Loading...
14010019-calgreen/spec insp111610017 DATE: Nov. 18, 2014 FROM: Ray Chen FACSIMILE TRANSMITTAL TIME: F L E f3 PLEASE DELIVER THE FOLLOWING PAGES TO: NAME: COMPANY: FAX #: To: Mr. Murugesan 10585 N. Stelling Rd. Cupertino, CA NUMBER OF PAGES INCLUDING COVER SHEET: 1 SUBJECT: Structural Framing Observation Approval -10585 N. Stelling Rd. Cupertino, CA REMARKS: • Per request on 11/07/14, we have provided the construction service of Structural Observation, for the job located at 10585 N. Stelling Rd. Cupertino. Structural Observation is visual observation of the structure system for general conformance. This observation, the only observation, was performed after the roofing file had been installed, the exterior lath had been in-place. Plumbing rough, electrical rough, HVAC rough, framing had been completed. Due to work progresses, there was no structural observation done related to the exterior side (face) of the building. No such observation was performed at subfloor framing. This observation was based upon items which are still exposed for visual identification -identify if structural members are in places per their design theory or per approved plan. The observation did not intend to go through thorough in detail such as to exam number of nails nailed, inspect type of nails used, etc. Therefore, the quality of the work is not the best interest of it all. In general, the framing is conforming to the requirements per approved set, except the following on-site modification: 1) Installed OSB at pony wall inside the attic is not shown on the approved set. Due to this sheathing, teco nail shall not be used for LUS of the ceiling joists at Line D. Contractor . has been advised to replace such nails with 10d common at the header beam. 2) Due to roof as -built framing, roof framing at Line E, B has been modified. Designated beam 5 1/4" x 14" Parallam to support roof rafters, thereafter to support California framing, was not installed. Rafters are not supported by HB -1 Hip beam. See attached sheet S-3.1, sheet S-5.1 for modifications 3) Either new modifications or missing items based on approved set were shown sheet S-3.1 and sheet S-5.1. Please see the two sheets for more information. Please note: there is a footing pad added sheet S-3.1 • Contractor shall have the city official to verify the installations and sign off on the inspection record sheet (card) for job completion. IF YOU DO NOT RECEIVE ALL OF THE PAGES, PLEASE NOTIFY ME AS SOON AS POSSIBLE AT PHONE (408) 524-5488 OR FAX (408) 736-8059. - - Ito PD1 FILE: C LGREEN SIGNATURE. DECLARATIONS IONS Project fume: 26-J &® Ado L-14 Z>Z) ®V -VA >/ P rojeci.Address: /qZ4 9�> ?roject Description: ,t% ®1% SECTION 17 DESIG N. VE IFICATIO Complete all lines of Section 1 — "Design Verification" and submit the completed checklist (Columns 1 and 2) with the plans and building permit application to the Building Department. The owner and design professional responsible for compliance with CalGreen Standards have revised the plans and I certify that the items checked above are hereby incorporated into the project pians and will be implemented into the project in accordance with the requirements set forth in the e&} -&California Green Building Standards Code as adopted by tiM City of Cupertino. SECT ION 2 - IMPLEMENTATION, VERIFICAT�ON 1 Com lett t o p I p „ .., sign and submit the competed checklist, including column 3, together with � all original signatures on Section j 2 to the Building Department prior to Building Department final inspection. I have inspected the work and have received sufficient documentation to verify and certify that the project identified above was constructed in accordance with this Green Building Checklist and in accordance with the requirements of the 2010 California Green Building Standards Code as ado by the City of Cupertino. Oak ehs I Signature of Licnc Narne of License P Email Address for I Page 5 of 5 Professional responsible for CalGreen compliance ► I/--- 7 /-"- ionai responsible for CalGreen compliance (Please Print) ,red2 -er11. ct�7� .ense PCaessional responsible for CalGreen compliance Date CalGreen 2010.doc revised 08127/11 03104 .01 J Owner's Signm re Date �'l � � GC (/t ✓� C� / fi�ri/E9-�� Owner's Name (Please P. t) Design Professional's Sianature . Date Design Professional's Na e (PieasePrint) Signature of LicenseProfessional responsible ` r CalGreen compliance Date Dame of License Pro essional responsible for .CalGreen compliance (Please Print) Phone � G eig 4 .fi- Email Address for License Professio responsible for CalGreen compliance SECT ION 2 - IMPLEMENTATION, VERIFICAT�ON 1 Com lett t o p I p „ .., sign and submit the competed checklist, including column 3, together with � all original signatures on Section j 2 to the Building Department prior to Building Department final inspection. I have inspected the work and have received sufficient documentation to verify and certify that the project identified above was constructed in accordance with this Green Building Checklist and in accordance with the requirements of the 2010 California Green Building Standards Code as ado by the City of Cupertino. Oak ehs I Signature of Licnc Narne of License P Email Address for I Page 5 of 5 Professional responsible for CalGreen compliance ► I/--- 7 /-"- ionai responsible for CalGreen compliance (Please Print) ,red2 -er11. ct�7� .ense PCaessional responsible for CalGreen compliance Date CalGreen 2010.doc revised 08127/11