Loading...
14080247-Spec Insp'_4WSt>s"ctural, Inc. January 22, 201.5 Project No.: 14-026 Barron Buil der s 415 Clyde Avenue, Suite 105 Mountain Vi ew,. CA 94043 Attention: Byron Nobriga Project Manager Subj ect: Apple DA03 — New Rooftop Units 10500 N. D e Anza Blvd. Cupertino, CA D ear.Byron: FILE Please let this letter:serve as confirmation that we have'reviewed-the install-ation of the new roof mounted roof sleepers on subject project. The new pressure treated 6x sleeper beam was tapered to accommodate the roof slope. and tlien a 4x6 was mounted on top of the tapered sleeper. Connection of the 4x6 to.the sleeper beam.4uas made with Simpson SDS screws at 12" on -center (staggered). along the length of the sleeper. Additionally, a bead of construction adhesive was applied between the two members. The installed condition is consistent with our design intent and we take no exception to the installation. Should you have any questions or require clarifications, please do not hesitate to call. Sincerely, SW Structural, Inc. FIRM Steve Wade, SE_ Principal � ESStpjv Na.. S4-212 Exp 6/30/2016 nc- rh1 i75. 'SII 5P.3n}to. VVay., M orate Sereno% A. 9.503.0 svvadc@ Wc.true_tural,coFn 0 Piiun'e C1 =399-0.0 '3 i= c: icrlG,i AQti-3 5-0 i .4