Loading...
15040135CITY OF CUPERTINO BUILDING PERMIT BUILDING ADDRESS: 20823 STEVENS CREEK BLVD CONTRACTOR: NOVO CONSTRUCTION PERMIT NO: 15040135 OWNER'S NAME: STEVENS CREEK OFFICE CENTER ASSOC 1460 O'BR1EN DR DATE ISSUED: 05/11/2015 O NER'S PHONE: 6507832338 MENLO PARK, CA 94025 PHONE NO: (650)701-1500 LICENSED CONTRACTOR'S DECLARATION JOB DESCRIPTION: RESIDENTIAL ❑ COMMERCIAL r) License Class r/ Lic. #`7 q �V APPLE STE 300-T.I.TO RECONFIGURE & UPDATE, INCLUDING ADDING (N) COMPUTER ROOM WITHIN (E) Contractor /D yi7 / ,rn�tn`�Jf {/ l/V�1 ' I N I���h� AREA. ADD 2 HVAC UNITS & 1 AIR COMPRESSOR ON —/ ROOF I hereby affirm that I am licensed under the provisions of Chapter 9 (commencing with Section 7000) of Division 3 of the Business & Professions Code and that my license is in full force and effect. I hereby affirm under penalty of perjury one of the following two declarations: I have and will maintain a certificate of consent to self-insure for Worker's Compensation, as provided for by Section 3700 of the Labor Code, for the Sq. Ft Floor Area: Valuation: $250000 performance of the work for which this permit is issued. I have and will maintain Worker's Compensation Insurance, as provided for by Section 3700 of the Labor Code, for the performance of the work for which this APN Number: 32632053.20823 Occupancy Type: permit is issued. APPLICANT CERTIFICATION I certify that 1 have read this application and state that the above information is PERMIT EXPIRES IF WORK IS NOT STARTED correct. I agree to comply with all city and county ordinances and state laws relating WITHIN IT ISSUANCE OR to building construction, and hereby authorize representatives of this city to enter upon the above mentioned property for inspection purposes. (We) agree to save +RO LLED INSPECTION. indemnify and keep harmless the City of Cupertino against liabilities, judgments, costs, and expenses which may accrue against said City in consequence of granting of this permit. Additionally, the applicant understands and will CZ&Date: with all non-point source regulations per the Cupertino Municipal Code, Section 9.18. �j �r✓ RE-ROOFS: Signature Date All roofs shall be inspected prior to any roofing material being installed. if a roof is installed without first obtaining an inspection, 1 agree to remove all new materials for inspection. ❑ OWNER-BUILDER DECLARATION Signature of Applicant: Date: I hereby affirm that I am exempt from the Contractor's License Law for one of the following two reasons: ALL ROOF COVERINGS TO BE CLASS "A" OR BETTER 1, as owner of the property, or my employees with wages as their sole compensation, will do the work, and the structure is not intended or offered for sale (Sec.7044, Business & Professions Code) I, as owner of the property, am exclusively contracting with licensed contractors to HAZARDOUS MATERIALS DISCLOSURE construct the project (Sec.7044, Business & Professions Code). I have read the hazardous materials requirements under Chapter 6.95 of the California Health & Safety Code, Sections 25505, 25533, and 25534. I will I hereby affirm under penalty of perjury one of the following three maintain compliance with the Cupertino Municipal Code, Chapter 9.12 and the declarations: Health & Safety Code, Section 25532(x) should I store or handle hazardous I have and will maintain a Certificate of Consent to self-insure for Worker's material. Additionally, should I use equipment or devices which emit hazardous Compensation, as provided for by Section 3700 of the Labor Code, for the air contaminants as defined by the Bay Area Air Quality Management District I performance of the work for which this permit is issued, will maintain compliance with the Cupertino Municipal Code, Chapter 9.12 and I have and will maintain Worker's Compensation Insurance, as provided for by the Health & Safety Code, Sections 25505, 533, and 25534. Section 3700 of the Labor Code, for the performance of the work for which thisJr 11 20 Owner or authorized agent: Date: permit is issued. tl I certify that in the performance of the work for which this permit is issued, I shall not employ any person in any manner so as to become subject to the Worker's Compensation laws of California. If, after making this certificate of exemption, I CONSTRUCTION LENDING AGENCY become subject to the Worker's Compensation provisions of the Labor Code, I must I hereby affirm that there is a construction lending agency for the performance of forthwith comply with such provisions or this permit shall be deemed revoked. work's for which this permit is issued (Sec. 3097, Civ C.) Lender's Name APPLICANT CERTIFICATION Lender's Address I certify that I have read this application and state that the above information is correct. 1 agree to comply with all city and county ordinances and state laws relating to building construction, and hereby authorize representatives of this city to enter upon the above mentioned property for inspection purposes. (We) agree to save indemnify and keep harmless the City of Cupertino against liabilities, judgments, ARCHITECT'S DECLARATION costs, and expenses which may accrue against said City in consequence of the I understand my plans shall be used as public records. granting of this permit. Additionally, the applicant understands and will comply with all non-point source regulations per the Cupertino Municipal Code, Section Licensed Professional 9.18. Signature Date CONSTRUCTION PERMIT APPLICATION C:COMMUNIIY F'IFVFI,0PW-. [)FPAWM�NT • BUlt-DING DIVISION 10300 rORRF AVENUE' • t LJK R I INO CA 95014.3255 (408) 777-3228 r FAX (408) 717-:333 i 1; IILIi ql r,up �rtinU (erg 0� CUPERTINO M NFW'CON STRtx rlo)N n ADDITION ALTFRATION-TI M RHVISION. I)EFFRRFI) ORIGINAI PFRMITt! PRI 0 .\n2' tiff ! O .J T�.+vV'�S Cf �.G� x.1,4. Cv +;ne 7 ,\I'N -� 2, 3 � , s– *3 . (�{,/ (�/ up Nl R %,A41t Lc- / C h (: S, I a -,z- r -t �1 S� - 7 -- 2 3 38 C u2 �w1 .. con- s I' R t I I.\ ODRI SS /GY eJ1 ..KII.,II yVI 44:1 �,oV I\\ 4—// G t'.Av. o/ N,A1dI r NIONI Za — I -M II �(�('c 3c` no v LCV70-V [�J�f�\((nS4L vlar/�y� ;I'Hj_/ �)I�I SS f ('I Iti. ,-I,\II, /n' 1.1V �I Ml '✓t ❑ ON'%IR ❑ OA1'NFIt-01II0IR ❑ OIb NI RAGI NI (ONt'RtV( roll ❑ (ON IRV( IOR -WENT ❑ VR( -IIIA( r ❑ 1N6INIAR ❑ DIAI.IOTH ❑ II'N',ANI (ON I R V( I OR N 1111 I I('[ NSI M INI11 WIN;[ 1) 11I Ift:s I]( ;Alo f' l (1N11'AkV" N'AVII vv On S_, v .2 - . I -41- II _L.� �'2o✓vL or►s�!✓c fi .1... IAC _ _ __ :oIfSS Or ti,ArRCl (,,. S'IR It. /I Pf�� 'I10� 6 �. 70J—lS11 IIII�'I �IINf-H NAMI I Ili NtIA,VI a ' i,.I I(a�NN ('UNII'.AN) l�vM1a�vs I At \I[ to t}vdius, cow I A.0 S"I'RIIT.0r y dv l'I-I \'. S"I'\II.lIP v� PIRk-5-- H011,;" .S� t IN S( RIP IIUN 01VAoRK rG (a- Q T /�f Z J: o� [ cx� rte► .V� S . G%'f( cJl tike n �l 7� 1fL' $ati rGa(f c-oar�l .� Awa S rvt d%F ()oars t hc4rCJ- vcq C't Exist 1>6 [SSC PI20110S1I1 tISF ('ONRTR 771Fsr(1RIFS USI T\ -'Pt OC('- SO.I.I. V_\I t1A IIUN tS] 1X13 ": em s FCISr(� ARI: /-N we NP\\' I I "OR ARI.\ 0do5x M "I" ARI.,\ I )['\I ulr 1Rl ,\ [/OA 70U Of6u_ Ii,MIIROOM I:I11 IEN OIIIFR ItIiMOUPI.,ARIA� RrNIODI'I ARI';A� REM(ItilI ARI A POR( II VRIA DE('K -AREA 101M DF'.('K I'M 11 AREA GAR.AOF ARFA r) l' II AIIA( II IM I I I ING I."%IIS - ISA SFX OND t NF] m1!' SE('ONU S"rokN Al s 11EINO:ADDED:' ❑VG VDI1IHON? ONO I'R P -A I'rLl(,A"IION ❑No II Y FS. I'ROVIDF(()P OF IS TIiF. Ii I. DG .AN ❑1'I R BY' TO EAI b'AI�l1:ALION I'I A�TIVG AI'PL ❑NG 14ANNING ,AITROA%ALll r'E" N:I('HLEIt I10AIN:^. ❑VU 0,0 Qd Ry my signalure below. I certi fy to each of the fol lowing- I am the property oe'ner or author zed agent�ie,wner's bchal l: I tim C read this application and the information I havc provided is correct. I have read the DescriptionofWork nud rccomply vwith all applicable local or(linances and state laws relating to building construction. I authorize representatives of Cupetino to ed property for inspection purposes. Signature of Applicant Agent: Dale SUPPLFMFNTAL INFORMATION RF.QUIRFD PLAN CHECK TYPE Rout-ING SLIP ❑ OVER -THF -COUNTER ❑ BUILDING PLAN REVIEW New SFD or Multifamity dwellings: Apply for demolition permit for existing building(s). Demolition permit is required Prior to issuance ofbuilding permit for new bUllding. ❑ EXPRESS ❑ PLANNING PLAN REVIEW Commercial Bldgs: Provide a completed Hazardous Materials DISCIOSUI'c ❑ STANDARD ❑ PURLIC WORKS form if any Hazardous Materials are being used as part of this project. ❑ ❑ LARGE FIRE DEPT Copy of Planning Approval Letter or Meeting with Planning prior to -1 ❑ SEWER DISTRICT submittal of Building permit application. MAJOR SANITARY ❑ ENVIRONMENTAL HEALTH Bldg,lpp ?(111.clocrerLce(.1116�_'l(11 92,3 ;,f',*,,. C- e,-1 i 3h. -S. f, I CITY OF CUPERTINO FM_7 IMA3 FEE ESTIMATOR - BUILDING DIVISION 1AADDRESS:--6TEVENS CREEK BLVD DATE: 04/20/2015 REVIEWED BY: MELISSA PC FEE ID APN: 326 32 053 BP#: "VALUATION: 1$250,000 %PERMIT TYPE: Building Permit PLAN CHECK TYPE: Tenant Improvement PRIMARY Commercial Building USE: IBTIPLNCK PENTAMATION 1B TI PERMIT TYPE: WORK JAPPLE - STE 300 - T.I. TO RECONFIGURE AND UPDATE INCLUDING ADDING N COMPUTER SCOPE I ROOM WITHIN (E) AREA. ADD 2 HVAC UNITS & 1 AIR COMPRESSOR ON ROOF OCCUPANCY TYPE: TYPE OF CONSTR. FLR AREA S.f. PC FEES PC FEE ID BP FEES BP FEE ID B (Tenant Improvements) II-B,III-B,IV,V-B 4,800 $2,442.16 IBTIPLNCK $4,088.64 IBTIINSP 1 hrs $0.00 PME Plan Check: $0.00 Permit Fee: $4,088.64 Suppl. Insp. Fee:Q Reg. Q OT F0.0Thrs $0.00 PME Unit Fee: $0.00 TOTALS: 4,800 $2,442.16 $0.00 $4,088.64 NOTE: This estimate does not include fees due to other Departments (i.e. Planning, Public Works, Fire, Sanitary Sewer District, School Dictrirt otn 1_ Thoco foot aro hacod an tho nroliminary information availahlo and aro only an octimato_ Contact tho Dont for addn'I infa_ FEE ITEMS (Fee Resolution 11-053 F_,ff 711113) FEE QTY/FEE MISC ITEMS Plan Check Fee: $2,442.16 Select a Misc Bldg/Structure or Element of a Building Suppl. PC Fee: Q Reg. Q OT 0.0 1 hrs $0.00 PME Plan Check: $0.00 Permit Fee: $4,088.64 Suppl. Insp. Fee:Q Reg. Q OT F0.0Thrs $0.00 PME Unit Fee: $0.00 PME Permit Fee: $0.00 E) Work Without Permit? 0 Yes No $0.00 Advanced Planning Fee: $0.00 Select a Non -Residential Building or Structure 0 ;,E �.. .......... ._ Strong Motion Fee: IBSEISMICO $70.00 Select an Administrative Item Bldg Stds Commission Fee: IBCBSC $10.00 SUBTOTALS: $6,610.80,:$0-00 TOTAL FEE: 1 $6,610.80 Revised: 04101/2015 CUPERTINO CONTRACTOR / SUBCONTRACTOR LIST Building Department City Of Cupertino 10300 Torre AVenue Cupertino, CA 95014-3255 Telephone: 408-777-3228 Fax: 408-777-3333 JOB ADDRE_SS:20823 Ste 300, Steven's Creek Cupertino CA 950141 PERMIT 1115040135 OWNER'S NAME:Harvest Properties (Apple Tenant) PRONG 4(408) 855-9801 — - GFNF;RAL, CONTRACTOR.: Novo Construction BUSINESS LICENSE #/23891 ADDiZ FSS: 1460 O'Brien Dr CITY/ZIPCODE:94025 "Our municipal code requires all businesses working in the city to have a City of Cupertino business license. NO BUILDING FINAL, OR FINAL OCCUPANCY INSP£:CTION(S) A'VILL, BE SCHEDULED UNTIL TIIF GENII,RA1, CONTRACTOR AND ALL SUBCONTRACTORS IIAVE OBTAINED A CITY OF C:UPERTINO BUSINESS LICENSE. I ani not using any subcontractors: Signature Date Please check applicable subcontractors and cQniplete the following information: .a. Owner / Contractor Signature r } . f a Date SUBCONTRACTOR BUSINESS NANIE BUSINESS LICENSE # Cabinets & Millwork Commercial Casework Inc 28540 _ Cement Finishing Electrical Cupertino Electric t7'zM7 ,, I rXCavatlUn Fencing —_�--__ -ar�etin� FlooringCi Welker 25264 -_ Linoleum l Wood --J i Glass / Glazin(J j Flcatin>UMI- Walters & Wolf q5 97384211 96259 � Insulation -r Landscaping - --- ------------ ---------- ---' it Lathing Masonry Painting / wallpaper — — - - - D. Zelinksky _ 32209 i _ Paving CAWC 255484 Plastering Plumbing— ACCO 8822 t/ �— Roufing Schfic'Tanfc -- _ — Shect Vi etal UMI 962593 Sheet Rock MagnumZ@8- ! Tile .a. Owner / Contractor Signature r } . f a Date TAB REPORT FIRM: United Mechanical, Inc. 2185 Oakland Road San Jose, CA 95131 PHONE: 408.232.9000 FAX: 408.433.5203 PROJECT: Apple SC03X 20823 Stevens Creek Cupertino, CA 95014 DATE: 6/22/2015 PROJECT #: 5210-10 CONTACT: Vela, Tony NOTES: United Mechanical, Inc. Air Handling Unit PROJECT: Apple SC03X DATE: 6/22/2015 LOCATION: Cupertino, CA CONTACT: Tonv Vela PROJECT #: 5210-10 AUTHOR: Tonv Vela SYSTEM/UNIT: RTU 1-3 AREA: Roof Unit Data Unit Manufacturer York Unit Model Number DH18000OP2AAAIA Unit Serial Number NBMM017455 United Mechanical, Inc. 1"Taking Excellence Personallyl" Test Data Design Airflow 6400 CFM Actual Airflow 6320 CFM Design Outside Airflow 810 CFM Actual Outside Airflow 815 CFM Actual Return Airflow 5505 CFM RTU 1-3/Supply Fan 230 Volts Actual RPM LOA Motor Volts T1-T2 208 Volts Motor Volts T2-T3 209 Volts Motor Volts T1-T3 209 Volts Motor Amps T1 12.30 Amps Motor Amps T2 13.00 Amps Motor Amps T3 12.30 Amps United Mechanical, Inc. 1"Taking Excellence Personallyl" Motor Data RTU 1-3/Supply Fan -0.87 in. we Motor Manufacturer Baldor Motor Frame 184T Motor HP 5 HP Motor RPM 1750 RPM Motor Rated Volts 230 Volts Motor Phase 3 Motor Hertz 60 Hz Motor FL Amps 13 Amps Motor Service Factor 1.15 Sheave Data RTU 1-3/Supply Fan -0.87 in. we Motor Sheave Model 1 VP56 Motor Sheave Bore 1 in. Fan Sheave MFG Browning Fan Sheave Model BK80 Fan Sheave Bore 1.00 in. Number of Belts 1 Belt Size BX68 Sheave Center Line 26.00 in. Test Pressures Cooling Coil SP In -0.87 in. we Cooling Coil SP Out -1.34 in. we Fan SP In -1.34 in. we Fan SP Out 0.37 in. we Fin. Filter SP In -0.55 in. we Final Filter SP Out -0.87 in. we Actual Total SP 1.71 in. we Suction SP 1.34 in. we Discharge SP 0.37 in. we External SP 0.92 in. we O/A Damper Position 100 RTU 1-3/VVT-RH 1-01 uppIvOutIetSumma System/Unit Area Served Outlet Type Size LxW / Design Prelim % Prelim µ' Fina: °lo Final Diff Q Airflow Diff. Alrfl6w Outlet -01 First Floor I CD 1 12 375365 97 240 64 Totals: E375 365 97 240., 64 RTU 1-3/VVT-RH 1-02 Sunniv Outlet Summary System/Unit Area Served Outlet Type Size LxW I Design Airflow Prelim _ Airflow %Prelim Final % Final Diff. Outlet-02 First Floor CD 10 265 335 126 -xum2w— 195 74 Outlet -03 First Floor CD 10 265 295 111 215 81 Outlet -04 First Floor CD 10 265 335 126 205 77 410 Totals: 475 795 965 121 645 77 RTU 1-3NVT-RH 1-03 Sunniv Outlet Summary System/Unit Area Served Outlet Type Size LxW / Design Airflow Prelim Airflow %Prelim Diff. ,Final' Airflow %Final Diff. Outlet -05 First Floor CD 10 265 105 40 210 79 Outlet -06 First Floor CD 10 50 75 150 35 70 Outlet -07 First Floor CD 10 155 195 126 110 71 410 Totals: 475 470 376 80 365 76 RTU 1-3/VVT-RH 1-04 uppiv Outlet mary System/Unit Area Served Outlet Type Size LxW ! Design Prelim % Prelim 'Final. -o Final Diff D Airflow Airflow Airflow I I I I' Diff Outlet-08 First Floor CD 1 12 1 340 1 475 140 265 78 Totals: 1 1 340 1 475 140 • 265 1 78 RTII 1-3NVT-RH 1-05 Sunniv Outlet Summary System/Unit Area Served Outlet Type Size LxW ! Design Prelim % Prelim Final % Final Diff. Outlet -09 First Floor CD 16 610 405 66 455 75 Outlet -10 First Floor CD 16 610 325 53 470 77 Outlet -11 First Floor CD 16 610 410 67 475 78 Outlet -12 First Floor CD 16 610 305 50 455 75 1 180 Totals:2440 119 1445 58 1855 - 76 RTII 1-3A/VT-PH 1-06 Sunniv Outlet Summary System/Unit Area Served Outlet Type "Size LxW I Design, Airflow Prelim % Prelim Final, Final Diff. Outlet -13 First Floor CD 6 110 100 91 80 73 Outlet -14* First Floor CD 8 60 130 217 130 217 Outlet -1 5* First Floor CD 8 60 100 167 75 125 Outlet -16* First Floor CD 8 60 220 367 60 100 Totals: 1 290 550 1 180 - '345' 119 RTII 1-3/VVT-PH 1-07 Sunniv Outlet Sijmmary System/Unit Area Served Outlet Type Size LxW I Design Prelim Airflow % Prelim Final ' % Final Diff. Outlet -17 First Floor CD 12 310 145 47 240 77 Outlet -18 First Floor CD 12 310 115 37 250 81 Outlet -19 First Floor CD 12 310 110 35 230 74 Outlet -20 First Floor CD 12 310 100 32 230 74 Totals: 1 1240 1 470 1 38 ' 950 77 RTU 1-3/VVT-RH 1-08 uppiv Outlet Summary System/Unit Area Served Outlet Type Size LxW / Design Prelim % Prelim Final °t. Final Diff I I I D Airflow Airflow Diff. Airflow Outlet -21 First Floor CD 1 10 265 65 25 195 1 74 Totals: 265 65 26 195 1 74 RTI 19-4M/T-PW 9-Y1Q Sunniv Arr+lo4 Ciimmory System/Unit Area Served Outlet Type -Size LxW ! Design Prelim % Prelim ' Final ' =- % Final Diff. Outlet -22 First Floor CD 14 400 435 109 305 76 Outlet -23 First Floor CD 14 400 615 154 315 79 Totals: 800 1050 131 620 78 RTU 1-3/VVT-RH 1-10 uDplvOutletSumma System/Unit Area Served Outlet Type Size LxW I Design I Prelim % Prelim .Final °10 Final Diff Outlet -24 First Floor CD I 10 1 210 25 12 160 1 76 Totals: 210 25 12 160 1 76 United Mechanical, Inc. I"Taking Excellence Personallyl" SYSTEM/UNIT: RTU 1-4 AREA: Roof Unit Data Unit Manufacturer Daikin Unit Model Number DCC036XXX3BXXXAB Unit Serial Number 1504039594 RTU 1-4 SuDPW Outlet Summa System/Unit Area Served Outlet Type Size LxW / Design Prelim %Prelim - Final,., %Final Diff. Outlet -01 First Floor CD 1 16 1200 1080 90 1080 90 Totals: 1200 1 1080 901, 1080 90 United Mechanical, Inc. 1"Taking Excellence Personallyl" Test Data Design Airflow 1200 CFM Actual Airflow 1080 CFM RTU 1-4/Supply Fan 56 Actual RPM LOA Motor Volts T1-T2 212 Volts Motor Volts T2-T3 211 Volts Motor Volts T1-T3 212 Volts Motor Amps T1 2.60 Amps Motor Amps T2 2.40 Amps Motor Amps T3 2.20 Amps RTU 1-4 SuDPW Outlet Summa System/Unit Area Served Outlet Type Size LxW / Design Prelim %Prelim - Final,., %Final Diff. Outlet -01 First Floor CD 1 16 1200 1080 90 1080 90 Totals: 1200 1 1080 901, 1080 90 United Mechanical, Inc. 1"Taking Excellence Personallyl" Motor Data RTU 1-4/Suaoly Fan -0.35 in. we Motor Manufacturer US Motors Motor Frame 56 Motor HP 1 HP Motor RPM 1725 RPM Motor. Rated Volts 208-230 Volts Motor Phase 3 Motor Hertz 60 Hz Motor FL Amps 3.4 Amps Motor Service Factor 1.15 RTU 1-4 SuDPW Outlet Summa System/Unit Area Served Outlet Type Size LxW / Design Prelim %Prelim - Final,., %Final Diff. Outlet -01 First Floor CD 1 16 1200 1080 90 1080 90 Totals: 1200 1 1080 901, 1080 90 United Mechanical, Inc. 1"Taking Excellence Personallyl" SheaveData RTU 1-4/Suaaly Fan -0.35 in. we Motor Sheave MFG Browning Motor Sheave Model 1 VL40 Motor Sheave Bore 5/8 in. Fan Sheave MFG Browning Fan Sheave Model AK69 Fan Sheave Bore 1.00 in. Number of Belts 1 Belt Size AX52 Sheave Center Line 19 1/4 in. RTU 1-4 SuDPW Outlet Summa System/Unit Area Served Outlet Type Size LxW / Design Prelim %Prelim - Final,., %Final Diff. Outlet -01 First Floor CD 1 16 1200 1080 90 1080 90 Totals: 1200 1 1080 901, 1080 90 United Mechanical, Inc. 1"Taking Excellence Personallyl" Test Pressures Cooling Coil SP In -0.35 in. we Cooling Coil SP Out -0.50 in. we Fan SP In -0.50 in. we Fan SP Out 0.32 in. we Fin. Filter SP In -0.24 in. we Final Filter SP Out -0.35 in. we Actual Total SP 0.82 in. we Suction SP 0.50 in. we Discharge SP 0.32 in. we External SP 0.56 in. we RTU 1-4 SuDPW Outlet Summa System/Unit Area Served Outlet Type Size LxW / Design Prelim %Prelim - Final,., %Final Diff. Outlet -01 First Floor CD 1 16 1200 1080 90 1080 90 Totals: 1200 1 1080 901, 1080 90 United Mechanical, Inc. 1"Taking Excellence Personallyl" SYSTEM/UNIT: RTU 1-5 AREA: Roof Unit Data Unit Manufacturer Daikin Unit Model Number DCC036XXX3BXXXAB Unit Serial Number 1504039591 M 1-5 SuPplv Outlet Summa System/Unit Area Served Outlet Type Size LxW I Design Prelim %Prelim - Final., " °io Final Dif D Airflow Airflow Diff. Airflow Outlet -01 First Floor CD 1 16 1200 1100 92 1100 1 92 Totals: 1 9200 1100 " 92 7104% 92 United Mechanical, Inc. 1"Taking Excellence Personallyl" Test Data Design Airflow 1200 CFM Actual Airflow 1100 CFM RTU 1-5/Supply Fan 56 Actual RPM LOA Motor Volts T1-T2 212 Volts Motor Volts T2-T3 211 Volts Motor Volts T1-T3 212 Volts Motor Amps T1 2.30 Amps Motor Amps T2 2.30 Amps Motor Amps T3 2.20 Amps M 1-5 SuPplv Outlet Summa System/Unit Area Served Outlet Type Size LxW I Design Prelim %Prelim - Final., " °io Final Dif D Airflow Airflow Diff. Airflow Outlet -01 First Floor CD 1 16 1200 1100 92 1100 1 92 Totals: 1 9200 1100 " 92 7104% 92 United Mechanical, Inc. 1"Taking Excellence Personallyl" Motor Data RTU 1-5/Supply Fan -0.25 in. we Motor Manufacturer US Motors Motor Frame 56 Motor HP 1 HP Motor RPM 1725 RPM Motor Rated Volts 208-230 Volts Motor Phase 3 Motor Hertz 60 Hz Motor FL Amps 3.4 Amps Motor Service Factor 1.15 M 1-5 SuPplv Outlet Summa System/Unit Area Served Outlet Type Size LxW I Design Prelim %Prelim - Final., " °io Final Dif D Airflow Airflow Diff. Airflow Outlet -01 First Floor CD 1 16 1200 1100 92 1100 1 92 Totals: 1 9200 1100 " 92 7104% 92 United Mechanical, Inc. 1"Taking Excellence Personallyl" Sheave Data RTU 15/Supply Fan -0.25 in. we Motor Sheave MFG Browning Motor Sheave Model 1 VL40 Motor Sheave Bore 5/8 in. Fan Sheave MFG Browning Fan Sheave Model AK69 Fan Sheave Bore 1.00 in. Number of Belts 1 Belt Size AX52 Sheave Center Line 19 1/2 in. M 1-5 SuPplv Outlet Summa System/Unit Area Served Outlet Type Size LxW I Design Prelim %Prelim - Final., " °io Final Dif D Airflow Airflow Diff. Airflow Outlet -01 First Floor CD 1 16 1200 1100 92 1100 1 92 Totals: 1 9200 1100 " 92 7104% 92 United Mechanical, Inc. 1"Taking Excellence Personallyl" Test Pressures Cooling Cal SP In -0.25 in. we Cooling Cal SP Out -0.35 in. we Fan SP In -0.35 in. we Fan SP Out 0.51 in. we Fin. Filter SP In -0.16 in. we Final Filter SP Out -0.25 in. we Actual Total SP 0.86 in. we Suction SP 0.35 in. we Discharge SP 0.51 in. we External SP 0.67 in. we M 1-5 SuPplv Outlet Summa System/Unit Area Served Outlet Type Size LxW I Design Prelim %Prelim - Final., " °io Final Dif D Airflow Airflow Diff. Airflow Outlet -01 First Floor CD 1 16 1200 1100 92 1100 1 92 Totals: 1 9200 1100 " 92 7104% 92 United Mechanical, Inc. 1"Taking Excellence Personallyl"