15-125 Prime Mechanical to replace 5 ton Heat Pump at Creekside Park CITY OF '
AGREEMENT
CITY OF CUPERTINO
10300 Torre Avenue
Cupertino, CA 95014
CUPERTINO 408-777-3200 N
THIS AGREEMENT, made and entered into this 20th day of July, 2015 is by and between the
CITY OF CUPERTINO (Hereinafter "CITY") and Prime Mechanical P.O. Sox 1028, Pleasanton,
CA. 94566. (877) 635-4328
Hereinafter "CONTRACTOR"), in consideration of their mutual covenants, the parties agree as
follows:
CONTRACTOR shall provide or furnish the following specified services and/or materials: Replace
5 Ton Heat Pump at Creekside Park
Check box if services are further described in an Exhibit.
EXHIBITS: The following attached exhibits hereby are made part of this Agreement: A.
TERM: The services and/or materials furnished under this Agreement shall commence on July
20th 2015 and shall be completed ,no later than 90 Days.
COMPENSATION: For the full performance of this Agreement, CITY shall pay CONTRACTOR:
Four Thousand Nine Hundred Eighty Nine & 19/100 ($4,989.19)
California Labor Code, Section 1771 requires the payment of prevailing wages to all workers
employed on a Public Works contract in excess of$1,000.00.
GENERAL TERMS AND CONDITIONS
Hold Harmless. Contractor shall, to the fullest extent allowed by law, indemnify, defend, and hold
harmless the City and its officers, officials, agents, employees and volunteers against any and all
liability, claims, stop notices, actions, causes of action or demands whatsoever from and against
any of them, including any injury to or death of any person or damage to property or other liability
of any nature, arising out of, pertaining to, or related to the performance of this Agreement by
Contractor or Contractor's employees, officers, officials, agents or independent contractors.
Contractor shall not be obligated under this Agreement to indemnify City to the extent that the
damage is caused by the sole or active negligence or willful misconduct of City, its agents or
employees. Such costs and expenses shall include reasonable attorneys' fees of counsel of City's
choice, expert fees and all other costs and fees of litigation.
Subcontracting. Contractor has been retained due to their unique skills and Contractor may not
substitute another, assign or transfer any rights or obligations under this Agreement. Unless prior
written consent from City is obtained, only those people whose names are listed this Agreement
shall be used in the performance of this Agreement.
Assignment. Contractor may not assign or transfer this Agreement, without prior written consent
of CITY.
Page 1 of
Short Form Agreement
Insurance. Contractor shall file with City a Certificate of Insurance consistent with the following
requirements
Coverage:
Contractor shall maintain the following insurance coverage:
(1) Workers' Compensation:
Statutory coverage as required by the State of California.
(2) Liabili
Commercial general liability coverage in the following minimum limits:
Bodily Injury: $5009000
each occurrence
$1,000,000
aggregate- all other
Property Damage: $100,000 each occurrence
$250,000 aggregate
If submitted, combined single limit policy with aggregate limits in the amounts of
$1,000,000 will be considered equivalent to the required minimum limits shown
above.
(3) Automotive:
Comprehensive automotive liability coverage in the following minimum limits:
Bodily Injury: $500,000 each occurrence
Property Damage: $100,000 each occurrence
or
Combined Single Limit: $500,000 each occurrence
(4) Professional Liability:
Professional liability insurance which includes coverage for the professional acts,
errors and omissions of Consultant in the amount of at least$1,000,000.
Subrogation Waiver. Contractor agrees that in the event of loss due to.any of the perils for which
it has agreed to provide comprehensive general.and automotive liability insurance, Contractor shall
look solely to its insurance for recovery. Contractor hereby grants to City, on behalf of any insurer
providing comprehensive general and automotive liability insurance to either Contractor or City with
respect to the services of Contractor herein, a waiver of any right to subrogation which any such
insurer of said Contractor may acquire against City by virtue of the payment of any loss under such
insurance.
Termination of Agreement. The City reserves the right to terminate this Agreement with or
without cause with a seven (7)-day notice. The Contractor may terminate this Agreement with or
without cause with a seven (7)-day written notice.
Non-Discrimination. No discrimination shall be made in the employment of persons under this
Agreement because of the race, color, national origin, ancestry, religion, gender or sexual
orientation of such person
Interest of Contractor. It is understood and agreed that this Agreement is not a contract of
employment in the sense that the relationship of master and servant exists between City and
undersigned. At all times, Contractor shall be deemed to be an independent contractor and
Contractor is not authorized to,bind the City to any contracts or other obligations in executing this
Agreement. Contractor certifies that no one who has or will have any financial interest under this
Page 2 of 3
Short Form Agreement
Agreement is an officer or employee of.City. City shall have no right of control as to the manner
Contractor performs the services to-.be performed. Nevertheless, City may, at any time, observe
the manner in which such services are being performed by the contractor.
The Contractor shall comply with all applicable Federal, State, and local laws and ordinances
including, but not limited to, unemployment insurance benefits, FICA laws, and the City business
license ordinance.
Changes. No changes or variations of any kind are authorized without the written consent of the
City.
CONT -ACT CO-ORDINAT-OI a-nd-representative for-C{--'-shall-be:-- --
Chris Orr
Facilities Dept.
(408) 777-3272
This Agreement shall become effective upon its execution by CITY, in witness thereof; the parties .
have executed this Agreement the day and year first written above.
CONTRACTOR: CITY OF CUPERTINO:
Title 4M_q a c.E M �_ Title: P1-,L-7k%,C_ C� Vz- a
APPROVALS EXPENDITURE DISTRIBUTION
DEPART ENT H D DATE ACCOUNT NUMBER AMOUNT
- 100-87-837-900-990 $4,989.19
CITY P OVED S TO'FORM DATE
CITY CLERK: -.TTr= DATE
Page 3 of 3
Short Form Agreement
LiCEN E;#31.91 14
P_ -BOX X028
P E4MINT: ;,Ciel 945--66
ttiVeS.71 635.-HEAT
4Afi 3.f +A."4i15n"fi ?Y%�.'iS„� 4.4 J"'IA'4.R -
City of Cupertino Document#071315SP1
10300 Torre Ave
Cupertino,CA
Attn: Rudy Lomas
Subject: Creekside Park
Dear Rudy,
Thank you for the opportunity to assist City of Cupertino with its HVAC needs. Per your request,
enclosed is a quote to replace the 5ton Heat Pump Condensing Unit at Creekside Park.
Scope:
Creekside Park
• Reclaim unit
• Remove existing Condensing Unit
• Install new Ston (Dry Charge)Heat Pump Condensing Unit
• Install new liquid line drier
• Pressure test
• Evacuate system
• Reuse existing refrigerant
• Start up and verify proper operation
The cost for the work specified above is$4,989.19
The price includes labor and material for the completion of the work described. If this meets your
approval,please sign this proposal in the appropriate space below. Prices are effective for thirty days.
Thank you for choosing Prime Mechanical.
If you have any questions in regards to this quote, or if I may be of further assistance, please do not
hesitate to contact us at(877)635-HEAT.
Sincerely,
Spencer Platt
Prime Mechanical
Acceptance of Proposal: The price,specifications and conditions are satisfactory and are hereby
accepted. You are authorized to do the work specified above. The job will be paid on a NET-30 day
basis upon completion. i
Signed: Date: