15040111CITY OF CUPERTINO BUILDING PERMIT
BUILDING ADDRESS: 6 INFINITE LOOP
CONTRACTOR: NOVO CONSTRUCTION
PERMIT NO: 15040111
OWNER'S NAME: APPLE COMPUTER INC
1460 O'BRIEN DR
DATE ISSUED: 04/15/2015
OWNER'S PHONE: 4084380968
MENLO PARK, CA 94025
PHONE NO: (650)701 -1500
❑ JOW LICENSED CONTRACTOR'S DECLARATION
JOB DESCRIPTION: RESIDENTIAL E] COMMERCIAL E]
APPLE- 2ND FLOOR WEST WING. COMM .TI 2375 SQ FT
License Class Lic. # 9 oar
TO INCLUDE CONFERENCE ROOMS & LABS NON -LOAD
_
BEARING WALLS.
Contractor Lt Date S
DEF # 1 - STRUCTURAL DETAILS F R MOVABLE
I hereby affirm that I am licensed under the provisions of hapter 9
PATITION WALLS - ISSUED $ _2 S�
(commencing with Section 7000) of Division 3 of the Business & Professions
Code and that my license is in full force and effect.
I hereby affirm under penalty of perjury one of the following two declarations:
I have and will maintain a certificate of consent to self- insure for Worker's
Compensation, as provided for by Section 3700 of the Labor Code, for the
Sq. Ft Floor Area:
Valuation: $240000
performance of the work for which this permit is issued.
AA
I have and will maintain Worker's Compensation Insurance, as provided for by
Section 3700 of the Labor Code, for the performance of the work for which this
APN Number: 31602110.00
Occupancy Type:
permit is issued.
APPLICANT CERTIFICATION
I certify that I have read this application and state that the above information is
PERMIT EXPIRES IF WORK IS NOT STARTED
correct. 1 agree to comply with all city and county ordinances and state laws relating
WITHIN 180 DAYS OF PERMIT ISSUANCE OR
to building construction, and hereby authorize representatives of this city to enter
upon the above mentioned property for inspection purposes. (We) agree to save
180 DAYS FROM LAST CALLED INSPECTION.
indemnify and keep harmless the City of Cupertino against liabilities, judgments,
costs, and expenses which may accrue against said City in consequence of the
granting of this permit. Additionally, the applicant understands and will comply
Issued by: Date:
with all non -point source regulations per the Cupertino Municipal Code, Section
9.18.
8 f
RE- ROOFS:
Signature Date
All roofs shall be inspected prior to any roofing material being installed. If a roof is
installed without first obtaining an inspection, I agree to remove all new materials for
inspection.
❑ OWNER- BUILDER DECLARATION
Signature of Applicant: Date:
I hereby affirm that I am exempt from the Contractor's License Law for one of
the following two reasons:
ALL ROOF COVERINGS TO BE CLASS "A" OR BETTER
I, as owner of the property, or my employees with wages as their sole compensation,
will do the work, and the structure is not intended or offered for sale (Sec.7044,
Business & Professions Code)
I, as owner of the property, am exclusively contracting with licensed contractors to
HAZARDOUS MATERIALS DISCLOSURE
construct the project (Sec.7044, Business & Professions Code).
I have read the hazardous materials requirements under Chapter 6.95 of the
California Health & Safety Code, Sections 25505, 25533, and 25534. I will
I hereby affirm under penalty of perjury one of the following three
maintain compliance with the Cupertino Municipal Code, Chapter 9.12 and the
declarations:
Health & Safety Code, Section 25532(a) should I store or handle hazardous
1 have and will maintain a Certificate of Consent to self - insure for Worker's
material. Additionally, should I use equipment or devices which emit hazardous
Compensation, as provided for by Section 3700 of the Labor Code, for the
air contaminants as defined by the Bay Area Air Quality Management District I
performance of the work for which this permit is issued.
will maintain compliance with the Cupertino Municipal Code, Chapter 9.12 and
I have and will maintain Worker's Compensation Insurance, as provided for by
the Health & Safety Code, Sections 25505, 25533, and 25534.
Section 3700 of the Labor Code, for the performance of the work for which this
00
Owner or authorized agent, _ Date: // r,
permit is issued.
I certify that in the performance of the work for which this permit is issued, I shall
not employ any person in any manner so as to become subject to the Worker's
Compensation laws of California. If, after making this certificate of exemption, I
CONSTRUCTION LENDING AGENCY
become subject to the Worker's Compensation provisions of the Labor Code, I must
I hereby affirm that there is a construction lending agency for the performance of
forthwith comply with such provisions or this permit shall be deemed revoked.
work's for which this permit is issued (Sec. 3097, Civ C.)
Lender's Name
APPLICANT CERTIFICATION
Lender's Address
I certify that 1 have read this application and state that the above information is
correct. I agree to comply with all city and county ordinances and state laws relating
to building construction, and hereby authorize representatives of this city to enter
upon the above mentioned property for inspection purposes. (We) agree to save
indemnify and keep harmless the City of Cupertino against liabilities, judgments,
ARCHITECT'S DECLARATION
costs, and expenses which may accrue against said City in consequence of the
I understand my plans shall be used as public records.
granting of this permit. Additionally, the applicant understands and will comply
with all non -point source regulations per the Cupertino Municipal Code, Section
Licensed Professional
9.18.
Signature Date
CUPERTINO
CONSTRUCTION PERMIT APPLICATION
COMMUNITY DEVELOPMENT DEPARTMENT • BUILDING DIVISION
10300 TORRE AVENUE • CUPERTINO, CA 950143255
(408) 777.3228 • FAX (408) 777 -3333 • bullding:a�cupertino orq
NF:W CONSTROCTION ADDI IION ALTFRAIION TI x RUVISION DLFFRRIiD oRIGINAI PFRMCI Ir 15040111
PROJLCI ADDRESS
VPN h ( o Z- — /T 1 _
AA lJ f7
6 Infinite Loo
OAA NL.R NANU: Apple, Inc PHONE 408.438 - L I A11 P aul_bo er @a PP le "com
Rk:SS ('I IA', 5'I ATh:_LIP Cupertino, CA 94015 I. -AA
S'IRfiFI ADU 1 Infinite LooP
CONI -A('I NA'All, Novo Construction 111IONF 650 - 399 -5449 F - "IAII mdimonaco @novoconstruction -com
STRPL: i ADDRLSS (11) , s l A I'F" LIP I ,A,A
❑ OWNLR ❑ OANNFR- BI:IIDER ❑ OV,NI RADENI ❑ CON I RA( "IOR ❑CONTRACTOR -WI:NI ❑ AR('HITF('1 ❑ LNG INI -,I!R ❑ D!_AI I.OP6R ❑ 1EN,1NI
('ONTR.ACI OR N,AtvlP Michael DiMonaco
t'R
I I( "EN'& NI'NIB 791022
LINSL FA PL B
C'F
Bt's I W,
CONIPANA N `\It Novo Construction
P-NI '`[I
mdimonaco@novoconstruction.com
I
SIRI,FI 3DDRFSS
1460 O'Brien Dr
C'rrA. Sl'A I E, LIP
Menlo Park, CA 94025
PI I ONI'
650 - 399 -5449
AR('I Ilfl:('T F.NCrINEER NtAiAIG
LICFNSF NEMBIiR
BUR I_II 4
Diva Winje
CONIP- ANSNAML - HGA
E -NIAlt
dwinje @reelgrobman. com
I' -AS
S- IRFA;i ADDRI'SS
96 North 2nd Street
CllI Sr.AEL.LIP
San Jose, CA 95113
PHONE
408.213.8214
DFSCRI111R7N OF WORK Deffered submittal for structural drawings for movable partitions.
EXISTING USE
PROPOSED USF
CON S "rR TYPE
B S'FORIFS
LISC_
il'Pk
Of'('
SQ.F'r
V'AI UATION (5)
EMS TG
NEAVElOOR
DEMO
TOTAL
AREA
Ak1, A
AREA
NET AREA
$0
BATHROOM
KITC1IFN
OTHER
RENIOI)F1 AREA
RFNIODFL AREA
RFNIODFL:AREA
PORCH AREA DECK ARFA TOTAL DLCKIPORCH AREA GA RAGE AREA DE'T'ACH
CT "I A('H
t
u DWFI LING I iNITS Is A sECONU I'N1 "I' 0) EN SN COND STORY �YLS
BEING ADDED? 0 N ADDITION? ONO
IRE- ANTICATION ❑YES IF )TS. PROVIDE COPY OF
ISTHE BLDG AN ❑ YPS
TOTAk,A',ALt. ;ATION:
PLANNING APPI -n ONO PLANNING- APPROVAI II - IIFR
EICHLERDOME? ONO
$0
By nw signature below, I certify to each of the following I am the property owner or authorized 46t —t, --41 roperty ovvner's behalf' I have read this
application and the information I have provided is correct. I have read the Description of Work and verify it is accurate- I agree to comply with all applicable local
ordinances and state laws relating to ng constrtl on. autl )rive representatives of Cupertino to enter the above- Identified propem for inspection purposes.
ro
Signature ApplicantAgent Date- ?/2-8016
of
SIJPPLFMFN "fAl. INFORMATION RFOLI IRFD
PLAN CHECKTVPE
ROUTING SLIP
❑ OVER—THE-COUNTER
❑ BUILDING PLAN REVIEW
New SF D o1" Multifamily dwellings: Apply for demolition pemllt for
existing building(s). Demolition permit is required prior to issuance orbuilding
permit for new building"
❑ EXPRESS
❑ PLANNING PLAN REVIEW
Commercial Bldgs: Provide a completed Hazardous Materials DISCIOSUre
❑ STANDARD
❑ PUBLIC WORKS
form if any flazardous Materials are being used as part of this project.
❑ LARGE
❑ FIRE DEPT
Copy of Planning Approval Letter or Meeting with Planning prior to
11
❑ SEWER DISTRICT
SU bnlltlal Oh Brlllding Permit application.
MAJOR
SANITARY
❑ ENVIRONMENTAL HEALTH
f h/g. 1/)/) 30/ 1,doc revised 06 21, / /
CITY OF CUPERTINO
FEE ESTIMATOR - BUILDING DIVISION
ADDRESS: 6 INFINITE LOOP DATE: 07/28/2015 REVIEWED BY: MELISSA
APN: 316 02 116 BP #: 15040111 "VALUATION: Iso
PERMIT TYPE: Building Permit PLAN CHECK TYPE: Tenant Improvement
PRIMARY Commercial Building PENTAMATION 1 GENCOM
USE: PERMIT TYPE:
WORK DEF # 1 - STRUCTURAL DETAILS FOR MOVABLE PATITION WALLS - ISSUED Yl3 /<
SCOPE
NOTE. This estimate does not include fees due to other Departments (i.e. Planning, Public Works, Fire, Sanitary Sewer District, School
hictrirt atr 1_ Thoco fooe aro hacod an the nroliminary infarmatian available and are nnly an estimate_ Cantact the Dent for addn'1 info.
FEE ITEMS (Pee Resolution 11 -053 E ff. 7/1,13?
FEE
QTY /FEE
MISC ITEMS
Plan Check Fee:
$0.00
1 #
$286.00
Deferred Submittal
IDEFSUBM
Suppl. PC Fee: Q Reg. 0 OT
p.0
hrs
$0.00
PME Plan Check:
$0.00
Permit Fee:
$0.00
Suppl. Insp. Fee-.0 Reg. Q OT
0.0
hrs
$0.00
PME Unit Fee:
$0.00
PME Permit Fee:
$0.00
F1
0
E)
Work Without Permit? 0 Yes (j) No
$0.00
Advanced Planning Fee:
$0.00
Select a Non - Residential
Building or Structure
0
i
Strong Motion Fee:
$0.00
Select an Administrative Item
Bldg Stds Commission Fee:
$0.00
SUBTOTALS:
1 $0.00
$286.00
TOTAL FEE:
$286.00
Revised: 07/02/2015
I CITY OF CUPERTINO BUILDING PERMIT I
BUILDING ADDRESS: 6INFINITE LOOP I CONTRACTOR: NOVO CONSTRUCTION I PERMIT NO: 15040111 1
OWNER'S NAME: APPLE COMPUTER INC
OWNER'S PHONE: 4084380968
WLICENSED CONTRACTOR'S DECLARATION
License Class_ _ _5_� __, Lic.. # 7 9 as K
Contractor A tj Ind �,� %J �� Date � a � 1 )
I hereby affirm that I am licensed under the provisions of Chapter 9
(commencing with Section 7000) of Division 3 of the Business & Professions
Code and that my license is in full force and effect.
I hereby affirm under penalty of perjury one of the following two declarations:
I have and will maintain a certificate of consent to self - insure for Worker's
Compensation, as provided for by Section 3700 of the Labor Code, for the
performance of the work for which this permit is issued.
I have and will maintain Worker's Compensation Insurance, as provided for by
Section 3700 of the Labor Code, for the performance of the work for which this
permit is issued.
APPLICANT CERTIFICATION
I certify that 1 have read this application and state that the above information is
correct. I agree to comply with all city and county ordinances and state laws relating
to building construction, and hereby authorize representatives of this city to enter
upon the above mentioned property for inspection purposes. (We) agree to save
indemnify and keep harmless the City of Cupertino against liabilities, judgments,
costs, and expenses which may accrue against said City in consequence of the
granting of this permit. Additionally, the applicant understands and will comply
with all non -point source re ulations per t Cupertino Municipal Code, Section
9.18.
Signat Date p�0 %1
❑ OWNER- BUILDER DECLARATION
I hereby affirm that I am exempt from the Contractor's License Law for one of
the following two reasons:
I, as owner of the property, or my employees with wages as their sole compensation,
will do the work, and the structure is not intended or offered for sale (Sec.7044,
Business & Professions Code)
1, as owner of the property, am exclusively contracting with licensed contractors to
construct the project (Sec.7044, Business & Professions Code).
I hereby affirm under penalty of perjury one of the following three
declarations:
I have and will maintain a Certificate of Consent to self - insure for Worker's
Compensation, as provided for by Section 3700 of the Labor Code, for the
performance of the work for which this permit is issued.
I have and will maintain Worker's Compensation Insurance, as provided for by
Section 3700 of the Labor Code, for the performance of the work for which this
permit is issued.
I certify that in the performance of the work for which this permit is issued, I shall
not employ any person in any manner so as to become subject to the Worker's
Compensation laws of California. If, after making this certificate of exemption, I
become subject to the Worker's Compensation provisions of the Labor Code, I must
forthwith comply with such provisions or this permit shall be deemed revoked.
APPLICANT CERTIFICATION
I certify that I have read this application and state that the above information is
correct. I agree to comply with all city and county ordinances and state laws relating
to building construction, and hereby authorize representatives of this city to enter
upon the above mentioned property for inspection purposes. (We) agree to save
indemnify and keep harmless the City of Cupertino against liabilities, judgments,
costs, and expenses which may accrue against said City in consequence of the
granting of this permit. Additionally, the applicant understands and will comply
with all non -point source regulations per the Cupertino Municipal Code, Section
9.18.
Date
1460 O'BRIEN DR I DATE ISSUED: 04/15/2015
MENLO PARK, CA 94025 1 PHONE NO: (650)701 -1500
JOB DESCRIPTION: RESIDENTIAL [] COMMERCIAL E]
APPLE- 2ND FLOOR WEST WING. COMM .TI 2375 SQ FT
TO INCLUDE CONFERENCE ROOMS & LABS
NON -LOAD BEARING WALLS.
REV # I - REMOVE (E) HALLWAY DOOR & PHASING
PLAN FOR B211 & B213 - ISSUED 5/21/15
Sq. Ft Floor Area: I Valuation: $240000
APN Number: 31602110.00 1 Occupancy Type:
PERMIT EXPIRES IF WORK IS NOT STARTED
WITHIN 180 DAYS OF PERMIT ISSUANCE OR
180 DAYS FROM -LA ILED INSPECTION.
Date:
— RE- ROOFS:
All roofs shall be inspected prior to any roofing material being installed. If a roof is
installed without first obtaining an inspection, I agree to remove all new materials for
inspection.
Signature of Applicant: Date:
ALL ROOF COVERINGS TO BE CLASS "A" OR BETTER
HAZARDOUS MATERIALS DISCLOSURE
I have read the hazardous materials requirements under Chapter 6.95 of the
California Health & Safety Code, Sections 25505, 25533, and 25534. I will
maintain compliance with the Cupertino Municipal Code, Chapter 9.12 and the
Health & Safety Code, Section 25532(a) should I store or handle hazardous
material. Additionally, should I use equipment or devices which emit hazardous
air contaminants as defined by the Bay Area Air Quality Management District I
will maintain compliance with the Cupertino Municipal Code, Chapter 9.12 and
the Health & Safety Code, Sections 25505, 2$533, and 25534.
Owner or authorized agent: e % ^�� Date: J 1
CONSTRUCTION LENDING AGENCY
I hereby affirm that there is a construction lending agency for the performance of
work's for which this permit is issued (Sec. 3097, Civ C.)
Lender's Name
Lender's
ARCHITECT'S DECLARATION
I understand my plans shall be used as public records.
Licensed Professional
CUPERTINO
CONSTRUCTION PERMIT APPLICATION
COMMUNITY DEVELOPMENT DEPARTMENT • BUILDING DIVISION
10300 TORRE AVENUE • CUPERTINO, CA 95014 -3255
(408) 777 -3228 • FAX (408) 777 -3333 • building(a)cupertino.org
❑ NEW CONSTRUCTION ❑ ADDITION ® ALTERATION / TI ❑ REVISION/ DEFERRED ORIGINAL PERMIT #
PRZECT ADD1.ESi
APN # 3 C, 0 w
v-
OWNER A 40 _ f
P V l V
PHONE
do
E -MAIL
Pa,Ul _bo cl a can
STREET ADDRESS
CITY, STATE ZIP
l
FAX
n
V e.s�i.la
CONTACT NAME P ONE
F-(o�es 6Sa) ZaQ- 3
E -MAIL
If1or,-_.5Q nolrocv� -s�r`v
ST EET ADDRESS
76 0 fir,
CITY STATE, ZIP
N�en to w �a d L
FAX
❑ OWNER ❑ OWNER - BUILDER ❑ OWNER AGENT CONTRACTOR ❑ CONTRACTOR AGENT ❑ ARCHITECT ❑ ENGINEER ❑ DEVELOPER ❑ TENANT
CONTRACTOR NAME
LICENSE NUMBER
LICENSE TYPE
BUS LIC #
022
COMP NY NAME
E -MAIL C (Y1 1
!
f/ e
FAX
vc e n
n ovo coitJ r v cTr i� to
STREET ADDRESS
'
CITY, STATE, ZIP
k (CA
PHONE
-- J11 o 0
l q 4 d (i
pAJ A o VJ o 3-
&-D 70 1-
ARCHITECT/ENGINEER NAME
LICENSE NC ER
BUS. LIC #
Isan
- 2 v 117
COMPANY NAME
E- MAIL �GoI Scel h Q, COr�
FAX
STREET ADDRESS
CITY, STATE, ZIP
A -S Y.5m C--% a�r � �
(
PH . Q�
(Y
DESCRIPTION OF WO L t
J ;n ldff-A � tKbL ;nGA4
lnor 0 Sec a elA- �V
LOnSf ✓ *0n MI-V hlJn - 1 v -mil ��vtlrt A%tr�T��S dne
EXISTING USE
PROPOSED USE CONSTR.
TYPE
# STORIES
a
USE
TYPE
OCC.
SQ.FT.
VALUATION ($)
EXISTG
AREA
NEW FLOOR
AREA n �C
DEMO
AREA
TOTAL
NETAREA
0
'
�
2Y6
(J
BATHROOM KITCHEN
OTHER
REMODEL AREA REMODEL AREA
REMODEL AREA
PORCH AREA
DECK AREA
TOTAL DEC70RCH AREA
GARAGE AREA DETACH
[]ATTACH
S DWELLING UNITS
IS A SECOND UNIT ❑YES
SECOND STORY ❑YES
_
BEING ADDED? []NO
ADDITION? []NO
PRE - APPLICATION ❑YES IF YES. PROVIDE COPY OF
IS THE BLDG AN ❑ YES
RECEIVED BY:
TOTAL VALUATION:
PLANNING APPL# []NO PLANNING APPROVAL LETTER
EICHLER HOME? []NO
2YQ OO/1
VV
By my signature below, I certify to each of the following: I am the property owner or authorized agent to act on t e erty owner's behalf. I have read this
application and the information I have provided is correct. I have read the Description of Work and verify it is accurate. I agree to comply with all applicable local
ordinances and state laws relating to building construction. I authorize representatives of Cupertino to enter the above - identified property for inspection purposes.
Signature of Applicant /Agent: — Date:
SUPPLEMENTAL INFORMATION REQUIRED
PLAN CHECK TYPE
ROUTING SLIP
❑ OVER - THE - COUNTER
❑ BUILDING PLAN REVIEW
New SFD or Multifamily dwellings: Apply for demolition permit for
existing building(s). Demolition permit is required prior to issuance of building
permit for new building.
❑ EXPRESS
❑ PLANNING PLAN REVIEW
— Commercial Bldgs: Provide a completed Hazardous Materials Disclosure
1:1 STANDARD
El PUBLIC WORKS
rm
fo if any Hazardous Materials are being used as part of this project.
❑ LARGE
❑ FIRE DEPT
Copy of Planning Approval Letter or Meeting with Planning prior to
❑ MAJOR
❑ SANITARY SEWER DISTRICT
submittal of Building Permit application.
❑ ENVIRONMENTAL HEALTH
B1dgApp_2011.doc revised 06 121111
�ivn, coti
FM_7 CITY OF CUPERTINO
FEE ESTIMATOR - BUILDING DIVISION
1AADDRESS:
6 INFINITE LOOP
DATE: 05121 /2015
REVIEWED BY: MELISSA
MISC ITEMS
APN: 316 02 110
BP #: Z56 t0 ///
*VALUATION:
$0
*PERMIT TYPE: Building Permit
PLAN CHECK TYPE: Alteration / Addition / Repair
PRIMARY
USE: Commercial Building Tin
Civil / Religious activities
BQ zone? Yes � No
PENTAMATION
PERMIT TYPE: 1GENCOM
WORK
REV # 1 - REMOVAL OF HALLWAY DOOR & PHASING PLAN FOR B211 & B213 - ISSUED 5/21/15
SCOPE
M ,,..,,,
NOTE: This estimate does not include fees due to other Departments (i.e. Planning, Public Works, Fire, Sanitary Sewer District, School
District otr )_ Thnco font an, hocod an tho nreliminary information availahlo and are only an owimate_ Contact tho Dent for addn'l info_
FEE ITEMS (Fee Resolution 11 -053 U.711113)
FEE
QTY/FEE
MISC ITEMS
Plan Check Fee: Hourly Only? 0 Yes (E) No
$0.00
2 1 hours Plan Check, Hourly
$286.00 ISTPLNCK
Suppl. PC Fee: Q Reg. Q OT
0.0
hrs
$0.00
PME Plan Check:
$0.00
Permit Fee:
$0.00
Suppl. Insp. Fee-0 Reg. Q OT
Q.0
hrs
$0.00
PME Unit Fee:
$0.00
PME Permit Fee:
$0.00
Construction Tax: IBCONSTAXC
$0.00
G
Work Without Permit? 0 Yes (j) No
$0.00
Advanced Planning Fee:
$0.00
Select a Non - Residential
Building or Structure
I
J
Strong Motion Fee:
$0.00
Select an Administrative Item
Bldc Stds Commission Fee:
$0.00
SU13TOTALS:
1 $0.001
$286.00
TOTAL »EF_
F $286.00
Revised: 05/07/2015
I CITY OF CUPERTINO BUILDING PERMIT
BUILDING ADDRESS: 6 INFINITE LOOP I CONTRACTOR: NOVO CONSTRUCTION I PERMIT NO: 15040111 1
OWNER'S NAME: APPLE COMPUTER INC
OWNER'S PHONE: 4084380968
❑ LICENSED CONTRACTOR'S DECLARATION
License Class /1, Lic. # –7q 12
Contractor ,\1 0 U a, _5}! &,60,Date S
1 hereby affirm that I am licensed under the provisions of Chapter 9
(commencing with Section 7000) of Division 3 of the Business & Professions
Code and that my license is in full force and effect.
1 hereby affirm under penalty of perjury one of the following two declarations:
I have and will maintain a certificate of consent to self - insure for Worker's
Compensation, as provided for by Section 3700 of the Labor Code, for the
performance of the work for which this permit is issued.
I have and will maintain Worker's Compensation Insurance, as provided for by
Section 3700 of the Labor Code, for the performance of the work for which this
permit is issued.
APPLICANT CERTIFICATION
I certify that I have read this application and state that the above information is
correct. I agree to comply with all city and county ordinances and state laws relating
to building construction, and hereby authorize representatives of this city to enter
upon the above mentioned property for inspection purposes. (We) agree to save
indemnify and keep harmless the City of Cupertino against liabilities, judgments,
costs, and expenses which may accrue against said City in consequence of the
granting of this permit. Additionally, the applicant understands and will comply
with all non -point source regulations per the Cupertino Municipal Code, Section
9.18.
Signature ~� —Date
❑ OWNER - BUILDER DECLARATION
I hereby affirm that I am exempt from the Contractor's License Law for one of
the following two reasons:
I, as owner of the property, or my employees with wages as their sole compensation,
will do the work, and the structure is not intended or offered for sale (Sec.7044,
Business & Professions Code)
I, as owner of the property, am exclusively contracting with licensed contractors to
construct the project (Sec. 7044, Business & Professions Code).
I hereby affirm under penalty of perjury one of the following three
declarations:
1 have and will maintain a Certificate of Consent to self - insure for Worker's
Compensation, as provided for by Section 3700 of the Labor Code, for the
performance of the work for which this permit is issued.
I have and will maintain Worker's Compensation Insurance, as provided for by
Section 3700 of the Labor Code, for the performance of the work for which this
permit is issued.
I certify that in the performance of the work for which this permit is issued, I shall
not employ any person in any manner so as to become subject to the Worker's
Compensation laws of California. If, after making this certificate of exemption, I
become subject to the Worker's Compensation provisions of the Labor Code, I must
forthwith comply with such provisions or this permit shall be deemed revoked.
_APPLICANT CERTIFICATION
I certify that I have read this application and state that the above information is
correct. I agree to comply with all city and county ordinances and state laws relating
to building construction, and hereby authorize representatives of this city to enter
upon the above mentioned property for inspection purposes. (We) agree to save
indemnify and keep harmless the City of Cupertino against liabilities, judgments,
costs, and expenses which may accrue against said City in consequence of the
granting of this permit. Additionally, the applicant understands and will comply
with all non -point source regulations per the Cupertino Municipal Code, Section
9.18.
Date
1460 O'BRIEN DR I DATE ISSUED: 04/15/2015
MENLO PARK, CA 94025 1 PHONE NO: (650)701 -1500
JOB DESCRIPTION: RESIDENTIAL E] COMMERCIAL E]
APPLE- 2ND FLOOR WEST WING. COMM .TI 2375 SQ FT
TO
INCLUDE CONFERENCE ROOMS & LABS NON -LOAD
BEARING
WALLS.
Sq. Ft Floor Area: 1 Valuation: $240000
APN Number: 31602110.00 1 Occupancy Type:
PERMIT EXPIRES IF WORK IS NOT STARTED
WITHIN 180 DAYS OF PERMIT ISSUANCE OR
180 DAYS FRO CALLED INSPECTION.
Issued by: Date: `1 K,ice
RE- ROOFS:
All roofs shall be inspected prior to any roofing material being installed. If a roof is
installed without first obtaining an inspection, I agree to remove all new materials for
inspection.
Signature of Applicant: _ Date:
ALL ROOF COVERINGS TO BE CLASS "A" OR BETTER
HAZARDOUS MATERIALS DISCLOSURE
I have read the hazardous materials requirements under Chapter 6.95 of the
California Health & Safety Code, Sections 25505, 25533, and 25534. I will
maintain compliance with the Cupertino Municipal Code, Chapter 9.12 and the
Health & Safety Code, Section 25532(x) should I store or handle hazardous
material. Additionally, should I use equipment or devices which emit hazardous
air contaminants as defined by the Bay Area Air Quality Management District I
will maintain compliance with the Cupertino Municipal Code, Chapter 9.12 and
the Health & Safety Code, Sections 25505, 25533, and 25534.
Owner or authorized agent: �-' Date: l
CONSTRUCTION LENDING AGENCY
I hereby affirm that there is a construction lending agency for the performance of
work's for which this permit is issued (Sec. 3097, Civ C.)
Lender's Name
Lender's
ARCHITECT'S DECLARATION
I understand my plans shall be used as public records.
Licensed
CUPERTINO
CONSTRUCTION PERMIT APPLICATION
COMMUNITY DEVELOPMENT DEPARTMENT • BUILDING DIVISIO
10300 TORRE AVENUE • CUPERTINO, CA 95014 -3255
(408) 777 -3228 • FAX (408) 777 -3333 • building (d- )cupertino.crq
❑ NEW CONSTRUCTION ❑ ADDITION ❑ ALTERATION / TI IR REVISION / DEFERRED ORIGINAL PERMIT # ) 50 qQ // I
PRO Cf ADDRESS
APN # ` J V I r O
OWNER AME
P ONE
E -MAIL
up
PboYerte.
STREET ADDRESS
CITY, STATE, ZIP N U l
FAX
G -�� -��40
JDt�.Y G
CONT CT NAME
P
E -MAIL
STREET DRESS
CITY, STATE, ZIP
FAX
r •'
I
❑ OWNER ❑ OWNER- BUILDER OWNER AGENT < CONTRACTOR ❑ CONTRACTOR AGENT ❑ ARCHITECT ❑ ENGINEER ❑ DEVELOPER 11 TENANT
CONTRACTOR NAME
LICENSE NUMBER
LICENSE TYPE
BUS. LTC #
COMP NAME
E -MAIL
FAX
MV-0
STREET ADDRESS
/1-140 owmw
CITY, STATE, ZIP
Pkwj4 99Rk 9 ZE5
PHONE
• &?o - 6 ra
ARCHITECT/ENGINEER NAME
COT,f CUl.SOt,
LICENSE NUMBER
C
BUS. LTC #
COMPANY NAME
E -MAIL
FAX
)VA fi 5191►5
L W.A . cofA
STREET ADDRESS
`lf� 2�1a Srct�r
CITY, STATE, ZIP
S
BHONE.
- 7633
nl,
aster CA ?-511b
2AS
DESCRIPTION OF WORK
9Ie4(*laJ # 1 �f l04" arc l &-fJ &Y &20K Rn(a Pl SIA14 P�W r-w- $Z/[ ,gre Sgc3-
EXISTING USE
PROPOSED USE CONSTR
TYPE
# STORIES
I
USE
TYPE
OCC.
SQ.FT.
VALUATION ($)
EXISTG
NEW FLOOR
DEMO
TOTAL
AREA
AREA
AREA
NET AREA
BATHROOM
KITCHEN
OTHER
REMODEL AREA
REMODEL AREA
REMODEL AREA
PORCH AREA
DECK AREA
TOTAL DECK/PORCH AREA
GARAGE AREA: LJDETACH
[]ATTACH
# DWELLING UNITS:
IS A SECOND UNIT ❑ YES
SECOND STORY ❑ YES
BEING ADDED? []NO
ADDITION? ❑NO
PRE-APPLICATION ❑ YES IF YES, PROVIDE COPY OF
IS THE BLDG AN ❑ YES
-
TOTAL VALUATION:
PLANNING APPL # ❑ NO PLANNING APPROVAL LETTER
EICHLER HOME? ❑ N
kM y
By my signature below, I certify to each of the following: I am the property owmer or prized a on the property owner's behalf. I have read this
application and the information I have provided is correct I have read the Description of Work erify it is accurate. I agree to comply with all applicable local
ordinances and state laws relating to building con cti n. I authorize representatives of Cupertino to enter the above - identified property for inspection purposes.
Signature of Applicant/Agent: y Date:
SUPPLEMENTAL INFORMATION REQUIRED
PLAN CHECKfYIE.r r„
Ro1TINGSiiP 1.
New SFD or Multifamily dwellings: Apply for demolition permit for
❑'
❑ BUILDING
existing building(s). Demolition permit is required prior to issuance of building
OVER THE COUNTER
PLAN REVIEW
`
permit for new building.
❑; EXPRESS h t
❑ PLnxNmG�LANREViEw r i
Commercial Bldgs: Provide a completed Hazardous Materials Disclosure
❑ STANDARD t :
Elk-
form if any Hazardous Materials are being used as part of this project.
❑ � �
� ❑ `
Copy of Planning Approval Letter or Meeting with Planning prior to
LARGE �, � �
Ir'
x FIRE DEPT
❑' MAJORS r> =' �$ �
L7 "SANTTARY $EWERDISTRICI' "
submittal of Building Permit application.x
'
❑ 'ENVIRONMENTAL AEALTA y'..
BldgApp_2011.doc revised 06/21/11
FM_7 CITY OF CUPERTINO
FEE ESTIMATOR - BUILDING DIVISION
OCCUPANCY TYPE:
ADDRESS. 6 infinite loop DATE: 04/15/2015
APN: BP #:
�Z�w
REVIEWED BY: Mendez
*VALUATION: $240,000 _I
*PERMIT TYPE: Building Permit
PLAN CHECK TYPE: Tenant Improvement
PRIMARY Commercial Building
USE:
BP FEE ID
PENTAMATION 1 B TI
PERMIT TYPE:
WORK
apple- 2nd floor west wing. comm .ti 2375 sq ft to include conference rooms & labs non -load bearing
SCOPE
walls.
OCCUPANCY TYPE:
TYPE OF
CONSTIL
FLR AREA
s.f.
PC FEES
PC FEE ID
BP FEES
BP FEE ID
B (Tenant Improvements)
I -A,I -B
2,375
$3,436.21
IBTIPLNCK
$3,197.14
IBTIINSP
hrs
$0.00
PME Plan Check:
$0.00
Permit Fee:
$3,197.14
Suppl. Insp. Fee:Q Reg.
OT
0.0
hrs
$0.00
PME Unit Fee:
$0.00
TOTALS:
2,375
$3,436.21
$0.00
1 $3,197.14
MECH, HOURLY 0 Yes 0 No PLUMB, HOURLY ® Yes '0 No ELEC, HOURLY ' 0 Yes (E) No
NOTE: This estimate does not include fees due to other Departments (i.e. Planning, Public Works, Fire, Sanitary Sewer District, School
Metrirt otr ) _ Thaco fooc aro hacod nn tho nroliminan? infnrmatinn availahh, and an, nnly an actimato_ Cnntact tho Dont for addn'1 info_
FEE ITEMS (Fee Resolution 11 -053 Eff. 7/03)
FEE
QTY /FEE
MISC ITEMS
Plan Check Fee:
$3,436.21
0 kW
$0.00
Alternative Energy System
Photovoltaic System
Suppl. PC Fee: Reg. Q OT
0.0
hrs
$0.00
PME Plan Check:
$0.00
Permit Fee:
$3,197.14
Suppl. Insp. Fee:Q Reg.
OT
0.0
hrs
$0.00
PME Unit Fee:
$0.00
PME Permit Fee:
$0.00
Work Without Permit? Yes Q No
$0.00
Advanced Planning Fee:
$0.00
Select a Non - Residential
Building or Structure
Q
Strong Motion Fee:
IBSEISMICO
$67.20
Select an Administrative Item
Bldg Stds Commission Fee: 1BCBSC
$10.00
SUBTOTALS:
$6,710.55
1 $0.00
TOTAL FEE: "
$6,710.55
Revised: 04/01/2015
STATEMENT OF SPECIAL INSPECTIONS, 2013 CSC
COMMUNITY DEVELOPMENT DEPARTMENT • BUILDING DIVISION
ALBERT SALVADOR, P.E., C.B.O., BUILDING OFFICIAL
CUPERTINO 10300 TORRE AVENUE • CUPERTINO, CA 96014 -3265
(408) 777 -3228 • FAX (408) 777 -3333 • bjtllo ag Ca-curxgIrin orn
SITE
ADDRESS 6 Infinite Loop
APN
8P# 15040111
owner...... Apple,. Inc .._.... .................... ...............................
Construction
... uction
.......... ........ ....... ,.., ......................,...,
Address -....1 Infinite LAP ........................ ............
Address...1480,Q'Bden Dir
CltyiSt.rruRenlnQ.x. Cif.$? �QYn�.... Ztp....! 4�e� „......,...Phonoouaaae;o�ea
CityiSi. rrUP. t? niAQ ....... ........ .............. ZIp .�!4>7��.,.....Phone.esa�oca+o
Applicant ..Novo Constuuction ...
Engineer /Architect ................ ........................
Address....146Q.QR0n.'DT_ ....................................... ...............................
Address .............................. ................ .... .... .................. .....................
City /st,Man to. P. afk..('rt? ............... YIp..94925 .............. Phone. ate. "asua....
CitylSt............................. .............Zip............... Phone....................
PROJECT DESCRIPTION; installation of operable partitions.
This "STATEMENT OF SPECIAL INSPECTIONS' is submitted in fulfillment of the requirements of C6C Sections 1704 and 1705. This
foam is structured after and used by permission from the Stnirt�t tal Encnnner As!�ccirttion of Nathan : fomin's (SEAONC) mode
statement of Special Inspections. Also, included with this form is the following:
❑ "LIST OF SPECIAL INSPECTION AGENCIES (page 2). A list of testing agencies and other special inspectors that will be
retained to conduct the tests and inspections for this project
❑ "SCHEDULE OF SPECIAL INSPECTION" (page 3 — 6). The Schedule of Special Inspections summarizes the Special
Inspections and tests required. Special Inspectors will refer to the approved plans and speclflcaftris for detailed special
Inspection requirements. Any additional tests and inspections required by the approved plans and specifications shall also
be performed.
Special Inspections and Testing will be performed In accordance with the approved plans and specifications, this statement and CBC
Sections 1704, 1705, 1706, 1707, and 1708. Interim reports will be submitted to the Building Official and the Registered Design
Professional in Responsible Charge in accordance with CBC Section 1704.1.2.
A Final Report of Special Inspections documenting required Special Inspections, testing and correction of any discrepancies noted in
the inspections shall be submitted prior to issuance of a Certificate of Use and Occupancy (Section 1704.1:2). The. Final Report will
document: r”
• Required special inspections. '
• Correction of discrepancies noted in inspections.
The Owner recognizes his or her obligation to ensure that the construction complies with the approved permit documents and to
implement this program of "clot Inspections. In partial fulfillment of these obligations, the Owner will retain and directly pay for the
Special Inspections as required In CBC Section 1704.1.
This plan has been developed with the understanding that the Building Official will:
• Review and approve the qualifications of the Special Inspectors who will perform the inspections.
• Monitor special inspection activities on the job site to assure that the Special Inspectors are qualified and are performing their
duties as called for In this Statement of Special Inspection.
• Review submitted inspection reports.
• Perform inspections as required by the local building code,
I have read and aoree to coma /iv with the terms and conditions of this statement
Prepared By:
Project Engineer al Architect
(Brandow &
/ � ��{�f,{j,{,
06/26/2015
Registered Design Professional in Gha a
, Johnston Inc SE # 4896
Si nature ....,.. J......"" ................ ........................:).Uc.# ...... ...............................
Date:.............. ,.......
Omer Nannei
-f Jr
Owner'sAuthorizat(on
Si nature... .... ....` ............ ...................................... ..... ...........Onto:
.�r....��•.-4
Inspection Agency / Inspector Name:
C
J
Si na r L... ,...1. ........ ...............................
Date: !
Building Official or designee:
Signature ... ...... ..--_......... .......
Date: .
SpeciahtspechanFonn_2012.doc reriNed 09;0&J 2
LIST OF SPECIAL INSPECTION AGENCIES
APPROVAL OF SPECIAL INSPECTORS:
Each special inspection agency, testing facility, and special Inspector shall be recognized by the Building Official prior to performing any
duties. Special Inspection agency's listed on this form must be pre - approved and listed on Cupertino's approved Special Inspector's list.
Special inspectors shall carry approved Identification when performing the functions of a special inspector. Identification cards shall
follow the criteria set by the California Council of Testing and Inspection Agencies. No personnel changes shall be made without first
obtaining the approval of the Building Official. Any unauthorized personnel changes may result in a "Stop Work Order" and possible
permit revocation. To be pre- approved by the City of Cupertino, refer to the SPECIAL INSPECTION CRITERIA handout. Please allow
two weeks to complete the application process.
The following are the tastino and special insoection agencies that will be retained to conduct tests and insoactlon on this project:
EXPERTISE
FIRM / INSPECTOR INFORMATION
1, Special Inspection (except for
Firm.... ��.. �^? . ✓1.. /,.!u. Addr......�.� ... ..................97 ......... .,
geotechnical)
city .........5 .. fit' ` ... State , '.'IP.:�....,.... ip
s1 ..
�."3�,�.ZFax..
Telephone5.Q..t�. ...Q.....�?y.� Emeflli!�'�r�� .
2. Material Testing
Firm... ................... .................. ......... ........ _Addt ............ ,.,...... .,................. .................. ............... .... .... ....
City....................... tk .... ........... ................... ,..,.... .... , ................. ...,.......... State.. ..... Y ...........,Zip ......................
Telephone... .................................... Fax ............ ....... __ ........... Email... ......... ............ ........ ................
3. OeotechnicalInspections
Firm ................................................ ..................... Addr ........... ..................... .....,........... ............ ................. ...........
City...... ...................... -, ..,..................I.................,... ................,....,......,.. state .......................Zip
Telephone...... ............................... Fax. ................... .................... ..,. Email ........... ........... .............. ,...................
4. Other:
Firm ..................................................................... Addr.......................,.....,..............,............. ...............................
City..... ...................... ........................ ........................... _ ....... .................. State .......................Zip ......,...............
Telephone....... ............................... Fax,.,....,..... ............................... Email........................., ...............................
'All agencies specified on this form must be pre - approved and listed on the City of Cupertino's Approved Special Inspector's List.
SEISMIC REQUIREMENTS (Section 1708.3.8)
Description of seismic-force• resisting system and designated seismic systems subject to special inspections as per Section 1705,3:
The extent of the seismic-force- resisting system is defined in more detail in the construction documents.
Description of main wind- force- resisting system and designated wind resisting components subject to special Inspections in accordance with Section
1705.4,2:
The extent of the main wind- force - resisting system and wind resisting components is defined in more detail in the construction documents.
SpeciabispecliouFonn_2012.doc revised 09106112
�Y,sue
SCHEDULE OF SPECIAL INSPECTION
SITE APN BP#
ADDRESS
PROJECT DESCRIPTION:
Notation Used in Table:
Column headers
C Indicates continuous inspection is required.
P Indicates periodic inspections are required. The notes and /or contract documents should clarify.
Box entries:
X Is placed in the appropriate column to denote either "C" continuous or "P" periodic inspections.
- -- Denotes an activity that is either a one -time activity or one whose frequency is defined in some other
manner.
Additional detail regarding inspections and tests are provided in the project specifications or notes on the drawings.
VERIFICATION AND INSPECTION C p REFERENCED STANDARD IBC REFERENCE
INSPECTION OF FABRICATORS
1. ❑ Inspect fabricator's fabrication and quality control 1704.3
procedures.
INSPECTION OF STEEL
1. Material verification of high- strength bolts, nuts and washers.
• Identification marking to conform to ASTM stds
AISC 360,
specified in the approved construction documents.
- --
X
Section A3.3 and
applicable ASTM
material standards
• Inspect fabricator's fabrication and quality control
procedures.
2. Inspection of high- strength bolting:
• Snug -tight joints.
- --
X
• Pretensioned and slip - critical joints using turn -of -nut
with matchmarking, twist -off bolt or direct tension
---
X
AISC 360,
indicator methods of installation.
1704.3.3
Section M2.5
• Pretensioned and slip - critical joints using turn -of -nut
without matchmarking or calibrated wrench methods
X
- --
of installation.
3. Material verification of structural steel and cold- formed steel deck.
• For structural steel, identification markings to conform
X
AISC 360,
to AISC 360.
Section M2.5
• For other steel, identification markings to conform to
Applicable ASTM
ASTM standards specified in the approved
- --
X
material standards
construction documents.
• Manufacturer's certified test reports.
- --
X
Specrulnspeclranl brm 2012.doc revised 09 00,1?
VERIFICATION AND INSPECTION
C
P
REFERENCED
STANDARD
IBC
REFERENCE
4. Material verification of weld filler materials:
- ----- ----- - - - - --
❑ Identification marking to conform to AWS specification AISC 360,
in the approved construction documents. X Section A3.5 and
applicable AWS A5
documents
• Manufacturer's certificate of compliance required. - -- X - -- - --
5. Inspection of welding:
a. Structural steel and cold- formed steel deck:
❑ Complete and partial joint penetration groove welds.
X
---
AWS D1.1
1704.3.1
❑ Multipass fillet welds.
X
---
❑ Single -pass fillet welds > 5/16"
X
- --
❑ Plug and slot welds.
X
- -
❑ Single -pass fillet welds <= 5/16"
- --
X
❑ Floor and roof deck welds.
- --
X
AWS D1.3
b. Reinforcing steel:
• Verification of weldability of reinforcing steel other than
ASTM A 706.
X
• Reinforcing steel resisting flexural and axial forces in
intermediate and special moment frames, and
X
- --
AWS D1.4 ACI 318:
boundary elements of special structural walls of
Section 3.5.2
concrete and shear reinforcement.
• Shear reinforcement.
X
---
❑ Other reinforcing steel.
- --
X
6. Inspection of steel frame joints details for compliance.
❑ Details such as bracing and stiffening.
- --
X
- --
1704.3.2
❑ Member locations.
- --
X
❑ Application of joint details at each connection.
- --
X
VERIFICATION AND INSPECTION
C
P
REFERENCED
STANDARD
IBC
REFERENCE
INSPECTION OF WELDING
1. ❑ Welded studs when used for structural diaphragms.
- --
X
- --
1704.3
2. ❑ Welding of cold- formed steel framing members.
- --
X
3. ❑ Welding of stairs and railing systems.
- --
X
Speccdnspecljonhorin 2012.docrevised09'06,12
VERIFICATION AND INSPECTION
C
L-],
p
REFERENCED
IBC
STANDARD
REFERENCE
_
INSPECTION OF CONCRETE
1. ❑ Inspection of reinforcing steel, including prestressing
- --
X
ACI 318-.3.5,7.1-7.7
1913.4
tendons and placement.
2. ❑ Inspection of reinforcing steel welding in accordance
AWS D1.4 ACI 318:
with Table 1704.3 Item 5b.
3.5.2
3. ❑ Inspection of bolts to be installed in concrete prior to
and during placement of concrete where allowable
X
ACI 318: 8.1.3,
1911.5, 1912.1
loads have been increased or where strength design
21.2.8
is used.
4. ❑ Inspection of anchors installed in hardened concrete.
- --
X
ACI 318:
1912.1
5. ❑ Verifying use of required design mix.
1904.2.2,1913.2,
- --
X
ACI 318:
1913.3
6. ❑ At time fresh concrete is sampled to fabricate
ASTM C 172
specimens for strength tests, perform slump and air
X
- --
ASTM C 31
1913.10
content tests and determine the temperature of the
concrete.
ACI 318: 5.6, 5.8
7. ❑ Inspection of concrete and shotcrete placement for
X
- --
ACI 318: 5.9, 5.10
1913.6, 1913.7,
proper application techniques.
1913.8
8. ❑ Inspection for maintenance of specified curing
- --
X
ACI 318: 5.11 -5.13
1913.9
temperature and techniques.
9. Inspection of prestressed concrete:
• Application of prestressing forces.
X
- --
ACI 318: 18.20
• Grouting of bonded prestressing tendons in the
X
- --
ACI 318: 18.18.4
seismic force - resisting system.
10. ❑ Erection of precast concrete members.
- --
X
ACI 318: Ch. 16
---
11. ❑ Verification of in -situ concrete strength, prior to
stressing of tendons in posttensioned concrete and
- --
X
ACI 318: 6.2
--
prior to removal of shores and forms from beams and
structural slabs.
12. ❑ Inspect formwork for shape, location, and dimensions
- --
X
ACI 318: 6.6.1
- --
of the concrete member being formed.
13. ® Bolts Installed in Existing Masonry or Concrete
• Direct tension testing of existing anchors.
- --
X
See ICC ES Reports form special
inspection requirements for proprietary
products
• Direct tension testing of new bolts.
- --
X
® Torque testing of new bolts.
- --
X
❑ Prequalification test for bolts and other types of
X
anchors.
14. ❑ Other:
SpecicthtspeclionFoa-nr 2012.docrerisec109 "06,12
REFERENCE FOR CRITERIA
VERIFICATION AND INSPECTION C P IBC TMS 402 /ACI TMS 402 /ACI
SECTION 530 /ASCE 5 530 /ASCE 6
INSPECTION OF LEVEL 1 MASONRY
1. ❑ Compliance with required inspection provisions of
the construction documents and the approved - -- X - -- - -- Art. 1.5
submittals shall be verified.
2. ❑ Verification of f,,, and f'AAC prior to construction -_- X - -- - -- Art. 1.413
except where specifically exempted by this code.
3. ❑ Verification of slump flow and VSI as delivered to X - -- -- - -- Art. 1.513.1.b.3
the site for self consolidating grout.
4. As masonry construction begins, the following shall be verified to ensure compliance:
❑ Proportions of site - prepared mortar.
- --
X
- --
Art. 2.6A
❑ Construction of mortar joints.
- --
X
- --
- --
Art. 3.3B
• Location of reinforcement, connectors,
- --
X
- --
- --
Art. 3.4, 3.6A
prestressing tendons, and anchorages.
• Prestressing technique.
- --
X
- --
- --
Art. 3.613
• Grade and size of prestressing tendons and
- --
X
- --
- --
Art. 2.413, 2.4H
anchorages.
5. During construction the inspection program shall verify:
• Size and location of structural elements.
- --
X
- --
- --
Art. 3.3F
• Type, size, and location of anchors, including
Sec. 1.2.2(e),
other details of anchorage of masonry to
- --
X
- --
1.16.1
- --
structural members, frames or other construction.
• Specified size, grade, and type of reinforcement,
anchor bolts, prestressing tendons and
- --
X
- --
Sec. 1.15
Art. 2.4, 3.4
anchorages.
• Welding of reinforcing bars.
X
- --
- --
---
❑ Preparation, construction and protection of
masonry during cold weather (temperature below
___
X
Sec. 2104.3,
Art. 1.8C, 1.8D
40 degrees F) or hot weather (temperature above
2104.4
90 degrees F).
• Application and measurement of prestressing
X
--
--
--
Art. 3.613
force.
6. Prior to grouting the following shall be verified to ensure compliance:
❑ Grout space is clean.
- --
X
--
- --
Art. 3.2D
❑ Placement of reinforcement and connectors and
- --
X
- --
Sec. 1.3
Art. 3.4
prestressing tendons and anchorages.
❑ Proportions of site - prepared grout and
- --
X
- --
--
Art. 2.613
prestressing grout for bonded tendons.
❑ Construction ofmortarjoints.
- --
X
--
--
Art. 3.3B
7. Grout placement:
• Grout placement shall be verified ensure
X
- --
- --
- --
Art. 3.5
compliance.
• Observe grouting of prestressing bonded
X
- --
- --
- --
Art 3.6C
tendons.
SpecialnspeclionFolm 2013.doc revised 09'06 12
SpeckdnspecfionFonn 2012. doc reused 09 06 /?
REFERENCE FOR CRITERIA T
VERIFICATION AND INSPECTION
C
P
IBC
TMS 402 /ACI
TMS 402!AC1
SECTION
530 /ASCE 5
530 /ASCE 6
8. ❑ Preparation of any required grout specimens,
Sec.
mortar specimens, and /or prisms shall be
- --
X
2105.2.2,
- --
Art. 1.4
observed.
2105.3
--------------- - - - - --
INSPECTION OF LEVEL 2 MASONRY
1. ❑ Compliance with required inspection provisions
of the construction documents and the approved
- --
X
- --
- --
Art. 1.5
submittals.
2. ❑ Verification of f',,,and f'AAC prior to construction
and for every 5,000 square feet during
- --
X
- --
- --
Art. 1 AB
construction.
3. ❑ Verification of proportions of materials in
---- - - - - --
premixed or preblended mortar and grout as
- --
X
- --
- --
Art. 1.56
delivered to the site.
4. ❑ Verification of slump flow and VSI as delivered to
X
--
- --
- --
Art. 1.513.1.b.3
the site for self consolidating grout.
--
5. The following shall be verified to ensure compliance:
• Proportions of site - prepared mortar, grout, and
X
- --
- --
Art. 2.6A
prestressing grout for bonded tendons.
• Placement of masonry units and construction of
X
- --
- --
Art. 3.36
mortar joints.
• Placement of reinforcement, connectors and
- --
X
- --
Sec. 1.15
Art. 3.4, 3.6A
prestressing tendons and anchorages.
• Grout space prior to grouting.
X
- --
- --
- --
Art. 3.2D
• Placement of grout.
X
- --
- --
- --
Art. 3.5
• Placement of prestressing grout.
X
- --
- --
- --
Art. 3.6C
• Size and location of structural elements.
- --
X
- --
- --
Art. 3.3F
• Type, size, and location of anchors, including
other details of anchorage of masonry to
X
- --
- --
Sec. 1.2.2(e)
- --
structural members, frames and other
construction.
• Specified size, grade, and type of reinforcement,
anchor bolts, prestressing tendons and
- --
X
- --
Sec. 1.15
Art. 2.4, 3.4
anchorages.
• Welding of reinforcing bars.
X
-
Sec. 2.1.9.7.2,
- --
3.3.3.4 (b)
• Preparation, construction, and protection of
masonry during cold weather (temperature below
___
X
Sec. 2104.3,
- --
Art. 1.8C, 1.8D
40 degrees F) or hot weather (temperature above
2104.4
90 degrees F).
• Application and measurement of prestressing
X
- --
- --
- --
Art. 3.6B
force.
6. ❑ Preparation of any required grout specimens,
Sec.
mortar specimens, and /or prisms shall be
X
- --
2105.2.2,
- --
Art. 1 A
observed.
2105.3
SpeckdnspecfionFonn 2012. doc reused 09 06 /?
T_ REFERENCED
VERIFICATION AND INSPECTION C P
STANDARD
IBC
REFERENCE
INSPECTION OF WOOD
1. ❑ Inspect prefabricated wood structural elements and _
assemblies in accordance with Section 1704.2. - --
u -W
1704.6
__ ---
2. ❑ Inspect site built assemblies.
3. Inspect high -load diaphragms:
❑ Verify grade and thickness of sheathing.
- --
---
❑ Verify nominal size of framing members at adjoining
panel edges.
- --
1704.6.1
❑ Verify nail or staple diameter and length,
- --
- --
❑ Verify number of fastener lines,
- --
---
❑ Verify spacing between fasteners in each line and at
edge margins.
4. ❑ Metal- plate- connected wood trusses spanning 60 feet
or greater: Verify temporary installation
restraint /bracing and the permanent individual truss - -- X - -- 1704.6.2
member bracing are installed in accordance with the
approved truss submittal package.
REQUIRED VERIFICATION AND INSPECTION OF SOIL
1. ❑ Verify materials below footings are adequate to
--
X
_
achieve the desired bearing capacity.
2. ❑ Verify excavations are extended to proper depth and
have reached proper material.
X
3. ❑ Perform classification and testing of compacted fill
X
materials.
- --
Table 1704.7
4. ❑ Verify use of proper materials, densities and lift
thicknesses during placement and compaction of
X
- --
compacted fill.
5. ❑ Prior to placement of compacted fill, observe subgrade
and verify that site has been prepared properly.
X
REQUIRED VERIFICATION AND INSPECTION OF DEEP DRIVEN FOUNDATION ELEMENTS
1. ❑ Verify element materials, sizes and lengths comply
X
with the requirements.
2. ❑ Determine capacities of test elements and conduct
X
additional load tests, as required.
3. ❑ Observe driving operations and maintain complete
X
and accurate records for each element.
4. ❑ Verify locations of piles and their plumbness, confirm
type and size of hammer, record number of blows per
- --
Table 1704.8
foot of penetration, determine required penetrations to
X
- --
achieve design capacity, record tip and butt elevations
and document any damage to foundation element.
5. ❑ For steel elements, perform additional inspections in
accordance with Section 1704.3.
6. ❑ For concrete elements and concrete filled elements,
perform additional inspections in accordance with
- --
- --
Section 1704.4.
SpeciulnspernonFnrnr 20 12.doc revised 09 06 12
VERIFICATION AND INSPECTION C
_
P
REFERENCED IBC
STANDARD REFERENCE
7. ❑ For specialty piles, perform additional inspections as
determined by the registered design professional in - --
- --
- -- Table 1704.8
responsible charge.
REQUIRED VERIFICATION AND INSPECTION OF CAST -IN -PLACE DEEP FOUNDATION ELEMENTS
1 ❑ Observe drilling operations and maintain complete and
X
accurate records for each element.
2.. ❑ Verify placement locations and plumbness, confirm
element diameters, bell diameters (if applicable),
lengths, embedment into bedrock (if applicable), and
X
- --
- --
Table 1704.9
adequate end - bearing strata capacity. Record
concrete or grout volumes.
3. ❑ For concrete elements, perform additional inspections
in accordance with Section 1704.4.
_
HELICAL PILE FOUNDATIONS —
1. ❑ Record installation equipment used, pile dimensions,
TX
- --
- --
1704.10
tip elevations, final depth, final installation torque.
SPRAYED FIRE - RESISTANT MATERIALS
Physical and visual tests
1. Condition of substrates.
• Inspect surface for accordance with the approved fire -
resistance design and the approved manufacturer's
- --
- --
written instructions.
• Verify minimum ambient temperature before and after
-
X
application.
---
1704.12.1
• Verify ventilation of area during and after application.
- --
X
2. ❑ Measure average thickness per ASTM E605 and
---
- --
Section 1704.12.4.
S
3. ❑ Verify density of material for conformance with the
approved fire- resistant design and ASTM E605. (Ref.
- --
- --
Section 1704.12.5)
4. ❑ Test cohesive /adhesive bond strength per Section
1704.12.6.
- --
- --
5. ❑ Condition of finished application.
MISCELLANEOUS
1. Mastic and Intumescent Fire - Resistant Coating.
- --
- --
- --
1704.13
2. Exterior Insulation and Finish Systems (EIFS). Water -
resistive barrier coating when installed over a sheathing
- --
- --
- --
1704.14
substrate.
3. Special Cases
- --
- --
- --
1704.15
4. Smoke Control System
- --
- --
- --
1704.16
5. Seismic Resistance
❑ Suspended ceiling systems and their anchorage.
- -
- --
- --
1705.3 [4.3]
Speciulnspechnnh��rm ?OL.doc revised 09 06,!?
VERIFICATION AND INSPECTION
C
p
REFERENCED
STANDARD
IBC
REFERENCE
—_
6. Wind Resistance
• Roof cladding and roof framing connections.
- --
- --
---
❑ Wall connections to roof and floor diaphragms and
framing.
• Roof and floor diaphragm systems, including
collectors, drag struts and boundary elements.
• Vertical wind - force - resisting systems, including braced
frames, moment frames, and shear walls.
• Wind- force - resisting system connections to the
foundation.
• Fabrication and installation of systems or components
required to meet the impact resistance requirements
- --
- --
- --
of Section 1609.1.2.
SPECIAL INSPECTION FOR WIND REQUIREMENTS
1. Structural Wood
• Inspect field gluing operations of elements of the main
X
wind - force - resisting system.
- --
1706.2
• Inspect nailing, bolting, anchoring, and other fastening
of components within the main windforce- resisting
X
system, including wood shear walls, wood
diaphragms, drag struts, braces and hold- downs.
2. Cold- Formed Steel Framing
• Welding of elements of the main wind- force - resisting
X
system.
• Inspection of screw attachments, bolting, anchoring,
and other fastening of components within the main
- --
1706.3
wind- force - resisting system including shear walls,
- --
X
braces, diaphragms, collectors (drag struts) and hold -
downs.
3. Wind- resisting components
❑ Roof cladding.
- --
X
- --
1706.4
❑ Wall cladding.
- --
X
SPECIAL INSPECTIONS FOR SEISMIC RESISTANCE
1. ❑ Special inspection for welding in accordance with the
X
- --
1707.2
quality assurance plan requirements of AISC 341.
2. Structural Wood
❑ Inspect field gluing operations of elements of the
X
seismic - force - resisting system.
❑ Inspect nailing, bolting, anchoring, and other fastening
of components within the seismic - force - resisting
1707.3
system, including wood shear walls, wood
- --
X
diaphragms, drag struts, braces, shear panels and
hold- downs.
3. Cold- Formed steel light -frame construction
❑ Welding of elements of the seismic - force - resisting
X
1707.4
system.
Specxilnspeciionl-or•nr 2012.doc revised 0906 1?
❑ Inspection of screw attachments, bolting, anchoring,
and other fastening of components within the seismic- X
force - resisting system including shear walls, braces,
diaphragms, collectors (drag struts) and hold- downs.
4. Storage racks and access floors
❑ Anchorage of storage racks 8 feet or greater in height
and access floors.
X
1707.5
5. Architectural components
❑ Inspect erection and fastening of exterior cladding
weighing more than 5 psf and higher than 30 feet
- --
X
above grade or walking surface.
• Inspect erection and fastening of veneer weighing
more than 5 psf.and higher than 30 feet above grade
- --
X
or walking surface.
- --
1707.6
• Inspect erection and fastening of all exterior non-
bearing walls higher than 30 feet above grade or
- --
X
walking surface.
• Inspect erection and fastening of all interior non-
bearing walls weighing more than 15 psf and higher
- --
X
than 30 feet above grade or walking surface.
6. Mechanical and Electrical Components
• Inspect anchorage of electrical equipment for
emergency or stand -by power systems.
X
• Inspect anchorage of non - emergency electrical
X
equipment.
• Inspect installation of piping systems and associated
mechanical units carrying flammable, combustible, or
- --
X
- --
1707.7
highly toxic contents.
• Inspect installation of HVAC ductwork that contains
X
hazardous materials.
• Inspect installation of vibration isolation systems
X
where required by Section 1707.7.
7. ❑ Verify that the equipment label and anchorage or
mounting conforms to the certificate of compliance
1707.8
when mechanical and electrical equipment must be
seismically qualified.
8. ❑ Seismic isolation system: Inspection of isolation
-_-
X
- --
1707.9
system per ASCE 7 — Section 17.2.4.8
9. ❑ Obtain mill certificates for reinforcing steel, verify
compliance with approved construction documents,
- --
- --
- --
1708.2
and verify steel supplied corresponds to certificate.
10. ❑ Structural Steel: Invoke the QAP Quality Assurance
1708.3
requirements in AISC 341.
___
11. ❑ Obtain certificate that equipment has been seismically
1708.4
qualified.
- -_
- --
- -_
12. ❑ Obtain system tests as required by ASCE 7 Section
_ --
- --
___
1708.5
17.8.
Specnrl��specNuuForm 2012.doc revised 09 06 12