Loading...
15050087-Cert of comp/installCERTIFICATE OF COMPLIANCE 17. CF1R-ALT 02-E Alterations to Space Conditioning Systems (formerly CF -1R -ALT -HVAC) (Page 1 of 3 ) Project Name: /fry %fin ,� „ ifl TALWALKAR Date Prepared: 2015-05-09 A. General Information CF111-ALT 02 Is applicable to multiple space conditioning systems contained within a single dwelling unit. When multiple dwelling units must be documented, use one CF1R-ALT 02 welling unit. 01 Project Name TALWALKAR 02 Date Prepared 2015-05-09 03 Project Location 10258 COLD HABOR 04 Building Type Single family 05 CA City Cupertino 06 Dwelling Unit Name TALWALKAR 07 Zip Code 950 08 Dwelling Unit Conditioned 1746 ` `' t Floor Area (ft2) SC System SC System served N� systema refrigerant Number of space conditioning Installing � 09 Climate Zone 4 q' '''°, 10 (SC) systems in this dwelling 1 ducted containing system �, more than 40b unit. entirely new _ B. Space Conditioning (SC) System Information , x n �` •' r g. 01 02 03 04 05, r 06 ��<, 07 08 09 10 ���; =Is the SC' Installing a ` `' t SC System SC System served N� systema refrigerant Installing new SC Installing � Installmgx �F ,installing Identification or o-r"CFA Location or Area by this SC ducted containing system �, more than 40b entirely new entirely new Name Served System (ft2) system? component? components? feet of ducts? duct system? - SC system? Alteration Type System 1 Location 1 1746 Yes Yes Yes No No No Altered space conditioning system C. Extension of Existing Duct System, Greater Than 40 Feet (Section150.2(b)1Diib) This section does not apply to this project. Registration Number: 215-A0123117A-000000000-0000 CA Building Energy Efficiency Standards - 2013 Residential Compliance Registration Date/Time: 2015-05-09 19:59:55 Report Version: 2014-03-31 Schema Version: 0.555SDD HERS Provider: CaICERTS Report Generated: 2015-05-09 20:00:03 /J'0.1��� i CERTIFICATE OF COMPLIANCE CF111-ALT 02-E Alterations to Space Conditioning Systems (formerly CF -1R -ALT -HVAC) (Page 2 of 3 ) D. Altered Space Conditioning System (Sections 150.2(b)lE and F) 01 02 03 04 05 06 07 08 09 10 11 12 Heating Cooling System Heating Altered Heating Minimum Altered Cooling Minimum Required New or Identification System Heating Efficiency Efficiency Cooling Cooling Efficiency Efficiency Thermostat Replaced New Duct or Name Type Components Type Value System Type Components Type Value Type Duct Length R -Value Central gas Gas furnace Central split All new This field or This field or System 1 furnace AHU AFUE 0.8 AC cooling SEER 13 Setback section is not section is not components applicable applicable Required Documentation: ; CF2R-MCH-01-E - Space Conditioning Systems Ducts and Fans", -Duct insulation requirement for new plenums: R6. MR -MCH -20-H & CF311-MCH-20-14 — Duct Leakage testing required when heating or cooling components are installed in ducted systems, or when more than 40 ft of duct length is replaced. -Leakage rate compliance: 515%, or 510% leakage to outside; or,seal all accessible leaks. MR -MCH -25-11 & CF3R-MCH-25-H Refrigerant Charge -Verification -required when refrigerant containing components are installed or altered (applicable in CZ 2, 8-15). MRCF311-MCH-23 & CF3R-MCH-23 Air Flow Z`300 CFM ton required when MCH 25 is required. Exceptions:, -Duct systems registered with HERS provider as previously sealed are exemptfrom'MCH 20 Duct Leakage Testing requirements -Heating-only systems and Air Handler/Furnace changes do. not require verification of Air Flow MCH-23„or Refrigerant Charge MECH 25.'. z ? -Existing duct systems constructed, insulated or sealed with asbestos are exemp from MCH -20 Duct, Leakage Testing requirements. E. Entirely New or Complete Replacement Duct System, with or withoutEquipment Changeout (Sections 150.2(b)Dila and 150.2(b)3E, F) This section does not apply to this project. F. Entirely New or Complete Replacement Space Conditioning System (Section 150.2(b)1C) This section does not apply to this project. Registration Number: 215-A0123117A-000000000-0000 Registration Date/Time: 2015-05-09 19:59:55 HERS Provider: CaICERTS CA Building Energy Efficiency Standards - 2013 Residential Compliance Report Version: 2014-03-31 Report Generated: 2015-05-09 20:00:03 Schema Version: 0.555SDD L � L CERTIFICATE OF COMPLIANCE CFIR-ALT-02-E Alterations to Space Conditioning Systems (formerly CF -IR -ALT -HVAC) (Page 3 of 3 ) Documentation Author's Declaration Statement 1.1 certify that this Certificate of Compliance documentation is accurate and complete. Documentation Author Name: Documentation Author Signature: Phelps, Dale Company: Signature Date: A & H HEATING & AIR CONDITIONING SERVICE INC 2015-05=09 19:59:55 Address: CEA/ HERS Certification Identification (if applicable): 770 CHESTNUT STREET City/State/Zip: Phone: SAN JOSE CA 95110 f:. (408) 279-0722 Responsible Person's,Declaration stateme --"� F I certify the following under penalty of perjury, under the tawsof the State of California: 1. The information provided on -this Certificate of Compliance s.true and correct. 2. 1 am eligible under Division 3 oftbe Business}and Professions Code to accept:respdritibility forthe building design or system design identified on this Certificate of Compliance (responsible designer). 3. That the energy features and performance specifications matenats comppnents, and manufactured devices for the building design or system design identified on this Certificate of Compliance conform to the requirements of Title 24, Part 1 and Part 6;of the California Gode of Regulat ons. 4. The building design features or system design features identified on this Certificate of Compliance are#consistent with the mformatian provided on other applicable compliance documents, worksheets, calculations, plans and specifications subamitted to the enforcemeniagency forapprovalwith this budding permit applicatlorr. fi e 5 � eg. ! . 3ry 5. 1 will ensure that a registered copy of,this-Certificate of Compliance shall be,madeavailabI with,the buitding:permlt(s):,issuedfnr he,buildir g, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of Cgmpliancg is required to he included with the documentation the builderprgvides to,the building owner at occupancy. Responsible Designer Name: 4 Responsible Designer Signafure. Phelps, Dale Company: Date Signed: A & H HEATING & AIR CONDITIONING SERVICE INC 2015-05-09 19:59:55 Address: License: 770 CHESTNUT STREET 304472 City/State/Zip: Phone: SAN JOSE CA 95110 (408) 279-0722 Digitally signed by CaICERTS. This digital signature is provided in order to secure the content of this registered document, and in noway implies Registration Provider responsibility for the accuracy of the information. Registration Number: 215-A0123117A-000000000=0000 Registration Date/Time: 2015-05-09 19:59:55 HERS Provider: CaICERTS CA Building Energy Efficiency Standards - 2013 Residential Compliance Report Version: 2014-03-31 Report Generated: 2015-05-09 20:00:03 Schema Version: 0.555SDD C�7'5s 69 Z'p 1,4-4 'In /5bf/bcj� -7 CERTIFICATE OF INSTALLATION CFZR-MCH-01-E Space Conditioning Systems, Ducts, and Fans (Page 1 of 7 ) Project Name: TALWALKAR Enforcement Agency: City of Cupertino Permit Number: 15050087 Dwelling Address: 10258 COLD HABOR City: Cupertino Zip Code: 95014 A. General Information 01 Dwelling Unit Name TALWALKAR 02 Climate Zone 4 • 06 Ilmg Unit Conditioned Floor Area .- 08"-' 09 Number of space conditioning (SC) 03 �ft2) 1746 04 systems being altered in this dwelling 1 Installing SC System unit. by this SC 05 Certificate of Compliance Type `, %Prescriptive alterations (CF111-ALT) 06 Method used to calculate HVAC loads NotApplicableEquipmentChangeout 07 Calculated dwelling unit Sensible;? ; % This field or section is not applicable 08 Calculated Dwelling Unit Heating Load This field or section is not applicable system Cooling Load (Btuh)-; _ a ' - , entirely new (Btuh) Name 3 J: MCH -01b Prescriptive Alterations Space Conditioning SystemsvDucts and Fans Ac �. - B. Space Conditioning (SC) System-lnformation 01 02 03 04 x,05: • 06 01 .- 08"-' 09 10 CFA served Is the SC Installing a Installing SC System SC System by this SC system a refrigerant Installing new SC Installing more entirely Installing Identification or Location or Area System ducted containing system than 40 feet of new duct entirely new Name Served (ft2) system? component? components? ducts? system? SC system? Alteration Type Altered space System 1 Location 1 1746 Yes Yes Yes No No No conditioning system Registration Number: 215-A0123117A-M0100002A-0000 Registration Date/Time: 2015-05-15 07:54:43 HERS Provider: CalCERTS CA Building Energy Efficiency Standards - 2013 Residential Compliance Report Version: 2014-05-13 Report Generated: 2015-05-15 07:53:22 Schema Version: 0.555SDD CERTIFICATE OF INSTALLATION CF2R-MCH-01-E Space Conditioning Systems, Ducts, and Fans (Page 2 of 7 ) C. Space Conditioning (SC) System Alterations Compliance Information 01 02 03 04 05 06 07 08 09 10 11 12 13 Heating Unit serial Rated Heating Capacity, Name Heating Efficiency Type Value Manufacturer Model Number number Output (BTUH) Central Fan 310JAV0442090AFJ System 1 AFUE 0.8 BRYANT 0915A20997 72000 Integrated Heating Cooling New or (CFI) System Altered Heating Minimum Altered Cooling Minimum Required Replaced New Ventilation Identification Heating Heating Efficiency Efficiency Cooling Cooling Efficiency Efficiency Thermostat Duct Duct System or Name System Type Component Type Value System Type Component Type Value Type Length R -Value Status This field Central gas Gas`. Central All new N/A - no or sectio Not a CFI System 1 furnace furnace ,`'" AFUE 0.8 split AC cooling SEER 13 Setback ducts is AHU ' x components replaced n system not applic able x D. Installed Heating Equipment information` - s 4 amu. It 4"' , p,. ^ , , ; ,F -s a 01 02 03 04 .Y 05'-06 3 OT System Identification or Heating Efficiency Heating Unit Heating Unit Heating Unit serial Rated Heating Capacity, Name Heating Efficiency Type Value Manufacturer Model Number number Output (BTUH) 310JAV0442090AFJ System 1 AFUE 0.8 BRYANT 0915A20997 72000 Notes: Registration Number: 215-A0123117A-M0100002A-0000 Registration Date/Time: 2015-05-15 07:54:43 HERS Provider: CaICERTS CA Building Energy Efficiency Standards - 2013 Residential Compliance Report Version: 2014-05-13 Report Generated: 2015-05-15 07:53:22 Schema Version: 0.555SDD CERTIFICATE OF INSTALLATION CF2R-MCH-01-E Space Conditioning Systems, Ducts, and Fans (Page 3 of 7 ) E. Installed Cooling Equipment information: 01 02 03 04 05 06 07 08 Condenser or Package Unit Condenser or Condenser or Condenser or System Rated Cooling Condenser Rated System Identification Cooling Efficiency Cooling Efficiency Package Unit Package Unit Package Unit Capacity at Design Nominal Capacity or Name Type Value Manufacturer Model Number Serial Number Conditions (BTUH) (ton) System 1 SEER 13 BRYANT 105ANA042 1615EO9158 42000 3.5 Notes: H. Installed Air Filter Device Information This section does not apply to this project. I. Air Filter Device Requirements This section does not apply to this project. Registration Number: 215-A0123117A-M0100002A-0000 Registration Date/Time: 2015-05-15 07:54:43 HERS Provider: CalCERTS CA Building Energy Efficiency Standards - 2013 Residential Compliance Report Version: 2014-05-13 Report Generated: 2015-05-15 07:53:22 Schema Version: 0.555SDD _ qpc CERTIFICATE OF INSTALLATION CF2R-MCH-01-E Space Conditioning Systems, Ducts, and Fans (Page 4 of 7 ) J. HERS Verification Requirements 01 02 03 04 05 06 07 08 09 10 MCH20 MCH21 MCH22 MCH23 MCH25 MCH28 Exemption from Rr' �{, Minimum i tprc. S t.F' Exemption R -Value for AHU Fan AHU SC System SC System From Duct Duct Ducts In Ducts Located Efficacy Airflow Identification or Location or Area Leakage Leakage Conditioned In Cond Space (W per Rate (cfm Refrigerant Return Duct Design Name Served Requirements Test Space Verification cfm) per ton) Charge Table 150.0-C or D FJk sting duct 11,ystem r is System 1 Locatjon 1 a in sulated'or �o=X-•n Not applicable No No No No No sealed with asbestos Registration Number: 215-A0123117A-M0100002A-0000 Registration Date/Time: 2015-05-15 07:54:43 HERS Provider: CaiCERTS CA Building Energy Efficiency Standards - 2013 Residential Compliance Report Version: 2014-05-13 Report Generated: 2015-05-15 07:53:22 Schema Version: 0.555SDD g.i Rr' �{, i tprc. S t.F' Registration Number: 215-A0123117A-M0100002A-0000 Registration Date/Time: 2015-05-15 07:54:43 HERS Provider: CaiCERTS CA Building Energy Efficiency Standards - 2013 Residential Compliance Report Version: 2014-05-13 Report Generated: 2015-05-15 07:53:22 Schema Version: 0.555SDD L' f CERTIFICATE OF INSTALLATION CFZR-MCH-01-E Space Conditioning Systems, Ducts, and Fans (Page 5 of 7 ) K. Space Conditioning Systems, Ducts and Fans Mandatory Requirements and Additional Measures Note: Additional mandatory requirements from Section 150.0 that are not listed here may be applicable to some systems. These requirements may be applicable to only newly installed equipment or portions of the system that are altered. Existing equipment may be exempt from these requirements. Heating Equipment 01 Equipment Efficiency: All heating equipment must meet the minimum efficiency requirements of Section 110.1 and Section 110.2(a) and the Appliance Efficiency Regulations. 02 Controls: All unitary heating systems, including heat pumps, must be controlled by a setback thermostat. These thermostats must be capable of allowing the occupant to program the temperature set points for at least four different periods in 24 hours. See Sections 150.0(i), 110.2(b). 03 Sizing: Heating load calculations must be done on portions of the building served by new heating systems to prevent inadvertent undersizing or oversizing. See sections 150.0(h)1 and 2). 04 Furnace Temperature Rise: Central forced -air.: heating furnace installations must be configured to operate at or below the furnace manufacturer's maximum inlet -to -outlet temperature'rise specification. See Section -150:0(h)4. 05 Standby Losses and Pilot Lights: Fan -type central furnaceS'may not have a continuouslyburning'pilot'l ght Section 110 5�ari Section 1fi0.2(d). Cooling Equipment i : 4c .., asp 7s, ax ;i. Equipment Efficiency: All cooling equipment must'meet the minimum efficrency requirements,of�-Section'" 110.1 and Section 110 2(a) and the Appliance Efficiency 06 Regulations. 07 Refrigerant Line Insulation: All refrigerant line insulation in split system air conditioners and heat pumps must meet the R -value and protection requirements of Section 150.0(j)2 and 3, and Section 150.0(m)9. 08 Condensing Unit Location: Condensing units shall not be placed within five (5) feet of a dryer vent outlet. See Section 150.0(h)3A. Sizing: Cooling load calculations must be done on portions of the building served by new cooling systems to prevent inadvertent undersizing or oversizing. See Section 09 150.0(h)1 and 2. Air Distribution System Ducts, Plenums and Fans Insulation: In all cases, unless ducts are enclosed entirely in directly conditioned space, the minimum duct insulation value is R-6. Note that higher values may be 10 required by the prescriptive or performance requirements. See Section 150.0(m)1. Registration Number: 215-A0123117A-M0100002A-0000 Registration Date/Time: 2015-05-15 07:54:43 HERS Provider: CaICERTS CA Building Energy Efficiency Standards - 2013 Residential Compliance Report Version: 2014-05-13 Report Generated: 2015-05-15 07:53:22 Schema Version: 0.555SDD �.t CERTIFICATE OF INSTALLATION CF2R-MCH-01-E Space Conditioning Systems, Ducts, and Fans (Page 6 of 7 ) K. Space Conditioning Systems, Ducts and Fans Mandatory Requirements and Additional Measures Note: Additional mandatory requirements from Section 150.0 that are not listed here may be applicable to some systems. These requirements may be applicable to only newly installed equipment or portions of the system that are altered. Existing equipment may be exempt from these requirements. Connections and Closures: All installed air -distribution system ducts and plenums must be, sealed and insulated to meet the requirements of CMC Sections 601.0, 11 602.0, 603.0, 604.0, 605.0 and ANSI/SMACNA-006-2006: Supply -air and return -air ducts and plenums must be insulated to a minimum installed level of R-6.0 or enclosed entirely in directly conditioned space as confirmed through field verification and diagnostic testing in accordance with the requirements of Reference Residential Appendix RA3.1.4.3.8. Heat Pump Thermostat 12 A thermostat shall be installed that meets the requirements of Section 110.2(b) and Section 110.2(c). 13 The thermostat shall be installed in accordance with the manufacturers published installation specifications 14 First stage of heating shall be assigned to heat pump heating. 1s Second stage backup heating shall beset to come. omonly when the indoor set temperature cannot be met. The responsible person signature on this compliance documentaffirms that all applicable regwrements ni;this•table have been met . ..� r. Registration Number: 215-A0123117A-M0100002A-0000 Registration Date/Time: 2015-05-15 07:54:43 HERS Provider: CaICERTS CA Building Energy Efficiency Standards - 2013 Residential Compliance Report Version: 2014-05-13 Report Generated: 2015-05-15 07:53:22 Schema Version: 0.555SDD r-' y CERTIFICATE OF INSTALLATION CF2R-MCH-01-E Space Conditioning Systems, Ducts, and Fans (Page 7 of 7 ) Documentation Author's Declaration Statement 1.1 certify that this Certificate of Installation documentation is accurate and complete. Documentation Author Name: Documentation Author Signature: Phelps, Dale Company: Signature Date: A & H HEATING & AIR CONDITIONING SERVICE INC 2015-05-15 07:54:43 Address: CEA/ HERS Certification Identification (ifapplicable): 770 CHESTNUT STREET City/State/Zip: Phone: SAN JOSE CA 95110 1(408) 279-0722 Responsible Person's Declaration statement I certify the following under penalty of perjury, under the laws of the State of California: 1. The information provided,on this Certificate of Installation is true and correct. 2. lam eligible under Division 3 of the Busiriess and Professions Code in.the,_applicable classification to accept responsibility for the system design, construction, or installation of features, materials, components, or manufactured devices for the scope of work jdenfifi6d6n this Certificate of Installation and attest to the declarations in this statement (responsible builder/installer), otherwise I am an authorized representative of the respop"sible builder/Installer. °_ 3. The constructed or installed features, materials, components or manufactured device's (the, nstallation) identified onthis Certificate_of Installation`conforms,to all -applicable codes and regulations, and the Installation conforms to the requirements given on the plans and sp'ecdications approved by the enforcement agency. 4. 1 reviewed a copy of the Certificate of Compliance; approved by the'enforcement agency that identifies the_specific requirements for the scope of�construction orinstallation Identified on this Certificate of Installation, and I have ensured thatthe requirements thatapply to the construction or installation have been met. 5. 1 will ensure that a registered copy,.,of this Certificate of Installation shall be posted or made available with"the bwlding permits) issued forthe building and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate ofln`sta11 tion is required to be included with t lie docum"entation the t uilder'p"rovid'es to the building owner at occupancy. Responsible Builder/Installer Name: Responsible Builder/Installer Signature: Phelps, Dale Company Name: (Installing Subcontractor or General Contractor or Builder/Owner) Position With Company (Title): A & H HEATING & AIR CONDITIONING SERVICE INC RMO Address: CSLB License: 770 CHESTNUT STREET 304472 City/State/Zip: Phone: Date Signed: SAN JOSE CA 95110 1(408) 279-0722 12015-05-15 07:54:43 Digitally signed by CalCERTS. This digital signature is provided in order to secure the content of this registered document and in noway implies Registration Provider responsibility for the accuracy of the information. Registration Number: 215-A0123117A-M0100002A-0000 Registration Date/Time: 2015-05-15 07:54:43 HERS Provider: CaICERTS CA Building Energy Efficiency Standards - 2013 Residential Compliance Report Version: 2014-05-13 Report Generated: 2015-05-15 07:53:22 Schema Version: 0.555SDD