license: 770 CHESTNUT STREET 304472 City/State/Zip: Phone: Date Signed: SAN JOSE CA 95110 (408) 279-0722 12015-05-21 08:05:57 Digitally signed by Ca10ERTS. This digital signature is provided in order to secure the content of this registered document and in noway implies Registration Provider responsibility for the accuracy of the information. Registration Number: 215-A0133074A-M0100002B-0000 Registration Date/Time: 2015-05-21 08:05:57 HERS Provider: CaICERTS CA Building Energy Efficiency Standards - 2013 Residential Compliance Report Version: 2014-05-13 Report Generated: 2015-05-21 07:34:07 Schema Version: 0.555SDD