Loading...
15020093-Spec InspCONSTRUCTION TESTING SERVICES CTS Project #: Project Name _ Project Location CTS Representative TESTING • INSPECTING • ENGINEERING DAILY FIELD REPORT Date Permit#: hco "? 00 3 Appl. #: Time Arrived Time Departed Reported to &S f en with S&k mart at ^r -)t]b,54 o Asnmt cancelled by _ Concrete Batch Plant Operations Observed concrete batch plant operations at for mix no. 28 -day strength Specified slump inches. Monitored loads leaving for ConcretelShotcrete Observed placement of / Sampled only (circle) Concrete/Shotcrete/other (circle) for mix no. - day strength psi, specified slump inches, total cubic yards placed. Monitored loads for mix no., slump, temp. and time limit. Prepared test specimens sampled from Set# Set#_ Set# Set# Set# Set# . Set# Set# Set# Slump Mix Temp. Air Temp. Air Cont. Unit Wt. Truck # Location Per Set Sets Total Masonry Observed placing of masonry units for Observed placing of lift grout for Prepared samples from Prepared masonry prisms for Mortar —Per Set Sets Total Grout Per Set Sets Total Prisms Sets of Rebar / Post -Tensioning 1 Epoxy -Set Bolts and Dowels Observed placing of for Observed stressing of PT Tendons for Reviewed calibration data for jacking equipment Monitored stressing forces and tendon elongation. Recorded data on PT Report Enclosed On File Observed placing of chor Bolts Epoxy -Set Bolts Epoxy -Set Dowels, for�l�G�j'S` Epoxy: Material W114 Depth 43 r! Diameter Holes cleaned Y6s No Performed Pull Torque - test on epoxy -set Bolts Rebar Dowels, for Material Reviewed Material Identification and MTR's for Obtained samples of Cement Aggregate Rebar PT Tendons identified as Picked up samples at job site consisting of Conformance Masonry Units Soil AC Work observed was, to the best of my knowledge, in conformance with approved plans, specifications and applicable s andards of workmanship_ With the following exception (s). See attached Non -Compliance Report. Non-compliance conditions noted were brought to the attention of for corrective action. Additional Notes: 3/:a 4i A,- TESTING r Inspector Signature Date 2118 Rheem Drive I Pleasanton, CA 94588 1 Phone (925) 462-5151 1 Fax (925) 462-5183 4770 Duckhom Drive, Suite A I Sacramento, CA 95834 1 Phone (916) 419-4747 1 Fax (916) 419-4774 The Sobrato Organization Attn: Rich Truempler (email) 10600 N. Anza Blvd, Suite 200 Cupertino, CA 95014 Job No: J10438 Job Name: Stein Mart 20600 Homestead Road Cupertino, CA Permit #: 15020093 February 17, 2015 Summary Report #1 TESTING INSPECTION ENGINEERING FEB 2 5 2015 :Z_BY Adam Cherrie reported to Austen with Stein Mart at the jobsite. Observed placement of (56) 3/8"x4" Tapcon screw anchors for storage rack anchorage at storage room. Drilled to a depth of 3 1/4" and a3/8" diameter. Verified depths and cleanliness for 3/8"x4" Tapcon screw anchors per details provided by structural engineers incorporated sheet SKI. All work was completed as per plan, code and job specifications. Note: 3/8"x4" Hilti Kwik KH -EZ screw anchors were noted for use per sheet SK -1. Screw anchors used are the same dimensions but a different manufacturer. Work observed was, to the best of Adam's knowledge, in conformance with approved plans, specifications and applicable standards of workmanship. Laboratory test results are enclosed if testing was done during the period covered by this report. Limitations: These inspections were performed in accordance with requirements, but please note this report shall not be relied upon by others, as acceptance or guarantee of the work. Even with diligent inspection techniques, the contractor is solely liable for defects or failures to adhere to the code. 2/18/2015 Reviewed by Cole Phil Date Staff Engineer Technical Contact: Timothy Casey, Senior Engineer (tcasey@cts-Isom) Administrative Contact: Yolanda Deras (yderas@,cts-I.com) cc: Building Department — City of Cupertino Architect — ARC TEC, Inc (email) CTS PM —Don Camello (email) CTS Staff Engineer — Cole Philley (email) LH 2118 Rheem Drive, Pleasanton, CA 94588 a Phone (925) 462-5151 • Fax (925) 462-5183 4770 Duckhorn Drive, Sacramento, CA 95834 a Phone (916) 419-4747 a Fax (916) 419-4774 One Embarcadero Center; Suite 535, San Francisco, CA 94111 i Phone (415) 334-4747 Fax (415) 438-2357 246 30`x' St., Suite 101, Oakland, CA 94601 a Phone (510) 444-4747 ® Fax (510) 835-1825 • TESTING AdAll GONSTRl1CTION ® INSPECTING TESTING SERVICES ENGINEERING DAILY FIELD REPORT tS0'2-00 f-T CTS Project#: /0y69 Date Project Name L4¢g;/7 &a Permit#: I)LOD r3 Project Location 4622ftcfe9d Appl.#: CTS Representative ; &bgrL;B Time Arrived Time Departed Reported to A(aSf en with S&i2 a-f at S4&,, Asnmt cancelled by Concrete Batch Plant Operations Observed concrete batch plant operations at for mix no. 28-day strength Specified slump inches. Monitored loads leaving for - Concrete/Shotcrete Observed placement of / Sampled only (circle) Concrete/Shotcrete/other (circle) for mix no. -day strength psi, specified slump inches, total cubic yards placed. Monitored loads for mix no.,slump,temp.and time limit. Prepared test specimens sampled from Set# Set#_ Set# Set# Set# Set#.` Set# Set# Set# Slump Mix Temp. Air Temp. Air Cont. Unit%t. Truck# Location Per Set Sets Total Masonry Observed placing of masonry units for. Observed placing of lift grout for Prepared samples from Prepared masonry prisms for Mortar _Per Set Sets Total Grout Per Set Sets Total Prisms Sets of Rebar/Post-Tensioning!Epoxy-Set Bolts and Dowels Observed placing of for Observed stressing of PT Tendons for Reviewed calibration data for jacking equipment Monitored stressing forces and tendon elongation. Recorded data on PT Report Enclosed On File Observed placing ofchor Bolts Epoxy-Set Bolts Epoxy-Set Dowels,for sS' Epoxy:Material Depth 1/ f/Diameter / Holes cleaned Wes No Performed 7U--11 Torque-test on epoxy-set Bolts Rebar Dowels,for Material Reviewed Material Identification and MTR's for Obtained samples of Cement Aggregate Rebar PT Tendons Masonry Units Soil AC identified as Picked up samples at job site consisting of Conformance ., Work observed was,to the best of my knowledge, in conformance with approved plans,specifications and applicable s at ndards of workmanship. With the following exception(s). See attached Non-Compliance Report. Non-compliance conditions noted were brought to the attention of for corrective action. Additional Notes: / /Q q £' � r/ ij Q . i b F Inspector Signature Date 2118 Rheem Drive I Pleasanton,CA 94588 1 Phone(925)462-5151 1 Fax(925)462-5183 4770 Duckhorn Drive,Suite A I Sacramento, CA 95834 1 Phone(916)419-4747 1 Fax(916)419-4774