15030125CITY OF CUPERTINO BUILDING PERMIT
BUILDING ADDRESS: 6630 JOHN DR
CONTRACTOR: HOMESTEAD
PERMIT NO: 15030125
CONSTRUCTION INC
OWNER'S NAME: KO ESTHER M TRUSTEE
10080 STERN AVE
DATE ISSUED: 07/27/2015
OWNER'S PHONE: 4083160505
CUPERTINO, CA 95014
PHONE NO: (408) 255-8999
LICENSED CONTRACTOR'S DECLARATION
JOB DESCRIPTION: RESIDENTIAL COMMERCIAL ❑
License Class Lic. #
CONSTRUCT 2 STORY SFDWL IST FLOOR 1436, 2ND
FLOOR
_
Contractor.�'�y' "' `� �-7 {
833 W/ ATTACHED GARAGE 430 SQ FT; PORCH 679 SQ FT
Date
I hereb �r' is am licen w the provisions of Chapter 9
(commencing with Section 7000) of Division 3 of the Business & Professions
Code and that my license is in full force and effect.
I hereby affirm under penalty of perjury one of the following two declarations:
I have and will maintain a certificate of consent to self -insure for Worker's
Compensation, as provided for by Section 3700 of the Labor Code, for the
Sq. Ft Floor Area:
Valuation: $550000
performance of the work for which this permit is issued.
I have and will maintain Worker's Compensation Insurance, as provided for by
Section 3700 of the Labor Code, for the performance of the work for which this
permit is issued.
APN Number 36923011.00
Occupancy Type:
APPLICANT CERTIFICATION
I certify that I have read this application and state that the above information is
PERMIT EXPIRES IF WORK IS NOT STARTED
correct. I agree to comply with all city and county ordinances and state laws relating
to building construction, and hereby authorize representatives of this city to enter
WITIiIN 180 T ISSUANCE OR
upon the above mentioned property for inspection purposes. (We) agree to save
18 LED INSPECTION.
indemnify and keep harmless the City of Cupertino against liabilities, judgments,
costs, and expenses which may accrue against said City in consequence of the
granting of this permit. Additionally, the applicant understands and will
Issue Date:
with all non -point source regulations per the Cupertino Municipal Code, Se on
9.18.
RE -ROOFS:
�r-
Signature Date J
All roofs shall be inspected prior to any roofing material being installed. If a roof is
installed without first obtaining an mspec on, I agree to remove all new materials for
inspection.
❑ OWNER -BUILDER DECLARATION
I hereby affirm that I am exempt from the Contractor's License Law for one of
Signature of ApDate:
p '
the following two reasons:
ALL ROOF COVERINGS TO BE CLASS "A" OR BETTER
I, as owner of the property, or my employees with wages as their sole compensation,
will do the work, and the structure is not intended or offered for sale (Sec.7044,
Business & Professions Code)
I, as owner of the property, am exclusively contracting with licensed contractors to
HAZARDOUS MATERIALS DISCLOSURE
construct the project (Sec.7044, Business & Professions Code).
I have read the hazardous materials requirements under Chapter 6.95 of the
California Health & Safety Code, Sections 25505, 25533, and 25534. I will
I hereby affirm under penalty of perjury one of the following three
maintain compliance with the Cupertino Municipal Code, Chapter 9.12 and the
declarations:
Health & Safety Code, Section 25532(a) should I store or handle hazardous
I have and will maintain a Certificate of Consent to self -insure for Worker's
material. Additionally, should I use equipment or devices which emit hazardous
Compensation, as provided for by Section 3700 of the Labor Code, for the
air contaminants as defined by the Bay Area Air Quality Management District I
performance of the work for which this permit is issued.
will maintain compliance with the Cupertino Municipal Code, Chapter 9.12 and
I have and will maintain Worker's Compensation Insurance, as provided for by
Section 3700 of the Labor Code, for the performance of the work for which this
the Health & Safety Code, Sections 25505 a nd 25 34. ,s,
/ � 'i_
permit is issued.
Owner or authorized agent- Date:
I certify that in the performance of the work for which this permit is issued, I shall
not employ any person in any manner so as to become subject to the Worker's
Compensation laws of California. If, after making this certificate of exemption, I
CONSTRUCTION LENDING AGENCY
become subject to the Worker's Compensation provisions of the Labor Code, I must
I hereby affirm that there is a construction lending agency for the performance of
forthwith comply with such provisions or this permit shall be deemed revoked.
work's for which this permit is issued (Sec. 3097, Civ C.)
Lender's Name
APPLICANT CERTIFICATION
Lender's Address
I certify that I have read this application and state that the above information is
correct. I agree to comply with all city and county ordinances and state laws relating
to building construction, and hereby authorize representatives of this city to enter
upon the above mentioned property for inspection purposes. (We) agree to save
indemnify and keep harmless the City of Cupertino against liabilities, judgments,
ARCHITECT'S DECLARATION
costs, and expenses which may accrue against said City in consequence of the
I understand my plans shall be used as public records.
granting of this permit. Additionally, the applicant understands and will comply
with all non -point source regulations per the Cupertino Municipal Code, Section
Licensed Professional
9.18.
Signature Date
CONSTRUCTION PERMIT APPLICATION C
sJ
COMMUNITY DEVELOPMENT DEPARTMENT - BUILDING DIVISION �1
10300 TORRE AVENUE • CUPERTINO, CA 95014-3255 B.
(408) 7.7.7-3228 • FAX (408) 777-3333 • building 0(,cuaertino.org �(
[ION:_ ❑ - ADDT1 ION ❑ ALTERATION / TI ❑ REVISION / DEFERRED ORIGINAL PERMIT
PROJECr ADDRESS J _ {'
9 D r. APN R p2- .v 0 1
OWNER NAME. ..
PHONE E-MAIL �OR- 316- su�� c • ����
STREET ADDRESS' I %23CITY, STATE, ZIP. FAX '
A-nwa.oc P9
. A -W /+LTo CIG (7-#30d
CONTACT NAME •
(9 r, PHO7`B E-MAILQ
STREETADDRESS-- '.
CITY, STATE,. ZIP
m��FAX� L
OMINER `'' 'D' 01AINER-BUILDER"` ' ❑ O)A'KERAGENt " ❑ CONTRACTOR -:11 CONTRACTORAGE1,717 y2 _ARCHrfECT ❑ ENGAEER ,.,.,El :DEVELOPER : EI. IFNAt T
COAiRACTOR NAME LICENSE NUMBER LICENSE TYPE
BUS. LIC
COMPANTY NAME
E-MA1L
FAX
STREET ADDRESS
CITY, STATE, ZIP
T
__
HONE
RCHIT /ENGIAEER NA11E LICENSE NUMBER 8
BUS. LIC R
7
COMPANTY NAME
E-MAIL
FAX
STREET ADDRESS
CITY, STATE, ZIP
PHONE
DESCRIPTION OF WORK
44 c
EXISTING UU=E PROPOSED USE CONSTR TYPE ;STORES
I
USE
TYPE OCC. I SQ.FT.
VALUATION (5)
EXISTG F DEMO t-,)46
AREA C3
-iyLl
AREA 0
AREA NET AREA
Cri
; 4e
BATHROOM 10TCHE—N I0 R
REMODELAREA REMODELAREAREMODEL AREA F Q�A
1J/4 1: JDE
'--T
430 3 0
[�C
PORCH AREA DECK AREA TOTAL DECK/PORCH AREA GARAGE AREA: LJ DETACH
6_1 UFTACH
R DlV)T LD3G UNITS:
S: IS A SECOND ON IT ❑ YES SECOND STORY [3YES
BEING ADDED? •roh'
� 70 ADDIT1oN? UiCTO
r--- --
PRE-APPLICAYTION YES IF YES, PROVIDE COPY OF
PLANI�'INGAPPL0 ANO PLANNING APPROVAL LETTER
IS THE BLDG AN ❑ YES
I EICHLERHO�4E? pAO
rREGHIV>;rD �,� ;.�-� TAL VALUATION:
�„ a° .�a,.'�5 ,�..,
'O..
Tu r `. +�,
. r_ eL,a ' •�::N�.'-.`w^_-K .cJ : .ham-•.«-.: 5' -,: FC %:,) ll (/C, D "
By my signature below, I certify to each of the following: I am the property owner or authorized agent to act o roperty ovrer's behalf. I have read this
application and the information I have provided is correct. I have read the Description of Work and verify it is accurate. I agree to comply with all applicable local
ordinances and state laws relating to b ild ng co struction. I thorize representatives of Cupertino to enter the above -identified property for inspection purposes.
Signature of Applicant/Agent: Date:
SUPPLEMENTAL INFORMATION
NATION REQUIRED�-
'pI,AI�TCHECK'TYPE:�.�r�-,c.�„r
New SFD or Multifamily dvvelIings: Apply for demolition permit for
existing building(s). Demolition
� �
W�oRTCOTERr!
]ZDI� RE T&
permit is required prior to issuance of building
t
y1E;y}�I
permit for new building.
_ Commercial Bldgs: Provide a completed Hazardous Materials Disclosure
sT 1.D
i
form if any Hazardous Materials are being used as part ofthis project.
si vnxxs zg 1
V01 Ss 4
Copy of Planning Approval Letter or Meeting with Planning to
L cE�� s
_ prior
submittal ofBuilding Permit application.
e��Q11GgJUR
z S IIT R1'SEVL'ERISFSTR7C�a r
-
�.� �t �-�
�.�.--�`- -. �,,, � ,� �
�
' ,� • .sem _ P y�,�
-�
�
Bldg 1pp_2011.doc revised 06/21/11
a
CITY OF CUPERTINO
lem-1 FEE ESTIMATOR — RITILDING DIVICION
OCCUPANCY TYPE:
6630 john dr
DATE: 03/20/2015
REVIEWED BY: Mendez
IlaADDRESS:
APN:
BP#: • , 30 ,S-'
*VALUATION: 1$550,000
'PERMIT TYPE: Building Permit
PLAN CHECK TYPE: New Construction
PRIMARY SFD or Duplex
USE:
2nd Unit? Yes " No
PENTAMATION 1 R3SFDW
PERMIT TYPE: A
WORK
construct 2 story sfdwl 1 st floor 1436 2nd floor 833 w/ attached garage 430 sq ftporch 679 sq ft
SCOPE
$0.00
OCCUPANCY TYPE:
TYPE OF
CONSTR.
FLR AREA
s.f.
PC FEES
PC FEE ID
BP FEES
BP FEE ID
R-3 (Custom)
II-B,111-B,IV,V-B
3,378
$3,149.49
IR3PLNCK
$3,202.67
IR3INSP
PME Plan Check:
$0.00
Permit Fee:
$3,202.67
Suppl. Insp. Feer Reg. 0 OTO.0
hrs
$0.00
PME Unit Fee:
$0.00
PME Permit Fee:
$0.00
Construction Tax: IBCONSTAXR
TOTALS:
3,378
$3,149.49:
A61ininistrative Ff ee:
$3,202.67
Akch. Plart Check 1'lunih. 11lart C.'hecG L:Yec..l'!an C°heclt
lleclr. Peratil Fere: Plumb, Permit Fee: Elec. Permit Fee:
Oilier A/cc•h. 7rup, Other I'lumb Irap. Other LIec. Inman.
dech. Insp. hi>e: NwO. hasp. Fee: Elec. Insp. Fee:
Null✓: 1 his estimate does not include fees due to other Departments (i.e. Planning, Public Works, Fire, Sanitary Sewer District, School
District. etc). These fees are hated an the nreliminary informatian availahlo and aro nnhy an oetimato_ Contort tho Dont for addn'1 inln_
FEE ITEMS (Fee Resolution 11-053 E . 7/1/13,)
FEE
QTY/FEE
MISC ITEMS
Plan Check Fee:
$3,149.49
Select a Misc Bldg/Structure
or Element of a BuildingSuPp1.
PC Fee: o Reg COT
0.0hrs
$0.00
PME Plan Check:
$0.00
Permit Fee:
$3,202.67
Suppl. Insp. Feer Reg. 0 OTO.0
hrs
$0.00
PME Unit Fee:
$0.00
PME Permit Fee:
$0.00
Construction Tax: IBCONSTAXR
1
# new
units
$670.76
A61ininistrative Ff ee:
0
E)
Work Without Permit? 0 Yes No
$0.00
Advanced Planning Fee: IPLLONGR
$472.92
Select a Non -Residential
Building or Structure
E)
0
Travel Docume3nlalion fees:
Strong Motion Fee: IBSEISMICR
$71.50
Select an Administrative Item
Bldg Stds Commission Fee: 1BCBSC
$22.00
.SUBTaTALS: `'
$7,589.34
$0.00 TOTAL FEE.e
$7,589.34
Revised: 02/14/2015
CUPERTINO
CONTRACTOR / SUBCONTRACTOR LIST
Building Department
City Of Cupertino
10300 Torre Avenue
Cupertino, CA 95014-3255
Telephone: 408-777-3228
Fax: 408-777-3333
cQ/l�%hn
---
JOB ADDRESS:6630 John Dr, Cupertino PERMIT # 150301
25_
- 408-230-1163
OWNER'S NAME: Esther Ko
PHONE #
GENERAL CONTRACTOR:Homestead Construction, Inc. BUSINESS LICENSE # 27723
ADDRESS 10080 Stem Ave CITY/Z1PC;ODE:Cupertino, CA 95014
*Our municipal code requires all businesses working in the city to have a City of Cupertino business license.
NO BUILDING FINAL OR FINAL, OCCUPANCY INSPECTIONS) WILL BE SCHEDULED UNTIL THE
GENERAL CONTRACTOR AND ALL SUBCONTRACTORS HAVE OBTAINED A CITY OF CUPERTINO
BUSINESS LICENSE.
I am not using any subcontractors: Signature Date
vin'cn r•hork annlicable subcontractors and complete the following information:
1-6
ate
Owner ontractor Signature
BUSINESS NAME
BUSINESS LICENSE #
SUBCONTRACTOR
Cabinets & Millwork
Cement Finishing
_._.
--------- ---
Electrical
Katherina Danek
40297
Excavation
Marcelo Hauling & Grading
36493
Fencing
Flooring I Carpeting
_
Linoleum / Wood
Glass / Glazing
_
All Fresh Temp
35602
Heating
Barreras Insulation
_
Insulation
Marcelo Hauling & Grading
36493
Landscaping
Lathing
Masonry
MS Construction
31031
Painting / Wallpaper
Paving
Plastering
Ms Construction
__ _
31031
—
Plumbing
Peninsula Fire Protecting Inc
33893
Roofing
Septic Tank
Sheet Metal
-
Sheet Rock
Tile
1-6
ate
Owner ontractor Signature
n
CERTIFICATE OF VERIFICATION CF3R-MCH-20-H
Duct Leakage Diagnostic Test (Page 1 of 3 )
Project Name: Su house
Enforcement Agency: City of
Cupertino
Permit Number:
Dwelling Address: 6630 John Drive
City: Cupertino
Zip Code: 95014
A. System Information
01
Space Conditioning System Identification or Name
System two
02
Space Conditioning System Location or Area Served
second floor
03
Building Type from CF -113
Single family
04
Verified Low Leakage Ducts in Conditioned Space
(VLLDCS) Credit from CF1R?
No, credit is not taken
05
Verified Low Leakage Air Handling Unit (VLLAHU) Credit
from CFSR?
No, credit is not taken
06
Duct System Compliance Category
New
MCH -20a - Completely New Duct System
B. Duct Leakage Diagnostic Test
01
Condenser Nominal Cooling Capacity (ton)
0
02
Heating Capacity (ketu/h)
58
03
Conditioned Floor Area served by this HVAC system (ft2)
900
04
Duct Leakage Test Condition
Test final
05
Duct Leakage Test Method
Total leakage
06
Leakage Factor
0.06
07
Air Handling Unit Airflow (AHUAirflow) Determination
Method
Heating system method
08
Measured AHUAirflow
This field or section is not applicable
09
Calculated Target Allowable Duct Leakage (cfm)
76
10
Actual duct leakage rate from leakage test measurement
(cfm)
60
11
Compliance Statement
System passes leakage test
Registration Number: 216-A0317864A-M2000001A-M20A Registration Date/Time: 2016-08-25 12:06:32 HERS Provider: CaICERTS
CA Building Energy Efficiency Standards Report Version: 2013 Rev 1.007 Report Generated: 2016-08-25 12:01:57
2013 Residential Compliance Schema Version: 2013.1.007
oe
CERTIFICATE OF VERIFICATION CF3R-MCH-20-H
Duct Leakage Diagnostic Test (Page 2 of 3 )
B. Duct Leakage Diagnostic Test
12 Notes
C. Additional Requirements for Compliance
01
System was tested in its normal operation condition. No temporary taping allowed.
Outside air (OA) duct connections to the central forced air duct system shall not be sealed/taped off during duct leakage
testing. OA ducts used for Central Fan Integrated (CFI) Indoor Air Quality ventilation systems, or Central Fan Ventilation
C2
Cooling Systems, that utilize dampers that open only when OA is required and automatically close when OA is not required,
may configure the OA damper to the closed position during duct leakage testing.
03
All supply and return register boots were sealed to the drywall.
04
Building cavities were not used as plenums or platform returns in lieu of ducts.
05
If cloth backed tape was used it was covered with Mastic and draw bands.
06
All connection points between the air handler and the supply and return plenums are completely sealed.
Visual Inspection at Final Construction Stage (applicable if system was tested at rough -in)
After installing the interior finishing wall and verifying that the above rough -in tests was completed, the following procedure must
be performed
For all supply and return registers, verify that the spaces between the register boot and the interior finishing wall are
07
properly sealed.
if the house rough -in duct leakage test was conducted without an air handler installed, inspect the connection points
08
between the air handler and the supply and return plenums to verify that the connection points are properly sealed.
09
Inspect all joints to ensure that no cloth backed rubber adhesive duct tape is used.
10
Verification Status
Pass
11
Correction Notes for this table
The responsible persons signature on this compliance document affirms that all applicable requirements in this table have
been met unless otherwise noted in the Verification Status and the Corrections Notes in this table.
D. Determination of HERS Verification Compliance
All applicable sections of this document shall indicate compliance with the specified verification protocol requirements in order
for this Certificate of Verification as a whole to be determined to be in compliance.
l 01 I Complies: All specified verification protocol requirements on this document are met.
Registration Number: 216-A0317864A-M2000001A-M20A Registration Date/Time: 2016-08-25 12:06:32 HERS Provider: CaICERTS
CA Building Energy Efficiency Standards Report Version: 2013 Rev 1.007 Report Generated: 2016-08-25 12:01:57
2013 Residential Compliance Schema Version: 2013.1.007
CERTIFICATE OF VERIFICATION CF3R-MCH-20-H
Duct Leakage Diagnostic Test (Page 3 of 3 )
Documentation Author's Declaration Statement
1.1 certify that this Certificate of Verification documentation is accurate and complete.
Documentation Author Name:
Documentation Author Signature:
50"wete
Darrel Kelly
Company:
Date Signed:
Builders' Energy Services, Inc.
2016-08-25 12:06:32
Address:
CEA/ HERS Certification Identification (if applicable):
1478 Bird Avenue
City/State/Zip:
Phone:
San Jose CA 95125
408-202-9075
Responsible Person's Declaration statement
I certify the following under penalty of perjury, under the laws of the State of California:
1. The information provided on this Certificate of Verification is true and correct.
2. 1 am the certified HERS Rater who performed the verification identified and reported on this Certificate of Verification (responsible rater).
3. The installed features, materials, components, manufactured devices, or system performance diagnostic results that require HERS verification
identified on this Certificate of Verification comply with the applicable requirements in Reference Appendices RA2, RA3, and the requirements
specified on the Certificate of Compliance for the building approved by the enforcement agency.
4. The information reported on applicable sections of the Certificate(s) of installation (CF2R) signed and submitted by the person(s) responsible for the
construction or installation conforms to the requirementsspecified on the Certificate(s) of Cornplianpe (CF1R) approved by the enforcement agency.
5. 1 will ensure that a registered copy of this Certificate of Verification shall be posted, or made available with the building permit(s) issued for the
building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of
Verification is required to be included with the documentation the builder provides to the building owner at occupancy.
Builder Or Installer Information As Shown On The Certificate Of Installation
Company Name (Installing Subcontractor, General Contractor, or Builder/Owner):
N/A - Consumer Certificate
Responsible Builder or Installer Name:
CSLB License:
N/A- Consumer Certificate
N/A - Consumer Certificate
HERS Provider Data Registry Information
Sample Group Number (if applicable):
Dwelling Test Status in Sample Group (if applicable)
Tested
HERS Rater Information
HERS Rater Company Name:
Builders' Energy Services, Inc.
Responsible Rater Name:
Responsible Rater Signature:
Darrel Kelly
Responsible Rater Certification Number w/ this HERS Provider:
Date Signed:
CC2005655
2016-08-25 12:06:32
Digitally signed by CaICERTS. This digital signature is provided in order to secure the content of this registered document, and in noway implies Registration Provider
responsibility for the accuracy of the information.
Registration Number: 216-A0317864A-M2000001A-M20A Registration Date/Time: 2016-08-25 12:06:32 HERS Provider: CaICERTS
CA Building Energy Efficiency Standards Report Version: 2013 Rev 1.007 Report Generated: 2016-08-25 12:01:57
2013 Residential Compliance Schema Version: 2013.1.007
CERTIFICATE OF VERIFICATION CF3R-MCH-20-H
Duct Leakage Diagnostic Test (Page 1 of 3 )
Project Name: Su house
Enforcement Agency: City of
Cupertino
Permit Number:
Dwelling Address: 6630 John Drive
City: Cupertino
Zip Code: 95014
A. System Information
01
Space Conditioning System Identification or Name
System one
02
Space Conditioning System Location or Area Served
First floor
03
Building Type from CF -111
Single family
04
Verified Low Leakage Ducts in Conditioned Space
(VLLDCS) Credit from CF1R?
No, credit is not taken
05
Verified Low Leakage Air Handling Unit (VLLAHU) Credit
from CF1R?
No, credit is not taken
06
Duct System Compliance Category
New
MCH -20a - Completely New Duct System
B. Duct Leakage Diagnostic Test
01
Condenser Nominal Cooling Capacity (ton)
0
02
Heating Capacity (kBtu/h)
58
03
Conditioned Floor Area served by this HVAC system (ft2)
900
04
Duct Leakage Test Condition
Test final
05
Duct Leakage Test Method
Total leakage
06
Leakage Factor
0.06
07
Air Handling Unit Airflow (AHUAirflow) Determination
Method
Heating system method
08
Measured AHUAirflow
This field or section is not applicable
09
Calculated Target Allowable Duct Leakage (cfm)
76
10
Actual duct leakage rate from leakage test measurement
70
L(cfm)
11
Compliance Statement
System passes leakage test
Registration Number: 216-A0317841A-M2000001A-M20A Registration Date/Time: 2016-08-25 11:57:02 HERS Provider: CaICERTS
CA Building Energy Efficiency Standards Report Version: 2013 Rev 1.007 Report Generated: 2016-08-25 11:55:53
2013 Residential Compliance Schema Version: 2013.1.007
y
J/
CERTIFICATE OF VERIFICATION CF3R-MCH-20-H
Duct Leakage Diagnostic Test (Page 2 of 3 )
B. Duct Leakage Diagnostic Test
12 Notes
C. Additional Requirements for Compliance
01
System was tested in its normal operation condition. No temporary taping allowed.
Outside air (OA) duct connections to the central forced air duct system shall not be sealed/taped off during duct leakage
testing. OA ducts used for Central Fan Integrated (CFI) Indoor Air Quality ventilation systems, or Central Fan Ventilation
02
Cooling Systems, that utilize dampers that open only when OA is required and automatically close when OA is not required,
may configure the OA damper to the closed position during duct leakage testing.
03
All supply and return register boots were sealed to the drywall.
04
Building cavities were not used as plenums or platform returns in lieu of ducts.
05
If cloth backed tape was used it was covered with Mastic and draw bands.
06
All connection points between the air handler and the supply and return plenums are completely sealed.
Visual Inspection at Final Construction Stage (applicable if system was tested at rough -in)
After installing the interior finishing wall and verifying that the above rough -in tests was completed, the following procedure must
be performed
For all supply and return registers, verify that the spaces between the register boot and the interior finishing wall are
07
properly sealed.
If the house rough -in duct leakage test was conducted without an air handler installed, inspect the connection points
08
between the air handler and the supply and return plenums to verify that the connection points are properly sealed.
09
Inspect all joints to ensure that no cloth backed rubber adhesive duct tape is used.
10
Verification Status
Pass
11
Correction Notes for this table
The responsible persons signature on this compliance document affirms that all applicable requirements in this table have
been met unless otherwise noted in the Verification Status and the Corrections Notes in this table.
D. Determination of HERS Verification Compliance
All applicable sections of this document shall indicate compliance with the specified verification protocol requirements in order
for this Certificate of Verification as a whole to be determined to be in compliance.
1 01 1 Complies: All specified verification protocol requirements on this document are met.
Registration Number: 216-A0317841A-M2000001A-M20A Registration Date/Time: 2016-08-25 11:57:02 HERS Provider: CaICERTS
CA Building Energy Efficiency Standards Report Version: 2013 Rev 1.007 Report Generated: 2016-08-25 11:55:53
2013 Residential Compliance Schema Version: 2013.1.007
i. ,
CERTIFICATE OF VERIFICATION CF3R-MCH-20-H
Duct Leakage Diagnostic Test (Page 3 of 3 )
Documentation Author's Declaration Statement
1. 1 certify that this Certificate of Verification documentation is accurate and complete.
Documentation Author Name:
Documentation Author Signature: ��r
P!�
Darrel Kelly
Company:
Date Signed:
Builders' Energy Services, Inc.
2016-08-25 11:57:02
Address:
CEA/ HERS Certification Identification (if applicable):
1478 Bird Avenue
City/State/Zip:
Phone:
San Jose CA 95125
408-202-9075
Responsible Person's Declaration statement
I certify the following under penalty of perjury, under the laws of the State of California:
1. The information provided on this Certificate of Verification is true and correct.
2. 1 am the certified HERS Rater who performed the verification identified and reported on this Certificate of Verification (responsible rater).
3. The installed features, materials, components, manufactured devices, or system performance diagnostic results that require HERS verification
identified on this Certificate of Verification comply with the applicable requirements in Reference Appendices RA2, RA3, and the requirements
specified on the Certificate of Compliance for the building approved by the enforcement agency,
4. The information reported on applicable sections of the Certificate(s) of Installation (MR) signed and submitted by the person(s) responsible for the
construction or installation conforms to the requirements: specified on the Certificate(s) of Compliance (CF1R) approved by the enforcement agency.
5. 1 will ensure that a registered copy of this Certificate of Verification shall be posted, or made available with the building permit(s) issued for the
building, and madeavailable to the enforcement agency for, all applicable inspections. I understand that a registered, copy of this Certificate of
Verification is required to be included with the documentation the builder provides to the building owner at occupancy.
Builder Or Installer Information As Shown On The Certificate Of Installation
Company Name (Installing Subcontractor, General Contractor, or Builder/Owner):
N/A - Consumer Certificate
Responsible Builder or Installer Name:
CSLB License:
N/A - Consumer Certificate
N/A - Consumer Certificate
HERS Provider Data Registry Information
Sample Group Number (if applicable):
Dwelling Test Status in Sample Group (if applicable)
Tested
HERS Rater Information
HERS Rater Company Name:
Builders' Energy Services, Inc.
Responsible Rater Name:
Responsible Rater Signature:
Darrel Kelly
Responsible Rater Certification Number w/ this HERS Provider:
Date Signed:
CC2005655
2016-08-25 11:57:02
Digitally signed by CaICERTS. This digital signature is provided in order to secure the content of this registered document, and in noway implies Registration Provider
responsibility for the accuracy of the information.
Registration Number: 216-A0317841A-M2000001A-M20A Registration Date/Time: 2016-08-25 11:57:02 HERS Provider: CaICERTS
CA Building Energy Efficiency Standards Report Version: 2013 Rev 1.007 Report Generated: 2016-08-25 11:55:53
2013 Residential Compliance Schema Version: 2013.1.007
W.
BUILDING ENERGY ANALYSIS REPORT
PROJECT:
CUPERTINO
Building Department
SUBMITTAL SINGLE HOUSE U JUL 17 2015
6630 JOHN DR.
#2
CUPERTINO, CA 95014.EVIEWED FOR CODE COMPLIANCE
Reviewed By:
Project Designer:
H.M.C. ASSOCIATES, LLP
12280 SARATOGA SUNNYVALE RD., #209
SARATOGA, CA 95070
(408) 446-8418
Report Prepared by:
PERFECT DESIGN & DEVELOPMENT, INC.
1
OFFICE COPY
Job Number:
R15 -2672R
Date:
6/10/2015
RECEIVES I
!JUN 2 4 2015
The EnergyPro computer program has been used to perform the calculations summarized in this compliance report. This program has approval and is
authorized by the California Energy Commission for use with both the Residential and Nonresidential 2013 Building Energy Efficiency Standards.
This program developed by EnergySoft, LLC —www energysoft.com.
Ener Pro 6 5 by Ener Soft User Number 1919 ID: R15 -2672R
w
I TABLE OF CONTENTS I
Cover Page
1
Table of Contents
2
Form CF -1 R -PRF -01-E Certificate of Compliance
3
Form RMS -1 Residential Measures Summary
12
Form MF -1 R Mandatory Measures Summary
13
HVAC System Heating and Cooling Loads Summary
17
Room Load Summary
19
Room Heating Peak Loads
21
Room Cooling Peak Loads
23
I EnergyPro 6.5 by EnergySoft .inn N,,.hw ID: R15 -2672R User Number: 1919 1
CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD CF1R-PRF-01
Project Name: SINGLE HOUSE Calculation Date/Time: 12:52, Wed, Jun 10, 2015 Page 1 of 9
Calculation Description: Title 24 Analysis Input File Name: R15-2672R.xml
GENERAL INFORMATION
01
Project Name SINGLE HOUSE
Building Complies with Computer Performance
02
Calculation Description Title 24 Analysis
02
This building incorporates features that require field testing and/or verification by a certified HERS rater under the supervision of a CEC-approved HERS provider.
03
Project Location 6630 JOHN DR.
04
City CUPERTINO
05
Standards Version Compliance 2015
06
Zip Code 95014
07
Compliance Manager Version BEMCmpMgr 2013-3c (710)
08
Climate Zone CZ4
09
Software Version EnergyPro 6.5
10
Building Type Single Family
11
Front Orientation (deg/Cardinal) 0
12
Project Scope Newly Constructed
13
Number of Dwelling Units 1
14
Total Cond. Floor Area (FT2) 2269
15
Number of Zones 2
16
Slab Area (FT2) 0
17
Number of Stories 2
18
Addition Cond. Floor Area N/A
19
Natural Gas Available Yes
20
Addition Slab Area (FT2) N/A
21
Glazing Percentage (%) 18.7%
COMPLIANCE RESULTS
01
Building Complies with Computer Performance
02
This building incorporates features that require field testing and/or verification by a certified HERS rater under the supervision of a CEC-approved HERS provider.
03
This building incorporates one or more Special Features shown below
ENERGY USE SUMMARY
04
05
06
07
08
Energy Use
(kTDV/ft2-yr)
Standard
Design
Proposed
Design
Compliance
Margin
Percent
Improvement
Space Heating
11.15
10.85
0.30
2.7%
Space Cooling
12.15
10.48
1.67
13.7%
IAQ Ventilation
1.23
1.23
0.00
0.0%
Water Heating
12.88
10.97
1.91
14.8%
Photovoltaic Offset
----
0.00
0.00
----
Compliance Energy Total
37.41
33.53
3.88
10.4%
Registration Number: 215-N0073053B-000000000-0000 Registration Date/Time: 2015-06-10 12:53:42 HERS Provider: CaICERTS inc.
CA Building Energy Efficiency Standards - 2013 Residential Compliance Report Version - CF1R-02272015-710 Report Generated at: 2015-06-10 12:52:55
IF
CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD
Project Name: SINGLE HOUSE Calculation Date/Time: 12:52, Wed, Jun 10, 2015
Calculation Description: Title 24 Analysis Input File Name: R15-2672R.xml
REQUIRED SPECIAL FEATURES
The following are features that must be installed as condition for meeting the modeled energy performance for this computer analysis.
• Ducts with high level of insulation
• Cathedral Ceiling
• Ceiling has high level of insulation
CF1R-PRF-01
Page 2 of 9
HERS FEATURE SUMMARY
The following is a summary of the features that must be field -verified by a certified HERS Rater as a condition for meeting the modeled energy performance for this computer analysis. Additional detail is
provided in the building components tables below.
Building -level Verifications:
• IAQ mechanical ventilation
Cooling System Verifications:
• Minimum Airflow
• Verified EER
• Refrigerant Charge
• Fan Efficacy Watts/CFM
HVAC Distribution System Verifications:
• Duct Sealing
Domestic Hot Water System Verifications:
• --None --
ENERGY DESIGN RATING
This is the sum of the annual TDV energy consumption for energy use components included in the performance compliance approach for the Standard Design Building (Energy Budget) and the annual
TDV energy consumption for lighting and components not regulated by Title 24, Part 6 (such as domestic appliances and consumer electronics) and accounting for the annual TDV energy offset by an
on-site renewable energy system.
Reference Energy Use Energy Design Rating
Margin Percent Improvement
Total Energy (kTDV/f2-yr)* 84.68 80.80
3.88 4.6%
* includes calculated Appliances and Miscellaneous Energy Use (AMEU)
BUILDING - FEATURES INFORMATION
01
02
03
04
05
06
07
Project Name
Conditioned Floor Area (ft2)
Number of Dwelling
Units
Number of Bedrooms
Number of Zones
Number of Ventilation
Cooling Systems
Number of Water
Heating Systems
SINGLE HOUSE
2269
1
4
2
0
1
Registration Number: 215-N0073053B-000000000-0000 Registration Date/Time: 2015-06-10 12:53:42 HERS Provider: CaICERTS inc.
CA Building Energy Efficiency Standards - 2013 Residential Compliance Report Version - CF1R-02272015-710 Report Generated at: 2015-06-10 12:52:55
CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD
Project Name: SINGLE HOUSE Calculation Date/Time: 12:52, Wed, Jun 10, 2015
Calculation Description: Title 24 Analysis
Input File Name: R15-2672R.xml
CF1 R -PRF -01
Page 3 of 9
ZONE INFORMATION
01
02
03
04
05
06
07
Zone Name
Zone Type
HVAC System Name
Zone Floor Area
(ft2)
Avg. Ceiling
Height
Water Heating System 1
Water Heating System 2
1ST FLOOR PLAN
Conditioned
1ST FLOOR AREA1
1436
9
DHW Sys 1
Gross Area (ft)
2ND FLOOR PLAN
Conditioned
2ND FLOOR AREA2
833
9
DHW Sys 1
Right
OPAQUE SURFACES
01
02
03
04
05
06
01
02
03
04
05
06
07
08
Name
Zone
Construction
Azimuth
Orientation
Gross Area (ft)
Window $ Door Area (ft2)
Tilt (deg)
WEST WALL
1ST FLOOR PLAN
R-21 Wall
270
Right
427.5
20
90
EAST WALL
1ST FLOOR PLAN
R-21 Wall
90
Left
427.5
70
90
NORTH WALL
1ST FLOOR PLAN
R-21 Wall
0
Front
342
58.5
90
SOUTH WALL
1ST FLOOR PLAN
R-21 Wall
180
Back
342
123
90
R-38 Roof 3
1ST FLOOR PLAN
R-38 Roof Attic
694.7
WEST WALL 2
2ND FLOOR PLAN
R-21 Wall
270
Right
319.5
39
90
EAST WALL 2
2ND FLOOR PLAN
R-21 Wall
90
Left
419.5
24
90
NORTH WALL 2
2ND FLOOR PLAN
R-21 Wall
0
Front
229.5
33
90
SOUTH WALL 2
2ND FLOOR PLAN
R-21 Wall
180
Back
229.5
43.5
90
R-38 Roof 4
2ND FLOOR PLAN
R-38 Roof Attic
829
OPAQUE SURFACES — Cathedral Ceilings
01
02
03
04
05
06
07
08
09
10
11
Name
Zone
Type
Orientatio
n
Area (ft)
Skylight Area
(ft2)
Roof Rise
(x in 12)
Roof
Pitch
Roof Tilt
(deg)
Roof
Reflectance
Roof
Emittance
Framing
Factor
R-38 Roof
1ST FLOOR PLAN
R-38 Roof Attic1
Front
10.4
10.3
4
0.33
18.43
0.1
0.85
0.07
R-38 Roof 2
2ND FLOOR PLAN
R-38 Roof Attic1
Front
4.1
4
4
0.33
18.43
0.1
0.85
0.07
ATTIC
01
02
03
04
05
06
07
08
Name
Construction
Type
Roof Rise
Roof Reflectance
Roof Emittance
Radiant Barrier
Cool Roof
Attic 1ST FLOOR PLAN
Attic Roof1ST FLOOR PLAN
Ventilated
4
0.1
0.85
No
No
Attic 2ND FLOOR PLAN
Attic Roof2ND FLOOR PLAN
Ventilated
4
0.1
0.85
No
No
Registration Number: 215-N0073053B-000000000-0000 Registration Date/Time: 2015-06-10 12:53:42 HERS Provider: CaICERTS inc.
CA Building Energy Efficiency Standards - 2013 Residential Compliance Report Version - CF1R-02272015-710 Report Generated at: 2015-06-10 12:52:55
CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD
Project Name: SINGLE HOUSE Calculation Date/Time: 12:52, Wed, Jun 10, 2015
Calculation Description: Title 24 Analysis
Input File Name: R15-2672R.xml
CF1 R -PRF -01
Page 4 of 9
WINDOWS
01
02
03
04 05 06
07
08
09
10
Name
Type
Surface (Orientation -Azimuth)
Multipli
Width (ft) Height (ft) er
Area
(ft)
Ll -factor
SHGC
Exterior Shading
WINDOWS
Window
WEST WALL (Right -270)
---- ---- 1
20.0
0.32
0.25
Insect Screen (default)
WINDOWS 2
Window
EAST WALL (Left -90)
---- ---- 1
70.0
0.32
0.25
Insect Screen (default)
WINDOWS 3
Window
NORTH WALL (Front -0)
---- ---- 1
58.5
0.32
0.25
Insect Screen (default)
WINDOWS 4
Window
SOUTH WALL (Back -180)
---- ---- 1
123.0
0.32
0.25
Insect Screen (default)
Skylight
Skylight
R-38 Roof (Front -0)
1
10.3
0.51
0.26
WINDOWS 5
Window
WEST WALL 2 (Right -270)
---- ---- 1
39.0
0.32
0.25
Insect Screen (default)
WINDOWS 6
Window
EAST WALL 2 (Left -90)
---- ---- 1
24.0
0.32
0.25
Insect Screen (default)
WINDOWS 7
Window
NORTH WALL 2 (Front -0)
---- ---- 1
33.0
0.32
0.25
Insect Screen (default)
WINDOWS 8
Window
SOUTH WALL 2 (Back -180)
---- ---- 1
43.5
0.32
0.25
Insect Screen (default)
Skylight 2
Skylight
R-38 Roof 2 (Front -0)
1
4.0
0.51
0.26
Registration Number: 215-N00730538-000000000-0000 Registration Date/Time: 2015-06-10 12:53:42 HERS Provider: CaICERTS inc.
CA Building Energy Efficiency Standards - 2013 Residential Compliance Report Version - MR -02272015-710 Report Generated at: 2015-06-10 12:52:55
CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD
Project Name: SINGLE HOUSE Calculation Date/Time: 12:52, Wed, Jun 10, 2015
Calculation Description: Title 24 Analysis
Input File Name: R15-2672R.xml
CF1R-PRF-01
Page 5 of 9
OPAQUE SURFACE CONSTRUCTIONS
01
02
03
04
05
06
07
Total Cavity
Winter Design
Construction Name
Surface Type
Construction Type
Framing
R -value
U -value
Assembly Layers
• Cavity/ Frame: no insul. / 2x4 Top Chrd
• Roof Deck: Wood Siding/sheathing/decking
2x4 Top Chord of Roof Truss @ 24
Tile Gap: present
Attic Roof1ST FLOOR PLAN
Attic Roofs
Wood Framed Ceiling
in. O.C.
none
0.400
Roofing: 10 PSF (Roofrile)
• Inside Finish: Gypsum Board
Ceilings (below
Cavity/Frame: R-9.1 /2x4
R-38 Roof Attic
attic)
Wood Framed Ceiling
2x4 @ 24 in. O.C.
R 38
0.025
Over Floor Joists: R-28.9 insul.
• Inside Finish: Gypsum Board
• Cavity / Frame: R-38 / 2x4
• Roof Deck: Wood Siding/sheathing/decking
• Tile Gap: present
R-38 Roof Atticl
Cathedral Ceilings
Wood Framed Ceiling
2x4 @ 24 in. O.C.
R 38
0.034
Roofing: 10 PSF (RoofTile)
• Inside Finish: Gypsum Board
• Cavity/ Frame: R-21 / 2x6
• Exterior Finish: Wood
R-21 Wall
Exterior Walls
Wood Framed Wall
2x6 @ 16 in. O.C.
R 21
0.066
Siding/sheathing/decking
• Floor Surface: Carpeted
• Floor Deck: Wood Siding/sheathing/decking
• Cavity / Frame: R-19 / 2x6
R-19 Floor W/ Crawlspace
Interior Floors
Wood Framed Floor
2x6 @ 16 in. O.C.
R 19
0.048
Ceiling Below Finish: Gypsum Board
• Cavity/ Frame: no insul. / 2x4 Top Chrd
• Roof Deck: Wood Siding/sheathing/decking
2x4 Top Chord of Roof Truss @ 24
Tile Gap: present
Attic Roof2ND FLOOR PLAN
Attic Roofs
Wood Framed Ceiling
in. O.C.
none
0.400
Roofing: 10 PSF (RoofTile)
• Floor Surface: Carpeted
• Floor Deck: Wood Siding/sheathing/decking
• Cavity / Frame: R-19 / 2x6
R-19 Floor W/O Crawlspace
Interior Floors
Wood Framed Floor
2x6 @ 16 in. O.C.
R 19
0.048
Ceiling Below Finish: Gypsum Board
BUILDING ENVELOPE - HERS VERIFICATION
01 02 03 04
Quality Insulation Installation (QII) Quality Installation of Spray Foam Insulation Building Envelope Air Leakage ACH @ 50 Pa
Not Required Not Required Not Required ---
Registration Number: 215-N0073053B-000000000-0000 Registration Date/Time: 2015-06-10 12:53:42 HERS Provider: CaICERTS inc.
CA Building Energy Efficiency Standards - 2013 Residential Compliance Report Version - CF1R-02272015-710 Report Generated at: 2015-06-10 12:52:55
CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD
Project Name: SINGLE HOUSE
Calculation Description: Title 24 Analysis
Calculation Date/Time: 12:52, Wed, Jun 10, 2015
Input File Name: R15-2672R.xml
CF1R-PRF-01
Page 6 of 9
WATER HEATING SYSTEMS
01 02 03 04 05 06
Name System Type Distribution Type Water Heater Number of Heaters Solar Fraction (%)
DHW Sys 1 - 1/1 DHW Standard DHW Heater 1 1 .0%
WATER HEATERS
01
02
03
04
05
06
07
08
Name
Heater Element Type
Tank Type
Tank Volume
(gal)
Energy Factor or
Efficiency
Input Rating
Tank Exterior
Insulation
R -value
Standby Loss
(Fraction)
DHW Heater 1
Natural Gas
Small Storage
75
0.69
72000-Btu/hr
0
0.04
WATER HEATING - HERS VERIFICATION
01
02
03
04
05
06
07
Name
Pipe Insulation
Parallel Piping
Compact Distribution
Point -of Use
Recirculation
Control
Central DHW
Distribution
DHW Sys 1 - 1/1
---
---
Air Distribution System 1
Cooling Component 2:Heating Component 2:Air
Distribution System 2:HVAC Fan 2:1
Other Heating and Cooling
System
Heating Component 2
SPACE CONDITIONING SYSTEMS
01
02
03
04
05
06
SC Sys Name
System Type
Heating Unit Name
Cooling Unit Name
Fan Name
Distribution Name
Cooling Component 1:Heating Component 1:Air
Distribution System 1:HVAC Fan 1:1
Other Heating and Cooling
System
Heating Component 1
Cooling Component 1
HVAC Fan 1
Air Distribution System 1
Cooling Component 2:Heating Component 2:Air
Distribution System 2:HVAC Fan 2:1
Other Heating and Cooling
System
Heating Component 2
Cooling Component 2
HVAC Fan 2
Air Distribution System 2
HVAC - HEATING UNIT TYPES
01
02
03
Name
Type
Efficiency
Heating Component 1
CntrlFurnace - Fuel -fired central furnace
80 AFUE
Heating Component 2
CntrlFurnace - Fuel -fired central furnace
80 AFUE
Registration Number: 215-No073053B-000000000-0000 Registration Date/Time: 2015-06-10 12:53:42 HERS Provider: CaICERTS inc.
CA Building Energy Efficiency Standards - 2013 Residential Compliance Report Version - CF1R-02272015-710 Report Generated at: 2015-06-10 12:52:55
CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD
Project Name: SINGLE HOUSE Calculation Date/Time: 12:52, Wed, Jun 10, 2015
Calculation Description: Title 24 Analysis
Input File Name: R15-2672R.xml
CF1R-PRF-01
Page 7 of 9
HVAC - COOLING UNIT TYPES
01
02
03 04
05
06
07
Name
Verified Airflow
Efficiency
Verified EER
Multi -speed
Verified Refrigerant
Charge
Name
System Type
EER SEER
Zonally Controlled
Compressor
HERS Verification
Cooling Component 1
SplitAirCond
12.2
14
Not Zonal
Single Speed
Cooling Component
Attic
None
Air Distribution System
2 -hers -dist
I Not Required
Not Required
Not Required
1 -hers -cool
Cooling Component 2
SplitAirCond
12.2
14
Not Zonal
Single Speed
Cooling Component
1 -hers -cool
HVAC COOLING - HERS VERIFICATION
01
02
03
04
05
06
Name
Verified Airflow
Airflow Target
Verified EER
Verified SEER
Verified Refrigerant
Charge
Cooling Component 1 -hers -cool
Required
350
Required
Not Required
Required
Cooling Component 2 -hers -cool
Required
350
Required
Not Required
Required
HVAC - DISTRIBUTION SYSTEMS
01
02
03
04
05
06
07
Name
Type
Duct Leakage
Insulation R -value
Duct Location
Bypass Duct
HERS Verification
Air Distribution System 1
DuctsAttic
Sealed and tested
8
Attic
None
Air Distribution System
1 -hers -dist
Air Distribution System 2
DuctsAttic
Sealed and tested
8
Attic
None
Air Distribution System
2 -hers -dist
HVAC DISTRIBUTION - HERS VERIFICATION
01
02
03
04
05
06
07
08
Name
Duct Leakage
Verification
Duct Leakage
Target (%)
Verified Duct
Location
Verified Duct
Design
Buried
Ducts
Deeply Buried
Ducts
Low -leakage
Air Handler
Air Distribution System 1 -hers -dist
Required
6.0
Not Required
Not Required
Not Required
Not Required
---
Air Distribution System 2 -hers -dist
Required
6.0
Not Required
I Not Required
Not Required
Not Required
HVAC -FAN SYSTEMS
01
02
03
04
Name
Type
Fan Power (Watts/CFM)
HERS Verification
HVAC Fan 1
Single Speed PSC Furnace Fan
0.58
HVAC Fan 1 -hers -fan
HVAC Fan 2
Single Speed PSC Furnace Fan
0.58
HVAC Fan 2 -hers -fan
Registration Number: 215-N0073053B-000000000-0000 Registration Date/Time: 2015-06-10 12:53:42 HERS Provider: CaICERTS inc.
CA Building Energy Efficiency Standards - 2013 Residential Compliance Report Version - CF1R-02272015-710 Report Generated at: 2015-06-10 12:52:55
CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD
Project Name: SINGLE HOUSE Calculation Date/Time: 12:52, Wed, Jun 10, 2015
Calculation Description: Title 24 Analysis
Input File Name: R15-2672R.xml
CF1 R -PRF -01
Page 8 of 9
HVAC FAN SYSTEMS - HERS VERIFICATION
01
02
01
02
03
Name
Verified Fan Watt Draw
Required Fan Efficiency (Watts/CFM)
HVAC Fan 1 -hers -fan
Required
0.58
HVAC Fan 2 -hers -fan
Required
0.58
IAQ (Indoor Air Quality) FANS
01
02
03
04
05
06
Dwelling Unit
IAQ CFM
IAQ Watts/CFM
IAQ Fan Type
IAQ Recovery
Effectiveness(%)
HERS Verification
SFam IAQVentRpt
60.19
0.25
Default
0
Required
Registration Number: 215-N0073053B-000000000-0000 Registration Date/Time: 2015-06-10 12:53:42 HERS Provider: CaICERTS inc.
CA Building Energy Efficiency Standards - 2013 Residential Compliance Report Version - CF1R-02272015-710 Report Generated at: 2015-06-10 12:52:55
CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD
Project Name: SINGLE HOUSE Calculation Date/Time: 12:52, Wed, Jun 10, 2015
Calculation Description: Title 24 Analysis Input File Name: R15-2672R.xml
CF1 R -PRF -01
Page 9 of 9
DOCUMENTATION AUTHOR'S DECLARATION STATEMENT
1. 1 certify that this Certificate of Compliance documentation is accurate and complete.
Documentation Author Name:
Documentation Author Signature:_
Raymond Zhong
Company:
Signature Date:
Perfect Design
2015-06-10 12:53:42
Address:
CEA/HERS Certification Identification (If applicable):
2416 W. Valley Blvd.
City/State/Zip:
Phone:
Alhambra, CA 91803
6262898808
RESPONSIBLE PERSON'S DECLARATION STATEMENT
I certify the following under penalty of perjury, under the laws of the State of California:
1. I am eligible under Division 3 of the Business and Professions Code to accept responsibility for the building design identified on this Certificate of Compliance.
2. 1 certify that the energy features and performance specifications identified on this Certificate of Compliance conform to the requirements of Title 24, Part 1 and Part 6 of the California Code of
Regulations.
3. The building design features or system design features identified on this Certificate of Compliance are consistent with the information provided on other applicable compliance documents,
worksheets, calculations, plans and specifications submitted to the enforcement agency for approval with this building permit application.
Responsible Designer Name:
Responsible Designer Signature:
Raymond Zhong
Company:
Date Signed:
Perfect Design
2015-06-10 12:53:42
Address:
License:
2416 W. Valley Blvd.
M-27635
City/State/Zip:
Phone:
Alhambra, CA 91803
6262898808
Digitally signed by CaICERTS. This digital signature is provided in order to secure the content of this registered document, and in noway implies Registration Provider responsibility for the accuracy of the
information.
Registration Number: 215-No073053B-000000000-0000 Registration Date/Time: 2015-06-10 12:53:42 HERS Provider: CaICERTS inc.
CA Building Energy Efficiency Standards - 2013 Residential Compliance Report Version - CF1R-02272015-710 Report Generated at: 2015-06-10 12:52:55
RESIDENTIAL MEASURES SUMMARY
RMS -1
Project Name
SINGLE HOUSE
Building Type m Single Family ❑ Addition Alone
❑ Multi Family ❑ Existing+Addition/Alteration
Date
6/10/2015
Project Address
6630 JOHN DR. CUPERTINO
California Energy Climate Zone
CA Climate Zone 04
Total Cond. Floor Area
2,269
Addition
n/a
# of Units
1
INSULATION
Construction Type
Area
Cavity (ft) Special Features Status
Roof Wood Framed Attic R 38 1,524 New
Wall Wood Framed R 21 2,326 New
Demising Wood Framed w/Crawl Space R 19 1,436 New
Demising Wood Framed w/o Crawl Space R 19 833 New
FENESTRATION I Total Area: 425 Glazing Percentage: 18.7%1 New/Altered Average U -Factor: 0.33
Orientation Area(ft2) U -Fac SHGC Overhang Sidefins Exterior Shades Status
Skylight 10.3 0.510
0.26 none none None New
Right (Vv) 59.0 0.320
0.25 none none Bug Screen New
Left (E) 94.0 0.320
0.25 none none Bug Screen New
Front (N) 91.5 0.320
0.25 none none Bug Screen New
Rear (S) 166.5 0.320
0.25 none none Bug Screen New
Skylight 4.0 0.510
0.26 none none None New
HVAC SYSTEMS
Qty. Heating Min. Eff
Cooling Min. Eff Thermostat Status
1 Central Furnace 80% AFUE
Split Air Conditioner 14 0 SEER Setback New
1 Central Furnace 80% AFUE
Split Air Conditioner 14.0 SEER Setback New
HVAC DISTRIBUTION
Location Heating
Duct
Cooling Duct Location R -Value Status
1ST FLOOR AREA Ducted
Ducted Attic 8.0 New
2ND FLOOR AREA Ducted
Ducted Attic 8.0 New
WATER HEATING
Qty. Type Gallons Min. Eff Distribution Status
1 Small Storage Gas 75
0.69 Standard New
Ener Pro 6.5 by Ener Soft User Number: 1919
RunCode: 2015-06-10T12:56:03 ID. R15 -2672R Pae 12 of 24
2013 Low -Rise Residential Mandatory Measures Summary
NOTE: Low-rise residential buildings subject to the Standards must comply with all applicable mandatory measures listed, regardless of the
compliance approach used. Exceptions may annly. Review the respective code section for more information.
Building Envelope Measures:
§ 110.6(a)1:
Doors and windows between conditioned and unconditioned spaces are manufactured to limit air leakage.
§ 110.6(a)5:
Fenestration products (except field -fabricated windows) have a label listing the certified U -Factor, certified Solar Heat Gain
Coefficient SHGC), and infiltration that meets the requirements of § 10-111 (a).
§ 110.7:
Exterior doors and windows are weatherstripped; all joints and penetrations are caulked and sealed.
§ 110.8(a):
Insulation specified or installed meets Standards for Insulating Material. Indicate type and include on the CF2R.
§ 110.8(i):
The thermal emittance and aged solar reflectance values of the cool roofing material meets the requirements of § 110.8(1) when the
installation of a cool roof is specified on the CF I R.
§ 110.86):
A radiant barrier shall have an emittance of 0.05 or less when the installation of a radiant barrier is specified on the CFI R.
Minimum R-30 insulation in wood -frame ceiling; or the weighted average U -factor shall not exceed 0.031. Minimum R-19 in a
§150.0(a):
rafter roof alteration. Attic access doors shall have permanently attached insulation using adhesive or mechanical fasteners. The
attic access shall be gasketed to prevent air leakage.
§150.0(b):
Loose fill insulation shall conform with manufacturer's installed design labeled R -value.
§150.0(c):
Minimum R-13 insulation in 2x4 inch wood framing wall or have a U -factor of 0.102 or less (R-19 in 2x6 or 0.074 maximum U -
factor).
§ 150.0(d):
Minimum R-19 insulation in raised wood -frame floor or 0.037 maximum U -factor.
In Climate Zones 14 and 16 a Class II vapor retarder shall be installed on the conditioned space side of all insulation in all exterior
§150.0(g)]:
walls, vented attics and unvented attics with air -permeable insulation.
In Climate Zones 1-16 with unvented crawl spaces the earth floor of the crawl space shall be covered with a Class I or Class II
§ 150.0(g)2:
vapor retarder.
In a building having a controlled ventilation crawl space, a Class I or Class Il vapor retarder shall be placed over the earth floor of
§150.0(g)3:
the crawl space to reduce moisture entry and protect insulation from condensation, as specified in the exception to Section
150.0(d).
§ 150.0(1):
Slab edge insulation shall: have a water absorption rate, for the insulation material alone without facings, no greater than 0.3%;
have water vapor permeance rate is no greater than 2.0 perm/inch, be protected from physical damage and UV light deterioration;
and when installed as part of a heated slab floor meets therequirements of § 110.8
150.0
§ (q)'
Fenestration, including skylights, separating conditioned space from unconditioned space or outdoors shall have a maximum U-
factor of 0.58; or the weighted average U -factor of all fenestration shall not exceed 0.58.
Fireplaces, Decorative Gas Appliances and Gas Log Measures:
§ 150.0(e)]A:
Masonry or factory -built fireplaces have a closable metal or glass door covering the entire opening of the firebox.
§ 150.0(e)1 B:
Masonry or factory -built fireplaces have a combustion outside air intake, which is at least six square inches in area and is
equipped with a readily accessible, operable, and tight -fitting damper or a combustion -air control device.
§150.0(e)1C:
Masonry or factory -built fireplaces have a flue damper with a readily accessible control.
§150.0(e)2:
Continuous burning pilot lights and the use of indoor air for cooling a firebox jacket, when that indoor air is vented to the outside
of the building, are prohibited.
Space Conditioning, Water Heating and Plumbing System Measures:
§ 110.0-§110.3:
HVAC equipment, water heaters, showerheads, faucets and all other regulated appliances are certified to the Energy Commission.
§ 110.3(c)5:
Water heating recirculation loops serving multiple dwelling units meet the air release valve, backflow prevention, pump isolation
valve, and recirculation loop connection requirements of §110.3(c)5.
Continuously burning pilot lights are prohibited for natural gas: fan -type central furnaces, household cooking appliances (appli-
§ 110.5:
ances without an electrical supply voltage connection with pilot lights that consume less than 150 Btu/hr are exempt), and pool
and spa heaters.
§ 150.0(h)l:
Heating and/or cooling loads are calculated in accordance with ASHRAE, SMACNA or ACCA using design conditions specified
in §150.0(h)2.
150.0(h)3A:
Installed air conditioner and heat pump outdoor condensing units shall have a clearance of at least five feet from the outlet of any
dryer vent.
§ 150.0(i):
Heating systems are equipped with thermostats that meet the setback requirements of § 110.2(c).
§150.00)IA:
Storage gas water heaters with an energy factor equal to or less than the federal minimum standards shall be externally wrapped
with insulation having an installed thermal resistance of R-12 or greater.
§ 150.00)1B:
Unfired hot water tanks, such as storage tanks and backup storage tanks for solar water -heating systems, have R-12 external
insulation or R-16 internal insulation where the internal insulation R -value is indicated on the exterior of the tank.
For domestic hot water system piping, whether buried or unburied: the first 5 feet of hot and cold water pipes from the storage
tank, all piping with a nominal diameter of 3/4 inch or larger, all piping associated with a domestic hot water recirculation system
§ 150.06)2A:
regardless of the pipe diameter, piping from the heating source to storage tank or between tanks, piping buried below grade, and
all hot water pipes from the heating source to kitchen fixtures must be insulated according to the requirements of TABLE 120.3-
A.
§ 150.00)2B:
All domestic hot water pipes that are buried below grade must be installed in a water proof and non -crushable casing or sleeve
that allows for installation, removal, and replacement of the enclosed pipe and insulation.
2013 Low -Rise Residential Mandatory Measures Summary
§150.00)2C:
Pipe for cooling system lines shall be insulated as specified in §150.00)2A. Piping insulation for steam and hydronic heating
systems or hot waters stems with pressure > 15 psig shall meet therequirements in TABLE 120.3-A.
§ 150.00)3:
Insulation is protected from damage, including that due to sunlight, moisture, equipment maintenance, and wind.
Insulation exposed to weather shall either be rated for outdoor use or installed with a cover suitable for outdoor service. For
§ 150.00)3A:
example, protected by aluminum, sheet metal, painted canvas, or plastic cover. Cellular foam insulation protected as specified or
painted with coating that is water retardant and provides shielding from solar radiation that degrades the material.
Insulation covering chilled water piping and refrigerant suction piping located outside the conditioned space shall have a Class I
§150.00)3B:
or Class II vapor retarding facing, or the insulation shall be installed at the thickness that qualifies as a Class I or Class II vapor
retarder.
Systems using gas or propane water heaters to serve individual dwelling units shall include: a 120V electrical receptacle within 3
feet of the water heater; a Category III or IV vent, or a Type B vent with straight pipe between the outside termination and the
§150.0(n)l:
space where the water heater is installed; a condensate drain that is no more than 2 inches higher than the base of the installed
water heater, and allows natural draining without pump assistance; and a gas supply line with a capacity of at least 200,000
Btu/hr.
§150.0(n)2:
Recirculating loops serving multiple dwelling units shall meet the requirements of §I 10.3(c)5.
§ 150.0(n)3:
Solar water -heating systems and collectors shall be certified and rated by the Solar Rating and Certification Corporation (SRCC)
or by a testing agency approved by the Executive Director.
Ducts and Fans Measures:
All air -distribution system ducts and plenums installed are sealed and insulated to meet the requirements of CMC §601.0, §602.0,
§603.0, §604.0, §605.0 and ANSI/SMACNA-006-2006 HVAC Duct Construction Standards Metal and Flexible 3rd Edition.
Supply -air and retum-air ducts and plenums are insulated to a minimum installed level of R-6.0 (or higher if required by CMC
§605.0) or enclosed entirely in directly conditioned space as confirmed through field verification and diagnostic testing
(RA3.1.4.3.8). Connections of metal ducts and inner core of flexible ducts are mechanically fastened. Openings shall be sealed
§150.0(m)l:
with mastic, tape, or other duct -closure system that meets the applicable requirements of UL 181, UL 181A, or UL 181B or
aerosol sealant that meets the requirements of UL 723. If mastic or tape is used to seal openings greater than %. inch, the
combination of mastic and either mesh or tape shall be used. Building cavities, support platforms for air handlers, and plenums
defined or constructed with materials other than sealed sheet metal, duct board or flexible duct shall not be used for conveying
conditioned air. Building cavities and support platforms may contain ducts. Ducts installed in cavities and support platforms
shall not be compressed to cause reductions in the cross-sectional area of the ducts.
Factory -Fabricated Duct Systems shall comply with specified requirements for duct construction, connections, and closures; joints
§ 150.0(m)2:
and seams of duct systems and their components shall not be sealed with cloth back rubber adhesive duct tapes unless such tape is
used in combination with mastic and draw bands.
§150.0(m)3-6:
Field -Fabricated Duct Systems shall comply with requirements for: pressure -sensitive tapes, mastics, sealants, and other
requirements specified for duct construction; duct insulation R -value ratings; duct insulation thickness; and duct labeling.
§150.0(m)7:
All fan systems that exchange air between the conditioned space and the outside of the building must have backdraft or automatic
dampers.
§150.0(m)8:
Gravity ventilating systems serving conditioned space have either automatic or readily accessible, manually operated dampers
except combustion inlet and outlet air openings and elevator shaft vents.
Insulation shall be protected from damage, including that due to sunlight, moisture, equipment maintenance, and wind but not
§ 150.0(m)9:
limited to the following: insulation exposed to weather shall be suitable for outdoor service. For example, protected by aluminum,
sheet metal, painted canvas, or plastic cover. Cellular foam insulation shall be protected as above or painted with a coating that is
water retardant and provides shielding from solar radiation.
§150.0(m)10:
Flexible ducts cannot have porous inner cores.
When space conditioning systems use forced air duct systems to supply conditioned air to an occupiable space, the ducts shall be
§I50.0(m)11:
sealed and duct leakage tested, as confirmed through field verification and diagnostic testing, in accordance with Reference
Residential Appendix RA3.
Mechanical systems that supply air to an occupiable space through ductwork exceeding 10 feet in length and through a thermal
§150.0(m)12:
conditioning component, except evaporative coolers, shall be provided with air filter devices that meet the requirements of
§150.0(m)12.
Space conditioning systems that utilize forced air ducts to supply cooling to an occupiable space shall have a hole for the
placement of a static pressure probe (HSPP), or a permanently installed static pressure probe (PSPP) in the supply plenum. The
150.0(m)13:
space conditioning system must also demonstrate airflow > 350 CFM per ton of nominal cooling capacity through the return
grilles, and an air -handling unit fan efficacy:5 0.58 W/CFM as confirmed by field verification and diagnostic testing, in
accordance with Reference Residential Appendix RA3.
Zonally controlled central forced air cooling systems shall be capable of simultaneously delivering, in every zonal control mode,
§150.0(m)15:
an airflow from the dwelling, through the air handler fan and delivered to the dwelling, of >_ 350 CFM per ton of nominal cooling
capacity, and operating at an air -handling unit fan efficacy of:S 0.58 W/CFM as confirmed by field verification and diagnostic
testing, in accordance with Reference Residential Appendix RA3.
All dwelling units shall meet the requirements of ASHRAE Standard 62.2. Neither window operation nor continuous operation of
§ 150.0(0):
central forced air system air handlers used in central fan integrated ventilation systems are permissible methods of providing the
Whole Building Ventilation.
§ 150.0(o)IA:
Whole Building Ventilation airflow shall be confirmed through field verification and diagnostic testing, in accordance with
Reference Residential Appendix RA3.
Pool and Spa Heating Systems and Equipment Measures:
Any pool or spa heating system shall be certified to have: a thermal efficiency that complies with the Appliance Efficiency
§ 110.4(a):
Regulations; an on-off switch mounted outside of the heater that allows shutting off the heater without adjusting the thermostat
setting; a permanent weatherproof plate or card with operating instructions; and shall not use electric resistance heating.
2013 Low -Rise Residential Mandatory Measures Summary
§ 110.4(b)1:
Any pool or spa heating equipment shall be installed with at least 36 inches of pipe between filter and heater or dedicated suction
and return lines, or built-up connections for future solar heating.
§ 110.4(b)2:
Outdoor pools or spas that have a heat pump or gas heater shall have a cover.
§ 110.4(b)3:
Pools shall have directional inlets that adequately mix the pool water, and a time switch that will allow all pumps to be set or pro -
ammed to run only during off-peak electric demand periods.
§ 110.5:
Natural gas pool and spa heaters shall not have a continuous burning pilot light.
§ 150.0(p):
Residential pool systems or equipment shall meet specified pump sizing, flow rate, piping, filters, and valve requirements.
Lighting Measures:
§110.9:
All lighting control devices and systems, ballasts, and luminaires shall meet the applicable requirements of §110.9.
§ 150.0(k)IA:
Installed luminaires shall be classified as high -efficacy or low -efficacy for compliance with § 150.0(k) in accordance with TABLE
150.0-A or TABLE 150.0-B, as applicable.
§150.0(k)IB:
When a high efficacy and low efficacy lighting system are combined in a single luminaire, each system shall separately comply
with the applicable provisions of § 150.0
The wattage and classification of permanently installed luminaires in residential kitchens shall be determined in accordance with
§150.0(k)IC:
§ 130.0(c). In residential kitchens, the wattage of electrical boxes finished with a blank cover or where no electrical equipment has
been installed, and where the electrical box can be used for a luminaire or a surface mounted ceiling fan, shall be calculated as 180
watts of low efficacy lighting er electrical box.
§ 150.0(k)1D:
Ballasts for fluorescent lamps rated 13 watts or greater shall be electronic and shall have an output frequency no less than 20 kHz.
Permanently installed night lights and night lights integral to installed luminaires or exhaust fans shall be rated to consume no
§150.0(k)IE:
more than 5 watts of power per luminaire or exhaust fan as determined in accordance with § I30.0(c). Night lights do not need to
be controlled by vacancy sensors.
§ 150.0(k)1F:
Lighting integral to exhaust fans (except when installed by the manufacturer in kitchen exhaust hoods) shall meet the applicable
requirements of § 150.0(k).
§ 150.0(k)2A:
High efficacy luminaires must be switched separately from low efficacy luminaires.
§ 150.0(k)2B:
Exhaust fans shall be switched separately from lighting systems.
§ 150.0(k)2C:
Luminaires shall be switched with readily accessible controls that permit the luminaires to be manually switched ON and OFF.
§ 150.0(k)2D:
Controls and equipment are installed in accordance with manufacturer's instructions.
§ 150.0(k)2E:
No control shall bypass a dimmer or vacancy sensor function if the control is installed to comply with § I50.0(k).
§ 150.0(k)2F:
Lighting controls comply with applicable requirements of § 110.9.
An Energy Management Control System (EMCS) may be used to comply with dimmer requirements if. it functions as a dimmer
§150.0(k)2G:
according to §110.9; meets Installation Certificate requirements of §130.4; the EMCS requirements of §130.5; and all other
requirements in §150.0(k)2.
An Energy Management Control System (EMCS) may be used to comply with vacancy sensor requirements of §150.0(k) if: it
§ 150.0(k)2H:
functions as a vacancy sensor according to § 110.9; meets Installation Certificate requirements of § 130.4; the EMCS requirements
of § 130.5; and all other requirements in § 150.0(k)2.
§ 150.0(k)2I:
A multiscene programmable controller may be used to comply with dimmer requirements of this section if it provides the
functionality of a dimmer according to § 110.9, and complies with all other applicable requirements in § 150.0(k)2.
§ 150.0(k)3A:
A minimum of 50 percent of the total rated wattage of permanently installed lighting in kitchens shall be high efficacy.
Kitchen lighting includes all permanently installed lighting in the kitchen except internal lighting in cabinets that illuminate only
§ 150.0(k)3B:
the inside of the cabinets. Lighting in areas adjacent to the kitchen, including but not limited to dining and nook areas, are
considered kitchen lighting if they are not separately switched from kitchen lighting.
§150.0(k)4:
Permanently installed lighting that is internal to cabinets shall use no more than 20 watts of power per linear foot of illuminated
cabinet.
§ 150.0(k)5:
A minimum of one high efficacy luminaire shall be installed in each bathroom; and all other lighting installed in each bathroom
shall be high efficacy or controlled by vacancy sensors.
§ I50.0(k)6:
Lighting installed in attached and detached garages, laundry rooms, and utility rooms shall be high efficacy luminaires and
controlled by vacancy sensors.
§150.0(k)7:
Lighting installed in rooms or areas other than in kitchens, bathrooms, garages, laundry rooms, and utility rooms shall be high
efficacy, or shall be controlled by either dimmers or vacancy sensors.
Luminaires recessed into ceilings shall: be listed for zero clearance insulation contact (IC) by Underwriters Laboratories or other
nationally recognized testing/rating laboratory; have a label that certifies that the luminaire is airtight with air leakage less than 2.0
CFM at 75 Pascals when tested in accordance with ASTM E283; be sealed with a gasket or caulk between the luminaire housing
§150.0(k)8:
and ceiling, and shall have all air leak paths between conditioned and unconditioned spaces sealed with a gasket or caulk; and
allow ballast maintenance and replacement without requiring cutting holes in the ceiling.
For recessed compact fluorescent luminaries with ballasts to qualify as high efficacy for compliance with § 150.0(k), the ballasts
shall be certified to the Energy Commission to comply with the applicable requirements in § 110.9.
For single-family residential buildings, outdoor lighting permanently mounted to a residential building or other buildings on the
same lot shall be high efficacy, or may be low efficacy if it meets all of the following requirements:
i. Controlled by a manual ON and OFF switch that does not override to ON the automatic actions of Items ii or iii below; and
§ 150.0(k)9A:
ii. Controlled by a motion sensor not having an override or bypass switch that disables the motion sensor, or controlled by a
motion sensor having a temporary override switch which temporarily bypasses the motion sensing function and automatically
reactivates the motion sensor within 6 hours; and
iii. Controlled by one of the following methods:
2013 Low -Rise Residential Mandatory Measures Summary
a. Photocontrol not having an override or bypass switch that disables the photocontrol; or
b. Astronomical time clock not having an override or bypass switch that disables the astronomical time clock, and which is
programmed to automatically turn the outdoor lighting OFF during daylight hours; or
c. Energy management control system which meets all of the following requirements: At a minimum provides the functionality of
an astronomical time clock in accordance with §110.9; meets the Installation Certification requirements in § 130.4; meets the
requirements for an EMCS in § 130.5; does not have an override or bypass switch that allows the luminaire to be always ON; and,
is programmed to automatically turn the outdoor lighting OFF during daylight hours.
For low-rise multifamily residential buildings, outdoor lighting for private patios, entrances, balconies, and porches; and outdoor
lighting for residential parking lots and residential carports with less than eight vehicles per site shall comply with one of the
§ 150.0(k)9B:
following requirements:
i. Shall comply with §150.0(k)9A; or
ii. Shall comply with the applicable requirements in § 110.9, §130.0, § 130.2, § 130.4, §140.7 and § 141.0.
§ 150.0(k)9C:
For low-rise residential buildings with four or more dwelling units, outdoor lighting not regulated by § 150.0(k)9B or 150.0(k)9D
shall comply with the applicable requirements in § 110.9, § 130.0, § 130.2, § 130.4, § 140.7 and § 141.0.
§ 150.0(k)9D:
Outdoor lighting for residential parking lots and residential carports with a total of eight or more vehicles per site shall comply
with the applicable requirements in § 110.9, § 130.0, § 130.2, § 130.4, § 140.7 and § 141.0.
§ 150.0(k)10:
Internally illuminated address signs shall comply with § 140.8; or shall consume no more than 5 watts of power as determined
according to § 130.0(c).
§150.0(k)11:
Lighting for residential parking garages for eight or more vehicles shall comply with the applicable requirements for
nonresidential garages in § 110.9, § 130.0, § 130. 1, § 130.4, § 140.6, and § 141.0.
In a low-rise multifamily residential building where the total interior common area in a single building equals 20 percent or less of
§ 150.0(k)12A:
the floor area, permanently installed lighting for the interior common areas in that building shall be high efficacy luminaires or
controlled by an occupant sensor.
In a low-rise multifamily residential building where the total interior common area in a single building equals more than 20
percent of the floor area, permanently installed lighting in that building shall:
§ 150.0(k)12B:
i. Comply with the applicable requirements in §110.9, §130.0, §130.1, §140.6 and §141.0; and
ii. Lighting installed in corridors and stairwells shall be controlled by occupant sensors that reduce the lighting power in each
space by at least 50 percent. The occupant sensors shall be capable of turning the light fully On and Off from all designed paths of
ingress and egress.
Solar Ready Buildings:
Single family residences located in subdivisions with ten or more single family residences and where the application for a
§ 110.10(a)l :
tentative subdivision map for the residences has been deemed complete, by the enforcement agency, on or after January 1, 2014,
shall comply with therequirements of §110.10 b through 110.10(e).
§ 110.10(a)2:
Low-rise multi -family buildings shall comply with the requirements of § 110.10(b) through § 110.10(d).
The solar zone shall have a minimum total area as described below. The solar zone shall comply with access, pathway, smoke
ventilation, and spacing requirements as specified in Title 24, Part 9 or other Parts of Title 24 or in any requirements adopted by a
local jurisdiction. The solar zone total area shall be comprised of areas that have no dimension less than 5 feet and are no less than
80 square feet each for buildings with roof areas less than or equal to 10,000 square feet or no less than 160 square feet each for
§1 10.10(b)l:
buildings with roof areas greater than 10,000 square feet.
For single family residences the solar zone shall be located on the roof or overhang of the building and have a total area no less
than 250 square feet. For low-rise multi -family buildings the solar zone shall be located on the roof or overhang of the building or
on the roof or overhang of another structure located within 250 feet of the building or on covered parking installed with the
building project and have a total area no less than IS percent of the total roof area of the building excluding any skylight area.
§ 110.10(b)2:
All sections of the solar zone located on steep -sloped roofs shall be oriented between 110 degrees and 270 degrees of true north.
§ 110.10(b)3A:
No obstructions, including but not limited to, vents, chimneys, architectural features, and roof mounted equipment, shall be
located in the solar zone.
Any obstruction, located on the roof or any other part of the building that projects above a solar zone shall be located at least twice
§ 110.10(b)3B:
the distance, measured in the horizontal plane, of the height difference between the highest point of the obstruction and the
horizontal projection of the nearest point of the solar zone, measured in the vertical plane.
§ 110.10(b)4:
For areas of the roof designated as solar zone, the structural design loads for roof dead load and roof live load shall be clearly
indicated on the construction documents.
The construction documents shall indicate: a location for inverters and metering equipment and a pathway for routing of conduit
§ 110.10(c):
from the solar zone to the point of interconnection with the electrical service (for single family residences the point of
interconnection will be the main service panel); a pathway for routing of plumbing from the solar zone to the water -heating
system.
§ 110.10(d):
A copy of the construction documents or a comparable document indicating the information from § 110.10(b) through § 110.10(c)
shall be provided to the occupant.
§ 110.10(e)1:
The main electrical service panel shall have a minimum busbar rating of 200 amps.
The main electrical service panel shall have a reserved space to allow for the installation of a double pole circuit breaker for a
§ 110.10(e)2:
future solar electric installation. The reserved space shall be: positioned at the opposite (load) end from the input feeder location o -
main circuit location, and permanently marked as "For Future Solar Electric".
HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY
Project Name
SINGLE HOUSE
Date
6/10/2015
System Name
1 ST FLOOR AREA
Floor Area
1,436
ENGINEERING CHECKS
SYSTEM LOAD
Number of Systems
1
COIL
CFM
Total Room Loads 425
Return Vented Lighting
Return Air Ducts
Return Fan
Ventilation 0
Supply Fan
Supply Air Ducts
TOTAL SYSTEM LOAD
COOLING
PEAK COIL HTG.
PEAK
Heating System
Sensible
Latent CFM
Sensible
Output per System 68,000
10,389
642 259
10,222
Total Output (Btuh) 68,000
0
Output Btuh/s ft 47,4
405
484
Cooling System
0
0
Output per System 33,400
0
0 0
0
Total Output Btuh) 33,400
0
642
0
Total Output (Tons) 2.8
405
484
Total Output (Btuh/s ft) 23.3
Total Output s ft/Ton 515.9
1 11,200
11,191
Air System
CFM per System
1,200
HVAC EQUIPMENT SELECTION
Airflow cfm
1,200
CARRIER 24ABB336/58CVA-110-20 (3 TON)
27,607 4,429
68,000
Airflow cfm/s ft)
0.84
Airflow (cfm/Ton)
431.1
Outside Air (%)
0.0%
Total Adjusted System Output 1
(Adjusted for Peak Design conditions)
TIME OF SYSTEM PEAK
27,607 4,429 68,000
Aug 3 PM Jan 1 AM
Outside Air cfm/s ft 0.00
Note: values above given at ARI conditions
HEATING SYSTEM PSYCHROMETRICS
Airstream Temperatures at Time of Heating
Peak
28 OF
00-0 101
Outside Air
0 cfm
AL
68 IF
4 Ar
68 IF 105 IF 105 IF
LJ i
YJ T1 1 1
Heating Coil Supply Fan
1,200 cfm
1
105 OF
y
ROOM „3
68 IF
COOLING SYSTEM PSYCHROMETICS (Airstream Temperatures at Time of Cooling Peak)
88/68°F
Outside Air
0 cfm
78 / 62 OF
78/62°F 55/54°F 55/54°F
Cooling Coil Supply Fan
1,200 cfm
55 / 54 OF
41.0% { ROOM
78 / 62 OF
EnergyPro 6.5 by EnergySoft
User Number.1919 RunCode: 2015-06-10T12:56:03
ID. R15 -2672R Page 17 of 24
HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY
Project Name
SINGLE HOUSE
Date
6/10/2015
System Name
2ND FLOOR AREA
Floor Area
833
ENGINEERING CHECKS
SYSTEM LOAD
Number of Systems
1
COIL
CFM
Total Room Loads 218
Return Vented Lighting
Return Air Ducts
Return Fan
Ventilation 0
Supply Fan
Supply Air Ducts
TOTAL SYSTEM LOAD
COOLING
PEAK COIL HTG.
PEAK
Heating System
Sensible
Latent CFM
Sensible
Output per System 40,800
5,336
548 177
6,977
Total Output (Btuh) 40,800
0
Output Btuh/s ft 49.0
208
331
Cooling System
0
0
Output per System 22,800
0
0 F 0
0
Total Output (Btuh) 22,800
0
548
0
Total Output (Tons) 1.9
2081
331
Total Output (Btuh/s ft) 27.4
Total Output s ft/Ton 438.4
5,753
7,638
Air System
CFM per System
800
HVAC EQUIPMENT SELECTION
Airflow (cfm)
800
CARRIER 24ABB324/58CVA-070-12 (2 TON) 18,093
3,787
40,800
Airflow cfm/s ft)
0.96
Airflow (cfm/Ton)
421.1
Outside Air (%)
0-0%
Total Adjusted System Output 18,093
(Adjusted for Peak Design conditions)
TIME OF SYSTEM PEAK
3,787
Aug 3 PM
40,800
Jan 1 AM
Outside Air cfm/s ft) 0.00
Note: values above given at ARI conditions
HEATING SYSTEM PSYCHROMETRICS (Airstream Temperatures at Time of Heating Peak
28 OF
Outside Air
0 cfm
68 OF
68 OF 105 OF 105 OF
t
Heating Coil Supply Fan
800 cfm 105 IF
RO st
68 OF
COOLING SYSTEM PSYCHROMETICS (Airstream Temperatures at Time of Cooling Peak)
88/68°F
Outside AirAV'
0 cfm
78 ! 62 IF
78/62°F 55/54°F 55/54°F
U=:fl
Cooling Coil Supply Fan 55 / 54 OF
800 cfm
41.2% RO0M
78 / 62 IF
EnergyPro 6.5 by EnergySoft
User Number: 1919 RunCode: 2015-06-10T12:56:03 ID. R15 -2672R Page 18 of 24
A
ROOM LOAD SUMMARY
Project Name Date
SINGLE HOUSE 6/10/2015
System Name Floor Area
1ST FLOOR AREA 1,436
ROOM LOAD SUMMARY
ROOM COOLING PEAK COIL COOLING PEAK I COIL HTG. PEAK
Zone Name Room Name Mult. CFM I Sensible I Latent CFM Sensible Latent CFM Sensible
1 ST FLOOR PLAN IST FLOOR PLAN 1 1 4251 10,3891 642 425 10,389 6421 2591 10,222
PAGE TOTAL
TOTAL*
425 10,389
642
259
10,222
425 10,389
642
259
10,222
' Total includes ventilation load for zonal systems.
Ener Pro 6.5 by Ener Soft User Number. 1919 RunCode: 2015-06-10T12:56:03 ID: R15 -2672R Pae 19 of 24
c
ROOM LOAD SUMMARY
Project Name Date
SINGLE HOUSE 6/10/2015
System Name Floor Area
2ND FLOOR AREA 833
ROOM LOAD SUMMARY
ROOM COOLING PEAK COIL COOLING PEAK COIL HTG. PEAK
Zone Name Room Name Mult.[CFM Sensible Latent CFM Sensible Latent CFM Sensible
2ND FLOOR PLAN 2ND FLOOR PLAN 1 218 5,336 548 218 5,336 548 177 6,977
PAGE TOTAL
TOTAL*
218
5,336
548
177 6,977
218
5,336
548
177 6,977
' Total includes ventilation load for zonal systems.
Ener Pro 6.5 by Ener Soft User Number. 1919 RunCode: 2015-06-10T12:56:03 ID: R15 -2672R Page 20 of 24
ROOM HEATING PEAK LOADS
Project Name
SINGLE HOUSE
Date
6/10/2015
ROOM INFORMATION
DESIGN CONDITIONS
Room Name 1 ST FLOOR PLAN
Floor Area 1,436.0 ft2
Indoor Dry Bulb Temperature 68 OF
Time of Peak Jan 1 AM
Outdoor Dry Bulb Temperature 28 OF
Conduction
Area
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
to
Ceiling
U -Value
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
AT °F
=
=
_
=
=
=
=
=
=
=
=
=
=
=
=
=
40
Btu/hr
R-38 Roof Attic
694.7
0.0250
40
695
Double Metal Clear-
10.3
0.5100
40
210
R-21 Wall
1,267.5
0.0690
40
3,498
Double Non Metal Clear (6)
271.5
0.3200
40
3,475
Items shown with an asterisk (`) denote conduction
Infiltration:[ 1.00 X 1.077
Schedule Air Sensible
Fraction
through an interior surface
X 1,436 X
Area
another room
9.00 X 0.253
Height ACH
Page Total
/60] X
AT
7,878
= 2,344
TOTAL HOURLY HEAT LOSS FOR ROOM 10,222
EnergyPro 6.5 by EnergySoft User Number: 1919 RunCode: 2015-06-10712:56:03 ID: R15 -2672R Page 21 of 24
ROOM HEATING PEAK LOADS
Project Name
SINGLE HOUSE
Date
6/10/2015
ROOM INFORMATION
DESIGN CONDITIONS
Room Name 2ND FLOOR PLAN
Floor Area 833.0 ftZ
Indoor Dry Bulb Temperature 68 OF
Time of Peak Jan 1 AM
Outdoor Dry Bulb Temperature 28 OF
Conduction
Area
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
to
Ceiling
U -Value
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
AT °F
=
=
=
_
=
=
=
=
=
=
=
=
40
Btu/hr
R-38 Roof Attic
829.0
0.0250
40
829
Double Metal Clear..
4.0
0.5100
40
82
R-21 Wall
1,058.5
0.0690
40
2,921
Double Non Metal Clear (6)
139.5
0.3200
40
1,786
'R-19 Floor W/O Crawlspace
731.0
0.0490
0
0
Items shown with an asterisk (') denote conduction
Infiltration:[ 1.00 X 1.077
Schedule Air Sensible
Fraction
through an interior surface
X 833 X
Area
another room
9.00 X 0.253
Height ACH
Page Total
/60] X
AT
5,618
= 1,360
TOTAL HOURLY HEAT LOSS FOR ROOM 6,977
EnergyPro 6.5 by EnergySoft User Number: 1919 RunCode: 201 5-06-1 0 712:56:03 ID: R15 -2672R Page 22 of 24
RESIDENTIAL ROOM COOLING LOAD SUMMARY
Project Name
Date
SINGLE HOUSE
6/10/2015
ROOM INFORMATION
DESIGN CONDITIONS
Room Name
1 ST FLOOR PLAN
Outdoor Dry Bulb Temperature
88 OF
Floor Area
1,436.0 ftz
Outdoor Wet Bulb Temperature
68 OF
Indoor Dry Bulb Temperature 78 OF
Outdoor Daily Range:
30 OF
Opaque Surfaces
Orientation Area U -Factor CLTD'
Btu/hr
R-38 Roof Attic
(N) 694.7 X 0.0250 X
37.0 =
643
R-21 Wall
(W) 407.5 X 0.0690 X
13.0 =
366
R-21 Wall
(E) 357.5 X 0.0690 X
13.0 =
321
R-21 Wall
(N) 283.5 X 0.0690 X
3.0 =
59
R-21 Wall
(S) 219.0 X 0.0690 X
6.0 =
91
X X
=
X X
=
X X
=
X X
=
Page Total
1,478
Items shown with an asterisk (')
denote conduction through an interior surface to another room.
1. Cooling Load Temperature
Difference (CLTD)
Shaded Unshaded
Fenestration
Orientation Area GLF Area
GLF
Btu/hr
Skylight
(N) 0.0 X 10.3 + 10.3 X
46.9 =
483
WINDOWS
(W) 0.0 X 9.9 + 20.0 X
25.1 =
503
WINDOWS
(E) 0.0 X 9.9 + 70.0 X
25.1 =
1,760
WINDOWS
(N) 0.0 X 9.9 + 58.5 X
9.9 =
581
WINDOWS
(S) 0.0 X 9.9 + 123.0 X
13.7 =
1,687
X + X
=
X + X
=
X + X
=
X + X
=
Page Total
1 5,014
Internal Gain
Btu/hr
Occupants
4.3 Occupants X 245 Btuh/OCC.
=
L1,055
Equipment
1,436 Floor Area X 0.50 w/sgft
=
2,451
Infiltration: 1.077
X 0.61 X 59.23 X 10 =
391
Air Sensible
CFM ELA AT
TOTAL HOURLY SENSIBLE HEAT GAIN FOR ROOM
10,389
Latent Gain
Btu/hr
Occupants
4.3 Occupants X 155 Btuh/occ.
=
668
Infiltration: 4,830
X 0.61 X 59.23 X -0.00015 =
-25
Air Sensible
CFM ELA AW
TOTAL HOURLY LATENT HEAT GAIN FOR ROOM
491
Ener Pro 6.5 by Ener Soft
User Number: 1919 RunCode: 201 5-0 6-1 0 71 2:56:03 ID. R15 -2672R
Page 23 of 24
RESIDENTIAL ROOM COOLING LOAD SUMMARY
Project Name
Date
SINGLE HOUSE
6/10/2015
ROOM INFORMATION
DESIGN CONDITIONS
Room Name
2ND FLOOR PLAN
Outdoor Dry Bulb Temperature
88 OF
Floor Area
833.0 ft2
Outdoor Wet Bulb Temperature
68 OF
Indoor Dry Bulb Temperature 78 OF
I Outdoor Daily Range:
30 OF
Opaque Surfaces
Orientation Area U -Factor
CLTD'
Btu/hr
R-38 Roof Attic
(N) 829.0 X 0.0250
X
37.0 =
767
R-21 Wall
(W) 280.5 X 0.0690
X
13.0 =
252
R-21 Wall
(E) 395.5 X 0.0690
X
13.0 =
355
R-21 Wall
(N) 196.5 X 0.0690
X
3.0 =
41
R-21 Wall
(S) 186.0 X 0.0690
X
6.0 =
77
*R-19 Floor W/O Crawlspace
731.0 X 0.0490
X
0.0 =
0
X
X
=
X
X
=
X
X
=
Page Total
1,491
Items shown with an asterisk (*)
denote conduction through an interior surface to another room.
1. Cooling Load Temperature
Difference (CLTD)
Shaded
Unshaded
Fenestration
Orientation Area GLF
Area
GLF
Btu/hr
Skylight
(N) 0.0 X 10.3 +
4.0 X
46.9 =
187
WINDOWS
(W) 0.0 X 9.9 +
39.0 X
25.1 =
981
WINDOWS
(E) 0.0 X 9.9 +
24.0 X
25.1 =
604
WINDOWS
(N) 0.0 X 9.9 +
33.0 X
9.9 =
328
WINDOWS
(S) 0.0 X 9.9 +
43.5 X
13.7 =
597
X +
X
=
X +
X
=
X +
X
=
X +
X
=
Page Total
2,696
Internal Gain
Btu/hr
Occupants
2.5 Occupants X 255
Btuh/occ.
=
638
Equipment
833 Floor Area X 0.10
w/sq ft
=
284
Infiltration: 1.077
X 0.61 X 34.36 X 10 =
227
Air Sensible
CFM ELA AT
TOTAL HOURLY SENSIBLE HEAT GAIN FOR ROOM
5,336
Latent Gain
Btu/hr
Occupants
2.5 Occupants X 225
Btuh/occ.
=
563
Infiltration: 4,830
X 0.61 X 34.36 X 0.00015 =
15
Air Sensible
CFM ELA AW
TOTAL HOURLY LATENT HEAT GAIN FOR ROOM
358
Ener Pro 6.5 by Ener Soft
User Number. 1919 RunCode: 2015-06-10712:56:03 ID. R15 -2672R
Page 24 of 24